Southtowns Record

6-2-26 - Recommendation, Lead Agency, and Site Plan Approvals

Government
Town of Evans
Board
Town Board
Meeting
Jun 2, 2026
Kind
Minutes
Topics
Water, sewer and drainage, Zoning and land use, Budget and taxes, Housing, Parks and recreation, Public safety, Roads and traffic

Original document

Motions and votes

Copied word for word from these minutes. Who moved and seconded, the tally and the roll call appear only where the minutes state them. Picked out automatically: the minutes themselves are the record. All votes for this government.

  1. Before we begin tonight’s meeting, we have some housekeeping we need to take care of; regarding minutes from the April 22nd, 2026, public meeting. Are there any additions, corrections, or questions, or may I please have a motion to accept them as submitted. Motion: Joe Pinter Second: Madeleine Dewey Vote: all in favor

    Carried unanimously, seconded by Madeleine Dewey Vote

    Page 1 of the minutes, motion 1

  2. Chair Szewczyk: Motion carried.

    Carried

    Page 1 of the minutes, motion 2

  3. BE IT FURTHER RESOLVED, that the Planning Board hereby recommends that Town Board (as SEQR Lead Agency) approves the Preliminary Plat and issues a Negative Declaration, thereby concluding that the project will not adversely affect the natural resources of the State and/or health, safety, and welfare of the public and is consistent with social and economic considerations. Roll Call Vote: All in favor… Carried.

    Carried unanimously

    Page 4 of the minutes, motion 3

  4. WHEREAS, the Evans Planning Board before them a Site Plan Review Application prepared by Tredo Engineers on behalf of Melody Meadow Estates (“the Applicant”) for a proposed expansion of the current mobile home park with supporting infrastructure and lot layout for 75 new units located at 8930 Erie Rd., Angola, NY (SBL. 235.00-2-6.1); and WHEREAS, the Planning Board seeks to commence coordinated review of this action and seeks to act as Lead Agency pursuant to the requirements of the State Environmental Quality Review Act (“SEQR”), New York State Environmental Conservation Law, Article 8 and 6 NYCRR Part 617; and WHEREAS, the Planning Board determines that it is the most appropriate agency to…

    Carried unanimously

    Page 5 of the minutes, motion 4 (full wording)

  5. 3. Site Plan – Resolution to determine SEQR declaration and to approve the proposed construction of eight (8) apartment buildings, housing eight (8) units each on a 6± acre portion of a 14± acre parcel located on North Main Street, Angola, NY. Property owners E&K Estates, LLC, SBL# 235.07-4-5. Petitioner: Metzger Civil Engineering, PLLC Background • On September 27, 2017 the Planning Board unanimously approved the site plan for

    Carried unanimously

    Page 5 of the minutes, motion 5; vote on page 6, motion 5

  6. • The Applicant shall address comments provided in the Town Engineer’s review dated May 8, 2026. • The Applicant shall perform a detailed Downstream Sewer Capacity Analysis to be submitted to the Erie County Division of Sewerage Management for approval. • The Applicant must meet all the requirements and obtain all necessary permits of the Erie County Highway Department. • The Applicant must meet all the requirements of the Erie County Water Authority. • All elements of the project will be constructed per the approved Site Plan and in compliance with the Town of Evans Code Enforcement, Planning and Engineering Department’s reviews and comments. • The applicant will c…

    Carried unanimously

    Page 8 of the minutes, motion 6 (full wording)

  7. BE IT FURTHER RESOLVED, final site plan approval and issuance of any building permits from the Town of Evans is conditioned on the successful completion of the following: • The Applicant shall address any outstanding comments provided in the Town Engineer’s review dated May 12, 2026. • The Applicant shall coordinate with NYSDOT to receive all approvals and permits to conduct work on NYS Route 5, including issuance of a Highway Work Permit for the proposed curb cut and roadside drainage. • Per Evans Town Code 70-7, any new businesses occupying the proposed units must first meet with the Director of Planning and Code Enforcement Officer to understand the nature of the business…

    Carried unanimously

    Page 11 of the minutes, motion 7 (full wording)

  8. • The Town will continue working through the Joint Application for Permitting process and receive all necessary approvals from any permitting agencies to perform the work, including the NYS Department of Environmental Conservation, the US Army Corps of Engineers, the NYS Department of State, and the NYS Office of General Services. Roll Call Vote: Roll Call Vote: All in favor… Carried.

