Southtowns Record

TBA01.26.2026packet (full text)

Town of West Seneca Town Board Jan 26, 2026, 6:00 p.m. 301 pages

Page 1

TOWN BOARD AGENDA Meeting # 2026-02 January 26, 2026 The Town Board meeting will be held in the West Seneca Court Room at 6:00 PM. If a member of the public wishes to speak regarding Communications or the Issues of the Public portion of the meeting, they can do so by: 1) appearing in person during those portions of the meeting; 2) during the Facebook live stream by writing "PUBLIC COMMENT" before expressing their point during those portions of the live stream.3) by emailing the Town Board at [email protected] by 3pm of the day of the meeting. Emails are for the Town Board's consideration and are not read aloud during the meeting. SUPERVISOR CALL TO ORDER 1. Pledge of Allegiance 2. Fire Safety Notification 3. Roll Call CONSENT AGENDA 1. Accept agenda as published MINUTES TO BE APPROVED 1. Town Clerk Newton re 2026 Organizational Meeting Minutes of January 12, 2026 2. Town Clerk Newton re Meeting Minutes 2026-01 of January 12, 2026 LEGAL NOTICES 1. Town Clerk Newton re Proofs of Publication and posting of legal notice "OF A PUBLIC HEARING TO HEAR ALL PERSONS INTERESTED IN THE PROPOSED REZONE REQUEST FOR 120 SOUTH AVE, CHANGING ITS CLASSIFICATION FROM C-1&R-50 TO C-2 " in the Town of West Seneca. Publication date was December 25, 2025. PUBLIC COMMENTS NEW BUSINESS 1. PERSONNEL 1. Supervisor Dickson re Creation of part-time Recreation Supervisor Position 2. Supervisor Dickson re Resignation of Recreation Supervisor Lauren Masset 3. Supervisor Dickson re Appointment of Lauren Masset as part-time Recreation Supervisor 4. Chief Cosgrove re Title change for Emily Floreno to full-time Public Safety Dispatcher 5. Chief Cosgrove re Status change of part-time Public Safety Dispatcher David Velasquez 6. Director of Senior Services re Status change for part-time Clerk Typist Janet Kropczynski 7. Director of Senior Services re Appointment of Scott Cooke as part-time permanent Van Driver 1 Page 1 of 301

Page 2

2. FOR DISCUSSION 1. Supervisor Dickson re Discussion regarding public comment periods and open meetings issues 2. Town Engineer re Grant funding update and planned grant strategy 3. PRESENTATIONS 1. Supervisor Dickson re Farmer Pirates composting program 4. COMMUNICATIONS TO BE VOTED ON 1. Supervisor Dickson re Renewal of Recycling Contract 2. Supervisor Dickson re Selection of Harris Beach Murtha as Bond Counsel 3. Supervisor Dickson re Selection of Qualified Engineering Companies for Engineering Services for Water and Wastewater Projects 4. Councilmember Breidenstein re Addition of Standing Agenda Item 5. Councilmember Robertson re Reappointment of Ben Szablewski to the Environmental Commission 6. Councilmember Robertson re Appointment of Gina Geller to the Environmental Commission 7. Town Clerk Newton re Name change of Official Newspaper 8. Highway Superintendent Adams re Purchase of Nautilus HD Diesel Floor Scrubber 9. Chief Cosgrove re Purchase of ammunition 5. WARRANT 1. Director of Finance re Approval of Warrant 6. REPORTS FOR FILING 1. Town Engineer re Capital Project Report January 2026 ISSUES OF THE PUBLIC COMMUNICATIONS BY BOARD MEMBERS AND DEPARTMENT HEADS EXECUTIVE SESSION 1. Supervisor Dickson re Executive session to interview candidates for deputy town attorney/prosecutor and to discuss current litigation, 1000 Queens Grant LLC v. Town of West Seneca, Town of West Seneca Town Board et al. ADJOURNMENT 2 Page 2 of 301

Page 3

TO: Honorable Town Board FROM: Kate Newton, Town Clerk DATE: January 26, 2026 SUBJECT: Town Clerk Newton re 2026 Organizational Meeting Minutes of January 12, 2026 Requested Action: Kindly approve the 2026 Organizational Meeting Minutes of January 12, 2026 RESOLUTION: ATTACHMENTS: 1. 2026 org min (1) Page 3 of 301

Page 4

WEST SENECA COURT ROOM DRAFT TOWN BOARD PROCEEDINGS 1250 Union Road 2026 Organizational Meeting West Seneca, NY 14224 January 12, 2026 ROLL CALL: Present: Supervisor Gary Dickson Councilmember Robert Breidenstein Councilmember Jeffrey Piekarec Councilmember Scott Robertson Councilmember Mary Sherman Absent: SUPERVISOR CALL TO ORDER 1. Pledge of Allegiance 2. Fire Safety Notification 3. Roll Call NEW BUSINESS 1. COMMUNICATIONS TO BE VOTED ON 1. Organizational Meeting agenda items 1. Motion by Supervisor Dickson, seconded by Councilmember Robertson, that Chris G. Trapp be appointed as Town Attorney for a two-year term as set by Town Law Section 24 at an annual salary of $77,063 effective January 1, 2026. Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 2. Motion by Supervisor Dickson, seconded by Councilmember Robertson, that the elected Town Officials are salaried as follows: Supervisor Gary Dickson $75,300.00 Town Clerk Kate Newton $74,984.00 Highway Supt. Brian Adams 98,792.00 Council Members (4) Jeffrey Piekarec $21,630.00 Scott Robertson $21,630.00 Mary Sherman $21,630.00 Robert Breidenstein $21,630.00 Town Justices (2) Jon Minear $47,361.00 Paul Michalek $47,361.00 Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 3. Motion by Supervisor Dickson, seconded by Councilmember Robertson, that Joseph G. Trapp be appointed as Town Prosecutor at an annual salary of $10,300 effective January 1, 2026. Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 4. Motion by Supervisor Dickson, seconded by Councilmember Robertson, that Joseph G. Trapp be 1 Page 4 of 301

Page 5

WEST SENECA COURT ROOM DRAFT TOWN BOARD PROCEEDINGS 1250 Union Road 2026 Organizational Meeting West Seneca, NY 14224 January 12, 2026 appointed Deputy Town Attorney at an annual salary of $5,000 effective January 1, 2026, and act as counsel to the Zoning Board of Appeals. Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 5. Motion by Supervisor Dickson, seconded by Councilmember Robertson, that Shauna Dittmar be appointed American with Disabilities Officer and Harassment Compliance Officer for the Town of West Seneca. On the question, Councilmember Sherman asked if the position was an appointed term and was it compensated. Supervisor Dickson stated the position is appointed annually and there is no compensation. Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 6. Motion by Supervisor Dickson, seconded by Councilmember Robertson, reaffirming that Mark Beehler be appointed to the Planning Board effective January 1, 2026, for a seven-year term ending December 31, 2032. Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 7. Motion by Supervisor Dickson, seconded by Councilmember Robertson, reaffirming that William Wise be appointed to the Planning Board effective January 1, 2026, for a five-year term ending December 31, 2030. Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 8. Motion by Supervisor Dickson, seconded by Councilmember Robertson, reaffirming that Stephen Stachowski be appointed to the Zoning Board of Appeals effective January 1, 2026, for a five-year term ending December 31, 2030. Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 9. Motion by Supervisor Dickson, seconded by Councilmember Robertson, reaffirming that Stephen Stachowski be appointed as Zoning Board of Appeals Chair for a one-year term effective January 1, 2026. Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 10. Motion by Supervisor Dickson, seconded by Councilmember Robertson, that the Highway Superintendent announces that Nicholas Gugliuzza is appointed Deputy Highway Superintendent effective January 1, 2026, at an annual salary of $6,700 as set in the 2026 budget and that he act in the capacity of the Highway Superintendent in the event of his absence for any reason, e.g. vacation, illness, etc. Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 2 Page 5 of 301

Page 6

WEST SENECA COURT ROOM DRAFT TOWN BOARD PROCEEDINGS 1250 Union Road 2026 Organizational Meeting West Seneca, NY 14224 January 12, 2026 11. Motion by Supervisor Dickson, seconded by Councilmember Robertson, that the Chief of Police announces that Captain James Unger has been selected as Emergency Management Liaison at an annual stipend of $6,000 pursuant to the PBA contract. Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 12. Motion by Supervisor Dickson, seconded by Councilmember Piekarec, that the Town Clerk announces that Molly Martin is appointed Deputy Clerk effective January 1, 2026, at an annual stipend of $2,750. Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 13. Motion by Supervisor Dickson, seconded by Councilmember Piekarec, that Pam Neal is appointed 2nd Deputy Clerk effective January 1, 2026, at an annual stipend of $500. Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 14. Motion by Supervisor Dickson, seconded by Councilmember Piekarec, that Kate Newton be appointed Registrar of Vital Statistics, at an annual salary of $4,500 effective January 1, 2026, all fees collected to go to the Town General Fund. Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 15. Motion by Supervisor Dickson, seconded by Councilmember Piekarec, on the recommendation of the Town Clerk, that Molly Martin be appointed Deputy Receiver of Taxes at an annual salary of $2,000 effective January 1, 2026. Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 16. Motion by Supervisor Dickson, seconded by Councilmember Piekarec, on the recommendation of the Town Clerk, that Molly Martin be appointed Deputy Registrar of Vital Statistics at an annual salary of $1,800 effective January 1, 2026. Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 17. Motion by Supervisor Dickson, seconded by Councilmember Piekarec, on the recommendation of the Town Clerk, that Pam Neal be appointed Sub-Registrar of Vital Statistics at an annual salary of $700 effective January 1, 2026. Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 18. Motion by Supervisor Dickson, seconded by Councilmember Breidenstein, that Tammie Maurino be appointed as Secretary to the Planning Board at an annual salary of $4,650, effective January 1, 2026. On the question, Councilmember Robertson requested that a current revision of the chart of roles and responsibilities for the secretary positions be provided. Supervisor Dickson acknowledged the 3 Page 6 of 301

Page 7

WEST SENECA COURT ROOM DRAFT TOWN BOARD PROCEEDINGS 1250 Union Road 2026 Organizational Meeting West Seneca, NY 14224 January 12, 2026 request and confirmed that it will be provided. Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 19. Motion by Supervisor Dickson, seconded by Councilmember Breidenstein, that Teressa Stacey be appointed as Secretary to the Zoning Board of Appeals at an annual salary of $4,650, effective January 1, 2026. Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 20. Motion by Supervisor Dickson, seconded by Councilmember Breidenstein, that Matthew Fincel be appointed as Secretary to the Ethics Board, at an hourly rate of $16.50 per hour effective January 1, 2026. Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 21. Motion by Supervisor Dickson, seconded by Councilmember Breidenstein, that Matthew Fincel be appointed as Secretary to the Historical Preservation Commission at an hourly rate of $16.50 per hour effective January 1, 2026. Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 22. Motion by Supervisor Dickson, seconded by Councilmember Breidenstein, that Matthew Fincel be appointed as Secretary to the Environmental Commission at an hourly rate of $16.50 per hour effective January 1, 2026. Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 23. Motion by Supervisor Dickson, seconded by Councilmember Breidenstein, that Matthew Fincel be appointed as Secretary to the Youth and Recreation Commission at an hourly rate of $16.50 per hour effective January 1, 2026. Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 24. Motion by Supervisor Dickson, seconded by Councilmember Sherman, that Brian Adams be appointed as Dog Control Officer at an annual stipend of $7,000 effective January 1, 2026. Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 25. Motion by Supervisor Dickson, seconded by Councilmember Sherman, that Thomas Murtha be appointed to a one-year term as Bingo Inspector for the Town of West Seneca at an annual salary of $1,200, with said terms commencing January 1, 2026, and expiring on December 31, 2026. Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 26. Motion by Supervisor Dickson, seconded by Councilmember Sherman, that Eric Conley be appointed Emergency Manager at a salary of $28.00 per hour, per incident, effective January 1, 4 Page 7 of 301

Page 8

WEST SENECA COURT ROOM DRAFT TOWN BOARD PROCEEDINGS 1250 Union Road 2026 Organizational Meeting West Seneca, NY 14224 January 12, 2026 2026. Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 27. Motion by Supervisor Dickson, seconded by Councilmember Sherman, that Daniel McCartan, John Monson, Joann Sands be appointed Deputy Emergency Managers at a salary of $23 per hour, per incident, effective January 1, 2026. Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 28. Motion by Supervisor Dickson, seconded by Councilmember Sherman, that Mark Koller be appointed as the Town's Fair Housing Officer & Affirmative Action Officer effective January 1, 2026, at an annual stipend of $1,200 and further direct Mr. Koller to submit a yearly report documenting matters handled. Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 29. Motion by Supervisor Dickson, seconded by Councilmember Sherman, as recommended by the West Seneca Historical Society and Museum Board of Directors, that James Pace be reappointed as Town Historian with an annual stipend of $4,500. Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 30. Motion by Supervisor Dickson, seconded by Councilmember Sherman, on the recommendation of the Town Justices, that Katie Almeida be appointed Administrative Clerk for the Courts effective January 1, 2026, with an annual stipend of $6,000. Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 31. Motion by Supervisor Dickson, seconded by Councilmember Breidenstein, that Clark, Patterson and Lee be hired as the provider of Engineering Services to the Town at a cost not to exceed $140,250 per year to be paid in a purchase order format with said purchase order format being written on an hourly unit price basis for each service provided and a written quotation requested for hourly services by the pay scale and incorporated into the purchase order; and the Supervisor is hereby authorized to complete and execute a professional services agreement with said firm for engineering services not to extend beyond the year 2026. On the question, Councilmember Breidenstein requested that the engineering services be put out to bid during fiscal year 2026 to be used for 2027 budgeting purposes. Supervisor Dickson acknowledged and confirmed this request. Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 32. Motion by Supervisor Dickson, seconded by Councilmember Sherman, that Steven DiSalvo and Angel Bustamante be appointed to the Board of Plumbing Examiners effective January 1, 2026, at an annual stipend of $500 each. 5 Page 8 of 301

Page 9

WEST SENECA COURT ROOM DRAFT TOWN BOARD PROCEEDINGS 1250 Union Road 2026 Organizational Meeting West Seneca, NY 14224 January 12, 2026 Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 33. Motion by Supervisor Dickson, seconded by Councilmember Sherman, that Ed Simoncelli and Dennis Kremblas be appointed to the Board of Electrical Examiners effective January 1, 2026. Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 34. Motion by Supervisor Dickson, seconded by Councilmember Sherman, that Brittany Hernon, Haris Ismail, and Charles Tuberdyke (as youth member) be appointed/reappointed to the Environmental Commission for two-year terms ending December 31, 2027. Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 35. Motion by Supervisor Dickson, seconded by Councilmember Sherman, that Lindsey Burgmaster appointed to the Library Board for a five-year term ending December 31, 2030. Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 36. Motion by Supervisor Dickson, seconded by Councilmember Sherman, that Fran D’Amico be re- appointed to the Historical Preservation Commission for a three-year term ending December 31, 2028. Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 37. Motion by Supervisor Dickson, seconded by Councilmember Sherman, that in keeping with the Ethics Code amendment that was adopted on June 23, 2025, which instituted five-year terms, one expiring every year, the following are appointed/reappointed to the Ethics Board. Also, in accordance with the code, which requires that no more than three members be part of one political party, three members are registered Democrats and two are registered Republicans. a. Theresa Funk – reappointment, term ends December 31, 2026 b. Kayla Leonard – reappointment, term ends December 31, 2027 c. Anna Parkes – reappointment, term ends December 31, 2028 d. Braedan Gillman – appointment – term ends December 31, 2029 e. Maggie Mackert – appointment, term ends December 31, 2030 Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 38. Motion by Supervisor Dickson, seconded by Councilmember Sherman, that the annual salaries of the Zoning Board of Appeals (ZBA) and Planning Board be set at $6,300 for the Chairman of each Board, and $4,350 each for the other members of each Board effective January 1, 2026, noting that members of each board will be paid one-twelfth of the annual salary, with any absences to be paid at the discretion of the Chairman. Members of the Planning Board and ZBA who are absent from three consecutive board meetings or greater than 30% of the total number of meetings in any calendar year may be removed by the Town Board after notice and a public hearing. Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 6 Page 9 of 301

Page 10

WEST SENECA COURT ROOM DRAFT TOWN BOARD PROCEEDINGS 1250 Union Road 2026 Organizational Meeting West Seneca, NY 14224 January 12, 2026 39. Motion by Supervisor Dickson, seconded by Councilmember Sherman, that Michael Shea of West Seneca, New York be appointed Civil Officer of the Town of West Seneca effective January 1, 2026, for the purpose of service of process, etc. without remuneration from the Town. Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 40. Motion by Supervisor Dickson, seconded by Councilmember Sherman, that Timothy Hourihan be reappointed to the Board of Assessment Review for a 5-year term effective January 1, 2026, for a term expiring September 30, 2030. Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 41. Motion by Supervisor Dickson, seconded by Councilmember Sherman, that the members of the Board of Assessment Review be subject to the call of the Assessor, at an annual stipend of $500 each and the Chairman of the Board of Assessment Review at an annual stipend of $750, effective January 1, 2026. Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 42. Motion by __________, seconded by __________, that _____________ be retained as bond counsel to the Town of West Seneca for all financing matters. Services will be performed at the fees and charges as described in the ___________ bond counsel engagement agreement, and the Supervisor is hereby authorized to complete and execute a retainer agreement with said firm for all financing matters for the Town of West Seneca. Supervisor Dickson stated Item No. 42 will be voted on at the January 26, 2026, meeting. 43. Motion by Supervisor Dickson, seconded by Councilmember Piekarec, to authorize the Supervisor to sign the grant consulting agreement with Rotella Grant Management in the amount of $30,000 a year in equal monthly installments effective January 1, 2026, through December 31, 2026. Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 44. Motion by Supervisor Dickson, seconded by Councilmember Piekarec, that the following Officials and Employees not represented by the Collective Bargaining Agreement recognized by the Town of West Seneca are hereby appointed to the following positions with salaries effective January 1, 2026: Brian Cosgrove - $164,313.00 - Chief of Police William Pelow - $145,419.00 - Assistant Chief of Police Teressa Stacey - $65,752.69 - Clerk to the Town Justices Kathryn Reagan - $52,335.07 - Clerk to the Town Justices Amelia Greenan - $81,550.00 - Deputy Town Supervisor Erik Finbar - $136,700.00 (shared with Town of Lancaster) - Town Assessor Shauna Dittmar - $83,000.00 - Municipal Director of Human Resources Carly Pappas - $44,902.90 - Secretary to the Highway Superintendent 7 Page 10 of 301

Page 11

WEST SENECA COURT ROOM DRAFT TOWN BOARD PROCEEDINGS 1250 Union Road 2026 Organizational Meeting West Seneca, NY 14224 January 12, 2026 Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 45. Motion by Supervisor Dickson, seconded by Councilmember Sherman, that the Town funds be deposited in the West Seneca Offices of the following banks, effective January 1, 2026: M&T Trust Co. - Operating, Trust & Agency, Payroll, Workers Compensation, P & A, General Investment, Reserves Account. NBT Bank - Operating, Trust & Agency J.P. Morgan Chase - Operating, Capital Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 46. Motion by Supervisor Dickson, seconded by Councilmember Sherman, that the Town Board does hereby authorize all funds of the Construction and Improvement Account to be maintained by a consolidated bank account, but that the Town continues to maintain a separate Improvement Account at all times, as recommended by the State Auditors. Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 47. Motion by Supervisor Dickson, seconded by Councilmember Sherman, that the Town Board approves the blanket purchase order for utilities for the 2026 fiscal year: Telephone: $102,790 - Spectrum, Verizon Wireless, Verizon Fios Electricity: $807,016 - NYSEG, National Grid Gas: $113,149 - National Fuel Water: $171,000 - Erie County Water Authority Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 48. Motion by Supervisor Dickson, seconded by Councilmember Sherman, that the Town Board of the Town of West Seneca, pursuant to §25 of the Town Law and §11(2) of the Public Officers Law, hereby approves the execution of a public employee's blanket bond , covering the Supervisor, Deputy Supervisor, Town Board, Town Clerk, Receiver of Taxes and Assessments, Collector, Superintendent of Highways, Director of Finance and two Town Justices for the sum of $100,000 and be it further resolved that the undertaking shall be effective within thirty (30) days after commencement of the term on January 1, 2026. Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 49. Motion by Supervisor Dickson, seconded by Councilmember Sherman, that the West Seneca Bee be designated as the Official Newspaper, and that the Buffalo News be used at the discretion of the Town Clerk. Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 50. Motion by Supervisor Dickson, seconded by Councilmember Sherman, that the following titles of Town Department Heads, elected or appointed officials, and certain other full-time employees not 8 Page 11 of 301

Page 12

WEST SENECA COURT ROOM DRAFT TOWN BOARD PROCEEDINGS 1250 Union Road 2026 Organizational Meeting West Seneca, NY 14224 January 12, 2026 covered by contractual provisions between the Town and either the Blue or White Collar CSEA Units or the West Seneca PBA be granted extended benefits, including health and welfare fund related benefits, in accordance with the CSEA White Collar Contract or the equivalent thereof, with the exception of the Chief of Police and Assistant Chief of Police, who are granted said benefits in accordance with the West Seneca PBA Contract or the equivalent thereof. Those individuals to whom this is applicable shall include the Supervisor, Town Clerk, Highway Superintendent, Assessor, Deputy Supervisor, HR Director, Secretary to the Highway Superintendent, two full-time Court Clerks to the Town Justices, Chief of Police, and Assistant Chief of Police. In addition to the health insurance benefits set forth in the CSEA White Collar Contract or West Seneca PBA, said elected or appointed officials shall also be entitled to the Blue Cross Blue Shield Gold Plan. The extended benefits granted to elected or appointed officials shall not include contractual wage or salary increases or other monetary allowances, including longevity, except for the Town Court Clerks to the Town Justices who will mimic the salary and longevity increases in Group 5 of the White-Collar Union Contract. Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 51. Motion by Supervisor Dickson, seconded by Councilmember Sherman, that pursuant to §119(1) of the Town Law, the Town Clerk be authorized to draw warrants to pay any claims for fixed salaries, for principal and interest on bonded or refunded debt or other loans on the legal or stated compensation of Officers or Employees of the Town or accounts becoming due upon lawful contracts for periods not exceeding one (1) year from January 1, 2026. Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 52. Motion by Supervisor Dickson, seconded by Councilmember Sherman, that the Town continue its Procurement Policy in the manner set forth in the Procurement and Purchasing Policy adopted by the Town in 2022 and as may be amended. Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 53. Motion by Supervisor Dickson, seconded by Councilmember Sherman, that all vouchers for claims upon the Town shall be acceptable for audit, in the manner set forth in the Procurement and Purchasing Policy adopted by the Town in 2022. Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 54. Motion by Supervisor Dickson, seconded by Councilmember Sherman, that the mileage rate allowed to public officials and Town employees be the same as the Federal Internal Revenue regulations and in the manner set forth in the policy adopted by resolution of the Town Board. Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 55. Motion by Supervisor Dickson, seconded by Councilmember Sherman, that Petty Cash Funds/Change Funds be created as follows: Accounting and Financial Consult. Services: $250 9 Page 12 of 301

Page 13

WEST SENECA COURT ROOM DRAFT TOWN BOARD PROCEEDINGS 1250 Union Road 2026 Organizational Meeting West Seneca, NY 14224 January 12, 2026 Town Clerk: $350 Receiver of Taxes: $500 Highway Superintendent: $250 Police Confidential Investigation: $2,500 Police Department: $500 Recreation: $300 Justice Court: $250 Senior Citizens: $200 Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 56. Motion by Supervisor Dickson, seconded by Councilmember Sherman, that the Town Hall offices be open 9:00 A.M. to 5:00 P.M. five days per week unless otherwise directed by the Town Board or the Supervisor. Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 57. Motion by Supervisor Dickson, seconded by Councilmember Sherman, that the Town Supervisor be authorized to sign checks for the West Seneca Library, pursuant to §259 of the Education Law. Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 58. Motion by Supervisor Dickson, seconded by Councilmember Sherman, that the Supervisor and/or Director of Finance to the Town be authorized to temporarily invest Town monies not needed for immediate expenditure. And further, the Town Board adopts and authorizes the Supervisor and/or Director of Finance to the Town to comply with the Investment Policy and Guidelines as originally adopted by the Town Board on February 20, 2020. Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 59. Motion by Supervisor Dickson, seconded by Councilmember Sherman, that the following list of banks be added to the Town Investment Policy for use at the discretion of the Supervisor and/or the Director of Finance: Key Bank of W.N.Y., N.A., Bank of America, Citizens Bank, M & T Bank, J.P. Morgan Chase, NBT Bank, New York Cooperative Liquid Assets Securities System (NYCLASS). Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 60. Motion by Supervisor Dickson, seconded by Councilmember Breidenstein, that to the extent possible, regular meetings of the Town Board, will be held in Courtroom located in the West Seneca Town Hall on the second and fourth Mondays of every month, Town Court Room, 1250 Union Road, 2nd floor, except as noted: Monday, January 12, 2026 Monday, January 26, 2026 Monday, February 9, 2026 Monday, February 23, 2026 Monday, March 9, 2026 10 Page 13 of 301

Page 14

WEST SENECA COURT ROOM DRAFT TOWN BOARD PROCEEDINGS 1250 Union Road 2026 Organizational Meeting West Seneca, NY 14224 January 12, 2026 Monday, March 23, 2026 Monday, April 13, 2026 Monday, April 27, 2026 Monday, May 11, 2026 Thursday, May 28, 2026, Moved due to Memorial Day Monday, June 8, 2026 Monday, June 22, 2026 Monday, July 13, 2026 Monday, July 27, 2026 Monday, August 10, 2026 Monday, August 24, 2026 Monday, September 14, 2026 Monday, September 28, 2026 Wednesday, September 30, 2026, Budget Work Session in the CCL Thursday, October 15, 2026, Moved due to Columbus Day Monday, October 26, 2026 TBD Public Hearing for 2026 budget Monday, November 9, 2026 Monday, November 23, 2026 Monday, December 14, 2026 Monday, December 28, 2026 Special meetings shall be held at the call of the Supervisor or of the Town Clerk upon write request of at least two members of the Town Board. Notice, in writing, stating the time, place and purpose of the special meeting shall be served personally upon each member of the Board at least 48 hours before the date fixed for holding the meeting. Only business specified in the notice thereof may be transacted at a special meeting. In accordance with the Open Meeting Law, the public and news media shall be given reasonable notice of any special meeting and all further executive sessions shall be public except for specific purposes allowed by law. Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 61. Motion by Supervisor Dickson, seconded by Councilmember Sherman, that the Town Board subject to the provisions of Section 284 of the Highway Law, enter into an agreement with the Superintendent of Highways that moneys levied and collected in the Town for the repair and improvement of highways and received from the State for State Aid for the repair and improvement of highways shall be expended pursuant the terms set forth therein. Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 62. Motion by Supervisor Dickson, seconded by Councilmember Sherman, that no Town vehicles be used for personal use, and all Town vehicles including the equipment in the Highway Department, be identified by decals with the exception of the Police Department vehicles used for detective work and the Police Chief's car and direct the Supervisor to ensure that decals are placed on all cars except those mentioned. Town vehicles for take home use shall be provided to the Chief of Police, Highway Superintendent, and Police Officer assigned as K-9 Officer. Town vehicles shall not leave the Town limits except for use on official Town business. 11 Page 14 of 301

Page 15

WEST SENECA COURT ROOM DRAFT TOWN BOARD PROCEEDINGS 1250 Union Road 2026 Organizational Meeting West Seneca, NY 14224 January 12, 2026 Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 63. Motion by Supervisor Dickson, seconded by Councilmember Sherman, that no Town equipment may be used for personal use. Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 64. Motion by Supervisor Dickson, seconded by Councilmember Sherman, that the Town Board sets the following rules relating to use of Highway personnel and equipment for emergencies: a. West Seneca Highway Department is authorized to provide for emergency assistance to the local school systems, fire districts and other municipalities, if personnel or equipment are requested; and b. An emergency must exist and have been declared in the Erie County municipality requesting assistance; and c. Highway Superintendent will promptly notify the Supervisor of such action. A written summary will be immediately given to the Town Clerk and Town Attorney outlining the details of the emergency service, including the Emergency Operations Center; and d. Town equipment will be operated by West Seneca employees in the majority of work situations. However, slow-moving vehicles (roller), stationary equipment (air compressor or pumps) and light tools may be loaned to another Highway Department to be used and operated by their employees and fees may be assigned to the Municipality that receives long term aid; and e. West Seneca Highway Superintendent is authorized to request aid from other towns in Erie County. Non-West Seneca personnel and equipment will work under the supervision of the West Seneca Highway Superintendent. Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 65. Department/Committee Liaison Assignments Supervisor Dickson AIS IT Services Assessor's Office Code Enforcement/Buildings Department Engineering Department Erie County Sewer District 1 Board of Managers Finance Department Human Resources Insurance Legal Department Rotella Grant Management Councilmember Breidenstein Ethics Board Planning Board Police Department West Seneca Central School District 12 Page 15 of 301

Page 16

WEST SENECA COURT ROOM DRAFT TOWN BOARD PROCEEDINGS 1250 Union Road 2026 Organizational Meeting West Seneca, NY 14224 January 12, 2026 Labor Management Healthcare Fund Councilmember Piekarec Fire Districts Internal Audit Committee Senior Advisory Committee Senior Center Town Courts Zoning Board of Appeals Councilmember Robertson Buildings & Grounds Department Highway Department Town Clerk Library Advisory Board Environmental Commission Historical Preservation Commission Councilmember Sherman Environmental Commission Erie County Sewer District 1 Board of Managers Internal Audit Committee Northeast South Towns (NEST) Solid Waste Management Board Recreation Commission Recreation Department ADJOURNMENT 66. Motion by Supervisor Dickson, seconded by Councilmember Robertson, to adjourn the 2026 Organizational Meeting at 6:09 P.M. Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 13 Page 16 of 301

Page 17

TO: Honorable Town Board FROM: Kate Newton, Town Clerk DATE: January 26, 2026 SUBJECT: Town Clerk Newton re Meeting Minutes 2026-01 of January 12, 2026 Requested Action: Kindly approve Meeting Minutes 2026-01 of January 12, 2026 RESOLUTION: ATTACHMENTS: 1. tbm01.12.2026 (2) Page 17 of 301

Page 18

WEST SENECA COURT ROOM DRAFT TOWN BOARD 1250 Union Road PROCEEDINGS West Seneca, NY 14224 Meeting # 2026-01 January 12, 2026 ROLL CALL: Present: Supervisor Gary Dickson Councilmember Robert Breidenstein Councilmember Jeffrey Piekarec Councilmember Scott Robertson Councilmember Mary Sherman Absent: SUPERVISOR CALL TO ORDER 1. Pledge of Allegiance 2. Fire Safety Notification 3. Roll Call The Town Board Meeting began at 6:11 P.M. CONSENT AGENDA 1. Accept agenda as published Motion by Supervisor Dickson, seconded by Councilmember Robertson, to accept the agenda as published with the following change: Personnel Item Nos. 3, 4 and 5 are moved to the beginning of the meeting. Ayes: 5 Noes: 0 Abstain: 0 Motion Carried MINUTES TO BE APPROVED 1. Town Clerk Newton re Meeting Minutes 2025-24 of December 22, 2025 Motion by Supervisor Dickson, seconded by Councilmember Robertson, to approve Meeting Minutes 2025-24 of December 22, 2025. Ayes: 5 Noes: 0 Abstain: 0 Motion Carried PUBLIC COMMENTS The following comments and questions were received: James Raymond, 81 Cedar Ridge Drive: - Shared his personal history and expressed his interest in participating in the town - Applied to the Recreation Commission, and the Zoning and Planning Boards but was not offered an interview - Personal interest and concerns regarding future development's impact on infrastructure, water pressure, traffic, and neighborhood quality of life - Referred to the recent appointments to the previously mentioned committee and boards and expressed concerns about political control and public trust - Referred to the recent Town Prosecutor appointment that was made despite laws that prohibit law partners serving together in the same court and in his opinion, this is a failure of judgment, governance, and respect for the rules meant to protect public trust - In his opinion, Town Board members should provide explanations when recusing themselves from a vote 1 Page 18 of 301

Page 19

WEST SENECA COURT ROOM DRAFT TOWN BOARD 1250 Union Road PROCEEDINGS West Seneca, NY 14224 Meeting # 2026-01 January 12, 2026 Jacqueline Balikowski, Highland Avenue: - Referred to the For Discussion item and asked why there is not an attachment - Suggested the public have an opportunity to make comments after the Town Board Members and Department Heads portion Jeff Quain, Davis Road: - Expressed concern about the appointment of the Town Prosecutor and what process was followed - Inquired as to who runs the town's Facebook page and noted turning off comments limits public comments and violates First Amendment rights - Supervisor Dickson stated Mr. Quain is not correct and one cannot discriminate, and there is no obligation for the town to give a public forum on every post. A public comment from Facebook asked why notification of the meeting agenda is not given when individuals have enrolled. Supervisor Dickson referred the inquiry to Town Clerk Newton who stated she was working with Deputy Supervisor Greenan regarding this prior to Ms. Greenan's leave. NEW BUSINESS 1. FOR DISCUSSION 1. Councilmember Breidenstein re Revision to Town Board Meeting Agenda format Councilmember Breidenstein apologized for the lack of supporting information as he attempted to include his proposal with the agenda item. Councilmember Breidenstein commented on the public's expectation that the Town Board provide answers to their comments and questions, and proposed that two standing items be added to the agenda: Response to Public Comment and Department Head Responses. Councilmember Piekarec stated in his opinion, the current process is adequate and formalizing the proposed process is not necessary. Supervisor Dickson stated the town has the most liberal policy and allows far more public comments than the vast majority of towns. 2. PERSONNEL 1. Highway Superintendent Adams re Retirement of Secretary to the Highway Superintendent Dina Weixlmann Motion by Supervisor Dickson, seconded by Councilmember Robertson, to accept the retirement of Dina Weixlmann as the Secretary to the Highway Superintendent effective January 10, 2026. Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 2. Highway Superintendent Adams re Appointment of Carly Pappas as Secretary to the Highway Superintendent Motion by Supervisor Dickson, seconded by Councilmember Robertson, to appoint Carly Pappas as full time Secretary to the Highway Superintendent Group 3, Step 1 of the White Collar contract as of January 10, 2026, at an annual salary of $44,902.90 to be paid from the account line 001-5010-0137- 0000-0000. 2 Page 19 of 301

Page 20

WEST SENECA COURT ROOM DRAFT TOWN BOARD 1250 Union Road PROCEEDINGS West Seneca, NY 14224 Meeting # 2026-01 January 12, 2026 Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 3. Highway Superintendent Adams re Retirement of Highway Heavy Equipment Operator Brian Cummins Motion by Supervisor Dickson, seconded by Councilmember Robertson, to accept the retirement of Brian Cummins from his position as a Heavy Motor Equipment Operator after 39 years of service effective January 27, 2026, noting his last day of work will be January 26, 2026. Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 4. Chief Cosgrove re Appointment of Evin Ksiezarczyk as Police Officer Motion by Supervisor Dickson, seconded by Councilmember Breidenstein, to appoint Evin Ksiezarczyk as Police Officer at the training rate of $29.80 per hour with an effective start date of January 13, 2026, noting this appointment is contingent upon successful completion of pre- employment requirements. Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 5. Chief Cosgrove re Appointment of Wilford Whitney III as Police Officer Motion by Supervisor Dickson, seconded by Councilmember Breidenstein, to appoint Wilford Whitney III as Police Officer at the training rate of $29.80 per hour with an effective start date of January 13, 2026, noting this appointment is contingent upon successful completion of pre-employment requirements. Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 3. ANNOUNCEMENTS 1. Councilmember Breidenstein re Appointment of David Cox to the Youth and Recreation Commission Councilmember Breidenstein re-appointed David Cox to the Youth and Recreation Commission for a 3-year term effective January 1, 2026, and expiring December 31, 2028. 2. Councilmember Breidenstein re Appointment Georgi Ann Busse to Senior Advisory Board Councilmember Breidenstein re-appointed Georgi Ann Busse to the Senior Services Advisory Board for a 4-year term effective January 1, 2026, and expiring December 31, 2029. 3. Councilmember Sherman re Appointment of Maura Lillis Blonski to the Youth and Recreation Commission Councilmember Sherman re-appointed Maura Lillis Blonski to the Youth and Recreation Commission for a 3-year term effective January 1, 2026, and expiring December 31, 2028. 3 Page 20 of 301

Page 21

WEST SENECA COURT ROOM DRAFT TOWN BOARD 1250 Union Road PROCEEDINGS West Seneca, NY 14224 Meeting # 2026-01 January 12, 2026 4. Councilmember Sherman re Appointment of Nancy Miloff to the Youth and Recreation Commission Correction: This appointment is to the Senior Services Advisory Board Councilmember Sherman appointed Nancy Miloff to the Senior Services Advisory Board for a 4-year term effective January 1, 2026, and expiring December 31, 2029. 4. COMMUNICATIONS TO BE VOTED ON 1. Supervisor Dickson re Excess Workers Compensation renewal Kathleen Rapasadi of Tompkins Insurance stated the premium increased by approximately 5.5% and the town is receiving a 2-year rate block. Ms. Rapasadi stated two carriers declined to provide quotations. Councilmember Piekarec asked why the responses were not provided for the agenda packet. Ms. Rapasadi stated she did not have them available when the original was forwarded but did provide the responses directly to Supervisor Dickson. Councilmember Sherman referred to the Renewal Comparison page and asked for clarification of the annual cost to the town. Ms. Rapasadi confirmed that the premium would be $149,265 per year for two years. Councilmember Sherman asked what "Prd" means under the Total Est Policy Prd Premium. Ms. Rapasadi stated she was unsure. Supervisor Dickson stated he believes it is "period." Motion by Supervisor Dickson, seconded by Councilmember Sherman, to authorize the Supervisor to execute the excess workers' compensation contract with Midwest Employers Casualty with a total premium for two years of $298,530.00. Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 2. Supervisor Dickson re EPIC fund NY Leslie Murphy and Marty Hammond from PFM Asset Management introduced the company which serves the public sector. EPIC stands for Empire Public Investment Cooperative Fund of New York. The fund is being formed in collaboration with the New York Association of Towns. Supervisor Dickson stated the resolution would allow the town to participate in the EPIC fund. Motion by Supervisor Dickson, seconded by Councilmember Sherman, to adopt the following resolution adding the option of investment in the EPIC fund at the discretion of the Finance Director. WHEREAS, New York General Municipal Law, Article 5-G, Section 119-o (“Section 119-o”) empowers municipal corporations, such as the Town of West Seneca (the “Town”), to enter into agreements for the performance of their respective functions, powers and duties on a cooperative or contract basis, with other municipal corporations; and WHEREAS, the Town is considering investing portions of its available investment funds in cooperation with other municipal corporations and/or districts pursuant the EPIC Fund NY Municipal Cooperation Agreement (the “EPIC Fund NY MCA”) and, prior to investment, the information 4 Page 21 of 301

Page 22

WEST SENECA COURT ROOM DRAFT TOWN BOARD 1250 Union Road PROCEEDINGS West Seneca, NY 14224 Meeting # 2026-01 January 12, 2026 statement will be presented to the Town; and WHEREAS, the Town wishes to assure the safety and liquidity needs of their funds; and BE IT RESOLVED, that the Town Supervisor, acting on behalf of the Town of West Seneca is hereby authorized to participate in the EPIC Fund NY program under the terms of the EPIC Fund NY MCA and information statement. Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 3. Councilmember Sherman re Attendance at AOT training conference Motion by Supervisor Dickson, seconded by Councilmember Robertson, to authorize Town Board Member Mary Sherman to attend the New York State Association of Towns Newly Elected Town Officials Training, January 21 – 23, 2026, in Corning, New York, at a cost not to exceed $900, noting funds are available in account 01101000.50414. Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 4. Town Engineer re St. David's Drive Drainage Project Change Order Motion by Supervisor Dickson, seconded by Councilmember Piekarec, to approve Change Order Number 2 for the St. David's Drive Drainage Project in the amount of $11,220.00. On the question, Councilmember Breidenstein challenged the decision to preserve the shrubbery. Mr. Foote stated the plantings were mature, and the gutter was uncovered during the project. Councilmember Breidenstein asked when the work was completed. Mr. Foote stated in October. Councilmember Robertson stated he would prefer the Town Board approve additional costs before additional work is completed. Mr. Foote stated there is a general urgency during projects and timely decisions must be made. Councilmember Roberston questioned the amount of time that had passed before the change order was presented to the Town Board for approval. Mr. Foote acknowledged the need to relay the changes to the Town Board in a more timely fashion. Councilmember Piekarec agreed that timely notification should be made to the Town Board. Councilmember Sherman asked what impact saving the shrubs had on the project. Mr. Foote stated as the project began, the plans were adjusted to save the shrubs and additional paving was the result. Councilmembers Breidenstein and Piekarec reiterated that the Town Board should be made aware of any changes that impact the cost of a project. Ayes: 3 Noes: 2 Abstain: 0 Motion Carried Voting For: Supervisor Dickson, Councilmembers Piekarec and Sherman Voting Against: Councilmembers Breidenstein and Robertson Abstain: None 5. Town Engineer re Animal Shelter Improvements Motion by Supervisor Dickson, seconded by Councilmember Robertson, to adopt the following resolution authorizing the Supervisor and the town's grant writer to apply for a grant through the NYS Department of Agriculture and Markets Companion Animal Capital Projects Fund. 5 Page 22 of 301

Page 23

WEST SENECA COURT ROOM DRAFT TOWN BOARD 1250 Union Road PROCEEDINGS West Seneca, NY 14224 Meeting # 2026-01 January 12, 2026 On the question, Councilmember Sherman if the statement about municipalities being compliant with standards by December of 2025 was correct. Highway Superintendent Adams stated the standards were pushed back. WHEREAS, the New York State Department of Agriculture and Markets has announced funding opportunities through the Companion Animal Capital Projects Fund to assist eligible municipalities and nonprofit organizations with the construction, renovation, or improvement of animal shelters; and WHEREAS, the Town of West Seneca owns and operates a dog control facility located at 582 Mineral Springs Road, providing essential dog sheltering and control services for the Town, handling hundreds of dogs annually and managing complaints, licensing, adoptions, and enforcement activities; and WHEREAS, the current facility is in need of critical structural and operational improvements, including the enclosure of kennels, replacement of chain-link kennel doors with plexiglass doors, replacement of exterior siding, installation of outdoor perimeter fencing, addition of a wash and grooming bay, resurfacing of interior floors with epoxy, construction of interior isolation kennels, HVAC improvements and the installation of a key fob and security system, all to enhance safety, efficiency, and compliance with upcoming regulations; and WHEREAS, the standards for companion animal care in New York State will soon change. In December of 2022, Article 26-C of NYS Agriculture and Markets Law regarding the regulation of Animal Shelters, or the Companion Animal Care Standards Act (CACSA), was passed. Whereas the current standards (Title 1 of the NYCRR) consist of four pages of directives, the new law (Articles 26- C) has 15 sections of standards detailed on 20 pages. Municipalities are expected to be compliant with the new standards by December of 2025; and WHEREAS, the Town Board has prepared an application requesting grant funding not to exceed $65,700 from the Companion Animal Capital Projects Fund, with the Town committed to providing no less than a 10% ($7,300) cash match towards the total eligible project costs and any additional funds necessary for project completion; and NOW, THEREFORE, BE IT RESOLVED, that the Town of West Seneca Board authorizes Mr. Gary Dickson, as Supervisor of the Town of West Seneca, or his successor, to file an application to the 2025-2026 New York State Companion Animal Capital Projects Fund, and upon approval, to enter into and execute a project agreement with the New York State Department of Agriculture and Markets for such financial assistance; and BE IT FURTHER RESOLVED, that Rotella Grant Management, the Town's grant consultant, is authorized and directed to prepare and submit all necessary documents for the application; and BE IT FURTHER RESOLVED, that the Town commits to the timely implementation and completion of the project within 24 months of funding approval, ensuring adherence to the standards set forth by New York State. 6 Page 23 of 301

Page 24

WEST SENECA COURT ROOM DRAFT TOWN BOARD 1250 Union Road PROCEEDINGS West Seneca, NY 14224 Meeting # 2026-01 January 12, 2026 Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 6. Town Engineer re Award of professional land surveying services Motion by Supervisor Dickson, seconded by Councilmember Robertson, to award the land surveying services contract to the lowest bidder, True North Land Surveying, in the total amount of $7,300 for professional land surveying services to support upcoming Town projects and endeavors noting the scope of services includes performing boundary surveys and property staking at 3699 Seneca Street, a vacant lot on Orchard Park Road, and 2589 Clinton Street. Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 7. Town Justice Court Liaison Almeida re Attendance at annual training Motion by Supervisor Dickson, seconded by Councilmember Breidenstein, to authorize two Justice Court Clerks and one Town Justice to attend the annual NYC Town and Village continuing education training February 15–17, 2026, at a cost not to exceed $6,600.00 with funds available from Budget line 01111000.50414. Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 8. Director of Finance re Budget transfer - Town Board Motion by Supervisor Dickson, seconded by Councilmember Breidenstein, to authorize the following 2026 budget transfer: RESOLVED, that the Town of West Seneca Board authorizes the following 2026 budget transfer for an adjustment to 01101000.50414 Town Board Training from 01122000.50414 Supervisor Training Increase $900.00 01101000.50414 Town Board Training $900.00 Total Increases Decrease $900.00 01122000.50414 Supervisor Training $900.00 Total Decreases Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 5. WARRANT 1. Director of Finance re Approval of warrant Motion by Supervisor Dickson, seconded by Councilmember Sherman, to approve the vouchers submitted for audit, chargeable to the respected funds as follows: General Fund: $ 336,200.19 Highway Fund: $ 292,864.08 Trust & Agency: $ 0.00 7 Page 24 of 301

Page 25

WEST SENECA COURT ROOM DRAFT TOWN BOARD 1250 Union Road PROCEEDINGS West Seneca, NY 14224 Meeting # 2026-01 January 12, 2026 Capital Fund: $ 375,781.15 Sewer Districts: $ 21,377.45 Water Districts: $ 6,251.66 Drainage District: $ 0.00 Gas Conversion Lighting Districts: $ 240.38 Electric Lighting Districts: $ 1,174.67 Total: $ 1,033,889.58 Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 6. REPORTS FOR FILING 1. Councilmember Breidenstein re Ethics Board Annual Report 2025 Motion by Supervisor Dickson, seconded by Councilmember Sherman, to receive and file the Ethics Board Annual Report for 2025. Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 2. Town Clerk Newton re Town Clerk monthly report for December 2025 Motion by Supervisor Dickson, seconded by Councilmember Sherman, to receive and file the Town Clerk monthly report for December 2025. Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 3. Code Enforcement re Building and Plumbing reports for December 2025 Motion by Supervisor Dickson, seconded by Councilmember Sherman, to receive and file the Building and Plumbing Reports for December 2025. Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 4. Recreation Masset re Youth & Recreation Program Highlights 2025 Motion by Supervisor Dickson, seconded by Councilmember Sherman, to receive and file the Youth and Recreation Program Highlights for 2025. Ayes: 5 Noes: 0 Abstain: 0 Motion Carried ISSUES OF THE PUBLIC The following comments and questions were received: Beverly Leising, Harwood Road: - Requested status of the stipends for the boards and commissions - Municipal Director of Human Resources Dittmar stated the Secretary's stipends for the Zoning Board of Appeals and Planning Board will remain the same and the smaller boards will be changed to an hourly wage. Supervisor Dickson stated the stipends were included in the agenda items. - What is the status of recycling - Highway Superintendent Adams stated the town determined it was 8 Page 25 of 301

Page 26

WEST SENECA COURT ROOM DRAFT TOWN BOARD 1250 Union Road PROCEEDINGS West Seneca, NY 14224 Meeting # 2026-01 January 12, 2026 currently more cost-effective to remain with Modern. The town did purchase three trucks for the price of one and can use them for garbage pick-up. - Whose responsibility is it to identify water pressure issues when a house is being sold - Code Enforcement Officer Schieber stated there is no responsibility regarding this and encourages all potential buyers to seek information from the Code Enforcement Office about any property. Mrs. Harwood encouraged making this information known to the public and realtors. - West Seneca Cares provided 127 gift bags to the residents of West Seneca nursing homes and thanked all who donated James Raymond, Cedar Ridge Drive: - Requested answers to questions he posed earlier in the meeting: why did Councilmember Breidenstein recuse himself from the Town Prosecutor appointment; can Councilmember Breidenstein speak to the transparency issues regarding the appointment of Mark Beehler to the Planning Board, a former colleague and employee; and is there a transparency issue with Joe Sherman sitting on the Planning Board while Mary Sherman is on the Town Board. Kate Kotecki, Seneca Street: - Asked why CPL was reappointed as the Town Engineer and, in her opinion, the town is encouraging bad behavior from this vendor - Is a written policy in place for Facebook, or are comments turned off on a per-post basis, would like to review any existing written policy James Manley, Larkwood Road: - Governor Hochul signed NYS Bill S1183 which established real property tax exemption for the primary residence of veterans with 100% service-connected disability, and the West Seneca Joint Veterans Committees requested that the town adopt a local law or resolution creating a real property tax exemption - Supervisor Dickson relayed a message from Town Assessor Finbar that amendments will be made to the bill and Supervisor Dickson expressed support from the Town Board to adopt a local law. - Requested status on the request to rename a park in honor of a veteran - Supervisor Dickson stated the Youth and Recreation Commission has been asked to follow up on the request. - Offered assistance from the Joint Veterans Commission members with the town's 250th Anniversary celebrations - Supervisor Dickson stated a larger remembrance event is being planned for the 25th anniversary of 9/11. Facebook comments: - Why did Chelsea MacDonald resign, who runs the town's Facebook page and who decides to block comments - Is one month a reasonable amount of time to provide answers to the public's questions - Are there any laws or limits on flock cameras - Assistant Chief Pelow stated that based on communications he has viewed from Flock's legal team and advisors, Flock houses data for 30 days and then the data is scrubbed, and is a work in progress. COMMUNICATIONS BY BOARD MEMBERS AND DEPARTMENT HEADS Councilmember Breidenstein - The Civic and Patriotic Commission is considering the following: beautification of Union Road, 9 Page 26 of 301

