Ongoing Project Summary
Water Tank Repairs  Water Consolidation Study
• Wohlheuter Tank, Rice Hill & Crestwood  • Study started in 2021
  tanks – all repairs completed!
  • Public presentation of options held May
• Project came in under budget by $115,070  2023
• Town issued a BAN for $1,013,790 on  • Open for discussion if desired
  10/6/22 & renewed it twice so far

Waterline Replacement – CDBG/ARPA  North Boston Park Shelter
• 1450 feet ductile iron water main along  • Shelter tear-down and replacement
  Boston State between Meadow & Ripple  • ARPA funding & CDBG Funding
• Final payment to contractor in 2024 for work  • Completed with final payment in March 2024
  performed after freeze-thaw cycle

Waterline Replacements  Comprehensive Plan Update
• 3 Phase waterline replacement in District 1 &  • Awarded Consultant 5/29/23 to CPL
  District 2 based on ECWA break history  • Funded by Erie County Grant & NYS Grant
• Engineering estimates started at $10.8  • Steering committee formed, surveys &
  million –in May 2023 they were $15.6 million  community outreach conducted, vision &
• Phase 1 covering 10,770 linear foot in the  goals set, action plan created, public
  north end of Boston recently bid out.  meetings held. Currently have a Draft Plan
  Engineering estimates originally slated $3.8
  million for this part. Phase 1 low bid received
  was $2,415,741. Engineering is another  EV Charging
  $355,259. BAN issued for $2,771,000 in
  October 2024.  • 2021 NYSERDA Grant received for $5,000
• Phase 2 & 3 will include repairs to waterline  • 2024 NYSERDA Grant received for $10,000
  & a pump station in District 1 and District 2 in  • 2024 Approved purchase of Blink Dual Port
  the geographical middle & south end of town  Level 2 Fast Charger