Southtowns Record

6-2-26 - Recommendation, Lead Agency, and Site Plan Approvals

Government
Town of Evans
Board
Town Board
Meeting
Jun 2, 2026
Kind
Minutes
Topics
Water, sewer and drainage, Zoning and land use, Budget and taxes, Housing, Parks and recreation, Public safety, Roads and traffic

Original document

Motions and votes

Copied word for word from these minutes. Who moved and seconded, the tally and the roll call appear only where the minutes state them. Picked out automatically: the minutes themselves are the record. All votes for this government.

  1. Before we begin tonight’s meeting, we have some housekeeping we need to take care of; regarding minutes from the April 22nd, 2026, public meeting. Are there any additions, corrections, or questions, or may I please have a motion to accept them as submitted. Motion: Joe Pinter Second: Madeleine Dewey Vote: all in favor

    Carried unanimously, seconded by Madeleine Dewey Vote

    Page 1 of the minutes, motion 1

  2. Chair Szewczyk: Motion carried.

    Carried

    Page 1 of the minutes, motion 2

  3. BE IT FURTHER RESOLVED, that the Planning Board hereby recommends that Town Board (as SEQR Lead Agency) approves the Preliminary Plat and issues a Negative Declaration, thereby concluding that the project will not adversely affect the natural resources of the State and/or health, safety, and welfare of the public and is consistent with social and economic considerations. Roll Call Vote: All in favor… Carried.

    Carried unanimously

    Page 4 of the minutes, motion 3

  4. WHEREAS, the Evans Planning Board before them a Site Plan Review Application prepared by Tredo Engineers on behalf of Melody Meadow Estates (“the Applicant”) for a proposed expansion of the current mobile home park with supporting infrastructure and lot layout for 75 new units located at 8930 Erie Rd., Angola, NY (SBL. 235.00-2-6.1); and WHEREAS, the Planning Board seeks to commence coordinated review of this action and seeks to act as Lead Agency pursuant to the requirements of the State Environmental Quality Review Act (“SEQR”), New York State Environmental Conservation Law, Article 8 and 6 NYCRR Part 617; and WHEREAS, the Planning Board determines that it is the most appropriate agency to…

    Carried unanimously

    Page 5 of the minutes, motion 4 (full wording)

  5. 3. Site Plan – Resolution to determine SEQR declaration and to approve the proposed construction of eight (8) apartment buildings, housing eight (8) units each on a 6± acre portion of a 14± acre parcel located on North Main Street, Angola, NY. Property owners E&K Estates, LLC, SBL# 235.07-4-5. Petitioner: Metzger Civil Engineering, PLLC Background • On September 27, 2017 the Planning Board unanimously approved the site plan for

    Carried unanimously

    Page 5 of the minutes, motion 5; vote on page 6, motion 5

  6. • The Applicant shall address comments provided in the Town Engineer’s review dated May 8, 2026. • The Applicant shall perform a detailed Downstream Sewer Capacity Analysis to be submitted to the Erie County Division of Sewerage Management for approval. • The Applicant must meet all the requirements and obtain all necessary permits of the Erie County Highway Department. • The Applicant must meet all the requirements of the Erie County Water Authority. • All elements of the project will be constructed per the approved Site Plan and in compliance with the Town of Evans Code Enforcement, Planning and Engineering Department’s reviews and comments. • The applicant will c…

    Carried unanimously

    Page 8 of the minutes, motion 6 (full wording)

  7. BE IT FURTHER RESOLVED, final site plan approval and issuance of any building permits from the Town of Evans is conditioned on the successful completion of the following: • The Applicant shall address any outstanding comments provided in the Town Engineer’s review dated May 12, 2026. • The Applicant shall coordinate with NYSDOT to receive all approvals and permits to conduct work on NYS Route 5, including issuance of a Highway Work Permit for the proposed curb cut and roadside drainage. • Per Evans Town Code 70-7, any new businesses occupying the proposed units must first meet with the Director of Planning and Code Enforcement Officer to understand the nature of the business…

    Carried unanimously

    Page 11 of the minutes, motion 7 (full wording)

  8. • The Town will continue working through the Joint Application for Permitting process and receive all necessary approvals from any permitting agencies to perform the work, including the NYS Department of Environmental Conservation, the US Army Corps of Engineers, the NYS Department of State, and the NYS Office of General Services. Roll Call Vote: Roll Call Vote: All in favor… Carried.