Page 27

WEST SENECA COURT ROOM DRAFT TOWN BOARD 1250 Union Road PROCEEDINGS West Seneca, NY 14224 Meeting # 2026-01 January 12, 2026 partnering with the High Schools to make planters for the Town Hall campus, an event on September 12th, A More Perfect Union on Union, to include a car show, vendors, food, and a concert - A Response to Public Comment is needed during the meeting so that all questions are addressed Supervisor Dickson - Quoted from an ACLU site: an official government social media channel can turn off all commenting on a post without encroaching on first amendment violation - Supervisor Dickson or Deputy Supervisor Green control the posts - Advised interested candidates to utilize the email provided - Ms. MacDonald felt that being in the same law firm as Judge Minear could be an appearance of conflict and the Town Board initially thought it was acceptable that Ms. MacDonald would not appear before Judge Minear. Ironically, this situation occurred before and no one took issue. - Attended the Union Fire Company Installation dinner and will attend others and commented on the longevity of those who serve the town - Board members are selected through interviews and also personal knowledge, and it is insulting that some think that personal knowledge should disqualify a candidate Councilmember Piekarec - Echoed Supervisor Dickson's sentiments about volunteer firefighters and mentioned volunteers are always needed - In his opinion, comments should be left on for all government pages - The Internal Audit Committee has reviewed shipping charges and will review bank reconciliations next Town Attorney Trapp - Is looking forward to continuing his tenure with the town - Forwarded revisions for music venues and avoidable alarms to the Code Enforcement Office for review - Revisited his suggestion about alternate members for the Planning and Zoning Boards and asked for comments from the Town Board members who had not responded, including how many alternates for each board and would the alternates be used for conflicts of interest and/or absences. Mr. Trapp will proceed with one alternate for each board to fill in for both absences and conflicts of interest. - Joe Trapp will attend the AOT Conference Code Enforcement Officer Schieber - All inspectors in NYS have 24 hours of in-service required - Electrification is paused - Agile Storage is nearly complete, Upstate Dairy expansion is to begin, and Ebenezer Landing is underway - Nearly 500 multiple dwelling apartment fire inspections have been completed - Town newsletters highlight fire districts, the Office of Emergency Management, and Dispatch Town Clerk Newton - The 2027 Organizational Meeting items will be entered into the meeting software as requested by residents - 2026 Town and County Tax bills will be going out soon and the warrant is approximately $70M 10 Page 27 of 301

Page 28

WEST SENECA COURT ROOM DRAFT TOWN BOARD 1250 Union Road PROCEEDINGS West Seneca, NY 14224 Meeting # 2026-01 January 12, 2026 - The US Postal Service has made changes to the postmarking process and taxpayers need to be diligent to have their payments postmarked accordingly - Reminded all that the Town Clerk secure drop box is just inside the doors at Town Hall Recreation Supervisor Masset - Hiring for pool supervisors and aquatic positions - Announced her resignation as Recreation Supervisor and spoke kindly of her time with the town EXECUTIVE SESSION No executive session was needed. ADJOURNMENT Motion by Supervisor Dickson, seconded by Councilmember Robertson, to adjourn the meeting at 7:57 P.M. Ayes: 5 Noes: 0 Abstain: 0 Motion Carried 11 Page 28 of 301

Page 29

Page 29 of 301

Page 30

TO: Honorable Town Board FROM: Kate Newton, Town Clerk DATE: January 26, 2026 SUBJECT: Town Clerk Newton re Proofs of Publication and posting of legal notice "OF A PUBLIC HEARING TO HEAR ALL PERSONS INTERESTED IN THE PROPOSED REZONE REQUEST FOR 120 SOUTH AVE, CHANGING ITS CLASSIFICATION FROM C-1&R-50 TO C-2 " in the Town of West Seneca. Publication date was December 25, 2025. Requested Action: This request was reviewed by the Planning Board at the December 11, 2025 meeting. The parcel has a zoning classification of C-1 to a depth of approx 200ft, then transitions to R-50 for the remainder of the site. The initial request was made to rezone the entire parcel to C-1 to permit additional warehouse buildings at the site. The Planning Board recommended the entire site be rezoned to C-2, to conform to the Town Zoning Code. The motion at the Planning Board passed 7-0. If this request is approved, it would return to the Planning Board for a Final Site Plan Approval. You are required to make a determination pursuant to SEQRA, see attached draft resolution by the Town Attorney. An additional vote must then be taken for the rezone of the property. RESOLUTION: ATTACHMENTS: 1. Town Cover Letter 2. 25-4186 C-100 CONCEPT PLAN - 20251107 3. 25-4186 Re-Zoning and Special Permit Application - 20251113 4. 25-4186 SHORT EAF PART 1 - Signed - 20251113 5. 120 South ave SEQR draft resolution Page 30 of 301

Page 31

Page 31 of 301

Page 32

sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration. All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145 Greensboro Utica Buffalo N/F CHARLES J MALEY N/F KARI A KAUL 1245 INDIAN CHURCH ROAD 134 SOUTH AVE SBL 134.07-2-1.1 SBL 134.07-2-1.2 ZONE R-50 ZONE R-50 7.76' 7.76' 30.95' 150' ZONE C-1 ZONE R-50 25' SIDE SETBACK 40' 6000 SQ. FT. N/F DANIEL A NIZIOL JR. BUILDING 1249 INDIAN CHURCH ROAD SBL 134.07-2-2 12.27' 30.00' ZONE R-50 18.00' TYP. EX. PAVEMENT 13 SOUTH AVE. 30' REAR SETBACK 9.00' TYP. R28 ' 120.00' 24.00' 5' SIDE SETBACK Flex Warehouse 8' R2 13 228.58' N/F JOSEPH P MILLER 1253 INDIAN CHURCH ROAD SBL 134.07-2-2 40' FRONT SETBACK 30' REAR SETBACK EX. BUILDING ZONE R-50 40' 6000 SQ. FT. BUILDING © CARMINA WOOD DESIGN 25' SIDE SETBACK West Seneca, NY 11.22' 150' 20.00' TURNAROUND FOR POTENTIAL STORMWATER EMERGENCY SERVICE MANAGEMENT AREA 120 South Ave VEHICLES 12.18' 12.18' APPROXIMATE LOCATION OF EX. ZONE LINE N/F HOLIDAY MEADOWS LLC 1291 INDIAN CHURCH ROAD SBL 134.07-2-12 ZONE R-50 Date Site Plan SCALE: 1"=30' No. Description REVISIONS: SITE DATA SITE AREA = 2.20 AC ZONED: C-1 COMMERCIAL & R-50 RESIDENTIAL (R-50 PORTION TO BE REZONED TO C-1) BUILDING: 2 x 6,000 G.S.F. FLEX WAREHOUSE ARY SETBACKS - BUILDING REQUIRED PROVIDED CTION FRONT 40 FT 40 FT SIDE 5 FT * 7.76 FT MIN.*** REAR 30 FT 30 FT CONSTRU PRELIMIN * WHERE A SIDE YARD ABUTS AN R DISTRICT BOUNDARY, ITS WIDTH SHALL BE NOT LESS THAN THAT REQUIRED FOR SIDE YARDS FOR MULTIFAMILY DWELLINGS OR BUILDINGS OF MIXED OCCUPANCY IN SUCH ABUTTING R DISTRICT.** ** FOR MULTIFAMILY DWELLINGS, EACH SIDE YARD SHALL BE 25 FEET OR A DISTANCE EQUAL TO ONE-HALF (1/2) THE HEIGHT OF SUCH BUILDING, WHICHEVER IS GREATER. THE TOTAL OF THE TWO SIDE YARDS SHALL BE TWICE THAT REQUIRED FOR NOT FOR ONE SIDE YARD. THE TOWN BOARD SHALL HAVE THE POWER TO REDUCE SAID SIDE YARD REQUIREMENTS UPON SHOWING OF SPECIAL CIRCUMSTANCES OR HARDSHIP. PARKING # OF SPACES - SEE CALCULATION BELOW 12 26 PARKING SPACE SIZE 9' x 18' 9' x 18' MAX. BUILDING HEIGHT 40 FT 25 FT PARKING CALCULATION: DRAWING NAME: RETAIL: REQ'D = 1 SPACE PER 1,000 G.S.F Site Plan (6,000 + 6,000) G.S.F. / 1,000 12 =SPACES REQ'D Concept *** VARIANCE REQUIRED BY ZBA Date: 11/07/25 Drawn By: C. Wood Scale: As Noted NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS, CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY. DRAWING NO. 30' 30 0 30 60Ft. C-100 Project No: 25-4186 Page 32 of 301

Page 33

Page 33 of 301

Page 34

Page 34 of 301

Page 35

Page 35 of 301

Page 36

Page 36 of 301

Page 37

Page 37 of 301

Page 38

WHEREAS, the Town Board of the Town of West Seneca, as lead agency acting pursuant to the State Environmental Quality Review Act, Article 8 of the New York State Environmental Conservation Law, has reviewed Part I of the Short Environmental Assessment Form ("EAF") prepared by the applicant for property located at 120 South Avenue ("Subject Property"), for development of two warehouses and associated site work and parking (the "Project"), and reviewed the draft completed Part II and Part III of the EAF analyzing the potential for the Project to result in any significant adverse environmental impacts and has otherwise taken a hard look at the identified potential environmental impacts utilizing the criteria specified in 6 NYCRR 617.7(c); and WHEREAS, the Erie County Division of Planning, after carefully and fully reviewing a description of the proposed project, along with the application and other documents as submitted by the Town of West Seneca, replied in writing that the project was to be of local concern; and WHEREAS, the Town Board held a public hearing which was properly noticed to the public wherein the project was discussed; and WHEREAS, the Town Board herein determines that it shall act as lead agency for such purposes and there has been no opposition thereto by any other interested agency; and WHEREAS, the Town Board, carefully and fully reviewed the application including the following documents submitted by the applicant and other interested entities: SHPO along with the responses from Erie County Environment and Planning, ECWA, and the reports and submissions from Carmina Wood Design; and WHEREAS, a zoning change from _____________ to ___________ to allow the construction of warehouses is sought; and WHEREAS, the Town Board, upon taking an independent hard look and reasoned evaluation of all of the above-referenced information, comments and written documentation with regard to the project; WHEREAS, upon review of Parts I, II, and III of the EAF and documentation and plans submitted by the applicant in connection with the review of the Project, the Town Board has not identified any potentially significant adverse environmental impacts associated with the proposed use of the Subject Property, has determined that this is an unlisted action and preparation of a Full Environmental Impact Statement is not necessary and that the issuance of a Negative Declaration is therefore appropriate; now, therefore, be it RESOLVED that pursuant to 6 NYCRR 617.7(a) the Town Board hereby accepts its designation as lead agency and does hereby adopt a Negative Declaration with respect to the Project based on its determination that the Project will not result in any potentially significant adverse environmental impacts. Page 38 of 301

Page 39

TO: Honorable Town Board FROM: Gary Dickson, Supervisor DATE: January 26, 2026 SUBJECT: Supervisor Dickson re Creation of part-time Recreation Supervisor Position Requested Action: Create part-time Recreation Supervisor position RESOLUTION: ATTACHMENTS: Page 39 of 301

Page 40

TO: Honorable Town Board FROM: Gary Dickson, Supervisor DATE: January 26, 2026 SUBJECT: Supervisor Dickson re Resignation of Recreation Supervisor Lauren Masset Requested Action: Move to accept the attached resignation of Lauren J. Masset from the position of full-time Recreation Supervisor effective January 23, 2026. RESOLUTION: ATTACHMENTS: 1. Masset Letter of Res 11226 Page 40 of 301

Page 41

​Town​​of​​West​​Seneca​ ​Lauren​​J.​​Masset​ ​ ecreation​​Supervisor​ R ​lmasset@​​westseneca.gov​​/​​716-674-6086​ ​January​​12,​​2026​ ​Re:​​Resignation​​–​​Lauren​​J.​​Masset,​​Recreation​​Supervisor​ ​Dear​​Honorary​​Town​​Board​​Members,​ ​ lease​​accept​​this​​letter​​as​​formal​​notification​​that​​I​​will​​be​​resigning​​from​​my​​position​​as​​Recreation​​Supervisor​ P ​FT​​for​​the​​Town​​of​​West​​Seneca,​​effective​​January​​23,​​2026.​ ​ erving​​this​​community​​for​​the​​past​​12+​​years​​has​​been​​a​​dream​​come​​true.​​It​​has​​been​​a​​profound​​honor​​to​ S ​oversee​​the​​Recreation​​Department​​and​​to​​witness​​the​​growth​​of​​our​​programs,​​events,​​and​​facilities.​ ​ hroughout​​my​​tenure,​​my​​primary​​goal​​has​​always​​been​​to​​serve​​our​​residents​​and​​adapt​​our​​services​​to​​meet​ T ​the​​evolving​​needs​​and​​requests​​of​​our​​community.​​Seeing​​these​​efforts​​come​​to​​fruition​​has​​been​​one​​of​​the​ ​greatest​​highlights​​of​​my​​professional​​life.​ I​ ​​am​​deeply​​grateful​​for​​the​​relationships​​I​​have​​formed​​during​​my​​time​​here.​​I​​have​​truly​​enjoyed​​the​​daily​ ​interactions​​with​​our​​patrons​​and​​families,​​and​​I​​value​​the​​collaborative​​spirit​​of​​our​​elected​​officials,​​fellow​ ​department​​heads,​​Town​​employees,​​school​​district​​and​​community​​service​​organizations.​​The​​trust​​placed​​in​ ​me​​to​​lead​​this​​department​​has​​been​​an​​honor​​I​​do​​not​​take​​lightly.​ ​ s​​I​​prepare​​for​​this​​transition,​​safety​​and​​continuity​​remain​​my​​top​​priorities.​​I​​am​​fully​​committed​​to​​ensuring​ A ​a​​smooth​​handover​​and​​will​​do​​everything​​I​​can​​to​​support​​the​​team​​and​​the​​Town​​during​​this​​period​​of​​change​ ​to​​ensure​​our​​department​​continues​​to​​thrive.​ ​ hank-you​​for​​the​​opportunity​​to​​serve​​the​​Town​​of​​West​​Seneca.​​I​​look​​forward​​to​​seeing​​the​​department​ T ​continue​​its​​wonderful​​work​​for​​the​​community.​ ​Best​​Regards,​ Page 41 of 301

Page 42

TO: Honorable Town Board FROM: Gary Dickson, Supervisor DATE: January 26, 2026 SUBJECT: Supervisor Dickson re Appointment of Lauren Masset as part-time Recreation Supervisor Requested Action: Change the title of Lauren J. Masset from full-time Recreation Supervisor to part-time permanent Recreation Supervisor, effective January 23, 2026, at a rate of $44.04 per hour. (This rate is based on her hourly rate as full-time Recreation Supervisor.) RESOLUTION: ATTACHMENTS: Page 42 of 301

Page 43

TO: Honorable Town Board FROM: Brian Cosgrove, Chief of Police Lydia Ciminelli DATE: January 26, 2026 SUBJECT: Chief Cosgrove re Title change for Emily Floreno to full-time Public Safety Dispatcher Requested Action: Kindly move to change the title of part-time Public Safety Dispatcher and appoint Emily Floreno to full time Public Safety Dispatcher, Group 7A, Step 1 at the rate of $25.74 per hour per the White Collar Union Contract, effective February 2, 2026; to be paid from account line 01312000.50155. RESOLUTION: ATTACHMENTS: Page 43 of 301

Page 44

TO: Honorable Town Board FROM: Brian Cosgrove, Chief of Police DATE: January 26, 2026 SUBJECT: Chief Cosgrove re Status change of part-time Public Safety Dispatcher David Velasquez Requested Action: Kindly change the status of part-time Public Safety Dispatcher David Vasquez to part-time seasonal effective February 1, 2026 through June 30, 2026. RESOLUTION: ATTACHMENTS: Page 44 of 301

Page 45

TO: Honorable Town Board FROM: DATE: January 26, 2026 SUBJECT: Director of Senior Services re Status change for part-time Clerk Typist Janet Kropczynski Requested Action: Please change the status of part-time Clerk Typist Janet Kropczynski to part-time seasonal effective February 1, 2026. Funds will come from account code 01762000.50138 RESOLUTION: ATTACHMENTS: Page 45 of 301

Page 46

TO: Honorable Town Board FROM: Kelsey Lignos, Director of Senior Services DATE: January 26, 2026 SUBJECT: Director of Senior Services re Appointment of Scott Cooke as part-time permanent Van Driver Requested Action: Please approve the appointment of Scott Cooke as part-time permanent Van Driver at the rate of $16.00 per hour effective January 27, 2026. Funds are available from account code 01762000.50146. RESOLUTION: ATTACHMENTS: Page 46 of 301

Page 47

TO: Honorable Town Board FROM: Gary Dickson, Supervisor DATE: January 26, 2026 SUBJECT: Supervisor Dickson re Discussion regarding public comment periods and open meetings issues Requested Action: Discussion between the Town Board and Paul Wolf, Executive Director of the NY Coalition for Open Government, regarding public comment periods in open meetings and any other open meetings issues. RESOLUTION: ATTACHMENTS: Page 47 of 301

Page 48

TO: Honorable Town Board FROM: Jason Foote, Town Engineer DATE: January 26, 2026 SUBJECT: Town Engineer re Grant funding update and planned grant strategy Requested Action: I wanted to provide an update on recent grant announcements and outline the Town’s plan moving forward for future grant applications. The Town was recently denied a 2025 WIIA Water grant for the replacement of water mains along Seneca Street and within Water District No. 2. In addition, the Town was denied a 2025 WIIA Sewer grant and a 2025 WQIP grant for the proposed Phase 9 Sanitary Sewer Project. The Town is requesting a formal debrief with NYSDEC and NYSEFC to better understand the scoring and evaluation process and to strengthen future applications. While it is certainly disheartening to be denied grant funding, the Phase 9 Sanitary Sewer Project must continue to move forward in order for the Town to remain in compliance with the existing Consent Order schedule. Accordingly, I recommend that the Town utilize remaining available funds from the Phase 8 project, together with budgeted sewer funds, to advance key components of the Phase 9 project. These efforts would include construction of access roads, installation of flow meters, and procurement of a new SCADA system. For the upcoming year, I and requesting Town Board approval to proceed with submitting grant applications for the following recommended projects: • 2026 WIIA Water Grant – Consideration for replacement of the Orchard Park Road water main in advance of the NYSDOT project which is expected to be completed in 2027-2028. The water mains are listed on the ECWA recommended improvement list. Additionally, there should be consideration to upsize the sanitary sewer mains. The work could be completed as part of the DOT project as a betterment. • 2026 WQIP Sewer and 2026 WIIA Grant – Consideration for the replacement and upsize of the sanitary sewer mains along Orchard Park Road or for Phase 10 Sanitary Sewer Project which builds upon prior rehabilitation efforts and supports continued compliance with the Consent Order. Page 48 of 301

Page 49

Should you have any questions or need further clarification, please don’t hesitate to reach out. RESOLUTION: ATTACHMENTS: Page 49 of 301

Page 50

TO: Honorable Town Board FROM: Gary Dickson, Supervisor DATE: January 26, 2026 SUBJECT: Supervisor Dickson re Farmer Pirates composting program Requested Action: RESOLUTION: ATTACHMENTS: 1. Jan 2026 WS Testimonials 2. West Seneca Monthly Reports - December 2025 Page 50 of 301

Page 51

West Seneca Pilot Composting Program FARMER PIRATES COMPOST In the December 2025 monthly check-in, we asked program participants to share their thoughts on the program - and 52% of check in respondents took the time to write a testimonial. Below are just a handful of those responses, sharing why composting matters to West Seneca residents. Composing is a necessity. We as humans already create so much waste. The fact that we in West Seneca have this option to help the planet is huge. West Seneca seems to pride itself on forward thinking, such as having electronic recycling available to it's residents, and upcycling donation bins for items that people no longer need, while also redicuing landfill waste. Continuing the composting project, and expanding it, just seems like the natural next step in bettering not only our community, but out small sliver of the world. -Amanda V. I love our town composting program because it makes it easy for everyone to reduce waste We have been bringing and take care of the environment. Instead of our scraps since the start throwing food scraps away, we’re turning them of this pilot program in into something useful. It also shows that small West Seneca. We love it! actions can add up when everyone participates. We drop off on average, It makes me proud to live in a town that cares twice a week. We feel so about sustainability. -Jessica K. much better not putting these compostable items in our trash can. We This composting program is amazing! It's good for appreciate this service so reducing waste and repurposing it for something much, and hope it valuable and useful for everyone. I hope it gets continues for years. expanded! -Renee P. Thank you! -Sandra W. I am not a "tree hugger," but I love the FACT that I am helping reduce the tipping expense to the Town. I also purchase compost from Farmers Compost Pirate and consider this the full circle experience. I encourage the Town of West Seneca to expand the Farmers Compost project to reduce the kitchen/table waste that is unnecessarily disposed of. -Ken M. Page 51 of 301

Page 52

I had been wanting to compost on my own before this program, but realistically did not know how to do it. I wasn’t sure where to start, what I needed to buy, HOW to actually do it, and in the end what to actually do with all the compost that is created. I’m so happy that Farmer Pirates makes it so easy to compost. So many pounds of food scraps are being kept from landfills and collectively, as a community, we are making a huge difference for our planet. -Kathryn R. Using Farmer Pirates Compost has I am grateful to West Seneca for noticeably reduced the amount of continuing to fund this opportunity. ... garbage we have on a weekly basis. I As a younger home owner in the love that the Town provides town, this program is a very residents an option to keep food attractive benefit of living in the waste out of landfills. It would be community. Would love to see more disappointing if this program was no opportunities for West Seneca to be longer available through the Town. more eco-friendly. Thank you for -Jennifer B. allowing us to do our part in helping the environment and reducing our This program has reduced the carbon footprint. -Megan S. amount of garbage going into the landfill. My food scraps are mulched I’m so grateful to have a program in for reuse and for sale. Reuse, my community to help reduce food recycle is a big commitment for me waste. Hoping more people take and my family. I'm hoping the town advantage of this. -Leslie J. of West Seneca will renew this program. -Julie R. The compost drop-off program is a great resource for people who are looking to reduce the amount of waste they send to a landfill. I cook with fresh produce a lot, and knowing that my potato peels and squash skins are going to turn into compost makes me feel good! It also helps me feel better about food waste, which I try to avoid but find inevitable. ... I hope the Town extends the program so I can keep composting. I would love it if there were a pick-up option! I know I’d compost even more. -Natalie P. The two drop off spots in town make it so easy to drop off allowable food scraps as part of normal errand running. Since staring with the program I pretty much only have one bag of regular trash a week. I am thankful our town has given us the chance to participate in the program. -Brett D. Page 52 of 301

Page 53

West Seneca Pilot Composting Program - Phase II December 2025 Report December Collection Data Pick Up Date 12/05/2025 12/12/2025 12/19/2025 12/26/2025 Number of Totes at Drop Off 5 Community Center / 1 Mineral Springs Number of Participants Registered 104 Food Scraps Collected (lbs) - Community Center 550 300 325 600 Food Scraps Collected (lbs) - Mineral Springs 10 15 3 5 Food Scraps Collected - December (lbs) 1,808 Total Food Scraps Collected - To Date (lbs) 34,934 December Check In Data Responses Percent Check In Submittals (out of 104) 87 83.65% Drop Off Frequency (out of 87) More than once a week 13 14.9% Weekly 20 23.0% Twice this Month 27 31.0% Once this Month 17 19.5% Never 10 11.5% See additional attached for selected testimonial submissions included in this month's check in. Page 53 of 301

Page 54

TO: Honorable Town Board FROM: Gary Dickson, Supervisor DATE: January 26, 2026 SUBJECT: Supervisor Dickson re Renewal of Recycling Contract Requested Action: Please approve the attached contract to renew recycling services. RESOLUTION: ATTACHMENTS: 1. THIRD EXTENSION AGREEMENT 1.31.2026.RECYCLING Page 54 of 301

Page 55

THIRD EXTENSION AGREEMENT This Extension Agreement is made as of January __, 2026, by and between Town of West Seneca (the “Town”), a municipal corporation existing pursuant to the laws of New York with an address at 1250 Union Road, West Seneca, NY 14224, and Modern Disposal Services, Inc. ("Modern), a New York corporation with an address at 4746 Model City Road, Model City, NY 14107. WHEREAS, the Town and Modern entered into a Contract dated January 28, 2019 for a three (3) year term beginning February 1, 2019 (the “Agreement”) pursuant to which Modern agreed to provide the Town with recycling collection and processing services (the “Services”) more particularly described in the contract documents for Request for Bids to Provide Recyclable Materials Collection and Processing (the “RFP Contract Documents”); and WHEREAS, the Agreement grants the Town and Modern the mutual option to renew the Agreement for three additional extensions for a combined total period of nine (9) years; and WHEREAS, the parties by Extension Agreement B entered into the First Extension for the period January 31, 2022 through January 31, 2025; and WHEREAS, the parties by Extension Agreement dated October 22, 2024 exercised the Second Extension for the period February 1, 2025 through January 31, 2026; and WHEREAS, the Town and Modern now desire to (i) exercise the Third Extension for a two-year period beginning February 1, 2026 and ending January 31, 2028; and (ii) set the pricing during the Third Extension. NOW THEREFORE, in consideration of the premises and other good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged, the parties hereby agree as follows: 1. The Town and Modern hereby exercise the Third Extension to extend the Agreement for the period February 1, 2026 through January 31, 2027. The Town shall pay Modern for the Services during the Third Extension as follows: (i) for the period February 1, 2026 through January 30, 2027, the current rate plus an adjustment upward based on the net percentage of change over the then most recent twelve month period for which the index figures are available for the Consumer Price Index (CPI) for the US WST (Water, Sewer, Trash Collection) as published by the U.S. Department of Labor, Bureau of Labor Statistics, such adjustment to be 2% (the “2026 Rate”). (ii) for the period February 1, 2027 through January 30, 2028, the 2026 Rate plus an adjustment upwards or downwards based on the net Page 55 of 301

Page 56

percentage of change over the then most recent twelve month period for which the index figures are available for the Consumer Price Index (CPI) for the US WST (Water, Sewer, Trash Collection) as published by the U.S. Department of Labor, Bureau of Labor Statistics, provided such adjustment shall not exceed 2%. This Third Extension Agreement is intended to modify the Agreement, only to the extent that the Agreement is consistent with the terms stated herein. All the other terms and conditions of the Agreement and the RFP Contract Documents shall remain in full force and effect. IN WITNESS WHEREOF, the parties have executed this Third Extension Agreement as of the date first written above. Town of West Seneca By______________________________ Name: Title: Modern Disposal Services, Inc. By______________________________ Derek Veenhof, CEO 2 Page 56 of 301

Page 57

TO: Honorable Town Board FROM: Gary Dickson, Supervisor DATE: January 26, 2026 SUBJECT: Supervisor Dickson re Selection of Harris Beach Murtha as Bond Counsel Requested Action: Authorize the Supervisor to execute the attached Engagement Letter with Harris Beach Murtha for bond counsel services for 2026. The two firms that submitted proposals but were not selected are Lippes Mathias LLP and Hawkins Delafield & Wood LLP. RESOLUTION: ATTACHMENTS: 1. WSen Engage 2. Bd memo re bond counsel 1-19-26 Page 57 of 301

Page 58

726 E XCHANGE STREET , SUITE 900 B UFFALO, N EW Y ORK 14210 (212) 287-0100 JEFFREY S TORCH M EMBER January 20, 2025 Town Board of the Town of West Seneca c/o Hon. Gary A. Dickson, Town Supervisor 1250 Union Road West Seneca, NY 14224 Re: Proposal to Provide Bond Counsel Services To the Members of the Town Board: Harris Beach PLLC is pleased to submit this proposal to continue providing general obligation bond counsel services to the Town of West Seneca. This letter will set forth a summary of the services we would expect to provide as bond counsel in 2023 and an estimate of the proposed fees that we would charge the Town for such services. Experience Harris Beach PLLC is a nationally recognized bond “Red Book” listed bond counsel firm. We serve as bond counsel to municipalities, school districts, fire districts and state and local agencies throughout New York State. Our Public Finance Department has experience with all types of general obligation bond financings and has worked with most of the underwriters and fiscal advisors who do business with New York State municipalities and school districts. Services As bond counsel to the Town, we would act as a recognized independent counsel with respect to the authorization of the obligations being issued, and undertake all legal services associated with that responsibility. In particular, we would draft or review all resolutions to be adopted by the Town Board to authorize the bond and/or notes to be issued, and all associated legal notices and certificates. We would work closely with the Town in structuring the financing, provide counsel regarding municipal finance questions raised in connection with a project and advise the Town as to alternatives available under any particular scenario. For each bond anticipation note issue (other than a short-term loan from the Environmental Facilities Corporation (the “EFC”), we would prepare or review, as appropriate, the Notice of Sale, if any, for the financing’ and if an Official Statement is published for such transaction, we would assist in the preparation of such document by reviewing those sections describing the notes, the project being financed, and the legality and tax exempt status of the notes. For the closing on the notes, we would prepare all of the necessary documentation, including the certificate of determination or authorizing resolution, as appropriate, the note, the HARRIS BEACH MURTHA CULLINA PLLC 320406\4919-5631-8850\ v1 Page 58 of 301

Page 59

arbitrage and tax certificates, the material events disclosure agreement, if required, and all other certificates and documents customarily provided in this type of transaction. We would also file the necessary information return with the Internal Revenue Service. Finally, we would render our approving opinion regarding the validity, enforceability and tax exempt status of the notes. For each bond anticipation note or bond financing undertaking through the EFC, we will review and comment on all of the EFC loan documents, participate in conference calls with EFC personnel, prepare all additional documents that may be necessary and will arrange for delivery of the bonds or BANS, as applicable, to EFC, or its designee. If applicable, we will complete or review, as appropriate, the tax questionnaire provided by EFC for the financing and will address any tax issues that may be posed by EFC and its counsel. We will also calculate any minimum required annual payments to be made on a short term financing prior to the closing of a long term financing. For each serial bond or statutory installment bond transaction (other than through the United States Department of Agriculture, Office of Rural Development (“RD”)), we expect to be primarily responsible for the preparation of the notice of sale for the bond issue. We would also assist the Town in the preparation of any official statement by reviewing those sections of the document pertaining to the bond issue, the projects being financed, and the legality and tax exempt status of the bonds. For the closing on the bond issue, we would prepare all the documentation customarily entered into for this type of transaction, including the certificate of determination; the form of bond, the tax and arbitrage certificates, the continuing disclosure agreement, if required, and all other certificates and documents to be entered into in connection with the financing. If the bond issue is to be insured by a municipal bond issuance policy, we would review the documents provided by the bond insurer, including the policy, closing certificates and legal opinion. We would also conduct the closing on the bonds and arrange for the delivery of the bonds to the purchaser (or if the bonds are in book entry form, to the depository for the bonds) and file the necessary information return with the Internal Revenue Service. Finally, we would render our approving bond counsel opinion regarding the validity, enforceability and tax exempt status of the bonds. In connection with any bond financing undertaken through RD, in additional to the services described above with respect to statutory installment bonds, we would prepare all of the other necessary closing documents required in accordance with RD’s policies and requirements. Please note that in connection with each bond and note transaction, we do not anticipate that we will be primarily responsible for the preparation of either the official statement (or other disclosure document) or any debt statement prepared and filed in accordance with New York Law. It is our assumption that these documents will be prepared either by the Town or by its fiscal advisor, if any, as is customarily the case. We will, however, review these documents and comment, as necessary, to ensure that the Town has complied with all applicable disclosure and filing requirements in connection with the bond issue. 320406\4919-5631-8850\ v1 Page 59 of 301

Page 60

Fees and Charges Set forth below is the proposed schedule for fees we would charge the Town for bond counsel services. Bond Anticipation Notes: For each original issue bond anticipation note issue, we would charge a fee not to exceed $750 plus $.50 per thousand dollars of note issued. For each renewal bond anticipation note issue, we would charge a fee not to exceed $600 plus $.50 per thousand dollars of note issued, plus out-of-pocket disbursements. For EFC Short Term Loan: For the short term financing through EFC, we would charge a fee of $3,500, plus $0.50 per thousand dollars of bonds issued, plus disbursements. RD Loan: For a long-term bond issue through RD, we estimate a fee not to exceed $3,500 plus $1.00 per thousand dollars of the loan amount. Serial Bonds (competitive bid): For a serial bond issue, we estimate a fee not to exceed $3,500 plus $1.00 per thousand dollars of bonds issued, plus hourly fees as described below and out-of-pocket disbursements. Statutory Installment Bond: For a statutory installment bond of $5 million or less, we would charge a fee not to exceed $1,500 plus $1.00 per thousand dollars of bonds issued plus disbursements. For EFC Long Term Loan: For the long term bond issue through EFC (including any hardship assistance grants), we would charge a fee of $5,000 plus $1.00 per thousand dollars of bonds issued, plus disbursements. Refunding Bonds: For each refunding bond issue our fee will be as specifically agreed upon with the Town at the time of the refunding. Bond Resolutions: Fees for preparation of bond resolutions will be $600 for preparation of each resolution, provided that with the Town's approval, additional fees may be charged in the event that a particular resolution involves unusual research and complexity. Hourly Fees: In addition to the foregoing fees, a fee of $295 per hour for partners and $195 per hour for associates and $110 for Paralegals will be charged for time spent in meetings with Town officials in the Town or elsewhere, for attendance at rating agency sessions, for working group sessions with the Town's financial advisor and its own finance team and for our work on drafting and reviewing disclosure materials and any documentation which is required in connection with the negotiation by private sale of any Town obligations. For matters apart from the foregoing, including research, analysis and rendering of advice to the Town and attendance at meetings in connection with development proposals, new financing alternatives for the Town and review of proposals submitted to the Town relating to other than routine financings, Bond Counsel will charge the above hourly rates, subject to a maximum agreed upon fee for each matter. 320406\4919-5631-8850\ v1 Page 60 of 301

Page 61

Disbursements. Disbursements for direct out-of-pocket costs, such as telephone calls, photocopying and facsimile charges, postage and courier charges, and travel costs, if any, will be billed to the Town in addition to the fees for services rendered. The above fee quotes are based upon our understanding of the scope of services customarily provided on financing transactions. In the event that there is a change in circumstances which warrants significantly greater Bond Counsel services than which are normally required in connection with the types of transactions outlined above, we will contact you to arrange for an appropriate adjustment in our Bond Counsel fee, in an amount to be agreed upon with the Town at that time. The above fee quotes are based upon our understanding of the projects being financed and the Town’s current needs. In the event that there is a change in circumstances which warrants significantly greater bond counsel services than which are normally required in connection with the types of transactions outlined above, we would contact you to arrange for an appropriate adjustment in our bond counsel fee, in an amount to be agreed upon with the Town. Billing and Collection Information For services not associated with a specific financing transaction, such as review of proposals submitted to the Town relating to project development proposals and proposals submitted to the Town relating to other than routine financings, we will bill the Town periodically as such specific services are rendered. For services performed in connection with the issuance of bonds or notes, our fees are normally billed after the closing of each transaction. We customarily do not submit an invoice for services until that time, unless there is a substantial delay in completing the financing or the financing is not completed. Termination of Engagement Either the Town or Harris Beach may terminate this Engagement at any time for any reason by written notice, subject, on our part, to the rules of professional responsibility. No such termination, however, will relieve the Town of the obligation to pay the legal fees owed to Harris Beach for services performed and other charges owed to us through the date of termination. After the completion of our services on the Town's behalf, changes may occur in applicable laws or regulations that could have an impact upon the Town's future rights and liabilities. Unless the Town engages Harris Beach after completion of the Engagement to provide additional advice on issues arising from the Engagement or related matters, Harris Beach has no continuing obligation to advise the Town with respect to future legal developments. Conclusion of Representation; Disposition of Client Documents Following termination of this Engagement, any otherwise nonpublic information the Town has supplied to Harris Beach that is retained by Harris Beach will be kept confidential in accordance with applicable rules of professional conduct. At the Town's request, papers and property will be returned promptly after receipt of payment for any outstanding fees and costs. Our own files pertaining to the matters worked on for the Town will be retained by the firm. These firm files include, for example, firm administrative records; internal lawyers' work product such as drafts, notes, internal memoranda; and legal and factual research, including investigative reports, prepared by or for the internal use of lawyers. We will retain all remaining documents 320406\4919-5631-8850\ v1 Page 61 of 301

Page 62

for a certain period of time, but reserve the right for various reasons including the minimization of unnecessary storage expenses, to destroy or otherwise dispose of them within a reasonable time after the termination of the engagement. Client Responsibilities The Town agrees to cooperate fully with us and to provide promptly all information known or available to you relevant to our representation. The Town also agrees to pay in a timely manner our statements for services and expenses as provided above. We look forward to working with you and appreciate the opportunity to represent the Town as bond counsel. If you find the terms of this Engagement acceptable, please have the enclosed copy of this letter signed on the signature line provided below and return it to my attention Please call me with any questions regarding the foregoing. If you find the terms of this proposal acceptable, please have a copy of this letter signed on the signature line provided below and return it to my attention. Very truly yours, Jeffrey Storch Agreed to and accepted this ____ day of January, 2025 TOWN OF WEST SENECA By: Name: Hon. Gary A. Dickson Title: Town Supervisor 320406\4919-5631-8850\ v1 Page 62 of 301

Page 63

TOWN OF WEST SENECA TOWN SUPERVISOR Gary A. Dickson TOWN COUNCIL Robert J. Breidenstein Jeffrey A. Piekarec Scott D. Robertson Legal Department Mary T. Sherman To: Town Board From: Chris G. Trapp, Town Attorney Re: Bond Counsel Date: January 19, 2026 In December, as a matter of prudent fiscal responsibility, the Town submitted a Request for Proposals for the provision of Bond Counsel services for the Town. Proposals were sought from multiple law firms and ultimately three were received by the Town which then evaluated them based upon cost, experience, and other factors. Two of the firms had significant experience in providing such services to municipalities and larger practice groups devoted to public finance than the third applicant. When costs were compared, while somewhat different in different areas, a comparison showed that based upon prior years of public finance by the Town, the costs of one firm were slightly more favorable than the other. Obviously, those costs could change from year to year considering the nature and amount of financing sought by the Town. The Town also examined past relationships and the value of a firm having familiarity with the Town’s operations and personnel. In the past, services were provided by the firm of Harris Beach, now Harris Beach Murtha as a result of a recent merger. That firm, unlike the other large firm, has a local office and has provided good services to the Town for a number of years. Based upon a review of the past relationships, experience with public finance, location, and after a cost analysis, it is recommended that the Town retain the services of Harris Beach Murtha to provide Bond Counsel services for the Town of West Seneca for the next three years. Page 63 of 301

Page 64

TO: Honorable Town Board FROM: Gary Dickson, Supervisor DATE: January 26, 2026 SUBJECT: Supervisor Dickson re Selection of Qualified Engineering Companies for Engineering Services for Water and Wastewater Projects Requested Action: In order to comply with the $100,000 DEC/EFC grant in the amount that we received for engineering planning, we are required to do an Request For Qualifications for engineering services to identify qualified companies. Acceptance of the qualifications of these two companies does not mean they will both be selected for a project, just that they are qualified to do the work. The selection of the company to do the work will come later on a case by case basis. This RFQ process is a new requirement for state grants. Acceptance of the qualifications of these two companies is good for three years, but the town can do a new RFQ at any time if the need arises. RESOLUTION: WHEREAS, The Town of West Seneca issued a Request for Qualifications (RFQ) for Engineering Services for Water and Wastewater Projects in order to procure professional engineering services on a qualifications-based basis in accordance with applicable New York State requirements; and WHEREAS, The RFQ sought statements of qualifications from consulting engineering firms licensed in the State of New York to provide engineering services including, but not limited to, planning, evaluation, design, bidding, construction administration, inspection, and project close-out for various water and wastewater system improvement projects to be undertaken by the Town on an as-needed basis; and WHEREAS, The Town received two (2) Statements of Qualifications in response to the RFQ, submitted by CPL and GHD; and WHEREAS, The Town Board reviewed the submitted qualifications in accordance with the evaluation criteria outlined in the RFQ, including firm experience, staff qualifications, project management approach, familiarity with the Town’s water and wastewater systems, and experience with state and federally funded projects; and WHEREAS, Based on this review, the Town Board has determined Page 64 of 301

Page 65

that CPL and GHD possess the necessary experience, qualifications, and resources to provide professional engineering services to the Town for water and wastewater projects; NOW, THEREFORE, BE IT RESOLVED, That the Town Board of the Town of West Seneca hereby determines that CPL and GHD are qualified firms for the provision of professional engineering services for water and wastewater projects; and be it further RESOLVED, That selection as a qualified firm does not guarantee the assignment of any specific project, and that individual projects shall be assigned based on the Town’s needs, project requirements, funding considerations, and scheduling; and be it further RESOLVED, That the scope of services and professional fees for each assigned project shall be separately negotiated on a project-by-project basis in accordance with qualifications-based selection requirements, and subject to Town Board approval, as applicable; and be it further RESOLVED, That the Supervisor is hereby authorized to take any actions necessary to implement this resolution consistent with the RFQ and this determination. ATTACHMENTS: 1. West Seneca RFQ Engineering Services Water and Sewer 2. CPL_Request for Engineering Qualifications-Town of West Seneca 3. GHD Statement of Qualifications - Engineering Services for Water and Wastewater Projects Page 65 of 301

Page 66

Request for Qualifications (RFQ) Town of West Seneca Engineering Services for Water and Wastewater Projects I. PROJECT DESCRIPTION The Town of West Seneca is issuing this Request for Qualifications for the qualifications-based procurement of an engineering firm to assist with engineering tasks associated with a range of water and wastewater system improvement projects. Utilizing a qualifications-based process, the Town will select consulting engineering firm(s) licensed in the State of New York to study, evaluate, design, bid, administer and close-out various water and wastewater projects as the need arises. The water and wastewater project are anticipated to be funded with various NYS and/or Federal loan and grant funds. All project bidding, construction administration, and inspection/closeout activities associated with the project must be performed in accordance with the applicable funding agency requirements and regulations. In keeping with these requirements, the qualifications-based procurement standards for the Procurement of Architectural, Engineering, and Surveying (A/E) Services shall apply. Utilizing a qualifications-based process, the Town will select multiple consulting engineering firms to study, evaluate, design, bid, administer and close-out various water and wastewater projects to be undertaken by the Town. Proposals will be received from all firms which wish to be considered for this engagement. II. CONSULTANT SELECTION CRITERIA Consultants must demonstrate their level of competence and qualification, and each subcontractor’s level of competence and qualification, with respect to the listed evaluation factors for the needed services. 1 Page 66 of 301

Page 67

NOTE: These factors are not listed in order of importance. Evaluation factors include: 1. Serve as Engineer-of-Record for the Town for each project. 2. The ability of the selected firm(s) to provide the technical skills necessary for capital improvement or maintenance projects, or evaluate such projects on very short notice, and on an as-needed basis as determined by the Town. 3. Size and experience of the consultant’s professional and technical staff with respect to the magnitude and complexity of various projects. 4. Experience of the consultant’s professional staff with water system operation, distribution and storage system improvements. 5. Experience of the consultant’s professional staff with wastewater collection system operation, pump station, and wastewater treatment improvements. 6. The consultant’s ability to make practical water and wastewater system evaluations and develop best practice design recommendations. 7. Record of success by the consultant(s), demonstrated by work previously performed for the Town or similar work performed for others. 8. Individual within the consultant’s organization who will have direct charge of the work. 9. Whether the consultant has adequate staff and/or other resources to perform the work within schedule and meet funding program MWBE requirements. 10. The approach the consultant proposes to use for the work and to keep the project within budget and on schedule. 11. Pertinent new ideas that may be presented by the consultant during the selection process. 12. Whether the consultant has an effective quality control program. 13. The consultant’s demonstrated record of keeping construction costs within project budgets and design estimates. 14. Demonstrated ability to identify all necessary permits, regulatory requirements, and processes and obtain involved agency approvals. 15. Understanding of the importance of safety in design and constructability. 16. Demonstrated ability to run a diverse program including managing and coordinating schedules, deliverables, resources, and multiple consultants/subconsultants. 17. Submit a list of communities/clients where you have provided similar water and wastewater design services over the last three years. After initial review of the submittals, a short list of consultants will be developed for further consideration. These firms may be invited for an interview. The best qualified firm or firms will be selected based on its demonstrated competence and qualification for the services required for various water and wastewater projects. A more detailed scope of work and fee schedule will be negotiated with the best qualified firm or firms. If negotiations are not successful with any selected firm, the Town will terminate negotiations with that firm and initiate negotiations with the next best qualified firm. When a fair and reasonable fee is established, a contract award recommendation will be made to the Town of West Seneca Town Board for its consideration. 2 Page 67 of 301

Page 68

Engineering Firm Insurance Requirements The firm must meet the following insurance requirements. 1. Proof of Workers Compensation insurance coverage. 2. General Liability $1,000,000 per occurrence/$2,000,000 aggregate. The Town must be listed as additional insured and endorsement required. 3. Auto Liability Insurance $1,000,000 per occurrence combined single limits applicable to claims due to bodily injury and/or property damage. The Town must be listed as additional insured and endorsement required. 4. Professional Liability not less than $2,000,000 per loss. III. PROJECT SCHEDULE Below outlines the projected schedule. DATE DESCRIPTION December 11, 2025 Request for Qualifications Advertised January 5, 2025 Statement of Qualifications Received January 18, 2026 Review Qualifications and Short List Consultants, Begin Interviews, if needed. February 9, 2026 Award to consultant(s) at Town Board Meeting IV. SUBMISSION Please provide a copy of your qualifications and related materials via electronic or hard copy. Proposals may be transmitted as two total files electronically in a PDF format consisting of a Statement of Qualifications or four (4) bound copies of your qualifications statement via mail in a sealed envelope no later than 3:00 pm, January 5, 2026, the submittal deadline date. Please mark your response “REQUEST FOR ENGINEERING QUALIFICATIONS – TOWN OF WEST SENECA” and send or mail your response to: Kate Newton, Town Clerk Town of West Seneca 1250 Union Road West Seneca, NY 14224 Phone: (716) 558-3215 Email: [email protected] 3 Page 68 of 301

Page 69

V. PROPOSAL EVALUATION The Town will review and rank the proposals using the factors /rating scale listed below to select the preferred consultant based on qualifications. Based upon the evaluation of the proposals, the Town reserves the right to invite any or all consultants for an interview before making a final selection. Such an invitation does not commit the Town to pay any costs incurred in participating in said interview. The evaluation factors are: • Knowledge and familiarity with the Town of West Seneca’s water and wastewater systems. Maximum Points: 20 • Project Management Approach: Response as outlined regarding the Firm’s Project Management Approach and the performance of the identified services as well as the timeliness of project deliverables. Maximum Points: 25 • Availability of Staff and Experience of the Project Team: Having the right team helps deliver a project within budget and on schedule. The Town will give considerable weight to the individual qualifications of the project team members who will be assigned to do a majority of the work identified. Considerations will include the individuals’ qualifications, experience, and location of key personnel. Maximum Points: 30 • Experience with NYSEFC Funded Projects: The Firm’s familiarity and experience in successfully satisfying funding agency construction documents and MWBE requirements will be reviewed and ranked. Maximum Points: 25 Following the review of Statement of Qualifications, no guarantee of work assignments or projects can be made, however, the assignment of projects will be based on the Town’s needs. The selection of the consultant will be valid for a period of three (3) years from the date of Town Board approval and the Town reserves the right to renew the selected consultants for an additional three (3) years. 4 Page 69 of 301

Page 70

VI. EQUAL OPPORTUNITY / AFFIRMATIVE ACTION EMPLOYER All qualified engineers will receive consideration without regard to race, color, religion, creed, sex, age, or national origin. The Town of West Seneca encourages MWBE and Section 3 firms to submit. VII. RIGHTS The Town of West Seneca shall be the sole judge of whether a submittal conforms to the requirements of this RFQ and of the merits and acceptability of the individual submittals. Notwithstanding anything to the contrary contained herein, the Town reserves the right to take any of the following actions in connection with this RFQ: amend, modify or withdraw this RFQ; waive any requirements of this RFQ; require supplemental statements and information from any respondents to this RFQ; award a contract to as many or as few or none of the respondents as the Town may select; to award a contract to entities who have not responded to this RFQ; accept or reject any or all proposals received in response to this RFQ; extend the deadline for submission of proposals; negotiate or hold discussions with one or more of the respondents; permit the correction of deficient proposals that do not completely conform with this RFQ; waive any conditions or modify any provisions of this RFQ with respect to one or more respondents; reject any or all proposals and cancel this RFQ, in whole or in part, for any reason or no reason, in the Town’s sole discretion. The Town may exercise any such rights at any time, without notice to any respondent or other parties and without liability to any respondent or other parties for their costs, expenses or other obligations incurred in the preparation. Questions regarding this RFQ should be directed to: Kate Newton, Town Clerk Phone: (716) 558-3215 Email: [email protected] 5 Page 70 of 301

Page 71

Town of York, NY - Water & Sewer Improvements Town of Elba, NY - Water District No. 2 Village of Warsaw, NY - WWTF Improvements REQUEST FOR ENGINEERING QUALIFICATIONS Town of West Seneca Water and Wastewater Projects Professional Engineering Services January 5, 2026 Page 71 of 301

Page 72

Page 72 of 301

Page 73

January 5, 2026 Kate Newton, Town Clerk Town of West Seneca 1250 Union Road West Seneca, NY 14224 Via Email: [email protected] RE: Town of West Seneca, Engineering Services Related to Water and Wastewater Improvements, RFQ Dear Ms. Newton and Members of the Selection Committee: On behalf of the entire CPL team, I am pleased to submit our qualifications for the Town’s request for Engineering Services for various water and wastewater system improvements. Our team has successfully completed a variety of water and wastewater projects of all sizes throughout New York State. We have the right blend of design and management expertise to successfully complete your deliverables within budget and on time. Our design team has extensive experience with the Town of West Seneca’s water and wastewater infrastructure, having partnered with the Town for over 10 years and successfully delivered numerous projects such as sanitary sewer studies, multiple phases of sanitary sewer rehabilitation, and many water main replacement projects, including recently completing the Water District No. 8 and Bullis Road Water Main Replacement project. Building on this experience, we understand that the needs of each water and wastewater project can vary, and we can provide the appropriate mix of expertise and resources to deliver comprehensive professional services to the Town of West Seneca. We also have strong relationships with key infrastructure funding agencies, including NYSEFC, NYSDEC, USDA Rural Development, and the NYSOCR CDBG program. These connections help us streamline the funding process and minimize red tape, giving our clients an advantage. We are unwavering in our commitment to delivering properly coordinated and high-quality solutions that water and wastewater projects demand. Our portfolio of infrastructure projects boasts success stories in Erie, Cattaraugus, Wyoming, Chautauqua, Yates, Livingston, Genesee, Cayuga, Orange, Dutchess, Columbia, Albany, and Saratoga Counties. Notably, CPL received the prestigious APWA State Award in 2022 for Project of the Year in the Environment category (of less than $5 million) for the Raw Water Intake Improvements in Saratoga Springs, NY. We recognize the significance of maintaining the integrity of your infrastructure, and our team is poised to contribute expertise, innovation, and a steadfast commitment to excellence. We appreciate the consideration given to our team and look forward to many successful water and wastewater projects with the Town. If you have any questions or require any additional information, please do not hesitate to contact me. Very truly yours, CPL Jason Foote, PE Principal / Principal-in-Charge 585.402.7505 [email protected] CPL Architecture | Engineering | Planning 726 Exchange Street, Suite 920, Buffalo, NY 14210 716.852.2100 CPLteam.com 3 Page 73 of 301

Page 74

Table of Contents Cover Letter......................................................................................................................................... 3 1 Firm Qualifications......................................................................................................................... 5 2 Technical/Managerial Qualifications................................................................................ 17 3 Experience......................................................................................................................................... 21 4 Project Team................................................................................................................................... 33 5 References and Insurance.....................................................................................................45 4 Page 74 of 301