    Carried unanimously

    Page 14 of the minutes, motion 8

  9. 11. Impact on Open Space and Recreation The proposed action may result in a loss of recreational opportunities or a † NO ✔ † YES reduction of an open space resource as designated in any adopted

    Carried

    Page 22 of the minutes, motion 10

  10. 11. Impact on Open Space and Recreation The proposed action may result in a loss of recreational opportunities or a † NO ✔ † YES reduction of an open space resource as designated in any adopted

    Carried

    Page 45 of the minutes, motion 11

1 routine motion (minutes, bills, agenda, adjournment…)
  1. Thank you everyone for joining our meeting this evening, whether in-person or remotely. May I please have a motion to adjourn. Motion: Lori Szewczyk Second: Kevin Hassen Roll Call Vote: Roll Call Vote: All in favor.

    Carried unanimously, seconded by Kevin Hassen Roll

    Page 14 of the minutes, motion 9; vote on page 15, motion 9

Text · page 37 of 74

Read the whole document on one page (all 74 pages, each with its own heading)

Outlook

FW: Coordinated Review - Town of Evans; Commercial St subdivision; NYSDOT Additional Comment 2026-49

From dot.sm.r05.SEQR <[email protected]>
Date Thu 4/16/2026 3:33 PM
To  Alexandra Kane <[email protected]>; William Smith <[email protected]>
Cc  Nelson, Todd E. (DOT) <[email protected]>; Schoenfeldt, Alyssa (DOT) <[email protected]>; Ken Zollitsch
  <[email protected]>; Calarco, Carl (DOT) <[email protected]>; Hebert, Kevin P (DOT) <[email protected]>

Alexandra and William,

After reviewing documentation provided by Greenman-Pedersen, Inc. for the Commercial St subdivision, NYSDOT has
the following additional comment:

  Based upon the information provided, a NYSDOT highway work permit is not needed at this time. If any changes are
  made to the site plan and work would be needed in the State right of way, a highway work permit would be required.

Thanks,

Thomas Nieswiadomy
Transportation Analyst Trainee 1
Planning and Program Management

New York State Department of Transportation, Region 5
100 Seneca Street, Buffalo, NY 14203
(716) 847-3580 | [email protected]
www.dot.ny.gov

From: dot.sm.r05.SEQR
Sent: Monday, March 30, 2026 11:20 AM
To: Alexandra Kane <[email protected]>; William Smith <[email protected]>
Cc: Nelson, Todd E. (DOT) <[email protected]>; Schoenfeldt, Alyssa (DOT) <[email protected]>
Subject: RE: Coordinated Review - Town of Evans; Commercial St subdivision; NYSDOT Comments 2026-49

Alexandra and William,

The New York State Department of Transportation (NYSDOT) has reviewed the documentation provided for the
Commercial St subdivision and has the following comments:

  NYSDOT concurs with the Town Board of the Town of Evans for it to act as the Lead Agency
  As an involved agency, NYSDOT is requesting additional information through the SEQR process in order to provide
  comments on the project’s potential impact on the State Highway System
  Site Plan documents (the following should be included on the site plan)
  Existing roadway features including but not limited to drainage and utilities
  Lane/shoulder widths, lane configurations, and pavement markings
  All driveway/access points on the opposite of the roadway from the proposed development’s access
  points and any adjacent to the site with appropriate measurements
  Signs, signal infrastructure, pavement markings, and highway boundaries
  Adjoining parcels to the proposed development

Thanks,

Thomas Nieswiadomy
Transportation Analyst Trainee 1
Planning and Program Management

New York State Department of Transportation, Region 5
100 Seneca Street, Buffalo, NY 14203
(716) 847-3580 | [email protected]