Ongoing Project Summary Water Tank Repairs Water Consolidation Study • Wohlheuter Tank, Rice Hill & Crestwood • Study started in 2021 tanks – all repairs completed! • Public presentation of options held May • Project came in under budget by $115,070 2023 • Town issued a BAN for $1,013,790 on • Open for discussion if desired 10/6/22 & renewed it twice so far Waterline Replacement – CDBG/ARPA North Boston Park Shelter • 1450 feet ductile iron water main along • Shelter tear-down and replacement Boston State between Meadow & Ripple • ARPA funding & CDBG Funding • Final payment to contractor in 2024 for work • Completed with final payment in March 2024 performed after freeze-thaw cycle Waterline Replacements Comprehensive Plan Update • 3 Phase waterline replacement in District 1 & • Awarded Consultant 5/29/23 to CPL District 2 based on ECWA break history • Funded by Erie County Grant & NYS Grant • Engineering estimates started at $10.8 • Steering committee formed, surveys & million –in May 2023 they were $15.6 million community outreach conducted, vision & • Phase 1 covering 10,770 linear foot in the goals set, action plan created, public north end of Boston recently bid out. meetings held. Currently have a Draft Plan Engineering estimates originally slated $3.8 million for this part. Phase 1 low bid received was $2,415,741. Engineering is another EV Charging $355,259. BAN issued for $2,771,000 in October 2024. • 2021 NYSERDA Grant received for $5,000 • Phase 2 & 3 will include repairs to waterline • 2024 NYSERDA Grant received for $10,000 & a pump station in District 1 and District 2 in • 2024 Approved purchase of Blink Dual Port the geographical middle & south end of town Level 2 Fast Charger 114