Page 75

Village of Akron, NY - WWTF Improvements 1 Firm Qualifications 5 Page 75 of 301

Page 76

FIRM QUALIFICATIONS We are architects, engineers, planners and technical specialists. We are community leaders, CPL BY THE NUMBERS business owners, and volunteers. 1975 CPL is a multi-disciplinary firm that has been serving public and private Year Founded clients since 1975. We have grown in size from a small civil engineering firm of a half dozen employees to a multi-disciplinary firm of more than 500+ 500 professionals in eight states. Our team of dedicated professionals Total Staff offers expertise in architecture, engineering, planning and construction administration services. 93 Licensed Architects CPL is a privately held (shareholders) Design Professional Corporation (DPC), registered, fully licensed and originating in New York State. Our registered 65 architectural staff includes specialists in civic, educational, and healthcare Licensed Engineers design. Our licensed engineering services include: civil and site engineering, transportation and traffic engineering, bridge inspection and design, 34 water and wastewater services, environmental services and construction LEED Accredited Professionals inspection. 29 Rooted in integrity, partnership and communication, our culture ensures Interior Designers that you will receive the highest level of personalized service – a hallmark of our firm that has garnered years of continued service for our clients. This 26 commitment to excellence and client-centered approach has enabled us Offices to build lasting relationships and deliver exceptional results across all our service areas for five decades. Top 50 Architecture- Engineering From your first encounter with members of our team, you will realize that Firms in the Nation for 2025 we do things differently here at CPL. We are dedicated to a client-centered Building Design + philosophy of service that is based on core beliefs of full service and personal Construction (BDC) Giants attention. 400 Report At CPL, we feel inspired every day to make our world a better place through exceptional design, dedicated service and lasting client relationships. 6 Page 76 of 301

Page 77

FIRM QUALIFICATIONS As an integrated, full service design firm, our team members could literally create an entire city – from the earliest planning stages to the ribbon cutting– approaching every aspect with personal attention and principal participation. Our Integrated Services CIVIL ENGINEERING TRANSPORTATION ENGINEERING LANDSCAPE ARCHITECTURE Often hidden beneath the surface, For nearly half a century, CPL At the intersection of beauty and civil engineering projects must has brought a holistic approach functionality, you will find our team blend the natural environment to the design, planning and of skilled landscape architects with man-made resources to keep management of transportation designing gardens, parks, and communities thriving. From waste infrastructure. We bring the more. As we progress into a future management, site development, expertise necessary to ensure of sustainability, the onus is on us water system design and more, your bridge, streetscape, highway, to incorporate environmentally we enjoy projects that have the roundabout or parking lot project responsible practices in every ability to transform the lives of our gives people better access to the landscape design. families, friends and neighbors for world around them. the better. CPL HIGH PERFORMANCE DESIGN MUNICIPAL SERVICES Achieving operational efficiency BUILDINGS & STRUCTURAL & PLANNING to maintain financial stability and ENGINEERING We take great pride in partnering a commitment to environmental Ensuring you have power and with municipalities to provide stewardship is the standard we electricity where and when you privatized services that support set for ourselves. CPL’s High need it is a complex task in any quality of life, public infrastructure, Performance Design services are building, let alone multi-story growth and development. geared to reduce energy use and hospital or large industrial facility. Whether we’re gathering data, free up funds to deliver resilient From the lighting and ventilation creating concepts or developing designs that are sustainable and throughout your building to the long-range plans, we make sure highly functional. fire protection measures taken communities have all the tools and building’s structural integrity, and resources they need to thrive. CPL provides smart and seamless solutions to your complex INTERIOR DESIGN building systems. Through a strategic lens that balances both form and ARCHITECTURE function, everything you see in Whether you’re adding a a CPL interior space has been new wing to your building or meaningfully designed. These designing a facility from the environments are flexible and ground up, your space has a inclusive, meaningful and story to tell. Our industry-leading enriched, and above all, architects are passionate about people-centric. creating purposeful designs that reflect your spirit, spur productive change and make lasting impressions. 7 Page 77 of 301

Page 78

FIRM QUALIFICATIONS Wastewater Systems Effective wastewater management is essential for protecting public health—so we partner with municipalities to upgrade and expand existing sewer systems, addressing critical issues such as aging infrastructure, inflow and infiltration, while extending service to areas without access to public sewers. Our approach begins with feasibility studies to develop scalable, sustainable collection frameworks that prevent untreated sewage from entering local waterways. Whether tackling conditional issues in decades-old systems or improving groundwater management, we prioritize regulatory compliance, environmental stewardship, and long-term durability to help communities prepare for a healthier future. Our Wastewater Systems design experience includes the following • Industrial user permitting and reviews to ensure services: industries don’t negatively affect the public sewer system. • Grant and funding applications related to sewer system expansions and improvements to existing • Preliminary Engineering Reports and Facility Plans infrastructure, including the NYSEFC, CDGB, that define the issues, establish design criteria, NYSERDA, USDA-RD, and NYSDEC. and review the project costs. • Inflow and infiltration studies used by • Sanitary Sewer Use Law and Design Criteria municipalities to plan long range projects development. intended to reduce flows. • Capital improvement plans,that provide a long • Design, Bidding, and Construction services range financial plan for municipalities. related to new wastewater treatment facilities, • Design, Bidding, and Construction services and expansions or improvements to existing related to new collection systems, and expansions wastewater treatment facilities. or improvements to existing collection systems. • Environmental reviews of proposed projects • Environmental permitting associated with capital for the purpose of identifying issues that need projects, including the NYSDEC, ACOE, and DOH. to be addressed during design. Includes the • Planning Board reviews related to private NYS SEQRA process, Environmental Impact developments. Statements, and SHPO coordination. 8 Page 78 of 301

Page 79

FIRM QUALIFICATIONS WWTF & Collection System Projects CPL has established solid working relationships with communities across New York State, as well as the State and Federal agencies involved in local projects. Our experience allows us to be realistic and upfront about the time required and the amount of information and documentation that must be developed. We are experts in gathering and managing information to ensure projects are kept on schedule. Below is a partial list of wastewater system projects that CPL has completed in New York: Village of Akron City of Kingston Wastewater Treatment Facility Sanitary & Stormwater Improvements Village of Alfred Town of LaGrange Wastewater Treatment Facility Wastewater Treatment Facility Village of Arcade Village of LeRoy Wastewater Treatment Facility Wastewater Treatment Facility Village of Bolivar Livingston County Water & Wastewater Treatment Facility & Collection System Sewer Authority Wastewater Improvements Catoosa County City of Middletown Meadow Green Sanitary Sewer Sanitary Sewer Rehabilitation Town of Conesus Monroe County Lake Sewer District Improvements Pump Station City of Corning Town of Owego Wastewater Treatment Facility & Collection System Wastewater Treatment Plant Columbia County Town of Pembroke Wastewater Collection Sewer Districts No. 1 and 2 Town of Cuba Town of Ripley Lake Sewer District No. 5 Sewer District No. 2 Town of Dix Village of Wolcott Water and Sewer Sewer System Improvements Town of Dunkirk Village of Warsaw Water and Sewer Wastewater Treatment Facility Improvements Village of Elba Town of West Seneca East and West Road Sewer Rehabilitation Wastewater Treatment Facility 48” Trunk Sewer Replacement Sewer Trunk Main Replacement Town of Greenport Phases 1-8, Sewer Lining and Manhole Rehab I&I Study Phases 1-8, Sanitary Sewer Evaluation Surveys Town of York Sewer Districts No. 1 and 2 9 Page 79 of 301

Page 80

FIRM QUALIFICATIONS Water Systems Access to safe water is non-negotiable—but dated infrastructure often jeopardizes this life-sustaining necessity. That’s where our team steps in. Reimagining water distribution networks, we provide tailored solutions that increase availability, support growing populations and satisfy the latest agency standards. In this vein, we become embedded within towns, villages and counties to tackle challenges both big and small—from upgrading storage tanks to meet agricultural and industrial demands, to extending water mains to underserved neighborhoods relying on private wells. Together, we’re not just supplying water; we’re equipping entire communities to succeed. Our Water Systems design • Representation of County Health Departments for the purpose of reviewing and approving experience includes the following design plans submitted to the County by services: developers and municipalities. • Grant and funding applications related to water • Environmental reviews of proposed projects system expansions and improvements to existing for the purpose of identifying issues that need infrastructure, including the NYSEFC, CDBG, to be addressed during design. This includes NYSERDA, and USDA-RD. the NYS SEQRA process, Environmental Impact Statements, and SHPO coordination. • Hydraulic flow modeling used by municipalities to plan long range projects, simulate proposed • Preliminary Engineering Reports and Facility improvements, and identify distribution system Plans that define the issues, establish design deficiencies. criteria, and review project costs. • Design, Bidding, and Construction Services for: • Water Use Law and Design Criteria development. New water treatment facilities, and expansions • Capital improvement plans that provide a long- or improvements to existing water treatment range financial plan for municipalities. facilities. New distribution systems and • Environmental permitting associated with capital expansions or improvements to existing projects, including the NYSDEC, ACOE, and DOH. distribution systems. This includes water storage tanks, pump stations, and control vaults. • Planning Board reviews related to private developments. • Assistance with the water district formation process. • Water rate studies and budget analysis. 10 Page 80 of 301

Page 81

FIRM QUALIFICATIONS FIRM QUALIFICATIONS Water System Projects Below is a partial list of water system projects that CPL has completed in New York: City of Albany Water Board LCWSA Task Order On-Call Water Supply Program Village of Alfred Town of Lima Infrastructure Capital Improvement Plan Water District No. 5 Village of Arcade Town of Lloyd Water District Study Water Storage Tank Town of Batavia City of Middletown Water Storage Tanks, Water District Water District Improvements System Improvements, Raw Water Intake Town of Bethany Niagara Falls Water Board Water District No. 5 Water Main Replacements Town of Binghamton City of Poughkeepsie Water System Improvements, Water Storage Tanks Water Main Replacement, Water Storage Tanks Village of Bolivar City of Saratoga Springs Infrastructure Improvements Raw Water Intake Town of Boston Town of Shelby Water System Improvements Water District 12 Chautauqua County Town of Warsaw Water System Study & Water District Water Mains Improvements Town of Evans Village of Warsaw Water Storage Tank Water System Capital Improvement Projects GCEDC & Town of Alabama Town of Westfield Water Mains Route 5 Water Phase 2 Genesee County Village of Westfield Water Supply Program Water System Improvements Town of LaGrange Village of Wolcott Water System Improvements, Water Storage Tanks Capital Improvement Report Water Treatment Plant Study and Upgrade 11 Page 81 of 301

Page 82

FIRM QUALIFICATIONS Quality Assurance and Control METHODOLOGY USED TO ASSURE QUALITY CONTROL AND ASSURANCE The key to developing quality design and construction documents is the continuous involvement of the same project manager who serves as the liaison between the client and the project team, communicating information to staff members via formal and informal meetings. The Principal-in-Charge, Jason Foote, PE, works with the Project Team to regularly evaluate the project scope to ensure that the project remains on track. Project design review sessions provide the opportunity to confirm that design solutions are aligned with the scope and budget. All CPL professional staff members have a responsibility to ensure both quality design and client satisfaction throughout the life of a project. Independent In-house Review Print Review of Drawings and Specifications Our work products are independently and objectively We have access to many tools that aid in the quality reviewed in-house by professional staff members who assurance of our contract documents, including a are familiar with both the project and the needs of the critical review of each drawing sheet and specification client, but who are removed from the actual hands-on section by an experienced professional. This design. task involves the review of printed drawings and specifications for content and completeness based Critical Path Schedule on the stage of design. We also use specially prepared In-house project milestones are strategically developed project design checklists, which reference scope items in the design schedule as checkpoints to review and details that are to be completed for each phase progress of the documents with respect to drawing, of the design process. With these quality assurance specification and interdisciplinary coordination. Critical procedures in place, our construction documents are of path decisions are reviewed to ensure the team is the highest quality, minimizing the potential for costly prepared to move to the next phase of the design. changes during the construction period. These checkpoints allow for better quality control as they are performed during each phase of design. “Quality This process reduces the number of changes to the documents at the end of the construction document phase and minimizes potential errors that are created means doing when items are modified at the end of the design. Technology Resources it right when Advances in technology have made a positive impact on quality assurance. With design programs like CIVIL 3D, our project team can work on the same drawing simultaneously. This technology allows for no one is resolution of detail conflicts in real time, allowing our design professionals to solve design issues before they become construction problems. We have established looking” in-house CIVIL 3D standards to reduce the potential for errors and inconsistencies. We regularly review our CIVIL 3D standards to ensure that we are current with design trends. Part of this review includes making recommendations for changes in document preparation, software and training needs. -Henry Ford 12 Page 82 of 301

Page 83

FIRM QUALIFICATIONS Project Budget Management We begin every project with a detailed evaluation of Real-time cost modeling. The team works closely the project budget and the creation of a cost model. together to evaluate design options during the design This allows the team to begin the project with a solid process. This enables the owner and design team to understanding of project cost and uncover potential make design decisions based on scope and price. budget issues. Even in our current market environment Explore the use early equipment packages, allowing we have had recent success in delivering projects on the contractor or Owner to pre-order long lead and budget. Additionally, due to the current escalation limited equipment. The current post-pandemic and supply issues, it is possible that your project will economy has created a backlog of specific building face market pressure and equipment delays. Our products and increased the lead time for building cost estimating approach is designed to account for systems and equipment. By seeking a means to these types of variables by collaborating with the procure this equipment early, the project team can construction management team and employing a help limit construction schedule disturbance, improve proactive process that includes: construction logistics and reduce delays. Designing to a percentage of construction cost, with Track costs on a trade-by-trade basis with a target- the remaining percentage identified as add alternates. value approach. This links conditions in the market, Starting in the programming and planning stage, we such as escalation or supply limitations, to each trade set the design team’s project budget slightly below based on the specific material or building system the funding limit and then create a series of alternates being used. Trades such as plumbing have seen limited that if taken, will make up the cost gap between the competition and large price increases. For these trades design budget and funding budget. The creation and the team assigns higher trade specific contingencies prioritization of these alternates is discussed early in to buffer the market effects. This approach has been the project with the intent of building consensus and successfully utilized by our team on previous projects. confidence. 13 Page 83 of 301

Page 84

FIRM QUALIFICATIONS Grant Funded Projects Unlocking funds to deliver your best tomorrow. A well-defined funding strategy is essential to the success and sustainability of any project. It provides a clear roadmap for decision-making, resource allocation, and goal setting, ensuring that all efforts are aligned. GRANT FUNDING At the beginning of every year, we gather the team and talk about each client and every potential project to develop a draft funding strategy. What worked in past years, are there new funding opportunities, are there new guidelines, how can we SERVICES make each application more competitive? These are just a few • Proactively identify your of the questions asked. best opportunities Success related to our strategy was realized in 2024, when • Leverage our relationships approximately 50% of the total funding requested was awarded to obtain the right funding to the municipalities we work with, for a total of $37 million resources in grant funding through the New York State Environmental Facilities Corporation alone. Many of the projects included co- • Plan early, assemble the pieces funding through other State and Federal agencies including and move confidently through the USDA-Rural Development and NYSDEC Water Quality the process Improvements Program. • Eliminate uncertainty and Recognizing that “not every shoe fits” is critical to developing confusion a funding strategy that truly aligns with each project we work on. To adhere to this, the team at CPL has recognized the • Save substantial time and capital importance of not just being aware of the various funding programs, but of becoming experts and being connected to • Realize your community’s each program that is available. These agencies and programs best tomorrow include: • New York State Environmental Facilities Corporation o Engineering Planning Grant o Water Infrastructure Improvement Act o Intermunicipal Water Infrastructure Grants o Drinking Water State Revolving Loan Fund o Clean Water State Revolving Loan Fund o Green Innovation Grant Program o Green Resiliency Grants Approximately $37M in • United States Rural Development o Rural Utilities Service Water and Environmental Programs grants were awarded to • New York State Department of Environmental Conservation o Water Quality Improvement Project our communities in 2024 • NYS Office of Homes and Community Renewal o Community Development Block Grant 14 Page 84 of 301

Page 85

FIRM QUALIFICATIONS Grant Funded Projects (Continued) WATER/SEWER SPECIFIC GRANT EXPERIENCE The table represents a sampling of NYS projects and We are very familiar with various funding programs sources from which CPL has been able to assist clients and agencies that are relevant for public water/ in obtaining grants or low- or no-interest loans specific sewer projects including NYS Environmental Facilities to water and wastewater projects. This is not an all- Corp. (EFC). We can assist in obtaining grants and inclusive listing of projects. administering the funding. CLIENT PROJECT NAME GRANT AMOUNT FUNDING SOURCE Akron, Village of WWTF $1,938,000 EFC & NYSDEC Alfred, Village of Collection System Study - Phase 2 $50,000 EFC Alfred, Village of Collection System Study $30,000 EFC Almond, Village of Wastewater Study $40,000 EFC Arcade, Village of WWTF $1,200,000 EFC Batavia, Town of Pratt Road Sewer $24,000 EFC Bergen, Village of Collection System Study - Phase 2 $50,000 EFC Bergen, Village of WWTF Disinfection $137,500 WQIP Bolivar, Village of Collection System Study - Phase 3 $100,000 WQIP Bolivar, Village of WWTF UV & Collection Repairs $1,250,000 CDBG Darien, Town of Sanitary Sewer improvements $4,734,000 WIIA, LGE, DCBG, WQIP Elba, Village of Phases 1, 2 & 3 Sanitary Sewer Improvements $3,351,000 WIIA, WQIP, CDBG Elba, Village of Collection System Study $30,000 EFC Greenport, Town of Wastewater Treatment Facility $9,300,000 ARRA Independence, Town of Wastewater Study $30,000 EFC LCWSA Livingston County Collection System Study - Phase 3 $100,000 EFC LCWSA Livingston County Sewer Vac Truck $450,000 LGE LCWSA Livingston County Groveland WWTP Disinfection $367,576 WQIP LCWSA Livingston County Lakeville WWTP $198,055 WQIP LCWSA Livingston County Collection System Study - Phase 2 $100,000 EFC LeRoy, Village of WWTP Disinfection $1,000,000 WQIP Lloyd, Town of Wastewater Treatment Facility Improvements $8,500,000 EFC Middletown, City of Black Dirt Sewer Replacement $975,345 EFC Newark, Village of Allerton Hill Reservoir Replacement $3,591,000 WIIA Niagara Falls Water Board LaSalle Sewer Planning Study $100,000 EFC Niagara Falls Water Board LaSalle Sewer Construction Improvement $800,000 WQIP Oakfield, Town of Sanitary Sewer Study $24,000 EFC Owego, Town of Biosolids Mgmt & Outfall Sewer Study $50,000 EFC Owego, Town of WWTF No. 1 $2,543, 500 NYSDEC, EFC Pembroke, Town of Sewer Districts 1 & 2 $3,270,000 NYSDEC Pomfret, Town of Collection System Study $30,000 EFC Pomfret, Town of Water Meters $135,000 GIGP Poughkeepsie, City of Sewer Rehabilitation $2,800,000 EFC Poughkeepsie, Town of Pump Station Evaluation $100,000 EFC Ripley, Town of Collection System Study $30,000 EFC Wappinger, Town of Wildwood Sewer Improvements $2,484,620 EFC Warsaw, Village of WWTF Improvements $1,812,000 EFC & NYSDEC Warsaw, Village of I&I Study $50,000 EFC West Seneca, Town of Phase 8 Sanitary Sewer Improvements $3,871,000 WIIA Wyoming County WRA Silver Lake LWRP $148,750 DOS York, Town of WWTP Disinfection $750,000 WQIP York, Town of WWTP $24,000 EFC EFC - Environmental Facilities Corporation WQIP - Water Quality Improvement Project LGE - Local Government Efficiency Grant Program GIGP - Green Innovation Grant Program DOS - US Department of State Grant ARRA - American Recovery & Reinvestment Act WIIA - Water Infrastructure Improvement Award 15 Page 85 of 301

Page 86

Page intentionally left blank Page 86 of 301

Page 87

Genesee County Phase 2 Water System, Golden Road Pump Station, Monroe County, NY 2 Technical/Managerial Qualifications 17 Page 87 of 301

Page 88

TECHNICAL/MANAGERIAL QUALIFICATIONS Our project approach is personalized to your process but rooted in our project design experience and our core values. PROJECT UNDERSTANDING Town projects and will continue reduce engineering costs for Town AND APPROACH this coordinated approach, residents. This effective model CPL understands that the Town leveraging a strong working will continue to be applied where of West Seneca is seeking an relationship and seamless appropriate and will also include the engineering partner to provide teamwork to maximize funding continued use of Town Engineering professional services for a wide success. Department staff for construction range of water and wastewater inspection services. This system improvement projects. Recently, CPL assisted the Town partnership has proven effective of West Seneca in securing a on past projects, reducing overall Many of the Town’s water 2025 Engineering Planning Grant engineering fees while keeping and wastewater projects are (EPG) to help fund a re-evaluation total project costs lower for Town expected to be funded through study of the Town’s sanitary sewer residents. If selected by the Town, a combination of New York system. This study will identify CPL welcomes the opportunity to State and federal loan and grant areas with the highest priority discuss project-specific scopes of programs. CPL’s approach is to for inflow and infiltration (I&I), work in more detail and to follow proactively identify and take and the results will strategically up with a detailed scope and fee full advantage of all available guide future I&I mitigation proposal funding opportunities to reduce projects, with a particular focus on the Town’s financial burden improvements on the private side LOCAL KNOWLEDGE and minimize local costs. This of the sanitary sewer system. CPL has served as the Town includes programs such as the Engineer for the Town of West NYS Environmental Facilities Practical system evaluations, Seneca for over ten years, providing Corporation Water Infrastructure constructible designs, and cost- continuous general engineering Improvement Act (WIIA), NYSDEC effective solutions that align support as well as engineering Water Quality Improvement with regulatory requirements design services for the Town’s Program (WQIP), DASNY, the U.S. and available funding are always water and wastewater systems, EPA Community Grants Program, emphasized. Our approach is in addition to other municipal CDBG, and other funding sources. tailored to the Town’s operational and planning projects. This long- practices, priorities, and staffing standing relationship has resulted Familiarity with the requirements, structure, reflecting direct in an in-depth, system-level timelines, and documentation experience delivering water and knowledge of the Town’s water standards of these funding wastewater projects for the Town distribution system, sanitary sewer agencies ensures that all of West Seneca and numerous collection system, sanitary pump project bidding, construction other municipalities throughout stations, and operational practices, administration, inspection, Western New York. including overflow response and and closeout activities are bypass pumping operations. performed in full compliance Close collaboration with the Maintaining continuity with the with applicable funding and Town Engineering Department same engineering firm has helped regulatory requirements. CPL has allowed Town staff to be ensure consistency with long-term has successfully partnered with utilized for the design and system planning and compliance Rotella Grant Management to permitting of select water and with the NYSDEC Consent Order. secure grant funding for past wastewater projects, helping to This partnership is highly valued, 18 Page 88 of 301

Page 89

TECHNICAL/MANAGERIAL QUALIFICATIONS and projects are frequently delivered at costs below Water typical market rates due to efficiencies gained through Over half of the Town of West Seneca water system is ongoing work and system familiarity. located within the Erie County Water Authority (ECWA) Leased-Managed Area. Within this area, the Town is Wastewater responsible for the maintenance and replacement CPL has played a central role in the planning, design, of Water Mains and related infrastructure, including and implementation of the Town’s NYSDEC Consent valves and hydrants, and bears the full cost of these Order sanitary sewer rehabilitation program, including repairs despite not receiving water service revenues. the completion of multiple phases of sewer lining, ECWA provides the Town with a list of Water Mains manhole rehabilitation, trunk sewer improvements, recommended for replacement every two years. While and associated mitigation efforts. This experience numerous Water Main replacement projects have provides a detailed understanding of completed work, been completed over the years, new sections of Water remaining system deficiencies, and the regulatory Main are continually added to the system, which has drivers shaping future sanitary sewer improvements. limited the Town’s ability to reduce the overall number of required replacements. As a result, the number Ongoing sanitary sewer work with the Town and of Water Main replacements has remained relatively NYSDEC continues to focus on planning and consistent in recent years. evaluating future mitigation projects, with an increasing emphasis on private-side inflow and CPL has worked closely with ECWA to advance the infiltration reduction strategies, targeted rehabilitation, transition of the Leased-Managed Area to direct ECWA and cost-effective implementation. This depth of service, with the long-term goal of transferring the knowledge regarding Consent Order requirements, entire water system to ECWA to reduce the Town’s system performance data, and funding constraints ongoing financial burden associated with water allows for effective assistance in prioritizing projects, system repairs. This transition is expected to occur reducing overflows, and maintaining regulatory incrementally, district by district, while maximizing compliance. available grant funding to minimize costs to water Town of West Seneca, NY - 48” Sewer Construction 19 Page 89 of 301

Page 90

TECHNICAL/MANAGERIAL QUALIFICATIONS customers. An Overlay District was established to help Partnerships with many municipalities across Western equitably distribute the costs associated with these New York have been developed, primarily due to the system improvements. ability to help with the necessary funding to implement projects. It was recognized long ago that municipalities PROJECT TEAM often lack the experience and relationships with these A visit to any CPL office reveals staff from multiple funding agencies to secure funding. This business disciplines intermingled throughout the space, model has resulted in the successful implementation resulting in true teamwork and a unified approach of hundreds of projects. Specialization in working with to client service. Every core group works together municipalities and grant writers to create strategic toward a common goal: to be successful and to provide funding plans helps optimize grant opportunities for excellent service to clients. various projects. By working directly with funding agencies and using programs like CDBG, WIIA, The Town has access to the resources of over 500 and WQIP, grants from multiple sources have been people at CPL. For a full list of services, visit cplteam. effectively secured for individual projects. com/services. For example, the technology team can scan the exterior and interior of buildings, creating The Firm Qualifications section of this proposal includes digital models and imagery that allow people to a small snapshot of some of the most recent funding remotely walk through spaces, as well as digital success stories. renderings of new spaces. M/WBE PARTICIPATION A core group of people is essential for project success. Minority and Women’s Business Enterprise (M/WBE) The organizational chart lists key contacts, starting and Service-Disabled Veteran Owned Business with Jason Foote, PE (Principal-In-Charge) and Dave (SDVOB) participation is encouraged for all projects Hardenbrook, PE (Water/Wastewater Project Manager), with the Town, due to the goals established by various who will serve as the primary points of contact for funding agencies, including the New York State every project. As projects are assigned, Jason and Dave Environmental Facilities Corporation (NYSEFC). will work with the Town to determine which team members should be assigned based on their strengths, CPL is very familiar with these requirements, with expertise, and project familiarity. recent projects within the Town of West Seneca and also for other projects with the Village of Warsaw, A list of potential team members who provide special Village of Akron, Village of Elba, Village of Brocton, services is also included. This includes Norm Gardner, Village of LeRoy, Town of Darien, Village of Newark, and a Certified Geologist; Justin Steinbach, a Certified Livingston County Water & Sewer Authority. The typical Planner; and Greg Royer, Director of Energy Solutions. approach is to meet or exceed the participation goals established for each project, but occasionally a waiver EXPERIENCE WITH CDBG, NYSEFC, AND USDA RD is requested. The M/WBE and SDVOB firms included on FUNDED PROJECTS our project team are as follows: Extensive experience exists in delivering water and wastewater projects funded through NYSEFC, as 1. Azar Design Company-Formerly Foit Albert well as others including NYSDEC (WQIP), US EPA Associates (MBE) - Survey, base mapping, Community Grants Program, CDBG, and other state environmental review, inspection services, etc. and federal programs. Familiarity with funding agency requirements allows for efficient management of 2. JM Davidson Engineering, DPC (WBE) – Water documentation, M/WBE participation, reporting, and and wastewater process design, structural design, closeout requirements. inspection, smoke testing, etc. 3. NW Contracting (WBE) – Geotechnical services, environmental review, etc. 4. CC Environmental & Planning (WBE) – Wetland delineation, planning, environmental review, etc. 20 Page 90 of 301

Page 91

Village of LeRoy, NY - WWTF Improvements 3 Experience 21 Page 91 of 301

Page 92

EXPERIENCE Town of West Seneca Sanitary Sewer Improvements GRANT FUNDED Location: West Seneca, NY Client: Town of West Seneca Completion Date: Ongoing CPL performed the evaluation, analysis, design and construction administration of various sanitary sewer system improvements throughout the Town of West Seneca. This was done in order to correct the deficiencies within • Phase 4 Sewer Rehabilitation: Relining of approximately the sanitary sewer system, as a result of the 76,000 linear feet of sanitary sewers and the rehabilitation New York State Department of Environmental of approximately 300 manholes. Conservation’s (NYSDEC) issued Order on Consent for excessive inflow and infiltration (I/I) • Phase 5 Sewer Rehabilitation: Lining of approximately and sanitary sewer overflows (SSO). 44,000 linear feet of sanitary sewer main and rehabilitation of manholes along Seneca Street between Main Street and The collection system consists of several Transit Road. pump stations, approximately 29 miles of large • Phase 6–7 Sewer Rehabilitation: Lining of approximately diameter interceptor sewers, approximately 81,000 linear feet of sanitary sewer main and rehabilitation 120 miles of small diameter sewer and over of manholes in the area of Angle Road, Reserve Road and 3,500 manholes. The following projects are behind Southgate Plaza. completed, currently under construction or at • Phase 8 Sewer Rehabilitation (in construction): Lining of various phases of design. approximately 140,000 linear feet of sanitary sewer main, including 24” and 36” trunk sewers, and rehabilitation of • Phase 2 and 3 Sewer Rehabilitation: Relining manholes. This phase was particularly challenging and of approximately 130,000 feet of sanitary required significant bypass pumping operations as well sewers and the rehabilitation of over 800 as the construction of temporary access roads to facilitate manholes. construction. • East and West Road (Leydecker Phase) Sewer Rehabilitation: Replacement of approximately CPL continues to work closely with the NYSDEC on planning 3,100 feet of sanitary sewer, relining of and implementation of the next phases of the sanitary approximately 4,500 feet of sewers and the sewer rehabilitation program. Future rehabilitation efforts rehabilitation of over 100 manholes. are focused on addressing deficiencies on the private side • East and West Road (Houghton Phase) Sewer of the sanitary sewer system, which has been identified as Rehabilitation: Replacement of over 5,500 a remaining source of inflow and infiltration. The goal of the feet of sanitary sewer mains, replacement of NYSDEC Consent Order is to reduce inflow and infiltration 50 manholes, relining of approximately 9,200 and eliminate sanitary sewer overflows, and recent data feet of sewer mains and rehabilitation of 39 shows that, as a result of the completed projects, sanitary manholes. sewer overflows have been reduced by approximately 80% over the past three years. • 48” and 36” Sewer Trunk Main Replacement and Installation: Replacement of Upcoming phases are being planned strategically to approximately 2,600 feet of 48” sewer trunk maximize system benefit, remain cost-effective, and leverage main, installation of 4,300 feet of new 36” available grant funding to the greatest extent possible. In sewer trunk main parallel to the existing 36” support of this effort, CPL assisted the Town in securing an sewer main in order to increase the capacity Engineering Planning Grant to fund a comprehensive flow and storage of the conveyance system to help study to help evaluate system performance and identify reduce SSOs. priority focus areas for future rehabilitation projects. 22 Page 92 of 301

Page 93

EXPERIENCE Village of Arcade Sanitary Sewer Inflow & Infiltration Studies GRANT FUNDED Location: Arcade, NY report included mapping showing locations of Client: Village of Arcade manholes, spot repairs/replacement and other sewer Completion Date: Phase 1-2017, deficiencies. It also offered a detailed cost estimate of Phase 2A-2019, Phase 2B-2020 the recommended improvements which consisted of the open cut replacement of sanitary sewer main, rehabilitation of manholes and the replacement of Inflow and Infiltration (I&I) is an ever-present problem manholes. in the Village of Arcade sanitary sewer system. In 2013, CPL completed a study of the entire sanitary sewer The evaluation for Phase 2A and Phase 2B for the collection system by performing flow monitoring in Southeast Service Area and North Service Area, order to identify the problematic areas of the Village’s consisted of approximately 9,000 feet of 8-inch five sanitary sewer collection service areas. As a sanitary sewers and approximately 48 manholes. For result of the study, the service areas were ranked both Phases, CPL coordinated the televising work, and prioritized based on their deficiencies for further completed a visual inspection of the existing sanitary investigations and future rehabilitation. manholes within the service area, coordinated smoke testing and tabulated findings; reviewed and evaluated For Phase 1, CPL performed additional inflow and televising and manhole inspection data. Engineering infiltration (I&I) evaluation of the Village’s northeast Reports were prepared for both Phases with the service area by completing televising of the sanitary findings and offered recommendations and priorities mains, inspection of manholes and smoke testing. for improvements to be made along with detailed cost The area consisted of approximately 12,885 feet of estimates of the recommended improvements. The 8-inch and 12-inch sanitary sewers and approximately improvements consisted of the open cut replacement 58 manholes. An Engineering Report was prepared of sanitary sewer main, rehabilitation of manholes and with the findings and offered recommendations the replacement of manholes. and priorities for improvements to be made. The 23 Page 93 of 301

Page 94

EXPERIENCE Livingston County Water & Sewer Authority Infrastructure Improvements GRANT FUNDED Location: Livingston County, NY Client: Livingston County Completion Date: Ongoing The Livingston County Water and Sewer Authority (LCWSA) operates a sanitary sewer collection system serving residential, commercial, and industrial customers across the Towns of Groveland, Conesus, Geneseo, Livonia, and Avon, as well as the Village of Livonia. The system includes 38 pump stations and approximately 3,000 lateral connections, with pipes made of asbestos cement, vitrified clay, and PVC. Originally constructed in the late 1960s, the system has undergone multiple extensions over the past 20 years. The Lakeville Wastewater Treatment Facility (WWTF) is permitted to discharge 0.98 million gallons per day (MGD), but recent flows have exceeded this limit due to Inflow and Infiltration (I&I) within the collection system. In 2019, the New York State Department of Environmental Conservation (NYSDEC) issued a Consent Order requiring LCWSA to assess and mitigate excessive flows. To address these issues, LCWSA has implemented a comprehensive I&I reduction program, investing over $750,000 in sewer cleaning, televising investigations, manhole inspections, smoke testing, flow monitoring, and system rehabilitation projects. These improvements include upgrades to pipelines, manholes, and pump stations to enhance system efficiency and compliance. Funding for these efforts has been secured through multiple grant sources, including Consolidated Funding Applications (CFA), Wastewater Infrastructure Engineering Planning Grants (EPG), and Water and Wastewater Infrastructure Improvement Act (WIIIA) grants, supplemented by LCWSA reserve funds. These ongoing improvements are crucial to maintaining system reliability and regulatory compliance. 24 Page 94 of 301

Page 95

EXPERIENCE Village of Akron Wastewater Treatment Facility Upgrades GRANT FUNDED Location: Akron, NY To comply with updated NYSDEC discharge permits, Client: Village of Akron CPL conducted a disinfection study and secured Completion Date: 2023 $450,945 in grant funding through the Water Quality Improvement Project (WQIP) program. A UV disinfection system was selected to eliminate chemical CPL was engaged to evaluate the Village of Akron’s costs and the need for dechlorination. Wastewater Treatment Facility (WWTF) and determine cost-effective upgrade options. A preliminary After a critical failure in 2018, the aging RBC system engineering study was completed, and CPL helped was replaced in Phase 1. Phase 2 included a new secure $1.49 million in grant funding and a 30-year 0% headworks building, UV disinfection, HVAC and roofing interest loan through the Clean Water State Revolving improvements, new digester system, screw pumps, Fund (CWSRF) to implement the improvements. site lighting, and a waste gas burn-off system. Originally built in 1964 and upgraded in 1986, the facility remains well-maintained but requires modernization. Key upgrades include a new headworks facility with a mechanical bar screen, hydrodynamic grit separator, and flume flow meter to improve treatment reliability. Anaerobic digesters will receive new covers and a mixing system to address biogas leaks, and the screw pumps and equalization basin mixer will be upgraded. 25 Page 95 of 301

Page 96

EXPERIENCE Village of Elba UV Disinfection GRANT FUNDED Location: Elba, NY was selected to avoid having to Client: Village of Elba utilize costly chemicals and avoid Completion Date: 2025 the need for dechlorination. In January 2021, the Village of Elba was successful in obtaining a grant On May 21, 2018, the NYS up to $288,750 through the WQIP Department of Environmental program. Conservation (NYS DEC) modified the SPDES permit for the Village The selective alternative included of Elba’s WWTF to include effluent the construction of a new cast- disinfection limits on fecal coliform in-place concrete structure for during the summer months (May the UV disinfection equipment, 1st to October 31st). The modified improvements to the effluent SPDES permit stipulated that the pump station, electrical upgrades disinfection system needs to be and miscellaneous site work. The operational by May 1, 2023. UV disinfection improvements at the WWTF are considered the CPL prepared the application for initial phase of a multi-phased a 2019 NYS DEC Planning Grant improvement project for the and the Village was successfully Village’s WWTF and sanitary awarded a $30,000 grant which collection system. help fund the required Engineering Report for the disinfection Due to rising construction costs, study. CPL completed the study which were the result of the evaluating the feasibility of various pandemic, additional funding disinfection technologies and was needed to keep the project assisted the Village with the affordable for the Village. In July application for the Water Quality 2022, CPL assisted the Village with Improvement Project (WQIP) the application for WIIA and was program for the 2021 grant funding successful in obtaining funding round for the recommended UV through the NYS EFC CWSRF disinfection system. UV disinfection program. 26 Page 96 of 301

Page 97

EXPERIENCE Town of West Seneca Water District No. 8 & Bullis Road Water Main Replacement GRANT FUNDED Location: West Seneca, NY CPL worked closely with the Town Engineering Client: Town of West Seneca Department and the Erie County Water Authority Completion Date: 2025 (ECWA) to advance the project, including coordination of permits, funding compliance, and construction sequencing. Construction inspection was performed by CPL was retained by the Town of West Seneca to the Town Engineering Department, with CPL providing provide engineering services for the replacement construction administration services and coordinating of aging water main infrastructure within Water closely with the Town and the Contractor throughout District No. 8 and along Bullis Road. The project was construction. undertaken to address deteriorated water mains that had experienced repeated breaks while improving The project was funded through a Congressional overall system performance and service to residents. Earmark under the U.S. Environmental Protection Agency (EPA) Community Grant Program, which The project involved the replacement of existing water provided $1,229,360 in grant funding. The original mains with new 4”, 6”, and 8” PVC water mains, along construction cost estimate for the project was with associated valves, hydrants, and water services, $1,771,600, and the project was completed with a final along portions of Terrace Boulevard, Mohawk Street, construction cost of $1,587,054. Hyland Avenue, Northwood Avenue, and Bullis Road. Design efforts focused on constructability, minimizing service disruptions, and maintaining system redundancy during construction. 27 Page 97 of 301

Page 98

EXPERIENCE Village of Elba Water System Improvements GRANT FUNDED Location: Elba, NY Client: Village of Elba Completion Date: 2018 CPL was hired by the Village of Elba to provide engineering services for improving their existing water system. This was done in phases in order to expedite providing a new water supply to the Village as soon as possible. Phase 1 involved abandoning the Village’s existing Chapel Well supply, which had poor water quality, and making a new water supply connection to the Town of Batavia Townline Water Project along NYS Route 98. Construction for Phase 1 was completed in the fall of 2016 as part of a Change Order to the Town of Batavia Townline’s Project, eliminating the need to separately bid the project. Phase 2 involved the replacement of approximately 20,000 LF of 6”, 8”, and 12” water main, valves, hydrants, over 250 water services, and the rehabilitation of the existing water storage tank. Bidding of Phase 2 occurred in July of 2017. Construction began in October of 2017 and was completed in June 2018. CPL worked closely with the Village of Elba and Town of Elba throughout the project because the Town was planning a separate townwide Water District that surrounded the Village. This was critical because the two water systems would be interconnected in several locations. Additionally, the Town was constructing a new 350,000-gallon water storage tank. Instead of rehabilitating the Village’s existing tank, the Village made a one-time contribution to the Town of Elba tank for fire protection and also deeded the existing Village tank lands to the Town for construction of the new Town tank. CPL also assisted the two communities in developing an intermunicipal agreement (IMA) for the flushing of water between the water systems which eliminated the need for six costly master meter vaults around the Village. The overall project budget was $3,463,000. The Village of Elba received a $2,077,000 grant from NYS EFC and a low interest loan from USDA Rural Development. 28 Page 98 of 301

Page 99

EXPERIENCE Genesee County Water Supply Program Location: Genesee County, NY Client: Genesee County Completion Date: Ongoing COMPREHENSIVE APPROACH CPL assisted Genesee County in developing a county-wide water distribution system. Our efforts began in 1997 when the Genesee County Legislature created the Genesee County Water Resources Agency (GCWRA) to assist in CONTINUED EXPANSION IMPROVED WATER QUALITY addressing on-going water IN PHASE II AND PHASE III AND DELIVERY problems. Working closely with In 2017, the County embarked on an • Improvements in water quality, the GCWRA and local officials, ambitious plan to provide service especially in the Village and Town CPL facilitated the inter-municipal to other areas of the County. Phase of Oakfield, Town of Pembroke collaboration needed to resolve the II of the Program involved 28 miles and the Town of Pavilion. For many water-related problems facing of new water main, 5 new pump example, the new system has the County. stations, upgrades to 5 existing provided water to the Village/ pump stations, rehabilitation of 4 Town of Oakfield, replacing the The resulting Genesee County water storage tanks and additional existing municipal well supply Water Supply Program involved upgrades to the Batavia Water located in close proximity to a the integration of County water Treatment Plant. federally designated Superfund resources with the regional water waste site. supply systems of the Monroe Phase III is currently underway, County Water Authority (MCWA) • Enhanced system reliability CPL will provide Program through financial, operational and and the Erie County Water Authority Management which includes (ECWA) along with the continued managerial assets of the Monroe meetings, coordination with the County Water Authority. use of the City of Batavia Water project team, technical, funding, Treatment Plant. financing, budgeting strategies, • Replacement of aging grant application assistance, LCRR infrastructure, most notable is the Also responsible for project design, and source water assistance, flow 75-year old City of Batavia water in Phase I of the Program the firm studies, feasibility reviews, cost treatment plant that was in need designed 65 miles of new water estimating, annual master plan of major process renovations. main, three new water storage updates, and other minor support • Provision of public water supply to tanks and five new pump stations services not related to specific the three school districts (Byron- as well as the integration of four Phase III design efforts. Bergen, Pavilion, and Pembroke) separate water supply sources. that were on insufficient well The impact of the investment in These improvements provide water systems. the Genesee County Water Supply to the Town and Village of Elba, Program is comprehensive and far- • Expanded public water service Town of Alabama, Town and Village in the Towns of Pavilion, Darien, reaching. It is designed to provide of Alexander, Town of Bethany, reliable, high-quality water well into Stafford, Oakfield, Batavia, and enhance supply in areas that Pembroke, and LeRoy. the next century. were considered in Phase I of the Program. 29 Page 99 of 301

Page 100

EXPERIENCE Livingston County Water Supply Program GRANT FUNDED Location: Livingston County, NY It’s been 30 years since CPL completed the Livingston County Water Client: Livingston County Supply study that led to our first water main replacement project for Water and Sewer Authority the County. The study presented water resource utilization alternatives, Completion Date: 1991-Ongoing specific facility recommendations and an implementation schedule, and a discussion of potential management structures, including the creation of a Water and Sewer Authority. The result was a blueprint for the implementation of a comprehensive plan for the development of water resources in Livingston County. WATER PROGRAM DETAILS • 17 Towns CPL works with the Livingston County Water and Sewer Authority on a • 9 Villages regular basis to maintain and improve the system of delivery, treatment • Purchase Water via Contract and water storage. Several water main replacement projects have been advanced over the years, including the East Lake Road Water Supply and from 6 Municipalities Distribution project; Towns of Conesus and Sparta, Scottsburg Water • 7 Pump Stations Supply project and the Hemlock Water Supply Project. • 58+ Miles of Distribution and Transmission Line • 11 Storage Tanks • 3,710 Retail Water Customers 30 Page 100 of 301

Page 101

EXPERIENCE Village of Alfred Water System Improvements GRANT FUNDED Location: Alfred, NY Client: Town of Alfred Completion Date: 2025 The Village of Alfred water system is complex for a small municipal system and includes two well houses, three booster pump stations, three storage tanks or reservoirs, and five pressure zones. Many components of the distribution system were nearing the end of their service lives and required repairs, upgrades, or removal from service. Although the Village had maintained all components of the distribution system, portions of water main within the system had approached 60 years since their installation, and the well house/pump station buildings were not in suitable condition for extended future use. In addition, water storage tank #3, originally constructed in 1903, had approached 120 years of service. The capital improvements included the replacement of 13,000 LF of transmission main from the well houses to Belmont Road, improvements to well houses #1 and #2, improvements to the booster pump stations, replacement of 8,000 LF of Water Main in the Pine Hill area, replacement of the water storage tank(s), and upgrades to the meters for Alfred University with associated pipe replacement. 31 Page 101 of 301

Page 102

EXPERIENCE Small Project Highlights While CPL has a strong desire to complete the big projects, it is the small projects that build relationships and help set us apart from other firms. These projects can take a lot of effort, but CPL realizes that municipalities don’t have large budgets to implement the small projects. This requires efficiency and a well-run team. Some examples of recent small projects include the following: CLIENT PROJECT FEE The Village needed assistance with obtaining funding related to the water system and WWTP. CPL completed the evaluations, prepared Village of Alfred $10,000 reports, and helped the Village successfully obtain significant grant funding for both projects. CPL provided the necessary design, permitting and construction Town of Barre administrative services for the installation of approximately 2,500 $9,550 linear feet of new 8” PVC water main along Eagle Harbor Road. CPL assisted with the design, bidding, and construction services Town of Bethany related to the replacement of the septic system for the Town Hall. $5,000 The Town used ARPA funds to complete the project. Design, bidding, and construction services related to an emergency water main replacement. CPL also led the effort to obtain 100% grant Village of Canisteo $10,000 funding. The project was completed in less than 6-months, including funding. CPL provided architectural services related to the replacement of the City of Corning $5,250 roofing systems at the WWTP. CPL helped the Town obtain funding for the construction of a new Town of Leicester salt storage facility. CPL also handled the design, bidding, and $19,500 construction services. The Town requested that CPL assist with obtaining WIIA funding in 2022 for the North End Water District. Within a 2 month period, CPL Town of Pomfret $8,000 provided the report, environmental review, and assisted with the grant application. The Town was successful. 32 Page 102 of 301

Page 103

4 Project Team 33 Page 103 of 301

Page 104

PROJECT TEAM Passionate People. Transformative Solutions. Meet Your Team KEY LEADERSHIP Jason Foote, PE Principal-in-Charge PROJECT TEAM Water & Wastewater MEP Engineering Structural Engineering System Engineering David Hart, PE Larry Werts, PE Lead - Mechanical Engineering PROJECT MANAGER Joseph Bellanca David Hardenbrook, PE Lead - Electrical Engineering PROJECT ENGINEERS Jennifer Wengender, PE Subconsultants Lead - Plumbing/ Jonathan Rink, PE Survey Fire Protection Engineering Colin Nims Azar Design Company RJ Green MBE SANITARY SEWER SYSTEM Water/Wastewater Support ADVISOR & INSPECTOR Special Services JM Davidson Engineering Andrew Bork WBE Environmental Review & Geotechnical WATER SYSTEM Geotechnical Norman Gardner, CPG ADVISOR NW Contracting WBE, DBE Jeremy DeLyser, PE Sustainability Greg Royer Planning/Environmental Review Planning & Grant Writing CC Environmental & Planning Justin Steinbach, AICP WBE Daniel Insinna, EIT 34 Page 104 of 301

Page 105

PROJECT TEAM Jason A. Foote PE Principal-in-Charge Jason is an Associate Principal with two decades of experience providing design services for civil and municipal engineering projects. His expertise ranges from water treatment and distribution to wastewater collection, storm drainage and planning board review. Delegating and overseeing work assigned to team members, Jason independently evaluates, selects and executes methodologies that will help streamline development and performs quality assurance / control for all assignments within his purview. He is a seasoned leader with a great talent for applying the right combination of skills and experience to consistently provide excellent service. PROJECT EXPERIENCE from Genesee County, highlighting Town of West Seneca, NY teamwork, coordination, and EDUCATION • Bachelor of Science, Civil Principal/Project Manager innovative problem-solving. Engineering Technology, • Phase 8 Sewer Rehabilitation University of Buffalo, 1999 • Water District 8 and Water Main Village of Elba, Phase 2 Water • Associate in Applied Science, Improvements System Improvements, Elba, NY Engineering Science, Genesee • Sanitary Sewer Improvements Project Manager of Phase 2, which Community College, 1995 • Energy Procurement involved the replacement of approximately 20,000 linear feet PROFESSIONAL REGISTRATION Professional Engineer: NY Village of Arcade, Sanitary Sewer of 6”, 8” and 12” water main, valves, Phases 1 & 2A, 2B Improvements, hydrants, over 250 water services, PROFESSIONAL AFFILIATIONS Arcade, NY and rehabilitating the existing water • AWWA Project Manager for a $1.4 million storage tank. Construction was • Western New York Water Works multi-phased, sanitary sewer completed in June 2018. Association project, which included planning, • Leadership Genesee design, approvals, bidding and Genesee County Phase 2 Water construction. The projects involved Supply, Genesee County, NY the replacement and/or rehabilitation Served as Project Manager to of existing sanitary sewer mains, and support the County in expanding manholes, and the restoration of all water service to additional areas. disturbed areas. The Village obtained Phase II of the program included grants and low interest loans from the installation of 28 miles of new NYS EFC to fund the projects. water mains, construction of 5 new pump stations, upgrades Town of Elba, Water District #2, to 5 existing pump stations, Elba, NY rehabilitation of 4 water storage Led planning and engineering tanks, and enhancements to the efforts to provide potable water to all Batavia Water Treatment Plant. residents in the Town by creating a single, town-wide Water District No. Livingston County Water & Sewer 2. The $17,769,000 project included Authority, DOCCS Water Supply, installing approximately 250,000 Livingston County, NY linear feet (over 47 miles) of 8” and Managed the installation of 12” and 12” water main, valves, hydrants, 16” water mains, valves, hydrants, around 500 water services, and a pressure-reducing/meter vaults, a 750,000-gallon water storage tank. Funding was secured through 250,000 gallon water storage tank, USDA Rural Development grants pump station and appurtenances and loans, along with a contribution along multiple roads. 35 Page 105 of 301

