Ongoing Project Summary Watermain replacement Community Room HVAC upgrade • 1450 feet ductile iron water main along • Grant funding through Erie County Boston State between Meadow & Ripple • 90% complete • CDBG & ARPA funding • 95% complete Water Tank Repairs North Boston Park Shelter • Wohleuter Tank started 9/6/22 • Shelter tear‐down and replacement • Rice Hill & Crestwood tanks–start Spring 2023 • ARPA funding • Town issued a Bond Anticipation Note (BAN) • 25% complete for $1,013,790 on 10/6/22 Waterline Replacements Comprehensive Plan Update • 3 Phase waterline replacement in District 1 & • In RFP stage to procure a consultant District 2 based on ECWA break history • Next, we’ll need community input and a • Engineering estimates started at $10.8 million steering committee – in May 2022 they were up to $16.1 million • Phase 1 in Engineering – hoping to be ready to bid in Spring. Engineering estimates originally slated $3.8 million for this part. In 1 year, the phase 1 engineering estimate has EV Charging risen to $5.2 million. Phase 1 covers 10,770 • NYSERDA Grant received for $5,000 linear foot in the north end of Boston • In discussion over the NYSEG Make‐Ready • Phase 2 & 3 will include repairs to waterline Program & a pump station in District 1 and District 2 in the geographical middle & south end of town • Currently looking at options 89