Text · page 162 of 204
Read the whole document on one page (all 204 pages, each with its own heading)
Water Tank Generator Upgrades The Town was contacted in August 2024 by ECWA that the existing emergency generators at the Rice Hill Tank (District 2) and Wohlheuter Tank (District 3) are in need of replacement due to age and availability of repair parts. The estimated project cost is $108,108 for both replacement generators and ECWA has slotted this project for 2025 173