Page 106

PROJECT TEAM David Hardenbrook PE Water & Wastewater Project Manager As a member of the civil engineering team in our Buffalo office, David focuses on technical design, drafting, reports and inspection services. He has completed a wide variety of projects throughout New York state, including water distribution systems and wastewater design assignments. His innate desire to learn propels him as he works alongside senior engineers on industrial and commercial projects. In addition to his engineering expertise, David has experience working in the construction management realm, which has helped him develop a deep understanding of construction procedures and safety standards. PROJECT EXPERIENCE City of Corning WWTP Town of West Seneca, NY Improvements, Chemical Storage EDUCATION Bachelor of Science, Civil Project engineer/manager for the Building, Corning, NY Engineering, University at Buffalo lining and manhole rehabilitation Provided building design services to of over 90,000 linear feet of sanitary the standards of 10 States Standards, PROFESSIONAL REGISTRATION sewer main, including the 24” and 36” The City of Corning, and NYSDOH. Professional Engineer: NY trunk sewers. The building provides nearly 8000 gallons of safe storage for the City’s PROFESSIONAL AFFILIATIONS Town of Darien, Sanitary Sewer phosphorus treatment chemicals. • American Society of Civil Engineers • OSHA 30 Certified Upgrades, Darien, NY The building provides safe delivery • American Water Works Association Project Engineer/Manager for the areas, chemical containment, alarms, • USA FAA Remote Pilot License installation of a new 6” sanitary force and SCADA to contain the chemicals main and sanitary pump station to and notify operators of leaks or other convey flows from the Town of Darien emergencies in a timely manner. to the Village of Corfu WWTF. The The Building was completed in the project included the abandonment Fall of 2022 -Provided construction and decommissioning of the existing administration services Darien WWTF. Genesee County Water Supply, City of Corning WWTP Phase 2 and 3, Genesee County, NY Improvements, UV Disinfection Phase 2A - Existing Pump Station Building, Corning, NY Upgrades (Contract 4) Provided building design services Provided building design services to the standards of 10 States to the standards of MCWA, Genesee Standards, The City of Corning, and County, and NYSDOH. The intent NYSDOH. The building provides of the upgrades is to increase the wastewater treatment utilizing pumping capacity into Genesee ultraviolet light rather than through County to meet the increased water the use of harsh chemicals. The demands within the County. Building was completed in the Fall of 2022-Provided construction administration services 36 Page 106 of 301

Page 107

PROJECT TEAM Jonathan Rink Colin Nims PE Project Engineer: Civil Engineer Project Engineer: Senior Engineering Designer Based in our Buffalo office, Jonathan is a skilled Civil Colin is a Project Engineer working with the Engineer specializing in the design and analysis of Infrastructure Team in our Buffalo Office. He brings a complex systems. With 9 years of experience and broad range of permitting, environmental compliance, proficiency in industry-standard tools like AutoCAD, Civil and municipal infrastructure experience in support of 3D, HydroCAD, and WaterCAD, he brings expertise to public works and development projects. His background projects ranging from waterline design and stormwater includes coordination of state and federal environmental modeling to pump station improvements. permitting, SWPPP compliance, and technical support for projects involving regulated waterways and environmentally sensitive areas. Colin has experience EDUCATION performing HEC-RAS hydraulic modeling for streams to Bachelor of Science, Environmental Engineering, evaluate flood elevations, flow conditions, and project University at Buffalo impacts, as well as implementing streambank protection PROFESSIONAL REGISTRATION and stabilization measures. He also has a wide range Professional Engineer: NY of municipal water and wastewater design experience, complemented by hands-on site and construction-phase PROJECT EXPERIENCE experience. Town of West Seneca, Water District 8 & Bullis Road Water Main Replacement, West Seneca, NY EDUCATION The project involved the replacement of existing water Bachelor of Science, Civil Engineering, mains along portions of Terrace Blvd, Hyland Place, University at Buffalo Mohawk Street and Bullis Road. PROJECT EXPERIENCE Niagara Falls Water Board, Beech Avenue Tank & Town of West Seneca, Phase 8 Sewer Rehabilitation, Pump Station, Niagara Falls, NY West Seneca, NY Project Engineer for the design, bidding, construction Assisted with preparation of engineering report for DEC administration and inspection for the rehabilitation of relative to phase 8 sewer rehabilitation requirements and the existing Beech Avenue water storage tank and the drawings and specs for lining, grouting of sewer mains construction of a new booster pump station to improve and laterals as well as manhole rehabilitation. pressure within the northern portion of the City of Niagara Falls water system. Town of West Seneca, Stormwater Management, West Seneca, NY Water Main Replacement Experience: Provides stormwater and regulatory support, SWPPP Project responsibilities included drafting, plan review, reviews and Planning Board reviews to ensure proposed engineer’s estimate, and assembling technical developments comply with applicable stormwater specifications. regulations and permit requirements. Maintains • The Town of Grand Island (Bronson, Towerwood, and compliance with the Town’s MS4 program, including Red Jacket Road) required documentation, reporting, inventory, and • The Town of Newstead (ECWA Lease Management - coordination with regulatory agencies. Indian Falls, Knapp, and Kirby Rd.) • The Town of Cambria (Saunders Settlement Road, Village of Alfred, NY Shawnee Road) • Sewer System Improvements • The Village of Holley (Village-wide replacement and • Collection System Study Thomas Street replacement) Sinclairville Water System Upgrade, Sinclairville, NY* Erie County Water Authority, NY* Assisted in the design and production of a complete set • 16-inch diameter water main and 8-inch and 12-inch of plans to construct a new pre-fabricated water tower, diameter water main replacements three pre-fabricated pump houses and two production • Ball Pump Station north Tank Replacement wells to improve the town’s existing water infrastructure. * Experience prior to CPL. * Experience prior to CPL. 37 Page 107 of 301

Page 108

PROJECT TEAM RJ Green Andrew J. Bork Project Engineer: Senior Sanitary Sewer System Engineering Designer Advisor & Inspector As an Engineering Designer in our Buffalo office, RJ Andy is a seasoned municipal professional with over plans and designs a myriad of projects, ranging from 30 years of service in the Town of West Seneca Sewer small site developments and roadway improvements Department, possessing intimate, system-level to wastewater treatment and collection assignments. knowledge of the Town’s sanitary sewer network. His Working primarily with our Infrastructure team, he extensive hands-on experience in water and wastewater gathers and analyzes data, performs field reviews and construction inspection and operations allows him to prepares layouts for stormwater management, grading quickly identify existing deficiencies, anticipate potential and erosion control. Whether conducting inspections issues, and help resolve problems efficiently in the or preparing backflow prevention reports, his work is field. Andy’s practical, boots-on-the-ground approach instrumental in advancing CPL’s mission of enriching supports informed decision-making and effective lives through compassionate design. coordination with contractors and municipal staff to keep projects moving forward. EDUCATION Bachelor of Science, Civil Engineering, CERTIFICATIONS University at Buffalo • OSHA 10 Confined Space • NYSDEC Erosion and Sediment Control PROJECT EXPERIENCE Town of West Seneca, NY PROJECT EXPERIENCE • Phase 8 Sewer Rehabilitation Town of Evans, Water System Improvements, Water • Water District 8 and Water Main Improvements Tank & Pump Station, Evans, NY Construction Inspection and Documentation of a 15,000 Town of Ripley, NY LF installation of a water main between a newly installed • Clarifier Improvements pump house and water tower, with new valves and • Water District No. 4 hydrants – pressure, bacteria and chlorine tested. Town of Bethany, NY Town of Boston, Water System Improvements, Boston, Water District No. 5 - Design and construction NY administration for approximately 154,000 feet of water Construction Inspection and Documentation of a 1,266 LF main and two pump stations to serve residents, farms, installation of a water main, valves, hydrants and water and businesses services, restoration of asphalt on shoulder and driveway approaches as well as lawn restoration, pressure, bacteria Town of Boston, NY and chlorine tested. Water Main Improvement Phase 1 - Design of approximately 10,770 feet of water main Village of Alfred, Water System Improvements, Alfred, NY Town of Lima, NY Pine Hill Water Storage Tank–Construction Inspection Water District No. 5 - Design and construction of water and Documentation of a 472,000 gallon water tank main improvements for the Town of Lima Water installation. District No. 5. Erie County Water Authority, Water Main/Services Town of LeRoy, NY Replacement Design and construction administration for Water • Replacement of water main, valves and hydrants District No. 12 • Replacement of 83 water services between new water main and right of way – 19 Interconnections, pressure bacteria and chlorine tested City of Olean Roundabout Project, Olean, NY Construction inspection for the construction of the City of Olean roundabout. 38 Page 108 of 301

Page 109

PROJECT TEAM Jeremy E. DeLyser David R. Hart PE Water System Advisor Lead - Mechanical Engineering Jeremy has more than 20 years of experience with Dave is an accomplished mechanical engineer with various types of civil and municipal engineering projects, over 30 years of experience in project engineering/ including water distribution and wastewater collection management, HVAC systems design, product design, systems, water and wastewater district formation, storm manufacturing process design, and materials selection. drainage and site planning, many of which are funded He also has strong organizational skills and the ability to through state and federal agencies. His experience communicate and work effectively with clients. Dave is through involvement with planning, design, funding the Lead MEP Engineer at CPL, directing the work of the source development, construction administration and mechanical, electrical, and plumbing engineering staff. inspection phases on a diverse array of projects, has been a benefit to numerous municipalities EDUCATION and clients Bachelor of Science, Mechanical Engineering, State University of New York at Buffalo, 1990 EDUCATION Bachelor of Science, Civil Engineering Technology, PROFESSIONAL REGISTRATION Rochester Institute of Technology Professional Engineer: NY, PA, NC, GA, SC PROFESSIONAL REGISTRATION PROFESSIONAL AFFILIATIONS Professional Engineer: NY • American Society of Heating, Refrigerating and Air Conditioning Engineers PROJECT EXPERIENCE • National Society of Professional Engineers Genesee County Water Supply, Phase 2A, Genesee • Association of Energy Engineers County, NY Golden Road Pump Station PROJECT EXPERIENCE (Contract 3) Monroe County Water Authority, East Side Water Provided building design services to the standards of Supply Project, Webster, NY MCWA, Genesee County, and NYSDOH. The Building was Project MEP Engineer for a $150 million water supply completed in the Spring of 2023-Provided Construction project. The project included: Administration Services • Raw water intake tunnel and pump station • Water treatment plant Town of Alabama, Water District No.2 Phase 3, • High lift pump station Alabama, NY • Transmission system CPL provided design and construction engineering services for the installation of approximately 100,000 LF Webster, NY of 8” PVC and HDPE water mains along various roads in • Raw water intake tunnel and pump station the Town of Alabama to provide water to approximately • Water treatment plant 177 residential parcels. • High lift pump station • Transmission system Town of Benton, NY Project Manager for the following: Middletown Water Treatment Plant, Middletown, NY • Water District No. 1, Extension 1 Project MEP Engineer for the design of HVAC systems for • Water District No. 1, North Extension a new 6 million GPD water treatment plant. • Water District No. 5 • Water District No. 6 Cross-Irondequoit Pump Station Improvements, Irondequoit, NY Town of Castile, Design & Construction Engineering • Project MEP Engineer for the design of the mechanical Services, Castile, NY and HVAC system improvements at the 100 million GPD Design and Construction Engineering Services for capacity pump station upgrades to existing water district. Addition of Booster • Installation of two 700 hp and two 1250 hp pumps, Pump Station and multiple pressure reducing valve and variable frequency drives and motors meter vaults. 39 Page 109 of 301

Page 110

PROJECT TEAM Joseph Bellanca Jennifer J. Wengender PE Lead - Electrical Engineering Lead - Plumbing/Fire Protection Engineering Joe is an Associate with nearly two decades of experience Jennifer has over 30 years of experience in mechanical in electrical engineering design, implementation and engineering, where she has concentrated on plumbing construction management. He is responsible for power and life safety. Since 1998, she has been designing distribution, communication, lighting and low-voltage plumbing, mechanical, fire protection and medical systems for CPL’s building projects, and works closely gas systems for CPL. Jennifer leads the plumbing with fellow team members to ensure all designs adhere department at the firm and serves as Project Manager to various codes and standards while maintaining client for several repeat clients. Her overall knowledge of codes expectations. He also has field experience designing including NYS, NFPA, DOH and SED and her ability to and building controls for water treatment plants, pump coordinate with Code Officials make her a valuable part stations and landfills, as well as electrical construction of the design team. work. A natural educator, Joe aspires to continuously expand the experience and understanding of junior EDUCATION engineers. • Bachelor of Science, Mechanical Engineering, State University of New York at Binghamton EDUCATION • Associate of Applied Sciences, Engineering Science, Bachelor of Science, Electrical Engineering Technology, Dutchess Community College Rochester Institute of Technology PROFESSIONAL REGISTRATION PROJECT EXPERIENCE Registration: Professional Engineer NY, NC, GA Town of Elba, NY Water District No. 2 PROJECT EXPERIENCE Town of West Seneca, West Seneca, NY Manchester Water District, LaGrange, NY Sanitary Sewer Improvements Project Engineer for preparation of design drawings, technical specifications and contract documents Village of LeRoy, LeRoy, NY for permitting and construction of the water supply Wastewater Treatment Facility Improvements and treatment facilities, the water storage tanks, and pumping and distribution system. Town of Elma, NY Project Plumbing Engineer for gas service upgrades for Genesee County, NY a new generator at water treatment facilities. Phase 2 Water Supply Genesee County Economic Development Center Village of Bergen, NY Business Park Water System Improvements Project Plumbing Engineer for plumbing, fire protection, and process gases for a large $6 million new building Village of Ellicottville, NY and miscellaneous client buildouts. Water System Improvements Monroe County Water Authority, East Side Water Monroe County Water Authority, Monroe County, NY Supply Project, Webster, NY Project engineer for two new single story fresh water Project Plumbing Engineer for a $150 million water pump station buildings. supply project. The project included: • Raw Water Intake Tunnel Town of Seneca, NY • Lake Water Pump Station Water System Improvements • Raw Water Transmission Main • Webster Water Treatment Plant and High Lift Pump Village of LeRoy, NY Station Wastewater Treatment Facility Improvements • Residuals Handling • Finished Water Transmission Main 40 Page 110 of 301

Page 111

PROJECT TEAM Larry D. Werts Norm Gardner PE CPG Environmental Review & Geotechnical Lead - Structural Engineer Senior Engineering Project Manager Larry is a licensed structural engineer with 25 years of Norm has more than three decades of experience extensive and varied experience. His design expertise providing oversight for civil, site and environmental includes water treatment facilities, multi-story schools tasks. He has experience providing oversight for State and healthcare buildings, warehouse/distribution Environmental Quality Review Act (SEQRA) compliance structures, hotels and highway bridges. Larry has for a wide range of assignments, encompassing completed several projects that required extensive comprehensive plans, and civil and municipal design analysis prior to design and renovation of existing projects. He has additionally conducted numerous site structures. investigations and environmental audits for private industrial concerns throughout New York state. EDUCATION EDUCATION • Bachelor of Science, Civil Engineering Technology, • Graduate Studies, Ohio State University Rochester Institute of Technology • Bachelor of Science, Geology, Ohio State University • Associate of Applied Science, Architectural Engineering Technology, State University of New York at Alfred State PROFESSIONAL REGISTRATION College Certified Professional Geologist PROFESSIONAL REGISTRATION PROJECT EXPERIENCE • Professional Engineer: NY, FL, GA, NC, PA, VA, WV, OH Village of Avoca, NY • Certified Code Enforcement Official: NY Project Consultant for a new groundwater supply for the Village to replace existing spring sources that were PROJECT EXPERIENCE in violation of the surface water influence regulations Structural Engineering for Municipal Infrastructure under USEPA’s Surface Water Treatment Rule. Prepared Structural Engineering support for municipal water and all drilling specifications and testing protocols to meet wastewater projects, designing concrete structures and NYSDEC approvals. Supervised all field work and equipment support structures. Projects include: prepared the final report for submittal to NYSDEC for • Village of Bergen Wastewater Treatment Facility New Source Approval. Upgrade, Bergen, NY • Livingston County Water and Sewer Authority, Lakeville Erie County Department of Public Works, Wastewater Treatment Facility, Livingston County, NY Reconstruction of Alden-Crittenden Road (CR1), Village • Town of Pavilion Sanitary Sewer, Pavilion, NY of Alden and Bullis Road (CR 330), Town of Marilla, NY • Genesee County Water Supply Program, Genesee Provided environmental/ geotechnical review for this County, NY roadway rehabilitation project. Design services included • City of Middletown Water Treatment Facility and pavement evaluation, design of new closed drainage Wastewater Treatment Plant, Middletown, NY system, new concrete gutter on CR 330, new concrete • Town of Stafford Water District 1, Stafford, NY curb-gutter on CR 1, upgrades of sidewalk ramps and • Village of Alfred Wastewater Treatment Facility, NY pedestrian crossings for compliance with ADA guidelines, • Monroe County Water Authority East Side Water Supply work zone traffic control, new signage and striping, Project, Webster, NY cost estimating, design report preparation, and public • Village of Portville Sewer System Improvements/ participation meetings. Collection System, NY • Town of Batavia Shepard Putnam Water District Livingston County, SEQRA Assistance, Mt. Morris, NY • Pearl Water District, NY Project Manager responsible for the environmental study • Village of Belmont Wastewater Treatment Facility, NY to assist Livingston County in meeting the requirements • Monroe County, Irondequoit Bay Pump Station, of the State Environmental Quality Review Act as it Rochester, NY applies to the construction of a new skilled nursing facility. 41 Page 111 of 301

Page 112

PROJECT TEAM Greg Royer Justin W. Steinbach AICP Sustainability Specialist Planning and Grant Writing Director of Energy Solutions Project Manager Drawing from nearly two decades of experience in As a Certified Planner, Justin is no stranger to helping energy conservation and brokering, building system communities figure out creative ways to reach their controls, renewable technologies, high performance full potential. Often working alongside public officials, lighting, EV and microgrid infrastructure, energy finance planning commissions and neighborhoods, he solutions, and client relationship management, Greg develops land use plans and programs that identify identifies cost-effective measures for new construction both short- and long-term solutions to improve and and renovation ventures while ensuring clients’ energy revitalize communities. For nearly two decades, saving goals are achieved in a timely and practical Justin has spent the better part of his career creating manner. His expertise and talent for mitigating energy sustainable community plans for towns, cities, counties demand is a true asset to the entire team, serving to and metropolitan areas. Whatever the project may strengthen our existing partnerships while driving encompass, he enjoys the process of learning everything immeasurable progress throughout CPL. about a community — its origin, character, uniqueness and hidden assets — to help give them a visual, phased plan for future growth. EDUCATION Associate of Science, Computer Networking Systems, ITT Technical Institute EDUCATION Bachelor of Arts, Environmental Design, State University PROFESSIONAL REGISTRATION of New York at Buffalo • Associate of Energy Engineers (AEE) • American Society of Heating, Refrigerating and Air- PROFESSIONAL REGISTRATION Conditioning Engineers (ASHRAE) American Institute of Certified Planners #025385 PROJECT EXPERIENCE PROJECT EXPERIENCE City of Lackawanna City Hall Conversion, Chautauqua County, Grant Assistance for Regional Lackawanna, NY Water System, Chautauqua County, NY Conversion of 2838 South Park Avenue into Lackawanna Successful in obtaining over $1 million in grant funding City Hall from the NYS Department of State. Otsego County, NY* Town of North Harmony (Chautauqua County), Local $2.2M EPC: new building automation controls, LED Government Efficiency Grant, North Harmony, NY lighting, building envelope improvements, mechanical Worked with the Town of North Harmony to submit system upgrades, and plug load controls for all county- a Local Government Efficiency grant for a joint water owned and leased building infrastructure. district study with neighboring communities to address water quality issues. Cortland County, NY* $5.2M EPC: new building automation controls, LED City of Olean, USDOT RAISE Grant, Olean, NY lighting, building envelope improvements, mechanical Resubmission of a 2022 USDOT RAISE Grant for $21 system upgrades, plug load controls, new windows for all million streetscape and transportation improvements county-owned and leased infrastructure. to West State Street. The 2021 application made it to a round of 200 +/- applicants from an initial pool of 763. Madison County, NY* $3M EPC: new building automation controls, LED Silver Lake Local Waterfront Revitalization Program, lighting, building envelope improvements, mechanical Wyoming County, NY system upgrades, plug load controls, and nano $149,000 grant from Dept. of State for the development ceramic window film for all county-owned and leased of a LWRP for the Towns of Perry and Castile and Village infrastructure. of Perry surrounding Silver Lake to inform and guide future conservation, water quality protection, and * Experience prior to CPL. waterfront revitalization efforts in line with the Federal Coastal Management Program. 42 Page 112 of 301

Page 113

PROJECT TEAM Daniel Insinna EIT Planning and Grant Writing Dan is a member of our civil engineering team with over a decade of experience supporting municipalities with water and wastewater infrastructure projects. His work is heavily focused on identifying grant opportunities, pursuing funding, and providing grant administration, including the preparation of engineering reports and supporting documentation suitable for funding through NYS EFC, NYSDEC, CDBG, and other programs. Dan also supports project planning and design for water distribution systems, water and wastewater treatment facilities, and wastewater collection systems, while providing ongoing assistance through data analysis, quality control and assurance, and infrastructure evaluations. EDUCATION • Bachelor of Science in Civil Engineering Technology, Rochester Institute of Technology • OSHA Training Certification PROFESSIONAL REGISTRATION Engineer in Training Certification PROJECT EXPERIENCE Village of Alfred, NY Water System Improvements Town of Bethany, NY Water District No. 5 Town of Boston, NY • Water Main Improvement Phase 1 • Water Consolidation Study LCWSA, NY • Regional Water • Groveland Correctional Water Supply Genesee County, NY Phase 2 Water Design Town of Oakfield, NY Water Districts No. 3-10 Village of Oakfield, NY Water Tank Replacement Niagara Falls Water Board, Niagara Falls, NY Grant Administration-Multiple water and wastewater projects 43 Page 113 of 301

Page 114

PROJECT TEAM Extraordinary projects are made from extraordinary relationships. Diversity and inclusion are priorities WBE of CPL’s culture. We build intentional PLANNING/ meaningful working relationships ENVIRONMENTAL with Diverse Business Enterprises. WBE REVIEW SERVICES When building our teams, we WATER/WASTEWATER SERVICES CC Environment & select consulting firms based on JM Davidson Engineering, D.P.C. Planning was formed their expertise, and work together (JMD) is a consulting firm located in 2009 to provide to eliminate barriers to their in Tonawanda, NY that offers a full environmental participation in public contracts - range of civil engineering services, expertise for communities, not to fill a goal. including water and wastewater, corporations, developers, and water resources, structural, conservation organizations. The As a New York State business, it is transportation, and railroad design firm provides innovative and important to us to support our local services. integrated services that facilitate economy by promoting other NYS a balanced approach to land use, enterprises and partnering on NYS The firm was founded in 2015 and conservation, and economic and contracts. has grown over the last seven community development. years to include a diverse staff that not only can assist with a project The success of CC Environment from preliminary design through & Planning is based on a strong construction but is also experienced network among federal, state, and working with the Erie County private entities including regulatory Department of Environment and agencies, economic development Planning, Division of Sewerage organizations, municipal MBE Management (ECDSM). government, planners, watershed SURVEY SERVICES Founded as Foit-Albert Associates groups and nonprofit organizations. in 1977, the company rebranded as Azar Design Co. in 2024 to reflect their rapidly growing business’s diverse clients, geography, and services, while upholding their commitment to being a trusted WBE consultant. GEOTECHNICAL SERVICES NW Contracting was founded in The surveying group provides a full 1989 as a petroleum remediation range of surveying services. Azar contractor specializing in bio- Design’s survey field crews are remediation. Since then, their equipped with current, state-of-the- services have grown to include art equipment supported by CADD tank removals, excavation/ graphic workstations. They have disposal of contaminated soil field crews located in Buffalo and and groundwater, complete Albany, allowing them to serve the in-situ remediation systems, entire State of New York effectively. environmental and geotechnical subsurface investigations/drilling, and complete fuel system installs and maintenance. 44 Page 114 of 301

Page 115

Dutchess County, NY - Airport Water Main 5 References and Insurance 45 Page 115 of 301

Page 116

REFERENCES Don’t just take our word for it... CPL is proud of its work in local communities and believes that its clients share this pride. We have included contacts for related projects mentioned in our submittal. These references can attest to our expertise, commitment and passion for the work we love. Village of Alfred Tom Costello Director of Public Works 7 W University Alfred, NY 14802 607.587.9188 [email protected] Village of Arcade Andrew Bartz Superintendent of Public Works 17 Church St. Arcade, NY 14099 585.492.1111 Ext. 113 Village of Elba Norman Itjen Mayor 7133 Oak Orchard Road Elba, New York 14058 585.409.4540 [email protected] Livingston County Water & Sewer Authority Jason Molino Executive Director 1997 D’Angelo Dr. Lakeville, NY 14480 585.346.3523 [email protected] North Chautauqua County Water District Dan Pacos Chairman 9 Day St. Fredonia, NY 14063 716.785.0862 [email protected] Village of Warsaw, NY -WWTF Improvements 46 Page 116 of 301

Page 117

INSURANCE DATE (MM/DD/YYYY) CERTIFICATE OF LIABILITY INSURANCE 4/29/2025 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). CONTACT PRODUCER NAME: Chris Romano AssuredPartners Design Professionals Insurance Services, LLC PHONE FAX 3697 Mt. Diablo Blvd Suite 230 (A/C, No, Ext): 714-427-3489 (A/C, No): E-MAIL Lafayette CA 94549 ADDRESS: [email protected] INSURER(S) AFFORDING COVERAGE NAIC # License#: 6003745 INSURER A : Valley Forge Insurance Company 20508 CPLARCH-01 INSURED INSURER B : Continental Insurance Company 35289 CPL Architects, Engineers, and Landscape Architect, DPC INSURER C : XL Specialty Insurance Company 37885 dba: CPL 255 Woodcliff Drive, Suite 200 INSURER D : Fairport NY 14450 INSURER E : INSURER F : COVERAGES CERTIFICATE NUMBER: 550507190 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR ADDL SUBR POLICY EFF POLICY EXP LTR TYPE OF INSURANCE INSD WVD POLICY NUMBER (MM/DD/YYYY) (MM/DD/YYYY) LIMITS A X COMMERCIAL GENERAL LIABILITY Y Y 7037093451 4/22/2025 4/22/2026 EACH OCCURRENCE $ 1,000,000 CLAIMS-MADE X OCCUR DAMAGE TO RENTED PREMISES (Ea occurrence) $ 1,000,000 X Contractual Liab MED EXP (Any one person) $ 15,000 X XCU Included PERSONAL & ADV INJURY $ 1,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ 2,000,000 POLICY X JECT PRO- LOC PRODUCTS - COMP/OP AGG $ 2,000,000 X OTHER: No XCU Exclusion $ B AUTOMOBILE LIABILITY Y Y 7037093448 4/22/2025 4/22/2026 COMBINED SINGLE LIMIT $ 1,000,000 (Ea accident) X ANY AUTO BODILY INJURY (Per person) $ OWNED SCHEDULED BODILY INJURY (Per accident) $ AUTOS ONLY AUTOS HIRED NON-OWNED PROPERTY DAMAGE $ AUTOS ONLY AUTOS ONLY (Per accident) $ B X UMBRELLA LIAB X OCCUR Y Y 7037095216 4/22/2025 4/22/2026 EACH OCCURRENCE $ 10,000,000 EXCESS LIAB CLAIMS-MADE AGGREGATE $ 10,000,000 X RETENTION $ DED 10,000 $ B WORKERS COMPENSATION Y 7037102875 4/22/2025 4/22/2026 X PER STATUTE OTH- ER AND EMPLOYERS' LIABILITY Y/N ANYPROPRIETOR/PARTNER/EXECUTIVE N E.L. EACH ACCIDENT $ 1,000,000 OFFICER/MEMBER EXCLUDED? N/A (Mandatory in NH) E.L. DISEASE - EA EMPLOYEE $ 1,000,000 If yes, describe under DESCRIPTION OF OPERATIONS below E.L. DISEASE - POLICY LIMIT $ 1,000,000 C Professional Liab & Y DPR5042350 4/22/2025 4/22/2026 Per Claim $5,000,000 Poll. Liability included Y Aggregate Limit $7,000,000 Retro Date: 01/01/1975 DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required) No XCU Exclusions apply. The following policies are included in the underlying schedule of insurance for umbrella/excess liability: General Liability/Auto Liability/Employers Liability/Employee Benefits Liability/Stop Gap Liability. Given as proof of coverages only. CERTIFICATE HOLDER CANCELLATION 30 day notice of cancellation SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. *Evidence of Insurance* AUTHORIZED REPRESENTATIVE © 1988-2015 ACORD CORPORATION. All rights reserved. ACORD 25 (2016/03) The ACORD name and logo are registered marks of ACORD 47 Page 117 of 301

Page 118

Your Vision, Unlocked. MODERN INFRASTRUCTURE REQUIRES DYNAMIC DESIGN Jason Foote, PE Principal 585.402.7505 [email protected] 726 Exchange Street Suite 920 Buffalo, NY 14210 www.CPLteam.com LCWSA, NY Page 118 of 301

Page 119

Engineering Services for Water and Wastewater Projects Statement of Qualifications Town of West Seneca January 05, 2026 The Power of Commitment Page 119 of 301

Page 120

Project name Engineering Services for Water and Wastewater Projects Document title Engineering Services for Water and Wastewater Projects | Statement of Qualifications Project number 12681649 File name 12681649-PRO-SOQ West Seneca Engineering Services.docx Revision Author Reviewer Approved for issue Name Signature Name Signature Date 00 L. Smith, R. Lannon R. Lannon 1/5/2026 E. Bradfuhrer GHD Consulting Services Inc. Contact: Ed Bradfuhrer, PE, Project Manager 285 Delaware Avenue, Suite 500 Buffalo, New York 14202, United States T +1 716 242-6925 | F +1 716 856 2160 | E [email protected] | ghd.com © GHD 2026 This document is and shall remain the property of GHD. The document may only be used for the purpose of assessing our offer of services and for inclusion in documentation for the engagement of GHD. Unauthorized use of this document in any form whatsoever is prohibited. The Power of Commitment Page 120 of 301

Page 121

285 Delaware Avenue, Suite 500 Buffalo, New York 14202 United States ghd.com Our ref: 12681649 Original Submitted Via Email January 05, 2026 Kate Newton, Town Clerk Town of West Seneca 1250 Union Road West Seneca, New York 14224 Statement of Qualifications | Engineering Services for Water and Wastewater Projects Dear Ms. Newton: GHD is pleased to present our qualifications to the Town of West Seneca (Town) in response to your Request for Qualifications (RFQ) for the above referenced services. We believe our engineering team’s knowledge and experience with the Town and our professional and technical teams’ qualifications and experience with municipal water and wastewater systems, as well as New York State funding programs, make GHD the best choice for the Town based on the following: – Local Experience and Dedication. Our experience working with municipalities and municipal authorities on water and wastewater infrastructure, while leveraging our global resources, gives us a unique advantage. We provide world-class practices tailored to local needs and deliver projects that are cost-competitive and of high quality. GHD’s history and presence in New York has given us detailed insight into how to manage programs that enable decisions for the highest level of service to communities of all sizes. Our Project Director, Robert Lannon, has a long history of working with local towns on a variety of water and wastewater projects and our proposed Project Manager, Edward Bradfuhrer, has been successfully working with the Town of West Seneca since 2010 in connection with its sanitary sewer system and he is familiar with the Town’s infrastructure and personnel and can guide our team in delivering solutions that are sensitive to your schedule and budget. GHD’s ability to leverage resources from regional offices enables us to offer the most qualified team to guide your project to success. Several of GHD’s staff also reside within the Town and can provide special insight into local issues. – A Leader in Water and Wastewater Systems. Since its founding in 1928, GHD has been at the forefront of the water industry, delivering sustainable outcomes for clients across the globe, including the Town of West Seneca. GHD’s water and wastewater professionals provide solutions covering every aspect of water distribution and sewer collection systems. We offer complete in-house engineering services from studies and modeling to design and construction, while collaborating with certified Minority, Women-owned and Service-Disabled, Veteran-owned Businesses that have a meaningful and positive impact on the project. We look forward to continuing our relationship with the Town and assisting you with your water and wastewater projects. Please do not hesitate to call if you have any questions or require additional information. Regards, Edward M. Bradfuhrer, PE Robert P. Lannon Jr., PE Project Manager Project Director +1 716 242-6925 +1 716 362-8806 [email protected] [email protected] The Power of Commitment GHD 337 GHD | Town of West Seneca | 12681649 | Engineering Services for Water and Wastewater Projects 0 Page 121 of 301

Page 122

Contents 1. Company Information 1 1.1 About GHD 1 2. Project Management Approach 2 2.1 Water/Sanitary Sewer General Project Approach 2 2.1.1 Project Understanding 2 2.1.2 Asset Condition Verification 3 2.1.3 Studies, Evaluation and Preliminary Design 3 2.1.4 Water Modeling 4 2.1.5 Detailed Design 4 2.1.6 Bid Phase Services 5 2.1.7 Construction Administration and Inspection Services 5 3. Quality Control Program 5 4. Qualifications and Experience 6 4.1 Municipal Wastewater Services 6 4.2 Municipal Water Services 7 4.3 Design Services 8 4.3.1 Building Information Modeling (BIM) 9 4.3.2 Safety in Design 9 4.3.3 Constructability 11 4.3.4 Construction Cost Estimating 11 4.3.5 Regulatory Compliance and Permitting 11 4.4 Construction Phase Services 12 5. Proposed Team 12 5.1 GHD Leadership Team 14 5.2 GHD Evaluation and Design Team Leads 15 5.3 Proposed Subconsultants 17 5.3.1 Arold Construction Company, Inc. | WBE 17 5.3.2 JM Davidson Engineering, DPC (JMD) | WBE 17 5.3.3 Jade Stone Engineering, PLLC | WBE 17 6. Similar Project Experience and References 18 7. Project Funding Experience 21 7.1 Project Grants Secured 23 GHD | Town of West Seneca | 12681649 | Engineering Services for Water and Wastewater Projects i Page 122 of 301

Page 123

Table index Table 4.1 Wastewater System Services 7 Table 6.1 Select Collection System and I/I Project Experience 19 Table 6.2 Select Linear Water Infrastructure Projects 20 Table 7.1 NYS Funding Programs 21 Table 7.2 NYS Funding Experience 23 Figure index Figure 4.2 Flowchart to Identify and Eliminate/Control Hazards During Design 10 Figure 5.1 Team Organizational Chart (* Resumes Provided in Appendix A) 13 Appendices Appendix A Proposed GHD Team Lead Resumes Appendix B Detailed Project Descriptions GHD | Town of West Seneca | 12681649 | Engineering Services for Water and Wastewater Projects ii Page 123 of 301

Page 124

1. Company Information GHD Consulting Services Inc. (GHD) is pleased to present our Statement of Qualifications (SOQ) to the Town of West Seneca (Town) in response to the Request for Qualifications (RFQ) for professional engineering services associated with a range of potential future water and wastewater projects that range in complexity from simple pipe repairs to large model evaluations. Our SOQ has been prepared to highlight the varied engineering services we can offer the Town, our proposed team’s qualifications, relevant water distribution and wastewater collection system project experience, and experience with New York State funding programs, as well as our proven approach to completing sanitary sewer evaluation surveys, new water/sewer systems, and other infrastructure projects that may be needed. 1.1 About GHD Established in 1928, GHD is a global professional services company that provides engineering, environmental, advisory, digital and construction services to private and public sector clients. Most important to us are our values of teamwork, respect, and integrity. We possess an unrelenting commitment to maintaining an industry leadership position in safety and client service. Driven by a client-service led culture, we connect the knowledge, skill, and experience of our people with innovative practices, technical capabilities, and robust systems to create lasting community benefits. Committed to sustainable development, GHD improves the physical, natural, and social environments of the many communities in which we operate. We are guided by a Practice Quality Management System, ISO 9001:2015, which is third-party certified. Wholly owned by our people, we are 12,000+ diverse and skilled individuals connected by over 160 offices across five continents – Asia, Australia, Europe, North and South America, and the Pacific region. GHD Consulting Services Inc. is the corporation licensed to provide professional engineering services in New York State (License Certificate No. 021536) and has four New York offices (Buffalo, Niagara Falls, Syracuse and Rye). Based in our downtown Buffalo office, Robert P. Lannon Jr., PE, Project Director, will serve as the Engineer-of-Record. GHD | Town of West Seneca | 12681649 | Engineering Services for Water and Wastewater Projects 1 Page 124 of 301

Page 125

2. Project Management Approach All GHD projects are effectively managed by qualified and experienced staff. Team members are assigned to projects based on their experience and the specific qualifications they bring to the projects. Our commitment to quality service is reflected in our ISO 9001:2015 Practice Quality Management System, which defines how projects are managed. Direct project responsibility rests with GHD’s Project Directors. Project Managers are accountable to the Project Directors and are responsible for defining the scope of work, assigning a work team, ensuring all work is done in a timely and efficient manner, and ensuring that the client is satisfied with the completed project. GHD maintains a commitment to communication with the client and team members throughout the duration of any project. The result is quality service and satisfied clients. Depending on the scope of future projects, GHD will assign the appropriate Task Leads or Design Manager to work directly with our Project Manager, Edward Bradfuhrer. Project Managers can draw on the expertise of staff from any office to assist with specialty engineering, laboratory services, data management, graphics, computer modeling, drafting and any other technical support services that may be required to complete a project. This local-global approach to projects allows for a team that understands local regulations, soils, and client needs while engaging subject matter experts and support staff to help solve complex problems or expedite project delivery. We believe in completing projects “hand-in-hand” with our client’s staff, from the Town Supervisor and Boards to utility departments and operations and maintenance (O&M) staff. This approach provides the greatest opportunity for project success. Ultimately, the consulting engineer is providing the proper tools to allow effective and efficient operation of sanitary sewers, storm, and water systems. O&M staff “buy in” to an engineer’s proposed solution is mandatory for a project to succeed. We will maintain this contact with the Town’s staff through regular communication and listening to their needs. 2.1 Water/Sanitary Sewer General Project Approach GHD understands the importance of maintaining water and wastewater infrastructure for the benefit of the Town and the community. As stated throughout this SOQ, GHD offers a full suite of engineering services to complete water and sewer infrastructure projects that the Town may pursue. For each project identified, GHD will focus on your goals for the project and provide our in-depth technical expertise to address key concerns, constraints, and issues to determine the right solution for the Town. GHD is a national leader in the assessment and rehabilitation of aging water and sewer systems and water/sewer design. Our capabilities provide a firm foundation for identification of a municipality’s needs and creating cost-effective programs. GHD adapts their project approach to fit individual projects. As the RFQ does not list any specific projects, the proposed approach below is a general approach for work that the Town may pursue. The specific work would be determined in a project initiation and scoping meeting. 2.1.1 Project Understanding The Town of West Seneca (Town) owns and operates a sewer system with pipes ranging in size from 8 to 48 inches in diameter. Flow generally travels from the south and east to the northwest starting at Transit and Leydecker Roads to an interconnection along the City of Buffalo border. There are also some isolated sewersheds that flow directly into the City of Buffalo to the west of railroad tracks and north of Cazenovia Creek. Flow from Erie County Sewer District No. 3 enters the Town’s system from the southwest and ties into the main 36-inch trunkline that follows Cazenovia Creek. Some small contributors to flow also come from the Towns of Elma and Orchard Park. The northwestern portion of the Town includes some satellite sewers that are not connected to the main system and connect to the City of Buffalo on the north side of Cazenovia Creek. The Town’s primary focus on sewer work recently has been to rehabilitate the sewer system in accordance with the work plan in Order on Consent Number R9-20030625-33 (Order), which the Town has been administering since 2004. The goal of this Order is to eliminate sanitary sewer overflows (SSOs) through a program of sewer rehabilitation GHD | Town of West Seneca | 12681649 | Engineering Services for Water and Wastewater Projects 2 Page 125 of 301

Page 126

projects that mitigates infiltration and inflow (I/I) in the sewer system. The program is currently completing in its eighth phase, which included lining the main trunkline in Flowmetering Basin (FM) 19 and FM 7, which follow Cazenovia Creek to the interconnection with the Buffalo Sewer Authority. This program has significantly reduced overflows since its inception. As part of the program, GHD prepared an engineering model report for the Town in October 2024 (Sanitary Sewer Evaluation Survey Re-evaluation), which evaluated potential ways to mitigate overflows and close out the Order. Potential projects included sanitary sewer lining, additional sewer lining, and upsized sewers. This report was submitted to the NYSDEC and initiated negotiations to modify the Order so that project funding could be optimized. New projects included in this plan were described in the Town Engineer’s presentation “Town of West Seneca Phase 8.5 Sanitary Sewer Improvements Informational Meeting, June 23, 2025.” The Town’s water system is currently fed by the Erie County Water Authority (ECWA), where the trunk lines are owned and operated by ECWA and some smaller diameter (8-12-inch) mains are owned and operated by the Town. No major projects are anticipated with the water system. However, growth demands within the Town may require capacity assessments and addressing pressure issues. Many water mains are also nearing the end of their expected service life and will eventually require rehabilitation or replacement. GHD has extensive experience with small- and large-scale system wide sanitary sewer investigation and rehabilitation projects, as well as waterline replacement and improvement projects and will leverage our experience to recommend approaches that are tailored to the Town’s unique circumstances. 2.1.2 Asset Condition Verification To ensure the full extent of project needs are captured in the scope of the design, GHD team members can visit the project site to verify asset conditions to help prevent scope creep or change orders during construction. Our typical approach to performing condition assessments is as follows: – GHD will review existing condition assessment information and supplement it with our field observations. We will collect additional field data as required to provide necessary input to develop the concept, final design, and bid documents. – GHD will undertake a systematic assessment of the asset, conducting both visual inspections and other testing as necessary. – GHD will review other projects elements (structural, mechanical, electrical, and instrumentation and controls) as necessary to confirm as-built conditions and capacity, as well as to assess condition and operability. – GHD will review the latest code requirements as they apply to the asset/facilities and identify any features not compliant. – GHD will field verify existing as-built drawings vs. field conditions and red-line any field changes made, such as decommissioned or replaced equipment, piping modifications, or field modifications. – GHD will develop a list of existing assets that cannot be accessed during the design phase for field verification (e.g., buried, encased, or insulated piping, ductbanks and raceways, and tank and channel conditions below the water line). We will incorporate bid items and expected quantities for anticipated potential repairs into the bid documents to cover anticipated or potential, but undefinable, work in these areas. 2.1.3 Studies, Evaluation and Preliminary Design GHD will evaluate alternatives for achieving the goals of each project and provide a conceptual plan or report consisting of the established footprint of the proposed project and mapping out the relationship between new and existing facilities or site areas. We will conduct field investigations to confirm as-built conditions of facilities, review identified O&M issues and concerns and assess the feasibility of the preliminary layouts. Site topography, accessibility, and site proximity to existing utilities will also be reviewed in the field with respect to available as-builts and GIS data. GHD | Town of West Seneca | 12681649 | Engineering Services for Water and Wastewater Projects 3 Page 126 of 301

Page 127

Where required for design, we will work with subconsultant partners to perform topographic surveys and research existing easements where required. GHD will also work with our subconsultant partners to conduct soil borings and environmental reviews. 2.1.4 Water Modeling Models are essential for planning system upgrades, evaluating existing conditions, and developing a holistic understanding of complex systems. GHD’s staff are globally recognized experts on sanitary sewer, water distribution, flood/stormwater, and complex hydraulics modeling. GHD has maintained a sanitary sewer model for the Town of West Seneca since 2010 and it has been used to plan and design projects like the Plant 5 Flowmetering Upgrades, and a genetic algorithm analysis in the SSES Re-Evaluation, which was used to develop Phase 8.5 of the Town’s SSES. Modeling projects generally begin with a comprehensive program of flow, precipitation and/or pressure data collection followed by review, and validation. GHD can support the Town with determining sensor locations. GHD has extensive experience with manhole inspections to determine suitability for flow metering and has incorporated digitization of manhole inspections and related geospatial data using Survey123. This program allows the inspector to capture manhole attributes and confirm locations quickly and with a standardized format for easy processing and summarization. These forms may be used while inspecting selected manholes, and documenting location, condition, and suitability for meter installation. If desired, a copy of the Survey123 form can be provided to the Town so that O&M personnel can perform an initial inspection using tablets and ESRI server with support from GHD when needed. Collected data is validated using tools developed by GHD’s digital solutions staff, who have been pushing the boundaries of data analytics and automation. They have created tools that allow for advanced statistical/predictive analysis of large datasets with approximately 75 percent less effort than what would be done manually. Combining the expertise of GHD’s digital statisticians and data scientists with our engineers allows for projects to be delivered more efficiently and more accurately than in the past. They use technologies such as Machine Learning/Artificial Intelligence guided by domain experts to develop highly sophisticated algorithms that can assist utilities with their daily and strategic operations while solving several business problems. Once data has been validated and accepted as representative of a site, it is used for model calibration and validation. Potential models that can be used include but are not limited to Infoworks ICM 1D-2D models for stormwater, antecedent moisture models for inflow and infiltration, extended simulation models for drinking water planning, and HAMMER transient modeling to mitigate operational risk to pump stations. These models can be used to plan system upgrades and predict capacity needs in response to future growth. 2.1.5 Detailed Design GHD will prepare designs for proposed projects based on design standards and guidelines for water and sewer facilities. The goal of the detailed design phase is to prepare bid documents for the projects, generally consisting of: – General conditions – Supplementary conditions – Special provisions – Technical specifications – Contract drawings (plans) – We will incorporate any standard details and specifications into our design as applicable GHD will review designs for conformance with applicable building code requirements, codes, and regulations. In addition, we will review design for conformance with the Recommended Standards such as the Ten State Standards, AWWA, and other applicable industry standards. Following each design submittal, a meeting or workshop (in-person or virtual) will be held with Town staff and other stakeholders (as necessary) to review the draft design documents and solicit comments from all team members. We will track comments obtained in the workshop or in writing for verification that the comments have been addressed. GHD | Town of West Seneca | 12681649 | Engineering Services for Water and Wastewater Projects 4 Page 127 of 301

Page 128

2.1.6 Bid Phase Services For task order work intended for bidding by contractors, GHD will assist the Town in the advertisement and review of contractor bids. We expect the following tasks within the scope of work for publicly bid projects: – Attend the pre-bid meeting – Develop written answers to bidder questions – Develop written addenda for distribution – Assist in canvass of bids – Recommendation of award 2.1.7 Construction Administration and Inspection Services For projects requiring construction phase services, GHD may provide construction administration and inspection. We expect the following tasks within the scope of work for projects requiring construction phase services: – Attend a pre-construction meeting and monthly progress meetings – Review shop drawings and O&M manuals – Answer requests for information (RFIs) – Review and respond to work changes – Review test results and certificates – Develop as-built drawings – Conduct part-time or full-time site inspection – Administer the document management platform – Assist with startup and testing 3. Quality Control Program GHD firmly believes that quality assurance/quality control is essential to delivering a consistent quality deliverable to our clients. GHD’s overall quality management approach for each project is governed by GHD’s ISO 9001:2015 accredited North American Quality System. ISO 9001:2015 specifies requirements for GHD’s quality management system that allows GHD to demonstrate our ability to provide consistent quality of services to meet the Town’s requirements while providing continual improvement. GHD’s quality system has been streamlined by using standardized forms and checklists to make compliance clear and allow for consistent internal and external system auditing. Each project’s QA/QC procedure is scaled appropriately for the size and complexity of the project. Project Prepare Town and Internal Kick- Submit to the Management Design Peer Review Regulatory off Meeting Town Plan Deliverable Review • Q1514 Organization • Agenda Outline • Coordination • Q1522 Quality • Q1520 Deliverable • Comments Structure (Project • Review Project Meetings Control Review - Verification documented and Engineering Design Management Plan • Progress Meetings Peer Review Record • Completed prior to addressed in Team and CCA • Address comments submittal subsequent submittal Team) • Minutes • Q1501 Calculation Check Sheet prior to submittal to • Scope of Services Town • Q1504 Specification • QA/QC Procedures and Tender • Schedule Document Review GHD | Town of West Seneca | 12681649 | Engineering Services for Water and Wastewater Projects 5 Page 128 of 301

Page 129

4. Qualifications and Experience GHD's roots in engineering go back 98 years and we have been at the forefront of the industry, delivering sustainable outcomes for clients across the globe. More locally, GHD has provided full-service engineering in New York since 1950. Much of this experience stems from serving counties, cities, towns, villages, and water, wastewater authorities including services as retained engineer or engineer of record, and under multi-year term service contracts. With over 200 people in Western and Central New York, our New York design services group specializes in providing full-service professional engineering services for municipal and private clients. GHD's multi-disciplined engineering and design staff includes civil, structural, mechanical, electrical, automation, and process engineers, as well as environmental specialists, GIS analysts, and CAD designers. GHD also provides construction contract administration, start-up, and commissioning services. GHD’s diversified team offers a wealth of experience in developing both traditional and innovative solutions to engineering projects. We have managed a full range of local engineering projects from simple, single disciplinary projects to complex, multi‑disciplinary, multi‑million-dollar projects. Our engineers have the necessary core expertise from both theoretical and practical perspectives to fully meet the specific requirements of a project. We offer responsive and cost-effective engineering services ranging from studies and conceptual design to the development of plans and specifications, contract administration, and resident inspection. Our experienced team members also regularly assist utilities with permitting and regulatory compliance items, as well as assistance with project funding. 4.1 Municipal Wastewater Services GHD is a global leader in advanced wastewater treatment and reuse, delivering innovative cost-effective solutions with low ecological footprint to suit a wide range of situations. For each project, GHD applies its client relationship focus and in-depth technical expertise to work closely with client representatives to address key concerns, constraints, and issues. Once identified and analyzed, sound engineering alternatives are developed to provide tailored solutions to suite the project at hand. We have acquired experience in a wide variety of projects including the planning, evaluation, design, permitting and rehabilitation/construction of interceptors, gravity sewers, forcemains, and pumping stations. Much of this experience has been developed working on projects for municipal clients locally, in North America and around the globe. As technologies have developed, so has our expertise in planning for future growth and improving system performance for ratepayers. Plans for growth are tailored to each client and determined holistically to ensure that flow can optimally make it to its intended downstream point. GHD's civil and environmental engineers have prepared designs that range from small collector sewers in neighborhoods to tunnels that extend for miles. Our team includes members of the Water Environment Federation (WEF), the North American Society for Trenchless Technology (NASTT), and the National Association of Sewer Service Companies (NASSCO) PACP/MACP/LACP certified staff, who are at the forefront of new regulations and technologies. In addition, our team thoroughly understands system dynamics associated with pumping, condition assessments, air/water interaction in pressurized sewer systems, and applicability of flowmetering to a sewer system. Outcomes of similar evaluations have been successfully implemented throughout the United States. Table 4.1 highlights GHD’s relevant wastewater services. GHD | Town of West Seneca | 12681649 | Engineering Services for Water and Wastewater Projects 6 Page 129 of 301