    Carried unanimously

    Page 14 of the minutes, motion 8

  9. 11. Impact on Open Space and Recreation The proposed action may result in a loss of recreational opportunities or a † NO ✔ † YES reduction of an open space resource as designated in any adopted

    Carried

    Page 22 of the minutes, motion 10

  10. 11. Impact on Open Space and Recreation The proposed action may result in a loss of recreational opportunities or a † NO ✔ † YES reduction of an open space resource as designated in any adopted

    Carried

    Page 45 of the minutes, motion 11

1 routine motion (minutes, bills, agenda, adjournment…)
  1. Thank you everyone for joining our meeting this evening, whether in-person or remotely. May I please have a motion to adjourn. Motion: Lori Szewczyk Second: Kevin Hassen Roll Call Vote: Roll Call Vote: All in favor.

    Carried unanimously, seconded by Kevin Hassen Roll

    Page 14 of the minutes, motion 9; vote on page 15, motion 9

Text · page 41 of 74

Read the whole document on one page (all 74 pages, each with its own heading)

l. Other impacts: _______________________________________________________  9  9
  ___________________________________________________________________

4. Impact on groundwater
  The proposed action may result in new or additional use of ground water, or  ✔ NO
  †  † YES
  may have the potential to introduce contaminants to ground water or an aquifer.
  (See Part 1. D.2.a, D.2.c, D.2.d, D.2.p, D.2.q, D.2.t)
  If “Yes”, answer questions a - h. If “No”, move on to Section 5.
  Relevant  No, or  Moderate
  Part I  small  to large
  Question(s)  impact  impact may
  may occur  occur
a. The proposed action may require new water supply wells, or create additional demand  D2c  9  9
  on supplies from existing water supply wells.
b. Water supply demand from the proposed action may exceed safe and sustainable  D2c  9  9
  withdrawal capacity rate of the local supply or aquifer.
  Cite Source: ________________________________________________________

c. The proposed action may allow or result in residential uses in areas without water and  D1a, D2c  9  9
  sewer services.

d. The proposed action may include or require wastewater discharged to groundwater.  D2d, E2l  9  9

e. The proposed action may result in the construction of water supply wells in locations  D2c, E1f,  9  9
  where groundwater is, or is suspected to be, contaminated.  E1g, E1h

f. The proposed action may require the bulk storage of petroleum or chemical products  D2p, E2l  9  9
  over ground water or an aquifer.
g. The proposed action may involve the commercial application of pesticides within 100  E2h, D2q,  9  9
  feet of potable drinking water or irrigation sources.  E2l, D2c

h. Other impacts: ______________________________________________________  9  9
  __________________________________________________________________

5. Impact on Flooding
  The proposed action may result in development on lands subject to flooding.  † NO
  ✔  † YES
  (See Part 1. E.2)
  If “Yes”, answer questions a - g. If “No”, move on to Section 6.
  Relevant  No, or  Moderate
  Part I  small  to large
  Question(s)  impact  impact may
  may occur  occur
a. The proposed action may result in development in a designated floodway.  E2i  9  9

b. The proposed action may result in development within a 100 year floodplain.  E2j  9  9

c. The proposed action may result in development within a 500 year floodplain.  E2k  9  9

d. The proposed action may result in, or require, modification of existing drainage  D2b, D2e  9  9
  patterns.

e. The proposed action may change flood water flows that contribute to flooding.  D2b, E2i,  9  9
  E2j, E2k
f. If there is a dam located on the site of the proposed action, is the dam in need of repair,  E1e  9  9
  or upgrade?
  Page 3 of 10