Page 130

Table 4.1 Wastewater System Services System Analysis and Planning Collection and Pumping Systems – Sewer system extensions – Analysis and design of forcemains, interceptors, and – Infiltration/inflow (I/I) analysis and sewer system lateral sewers evaluation studies – Complex hydraulic modeling (XP-SWMM, PCSWMM, – System flow monitoring Infoworks, among others) – Capacity analysis and wastewater collection reports – Testing, field analytical services, including forcemain and pumping system hydraulic evaluation, dry and wet – Sewer system hydraulic modeling and analysis weather flow – Inter-municipal utility systems planning – Evaluations, modifications, and new design for pumping – Regional shared services and/or consolidation stations assistance – Overflow retention facilities – State environmental quality review (SEQR) assistance – Gravity sewer and forcemain piping and environmental impact assessments – Trenchless sewer replacement/CIPP lining design, – Sustainable utility growth and feasibility studies including microtunneling – Demand forecasting and management – SSO/CSO abatement Hydraulic Modeling GHD performs hydraulic modeling of wastewater systems to quantify I/I issues, identify capacity bottlenecks, and perform capacity analyses in response to permit applications for new construction. GHD utilizes the latest version of many modeling programs depending on client need including EPA-SWMM, PCSWMM, Bentley SewerGEMS, and InfoWorks ICM to create simulations of sewer flows in response to weather events. These models can be used to perform simple analyses that predict needed pipe sizes to multi-variable optimizations using software like Optimatics Optimizer. Sewer models currently maintained by GHD within Western New York include: 1. Niagara County Sewer District No. 1 5. Erie County Sewer District No. 2 2. Livingston County Water and Sewer Authority 6. Town of West Seneca 3. Town of Hamburg Mt. Vernon Sewer District 7. Town of Tonawanda 4. Erie County Sewer District No. 3 8. City of Tonawanda Wastewater Pump Stations Pump station design requires attention to design details that can have large effects on pump performance. Many of these design guidelines are maintained by the Hydraulics Institute in standard ANSI/HI 9.8. GHD’s engineers have a strong understanding of the standard and have used it to design and evaluate pump stations that range in size from can-style duplex systems to pump stations that are as large as 500 horsepower. When required, GHD uses Bentley HAMMER and computational fluid dynamics to analyze transient conditions and mitigate damage to pumps and pipelines that can occur. 4.2 Municipal Water Services GHD offers competitive services in water transmission and distribution covering the full life cycle of projects. With nearly 100 years’ experience, GHD works for public and private clients covering a wide range of services including planning, evaluations and design to bidding, construction administration, and field services during construction. We have developed a suite of tools and procedures to allow us to deliver projects expeditiously and cost effectively. They include: automated pipe grading for different pipe materials and joint systems; 3-D pipe routing software that helps to identify the optimum alignment that minimizes excavation and conflicts with existing services and other site constraints; proven bedding designs for different soil conditions and pipe materials. GHD | Town of West Seneca | 12681649 | Engineering Services for Water and Wastewater Projects 7 Page 130 of 301

Page 131

For the purposes of this submission, we are highlighting our experience with hydraulic modeling and the assessment, design and construction of waterlines. Hydraulic Modeling GHD performs hydraulic modeling of water systems from intake to distribution in order to determine flow rates, pressure requirements, fire flow, system demands and limitations, and to evaluate potential connections or emergency connections to surrounding communities. GHD utilizes the latest version of many modeling programs depending on client need including EPANET, Bentley WaterCAD, Bentley WaterGEMS, and InfoWater to perform static and dynamic computerized hydraulic network modeling, including fire flow, SCADA interface, water age analyses to determine pipe and storage size requirements. GHD also uses Bentley HAMMER to analyze transient conditions in pipelines to mitigate damage to pipelines caused by water hammer. Transmission and Distribution GHD is an industry leader in developing solutions for the transmission and distribution of potable water. Our staff has extensive experience designing pipe networks ranging from small diameter service laterals to large diameter transmission mains using a wide variety of pipe materials including ductile iron, steel, PVC, and HDPE installed via conventional excavation or trenchless methods. GHD’s pipeline engineers select the appropriate coating systems and pipeline materials for different soil conditions and service applications. They also provide appropriate solutions for cathodic protection. The condition assessment and rehabilitation of water supply lines requires specific experience with condition assessment technologies, risk assessment, public and permitting coordination, field safety, data management and analysis, construction technology and project management. GHD has realized efficiencies in both construction time and capital costs through the use of trenchless technologies for projects such as pipe bursting and replacement, directional drilling, and others. Trenchless technologies have also been applied by GHD to reduce environmental impacts and minimize traffic disruptions on watermain projects. As stated previously, GHD is member of the NASTT and stands at the forefront of modern technology on all aspects of locally available trenchless rehabilitation services. 4.3 Design Services GHD’s in-house resources can provide most services required to complete water distribution and sewer collection system projects. This provides a significant advantage to the Town in having a group of engineers with extensive knowledge of sewer facilities, stormwater, and water systems, as well as Town and firm expectations for quality, schedule, and budget. Our firm has qualified engineering design managers and support staff available to assist in the areas listed below: – Civil Engineering – Structural Engineering – Mechanical / HVAC Engineering – Electrical Engineering – Instrumentation, Automation and Control Engineering – Computer-Aided Design Services – Geographic Information Systems (GIS) GHD | Town of West Seneca | 12681649 | Engineering Services for Water and Wastewater Projects 8 Page 131 of 301

Page 132

GHD’s design teams make use of the latest technology to maximize collaboration between team members and resolve conflicts that are inherent in construction projects that can lead to unwanted change orders. Many resources are available to improve project outcomes including the ability to create 3D design models that can be shared among designers using Autodesk BIM 360. Local staff can call on subject matter experts to consult on complex issues, including for design concerns, cost estimates, and safety in design concerns. 4.3.1 Building Information Modeling (BIM) BIM is the digital representation of physical and functional characteristics of projects, assets, and environments, but it is more than a design tool—it is an avenue to create value. Data-rich BIM models are constructed using data captured from existing assets during the planning, design, and delivery process. On large and complex projects, BIM provides a clear picture of the project before it is realized to reduce costs, increase efficiencies, improve safety, and streamline processes. With this, the Town can expect greater project control, better connection with the design, reduced uncertainties, and cost overruns. 4.3.2 Safety in Design In broad terms, there are three stages in the design process that consider safety in design, including: – Concept Design: Conduct preliminary hazard identification, for hazards that are within the control of the designer. – Preliminary Design: Identify reasonably foreseeable, significant construction/manufacture, installation, commission/use, maintenance/repair, demolition and disposal hazards associated with a design project and controls to mitigate. – Detailed Design: Focusing on ways in which a design can be modified to eliminate or reduce issues that may affect the ongoing safety of persons involved in constructing, using, maintaining, or demolishing the design product. GHD | Town of West Seneca | 12681649 | Engineering Services for Water and Wastewater Projects 9 Page 132 of 301

Page 133

Figure 4.2 depicts a flow chart for identifying and eliminating/controlling hazards during design. Designers need to: – Identify relevant stakeholders – Be familiar with the assets being designed – Make clients aware of their duties to disclose information about hazards – Provide adequate and appropriate information about the residual risk of the design to those who need it – Designers must ensure, within the extent of their control, that any designs they prepare minimize the risks to: • Anybody occupying, using, or operating the asset • Anybody carrying out construction, maintenance, or cleaning work at any time • Anyone else who may be affected by these activities Figure 4.2 Flowchart to Identify and Eliminate/Control Hazards During Design GHD | Town of West Seneca | 12681649 | Engineering Services for Water and Wastewater Projects 10 Page 133 of 301

Page 134

4.3.3 Constructability Preparing a constructable and biddable set of contract documents are the ultimate goals for the design of every project. Identifying unknowns, solid design judgment, clearly communicating the design intent, and a well-coordinated design package are essential to meeting these goals. During the design phase, the GHD team will address key elements for construction sequencing during rehabilitation, repair, or replacement. As part of the design project, GHD’s approach to integrating the essential project disciplines will be a key component in providing a constructable, biddable, and high value design. 4.3.4 Construction Cost Estimating Our history of developing accurate costs is a function of our extensive experience on similar projects. GHD’s focus areas include: – Updated cost estimates at each design milestone to identify areas where scope may need to be adjusted to meet established project budget limits – GHD maintains a region-wide construction cost database of unit costs that is updated to account for current market and changing bidding climate. We frequently coordinate with contractors and vendors on changing market conditions and updated material costs throughout the design development process. – Tracking of recent bid tabulations to check against actual bid prices prior to advertisement and provide a chance to adjust as needed. – Our ability to draw upon in-house Certified Cost Estimators and multiple internal supporting disciplines such as electrical, instrumentation, controls, HVAC, structural, and fire protection has proven to provide a more accurate depiction of anticipated costs. • The use of industry standardized practices and tools for back-checking and cost adjustment. 4.3.5 Regulatory Compliance and Permitting GHD continually monitors the ever-changing regulations issued by the United States Environmental Protection Agency (EPA), NYSDEC, and the New York State Department of Health (DOH), and their implementation by local enforcement agencies. We work closely with these agencies to gain a solid understanding of new regulations so that we may help our clients obtain compliance in a timely and cost-effective manner. GHD’s extensive experience in municipal wastewater treatment and sanitary sewers, stormwater and water system infrastructure projects has gained our firm credibility with regulatory authorities. Our firm and personnel have been successful in achieving regulatory approvals from agencies across all levels of government. GHD has developed a strong knowledge of compliance policies and procedures through close working relationships with these agencies. Our firm has built a solid reputation based on hard work, discipline, and high-quality project delivery with local municipalities, public authorities, and regulatory agencies. GHD will develop a comprehensive list of required permits and identify agencies of jurisdiction. GHD will also hold initial stakeholder meetings to present the Town’s proposed project(s), identify permitting and design criteria, determine any other agency's projects or plans, which could affect the proposed project, as well as identifying potential schedule delays. GHD | Town of West Seneca | 12681649 | Engineering Services for Water and Wastewater Projects 11 Page 134 of 301

Page 135

4.4 Construction Phase Services We believe that construction services share an equal pedestal in importance to preliminary and detailed design services. While excellence in design is critical, the greatest risks to project success are often experienced during the construction phase. GHD’s staff have experience in administering municipal construction projects for capital improvement and maintenance projects for treatment plants, pumping stations, water storage tanks, water distribution and wastewater collection, including large diameter pipelines, and other challenging projects. These services are led by Mr. Daniel Kolkmann, who alone has more than 45 years of construction contract administration experience. We will support the Town during construction by providing contract administration and resident inspection services. Our design teams work closely with the assigned construction contract administrators and resident inspectors to verify that the design intent and quality of equipment and materials are maintained. We also provide regular training of our construction staff to foster a culture of continuous improvement, particularly in the areas of health and safety. GHD’s goal is to assume a leadership role during the construction phase by encouraging communication and understanding among the project participants, contributing to solutions, completing submittal reviews, inspections, delivery of owner-furnished equipment, processing payments, coordination of contractor, owner, and operations staff, and resolving disputes in a fair and expeditious manner. GHD maintains a full complement of staff experienced in procurement phases, pre-construction phase requirements, construction contract administration and site observation, facility start-up/performance phases, and project completion and closeout phases. 5. Proposed Team GHD’s local presence and history with the Town, and our proposed team’s experience working on similar projects make us uniquely qualified to deliver the requested services in the RFQ. To provide the greatest level of responsiveness to the Town, GHD offers a team of experienced and diverse professionals to meet the needs of any potential project, while providing the necessary comprehensive services identified in the framework of services in the RFQ. This team approach, which GHD has successfully employed on similar arrangements with many municipal clients, provides several advantages including: – A sole point of consultant contact and responsibility »Previous experience – Comprehensive and complementary service capabilities brought by the team to assure that any project assignment can be handled by appropriately skilled professionals working together goes a – A vast resource network and redundancy to assure that any and all assignments are completed on long way« schedule As shown on Figure 5.1, our proposed project team has been organized to offer the Town the most qualified group of individuals to respond to your needs in a timely and cost- efficient manner and the depth of our available resources. and redundancy to assure the Town that qualified personnel will be available as needed to complete a term assignment. See below for bios of our leadership team and key service and discipline leads. Abbreviated resumes for key staff are provided in Appendix A. GHD | Town of West Seneca | 12681649 | Engineering Services for Water and Wastewater Projects 12 Page 135 of 301

Page 136

Town of West Seneca Gary Dickson, Supervisor Jason Foote, Town Engineer QA/QC Project Director Project Manager John Story, PE* Robert Lannon, Jr., PE* Edward Bradfuhrer, PE* David Woolley* Key Technical and Discipline Leads/Subconsultants Water & Sewer Modeling Linear Design Funding Advisor Edward Bradfuhrer, PE* Paige Gilliam, EIT* Jaron Case, PE* Connor Bannochie Brandon Nowakowski, PE Environmental Services Linear Assessments Site/Civil/Stormwater Design Katherine Galanti Edward Bradfuhrer, PE – Sewer* Camie Jarrell, PE* Bethanne Weyenberg, PE Tyler Pitts, EIT PACP Sam Koplas Wetland Delineation Jacob Kocic, EIT – Water* Structural Greg Kunka Stormwater Permitting/SWPPPs Kyle Lantzy, PE Camie Jarrell, PE* Brian Regan MWBE Subconsultants Jaron Case, PE* Process-Mechanical Design Arold Construction Company, Inc. (WBE) Regulatory/Permitting Matthew Skuse, LEED AP BD+C CCTV/Smoke Testing Lisa Derrigan, PE* Electrical/Energy Jacob Kocic, EIT* JM Davidson Engineering, DPC (WBE) Steve Bochnowicz, PE Civil Engineering/Resident Inspection GIS Services Stephanie Altherr Todd Plank* Instrumentation/Controls Jade Stone Engineering (WBE) Miranda Girton Michael O’Donnell Electrical Engineering Brian Casillo Construction Phase Services Daniel Kolkmann* David Woolley Figure 5.1 – Team Organizational Chart (* Resumes Provided in Appendix A) GHD | Town of West Seneca | 12681649 | Engineering Services for Water and Wastewater Projects 13 Page 136 of 301

Page 137

5.1 GHD Leadership Team Robert Lannon, PE Project Director | Buffalo, New York Bob is a Principal at GHD with more than 40 years of experience in the civil engineering field. He has acted as Project Director/Manager for various municipal projects across Western and Central New York, including evaluation and design of water and wastewater facilities, water mains, sanitary and storm sewer systems, and pumping stations. Bob currently serves as the retained engineer/engineer of record for several municipalities in Niagara County including the Towns of Niagara and Lewiston, the Village of Youngstown, and Niagara County Sewer District No. 1. As Project Director, Bob will have direct charge of the work with responsibility for ensuring the team stays focused on meeting the Town’s objectives for the projects. Bob will also ensure that Ed has the resources in place to support his management of the day-to-day project delivery, while also providing technical leadership for the team. Edward M. Bradfuhrer, PE Project Manager/Sewer System Evaluation Lead/Hydraulic Modeling | Niagara Falls, New York Ed has 16 years of experience in the field of environmental engineering. Ed’s background in computer systems, hydraulics, hydrology, and geographic information systems allows designers to better quantify and visualize issues that can impact projects early on, which streamlines design and construction projects. He has been involved in the study, design, and construction of many projects that range from raw water collection to wastewater collection/treatment and stormwater modeling/design. Professional interests include trenchless sanitary sewer rehabilitation, flow control structures, computational fluid dynamics, and hydraulic modeling. As Project Manager, Ed will work with Bob and the Town to make sure the project team develops deliverables in line with the Town needs and goals. John Story, PE BCEE QA/QC – Wastewater | Buffalo, New York John is an Associate and Senior Project Manager at GHD, where he has been employed for more than 20 years. He has led the study, design, and construction phases of several phased collection system rehabilitation programs and large pump upgrades in upstate New York. John has assisted numerous clients with phased programs for CSO and SSO mitigation, often for compliance with NYSDEC-issued Orders on Consent. Many of John’s projects have included the development of Capacity, Management, Operations and Maintenance (CMOM) programs, as well as comprehensive pre- and post-rehabilitation flow monitoring. He understands the importance of long-term reliability of critical collection system assets while maintaining compliance with NYSDEC standards and EFC requirements. John will provide project QA/QC related to the collection system SSES investigation and will review all deliverables for technical accuracy and completeness prior to submitting to the Town and any funding or regulatory agencies. GHD | Town of West Seneca | 12681649 | Engineering Services for Water and Wastewater Projects 14 Page 137 of 301

Page 138

David Woolley, EIT QA/QC – Water | Buffalo, NY Dave is GHD’s Northeast Civil Engineering Manager. For the last 10 years he has been involved in the planning, design, and construction of multi-disciplined projects, with a focus on linear pipeline projects. Recently, he has served as the design manager on projects entailing over 20 miles of large diameter (24-84") gravity and pressure pipelines with challenging crossings and permitting, over 40 miles of small/medium pipelines, in addition to providing technical advisory/quality assurance to numerous pipeline routing and design projects of varying size and complexity in North America. 5.2 GHD Evaluation and Design Team Leads Camie Jarrell, PE Stormwater Permitting/SWPPPs and Site/Civil/Stormwater Design | Buffalo, New York Camie has 23 years of general municipal and civil engineering experience. She has been responsible for the execution of a variety of engineering tasks and projects including feasibility studies, infrastructure design, drainage system analysis, site planning, grant and permit applications, stormwater pollution prevention plans (SWPPPs) for both SPDES construction permits and Multi-sector general permits, MS4 permit compliance and reviews, and preparation of scope of work and contract documents for various municipal and industrial clients. She is also a qualified stormwater inspector and resident inspector for public improvement projects. In addition, Camie serves as representative Planning Consultant for the Towns of Lewiston and Niagara, the Engineering Consultant for the Town of Hamburg, and engineering representative for the Town of Aurora. Camie is a member of the New York Water Environment Association (NYWEA) and serves on the State Program Committee. She is also a member of the New York American Public Works Association (APWA). Jacob Kocic, EIT Linear Assessments and Regulatory/Permitting | Buffalo, New York Jake joined GHD in 2017 and has since been involved in design, planning, construction oversight, and engineering studies focusing on municipal water, wastewater, and stormwater. His design responsibilities have included both civil and process-mechanical disciplines and he has been involved with all aspects of design from plans and specification development to permitting and client reviews. Lisa Derrigan, PE Regulatory/Permitting | Buffalo, New York Lisa is a dedicated professional with more than 30 years of experience encompassing wastewater treatment evaluations, sewage facilities planning, and permit renewal and negotiations with state regulatory agencies. She has worked on numerous wastewater-related projects involving regulatory compliance, desktop evaluations, no feasible alternative analyses, preliminary engineering and basis of design reports, and inflow and infiltration studies. She possesses a wealth of knowledge in SPDES permitting/regulatory compliance and through various projects and more than 30 years as a member of NYWEA, she has developed solid working relationships with the regulators across the state. GHD | Town of West Seneca | 12681649 | Engineering Services for Water and Wastewater Projects 15 Page 138 of 301

Page 139

Jaron Case, PE Stormwater Permitting/SWPPPs and Funding Advisor | Syracuse, New York Jaron has more than 10 years of experience in the evaluation, design, permitting, funding, bidding, construction, and post-construction phases of wastewater and water engineering projects for municipal and private clients. Jaron provides funding support for projects and is experienced in working with municipalities to obtain grant funding and financing from various programs such as the NYSEFC CWSRF, WIIA, EPG, BIL, GIGP, IMG, NYSDEC WQIP, Northern Border Regional Commission, NYS ESD, and USDA Rural Development. Todd Plank, GISP GIS Services | Harrisburg, Pennsylvania Todd has 30 years’ experience providing GIS services. He is involved in a variety of different disciplines, providing GIS, GPS and web-GIS support to clients in addition to data analysis and management. Experience includes ArcGIS Online administration, water, wastewater, and stormwater systems inventory, lead inventory, inflow and infiltration evaluation, flow model development, web-mapping, GPS and survey data collection, database applications, and implementation of GIS for a wide range of projects. Todd has experience using many GIS, database and CAD software packages including ESRI’s ArcGIS Desktop, Pro, and Online, Innovyze’s InfoAsset Planner and Info360 Asset. Paige Gilliam, EIT Linear Design | Rye, New York Paige joined GHD in 2020, and has experience in the planning, design, and construction of multi-disciplinary infrastructure projects, specializing in linear pipeline systems. Paige will lead the linear design components for water and sewer projects. Her recent experience includes large-diameter transmission and conveyance pipelines of various materials including HDPE, PVC, and steel, with a focus on alignment routing and complex crossings. Paige specializes in design of trenchless installations, particularly horizontal directional drilling (HDD). Paige was recently named NASTT 2025 “Trenchless Rising Star”. In addition, Paige recently sat for and passed her NYS professional engineering exam. Daniel Kolkmann Construction Contract Administrator | Buffalo, New York Dan leads our Buffalo construction services group and has more than 45 years of experience in the inspection, contract administration, and construction management of municipal water and wastewater facility and infrastructure projects. Responsibilities have included: review of bid proposals, overseeing receipt/responses to requests for information from prospective bidders, advising/making recommendations to the Client regarding contract award, overseeing the construction of Projects. Dan also manages contractor progress payment recommendations, shop drawing review/processing, and provides consultation relative to substitutions and design modifications. As a project progresses or projects are assigned, a task or element may be identified that best suits the qualifications or experience of a specific person in another GHD office. When this situation occurs, this technical specialist will be added to the team to enhance project success. GHD’s policies and structure have been established to promote collaboration and take full advantage of expertise throughout the firm. This approach provides a direct benefit to the Town, as the best team possible will be assigned to your projects. GHD | Town of West Seneca | 12681649 | Engineering Services for Water and Wastewater Projects 16 Page 139 of 301

Page 140

5.3 Proposed Subconsultants GHD is committed to utilizing small and local businesses and maintains a successful Minority and Women-Owned Business Enterprise (MWBE) program. While GHD has the capabilities to complete most aspects of projects in-house, we have fostered valuable relationships with small and local firms. GHD will identify subconsultant tasks that would correspond with our goal of MWBE participation. This goal is important to us in having a meaningful and positive impact on projects. Below we have listed several MWBE and Service-Disabled Veteran-Owned Businesses (SDVOB) firms that we routinely engage and their probably roles on projects. Their utilization will vary based on the project assignment and their availability at that time. Resumes for select subconsultant staff are provided in Appendix C. To support an anticipated NYSEFC Engineering Planning Grant (EPG) project, GHD will partner with trusted local subconsultants in meaningful roles to complement GHD’s team. We have a strong history of delivering projects with an integrated team of experienced individuals from subconsultant MWBE and SDVOB firms. 5.3.1 Arold Construction Company, Inc. | WBE Proposed Role: Sewer Cleaning and Televising (CCTV) and Smoke Testing Services Arold specializes in many types of work in the construction industry such as installation of sewer and water lines, sidewalks and curbing, demolition, drainage improvements, sewer and water treatment plant construction and rehabilitation, bridge construction and asphalt paving. The company has also recently branched off into a form of construction called trenchless technology where they perform trenchless pipe and manhole lining, as well as utility line cleaning and inspection. Arold Construction strives to give the best possible products, results and solutions for each and every customer. Trenchless solutions have opened a new avenue making it possible to save customers money by rehabilitation rather than replacement. Their employees are highly qualified, and their equipment is state of the art. The majority of Arold’s customers are government agencies (NYSDOT, OGS, & DEC) or municipalities that include various counties, towns, villages, and cities. Their work area includes NY, NJ, PA, CT, MA & VT. Arold currently has nearly 50 employees. 5.3.2 JM Davidson Engineering, DPC (JMD) | WBE Proposed Role: Civil Engineering and Resident Inspection Services JM Davidson Engineering, D.P.C. (JMD) was founded in 2015 by Jaime Davidson, PE to assist in filling the need for women-owned businesses in the civil engineering field. Since then, JMD has grown to include multiple professional engineers, scientists, and construction inspectors, offering a full range of civil engineering services, including water and wastewater, structural, transportation, water resources, and railroad design services. Our firm is headquartered in Western New York, giving us a strong local connection to our clients in the region. JMD is certified as a Women- owned Business Enterprise (WBE) by New York State. JMD and GHD have successfully worked together on numerous projects with varying roles. 5.3.3 Jade Stone Engineering, PLLC | WBE Proposed Role: Electrical Engineering Jade Stone Engineering, PLLC (JSE) is a woman-owned small business located in Watertown, NY. JSE was founded in January 2012 and offers mechanical, electrical, and plumbing (MEP) engineering design. They also offer Arc flash studies, thermal imaging services, final permit closeout electrical inspections, building condition assessments, mechanical systems assessments, load calculations, and various other mechanical and electrical equipment testing services. JSE’s electrical engineering department is diverse in both small and large projects. Under the leadership of Benjamin Walldroff and Jeffrey Robinson, the electrical team has a vast depth of knowledge and experience. Ben and Jeff have practiced engineering in Delaware, Pennsylvania, Maryland, Washington DC, Vermont, and now live and practice throughout New York State. The electrical team’s project experience includes water and wastewater projects ranging GHD | Town of West Seneca | 12681649 | Engineering Services for Water and Wastewater Projects 17 Page 140 of 301

Page 141

from a small pump station up to a 240 mgd facility. They also have experience in substation design, extensive building systems, medium voltage power systems, emergency generator systems, electrical service design, and instrumentation and control system design. Jade Stone shares GHD’s belief that we succeed when our clients succeed. We have successfully collaborated with Jade Stone on the City of Oswego WTP Upgrades, Erie County Division of Sewerage Management Lackawanna WRRF and ORF Disinfection Improvements, and the Village of Bath WWTP Upgrades projects, and many projects in Central New York. 6. Similar Project Experience and References The following pages provide an overview of GHD’s experience with wastewater collection and water distribution projects. The client references below can attest to GHD’s and our proposed team’s current and past performance on projects of a similar nature to those proposed for the Town. Detailed project descriptions demonstrating this experience are provided in Appendix B. Plant 5 Flowmetering Project and SSES Re-Evaluation Town of West Seneca | Jason Foote, Town Engineer; 716 674-2280 2025 I/I Project – SWMM Model Update Niagara County Sewer District No. 1 | Thomas W. Blodgett, PE, Administrative Director; 716 693-0001 Consent Order Compliance Town of Tonawanda | Michael Kessler, Director of Water and Wastewater; 716 693-4900 Sanitary Sewer System Evaluation and Rehabilitation Town of Grand Island | Robert H. Westfall, PE, Town Engineer; 716 773-9600 Town-wide Water System Improvements Town of Lewiston | Steve Broderick, Supervisor; 716 754-8213 Royalton Phase 16 Water System Improvements Town of Royalton | Jeffrey Brown, Supervisor; 716 772-7531 Table 6.1 highlights GHD’s collection system and I/I experience across our Northeast region. GHD | Town of West Seneca | 12681649 | Engineering Services for Water and Wastewater Projects 18 Page 141 of 301

Page 142

Table 6.1 Select Collection System and I/I Project Experience Flow Monitoring / Data Collection Sewer and Rehabilitation Design Data Management & Analysis SSES & Strategies Reports GIS Mapping & Analysis Community Outreach I/I Source Detection Hydraulic Modeling Client Name Project Name I/I Analysis Niagara County Sewer District No. 1 2025 I/I Project - SWMM Model Update X X X Town of Lewiston, NY I/I Study and SSES Investigations X X X X X X Town of Grand Island, NY SSES and Rehabilitation X X X X X Town of Tonawanda, NY Consent Order Compliance, Flow Monitoring X X X X X X Town of Hamburg, NY Mt. Vernon Sewer District I/I Study X X X X X X City of Watertown, NY Western Outfall Sewer System X X X X X Town of Harrison, NY SSES and Sewer Rehabilitation X X X X X X Town of Newburgh, NY SSES, Sewer Rehabilitation X X X X X X City of New Rochelle, NY SSES X X X X X X X Rockland County Sewer District No. 1 Post Inflow Removal Flow Monitoring X X X X X X Orangeburg, NY City of Tonawanda, NY SSES and Rehabilitation X X X X X X X X City of Oswego, NY Sanitary Sewer Condition Assessment & Sewer X X X X X X X Rehabilitation Oneida County, NY Infiltration/Inflow (I/I) Reduction Program X X X X X X Village of Silver Creek, NY I/I Study X X X Town of Ramapo Waverley Place Sewer Replacement X X X X X Town of West Seneca Plant 5 Flowmetering X X X X X X Town of West Seneca Plant 5 Flowmetering X X X X X X Westchester County, City of New Development of Sanitary Sewer System Evaluation X X X X X X X X Rochelle & Town of Mamaroneck, NY Survey (SSES) Table 6.2 presents our water transmission and distribution system experience. GHD | Town of West Seneca | 12681649 | Engineering Services for Water and Wastewater Projects 19 Page 142 of 301

Page 143

Table 6.2 Select Linear Water Infrastructure Projects Construction Administration State & Federal Funding Resident Inspection Hydraulic Modeling Cultural Resources Easements & ROW Project Name Diameter Public Outreach Trenchless Permitting 2018 Water System Improvements – Lewiston, NY 8 – 12” X X X X X Phase 16 Water System Improvements – Royalton, NY 8” X X X X X X Hamlet of Gasport Water System Improvements – Royalton 8 – 10” X X X X Newburgh DAT WTP - City of Newburgh 20" X X X X Delaware Interconnect Project at Shaft 22, Veolia, Westchester County, NY 24" - 48" X X X X X X X X X Catskill Aqueduct Connection, Village of Kiryas Joel, Orange County 24" X X X X X X X 30-Inch Raw Water Transmission - Lockport, NY 36” X X X X X X X X X Roaring Creek Supply - Shamokin, PA 36” X X X X X X X X Parsons Transmission - RMWB, AB 42”-30” X X X X X X X X Brine Line - Port Author, TX 60” X X X X X X Water Supply Bridge - Syracuse, NY 36” X X X X X X X X X Cotati Pipeline - Sonoma County, GA 48” Charlotte Water Belmont - Charlotte, NC 36” X X X X X X X X X Van De Water Transmission Main, Tonawanda, NY 48" X X X X X X X X GHD | Town of West Seneca | 12681649 | Engineering Services for Water and Wastewater Projects 20 Page 143 of 301

Page 144

7. Project Funding Experience GHD understands the financial limitations and challenges facing municipalities across New York State. We have a strong history and track record in securing grant funding/financing for capital projects to help communities like the Town of West Seneca deliver critical infrastructure improvement projects. GHD will leverage this experience to help identify funding sources to support the planning, design and construction of key infrastructure projects in the Town. Understanding of Funding Programs GHD follows all applicable funding opportunities continuously to stay informed for our clients. Table 7.1 presents funding options available to the Town for potential future water and wastewater projects. GHD has experience with co- funding using multiple grants and/or financing programs for a single project. Program details are summarized based on currently published funding requirements, which often change from year to year. Table 7.1 NYS Funding Programs Program Program Overview Grant/Loan Figures Program Requirements NYSEFC Engineering Helps develop – Category 1 – Up to $50,000 for After Grant Award: Planning Grant (EPG) Engineering Reports, any wastewater infrastructure- – Detailed Final Budget and which are required to list related project Plan of Finance, including your project on the – Category 2 – Up to $100,000 for third-party funding Intended Use Plan (IUP) I/I projects required by an agreements and 20% local Annual List Order on Consent or SPDES match Permit Compliance Schedule – Board resolutions authorizing (Proof of Enforcement must be and obligating local match provided). fund, and designating – 20% local match of the authorized representative requested amount (may include – Fully executed Engineering cash and/ or in-kind services). Agreement Grants from other sources may not be used to satisfy local – EFC Certification for A/E match. Services Procurement NYSDEC Water Funds projects that – Match is a percentage of the – Apply through the NYS directly improve water award amount grant recipients Consolidated Funding Quality Improvements quality or habitat, promote are required to provide as a local Application (CFA) Project (WQIP) Grant flood risk reduction, share, based on the category. – MWBE and SDVOB restoration, and enhanced participation requirements flood and climate resiliency, or protect a – Regulatory driven projects drinking water source. that add effluent disinfection or include phosphorous removal and CSO/SSO improvements are prioritized – Applicants must be registered in the NYS Statewide Financial System to be considered eligible GHD | Town of West Seneca | 12681649 | Engineering Services for Water and Wastewater Projects 21 Page 144 of 301

Page 145

Program Program Overview Grant/Loan Figures Program Requirements NYSEFC Water – Grants of 25% of net eligible Infrastructure project costs up to $25 million , whichever is less. Improvement Act (WIIA) – No more than $5 million – MWBE and SDVOB Grant allocation per year participation requirements (Clean Water) – American Iron and Steel (AIS) (CWSRF and – Grants of 70% of net eligible WIIA/IMG with CWSRF project costs with No CAP. For funding) projects addressing an emerging (Drinking Water) contaminant (EC) above state – Bond/Authorizing resolution maximum contaminant level. Specific to IMG, must have a – Grants of 60% of net eligible current, valid and binding project costs up to $5 million, project Intermunicipal whichever is less, for other Agreement (IMA) between at eligible water projects. least two cooperating municipalities related to the NYSEFC Available for both clean – Grants of 40% of net eligible financing and implementation water and drinking water project costs up to $30 million , of the project. Intermunicipal Grant projects undertaken jointly whichever is less (IMG) Program by multiple municipalities – No more than $10 million allocation per year Clean Water State Administered by EFC in – Market rate, subsidized, – Bond/Authorizing Resolution Revolving Fund (CWSRF) coordination with hardship financing – Budget Information NYSDEC – Can be combined with WIIA or Financing – Environmental Review IMG grants. Documents – SHPO Approval – District Formation Documents, if applicable – Engineering Agreement, following A/E Procurement – Other Documents, based on project specifics – MWBE participation NYSEFC BIL Grant NYSEFC Clean Water – Grant funding for CWSRF, – DBE participation State Revolving Fund DWSRF, emerging requirements (CWSRF) Bipartisan contaminates, and lead service – Build America Buy America Infrastructure Law (BIL) line replacement/inventory (BABA) projects – Projects serving disadvantaged communities and environmental justice areas are prioritized Drinking Water State Co-administered by EFC – Market rate, subsidized, and – Bond/Authorizing Resolution Revolving Fund (DWSRF) and the NYSDOH hardship financing – Budget Information Financing – Can be combined with WIIA or – Environmental Review IMG grants. Documents – SHPO Approval – District Formation Documents, if applicable – Engineering Agreement, following A/E Procurement – Other Documents, based on project specifics – MWBE participation GHD | Town of West Seneca | 12681649 | Engineering Services for Water and Wastewater Projects 22 Page 145 of 301

Page 146

7.1 Project Grants Secured GHD regularly conducts studies, develops engineering reports, performs environmental review tasks, and works within the guidelines of funding sources to guide and assist our clients through the funding programs available in New York State. GHD staff across NYS have helped our clients secure millions of dollars in grant funding and zero to low- interest financing to support the delivery of critical projects for the municipalities represented in Table 7.2. This list presents grant funding only and is not a complete listing of clients and funding/financing received. Table 7.2 NYS Funding Experience Project Location Project Capital Cost Grant Awards Village of Antwerp, NY $3.7M $3.3M Town of Aurora, NY $12.6M $11.5M Village of Bath, NY $39.3M $3.2M Binghamton-Johnson City, NY $250M $50M Village of Carthage, NY $11.8M $6.75M Village of Cayuga Heights, NY (Phase 1 & 2) $8.5M $1.5M Chemung County, NY $5.5M $2.5M Village of Chittenango, NY $6.2M NA Village of Clayton, NY $3.5M $2.9M Consortium SSES Sewer Rehabilitation, NY $15M $9M Village of Deposit, NY $8.9M $5.2M Village of Lake Placid, NY $15.8M $1.8M City of Little Falls, NY $8.6M $2.9M City of Norwich, NY $16M $8M City of Ogdensburg, NY $41.2M $10.2M City of Oneida, NY $1.5M $380,000 Oneida County, NY (WPCP Rehabilitation) $300M $25M Onondaga County, NY $400M $90M Ontario County, NY $6.7M $4.3M Peach Lake Environmental Center (WWTP), MA $2.8M $2.8M Rte. 3 Sewer Corridor, Jefferson County, NY $33M $18.5M (24 miles of sewer & 26 pump stations) Rockland County Sewer District No. 1, NY $125M $7.5M Village of Saranac Lake, NY $6.7M $1.6M Town of Springport, NY $1.9M $1.6M Watertown, NY (3 projects) $10.7M $2.7M Westchester County, NY (Blind Brook WWTP) $24.2M $6M Westchester County, NY (Yonkers Joint WRRF) $25.9M $6.2M Town of Webb, NY $1.05M $761,000 GHD | Town of West Seneca | 12681649 | Engineering Services for Water and Wastewater Projects 23 Page 146 of 301

Page 147

Appendices GHD | Town of West Seneca | 12681649 | Engineering Services for Water and Wastewater Projects 24 Page 147 of 301

Page 148

Appendix A GHD Leadership and Team Lead Resumes GHD | Town of West Seneca | 12681649 | Engineering Services for Water and Wastewater Projects 25 Page 148 of 301

Page 149

Edward M. Bradfuhrer PE Project Manager/Modeling/Linear Assessments Location Experience Niagara Falls, New York USA 17 years Qualifications/Accreditations – BS, Environmental Engineering, 2009 Memberships – Registered Professional Engineer, New York – New York water Environmental Association – American Society of Civil Engineers Relevant experience summary Ed is a project manager and project engineer who has extensive experience modeling complex hydraulic structures starting with his work in the Buffalo, NY and Niagara Falls sewer systems. These combined sewer communities contain complex flow control structures that are meant to limit water levels and protect property. This experience led Ed to start GHD’s computational fluid dynamics modeling group in North America. He is always interested in ways to improve project outcomes and has piloted modeling software like Optimatics and Infoworks ICM cloud modeling capabilities to optimize projects, reduce delivery time, and control costs. SSES Re-Evaluation SWMM Model Development Project Manager | Town of West Seneca Technical Advisor | | West Seneca, NY, USA Niagara County Sewer District No. 1 | Niagara County, NY, USA Led pilot testing of Optimatics for use in an optimization analysis of a sewer rehabilitation program Directed the development of a new sewer system meant to reduce system inflow and mitigate sanitary model for Niagara County Sewer District No. 1, which sewer overflows. The software used a genetic will be used to assist with locating flow restrictions in algorithm to game sewer lining, lateral lining, off-line the system and assist with accommodating future storage, and added system capacity to determine a development. Determined the location of flowmeter program that could improve outcomes at a lower cost installation, analyzed flowmeter data, trained junior than the current plan. The software helped identify a personnel in calibrating sewer models and geographic recommended program that can better reduce sewer information systems, and reviewed model calibration. overflows at half the cost of the current program. West Side Interceptor Evaluation Plant 5 Flowmetering Modeler and Technical Advisor | Project Manager | Town of West Seneca Town of Amherst | Amherst, NY, USA | West Seneca, NY, USA Led a team of engineers and modelers who performed Updated plans and specifications that were produced a study on the feasibility of installing a relief sewer for for regulatory review so that a new flowmeter and the West Side interceptor in Amherst, NY. Options overflow control structure be bid and constructed. evaluated included gravity conveyance, pumping Managed a project team that provided bidding, station and forcemain, and green infrastructure. construction administration, controls integration, and Probable project costs, preliminary layouts, ecological startup assistance. Construction of the project impacts, and non-monetary factors were evaluated for ultimately reduced sanitary sewer overflows in the each alternative. A pumping station and forcemain was system and improved data accuracy, which reduced determined to be the most feasible option for sewer recurring treatment costs paid to the City of Buffalo. relief and is anticipated to be implemented by the Town. T 716-242-6925 | E [email protected] www.ghd.com Page 149 of 301

Page 150

Edward M. Bradfuhrer | Project Manager/Modeling/Linear Assessments Sanitary Sewer Evaluation Survey system in Hamburg, NY. Options for reducing surcharge levels in the system were evaluated Project Manager | including, additional conveyance and I/I source City of Tonawanda | Tonawanda, NY, USA reduction. Probable project costs, preliminary layouts, This project is part of a multi-year program the City is ecological impacts, and non-monetary factors were undertaking to reduce the amount of inflow in their evaluated for each alternative. Source reduction was sewer system. Managed the project from development determined to be the most feasible option because of the SSES report, which identified system defects there are few nearby locations where flow can be sent using dye testing, CCTV and manhole inspections, by pumping, and pumping costs would be prohibitively prepared contract documents using the report as a high. basis of design and served as the Owner’s representative during construction. Silver Creek SSES, Phases 2, 3, 4 and 5 Project Manager | Waverly Place Sewer Replacement Village of Silver Creek | Silver Creek, NY, USA Project Manager | Managed a multi-year SSES program as part of Town of Ramapo | Ramapo, NY, USA complying with an order on consent. Directed CCTV Updated an existing hydraulic sewer model for the and smoke testing subconsultants as part of their Town of Ramapo to evaluate the feasibility modifying infiltration and inflow reduction program. Analyzed the the Town’s existing sewer to accommodate additional data to determine a cost-effective sewer and manhole development that is expected in the area. Options rehabilitation program and produced a design report were evaluated based on a 30-year design life and that was acceptable to local regulators. Produced included replacement, parallel sewers, redirecting flow contract documents for implementation of the design to other sewers, and low pressure sewers. Based on and assisted with construction contract administration. evaluation, replacing the sanitary sewer in-place was determined to have the lowest lifetime cost and was Town of Tonawanda Consent Order the selected alternative for design. The selected Compliance design increased the sewer slope and diameter to improve velocities and reduce the risk of ragging in the Project Manager | Town of Tonawanda sewer. The design included removal of existing | Tonawanda, NY, USA asbestos cement pipe, improved pipe bedding and Managed a project team that performed flowmeter subbase to compensate for high groundwater and analysis and calibrated a sanitary sewer model for use loose soils, and connections to an existing steep in planning a sewer rehabilitation program. Flowmeter sewer anticipating additional work in the future. analysis was performed using GHD Digital’s flowmetering system. Model calibration was performed Order on Consent Compliance using Infoworks ICM’s cloud computing capabilities so that a team of 6 engineers could simultaneously Project Engineer and System Modeler | calibrate the model to over 100 sites within a three- Niagara Falls Water Board | Niagara Falls, NY, USA month deadline. Performed an evaluation of the Niagara Falls combined sewer system to comply with requirements Career history of an order on consent. The order required evaluating alternatives that would capture 95%-97% of combined 2009 - present GHD, Technical Director sewer overflow generated by the system. Options Summer 2008 New York State Office of General evaluated included in-line storage, off-line storage, Services, Intern enhanced conveyance, tunnels, real time control, high rate treatment, and sewer separation. Proposed Summer 2007 Lockheed Martin Integrated System alternatives were sized and evaluated for probable and Solutions, Intern project cost, ecological impacts, impacts to 2006 – 2009 University at Buffalo Computing stakeholders. No feasible alternative was found that and Information Technology, could meet the required level of capture without Systems Administrator significant social, ecological, or financial costs. However, an alternative to redirect overflows away 2001 – 2005 United States Marine Corps, from a popular tourist area was identified and explored Sergeant as part of a pumping station upgrade. Mt. Vernon Sewer Analysis Modeler | Town of Hamburg | Hamburg, NY, USA Developed a hydraulic model using XPSWMM and performed an analysis of the Mount Vernon sewer T 716-242-6925 | E [email protected] www.ghd.com Page 150 of 301

Page 151

A GHD Principal Robert P. Lannon Jr., PE Project Director Location Experience Buffalo, New York, USA 40 years Qualifications/Accreditations – B.S. Civil Engineering, 1985 – Licensed Professional Engineer, NY Memberships – Water Environment Federation – New York Water Environment Association Relevant experience summary Bob has 40 years of experience in the civil engineering field. He has acted as Project Director/Manager for various municipal projects across Western and Central New York, including the design of water and wastewater facilities, water mains, sanitary and storm sewer systems, and pumping stations. Bob currently serves as the retained engineer/engineer of record for Niagara County Sewer District No. 1, as well as the Towns of Lewiston and Niagara, and the Village of Youngstown. Various Projects - Sanitary Sewer Collection System Town Jobs 3089 and 3107 – Sanitary Sewer Lining (Various Locations) Project Director | Town of West Seneca | West Seneca, NY, USA Project Director | Town of Tonawanda | Tonawanda, NY, USA Bob has served as project director for several sanitary sewer system projects related to the Town’s Order on Bob served as project director for two sanitary sewer Consent including flowmetering upgrades at Plant 5 cured-in-place pipe (CIPP) lining and manhole lining along with the following post-construction analysis and projects in various locations throughout the Town. the SSES Re-evaluation, which identified additional These projects are intended to mitigate infiltration and improvements that would significantly reduce the inflow (I/I) within the Town of Tonawanda as directed volume and occurrence of overflows at approximately by an Order on Consent. half the cost of the current program. Retained Engineer On-Call Engineering Services (Wastewater) Project Director/Engineer of Record | Project Director | Niagara County Sewer District No. 1 | Town of Tonawanda | Tonawanda, NY, USA Niagara County, NY, USA | 2004 – Present Bob is directing engineering services provided by GHD As retained engineer since 2004, Bob attends monthly to support the Town’s efforts to operate and maintain Board Meetings, responds to client inquiries, and the 30 million gallon per day (mgd) wastewater oversees projects completed in connection with the treatment plant (WWTP), 300 miles of sanitary sewers, Niagara County Sewer District’s (NCSD) 14 mgd eight pumping stations, 270 miles of storm sewer, and Water Pollution Control Center (WPCC), seven pump the sanitary sewer overflow (SSO) network. GHD also stations, and interceptors within the six member assists the Town in maintaining compliance with Towns. Bob assisted the NCSD in negotiations with various permits and orders related to its wastewater the NYSDEC their SPDES Permit renewal and collection and treatment system. development and updating of the current 10-Year Capital Improvement Plan, as well as implementation of their annual Operation and Maintenance (O&M) improvements. Bob also directed the team responsible for development of the NCSD’s SWMM Model and calibration. T 716 362-8806 | M 716 491-1267 | E [email protected] www.ghd.com Page 151 of 301

Page 152

Robert P. Lannon Jr., | Project Director Retained Engineering Services Lockport Street Watermain Replacement Town Engineer | Project Manager Town of Lewiston | Lewiston, NY, USA | Village of Youngstown | Youngstown, NY, USA 2001-2003, 2004-2010, 2014-Present Bob managed the design and construction for the As Town Engineer, Bob is the main client contact. He replacement of approximately 2,300 linear feet of attends monthly Board Meetings and oversees existing watermain with new 8-inch ductile iron pipe. engineering support services as required by the Town The project included five interconnections to existing for municipal infrastructure projects including: watermains and replacement of water services. – Feasibility studies and preparation of contract documents for numerous infrastructure Van De Water Delivered Water Transmission improvement projects involving water, sewer, and Main storm sewer systems. Project Director | – Capital planning and implementation, including Erie County Water Authority | Tonawanda and capital cost estimating, concept designs, Amherst, NY, USA preparation of Map Plan & Reports, development of contract documents, regulatory agency approvals, Bob is directing the project team responsible for the contract administration, and assistance with preliminary engineering, design and construction of the obtaining financing. final segment of the Van De Water delivered water transmission main between the Colvin Storage Tank – Developing contract documents for a water system and the I 290/I 990 Interchange. Bob oversaw the capital improvement project to replace evaluation of alternatives, which agreed with a approximately 45,000 linear feet of 8-, 12- and previously completed routing study by others, with 16-inch water main and services throughout the minor alignment changes due to existing conflicts and Town. restrictions. GHD is further evaluating pipe materials – Several sanitary sewer infrastructure improvement and installation methods to construct the final portion projects, including installation of more than 4 miles of the main in the least intrusive and most cost- of sanitary sewers to service numerous residential effective manner. Bob is also overseeing ancillary neighborhoods. Services included design and steps that will take place along with the engineering preparation of contract documents and drawings, design including community engagement, SEQR, and refinancing assistance, and inspection of the public bidding process. He will assist the project construction activities. manager and the ECWA in developing a project-centric public outreach strategy in line with the Town Engineering Services ECWA’s core objectives, which includes informing Engineer of Record | stakeholders about the project need and benefits. Town of Niagara | Niagara Falls, NY, USA | Career history As Town Engineer, Bob is the main client contact and responds to client inquiries. He attends monthly Board 2003 – present GHD, Principal/Project Director Meetings and oversees engineering support services as required by the Town for municipal infrastructure 1983 – 2003 O’Brien & Gere Inc., Project projects, including: Manager – Providing cost effective recommendations to reduce flooding at problem locations throughout the Town's drainage system. – Periodic engineering reviews of proposed projects regulated by the Town Planning and Zoning boards. Town-wide Water System Improvements Project Director Town of Lewiston | Lewiston, NY, USA As retained engineer for the Town, Bob is directed project efforts for the development, design and construction phase services for this Town-wide water system improvement project. The project included 44,500 linear feet of waterline ranging in size from 8 – 16 inches in diameter and included railroad crossings, stream crossings, NYSDOT and Niagara County Highway roadways, trenchless technologies, and several interconnections. T 716 362-8806 | M 716 491-1267 | E [email protected] www.ghd.com Page 152 of 301

Page 153

John Story PE QA/QC – Wastewater Location Experience Buffalo, NY, USA 22 years Qualifications/Accreditations – B.S., Civil Engineering, 2003 – Registered Professional Engineer: New York – Board Certified Environmental Engineer American Academy of Environmental Engineers (Water Supply and Wastewater) Memberships – Member, New York Water Environment Association – Member, American Public Works Association New York Chapter/Western New York Branch Relevant experience summary John is a project manager with 22 years of experience in municipal water and wastewater engineering. He has been involved in the study, design, and construction of wastewater collection systems, pump stations, wastewater treatment plants, and biosolids treatment facilities. I/I Evaluation and SSES I/I Evaluation and SSES Project Engineer | Project Engineer | Town of West Seneca | West Seneca, NY, USA City of Tonawanda | Tonawanda, NY, USA Evaluation of I/I in the Town's sanitary sewer system. Flowmeter data analysis to estimate I/I and prioritize Evaluation included analysis of flowmeter data to SSES activities in the City's sanitary system. The City identify the mini-systems with the most severe wet is required to locate and remove I/I source connections weather peaking factors. I/I evaluation was used to as part of an Order on Consent issued by the prioritize a phased SSES program which included NYSDEC. Mini-systems were prioritized for smoke CCTV inspections, smoke and dye testing, sewer testing, dye testing, CCTV inspections, and manhole lining, and manhole repairs. inspections based on the severity of I/I identified Sanitary Sewer Rehabilitation during flowmetering. The project also included the development of a written CMOM plan for ongoing Project Manager | collection system evaluation and inspection. Town of Grand Island | Grand Island, NY, USA Project Manager for various projects to identify and Peanut Line Parallel Interceptor Sewer remove wet weather inflow and infiltration (I/I) sources. Project Manager | Prepared a 10-year phased work plan for I/I mitigation Town of Amherst | Amherst, NY, USA which was approved by the New York State Department of Environmental Conservation John is managing a critical infrastructure project in the (NYSDEC). Identified I/I sources through a Town of Amherst aimed at increasing sewer capacity combination of video inspection of sewers, manhole for the Town of Clarence and ECSD No.5. The project inspection, smoke testing, and dye testing. Several involves installing approximately 3,750 linear feet of construction contracts were performed to mitigate the 24-inch PVC parallel gravity sewer, including three suspect I/I sources. Construction activities included flow meters and a precast vault with manual flow cast in place pipe (CIPP) lining, open-cut sewer and restrictive devices. GHD utilized existing site and manhole replacement, manhole lining and sewer system information to assess capacity issues rehabilitation, and lateral repairs. Provided annual and develop solutions, leading to a detailed final updates to the NYSDEC to ensure compliance with the design. Key design aspects included connections to approved work plan. the existing sewer system at Transit Road, T +1 716 242-6928 | M +1 716 536-0863 | E [email protected] ghd.com Page 153 of 301

Page 154

John Story | QA/QC – Wastewater coordination with NYSDOT, NYSDEC, and USACE for inspection, sewer cleaning, standard operating crossing Gott Creek, and the use of open cut and procedures, root control, wet weather operating plan, trenchless auger bore installations. The project aims and emergency overflow response plan. to reduce surcharging in the Dodge Road Interceptor and support future development with minimal Lift Station 8 Discharge Forcemain disturbance to residents and businesses. Upon Project Manager | completion, the parallel interceptor sewer will Town of Grand Island | Grand Island, NY, USA enhance sewer capacity and support growth in Clarence and ECSD No.5. As part of an Order on Consent with the NYSDEC to evaluate and abate SSOs, John has been assisting the Wastewater Facilities Plan and Sanitary Sewer Town to identify and remove iI/I sources for the past Overflow (SSO) Abatement Plan 10 years. GHD was retained to evaluate the hydraulics of the system and review alternatives to increase the Project Engineer | size of the LS-8 forcemain, which was originally Town of Grand Island | Grand Island, NY, USA constructed in the mid-1970s and had reached the Evaluation of the existing collection system and end of its service life. The existing 16-inch diameter 3.5 mgd wastewater treatment plant in accordance asbestos cement pipe (ACP) was limiting LS-8 from with an order on consent issued by the NYSDEC for pumping at full capacity, resulting in frequent backups the elimination of SSOs. The evaluation included a and discharges. GHD recommended replacing the 16- capacity analysis of the collection system and WWTP inch ACP pipe with a 20-inch diameter PVC based on projected year 2030 flows and loads. forcemain. The new forcemain alignment totaled Alternatives were developed to eliminate SSOs in the 10,350 linear feet and included work within the New system; including pump station upgrades, new sewers, York State Thruway Authority property, crossings sewer repairs, and identification and removal of wet beneath high-pressure oil and gas lines, cased-bore weather I/I sources. Temporary flowmeters were stream and road crossings, and open-cut excavation utilized to prioritize mini-systems most prone to I/I. A within National Grid’s high voltage transmission line model was developed to estimate the effectiveness of easement. The project also involved three new each alternative toward the goal of SSO elimination. A interconnections, including a deep excavation phased sanitary sewer evaluation survey (SSES) work protected with steel soldier piles and timber lagging, plan was developed to prioritize I/I removal and and a vortex flow insert to mitigate hydrogen sulfide collection system improvement projects over a 10-year off-gassing. Several air relief chambers were included planning horizon. along the forcemain route for pressure testing. The project was substantially complete and operational by Collection System Evaluation July 2020. Project Engineer | Rockland County Sewer District No. 1 | Rockland Main Pump Station Upgrade County, NY, USA Project Engineer | The evaluation included 22 pumping stations, over City of Tonawanda | Tonawanda, NY, USA 100 miles of interceptors, 530 miles of 8-inch sewer lines, and 1,000 miles of building connections. The The project included replacement of existing vertical New York State Department of Environmental centrifugal pumps with new dry-pit submersible Conservation issued an order on consent to develop pumps. Two new 215-horsepower pumps were an abatement program to address Sanitary Sewer provided. A new controls system was developed to Overflows. Assisted in the development of the operate the pumps with new variable frequency drives. collection system model and performed hydraulic The peak flow of the station is 14.6 million gallons per calculations to evaluate alternatives for control of the day. discharges. Developed construction cost estimates for recommended improvements. Career history Capacity, Management, Operations, and 2003 - present GHD, Project Manager Maintenance Program Project Engineer | Niagara Falls Water Board | Niagara Falls, NY, USA Assisted in preparing SSO summary reports for regulatory agencies, and worked with NFWB staff to implement new Capacity, Management, Operations, and Maintenance (CMOM) Program requirements that were written into their SPDES permit. Written plans included procedural documentation for sewer T +1 716 242-6928 | M +1 716 536-0863 | E [email protected] ghd.com Page 154 of 301

Page 155

David Woolley BS QA/QC - Water Location Experience Buffalo, New York, United States 10 years Qualifications/Accreditations – Bachelor of Science (BS), Civil Engineering, 2015 Memberships – Buffalo Section American Society of Civil Engineers (ASCE) – American Water Works Association (AWWA) – New York Water Environment Association (NYWEA) – Member, North American Society for Trenchless Technology (NASTT) Relevant experience summary Dave has worked in consulting for 10 years and has been involved in the planning, design, and construction of multi- disciplined projects, with a focus on linear pipeline projects. Recently, he has acted as the design manager on projects entailing over 20 miles of large diameter (24-84") gravity and pressure pipelines with challenging crossings and permitting, over 40 miles of small/medium pipelines, in addition to providing technical advisory/quality assurance to numerous pipeline routing and design projects of varying size and complexity in North America. for overseeing all technical calculations and 48-Inch Finished Water Transmission Main development of design drawings and specifications. Design Manager | Erie County Water Authority | Tonawanda, NY | 2022- Hamburg Water Consolidation Improvement 2023 Project Dave was the design manager for the preliminary and Project Engineer | detailed design of approximately 18,000 feet of 48-inch Village of Hamburg | Hamburg, NY | 2019 steel finished water transmission main with numerous trenchless crossings including an 1,800-feet micro Dave was the lead design engineer for the replacement tunnel, land acquisition, permitting coordination, with an of approximately 26,000 feet of 8- and 12-inch water anticipated project cost of ~$45 Million. The project also main, associated hydrants, services, and included a high level alignment alternatives review, appurtenances. Dave was responsible for development evaluation of piping materials to determine the most of detailed design drawings, testing and disinfection advantageous material and a project phasing evaluation. plans, front-end documents, technical specifications, and construction cost estimate. Royalton Water Distribution System Improvements Town-wide Water System Improvements Design Manager | Engineer | Town of Royalton | Royalton, NY | 2020 - Ongoing Town of Lewiston | Lewiston, NY | 2018 David acted as the design manager for a multi-year Dave assisted in the detailed design for the replacement multi-phased project to expand the Town’s water of approximately 45,000 feet of various size water distribution system. The project(s) included mains. Assisted with pipeline alignment, materials of approximately 80,000 LF of new water distribution piping construction, and assembly of all contract documents. between 8- and 12-inch diameter. Dave was responsible Responsible for coordinating all permitting efforts with various entities T +1 716 362-8802 | E [email protected] www.ghd.com Page 155 of 301

Page 156

David Woolley | QA/QC - Water 30-Inch Raw Watermain Replacement Project Hamburg Victory Avenue Waterline Engineer | Replacement City of Lockport | Lockport, NY | 2018 Engineer | Assisted in the detailed design for the replacement of Village of Hamburg | Hamburg, NY | 2015 approximately 12,000 feet of 30-Inch raw watermain. Dave completed the detailed design and preparation of The raw watermain is City’s only source of water and the contract documents for the replacement of a waterline in project was declared an Emergency Situation; therefore, Hamburg, NY. Assisted in design of the waterline and in depth consideration was given to maintaining water was responsible for acquiring all necessary agency supply to the City through construction sequencing. approvals. Dave assisted with pipeline alignment, materials of construction, and assembly of all contract documents. South New York Street Waterline Replacement Responsible for coordinating all permitting efforts with various entities. Dave was also the lead Contract Engineer | Administrator throughout the construction phase of the City of Lockport | Lockport, NY | 2015 project and coordinated between involved parties and Responsible for the design and assembly of technical tracked budgets. specifications for the upgrade and replacement of a waterline in Lockport, NY. Coordinated with City officials Water Tank Painting Project and other agencies to acquire necessary approvals. Engineer | Town of Pendleton | Pendleton, NY | 2017 Parsons Development Area Water Transmission Main Phase 2 Valve Chamber Repairs Dave completed the detailed design and preparation of contract documents for the exterior painting and Engineer | rehabilitation of a water storage facility in Pendleton, NY. Regional Municipality of Wood Buffalo | Fort Design Engineer for the necessary rehabilitation and McMurray, AB | 2015 painting, and was responsible for acquiring all necessary Dave aided in the design and permitting for repairs to a agency approvals valve chamber on a water transmission main. He was responsible for assembling technical specifications and Water Tank Interior Painting Project assisted in submittal reviews. Engineer | Town of Pendleton | Pendleton, NY | 2016 Career history Completed the detailed design and preparation of 2015 – present GHD, Civil Engineer/Civil contract documents for the interior painting and Engineering Design Manager - rehabilitation of a water storage facility in Pendleton, NY. Northeast Assisted in design of the necessary rehabilitation and painting and was responsible for acquiring all necessary 2014 - 2015 PCS Crane & Rigging Company, agency approvals. Intern 2013 - 2014 Clark Patterson Lee Design Water System Improvements Professionals, Intern Engineer | Town of Eden | Eden, NY | 2016 Dave was responsible for the preparation and assembly of the U.S. Army Corps of Engineers Joint Application for Permits. The permit covered various watermain crossings under Eighteen Mile and Ryther Creeks. T +1 716 362-8802 | E [email protected] www.ghd.com Page 156 of 301

Page 157

Jacob Kocic BS Linear Assessments and Permitting Location Experience Buffalo, New York USA 8 years Qualifications/Accreditations – BS, Environmental Engineering, 2018 – Engineer-in-Training, New York, 2018 – NYS Endorsed Certificate of Erosion and Sediment Control Training (SWT# 16-T-110921-20) Memberships – New York Water Environment Association Director, Western Chapter; Chair, Awards Committee – Western New York Stormwater Coalition Relevant experience summary Jake joined GHD in 2017 and has since been involved in design, planning, construction oversight, and engineering studies focusing on municipal water, wastewater, and stormwater. His design responsibilities have included Civil, Environmental, and Process Mechanical disciplines and he has been involved with all aspects of design from plans and specification development to permitting and client reviews. In addition to his technical responsibilities, Jake is a Civil team lead within the Northeast Region’s Engineering Design Organization Van de Water Transmission Main Water System Improvements Design Engineer Design Engineer Erie County Water Authority | Town of Royalton | Royalton, NY, USA Erie County, NY, USA Jake assisted with the permitting of the design for the Jake was an integral part of the design team for the construction of multiple waterline projects within the ECWA’s Van de Water Transmission Main project, Town of Royalton. The permitting activities included assisting with design and permitting of the site civil and New York State’s Environmental Review Process mechanical components of the transmission main. consisting of coordination with the State Environmental Design included approximately 17,500 LF of 48-inch Quality Review (SEQR) and State Historic carbon steel transmission main and associated air- Preservation Office (SHPO). Permitting activities also release valves, isolation valves, access ports, and consisted of coordination with the affected chambers with differential settlement accommodation, municipalities, NYS DOT, and Army Corps of located within the Towns of Tonawanda and Amherst. Engineers. The transmission main alignment included multiple areas of trenchless installation via auger bore and Consulting Engineer’s Report microtunneling methods. Jake also assisted with the project permitting, which included New York’s State Engineer Environmental Review Process (SERP) consisting of South Central Connecticut Regional Water the State Environmental Quality Review (SEQR) Authority | New Haven, CT, USA coordinated review and State Historic Preservation Jake assisted with the writing of the South Central Office (SHPO) review. Permitting activities also Connecticut Regional Water Authority Consulting consisted of coordination with the involved Engineer’s Report. He was involved with personnel municipalities, NYS Department of Transportation, and interviews and plant and asset overview evaluations. the U.S. Army Corps of Engineers. The project required evaluation and design around multiple critical utility crossings (e.g., large storm sewer culverts, sanitary sewer piping, high pressure gas lines, etc.) in addition to corrosion protection design coordination. T +1 716 362-8843 | E [email protected] www.ghd.com Page 157 of 301

Page 158

Jacob Kocic | Linear Assessments and Permitting West Side Interceptor Relief Pump Station & Stormwater Inspection Services Forcemain Engineer Engineer Town of Amherst | Amherst, NY, USA Town of Amherst | Amherst, NY, USA Jake provides inspection oversight of the stormwater The WSI Relief Pump Station and Forcemain protection measures for various construction projects consisted of a new wet weather overflow, new 15 mgd located in the Town of Amherst. Site inspections are sanitary sewage pump station, and over 2 miles of 24- completed at designated phases of construction to inch forcemain. Jake was responsible for assisting with verify the contractor’s compliance with the routine the detailed design including permitting and agency (7-day) inspections required by the NYSDEC and reviews and approvals, development of design compliance with the Town’s MS4 permitting. drawings and technical specifications. A critical aspect Inspections include review of the site specific SWPPP of the project was an alignment alternative evaluation and inspection of erosion and sediment control for over 2 miles of medium diameter pipeline through a measures in place at the various sites. The activities highly sub-urbanized area, with numerous utility also include coordination with the respective conflicts, land acquisition implications, and permitting contractors if any deficiencies are noted or requirements. maintenance is required of the control measures in place. Low-pressure Sanitary Sewer Design Career history Project Engineer South & Center Chautauqua Lake Sewer Districts | 2017 – present GHD, Engineer Chautauqua County, NY, USA The West Side Sewer Extension consists of extending an existing sewer district along the west side of Chautauqua Lake. New infrastructure consists of approximately 25,000 linear feet of 1-1/4‑inch HDPE, 21,000 linear feet of 2‑inch HDPE, 7,500 linear feet of 3‑inch HDPE, 1,000 linear feet of 8‑inch HDPE, 22,000 linear feet of 10‑inch HDPE, 230 grinder pumps, two new pumping stations, rehabilitation of two existing pump stations, and all associated appurtenances. Jake assisted with developing easement acquisition documents and coordinating solicitation and acquirement of over 300 easements for infrastructure installation on private property. Jake also assisted with the development of Civil design drawings and specifications and coordinated permitting and agency review of the project including Joint Application for Permit between NYSDEC and USACE, review and approval from NYS SHPO, NYSDOT, and other local municipality and agency reviews. T +1 716 362-8843 | E [email protected] www.ghd.com Page 158 of 301

Page 159

Camie Jarrell PE Stormwater Permitting/SWPPP/Civil Design Location Experience Buffalo, New York, USA 23 years Qualifications/Accreditations – B.S., Civil Engineering, 2001 – Licensed Professional Engineer – PA Key technical skills Memberships – MS4 Compliance Reviews – Water Environment Federation – Stormwater Pollution Prevention Plans – New York Water Environment Association – American Public Works Association Relevant experience summary Camie has 23 years of general municipal and civil engineering experience. She has been responsible for the execution of a variety of engineering tasks and projects including feasibility studies, infrastructure design, drainage system analysis, site planning, grant and permit applications, stormwater pollution prevention plans for both SPDES construction permits and Multi-sector general permits, MS4 permit compliance and reviews, and preparation of scope of work and contract documents for various municipal and industrial clients. Camie also serves as the Town Engineering consultant for the Town of Hamburg, the engineering representative for the Town of Aurora, and the representative Planning Consultant for the Towns of Lewiston and Niagara. She is a qualified stormwater inspector and resident inspector for public improvement projects. Town Engineering Services Site Plan Reviews Town Engineer | Municipal Engineer | Town of Hamburg | Hamburg, NY, USA Multiple Municipal Clients | Erie and Niagara Counties, NY, USA Camie oversees the Town’s Engineering Department, providing direction to department staff, developing Camie has examined multiple submissions from department budgets, addressing resident inquiries and developers and/or property owners for compliance with complaints, and providing day-to-day engineering the associated municipal code, NYS standards and support. She performs site plan and subdivision reviews; standard engineering practices. Reviews included the State Environmental Quality Review (SEQR) design of stormwater, water, and sanitary systems; environmental reviews; drainage reviews; Stormwater contour elevations; connection to existing utilities; site Pollution Prevention Plan (SWPPP) reviews; stormwater access; and parking lot layout. Camie discusses assistance; and multiple separate storm sewer system comments with various department heads, attends (MS4) program coordination. She also provides project public meetings, and prepares review letters for Building management and design services for various Town Inspector. capital projects and development of and updates to the Town’s capital improvement plan (drainage, storm sewer, buildings and grounds and highway). Camie also attends meetings and provides consultation to the Town Board and Planning Board. T +1 716 856 2142 | M - | E [email protected] www.ghd.com Page 159 of 301

Page 160

Camie Jarrell | Stormwater Permitting/SWPPP/Civil Design Standard Design Specifications and Details public education and outreach, distribution of communication, reports, and instructions required to Engineer | comply with State regulations, preparation of annual Town of Pendleton | Pendleton, NY reports, assisting with the preparation of stormwater Camie reviewed and modified existing design standards, program plans, and working towards compliance with typical GHD specifications, and details for adoption by State permit requirements. She has also assisted the the Town. This project included communication with and County Attorney, local municipal attorneys, and incorporation of comments by department heads and individual clients with the review of existing local codes coordination with the CAD department. and the review and incorporation of State required stormwater erosion and sediment control and illicit Cayuga Creek Flood Study discharge elimination laws. Project Engineer | EPA Stormwater Audit Compliance Town of Niagara | Niagara, NY Engineer | Camie conducted a field investigation to determine the Town of Clarence | Clarence, NY, USA condition of the creek, to identify flow obstructions and potential causes of flooding, and coordinated an Camie conducted a detailed review and update to the emergency action to remove impediments and improve Town’s Stormwater Program, specifically the Stormwater flow. She compiled historical development and flow data Program Plan document, in response to an audit and to determine outside sources of stormwater, prepared a Administrative Order from the EPA. Work included: health and safety plan, coordinated the installation of – Review of storm and sanitary sewer systems at flow monitors along the creek and the collection of data, municipal facilities reviewed and analyzed the information, and assisted in – Preparation of concept plans for regulatory approval the preparation of project report for presentation to the client. – Updating procedures and documents for Illicit discharge detection and elimination program Stormwater Inspections – Post-construction stormwater practice inventories – Project involved several meetings with client and Project Manager/Lead Inspector | attorney and coordination with regulatory agency. Town of Amherst | Amherst, NY, USA As an approved inspection firm for the Town since 2008, Camie has and continues to conduct inspections of Career history residential and commercial developments for compliance with the SPDES General Permit for 2006 – present GHD, Buffalo, NY Stormwater Discharges from Construction Activities, including the installation of erosion and sediment control 2001 – 2006 O’Brien & Gere, Inc., measures, and compliance with the project SWPPP at Williamsville, NY various stages of construction. Camie coordinates inspections with the contractor(s), and prepares inspection reports outlining the status of construction and any necessary corrective actions. Camie also trains and acts as supervising professional to a team of junior engineers and inspection staff to conduct stormwater inspections. Phase 2 Stormwater Management Program Project Engineer | Multiple Municipal Clients | Erie and Niagara Counties, NY, USA Camie assists multiple municipal clients with compliance with their MS4 SPDES Permit. This includes answering specific questions from stormwater management officers, reviewing policies and procedures to meet the permit requirements, and assisting with enforcement. Camie attends Western New York Stormwater Coalition meetings representing several municipal clients. This allows her to update clients on activities of the Coalition, T +1 716 856 2142 | M - | E [email protected] www.ghd.com Page 160 of 301

Page 161

Jaron Case, PE Funding Assistance/Stormwater Office Location Experience Syracuse, New York 10 years Qualifications/Accreditations – BS, Civil Engineering, 2015 – AS, Engineering Science, 2013 – Registered Professional Engineer (Water Resources and Environmental): New York Memberships – American Society of Civil Engineers – New York Water Environment Association Relevant experience summary Jaron has 10 years of experience in the evaluation, design, permitting, funding, bidding, construction, and post- construction phases of wastewater and water engineering projects for municipal and private clients. Jaron’s work experience in the wastewater industry includes work on municipal WWTP, pump station, forcemain, and gravity sewer projects, and work on municipal watermain replacement projects in the drinking water industry. Jaron provides permitting and funding support for municipal wastewater and drinking water projects. Jaron also has provided site and stormwater design services for municipal and private sector projects. electrical buildings, new odor control systems, site Pump Station Rehabilitation Program – Cove improvements, and screenings removal. Jaron’s Road and Edgewater Point (Phase 2) responsibilities included project management, contractor and resident field representative Project Engineer / Project Manager | coordination, design reviews, submittal review, Westchester County | Mamaroneck, New York responding to contractor inquires, permitting, asset Design phase services for an approximately management services, and team collaboration. $5.8 million pump station upgrade project in the Village Construction was completed in late 2021. of Mamaroneck, NY. The project includes improvements to two pump stations consisting of Water System Improvements equipment upgrades, flood mitigation improvements, Project Engineer | new wetwells, building improvements, site Village of Skaneateles | Skaneateles, New York improvements, and the installation of an approximately 400 feet 6-inch diameter forcemain. Jaron’s Bidding and construction phase services for an responsibilities include project management, approximately $4 million water system improvements evaluations, vendor reviews, design calculations, project in the Village of Skaneateles, NY. The project specification development, drawing review, cost included the replacement of approximately 12,600 LF estimation, permitting, stormwater calculations, report of existing watermain piping, 220 water services, and development, and team collaboration. The project is 28 fire hydrants. The project also included a complete anticipated to bid for construction in late 2023. reconstruction of East Lake Street, including the replacement of approximately 1,300 LF of storm Pump Station Rehabilitation Program – East sewers, approximately 1,200 LF of sanitary sewers, Basin, West Basin, and Edgewater Point water system improvements, drainage improvements, and paving. The project included permitting and work Project Engineer / Project Manager | along NYSDOT roads and four NYSDOT road Westchester County | Mamaroneck, New York crossings. Jaron’s responsibilities included submittal Construction phase services for an approximately $6.7 review, contractor coordination, permitting, and on-site million pump station upgrade project in the Village of construction administration services. Jaron also Mamaroneck, NY. The project included improvements assisted with project management services including to three pump stations consisting of equipment client communication and leading progress meetings. upgrades, flood mitigation improvements, new The project was completed in late 2020. T 315 802 0273 | E [email protected] 315 802 7 www.ghd.com Page 161 of 301

Page 162

Jaron Case, | Funding Assistance/Stormwater Pump Station Upgrade Program – Walden Water System Improvements Woods, Jefferson Valley, Jefferson Park Project Engineer | Project Engineer / Project Manager | Town of Macedon | Macedon, New York Town of Yorktown | Yorktown, New York Construction phase services for an approximately $1.6 Construction phase services for an approximately $2.4 million water system improvements project in the Town million pump station upgrade project in the Town of of Macedon, NY. The project included the replacement Yorktown, NY. The project included improvements to of approximately 6,500 LF of existing watermain three pump stations consisting of new prefabricated piping, approximately 85 water services, and the pump station buildings, wetwell improvements, addition of approximately 900 LF of new 8-inch HDPE equipment upgrades, electrical upgrades, new sanitary piping and approximately 1,100 LF of 8-inch PVC sewer infrastructure, and site improvements. Jaron’s piping. The project included permitting and work along responsibilities included project management, NYSDOT roads and several NYSDOT road crossings. contractor and resident field representative The project also included the decommissioning of a coordination, design reviews, submittal review, 500,000-gallon water storage tank located in an responding to contractor inquires, permitting, design existing cemetery. Jaron’s responsibilities included calculations, and team collaboration. Construction was onsite construction administration services, submittal completed in early 2020. review, contractor and client coordination, and responding to contractor inquiries. Construction was completed in mid-2018. Western Wayne County Regional WWTP Project Engineer | West Lake Road Sanitary Sewer Wayne County Water and Sewer Authority | Wayne Improvements County, New York Project Engineer | Preliminary engineering design phase services for City of Syracuse | Skaneateles, New York sanitary sewer infrastructure to convey wastewater from the Town of Marion and Town Macedon WWTPs Construction phase services for an approximately to a new consolidated WWTP in the Village of $300k sanitary sewer improvements project for the Palmyra. The project proposed to decommission the City of Syracuse in Skaneateles, NY. The project Town of Marion and Town of Macedon WWTPs and included the installation of an approximately 1,800 LF repurpose into pump stations for sanitary sewer of 1½ and 2-inch low-pressure forcemain and sanitary conveyance to the new consolidated WWTP. Jaron’s sewer improvements in the Skaneateles Lake responsibilities included the development of alternative Watershed. Jaron’s responsibilities included daily forcemain routings, pump station sizing, cost onsite construction administration services, submittal estimation, evaluation of O&M costs, permitting, and review, contractor and client coordination, and report development. The work was completed in mid- responding to contractor inquiries. Construction was 2018. completed in late 2016. T 315 802 0273 | E [email protected] 315 802 7 www.ghd.com Page 162 of 301

Page 163

Lisa J. Derrigan PE Regulatory/Permitting Location Experience Buffalo, New York, USA 30 years Qualifications/Accreditations – M.S., Civil Engineering, 1993 – B.S., Civil Engineering, 1991 – Registered Professional Engineer: New York Memberships – Water Environment Federation – New York Water Environment Association, President – New York Section American Water Works Association Relevant experience summary Lisa is a dedicated professional with 30 years of experience encompassing drinking water and wastewater treatment evaluations, sewage facilities planning, and permit renewal and negotiations with state regulatory agencies. Tonawanda Order on Consent Assistance Consent Order Compliance Engineering Senior Project Engineer | Support Town of Tonawanda WWTP | Tonawanda, NY, USA Senior Project Engineer | Lisa assisted the Town with addressing regulatory Village of Depew | Depew, NY, USA comments on their Infiltration and Inflow (I/I) Lisa assisted with numerous Consent Order compliance Demonstration project, which led to negotiating a revised items for the Village of Depew, which is under Consent Order on Consent with the NYSDEC that provides a new Order to address SSOs in their sanitary sewer system. phased approach to further address I/I and sanitary This includes developing the Village’s Capacity, sewer overflows (SSOs) abatement. Lisa has been Management, Operation and Maintenance (CMOM) assisting the Town with several of the required work plan Plan, the Post-Construction Monitoring Report for the documents including a system wide I/I study, sewer Darwin/Argus area sewer rehabilitation project, the model update, private property I/I program, and other summary report for the System-wide Infiltration/Inflow related documents. Study, and the Work Plan for the Sanitary Sewer System Evaluation Survey (SSES) and Corrective Action Plan SPDES Permit Compliance Assistance (CAP). Lisa also prepared documents in support of funding applications. Senior Project Engineer | Darien Lake Theme Park and Resort | Darien, NY, USA Mount Vernon Sewer System Evaluation Lisa assisted the Darien Lake Theme Park and Resort Peer Reviewer | with review and negotiation of their State Pollutant Town of Hamburg | Hamburg, NY, USA Discharge Elimination System (SPDES) permit renewal Lisa conducted a peer review of the Mount Vernon with the NYSDEC. She also coordinated the I/I study of Sewer District Sewer System Evaluation report. Mount the collection system as required by the permit, including Vernon Sewer District is owned by the Town of Hamburg system flow metering and data evaluations, as well as but operated and maintained by the Erie County Division assisted with the Wastewater Treatment Facility of Sewerage Management. The District was under an (WWTF) evaluations. Order on Consent for the abatement of SSOs. The Town T +1 716 242-6932 | E [email protected] www.ghd.com Page 163 of 301

Page 164

Lisa J. Derrigan | Regulatory/Permitting was awarded an Engineering Planning Grant (through Big Sister Creek WRRF No Feasible Alternative NYSDEC/NYSEFC) to conduct a sewer system Analysis evaluation of flows in the District. The sewer system evaluation included flow monitoring analysis and Senior Project Engineer | hydraulic modeling to develop alternatives to abate the Erie County Division of Sewerage Management | remaining SSOs. Alternatives evaluated included green Evans, NY, USA infrastructure, infiltration and inflow (I/I) removal, and Lisa conducted technical evaluations for the No Feasible sewer/pump station upgrades. Alternative (NFA) analysis for the Erie County Sewer District No. 2 facilities, including the Big Sister Creek SPDES Permit Compliance Assistance WRRF and Overflow Retention Facility (ORF). The Senior Project Engineer | County was required to complete the NFA analysis as Niagara County Sewer District No. 1 | part of the WWTP's State Pollutant Discharge Wheatfield, NY, USA Elimination System (SPDES) permit, which also required development of a collection system hydraulic model and Lisa provided State Pollutant Discharge Elimination evaluation of the Sweetland Road Pumping Station and System (SPDES) permit compliance assistance to tributary area due to high flows and capacity issues. Lisa Niagara County Sewer District No. 1 (NCSD) for their conducted desktop engineering evaluations to determine Water Pollution Control Center (WPCC). This included the existing wet weather capacity of the WRRF and preparing the 2015 Annual Status Report for their ORF, their demonstrated performance, and develop wet Mercury Minimization Program. Lisa worked with the weather flow alternatives to mitigate ORF discharge NCSD staff to collect pertinent data and information, and events. Lisa also coordinated the Financial Capability prepare the status report for submittal to the New York Assessment (FCA) that considered the cost benefit and State Department of Environmental Conservation. affordability of the alternatives. West Side Interceptor Evaluation Career history Senior Project Engineer | 2015 - present GHD Town of Amherst | Amherst, NY, USA 2009 - Sep 2015 ARCADIS, U.S. Lisa assisted with alternatives analysis and report development for a study that examined various 1993 - 2009 Malcolm Pirnie, Inc. (acquired by alternatives and strategies to reduce surcharging during ARCADIS, U.S., Inc. in 2009) wet weather events within the West Side Interceptor (WSI) sewer in the Town of Amherst, with an added focus on infrastructure improvements to reduce I/I and accept future flows from redevelopment within an Amherst Opportunity Zone. This included looking at the impact the alternatives would have on flows to the Town’s Water Pollution Control Facility (WPCF) and onsite overflow retention basin (ORB) use. T +1 716 242-6932 | E [email protected] www.ghd.com Page 164 of 301

Page 165

Todd Plank, GISP | GIS Services Lead A GHD Associate Todd Plank, GISP GIS Services Lead Location Experience Harrisburg, PA 30 years Qualifications/Accreditations – Certified GIS Professional (GISP) – MD, Geo-Environmental Science, Shippensburg University of Pennsylvania, Shippensburg, PA, 1994 – BS, Geo-Environmental Science, Shippensburg University of Pennsylvania, Shippensburg, PA, 1992 – Key Technical Skills – Geographic Information System (GIS) – Infrastructure Asset Management Relevant Experience Summary Todd has 30 years’ experience providing GIS services to clients. He is involved in a variety of different disciplines, providing GIS, GPS and web-GIS support to clients in addition to data analysis and management. Experience includes ArcGIS Online administration, water, storm water, and wastewater systems inventory, lead inventory, inflow and infiltration evaluation, flow model development, web-mapping, GPS and survey data collection, database applications, and implementation of GIS for a wide range of projects. Todd has experience using many GIS, database, and CAD software packages including ESRI’s ArcGIS Desktop, Pro, and Online, Innovyze’s InfoAsset Planner and Info360 Asset. ArcGIS Online Administration Consolidated Planning Level Sewer Program Team Lead Platform Integrator Various Clients (20+) – Local Government Aqua America Inc | April 2023 - Ongoing Water/Sewer/Stormwater Authorities | 2018 - Ongoing Implemented Autodesk/Innovyze Info360 Asset cloud-based platform for Aqua-owned sanitary sewer systems across ESRI ArcGIS Online administration and implementation eastern Pennsylvania. Info360 Asset serves as a centralized of tools and interfaces integrating and collaborating GIS platform, streamlining inspection delivery for Aqua's staff and data into workflows, including development and contractors through a user-friendly drag & drop interface, maintenance of data through mobile data collection, facilitating the uploading of CCTV databases and media. The web-mapping, data conversion. GIS updates are platform allows for thorough review and approval of primarily stormwater, sanitary sewer and water related inspections, granting project staff access to mapping and varying depending on client needs. GIS data database results within Info360 Asset. Leveraging CCTV development involves the capture of features from and spatial data, GHD developed models to assess risk engineering drawing, scanned documents, field data scoring, prioritize projects, engage in Capital Improvement collection RTK GPS, and other client sources to produce Planning, and conduct cost analysis. This comprehensive a standardized, authoritative dataset. Data is used for approach equips our client with an environment to construction design evaluations, Inflow and Infiltration comprehend maintenance and renewal decisions, (I/I) investigation, Closed-Circuit Television (CCTV) considering multiple influencing factors. results mapping, local and state permitting, asset management, planning, public information, and system modeling. T 717.585.6387 | E [email protected] www.ghd.com Page 165 of 301

Page 166

Todd Plank, GISP | GIS Services Lead Lead & Copper Water System Inventory Asset Management Condition Assessment Team Lead Evaluation City of Batavia, NY; City of Oswego, NY; City of Senior GIS Analyst Danbury, CT | 2021 - Ongoing Utilities, Inc. of Pennsylvania | United States | 2020 Implemented Esri’s ArcGIS Online platform solution, Services included implementing condition assessment establishing web-map interfaces and mobile applications and consequence of failure scoring systems for multiple for inventorying and documenting the client’s water Utilities Inc water and wastewater systems into Innovyze system assets as related to the Lead & Copper Rule. InfoAsset Planner software as part of a risk/criticality Historic water system documents, tap cards, inspection assessment. GHD helped Utilities Inc develop an asset and repair data, and staff knowledge were used to management framework for their wastewater and water capture city and privately owned water line materials assets across five states. information. GHD continues to provide Administration of the ArcGIS Online platform, continuing to build out both Sanitary Sewer Web GIS Development capabilities and data for the Clients. Project Manager Lead Service Line Inventory Hamilton Township Municipal Authority | Franklin County, Pennsylvania | 2019 GIS Team Lead City of Batavia, NY; City of Oswego, NY; Town of The client had no prior existing GIS and wished to Lewiston, NY; City of Danbury, CT; City of Gahanna, develop a system to track sanitary sewer assets for OH; Lehigh County Authority, PA; Washington reporting and asset management purposes using ESRI’s Township Municipal Authority, PA; Huntingdon Local Government Information Model (LGIM). Converted Borough, PA; Aberdeen, MD | 2021 – Ongoing CAD files to capture the location of manholes, gravity and pressurized sewer. Attribute data was migrated from Working with numerous clients across five states, GHD the Client provided spreadsheets to the LGIM. ArcGIS has effectively created Lead Service Line Inventories by Online and Collector were used by the client to make utilizing Esri ArcGIS Online platforms. This enables GHD field corrections to the manhole locations through the to develop inventories that meet individual state use of iPad tablets. ArcGIS Server web-mapping allows reporting requirements on the client’s GIS platform. GHD access to the GIS data through a browser interface. The establishes standardized inventory databases interface provides geometry and attribute editing, accessible and updatable by multiple users, including document uploading and association to features, and public information gathering, depending on permission work order creation and management. levels and accessibility. Web and mobile applications facilitate the capture of information on both the utility and Township-Wide Stormwater Condition customer sides of the service lines. Assessment and GIS Development GHD developed mobile applications for smart devices, enabling both internal staff and water service customers Project Manager to document service line characteristics, including Susquehanna Township | Harrisburg, PA | 2018 photographs, into a centralized database for review and Coordinated a condition assessment of 15,000 inclusion in the master service line inventory. Additional stormwater assets in a five-week period and data sources for developing service line inventories development of storm outfall sewersheds. GHD staff include historical documents and drawings, service line utilized ESRI’s Collector for iPad application to inventory tap/connection cards and permits, inspection and repair and perform a condition assessment, including photos, data, staff expertise, and available tax assessment data. of the assets. ESRI’s ArcGIS Online (AGOL) GIS web By integrating these various data sources, we can create mapping platform provided a centralized cloud-based comprehensive inventories and utilize the data for database that GHD staff could upload/download and analytical modeling to predict the probability of materials synchronize data on a daily basis through a cellular or at locations with similar characteristics. wifi connection. The AGOL database was built upon Furthermore, GHD collaborates with clients to develop ESRI’s Local Government Information Model (LGIM). public-facing web maps and information content to Stormwater inlets, outlets, pipes, detention, manholes, enhance transparency and keep residents informed and ditches were collected to help the Township meet about the status of the Lead Service Line program. the requirements of their Chesapeake Bay Pollution On-going support for LSLI GIS development continues Reduction Plan. After completion of the data collection, for all clients, building out capabilities and data to meet storm outfall locations to water bodies were identified the longer-term requirements of the EPA and States and storm sewersheds were delineated for each outfall using Digital Elevation Model (DEM) data and manual interpretation of contours and mapped features. T 717.585.6387 | E [email protected] www.ghd.com Page 166 of 301

Page 167

Paige Gilliam EIT Linear Design Location Experience Rye, New York USA 5 years Qualifications/Accreditations – BS, Environmental Engineering, 2021 – Engineer-in-Training, New York, 2021 – NYS Endorsed Certificate of Erosion and Sediment Control Training, SWT # 060T-9072021-109 Memberships Awards – North American Society for Trenchless Technology – NASTT 2025 “Trenchless Rising Star” (NASTT) – Water Environment Federation (WEF) – New York Water Environment Association (NYWEA) Relevant experience summary Paige joined GHD in 2020, and has experience in the planning, design, and construction of multi-disciplinary infrastructure projects, specializing in linear pipeline systems. Paige will lead the linear design components water and sewer projects. Her recent experience includes large-diameter transmission and conveyance pipelines of various materials including HDPE, PVC, and Steel, with focus in alignment routing and complex crossings. Paige specializes in design of trenchless installations, particularly horizontal directional drilling (HDD). West Side Interceptor Relief Pump Station & West Side Sewer Extension Forcemain Design Engineer/Construction Administration | Design Engineer | South & Center Chautauqua Lake Sewer Districts | Town of Amherst | Amherst, NY, USA Chautauqua, NY, USA The West Side Interceptor project consists of a new The West Side Sewer Extension consists of extending wet weather overflow, new 15 million gallons per day an existing sewer district along the west side of (mgd) sanitary sewage pump station, and more than Chautauqua Lake. New infrastructure consists of 2 miles of 24-inch forcemain. The project is in a sub- approximately 150,000 LF of 2-6" HDPE, 75,000 LF of urbanized area with numerous utility conflicts, and it 8/10" HDPE, 750 grinder pumps, six new pumping consists of six auger bore installations, and the critical stations, and all associated appurtenances. Ellicott Creek pipe utility bridge crossing, which is Responsibilities included hydraulic calculations, along a NYSDOT-owned bridge, with steep pipeline sizing and routing, the design of horizontal embankments, and has challenging soil conditions. directional drilling (HDD) installations, and Paige completed routing and constructability analysis, development of detailed design drawings and technical size/material selection, settlement analysis, and profile specifications, and construction cost estimates. Paige design, and the development of detailed design is currently leading construction administration for drawings and technical specifications, and bidding Phase 2. phase services. Van de Water 48-Inch Finished Water Peanut Line Interceptor Project Transmission Main Design Engineer | Engineer| Erie County Water Authority | Town of Amherst | Amherst, NY, USA Tonawanda, NY, USA Paige was responsible for the civil design of 3,750 LF The VDW Transmission Main consists of a new 48- of 24 and 30-inch gravity sewer, flow control inch carbon steel delivered water transmission pipeline structures, and flow metering. Design aspects included in the Towns of Tonawanda and Amherst NY. Paige precast vault sizing, gravity sewer alignment, was responsible for the preliminary and detailed installation methods. design of approximately 18,000 feet of 48-inch steel T +1 570 317-9128 | M 201 575-9196 | E www.ghd.com Page 167 of 301

Page 168

Paige Gilliam | Linear Design finished water transmission main with numerous Lake Ontario Water Treatment Plant Phase 2 trenchless crossings including an 1,800-feet microtunnel. The microtunnel consisted of 1,800 LF of Technical Advisor | 48-inch steel transmission main within a 60-inch steel Onondaga County Water Authority | casing to cross a town-owned golf course. Oswego, NY, USA Responsibilities include settlement, buckling, and The Lake Ontario Water Treatment Plant (LOWTP) is buoyancy calculations, significant constructability a 60 mgd nominal capacity (72 mgd-rated capacity) considerations, evaluation of shaft locations, direct filtration plant. Phase 2 Clearwells & Backwash development of detailed design plans and Tank Project consisted of new finished water piping to specifications, and construction cost estimates. and from the two new clearwell tanks. Piping included 72-inch steel inlet piping (from the new finished water Rio Dell distribution box) and new 60-inch steel outlet piping to connect to the existing 60-inch steel PCCP finished Trenchless Engineer | water line. Paige was responsible for guiding the steel City of Rio Dell | Rio Dell, CA, USA pipe design calculations, drawings, and specifications. The City of Rio Dell Drinking Water Infrastructure Improvement Project consists of the replacement of Harrison Town-Wide SSES Improvements the City’s failing watermain of various pipe materials Phase 1B and diameters. Paige was responsible for designing six HDD installations during the construction phase, in Design Engineer | which the Contractor’s preferred installation method Town of Harrison | Harrison, NY, USA differed from the final design. The HDDs range from Harrison SSES Improvements addresses the Town’s 300 LF to 800 LF of 18-inch thru 12-inch HDPE and issue of I/I in the sanitary sewer system. The project FPVC. includes MH inspections and sanitary sewer inspection footage review to determine recommended Belmont Lift Station and Forcemain rehabilitation methods. Paige was responsible for technical specifications, design drawings, and Trenchless Engineer | construction cost estimates. Rehabilitation includes Charlotte Water | Charlotte, NC, USA open cut and trenchless rehabilitation methods for Belmont Forcemain project involves approximately sanitary sewer pipeline and MH improvements. Paige 12,000 LF of new 24-inch PVC transmission main. provided construction and design phase services Paige was responsible for the HDD design to cross including construction administration, CCTV review, Paw Creek and a railroad. The HDD consisted of identifying I/I sources, scheduling open-cut sanitary 1,300 LF of two parallel 30-inch HDPE sanitary sewer sewer replacement, open-cut spot and service lateral forcemains with steel casing under the railroad portion. repairs, manhole replacement and rehabilitation, and The entire HDD was through bedrock. Paige was sanitary sewer CIPP lining installation. responsible for HDD alignment and profile design, significant constructability considerations, staging Career history locations, and development of detailed design drawings. 2020 – present GHD, Engineer Big Run Water Treatment Plant Finished Water Transmission Main Trenchless Engineer | Pennsylvania-American Water Company | Punxsutawney, PA, USA Paige was responsible for the horizontal directional drilling (HDD) design of approximately 650 LF of 16- inch HDPE finished water main to cross the Mahoning Creek and a NYSDOT-owned bridge. A critical component of the HDD is the limited space for staging and drilling operations. One side of the bridge was a highly populated residential neighbourhood, and the other side of the bridge was steep road embankments. T +1 570 317-9128 | M 201 575-9196 | E www.ghd.com Page 168 of 301

Page 169

Daniel Kolkmann AS Senior Construction Administrator Location Experience Buffalo, New York, USA 46 years Qualifications/Accreditations – AS, Engineering, 1984 – AAS, Construction Technology, 1982 Key technical skills – Constructability Reviews – Contract Administration – Construction Claim and Litigation Assistance Relevant experience summary Dan leads our Buffalo construction services group and has more than 45 years of experience in the inspection, contract administration, and construction management of municipal water and wastewater facility and infrastructure projects. Responsibilities have included: review of bid proposals, overseeing receipt/responses to requests for information from prospective bidders, advising/making recommendations to the Client regarding contract award, overseeing the construction of Projects. Dan also manages contractor progress payment recommendations, shop drawing review/processing, and provides consultation relative to substitutions and design modifications. of the test area. The project including cured in place pipe Town Jobs 3089 and 3107 – Sanitary Sewer Lining lining of 32,400 linear feet of sanitary sewers. The (Various Locations) sewers ranged in size from 8 – 15 inches. The work also Senior Contract Administrator | included rehabilitation of 80 manholes along point Town of Tonawanda | Tonawanda, NY, USA repairs and grouting lateral connections to new CIPP liner. Dan provided contract administration and oversaw resident inspection staff during the CIPP and manhole lining of sanitary sewers in the Town of Tonawanda for Parker Fries Interceptor Sewer Project two Town projects. Contract Administrator | – Job 3089 included approximately 115,500 LF of Town of Tonawanda | Tonawanda, NY, USA sanitary sewers and approximately 562 manholes. Dan was Construction Manager for this 7 year, multi Several other streets were developed as alternate bid phased sewer interceptor replacement project, which items to allow for the completion of additional areas if consisted of: funding was available. – Phase 1 Constructability Review, Bid, and – Job 3107 included 115,000 LF of sanitary sewers and Construction Phase Services. Dan was responsible approximately 422 manholes. for contract administration and oversight of resident inspection for this major sewer interceptor Infiltration and Inflow Demonstration Project replacement, which included installation of Contract Administrator | approximately 48,000 linear feet (LF) of gravity sewer Town of Tonawanda | Tonawanda, NY, USA to replace undersized and deteriorated sewers. Pipe sizes ranged from 12 to 84 inches in diameter, with Dan provided contract administration and oversaw approximately 18,000 feet of pipe larger than resident inspection staff during the sewer rehabilitation 36 inches in diameter. Installed depths of piping T +1 716 856 2142 | M +1 716 491-3804 | E [email protected] www.ghd.com Page 169 of 301

Page 170

Daniel Kolkmann | Senior Construction Administrator ranged up to 55 feet by open cut and tunnel boring Van De Water Delivered Water Transmission machine (TBM) pipe jacking installation methods. The Improvements project included new sanitary sewer overflow (SSO) chambers, manholes, overflow structures, and a new Constructability Review flow monitoring system, as well as the replacement of Erie County Water Authority | Amherst and approximately 6,000 LF of 12-inch PVC watermain. Tonawanda, NY This $30 million project was successfully completed Dan provided constructability guidance during design of on time and below the initial bid amount. the ECWA’s two transmission main segments within the – Phase 2 Bid and Construction Phase Services. Dan’s Tonawanda Mudflats. The second and final segment to efforts included lead assistance in defense of the be completed is between the Colvin Tank located near construction contract award recommendation / bid Colvin Boulevard and the I-290/I-990 Interchange. The protest through legal depositions and testimony, project involves construction of two 48-inch diameter which prevailed through the State Supreme Court, transmission mains from the VDWTP to BPS, providing Appellate Division. Dan was responsible for contract redundancy for this critical infrastructure, as well as administration and oversight of resident inspection for additional capacity for future use, if ever required. the installation of approximately 4,000 feet of 30-inch diameter sewer pipe replacement, and approximately 2018 Water System Improvement Project 2,000 feet each of 24 and 18-inch sewer pipe by open Construction Contract Administrator cut method. Project also included cast in place lining Town of Lewiston | Lewiston, NY of approximately 1,700 feet of existing 30-inch sewer pipe. The $10 million project was successfully Dan provided constructability guidance during design, completed on time and below the initial bid amount. and provided contract administration and oversaw resident inspection for the installation of approximately – Phase 3 Bid and Construction Phase Services. 44,000 linear feet of 8-inch, 12-inch, and 16-inch Constructability Review, Bid, and Construction Phase watermains, hydrants, valves and appurtenances to Services. Dan was responsible for contract replace existing waterlines in various areas of the Town administration and oversight of resident inspection. of Lewiston, New York. Project involved installation of approximately 5,500 LF of 42-inch diameter sewer pipe replacement, approximately 1,000 LF of 24- to 36-inch and Mountain View Drive Water System 3,200 LF of 12 through 18-inch sewer pipe by open Improvements cut method. Project also includes cast in place lining Construction Manager of approximately 1,500 LF of existing sewer pipe and Town of Lewiston | Lewiston, NY associated manhole and SSO chambers, including full pavement replacement and resurfacing of all affected Dan provided supervision for the installation of areas upon completion of pipe installations. 11,260 LF of 8-inch PVC watermain and associated appurtenances. Construction took place in a very – Phase 4 Bid and Construction Phase Services. Dan affluent area within the Town consisting of multi-million was again instrumental in defense of the construction dollar homes with special features that needed to be contract award recommendation / bid protest through taken into consideration. Restoration was a key concern, legal depositions and testimony, which prevailed and it was imperative that construction had as little through the State Supreme Court. Project includes negative impact on the area and its residents as installation of approximately 12,000 LF of 18 through possible. 36-inch diameter sewer pipe replacing existing interceptor lines, 12 storm sewer overflow chambers, and resurfacing of all affected areas upon completion Career history of pipe installations. The project also includes the 2003 – present GHD, Senior Project Administrator addition of an 800 kW diesel emergency generator at the Parker Pump Station. 1986 – 2003 R&D Engineering, PC, Construction Manager 1977 – 1985 Stimm Associates, Inc., General Contractors and Engineers T +1 716 856 2142 | M +1 716 491-3804 | E [email protected] www.ghd.com Page 170 of 301

Page 171

Appendix B Detailed Project Descriptions GHD | Town of West Seneca | 12681649 | Engineering Services for Water and Wastewater Projects 26 Page 171 of 301

Page 172

Plant 5 Flowmetering The challenge Client The Town of West Seneca owns, operates, and maintains its sanitary Town of West Seneca sewer collection system. Most flow from the system is conveyed to the Buffalo Sewer Authority (BSA) collection system where a wastewater Location treatment plant used to exist (Plant 5). Under the previous configuration, the majority of flow was monitored using a Parshall West Seneca, New York, USA flume (District 13) while the another area (District 5) was not monitored at all. Parshall flumes require strict upstream water level control to accurately measure flows. To do this, the system was designed with enough weir length to limit water levels to less than an inch above the weir. This issue was compounded by tree roots that regularly block the 36-inch interconnection and create a constant backwater on the flume. This effectively created a situation where overflows were frequent and the flume was reporting that the maximum flow was being conveyed to BSA in dry weather. Our response Multiple issues needed to be addressed to optimize the site. This included monitoring District 5, removing backwater on Plant 5 to reduce overflows, and accurately monitoring flows in a way that is not sensitive to downstream conditions. This required reconfiguring the site. The Power of Commitment Page 172 of 301

Page 173

Monitoring District 5 was instituted by installing an The impact area-velocity flowmeter in one of the manholes The new flowmeters are reporting significantly less flows upstream of the interconnection. Good hydraulics are than the Parshall flume was reporting, which reduced needed to capture accurate flow data, so the nearby sewer use costs to BSA. Preventing tree root incursion sewers were lined and the manhole was rehabilitated and allowing for less water level control has also reduced to include a proper manhole bench so that flow overflows, which has improved water quality of would stay confined to the trough and the meter Cazenovia Creek. wouldn’t provide poor data created by turbulence. District 13 metering was improved by demolishing the Parshall flume and replacing it with an Accusonic multipath flowmeter. This improved metering by allowing for direct velocity measurements at multiple points in the pipe cross-section and calculating flow based on water depth, cross-sectional area of each path, and path velocity. The overflow was moved to upstream of the flowmetering chamber to limit water levels during emergency situations and prevent flooding of nearby property. GHD incorporated flow and water depth measurements into the Town’s SCADA system to allow for real-time monitoring of Plant 5. The intent for this is operations personnel can identify when the downstream sewer needed clearing so that unnecessary overflows could be prevented. The downstream interconnection was lined by the Town in Phase 8.5 of their sewer system improvements to prevent tree root incursion. ghd.com Page 173 of 301

Page 174

SSES Re-Evaluation The challenge Client The Town of West Seneca (Town) has been embarking on a ten-phase Town of West Seneca sewer lining program that is required by a New York State Department of Environmental Conservation (NYSDEC) Order on Consent (Order). The Location Town have been seeing diminishing returns on investment from the lining work and want to modify their program to more effectively mitigate sewer West Seneca, New York, USA overflows. Date Our response Feb-2024-April 2025 GHD teamed with Optimatics, who created their Optimizer™ platform to identify potential solutions to multi-variable problems. This evaluation Value required preparing inputs like unit prices for various upgrades, feasible Approximate Construction Value: reductions to infiltration and inflow (I/I) from system interventions, and $8.2 Million identification of unwanted system behavior that needed to be mitigated. These inputs, along with GHD’s sewer model, was input into the software program, which ran more than 150,000 plan simulations that converged on a Pareto Front of local optimal solutions that were divided into buckets of similar solutions (Alternatives) and evaluated for feasibility, system benefit, and overall costs. The Power of Commitment Page 174 of 301

Page 175

The impact The multifactor Preliminary modeling and the system analysis confirmed the Town’s belief that sewer lining was analysis identified an having a positive effect on the sewer system, but additional upgrades would be required to mitigate alternative that would overflows. This included lining the interconnection with the City of Buffalo to prevent tree roots from significantly reduce the blocking their main interceptor and improving operations and maintenance to remove debris that volume of overflows at can become blockages and surcharge the system. approximately half the cost of the current The multifactor analysis identified additional improvements that would significantly reduce the volume and occurrence of overflows at approximately half the cost of the current program. program This program was presented to environmental regulators, who agreed that the modified program was promising but wanted to see if newer flow data would change the recommendations. Both the Town and Regulators agreed that the next step would be to do a full recalibration of the sewer model and validate the results of the analysis against new data before modifying the order on consent. ghd.com Page 175 of 301

Page 176

2025 SWMM Model Update The challenge Client The NCSD is a consortium of six communities that own, operate and Niagara County Sewer District No. 1 maintain a centralized interceptor sewer system, seven remote pumping stations, and a water pollution control center (WPCC). While the NCSD is Location responsible for operating and maintaining the interceptor sewers and Niagara County, New York, USA pump stations noted above, each member Town is responsible for the maintenance and operation of their individual systems. The entire sewer Date collection system, including interceptor sewers, consists of more than 285 miles of pipe. As retained engineer for the NCSD since 2004, GHD February 2025-Ongoing has assisted the NCSD Board and staff with engineering services as needed to maintain the system and meet regulatory requirements. Value Recently, the southern portion of the Town of Lockport has experienced Engineering: $169,300 significant growth in subdivision construction in recent years, with numerous new developments already completed and several more proposed. This growth has and will lead to a greater demand on the District-owned interceptor system in that area. Concerns have been raised that these additional flows could lead to sewer and pump capacity issues in the Town of Lockport and the adjacent Town of Pendleton. The Power of Commitment Page 176 of 301

Page 177

Our response The impact Working with our subconsultant, GHD installed 14 The model will continue to serve as a living inventory of flowmeters and four rain gauges within the southern the interceptor system. GHD will continue to work with portion of the Town of Lockport and the Town of NCSD to keep the model updated with any changes Pendleton to focus model recalibration in that area. made to the sewers or pump stations. Using the computed-based, system-wide PCSWMM The model will be used for predictive scenarios and hydraulic model created by GHD in 2016, this data future planning, especially in the case for construction of will be used to recalibrate the model in areas new subdivisions in Lockport, NY. upstream of the metered sewers using the newly collected information. Inflow/infiltration (I/I) will be modeled using recalibrated RTK unit hydrographs; the industry standard method for modeling I/I. Pump stations in the area of interest will be remodeled based on actual operating parameters including pumps curves, pump on elevations, and pump off elevations. In the future, this updated model will be utilized to conduct Downstream Capacity Analyses (DSCA), which aim to identify areas of concern within the sewer system and pinpoint potential capacity issues resulting from new developments and ongoing I/I removal efforts by the District and/or member towns. Particular attention will be given to the downstream capacity of South Lockport’s interceptor system to address any capacity issues arising from the proposed and ongoing subdivision construction. Pump capacity at the various pump stations will also be investigated. Model results will be presented in an engineering report that describes calibration methods and model statistics following the outline in the Chartered Institute of Water and Environmental Management Code of Practice for Modelling Urban Drainage Systems. ghd.com Page 177 of 301

Page 178

Tonawanda Consent Order Compliance The challenge Client The Town of Tonawanda (Town) owns, operates, and maintains its Town of Tonawanda sanitary sewer collection system and a wastewater treatment facility (WWTF). The Town’s sanitary sewer system experiences significant Location increases in flow during wet weather events, which has in part been attributed to inflow and infiltration (I/I) into the sanitary sewer system. Tonawanda, New York, USA These excess wet weather flows can result in sanitary sewer overflows (SSOs) to Ellicott Creek and Two Mile Creek. The Town entered into an Order on Consent (Order) with the New York State Department of Environmental Conservation (NYSDEC) in May 2012 (Consent Order R9-20110315-9) to address the abatement of SSOs and has completed several projects as required in Schedule A of the Order. In October 2022, a Revised Schedule A for the Order (Appendix A) was executed that included several new requirements to further address I/I and SSO abatement in the Town’s system. As part of the revised Order, the Town was required to submit an approvable work plan and schedule for conducting a system-wide I/I study of the sewer system, which served as the basis for developing the multi-phase Sanitary Sewer Evaluation Survey (SSES) and Corrective Action Plan (CAP) to address SSO reduction. The Power of Commitment Page 178 of 301

Page 179

Our response – Model Calibration: Using data collected during flowmetering in 2023, GHD calibrated the model The Town expressed several concerns with using a long-term simulation of the dataset. Results upcoming requirements of the 2012 Order, which of the I/I Study suggested that the relationship included updating the Long Term Control Plan in the between rainfall and I/I is linear, which indicated that required time. Further discussions with the NYSDEC the RTK unit hydrograph model was sufficient to led to developing a revised approach to I/I reduction achieve a satisfactory simulation. This was and SSO abatement and negotiating modifications to confirmed by satisfactory calibration metrics for ran the Order to include a phased approach to events in the simulation. The model is currently addressing I/I and SSOs moving forward. GHD was being used for planning and reporting. engaged with the Town throughout every step of this process, including preparing the first modified Order – Engineering Report: Results were presented in a deliverable, the Sewer System Inflow and Infiltration model calibration report that followed the outline in Work Plan that outlined the framework for the the approved Model Work Plan. The report proposed flow monitoring and system-wide I/I Study. described calibration methods, general statistics, The I/I Study was submitted to NYSDEC on and included storm hydrographs and scattergraphs April 17, 2024 and outlined flow and rain monitoring showing the correlation between model results and data collection for both the I/I Study and the sewer measured data. system model update/calibration requirements concurrently, quantified I/I in the study subbasins, The impact and validated flow data, which allowed the Town to Creation of the I/I Work Plan and calibrated model be more efficient with its limited resources. improved the Town’s ability to plan system assessment and rehabilitation. The improved model increased the The Sewer System Model Work Plan described a accuracy of overflow predictions and is anticipated to general plan for constructing a new sanitary sewer contribute to optimized sewer system upgrades. model, its proposed uses, and a schedule for submission of a model calibration report. The Model Work Plan was approved by the NYSDEC on September 27, 2023. While the Model Work Plan was under review by the NYSDEC, the Town was performing field investigations to update the sewer GIS dataset in anticipation of the recalibration work. This updated dataset was used as the basis for the updated model, which was due on November 1, 2024. Model calibration included the following tasks: – Model Update: GHD created an “all pipe” model using the updated GIS dataset provided by the Town. This dataset was imported directly into Infoworks ICM and evaluated for missing information, pipes sloping in the wrong direction, and other items that can lead to inaccurate output. Pump stations within the Town were modeled based on information provided in record drawings and operational data. ghd.com Page 179 of 301

Page 180

SSES and Sanitary Sewer System Rehabilitation Mission The challenge Evaluated the Town of Grand Island’s The Town of Grand Island (Town) owns and operates its sanitary sewer existing collection system and system, which includes over 100 miles of collector sewers and analyzed the capacity of their WWTP interceptors, 22 lift stations, seven SSOs, an overflow retention facility and prepared a Workplan for an SSES (ORF), and a 3.5 million gallon per day (mgd) wastewater treatment plant to abate SSOs. Provided phased (WWTP). Several areas of the collection system are prone to wet weather design and construction phase infiltration and inflow (I/I). The Town was issued an Order on Consent by services to implement improvements. the New York State Department of Environmental Conservation (NYSDEC) to eliminate sanitary sewer overflows (SSOs). Client Town of Grand Island, New York, USA Our response GHD was retained to implement a temporary flow metering program to Date characterize the system and quantify I/I in various mini-systems. Based on the flow metering data, GHD prepared a collection system model. 2012-Ongoing Several alternatives were developed to estimate the effectiveness of SSO Value abatement. Alternatives included inflow source identification and removal, sewer rehabilitation including pipe lining, lift station upgrades, in-line $21.5 million (Est.) storage, and increased capacity of sewer pipes. The Power of Commitment Page 180 of 301

Page 181

GHD provided design and construction phase services Recommendations for collection system for system repairs, which included: improvements were based upon the most cost-effective projects for abating SSOs. The final – Approximately 58,000 linear feet of cured in place recommendations included a combination of SSES lining of sanitary sewers work, sewer lining, manhole rehabilitation, and lift – Approximately 15,000 linear feet of open cut station capacity upgrades. replacement for sewers with severe structural GHD also prepared a Capacity Management defects Operations and Maintenance (CMOM) program for – Spot repairs at locations with minor defects the Town. The CMOM program is a guideline for – Lateral repairs at locations where the lateral ongoing collection system maintenance, including connection to the main sewer is damaged sewer cleaning, CCTV inspections, flow monitoring, – Manhole rehabilitation including bench repairs, and system testing. The NYSDEC approved the lining, and chimney seal CMOM program and now enforces CMOM activities through the Town's wastewater discharge permit. – Replacement of the 16-inch diameter, 2-mile-long Lift Station 8 forcemain. GHD provided the following services: – Replacement of two intermediate lift stations (LS-5 – Pre-construction flow monitoring and LS-11) and associated discharge forcemains, – System modeling currently underway. – Alternative analysis for SSO reduction At the conclusion of the repairs, post-construction flow – Workplan development monitoring was performed to quantify the effectiveness of I/I reduction and subsequent SSO mitigation. Data – CMOM program development suggest the program has been successful in mitigating – Design and construction phase services for up to 40 percent of wet weather I/I in several mini system repairs systems. – Coordination with the NYSDEC and Order on Consent negotiations The impact A 10-year Workplan was developed for SSES work within the collection system to identify and remove I/I sources. The first component of the Workplan included SSES investigations through smoke testing, dye testing, and CCTV inspection. More than 70,000 LF of sewers were inspected with sizes ranging from 8 to 30 inches in diameter. Based on the results of the inspections, recommendations were made for system repairs. ghd.com Page 181 of 301

Page 182

Town-wide Water System Improvements The challenge Client The Town owns, operates and maintains the existing public water Town of Lewiston, New York system, which provides potable water to Town residents and businesses through 5,162 service connections. This project reflects Location the efforts of the Town Board and Water Department to address deficiencies within the water system including areas with a history of Lewiston, New York frequent water main breaks, reduced flow capacity due to aging pipelines, and areas with insufficient fire flows. Date In general, the project included the replacement of approximately 2017 - 2022 8 miles of waterline along 12 roads in the Town. The development of the capital improvement list was based upon operation and Value maintenance data provided by the Water Department coupled with the Engineering: $1.1 million results of a Town-wide hydraulic water model developed by GHD in Construction: $11.9 million 2006. The Power of Commitment Page 182 of 301

Page 183

Our response This project was very challenging due to construction As retained engineer for the Town, GHD along with constraints, location of existing utilities and the Water Department staff completed a series of field requirements of the reviewing agencies (New York State investigations to review existing conditions, establish Department of Transportation, Niagara County Highway, conceptual waterline alignments, and to gain a better State Parks, etc.) understanding of potential construction constraints. The project included four horizontal directional drill The Town authorized GHD in late 2017 to provide installations (Robert Moses and three creeks), nine bored survey, design, bidding and construction phase and cased road crossings, and one bored and cased services for the installation of 44,500 linear feet of 8-, railroad crossing. 12- and 16-inch diameter PVC pipe including 43 Construction of the project was completed in 2022. water system interconnections, 100 new hydrants, 100 new valves and 380 new water services of both residential and business services. ghd.com Page 183 of 301

Page 184

Phase 16 Waterline Improvements The challenge Client The Town of Royalton (Town) is a rural municipality located in Town of Royalton southeastern Niagara County, New York. The existing public water system is owned, operated, and maintained by the Town. Over the Location years, the Town has expanded the water system to meet the Royalton, New York, USA increasing need of public water supply for its residents and established numerous water districts. In 1989, the Town determined it was in the public’s interest to extend public water supply to the entire Town and Date initiated the Wholly Part Town Water Improvement. The Town Board February 2021 – Present dissolved all pre-existing water districts and began constructing additional waterlines with the debt burden assessed to the entire Town Approximate Construction Value: as the benefitted area. Since this time, the Town has completed 15 $5.4 Million phases of the Water Plan and has extended public water supply to the majority of properties in the Town. Our response As retained engineer to the Town, GHD has provided design services for a number of water system improvements projects. In 2021, GHD was tasked with providing preliminary engineering support and was later authorized for design, bidding, and construction phase services to complete the Phase 16 Waterline improvements. This includes the construction of approximately 25,640 linear feet (LF) of new waterlines along Griswold Road, Ditch Road, and Akron Road to extend public water supply to rural areas served by private well systems. The Power of Commitment Page 184 of 301

Page 185

Under our initial authorization, GHD prepared a Map, The impact Plan and Report for the Phase 16 extension, Upon construction completion, the Town of Royalton will completed the SEQR and SHPO coordinated have increased public water supply for its residents. reviews, along with surveying and a wetlands Residents along the project area will experience delineation which were provided by outside improved capacity, reliability, and pressure. consultants. GHD subsequently provided detailed design, which included the following in each area: – Approximately 15,620 LF (2.95 miles) of 8-inch polyvinyl chloride (PVC) pipe, valves, services, fire hydrants, and associated appurtenances on Ditch Road and Griswold Street between Foote Road and Lewiston Road (NYS Route 77). – Approximately 4,320 LF (0.82 miles) of 8-inch PVC pipe, valves, services, fire hydrants, and associated appurtenances on Akron Road from Bulmore Road to NYS Route 93. – Approximately 5,700 LF (1.08 miles) of 8-inch PVC pipe, valves, services, fire hydrants, and associated appurtenances on Akron Road from NYS Route 93 to Grove Road. GHD coordinated with various local, county and state agencies, and utilities to obtain permits and land use agreements for the project, and is currently providing construction contract administration and resident inspection. ghd.com Page 185 of 301

Page 186

ghd.com The Power of Commitment GHD | Town of West Seneca | 12681649 | Engineering Services for Water and Wastewater Projects 27 Page 186 of 301

Page 187

TO: Honorable Town Board FROM: DATE: January 26, 2026 SUBJECT: Councilmember Breidenstein re Addition of Standing Agenda Item Requested Action: Pursuant to prior Town Board discussions, it is proposed that a “Response to Public Comment” be added as a standing agenda item for Town Board meetings on a 90-day pilot basis. The Youth and Recreation Commission has successfully used a similar process to provide timely, direct responses to resident concerns. The pilot would take effect on February 9, 2026, and would occur immediately following the first public comment agenda item. This structure is intended to promote respectful, civil engagement by allowing residents to be heard while giving Town Board members adequate time to listen, consider, and respond thoughtfully. Consistent with standard municipal practice, a public statement outlining public comment expectations will be read prior to the first public comment period and reaffirmed before any subsequent public comment agenda items. Kindly adopt the following resolution ADOPTING A 90-DAY PILOT “RESPONSE TO PUBLIC COMMENT” AGENDA ITEM RESOLUTION: WHEREAS, the Town Board seeks to enhance transparency, communication, and respectful civic engagement at Town Board meetings; and WHEREAS, the Town Board has discussed the addition of a structured opportunity for Board responses to public comments; and WHEREAS, the Board desires to implement this practice on a pilot basis to evaluate its effectiveness; NOW, THEREFORE, BE IT RESOLVED, that the Town Board hereby adopts a 90-day pilot addition of a “Response to Public Comment” as a standing agenda item at Town Board meetings, effective February 9, 2026 through May 8, 2026; and BE IT FURTHER RESOLVED, that the “Response to Public Comment” Page 187 of 301

Page 188

agenda item shall occur immediately following the first public comment period at each Town Board meeting during the pilot period; and BE IT FURTHER RESOLVED, that prior to the first public comment session at each Town Board meeting, the following public statement shall be read into the record: “The Board will now entertain public comments for an item on the agenda or for any topic of concern. Each speaker should state your name and street for the record. Please be respectful in your comments and do not divulge any personal or confidential information (for example: names, specific situations, etc.). Speakers should recognize that not all questions or comments can be answered immediately and may require additional research. It is the Board’s goal to respond in a thoughtful, timely, and accurate manner.” BE IT FURTHER RESOLVED, that at the conclusion of the 90-day pilot period, the Town Board shall review the process and determine whether to continue, modify, or discontinue the “Response to Public Comment” agenda item. ATTACHMENTS: 1. Response to Public Comment Pilot Page 188 of 301

Page 189

TOWN OF WEST SENECA TOWN SUPERVISOR Gary A. Dickson TOWN COUNCILMAN Jeffrey A. Piekarec Scott Robertson Mary T. Sherman Robert J. Breidenstein To: Town Board Members Town Clerk From: Robert J. Breidenstein, Town Councilman Re: Proposed Town Board Meeting Agenda Format Addition Pursuant to prior Town Board discussions, it is proposed that a “Response to Public Comment” be added as a standing agenda item for Town Board meetings on a 90-day pilot basis. The Youth and Recreation Commission has successfully used a similar process to provide timely, direct responses to resident concerns. The pilot would take effect on February 9, 2026, and would occur immediately following the first public comment agenda item. This structure is intended to promote respectful, civil engagement by allowing residents to be heard while giving Town Board members adequate time to listen, consider, and respond thoughtfully. Consistent with standard municipal practice, a public statement outlining public comment expectations will be read prior to the first public comment period and reaffirmed before any subsequent public comment agenda items. RESOLUTION NO. ____ OF 2026 ADOPTING A 90-DAY PILOT “RESPONSE TO PUBLIC COMMENT” AGENDA ITEM WHEREAS, the Town Board seeks to enhance transparency, communication, and respectful civic engagement at Town Board meetings; and WHEREAS, the Town Board has discussed the addition of a structured opportunity for Board responses to public comments; and WHEREAS, the Board desires to implement this practice on a pilot basis to evaluate its effectiveness; NOW, THEREFORE, BE IT RESOLVED, that the Town Board hereby adopts a 90-day pilot addition of a “Response to Public Comment” as a standing agenda item at Town Board meetings, effective February 9, 2026 through May 8, 2026; and BE IT FURTHER RESOLVED, that the “Response to Public Comment” agenda item shall occur immediately following the first public comment period at each Town Board meeting during the pilot period; and BE IT FURTHER RESOLVED, that prior to the first public comment session at each Town Board meeting, the following public statement shall be read into the record: Page 189 of 301

Page 190

“The Board will now entertain public comments for an item on the agenda or for any topic of concern. Each speaker should state your name and street for the record. Please be respectful in your comments and do not divulge any personal or confidential information (for example: names, specific situations, etc.). Speakers should recognize that not all questions or comments can be answered immediately and may require additional research. It is the Board’s goal to respond in a thoughtful, timely, and accurate manner.” BE IT FURTHER RESOLVED, that at the conclusion of the 90-day pilot period, the Town Board shall review the process and determine whether to continue, modify, or discontinue the “Response to Public Comment” agenda item. Page 190 of 301

Page 191

TO: Honorable Town Board FROM: Scott Robertson, Councilmember DATE: January 26, 2026 SUBJECT: Councilmember Robertson re Reappointment of Ben Szablewski to the Environmental Commission Requested Action: Please reappoint Ben Szablewski to the Environmental Commission for the following term: January 1, 2026, through December 31, 2027. RESOLUTION: ATTACHMENTS: Page 191 of 301

Page 192

TO: Honorable Town Board FROM: Scott Robertson, Councilmember DATE: January 26, 2026 SUBJECT: Councilmember Robertson re Appointment of Gina Geller to the Environmental Commission Requested Action: Please appoint Gina Geller to the Environmental Commission for an open vacancy for a term from January 1,2026, through December 31, 2027. RESOLUTION: ATTACHMENTS: Page 192 of 301

Page 193

TO: Honorable Town Board FROM: Kate Newton, Town Clerk DATE: January 26, 2026 SUBJECT: Town Clerk Newton re Name change of Official Newspaper Requested Action: At the Organizational Meeting on January 12, 2026, the Town Board designated that the West Seneca Bee was the official newspaper for the Town. The West Seneca Bee is undergoing a name change and will now be known as the Southtowns Bee. RESOLUTION: ATTACHMENTS: 1. doc20260122123906 Page 193 of 301

Page 194

Page 194 of 301

Page 195

TO: Honorable Town Board FROM: Brian Adams, Highway Superintendent DATE: January 26, 2026 SUBJECT: Highway Superintendent Adams re Purchase of Nautilus HD Diesel Floor Scrubber Requested Action: Please see the attached invoice and allow the Highway Superintendent to execute the purchase of a used Nautilus HD Diesel Floor Scrubber and Sweeper from HJS in the amount of $19,000.00. Over the past few weeks, we have used this machine as a demo to potentially buy new. The approximate cost of the new machine on the state contract is $75,000.00. This piece of equipment will be used at the new highway garage, but also benefit other departments and facilities in town. Funds for this purchase are available in the 2026 Highway Equipment Budget Line 0511000.50200. RESOLUTION: ATTACHMENTS: 1. HJS Invoice475362 Page 195 of 301

Page 196

Invoice 475362 Page 1 of 1 Remit To: Invoice 475362 Date 19-Dec-2025 PO Number HJS Supply Co. Order Date 3-Dec-2025 2983 Seneca Street Ship Date 19-Dec-2025 West Seneca, NY 14224 Terms C.O.D. 716-674-9860 Phone Due Date 19-Dec-2025 716-674-9862 Fax Carrier Best Way Bill To: Ship To: Town of West Seneca Town of West Seneca 39 South Ave 39 South Ave West Seneca NY 14224 West Seneca NY 14224 Description Item Code Ordered Shipped B/O Price Tax Amount Nautilus HD Diesel - USED PB45HDSL-U 1 1 0 19,000.00 Y $19,000.00 S/N: 16PB1385 Pricing to include: * Trial period * 30 Day Warranty on Labor and Non-Wear Parts * Defered Payment to January 2026 A service charge of 1.5%/month (18%/yr) Merch Total $19,000.00 will be charged on all past due accounts Taxable Sales $19,000.00 0.0% Sales Tax $0.00 Salesman SD $0.00 Cust Acct TOWNO120 Freight $0.00 Ppd Deposit $0.00 Total Due $19,000.00 Page 196 of 301

Page 197

TO: Honorable Town Board FROM: Brian Cosgrove, Chief of Police DATE: January 26, 2026 SUBJECT: Chief Cosgrove re Purchase of ammunition Requested Action: Please approve the purchase of ammunition per the attached quote from Amchar Wholesale Inc. The prices on the quote are in accordance with NYS contract #PC68734. The total amount of the purchase is $13,966.73. There are sufficient funds in the 2026 budget line 01312000.50409 to cover this expense. RESOLUTION: ATTACHMENTS: 1. doc AmChar 2026 ammunition quote Page 197 of 301

Page 198

Page 198 of 301

Page 199

TO: Honorable Town Board FROM: Megan Wnek, Director of Finance DATE: January 26, 2026 SUBJECT: Director of Finance re Approval of Warrant Requested Action: Kindly approve the vouchers submitted for audit, chargeable to the respected funds as follows: RESOLUTION: General Fund: $ 129,537.74 Highway Fund: $ 83,882.18 Trust & Agency: $ 0.00 Capital Fund: $ 2,525.89 Sewer Districts: $ 775.26 Water Districts: $ 0.00 Drainage District: $ 0.00 Gas Conversion Lighting Districts: $ 0.00 Electric Lighting Districts: $ 223.34 Total: $ 216,944.41 ATTACHMENTS: 1. WARRANT TB 01.26.2026 2. VDR 1.26.2026 WARRANT ADDITIONAL CHECK RUN 3. 2026 YTD BUDGET REPORT 1.26.2026 Page 199 of 301

Page 200

Munis Production Database ACCOUNTS PAYABLE CHECK RUN REPORT DATE: 01/26/2026 CHECK RUN: TB0126 AMOUNT: $ 207,783.88 ABSTRACT OF CLAIMS FOR TOWN BOARD AUDIT The claims set forth bearing numbers ________________ to ________________ have been audited and allowed by us being members of the Town Board. TOWN BOARD _____________________________________ _____________________________________ _____________________________________ DATE: ____________________________________ TO THE SUPERVISOR OF THE TOWN You are hereby authorized and directed to pay to the order of the following vendors the various amounts in payment of Claims hereinafter set forth, numbered the same as above inclusive, which have been audited and allowed and are chargeable to the fund and appropriation account as designated. Report generated: 01/22/2026 09:19 Page 1 User: mwnek Program ID: apwarrnt Page 200 of 301

Page 201

Munis Production Database DETAIL INVOICE LIST CASH ACCOUNT: 99000000 10200 Cash CHECK RUN: TB0126 01/26/2026 DUE DATE: 01/26/2026 VENDOR G/L ACCOUNTS R PO TYPE DUE DATE INVOICE/AMOUNT DOCUMENT VOUCHER CHECK 198 84 LUMBER, INC. 00000 20260083 INV 01/14/2026 0632-752951 47312 49808 1 03030019 50445 HWY Garage Repair and 19.49 Invoice Net 19.49 CHECK TOTAL 19.49 ----------- 203 ABC LOCKSMITH SERVICE 00000 20252995 INV 12/31/2025 52614 47131 49620 1 01714200 50445 Buildings Repair and 104.55 2 02513000 50493 Machinery Parts 89.25 Invoice Net 193.80 CHECK TOTAL 193.80 ----------- 213 ADMAR SUPPLY CO., INC. 00000 20253011 INV 01/05/2026 BU2117999 47167 49656 1 03030019 50445 HWY Garage Repair and 540.35 Invoice Net 540.35 CHECK TOTAL 540.35 ----------- 4 ADVANCE STORE COMPANY, 00000 20260040 INV 01/09/2026 8003600693483 47216 49708 1 01711000 50443 Buildings Equipment .00 2 01816000 50443 Sanitation Equipment .00 3 02513000 50493 Machinery Parts 103.90 Invoice Net 103.90 4 ADVANCE STORE COMPANY, 00000 20260040 INV 01/09/2026 8003600793575 47217 49709 1 01711000 50443 Buildings Equipment 1.44 2 01816000 50443 Sanitation Equipment 2.86 3 02513000 50493 Machinery Parts 2.86 Invoice Net 7.16 4 ADVANCE STORE COMPANY, 00000 20260040 INV 01/09/2026 5176600838992 47218 49710 1 01711000 50443 Buildings Equipment 13.45 2 01816000 50443 Sanitation Equipment 26.88 3 02513000 50493 Machinery Parts 26.88 Invoice Net 67.21 4 ADVANCE STORE COMPANY, 00000 20260040 INV 01/09/2026 8003600893637 47219 49711 1 01711000 50443 Buildings Equipment 485.63 2 01816000 50443 Sanitation Equipment .00 3 02513000 50493 Machinery Parts .00 Invoice Net 485.63 4 ADVANCE STORE COMPANY, 00000 20260040 INV 01/13/2026 8003601393889 47220 49712 1 01711000 50443 Buildings Equipment 183.66 2 01816000 50443 Sanitation Equipment .00 3 02513000 50493 Machinery Parts .00 Invoice Net 183.66 4 ADVANCE STORE COMPANY, 00000 20260040 INV 01/15/2026 8003600293344 47226 49718 1 01711000 50443 Buildings Equipment 27.94 2 01816000 50443 Sanitation Equipment 55.87 3 02513000 50493 Machinery Parts 55.87 Invoice Net 139.68 4 ADVANCE STORE COMPANY, 00000 CRM 01/12/2026 8003601293821 47227 49719 Report generated: 01/22/2026 09:19 Page 2 User: mwnek Program ID: apwarrnt Page 201 of 301

Page 202

Munis Production Database DETAIL INVOICE LIST CASH ACCOUNT: 99000000 10200 Cash CHECK RUN: TB0126 01/26/2026 DUE DATE: 01/26/2026 VENDOR G/L ACCOUNTS R PO TYPE DUE DATE INVOICE/AMOUNT DOCUMENT VOUCHER CHECK 1 01711000 50443 Buildings Equipment -105.00 Invoice Net -105.00 4 ADVANCE STORE COMPANY, 00000 20260040 INV 01/12/2026 8003601276232 47228 49720 1 01711000 50443 Buildings Equipment 53.00 2 01816000 50443 Sanitation Equipment 7.40 3 02513000 50493 Machinery Parts .00 Invoice Net 60.40 4 ADVANCE STORE COMPANY, 00000 20252336 INV 12/31/2025 8003536593301 47264 49756 1 01711000 50443 Buildings Equipment .00 2 01816000 50443 Sanitation Equipment .00 3 02513000 50493 Machinery Parts 13.50 Invoice Net 13.50 4 ADVANCE STORE COMPANY, 00000 20260040 INV 01/14/2026 8003601493913 47287 49780 1 01711000 50443 Buildings Equipment 10.52 2 01816000 50443 Sanitation Equipment .00 3 02513000 50493 Machinery Parts .00 Invoice Net 10.52 4 ADVANCE STORE COMPANY, 00000 20260040 INV 01/14/2026 800360139853 47288 49781 1 01711000 50443 Buildings Equipment 29.62 2 01816000 50443 Sanitation Equipment 59.23 3 02513000 50493 Machinery Parts 59.23 Invoice Net 148.08 4 ADVANCE STORE COMPANY, 00000 20260040 INV 01/14/2026 8003601493911 47289 49782 1 01711000 50443 Buildings Equipment 19.14 2 01816000 50443 Sanitation Equipment .00 3 02513000 50493 Machinery Parts .00 Invoice Net 19.14 4 ADVANCE STORE COMPANY, 00000 CRM 01/19/2026 8003601694061 47360 49859 1 02513000 50493 Machinery Parts -69.99 Invoice Net -69.99 CHECK TOTAL 1,063.89 ----------- 1311 ALTERNATIVE INFORMATIO 00000 20253000 INV 01/12/2026 42719 47147 49636 1 01122000 50200 Supervisor Equipment 1,792.00 Invoice Net 1,792.00 1311 ALTERNATIVE INFORMATIO 00000 20253003 INV 01/12/2026 42726 47148 49637 1 01122000 50200 Supervisor Equipment 4,044.00 Invoice Net 4,044.00 1311 ALTERNATIVE INFORMATIO 00000 20260020 INV 01/12/2026 42838 47153 49642 1 01167000 50460 Central Pr Computer/S 2,429.00 Invoice Net 2,429.00 1311 ALTERNATIVE INFORMATIO 00000 20260021 INV 01/12/2026 42876 47154 49643 1 01167000 50460 Central Pr Computer/S 300.00 Invoice Net 300.00 1311 ALTERNATIVE INFORMATIO 00000 20260022 INV 01/12/2026 42877 47155 49644 1 01167000 50460 Central Pr Computer/S 1,644.42 Invoice Net 1,644.42 Report generated: 01/22/2026 09:19 Page 3 User: mwnek Program ID: apwarrnt Page 202 of 301

Page 203

Munis Production Database DETAIL INVOICE LIST CASH ACCOUNT: 99000000 10200 Cash CHECK RUN: TB0126 01/26/2026 DUE DATE: 01/26/2026 VENDOR G/L ACCOUNTS R PO TYPE DUE DATE INVOICE/AMOUNT DOCUMENT VOUCHER CHECK 1311 ALTERNATIVE INFORMATIO 00000 20260026 INV 01/12/2026 42875 47159 49648 1 01167000 50460 Central Pr Computer/S 8,433.27 Invoice Net 8,433.27 1311 ALTERNATIVE INFORMATIO 00000 20260029 INV 01/14/2026 42878 47234 49726 1 01312000 50415 Police Other Cont 4,492.08 Invoice Net 4,492.08 CHECK TOTAL 23,134.77 ----------- 1570 AMAZON CAPITAL SERVICE 00000 20253002 INV 01/12/2026 1YM14Y6WKG34 47149 49638 1 01167000 50419 Central Pr Supplies 487.11 Invoice Net 487.11 1570 AMAZON CAPITAL SERVICE 00000 20260030 INV 01/06/2026 1QV9-JXXT-4Y3P 47171 49661 1 02511000 50419 General Re Contractua 20.77 Invoice Net 20.77 1570 AMAZON CAPITAL SERVICE 00000 20260046 INV 01/08/2026 1NTC-14R7-77GJ 47208 49700 1 02511000 50419 General Re Contractua 157.56 Invoice Net 157.56 1570 AMAZON CAPITAL SERVICE 00000 20253009 INV 01/16/2026 17YK-M3T1-7FDC 47318 49814 1 01762000 50478 Senior Cit Craft Mate 383.18 Invoice Net 383.18 CHECK TOTAL 1,048.62 ----------- 7 AMERICAN ROCK SALT CO. 00000 20252994 INV 01/02/2026 0814793 47132 49621 1 02514800 50416 Services f Gasoline 2,241.87 Invoice Net 2,241.87 7 AMERICAN ROCK SALT CO. 00000 20253019 INV 01/05/2026 0815273 47192 49683 1 02514200 50483 Snow Remov Salt/Chemi 2,155.16 Invoice Net 2,155.16 CHECK TOTAL 4,397.03 ----------- 1461 APPLIED INDUSTRIAL TEC 00000 20260039 INV 01/09/2026 7033679906 47215 49707 1 02513000 50493 Machinery Parts 59.08 Invoice Net 59.08 CHECK TOTAL 59.08 ----------- 1607 ASSOCIATION OF NYS YOU 00000 20260065 INV 01/14/2026 01/01/2026-$40.00 47276 49769 1 01312000 50479 Police Youth Cour 40.00 Invoice Net 40.00 CHECK TOTAL 40.00 ----------- 9 ASSOCIATION OF NYS YOU 00001 20260027 INV 01/07/2026 2026-85 47150 49639 1 01714000 50414 Recreation Continuing 125.00 Invoice Net 125.00 CHECK TOTAL 125.00 ----------- 1869 AT&T MOBILITY LLC 00000 INV 01/14/2026 287342241097X010825 47258 49750 1 01312000 50420 Police Telephone 830.24 Invoice Net 830.24 Report generated: 01/22/2026 09:19 Page 4 User: mwnek Program ID: apwarrnt Page 203 of 301

Page 204

Munis Production Database DETAIL INVOICE LIST CASH ACCOUNT: 99000000 10200 Cash CHECK RUN: TB0126 01/26/2026 DUE DATE: 01/26/2026 VENDOR G/L ACCOUNTS R PO TYPE DUE DATE INVOICE/AMOUNT DOCUMENT VOUCHER CHECK CHECK TOTAL 830.24 ----------- 251 BASIL FORD, INC. 00000 20260047 INV 01/12/2026 585796 47236 49729 1 02513000 50493 Machinery Parts 711.40 Invoice Net 711.40 251 BASIL FORD, INC. 00000 20260047 INV 01/12/2026 585804 47238 49730 1 02513000 50493 Machinery Parts 170.80 Invoice Net 170.80 251 BASIL FORD, INC. 00000 CRM 01/12/2026 CM585796 47239 49731 1 01711000 50443 Buildings Equipment -155.27 Invoice Net -155.27 251 BASIL FORD, INC. 00000 20260062 INV 01/12/2026 585910 47280 49773 1 01711000 50443 Buildings Equipment 31.05 Invoice Net 31.05 251 BASIL FORD, INC. 00000 20260086 INV 01/14/2026 586095 47306 49802 1 01711000 50443 Buildings Equipment 90.36 Invoice Net 90.36 CHECK TOTAL 848.34 ----------- 1539 BENZINGERS CLOTHING CA 00000 20250530 INV 01/16/2026 25346-155 47303 49799 1 01762000 50417 Senior Cit Cleaning a 52.80 Invoice Net 52.80 1539 BENZINGERS CLOTHING CA 00000 20250530 INV 01/16/2026 25329-722 47309 49805 1 01762000 50417 Senior Cit Cleaning a 45.00 Invoice Net 45.00 1539 BENZINGERS CLOTHING CA 00000 20253008 INV 01/16/2026 25364-811 47311 49807 1 01762000 50478 Senior Cit Craft Mate 72.00 Invoice Net 72.00 CHECK TOTAL 169.80 ----------- 909 BRENNTAG NORTH AMERICA 00000 20260049 INV 01/15/2026 BLN26-973765 47224 49716 1 02511000 50416 General Re Gasoline 502.51 Invoice Net 502.51 CHECK TOTAL 502.51 ----------- 297 BUFFALO CITY CLERK, 00000 20252929 INV 12/18/2025 Safety Paper 46982 49463 1 01141000 50419 Town Clerk Supplies 104.57 Invoice Net 104.57 CHECK TOTAL 104.57 ----------- 169 CHARTER COMMUNICATIONS 00001 INV 01/26/2026 244966701010126 47320 49816 1 01162000 50420 Buildings Telephone 1,987.10 Invoice Net 1,987.10 CHECK TOTAL 1,987.10 ----------- 169 CHARTER COMMUNICATIONS 00001 INV 01/26/2026 145205701010126 47321 49818 1 01711000 50420 Buildings Telephone 156.98 Invoice Net 156.98 Report generated: 01/22/2026 09:19 Page 5 User: mwnek Program ID: apwarrnt Page 204 of 301

Page 205

Munis Production Database DETAIL INVOICE LIST CASH ACCOUNT: 99000000 10200 Cash CHECK RUN: TB0126 01/26/2026 DUE DATE: 01/26/2026 VENDOR G/L ACCOUNTS R PO TYPE DUE DATE INVOICE/AMOUNT DOCUMENT VOUCHER CHECK CHECK TOTAL 156.98 ----------- 169 CHARTER COMMUNICATIONS 00001 INV 01/26/2026 145764501010726 47322 49819 1 01513200 50422 Highway Ga Gas 170.00 2 01711000 50420 Buildings Telephone 156.98 3 01742000 50420 Cultural C Telephone 133.98 4 01742000 50420 Cultural C Telephone 170.00 5 01162000 50420 Buildings Telephone 173.98 6 01513200 50420 Highway Ga Telephone 160.00 7 05050600 50514 SD 6 Operation 120.00 8 01162000 50420 Buildings Telephone 219.23 9 01162000 50420 Buildings Telephone 166.35 10 01162000 50420 Buildings Telephone 186.78 Invoice Net 1,657.30 CHECK TOTAL 1,657.30 ----------- 169 CHARTER COMMUNICATIONS 00001 INV 01/26/2026 145718401010726 47323 49820 1 01162000 50420 Buildings Telephone 40.00 Invoice Net 40.00 CHECK TOTAL 40.00 ----------- 169 CHARTER COMMUNICATIONS 00001 INV 01/26/2026 141749801010726 47324 49821 1 01762000 50420 Senior Cit Telephone 89.97 Invoice Net 89.97 CHECK TOTAL 89.97 ----------- 169 CHARTER COMMUNICATIONS 00004 INV 01/26/2026 52686010826 47201 49692 1 01162000 50420 Buildings Telephone 130.00 2 01762000 50420 Senior Cit Telephone 109.98 Invoice Net 239.98 CHECK TOTAL 239.98 ----------- 31 CHILD & FAMILY SERVICE 00000 20260028 INV 01/12/2026 000106 47160 49649 1 01908200 50806 Employee A Employee A 1,555.00 Invoice Net 1,555.00 CHECK TOTAL 1,555.00 ----------- 325 CHUDY PAPER CO.,INC. 00000 20260001 INV 01/08/2026 128282400 47195 49686 1 01162000 50417 Buildings Cleaning a 1,288.28 Invoice Net 1,288.28 325 CHUDY PAPER CO.,INC. 00000 20260001 INV 01/15/2026 128334600 47301 49797 1 01162000 50417 Buildings Cleaning a 562.68 Invoice Net 562.68 CHECK TOTAL 1,850.96 ----------- 33 CINTAS CORP 00001 20260042 INV 01/15/2026 4255565134 47222 49714 1 02908900 50821 Other Empl Mechanic C 106.43 Invoice Net 106.43 Report generated: 01/22/2026 09:19 Page 6 User: mwnek Program ID: apwarrnt Page 205 of 301

Page 206

Munis Production Database DETAIL INVOICE LIST CASH ACCOUNT: 99000000 10200 Cash CHECK RUN: TB0126 01/26/2026 DUE DATE: 01/26/2026 VENDOR G/L ACCOUNTS R PO TYPE DUE DATE INVOICE/AMOUNT DOCUMENT VOUCHER CHECK 33 CINTAS CORP 00001 20260042 INV 01/14/2026 4256311794 47290 49783 1 02908900 50821 Other Empl Mechanic C 106.43 Invoice Net 106.43 CHECK TOTAL 212.86 ----------- 36 COMPASS MINERALS AMERI 00000 20253006 INV 01/05/2026 1597833 47162 49651 1 02514200 50483 Snow Remov Salt/Chemi 2,855.64 Invoice Net 2,855.64 36 COMPASS MINERALS AMERI 00000 20253028 INV 12/31/2025 1593590 47206 49698 1 02514200 50483 Snow Remov Salt/Chemi 21,466.06 Invoice Net 21,466.06 36 COMPASS MINERALS AMERI 00000 20260043 INV 01/09/2026 1597922 47212 49704 1 02514200 50483 Snow Remov Salt/Chemi 6,537.02 Invoice Net 6,537.02 36 COMPASS MINERALS AMERI 00000 20260043 INV 01/09/2026 1599123 47214 49706 1 02514200 50483 Snow Remov Salt/Chemi 7,868.38 Invoice Net 7,868.38 36 COMPASS MINERALS AMERI 00000 20260043 INV 01/14/2026 1596653 47291 49784 1 02514200 50483 Snow Remov Salt/Chemi 9,800.76 Invoice Net 9,800.76 36 COMPASS MINERALS AMERI 00000 20253040 INV 12/31/2025 15947855 47331 49828 1 02514200 50483 Snow Remov Salt/Chemi 3,997.79 Invoice Net 3,997.79 CHECK TOTAL 52,525.65 ----------- 41 DARYLL'S ELECTRONICS, 00000 20253010 INV 01/14/2026 U 116687 47256 49748 1 01312000 50208 Police Police Veh 3,975.00 Invoice Net 3,975.00 41 DARYLL'S ELECTRONICS, 00000 20253010 INV 01/14/2026 U 116586 47257 49749 1 01312000 50208 Police Police Veh 650.00 Invoice Net 650.00 CHECK TOTAL 4,625.00 ----------- 356 DAY & NIGHT PLUMBING C 00000 20253012 INV 01/05/2026 I47520 47166 49655 1 01162000 50445 Buildings Repair and 243.00 Invoice Net 243.00 CHECK TOTAL 243.00 ----------- 44 DELACY FORD, INC. 00000 20260061 INV 01/13/2026 513838 47281 49774 1 01711000 50443 Buildings Equipment 62.11 Invoice Net 62.11 44 DELACY FORD, INC. 00000 20260085 INV 01/15/2026 513861 47316 49812 1 01711000 50443 Buildings Equipment 6.40 Invoice Net 6.40 CHECK TOTAL 68.51 ----------- 385 EATON OFFICE SUPPLY., 00000 20253001 INV 01/12/2026 PINV1315550 47151 49640 Report generated: 01/22/2026 09:19 Page 7 User: mwnek Program ID: apwarrnt Page 206 of 301

Page 207

Munis Production Database DETAIL INVOICE LIST CASH ACCOUNT: 99000000 10200 Cash CHECK RUN: TB0126 01/26/2026 DUE DATE: 01/26/2026 VENDOR G/L ACCOUNTS R PO TYPE DUE DATE INVOICE/AMOUNT DOCUMENT VOUCHER CHECK 1 01167000 50419 Central Pr Supplies 5.19 Invoice Net 5.19 385 EATON OFFICE SUPPLY., 00000 20253023 INV 01/26/2026 PINV1315185 47196 49687 1 01167000 50419 Central Pr Supplies 168.00 Invoice Net 168.00 CHECK TOTAL 173.19 ----------- 1752 ELLIOTT AUTO SUPPLY CO 00001 20260048 INV 01/15/2026 369-022313 47223 49715 1 01711000 50443 Buildings Equipment 8.62 2 01816000 50443 Sanitation Equipment 8.61 3 02513000 50493 Machinery Parts 8.61 Invoice Net 25.84 CHECK TOTAL 25.84 ----------- 54 ERIE COUNTY HEALTH DEP 00001 20260068 INV 01/07/2026 QUAZ202742180 47294 49787 1 01718000 50149 Veteran's Salaries o 376.00 Invoice Net 376.00 CHECK TOTAL 376.00 ----------- 1022 ERIE COUNTY TOWN CLERK 00000 20260070 INV 01/15/2026 West Seneca 47297 49791 1 01141000 50406 Town Clerk Membership 30.00 Invoice Net 30.00 1022 ERIE COUNTY TOWN CLERK 00000 20260071 INV 01/15/2026 West Seneca - TC 47298 49792 1 01141000 50406 Town Clerk Membership 30.00 Invoice Net 30.00 CHECK TOTAL 60.00 ----------- 56 ERIE COUNTY WATER AUTH 00000 INV 01/26/2026 705501600 10/25 47189 49680 1 01711000 50423 Buildings Water 5,662.45 Invoice Net 5,662.45 CHECK TOTAL 5,662.45 ----------- 56 ERIE COUNTY WATER AUTH 00000 INV 01/26/2026 606894334 12/25 47202 49694 1 01513200 50423 Highway Ga Water 54.00 Invoice Net 54.00 CHECK TOTAL 54.00 ----------- 56 ERIE COUNTY WATER AUTH 00000 INV 01/26/2026 170772505 10/25 47375 49876 1 05050500 50515 SD 5 Operation 78.05 Invoice Net 78.05 CHECK TOTAL 78.05 ----------- 56 ERIE COUNTY WATER AUTH 00000 INV 01/26/2026 171824507 10/25 47376 49878 1 05051200 50515 SD 12 Operation 78.05 Invoice Net 78.05 CHECK TOTAL 78.05 ----------- Report generated: 01/22/2026 09:19 Page 8 User: mwnek Program ID: apwarrnt Page 207 of 301

Page 208

Munis Production Database DETAIL INVOICE LIST CASH ACCOUNT: 99000000 10200 Cash CHECK RUN: TB0126 01/26/2026 DUE DATE: 01/26/2026 VENDOR G/L ACCOUNTS R PO TYPE DUE DATE INVOICE/AMOUNT DOCUMENT VOUCHER CHECK 56 ERIE COUNTY WATER AUTH 00000 INV 01/26/2026 171257009 10/25 47377 49879 1 05050500 50515 SD 5 Operation 78.05 Invoice Net 78.05 CHECK TOTAL 78.05 ----------- 414 FERRY, INC. 00000 20260063 INV 01/12/2026 78740 47279 49772 1 02513000 50493 Machinery Parts 30.66 Invoice Net 30.66 CHECK TOTAL 30.66 ----------- 1858 FIRST DUE EMERGENCY EN 00000 20260058 INV 01/15/2026 010226 47260 49752 1 01000000 10370 General Fu Assessment 563.04 Invoice Net 563.04 CHECK TOTAL 563.04 ----------- 420 FLEET MAINTENANCE INC. 00000 CRM 11/20/2025 CM699313 47140 49622 1 01816000 50443 Sanitation Equipment -15.58 Invoice Net -15.58 420 FLEET MAINTENANCE INC. 00000 20253013 INV 01/05/2026 699313 47165 49654 1 01816000 50443 Sanitation Equipment 42.31 Invoice Net 42.31 420 FLEET MAINTENANCE INC. 00000 20260080 INV 01/15/2026 702536 47315 49811 1 01816000 50443 Sanitation Equipment 148.40 Invoice Net 148.40 CHECK TOTAL 175.13 ----------- 446 GEORGE & SWEDE SALES & 00000 20260081 INV 01/15/2026 01-96587 47314 49810 1 02513000 50493 Machinery Parts 281.19 Invoice Net 281.19 CHECK TOTAL 281.19 ----------- 448 GEORGE'S COLLISION INC 00000 20252999 INV 01/14/2026 22526 47247 49738 1 01312000 50443 Police Equipment 1,617.97 Invoice Net 1,617.97 CHECK TOTAL 1,617.97 ----------- 1682 GO CAR WASH MANAGEMENT 01682 20260094 INV 01/19/2026 11.09.25-$4680.00 47329 49826 1 01312000 50415 Police Other Cont 4,680.00 Invoice Net 4,680.00 CHECK TOTAL 4,680.00 ----------- 69 GRAINGER INC. 00000 20253015 INV 01/05/2026 20253015 47163 49652 1 02513000 50493 Machinery Parts 179.76 Invoice Net 179.76 69 GRAINGER INC. 00000 20253015 INV 01/05/2026 9753704940 47164 49653 1 02513000 50493 Machinery Parts 13.09 Invoice Net 13.09 Report generated: 01/22/2026 09:19 Page 9 User: mwnek Program ID: apwarrnt Page 208 of 301

Page 209

Munis Production Database DETAIL INVOICE LIST CASH ACCOUNT: 99000000 10200 Cash CHECK RUN: TB0126 01/26/2026 DUE DATE: 01/26/2026 VENDOR G/L ACCOUNTS R PO TYPE DUE DATE INVOICE/AMOUNT DOCUMENT VOUCHER CHECK CHECK TOTAL 192.85 ----------- 462 GREAT PLATE GLASS CO., 00000 20252980 INV 01/14/2026 004041 47253 49745 1 01312000 50415 Police Other Cont 1,236.00 Invoice Net 1,236.00 CHECK TOTAL 1,236.00 ----------- 467 HANES SUPPLY, INC. 00000 20260034 INV 01/07/2026 10094952-00 47194 49685 1 02514000 50489 Snow and M Tool House 396.24 Invoice Net 396.24 CHECK TOTAL 396.24 ----------- 478 HAUN WELDING SUPPLY IN 00000 20260009 INV 01/05/2026 0000697401 47146 49635 1 01714200 50445 Buildings Repair and 172.78 Invoice Net 172.78 478 HAUN WELDING SUPPLY IN 00000 20260009 INV 01/12/2026 0000702260 47233 49725 1 01714200 50445 Buildings Repair and 172.78 Invoice Net 172.78 CHECK TOTAL 345.56 ----------- 72 HEALTHWORKS-WNY, LLP 00000 20252949 INV 01/12/2026 541661 47071 49556 1 01198900 50401 Special It Pre-employ 115.00 Invoice Net 115.00 CHECK TOTAL 115.00 ----------- 1728 HNI WORKPLACE FURNISHI 00001 20253016 INV 01/16/2026 2651784 47319 49815 1 01762000 50478 Senior Cit Craft Mate 1,957.63 Invoice Net 1,957.63 CHECK TOTAL 1,957.63 ----------- 75 HOME DEPOT CREDIT SERV 00001 20253041 INV 01/05/2026 010526-2575.63 47332 49829 1 01711000 50445 Buildings Repair and 134.66 2 01714200 50445 Buildings Repair and 400.28 3 01742000 50200 Cultural C Equipment 33.91 4 01752000 50445 Historical Repair and 17.96 5 01762100 50445 Buildings Repair and 9.30 6 01816000 50419 Sanitation Supplies 39.92 7 02513000 50493 Machinery Parts 8.44 8 03030019 50445 HWY Garage Repair and 1,931.16 Invoice Net 2,575.63 CHECK TOTAL 2,575.63 ----------- 938 Stuart c. Irby Co 00001 20260036 INV 01/05/2026 SO14470890.001 47207 49699 1 09090000 51421 EL Central Electricit 171.44 Invoice Net 171.44 938 Stuart c. Irby Co 00001 20260044 INV 01/09/2026 so14473192.002 47210 49702 1 09090000 51421 EL Central Electricit 51.90 Invoice Net 51.90 Report generated: 01/22/2026 09:19 Page 10 User: mwnek Program ID: apwarrnt Page 209 of 301

Page 210

Munis Production Database DETAIL INVOICE LIST CASH ACCOUNT: 99000000 10200 Cash CHECK RUN: TB0126 01/26/2026 DUE DATE: 01/26/2026 VENDOR G/L ACCOUNTS R PO TYPE DUE DATE INVOICE/AMOUNT DOCUMENT VOUCHER CHECK CHECK TOTAL 223.34 ----------- 504 IRISH PROPANE CORPORAT 00000 20250250 INV 12/31/2025 02653283 47141 49630 1 02513000 50493 Machinery Parts 32.75 Invoice Net 32.75 CHECK TOTAL 32.75 ----------- 523 JOHN W. DANFORTH COMPA 00000 20260082 INV 01/14/2026 SRVCE00063280 47313 49809 1 01714200 50445 Buildings Repair and 1,120.82 Invoice Net 1,120.82 CHECK TOTAL 1,120.82 ----------- 1813 KAMCO SUPPLY CORP. OF 00000 20260064 INV 01/12/2026 2601-201959 47278 49771 1 03030019 50445 HWY Garage Repair and 34.89 Invoice Net 34.89 CHECK TOTAL 34.89 ----------- 531 KAMINSKI AND SONS, INC 00000 20260035 INV 01/07/2026 98048 47193 49684 1 02513000 50493 Machinery Parts 696.97 Invoice Net 696.97 CHECK TOTAL 696.97 ----------- 1805 KATE NEWTON 00000 20253021 INV 01/09/2026 12.30.2025 supplies 47190 49681 1 01141000 50419 Town Clerk Supplies 125.03 Invoice Net 125.03 CHECK TOTAL 125.03 ----------- 603 MC CANN, WENDY L. 00000 20253039 INV 01/21/2026 McCan Dec 2025-$1900 47379 49882 1 01111000 50404 Town Justi Court Sten 1,900.00 Invoice Net 1,900.00 CHECK TOTAL 1,900.00 ----------- 112 NATIONAL FUEL GAS DIST 00002 INV 01/26/2026 1/7/26-7666.40 47325 49822 1 01513200 50422 Highway Ga Gas 7,666.40 Invoice Net 7,666.40 CHECK TOTAL 7,666.40 ----------- 114 NATIONAL GRID 00001 INV 01/26/2026 1/8/26-36.18 47326 49823 1 05051500 51454 SD 15 Rem Prog 36.18 Invoice Net 36.18 CHECK TOTAL 36.18 ----------- 114 NATIONAL GRID 00001 INV 01/26/2026 6509927106 12/25 47387 49894 1 01854000 50421 Drainage Electricit 116.84 Invoice Net 116.84 CHECK TOTAL 116.84 ----------- Report generated: 01/22/2026 09:19 Page 11 User: mwnek Program ID: apwarrnt Page 210 of 301

Page 211

Munis Production Database DETAIL INVOICE LIST CASH ACCOUNT: 99000000 10200 Cash CHECK RUN: TB0126 01/26/2026 DUE DATE: 01/26/2026 VENDOR G/L ACCOUNTS R PO TYPE DUE DATE INVOICE/AMOUNT DOCUMENT VOUCHER CHECK 114 NATIONAL GRID 00001 INV 01/26/2026 2883134005 12/25 47388 49895 1 05050300 51454 SD 3 Rem Prog 20.27 Invoice Net 20.27 CHECK TOTAL 20.27 ----------- 1227 QUADIENT FINANCE USA 00001 20252926 INV 01/12/2026 12/9/25-2214.51 46970 49451 1 01167000 50411 Central Pr Postage 2,214.51 Invoice Net 2,214.51 CHECK TOTAL 2,214.51 ----------- 1534 NOCO ENERGY CORP - FUE 00001 20260041 INV 01/15/2026 SP13209078 47221 49713 1 02511000 50416 General Re Gasoline 17,700.99 Invoice Net 17,700.99 CHECK TOTAL 17,700.99 ----------- 671 OLD DOMINION BRUSH, IN 00001 20253035 INV 12/31/2025 9766007 47295 49788 1 02513000 50493 Machinery Parts 405.67 Invoice Net 405.67 CHECK TOTAL 405.67 ----------- 1005 OMNI UNDERWRITING MANA 00000 20252861 INV 12/01/2025 5773172 46905 49385 1 01191000 50477 Special It Insurance 1,885.00 Invoice Net 1,885.00 CHECK TOTAL 1,885.00 ----------- 1669 POWERDMS, INC. 00001 20260010 INV 01/14/2026 INV-148316 47237 49728 1 01312000 50415 Police Other Cont 4,300.20 Invoice Net 4,300.20 1669 POWERDMS, INC. 00001 20260093 INV 01/19/2026 INV-148004 47330 49827 1 01312000 50415 Police Other Cont 11,525.28 Invoice Net 11,525.28 CHECK TOTAL 15,825.48 ----------- 589 QUADIENT LEASING 00001 20260019 INV 01/12/2026 Q2145030 47152 49641 1 01167000 50411 Central Pr Postage 829.14 Invoice Net 829.14 CHECK TOTAL 829.14 ----------- 719 REGIONAL INT'L OF WNY 00000 20260032 INV 01/05/2026 033325985P 47168 49657 1 02513000 50493 Machinery Parts 588.85 Invoice Net 588.85 CHECK TOTAL 588.85 ----------- 719 REGIONAL INT'L OF WNY 00001 20260032 INV 01/06/2026 033326045P 47169 49658 1 02513000 50493 Machinery Parts 1,177.70 Invoice Net 1,177.70 719 REGIONAL INT'L OF WNY 00001 20260084 INV 01/14/2026 033325784P 47308 49804 Report generated: 01/22/2026 09:19 Page 12 User: mwnek Program ID: apwarrnt Page 211 of 301

Page 212

Munis Production Database DETAIL INVOICE LIST CASH ACCOUNT: 99000000 10200 Cash CHECK RUN: TB0126 01/26/2026 DUE DATE: 01/26/2026 VENDOR G/L ACCOUNTS R PO TYPE DUE DATE INVOICE/AMOUNT DOCUMENT VOUCHER CHECK 1 02513000 50493 Machinery Parts 108.77 Invoice Net 108.77 CHECK TOTAL 1,286.47 ----------- 1535 ROTELLA GRANT MANAGEME 00000 20260015 INV 01/12/2026 1012026 47145 49634 1 01191000 50451 Special It Profession 2,500.00 Invoice Net 2,500.00 CHECK TOTAL 2,500.00 ----------- 739 S & S ELECTRIC REPAIR 00000 20260087 INV 01/07/2026 5785 47304 49800 1 01162000 50445 Buildings Repair and 138.56 Invoice Net 138.56 CHECK TOTAL 138.56 ----------- 146 S & S WORLDWIDE INC. 00000 20252320 INV 12/11/2025 101709824 47059 49543 1 01714000 50419 Recreation Supplies 2.71 Invoice Net 2.71 CHECK TOTAL 2.71 ----------- 745 SCHIEBER, JEFFREY 00000 20260057 INV 01/15/2026 010726 47261 49753 1 01362000 50448 Code Enfor Print, Lit 93.80 Invoice Net 93.80 CHECK TOTAL 93.80 ----------- 749 SCHRODER, JOSEPH & ASS 00000 20252862 INV 12/08/2025 27013 46906 49386 1 01142000 50452 Town Attor Profession 162.00 Invoice Net 162.00 CHECK TOTAL 162.00 ----------- 757 SEWING TECHNOLOGIES, I 00000 20253027 INV 01/14/2026 50832 47249 49741 1 01312000 50407 Police Uniform Al 162.00 Invoice Net 162.00 CHECK TOTAL 162.00 ----------- 1784 SHEILA MARIE TOY 00000 20252997 INV 01/14/2026 12/30/2025-$207.88 47248 49740 1 01312000 50407 Police Uniform Al 207.88 Invoice Net 207.88 CHECK TOTAL 207.88 ----------- 156 SITEONE LANDSCAPE SUPP 00000 20260031 INV 01/06/2026 161655231-001 47170 49660 1 01711000 50445 Buildings Repair and 600.25 Invoice Net 600.25 CHECK TOTAL 600.25 ----------- 1975 STARK TECH GROUP 00001 20260050 INV 01/15/2026 10038787 47225 49717 1 01162000 50445 Buildings Repair and 3,610.94 Invoice Net 3,610.94 Report generated: 01/22/2026 09:19 Page 13 User: mwnek Program ID: apwarrnt Page 212 of 301

Page 213

Munis Production Database DETAIL INVOICE LIST CASH ACCOUNT: 99000000 10200 Cash CHECK RUN: TB0126 01/26/2026 DUE DATE: 01/26/2026 VENDOR G/L ACCOUNTS R PO TYPE DUE DATE INVOICE/AMOUNT DOCUMENT VOUCHER CHECK CHECK TOTAL 3,610.94 ----------- 1788 STEFANIE MATTA 00000 20260011 INV 01/14/2026 000505 47235 49727 1 01312000 50415 Police Other Cont 7,514.71 Invoice Net 7,514.71 CHECK TOTAL 7,514.71 ----------- 789 SUBURBAN PEST CONTROL, 00000 20260067 INV 01/13/2026 2424037 47283 49776 1 01711000 50424 Buildings Rodent & V 59.81 Invoice Net 59.81 789 SUBURBAN PEST CONTROL, 00000 20260067 INV 01/13/2026 2424039 47285 49778 1 01711000 50424 Buildings Rodent & V 75.00 Invoice Net 75.00 789 SUBURBAN PEST CONTROL, 00000 20260067 INV 01/13/2026 2424040 47286 49779 1 01711000 50424 Buildings Rodent & V 45.00 Invoice Net 45.00 CHECK TOTAL 179.81 ----------- 1893 SUGARMAN LAW FIRM, LLP 00000 20252871 INV 11/30/2025 593994 46907 49387 1 01142000 50452 Town Attor Profession 4,720.00 Invoice Net 4,720.00 CHECK TOTAL 4,720.00 ----------- 2061 SUR-TEC, INC. 00000 20260052 INV 01/14/2026 16672 47277 49770 1 01312000 50415 Police Other Cont 2,963.00 Invoice Net 2,963.00 CHECK TOTAL 2,963.00 ----------- 804 TERMINAL SUPPLY CO. 00001 20250080 INV 12/31/2025 37779-01 47310 49806 1 01711000 50443 Buildings Equipment 10.70 2 01816000 50443 Sanitation Equipment 10.69 3 02513000 50493 Machinery Parts 10.69 Invoice Net 32.08 CHECK TOTAL 32.08 ----------- 809 THRUWAY BUILDERS O.P. 00000 20253020 INV 12/31/2025 202602 47191 49682 1 01711000 50445 Buildings Repair and 102.00 Invoice Net 102.00 CHECK TOTAL 102.00 ----------- 2041 TOLLS BY MAIL 00000 20253007 INV 01/16/2026 20026549173 47317 49813 1 01762000 50478 Senior Cit Craft Mate 7.80 Invoice Net 7.80 CHECK TOTAL 7.80 ----------- 1654 TREAD CITY TIRE 00000 20253022 INV 12/31/2025 73424 47205 49697 1 02513000 50492 Machinery Tires 900.00 Invoice Net 900.00 Report generated: 01/22/2026 09:19 Page 14 User: mwnek Program ID: apwarrnt Page 213 of 301

Page 214

Munis Production Database DETAIL INVOICE LIST CASH ACCOUNT: 99000000 10200 Cash CHECK RUN: TB0126 01/26/2026 DUE DATE: 01/26/2026 VENDOR G/L ACCOUNTS R PO TYPE DUE DATE INVOICE/AMOUNT DOCUMENT VOUCHER CHECK CHECK TOTAL 900.00 ----------- 1524 TREE PLUCKER LLC 00000 20253005 INV 12/13/2025 010526 47161 49650 1 01856000 50415 Tree Maint Other Cont 4,200.00 Invoice Net 4,200.00 CHECK TOTAL 4,200.00 ----------- 1588 UDIG NY INC 00000 20252996 INV 12/31/2025 25120775 47130 49619 1 02511000 50498 General Re Culvert, P 94.00 Invoice Net 94.00 CHECK TOTAL 94.00 ----------- 846 UPSTATE STEEL INC. 00001 20260045 INV 01/08/2026 93494 47209 49701 1 01816000 50443 Sanitation Equipment 875.00 Invoice Net 875.00 CHECK TOTAL 875.00 ----------- 180 VERIZON 00000 INV 01/26/2026 852734149000104 1/26 47327 49824 1 05050000 50420 SD Telephone 99.00 Invoice Net 99.00 CHECK TOTAL 99.00 ----------- 181 VERIZON WIRELESS 00000 INV 01/26/2026 6132462152 47203 49695 1 01362000 50419 Code Enfor Supplies 37.99 Invoice Net 37.99 CHECK TOTAL 37.99 ----------- 185 WB MASON COMPANY, INC. 00000 20252932 INV 01/14/2026 258886494 47250 49742 1 01312000 50415 Police Other Cont 229.54 Invoice Net 229.54 CHECK TOTAL 229.54 ----------- 1487 WELLS FARGO VENDOR FIN 00000 20260024 INV 01/12/2026 5037030877 47157 49646 1 01144000 50200 Town Engin Equipment 129.16 Invoice Net 129.16 1487 WELLS FARGO VENDOR FIN 00000 20260059 INV 01/15/2026 5036891904 47259 49751 1 01144000 50200 Town Engin Equipment 126.13 Invoice Net 126.13 CHECK TOTAL 255.29 ----------- 867 WEST PUBLISHING CORPOR 00000 20250326 INV 01/14/2026 853027570 47254 49746 1 01312000 50454 Police Profession 432.97 Invoice Net 432.97 CHECK TOTAL 432.97 ----------- 868 WEST SENECA CHAMBER OF 00001 20260025 INV 01/12/2026 152692 47158 49647 1 01698900 50451 Oth EO & D Profession 5,000.00 Invoice Net 5,000.00 Report generated: 01/22/2026 09:19 Page 15 User: mwnek Program ID: apwarrnt Page 214 of 301

Page 215

Munis Production Database DETAIL INVOICE LIST CASH ACCOUNT: 99000000 10200 Cash CHECK RUN: TB0126 01/26/2026 DUE DATE: 01/26/2026 VENDOR G/L ACCOUNTS R PO TYPE DUE DATE INVOICE/AMOUNT DOCUMENT VOUCHER CHECK CHECK TOTAL 5,000.00 ----------- 874 WEST SENECA PRINTING I 00000 20252876 INV 12/11/2025 25-324 47230 49722 1 01714000 50448 Recreation Print, Lit 144.00 Invoice Net 144.00 874 WEST SENECA PRINTING I 00000 20260056 INV 01/15/2026 25-326 47262 49754 1 01362000 50448 Code Enfor Print, Lit 220.00 Invoice Net 220.00 CHECK TOTAL 364.00 ----------- 1868 WILLIAM WEIXLMANN 00000 20252937 INV 12/31/2025 122825-175.00 47263 49755 1 02908900 50820 Other Empl Work Boot 175.00 Invoice Net 175.00 CHECK TOTAL 175.00 ----------- 884 WINKELMAN SALES INC. 00000 20260060 INV 01/13/2026 55424 47282 49775 1 01816000 50419 Sanitation Supplies 15.00 Invoice Net 15.00 CHECK TOTAL 15.00 ----------- 888 WNY IMAGING SYSTEMS, I 00000 20252998 INV 01/14/2026 361642 47255 49747 1 01312000 50415 Police Other Cont 117.62 Invoice Net 117.62 888 WNY IMAGING SYSTEMS, I 00000 20260069 INV 01/07/2026 01152026-199.00 47293 49786 1 01714000 50448 Recreation Print, Lit 199.00 Invoice Net 199.00 CHECK TOTAL 316.62 ----------- 150 INVOICES CHECK RUN TOTAL 207,783.88 207,783.88 CASH ACCOUNT BALANCE .00 Report generated: 01/22/2026 09:19 Page 16 User: mwnek Program ID: apwarrnt Page 215 of 301

Page 216

Munis Production Database CHECK RUN SUMMARY CHECK RUN: TB0126 01/26/2026 DUE DATE: 01/26/2026 FUND ORG ACCOUNT AMOUNT AVLB BUDGET 01 01000000 General Fund 01-0000-00-10370 Assessment Received - 563.04 01 01111000 Town Justice 01-1110-00-50404 Court Stenographer Fee 1,900.00 -143.31 01 01122000 Supervisor 01-1220-00-50200 Equipment 5,836.00 -5,836.00 01 01141000 Town Clerk 01-1410-00-50406 Membership Dues 60.00 5.83 01 01141000 Town Clerk 01-1410-00-50419 Supplies 229.60 388.93 01 01142000 Town Attorney 01-1420-00-50452 Professional Serv - Li 4,882.00 30,928.39 01 01144000 Town Engineer 01-1440-00-50200 Equipment 255.29 -6,084.58 01 01162000 Buildings 01-1620-00-50417 Cleaning and Other Sup 1,850.96 -7,607.81 01 01162000 Buildings 01-1620-00-50420 Telephone 2,903.44 -3,770.79 01 01162000 Buildings 01-1620-00-50445 Repair and Maintenance 3,992.50 -915.41 01 01167000 Central Printing a 01-1670-00-50411 Postage 3,043.65 7,106.20 01 01167000 Central Printing a 01-1670-00-50419 Supplies 660.30 -1,225.81 01 01167000 Central Printing a 01-1670-00-50460 Computer/Software Main 12,806.69 -79,823.95 01 01191000 Special Items 01-1910-00-50451 Professional Services 2,500.00 .00 01 01191000 Special Items 01-1910-00-50477 Insurance Administrati 1,885.00 4,359.10 01 01198900 Special Items 01-1989-00-50401 Pre-employment Screeni 115.00 4,856.80 01 01312000 Police 01-3120-00-50208 Police Vehicles 4,625.00 9,177.40 01 01312000 Police 01-3120-00-50407 Uniform Allowance 369.88 -2,367.70 01 01312000 Police 01-3120-00-50415 Other Contractual Expe 37,058.43 -34,819.07 01 01312000 Police 01-3120-00-50420 Telephone 830.24 3,830.37 01 01312000 Police 01-3120-00-50443 Equipment Repair & Mai 1,617.97 -3,696.98 01 01312000 Police 01-3120-00-50454 Professional Services 432.97 1,757.19 01 01312000 Police 01-3120-00-50479 Youth Court Program 40.00 284.94 01 01362000 Code Enforcement 01-3620-00-50419 Supplies 37.99 925.74 01 01362000 Code Enforcement 01-3620-00-50448 Print, Literature and 313.80 -941.79 01 01513200 Highway Garage 01-5132-00-50420 Telephone 160.00 2,288.22 01 01513200 Highway Garage 01-5132-00-50422 Gas 7,836.40 -26,124.09 01 01513200 Highway Garage 01-5132-00-50423 Water 54.00 -1,045.58 01 01698900 Oth Econ Opport & 01-6989-00-50451 Professional Services 5,000.00 .00 01 01711000 Buildings and Grou 01-7110-00-50420 Telephone 313.96 -766.42 01 01711000 Buildings and Grou 01-7110-00-50423 Water 5,662.45 -21,438.00 01 01711000 Buildings and Grou 01-7110-00-50424 Rodent & Vermin Contro 179.81 867.47 01 01711000 Buildings and Grou 01-7110-00-50443 Equipment Repair & Mai 773.37 -38,944.99 01 01711000 Buildings and Grou 01-7110-00-50445 Repair and Maintenance 836.91 -169,140.51 01 01714000 Recreation 01-7140-00-50414 Continuing Edu and Tra 125.00 -2,319.06 01 01714000 Recreation 01-7140-00-50419 Supplies 2.71 323.07 01 01714000 Recreation 01-7140-00-50448 Print, Literature and 343.00 202.00 01 01714200 Buildings and Grou 01-7142-00-50445 Repair and Maintenance 1,971.21 -2,070.14 01 01718000 Veteran's Swimming 01-7180-00-50149 Salaries of Seasonal & 376.00 -18,434.14 01 01742000 Cultural Center 01-7420-00-50200 Equipment 33.91 966.09 01 01742000 Cultural Center 01-7420-00-50420 Telephone 303.98 -1,216.66 01 01752000 Historical Propert 01-7520-00-50445 Repair and Maintenance 17.96 22,949.47 01 01762000 Senior Citizens 01-7620-00-50417 Cleaning and Other Sup 97.80 2,839.55 01 01762000 Senior Citizens 01-7620-00-50420 Telephone 199.95 9,010.74 01 01762000 Senior Citizens 01-7620-00-50478 Craft Material & Suppl 2,420.61 6,854.03 01 01762100 Buildings and Grou 01-7621-00-50445 Repair and Maintenance 9.30 -47,583.90 01 01816000 Sanitation 01-8160-00-50419 Supplies 54.92 -181.76 01 01816000 Sanitation 01-8160-00-50443 Equipment Repair & Mai 1,221.67 -70,731.76 01 01854000 Drainage 01-8540-00-50421 Electricity 116.84 114.21 Report generated: 01/22/2026 09:19 Page 17 User: mwnek Program ID: apwarrnt Page 216 of 301

Page 217

Munis Production Database CHECK RUN SUMMARY CHECK RUN: TB0126 01/26/2026 DUE DATE: 01/26/2026 FUND ORG ACCOUNT AMOUNT AVLB BUDGET 01 01856000 Tree Maintenance 01-8560-00-50415 Other Contractual Expe 4,200.00 -4,545.29 01 01908200 Employee Assistanc 01-9082-00-50806 Employee Assistance Pr 1,555.00 2,370.00 FUND TOTAL 122,676.51 CASH ACCOUNT 99000000 10200 BALANCE .00 02 02511000 General Repairs 02-5110-00-50416 Gasoline 18,203.50 29,290.99 02 02511000 General Repairs 02-5110-00-50419 Contractual Expenses 178.33 3,264.73 02 02511000 General Repairs 02-5110-00-50498 Culvert, Pipe, Lumber, 94.00 -8,433.68 02 02513000 Machinery 02-5130-00-50492 Tires 900.00 4,086.03 02 02513000 Machinery 02-5130-00-50493 Parts 4,765.93 -223,938.20 02 02514000 Snow and Miscellan 02-5140-00-50489 Tool House Supplies 396.24 8,136.52 02 02514200 Snow Removal - Tow 02-5142-00-50483 Salt and Chemicals 54,680.81 72,325.12 02 02514800 Services for Other 02-5148-00-50416 Gasoline 2,241.87 -2,241.87 02 02908900 Other Employee Ben 02-9089-00-50820 Work Boot Allowance 175.00 833.03 02 02908900 Other Employee Ben 02-9089-00-50821 Mechanic Clothing 212.86 -2,687.90 FUND TOTAL 81,848.54 CASH ACCOUNT 99000000 10200 BALANCE .00 03 03030019 Highway Garage 03-0300-19-50445 Repair and Maintenance 2,525.89 -2,174,029.38 FUND TOTAL 2,525.89 CASH ACCOUNT 99000000 10200 BALANCE .00 05 05050000 SD 05-0500-00-50420 SD.Utilities 99.00 1,668.29 05 05050300 SD 3 05-0503-00-51454 Remedial Program 20.27 -485.46 05 05050500 SD 5 05-0505-00-50515 SD 5.Operation of Lift 156.10 -4,648.92 05 05050600 SD 6 05-0506-00-50514 SD 6.Operation of Ret 120.00 -6,285.46 05 05051200 SD 12 05-0512-00-50515 SD 12.Operation Lift S 78.05 7,038.97 05 05051500 SD 15 05-0515-00-51454 Remedial Program 36.18 -492.16 FUND TOTAL 509.60 CASH ACCOUNT 99000000 10200 BALANCE .00 09 09090000 EL Central 09-0900-00-51421 Electricity 223.34 -73,639.41 FUND TOTAL 223.34 CASH ACCOUNT 99000000 10200 BALANCE .00 CHECK RUN SUMMARY TOTAL 207,783.88 GRAND TOTAL 207,783.88 Report generated: 01/22/2026 09:19 Page 18 User: mwnek Program ID: apwarrnt Page 217 of 301

Page 218

Munis Production Database CHECK RUN SUMMARY CHECK RUN: TB0126 01/26/2026 DUE DATE: 01/26/2026 FUND ORG ACCOUNT AMOUNT AVLB BUDGET Report generated: 01/22/2026 09:19 Page 19 User: mwnek Program ID: apwarrnt Page 218 of 301

Page 219

Munis Production Database CHECK RUN LIST BY VOUCHER CHECK RUN: TB0126 01/26/2026 DUE DATE: 01/26/2026 VOUCHER VENDOR VENDOR NAME DOCUMENT PO TYPE DUE DATE AMOUNT COMMENT 49385 1005 OMNI UNDERWRITING MANAGERS LLC 46905 20252861 INV 12/01/2025 1,885.00 Workers Comp - FutureC 49386 749 SCHRODER, JOSEPH & ASSOCIATES, LLP 46906 20252862 INV 12/08/2025 162.00 Legal Services Rendere 49387 1893 SUGARMAN LAW FIRM, LLP 46907 20252871 INV 11/30/2025 4,720.00 Legal Services Rendere 49451 1227 QUADIENT FINANCE USA 46970 20252926 INV 01/12/2026 2,214.51 POSTAGE 2025 49463 297 BUFFALO CITY CLERK, 46982 20252929 INV 12/18/2025 104.57 Safety paper 49543 146 S & S WORLDWIDE INC. 47059 20252320 INV 12/11/2025 2.71 Craft Supplies for Rec 49556 72 HEALTHWORKS-WNY, LLP 47071 20252949 INV 01/12/2026 115.00 DRUG SCREEN NOVEMBER 49619 1588 UDIG NY INC 47130 20252996 INV 12/31/2025 94.00 LATE UFPO FEES 49620 203 ABC LOCKSMITH SERVICE INC 47131 20252995 INV 12/31/2025 193.80 #97 KEY, RINK-DUP KEYS 49621 7 AMERICAN ROCK SALT CO.LLC 47132 20252994 INV 01/02/2026 2,241.87 ORDER# 668598 BULK ICE 49622 420 FLEET MAINTENANCE INC. 47140 CRM 11/20/2025 -15.58 #97 KEY, RINK-DUP KEYS 49630 504 IRISH PROPANE CORPORATION 47141 20250250 INV 12/31/2025 32.75 CYLINDER RENTAL 49634 1535 ROTELLA GRANT MANAGEMENT 47145 20260015 INV 01/12/2026 2,500.00 JANUARY 2026 GRANT RET 49635 478 HAUN WELDING SUPPLY INC 47146 20260009 INV 01/05/2026 172.78 RINK-PROPANE 49636 1311 ALTERNATIVE INFORMATION SYSTEMS INC 47147 20253000 INV 01/12/2026 1,792.00 NEW LAPTOPS FOR TOWN C 49637 1311 ALTERNATIVE INFORMATION SYSTEMS INC 47148 20253003 INV 01/12/2026 4,044.00 NEW LAPTOPS FOR SECRET 49638 1570 AMAZON CAPITAL SERVICES INC 47149 20253002 INV 01/12/2026 487.11 SUPPLIES FOR COMMITTEE 49639 9 ASSOCIATION OF NYS YOUTH BUREAUS 47150 20260027 INV 01/07/2026 125.00 2026 ANYSYB Dues 49640 385 EATON OFFICE SUPPLY., INC. 47151 20253001 INV 01/12/2026 5.19 OFFICE SUPPLIES HISTOR 49641 589 QUADIENT LEASING 47152 20260019 INV 01/12/2026 829.14 MAIL LEASE 1/16/2026-4 49642 1311 ALTERNATIVE INFORMATION SYSTEMS INC 47153 20260020 INV 01/12/2026 2,429.00 ANNUAL FORTIGATE JANUA 49643 1311 ALTERNATIVE INFORMATION SYSTEMS INC 47154 20260021 INV 01/12/2026 300.00 IT SUPPORT GEMCOR JANU 49644 1311 ALTERNATIVE INFORMATION SYSTEMS INC 47155 20260022 INV 01/12/2026 1,644.42 IT SUPPORT JANUARY 202 49646 1487 WELLS FARGO VENDOR FINANCIAL SERVICE 47157 20260024 INV 01/12/2026 129.16 PRINTER RENTAL JANUARY 49647 868 WEST SENECA CHAMBER OF COMMERCE 47158 20260025 INV 01/12/2026 5,000.00 COMMUNITY DEVELOPMENT Report generated: 01/22/2026 09:19 Page 20 User: mwnek Program ID: apwarrnt Page 219 of 301

Page 220

Munis Production Database CHECK RUN LIST BY VOUCHER CHECK RUN: TB0126 01/26/2026 DUE DATE: 01/26/2026 VOUCHER VENDOR VENDOR NAME DOCUMENT PO TYPE DUE DATE AMOUNT COMMENT 49648 1311 ALTERNATIVE INFORMATION SYSTEMS INC 47159 20260026 INV 01/12/2026 8,433.27 IT SUPPORT JANUARY 202 49649 31 CHILD & FAMILY SERVICES 47160 20260028 INV 01/12/2026 1,555.00 EMPLOYEE ASSISTANCE PR 49650 1524 TREE PLUCKER LLC 47161 20253005 INV 12/13/2025 4,200.00 TREE TAKEDOWN-200 KIRK 49651 36 COMPASS MINERALS AMERICA INC. 47162 20253006 INV 01/05/2026 2,855.64 ORDER# 3157930 BULK IC 49652 69 GRAINGER INC. 47163 20253015 INV 01/05/2026 179.76 SHOP UTILITY CART 49653 69 GRAINGER INC. 47164 20253015 INV 01/05/2026 13.09 STEEL 49654 420 FLEET MAINTENANCE INC. 47165 20253013 INV 01/05/2026 42.31 #100 HARNESS 49655 356 DAY & NIGHT PLUMBING COMPANY, LLC 47166 20253012 INV 01/05/2026 243.00 TH-DRAIN CLEANING W/ S 49656 213 ADMAR SUPPLY CO., INC. 47167 20253011 INV 01/05/2026 540.35 GEMCOR-SCISSOR LIFT RE 49657 719 REGIONAL INT'L OF WNY INC 47168 20260032 INV 01/05/2026 588.85 #36 POD DRIVE CONTROL 49658 719 REGIONAL INT'L OF WNY INC 47169 20260032 INV 01/06/2026 1,177.70 #31 POD DRIVE CONTROL 49660 156 SITEONE LANDSCAPE SUPPLY HOLDING, LL 47170 20260031 INV 01/06/2026 600.25 ICE MELT 49661 1570 AMAZON CAPITAL SERVICES INC 47171 20260030 INV 01/06/2026 20.77 HWY 2026 PLANNERS 49680 56 ERIE COUNTY WATER AUTHORITY 47189 INV 01/26/2026 5,662.45 705501600 OCTOBER 49681 1805 KATE NEWTON 47190 20253021 INV 01/09/2026 125.03 Office supplies 49682 809 THRUWAY BUILDERS O.P. INC 47191 20253020 INV 12/31/2025 102.00 plow stakes 49683 7 AMERICAN ROCK SALT CO.LLC 47192 20253019 INV 01/05/2026 2,155.16 ORDER# 668598 BULK ICE 49684 531 KAMINSKI AND SONS, INC. 47193 20260035 INV 01/07/2026 696.97 #3 REPLACED BAD POWER 49685 467 HANES SUPPLY, INC. 47194 20260034 INV 01/07/2026 396.24 SLINGS 49686 325 CHUDY PAPER CO.,INC. 47195 20260001 INV 01/08/2026 1,288.28 cleaning supplies 49687 385 EATON OFFICE SUPPLY., INC. 47196 20253023 INV 01/26/2026 168.00 Eaton Signature Stamps 49692 169 CHARTER COMMUNICATIONS 47201 INV 01/26/2026 239.98 8358106990052686 JANUA 49694 56 ERIE COUNTY WATER AUTHORITY 47202 INV 01/26/2026 54.00 606894334 DECEMBER 49695 181 VERIZON WIRELESS 47203 INV 01/26/2026 37.99 78726516100001 DECEMBE Report generated: 01/22/2026 09:19 Page 21 User: mwnek Program ID: apwarrnt Page 220 of 301

Page 221

Munis Production Database CHECK RUN LIST BY VOUCHER CHECK RUN: TB0126 01/26/2026 DUE DATE: 01/26/2026 VOUCHER VENDOR VENDOR NAME DOCUMENT PO TYPE DUE DATE AMOUNT COMMENT 49697 1654 TREAD CITY TIRE 47205 20253022 INV 12/31/2025 900.00 #5 tires 49698 36 COMPASS MINERALS AMERICA INC. 47206 20253028 INV 12/31/2025 21,466.06 ORDER# 3156848 BULK IC 49699 938 Stuart c. Irby Co 47207 20260036 INV 01/05/2026 171.44 TAP CONN FOR STREET LI 49700 1570 AMAZON CAPITAL SERVICES INC 47208 20260046 INV 01/08/2026 157.56 HWY OFFICE-BATTERIES 49701 846 UPSTATE STEEL INC. 47209 20260045 INV 01/08/2026 875.00 #1101 & STOCK STEEL 49702 938 Stuart c. Irby Co 47210 20260044 INV 01/09/2026 51.90 STREET LIGHTS- SPLICES 49704 36 COMPASS MINERALS AMERICA INC. 47212 20260043 INV 01/09/2026 6,537.02 ORDER# 3159590 BULK IC 49706 36 COMPASS MINERALS AMERICA INC. 47214 20260043 INV 01/09/2026 7,868.38 ORDER# 3159590 BULK IC 49707 1461 APPLIED INDUSTRIAL TECHNOLOGIES 47215 20260039 INV 01/09/2026 59.08 SHOP SUPPLIES 49708 4 ADVANCE STORE COMPANY, INCORPORATED 47216 20260040 INV 01/09/2026 103.90 #11 filters 49709 4 ADVANCE STORE COMPANY, INCORPORATED 47217 20260040 INV 01/09/2026 7.16 epoxy 49710 4 ADVANCE STORE COMPANY, INCORPORATED 47218 20260040 INV 01/09/2026 67.21 shop supplies 49711 4 ADVANCE STORE COMPANY, INCORPORATED 47219 20260040 INV 01/09/2026 485.63 #819 brake pads, rotor 49712 4 ADVANCE STORE COMPANY, INCORPORATED 47220 20260040 INV 01/13/2026 183.66 #812 muffler 49713 1534 NOCO ENERGY CORP - FUELS DEPARTMENT# 47221 20260041 INV 01/15/2026 17,700.99 7560 GALLONS DIESEL 49714 33 CINTAS CORP 47222 20260042 INV 01/15/2026 106.43 MECHANICS CLOTHING 49715 1752 ELLIOTT AUTO SUPPLY CO, INC 47223 20260048 INV 01/15/2026 25.84 SPARK PLUGS 49716 909 BRENNTAG NORTH AMERICA, INC 47224 20260049 INV 01/15/2026 502.51 BULK SHOP OILS 49717 1975 STARK TECH GROUP 47225 20260050 INV 01/15/2026 3,610.94 TH-GENERATOR MAINTENAN 49718 4 ADVANCE STORE COMPANY, INCORPORATED 47226 20260040 INV 01/15/2026 139.68 SHOP LED'S 49719 4 ADVANCE STORE COMPANY, INCORPORATED 47227 CRM 01/12/2026 -105.00 CREDIT RETURN BRAKE CA 49720 4 ADVANCE STORE COMPANY, INCORPORATED 47228 20260040 INV 01/12/2026 60.40 #819 BRAEK FLUID, #101 49722 874 WEST SENECA PRINTING INC. 47230 20252876 INV 12/11/2025 144.00 Updated cards for Laur 49725 478 HAUN WELDING SUPPLY INC 47233 20260009 INV 01/12/2026 172.78 RINK PROPANE 49726 1311 ALTERNATIVE INFORMATION SYSTEMS INC 47234 20260029 INV 01/14/2026 4,492.08 Monthly IT-January Report generated: 01/22/2026 09:19 Page 22 User: mwnek Program ID: apwarrnt Page 221 of 301

Page 222

Munis Production Database CHECK RUN LIST BY VOUCHER CHECK RUN: TB0126 01/26/2026 DUE DATE: 01/26/2026 VOUCHER VENDOR VENDOR NAME DOCUMENT PO TYPE DUE DATE AMOUNT COMMENT 49727 1788 STEFANIE MATTA 47235 20260011 INV 01/14/2026 7,514.71 behavioral health serv 49728 1669 POWERDMS, INC. 47237 20260010 INV 01/14/2026 4,300.20 PowerTime (PlanIt) sub 49729 251 BASIL FORD, INC. 47236 20260047 INV 01/12/2026 711.40 #819 parts 49730 251 BASIL FORD, INC. 47238 20260047 INV 01/12/2026 170.80 #819 radiator hose 49731 251 BASIL FORD, INC. 47239 CRM 01/12/2026 -155.27 RETURN RAD HOSE 49738 448 GEORGE'S COLLISION INC. 47247 20252999 INV 01/14/2026 1,617.97 repair to pd 25 49740 1784 SHEILA MARIE TOY 47248 20252997 INV 01/14/2026 207.88 PSD Uniform reimbursem 49741 757 SEWING TECHNOLOGIES, INC. 47249 20253027 INV 01/14/2026 162.00 embroidered police bad 49742 185 WB MASON COMPANY, INC. 47250 20252932 INV 01/14/2026 229.54 water cooler/jugs for 49745 462 GREAT PLATE GLASS CO.,INC 47253 20252980 INV 01/14/2026 1,236.00 wall mirrors for Polic 49746 867 WEST PUBLISHING CORPORATION 47254 20250326 INV 01/14/2026 432.97 CLEAR-December billing 49747 888 WNY IMAGING SYSTEMS, INC. 47255 20252998 INV 01/14/2026 117.62 records copier-monthly 49748 41 DARYLL'S ELECTRONICS, INC 47256 20253010 INV 01/14/2026 3,975.00 pd 26 - new equipment 49749 41 DARYLL'S ELECTRONICS, INC 47257 20253010 INV 01/14/2026 650.00 pd 22 equipment 49750 1869 AT&T MOBILITY LLC 47258 INV 01/14/2026 830.24 acct# 287342241097-dec 49751 1487 WELLS FARGO VENDOR FINANCIAL SERVICE 47259 20260059 INV 01/15/2026 126.13 copier maintanence 49752 1858 FIRST DUE EMERGENCY ENCLOSURES INC 47260 20260058 INV 01/15/2026 563.04 break in at 1 Preble C 49753 745 SCHIEBER, JEFFREY 47261 20260057 INV 01/15/2026 93.80 NEC code books 49754 874 WEST SENECA PRINTING INC. 47262 20260056 INV 01/15/2026 220.00 800 Building permit ap 49755 1868 WILLIAM WEIXLMANN 47263 20252937 INV 12/31/2025 175.00 2025 BOOT/CLOTHING ALL 49756 4 ADVANCE STORE COMPANY, INCORPORATED 47264 20252336 INV 12/31/2025 13.50 #29 TEE CONN 49769 1607 ASSOCIATION OF NYS YOUTH COURTS INC 47276 20260065 INV 01/14/2026 40.00 NYS Youth Courts membe 49770 2061 SUR-TEC, INC. 47277 20260052 INV 01/14/2026 2,963.00 Casper connections-12 49771 1813 KAMCO SUPPLY CORP. OF NEW ENGLAND 47278 20260064 INV 01/12/2026 34.89 GEMCOR-SCREWS Report generated: 01/22/2026 09:19 Page 23 User: mwnek Program ID: apwarrnt Page 222 of 301

Page 223

Munis Production Database CHECK RUN LIST BY VOUCHER CHECK RUN: TB0126 01/26/2026 DUE DATE: 01/26/2026 VOUCHER VENDOR VENDOR NAME DOCUMENT PO TYPE DUE DATE AMOUNT COMMENT 49772 414 FERRY, INC. 47279 20260063 INV 01/12/2026 30.66 SHOP SUPPLIES 49773 251 BASIL FORD, INC. 47280 20260062 INV 01/12/2026 31.05 #807 WIRE ASY 49774 44 DELACY FORD, INC. 47281 20260061 INV 01/13/2026 62.11 #12 NUTS, WEATHERSTRIP 49775 884 WINKELMAN SALES INC. 47282 20260060 INV 01/13/2026 15.00 WELD STAPLES 49776 789 SUBURBAN PEST CONTROL,INC 47283 20260067 INV 01/13/2026 59.81 BRCHFLD-PEST CONTROL 49778 789 SUBURBAN PEST CONTROL,INC 47285 20260067 INV 01/13/2026 75.00 HWY-PEST CONTROL 49779 789 SUBURBAN PEST CONTROL,INC 47286 20260067 INV 01/13/2026 45.00 B&G PEST CONTROL 49780 4 ADVANCE STORE COMPANY, INCORPORATED 47287 20260040 INV 01/14/2026 10.52 #812 HARDWARE CLAMP, S 49781 4 ADVANCE STORE COMPANY, INCORPORATED 47288 20260040 INV 01/14/2026 148.08 SHOP SUPPLIES 49782 4 ADVANCE STORE COMPANY, INCORPORATED 47289 20260040 INV 01/14/2026 19.14 #812 TAIL PIPE, HARDWA 49783 33 CINTAS CORP 47290 20260042 INV 01/14/2026 106.43 MECHANICS CLOTHING 49784 36 COMPASS MINERALS AMERICA INC. 47291 20260043 INV 01/14/2026 9,800.76 ORDER# 3156848 BULK IC 49786 888 WNY IMAGING SYSTEMS, INC. 47293 20260069 INV 01/07/2026 199.00 Recreation letterhead 49787 54 ERIE COUNTY HEALTH DEPT. 47294 20260068 INV 01/07/2026 376.00 2026 Permit Fees 49788 671 OLD DOMINION BRUSH, INC. 47295 20253035 INV 12/31/2025 405.67 #1508 IMPELLER SHAFT 49791 1022 ERIE COUNTY TOWN CLERK & TAX 47297 20260070 INV 01/15/2026 30.00 ECTCTCA dues - MM 49792 1022 ERIE COUNTY TOWN CLERK & TAX 47298 20260071 INV 01/15/2026 30.00 ECTCTCA dues - KN 49797 325 CHUDY PAPER CO.,INC. 47301 20260001 INV 01/15/2026 562.68 cleaning supplies 49799 1539 BENZINGERS CLOTHING CARE 47303 20250530 INV 01/16/2026 52.80 Towels/ Kitchen suppli 49800 739 S & S ELECTRIC REPAIR INC 47304 20260087 INV 01/07/2026 138.56 CCL-ELECTRICAL REPAIRS 49802 251 BASIL FORD, INC. 47306 20260086 INV 01/14/2026 90.36 #812 WIRE ASY 49804 719 REGIONAL INT'L OF WNY INC 47308 20260084 INV 01/14/2026 108.77 #34 ELBOW HOSE, HOSE R 49805 1539 BENZINGERS CLOTHING CARE 47309 20250530 INV 01/16/2026 45.00 Towels/ Kitchen suppli 49806 804 TERMINAL SUPPLY CO. 47310 20250080 INV 12/31/2025 32.08 SHOP SUPPLIES 49807 1539 BENZINGERS CLOTHING CARE 47311 20253008 INV 01/16/2026 72.00 Towels/ Kitchen suppli Report generated: 01/22/2026 09:19 Page 24 User: mwnek Program ID: apwarrnt Page 223 of 301

Page 224

Munis Production Database CHECK RUN LIST BY VOUCHER CHECK RUN: TB0126 01/26/2026 DUE DATE: 01/26/2026 VOUCHER VENDOR VENDOR NAME DOCUMENT PO TYPE DUE DATE AMOUNT COMMENT 49808 198 84 LUMBER, INC. 47312 20260083 INV 01/14/2026 19.49 GEMCOR-BUILDING SUPPLI 49809 523 JOHN W. DANFORTH COMPANY 47313 20260082 INV 01/14/2026 1,120.82 RINK-LOW PRESSURE SWIT 49810 446 GEORGE & SWEDE SALES & SERV. INC. 47314 20260081 INV 01/15/2026 281.19 #54 HEATER MOTOR, GRAB 49811 420 FLEET MAINTENANCE INC. 47315 20260080 INV 01/15/2026 148.40 #112 PARTS 49812 44 DELACY FORD, INC. 47316 20260085 INV 01/15/2026 6.40 #812 NUTS 49813 2041 TOLLS BY MAIL 47317 20253007 INV 01/16/2026 7.80 tolls 49814 1570 AMAZON CAPITAL SERVICES INC 47318 20253009 INV 01/16/2026 383.18 office supplies/ refre 49815 1728 HNI WORKPLACE FURNISHINGS LLC 47319 20253016 INV 01/16/2026 1,957.63 LL award/ storage Cabi 49816 169 CHARTER COMMUNICATIONS 47320 INV 01/26/2026 1,987.10 244966701 JANUARY 49818 169 CHARTER COMMUNICATIONS 47321 INV 01/26/2026 156.98 145205701 JANUARY 49819 169 CHARTER COMMUNICATIONS 47322 INV 01/26/2026 1,657.30 145764501 JANUARY 49820 169 CHARTER COMMUNICATIONS 47323 INV 01/26/2026 40.00 145718401 JANUARY 49821 169 CHARTER COMMUNICATIONS 47324 INV 01/26/2026 89.97 141749801010726 JANUAR 49822 112 NATIONAL FUEL GAS DISTIBUTION CORP. 47325 INV 01/26/2026 7,666.40 908950601 DECEMBER 49823 114 NATIONAL GRID 47326 INV 01/26/2026 36.18 1486339101 DECEMBER 49824 180 VERIZON 47327 INV 01/26/2026 99.00 852734149000104 JANUAR 49826 1682 GO CAR WASH MANAGEMENT CORP 47329 20260094 INV 01/19/2026 4,680.00 basic wash annual plan 49827 1669 POWERDMS, INC. 47330 20260093 INV 01/19/2026 11,525.28 PowerDMS electronic su 49828 36 COMPASS MINERALS AMERICA INC. 47331 20253040 INV 12/31/2025 3,997.79 ORDER# 3157930 BULK IC 49829 75 HOME DEPOT CREDIT SERVICE 47332 20253041 INV 01/05/2026 2,575.63 HOME DEPOT ACCT# 60353 49859 4 ADVANCE STORE COMPANY, INCORPORATED 47360 CRM 01/19/2026 -69.99 CREDIT-LED RETURNS 49876 56 ERIE COUNTY WATER AUTHORITY 47375 INV 01/26/2026 78.05 170772505 OCTOBER 49878 56 ERIE COUNTY WATER AUTHORITY 47376 INV 01/26/2026 78.05 171824507 OCTOBER 49879 56 ERIE COUNTY WATER AUTHORITY 47377 INV 01/26/2026 78.05 171257009 OCTOBER Report generated: 01/22/2026 09:19 Page 25 User: mwnek Program ID: apwarrnt Page 224 of 301

Page 225

Munis Production Database CHECK RUN LIST BY VOUCHER CHECK RUN: TB0126 01/26/2026 DUE DATE: 01/26/2026 VOUCHER VENDOR VENDOR NAME DOCUMENT PO TYPE DUE DATE AMOUNT COMMENT 49882 603 MC CANN, WENDY L. 47379 20253039 INV 01/21/2026 1,900.00 McCann 12/25 49894 114 NATIONAL GRID 47387 INV 01/26/2026 116.84 6509927106 DECEMBER 49895 114 NATIONAL GRID 47388 INV 01/26/2026 20.27 2883134005 DECEMBER CHECK RUN TOTAL 207,783.88 ** END OF REPORT - Generated by Megan Wnek ** Report generated: 01/22/2026 09:19 Page 26 User: mwnek Program ID: apwarrnt Page 225 of 301

Page 226

Munis Production Database ACCOUNTS PAYABLE CHECK RUN REPORT DATE: 01/26/2026 CHECK RUN: TB0126 AMOUNT: $ 216,944.41 ABSTRACT OF CLAIMS FOR TOWN BOARD AUDIT The claims set forth bearing numbers ________________ to ________________ have been audited and allowed by us being members of the Town Board. TOWN BOARD _____________________________________ _____________________________________ _____________________________________ DATE: ____________________________________ TO THE SUPERVISOR OF THE TOWN You are hereby authorized and directed to pay to the order of the following vendors the various amounts in payment of Claims hereinafter set forth, numbered the same as above inclusive, which have been audited and allowed and are chargeable to the fund and appropriation account as designated. Report generated: 01/22/2026 15:14 Page 1 User: mwnek Program ID: apwarrnt Page 226 of 301

Page 227

Munis Production Database PREPAID INVOICE LIST CHECK RUN: TB0126 01/26/2026 VENDOR VENDOR NAME R DOCUMENT PO TYPE DUE DATE AMOUNT VOUCHER CHECK COMMENT CASH ACCOUNT: 99000000 10200 Cash 198 84 LUMBER, INC 00000 47312 20260083 INV 01/14/2026 19.49 49808 23694 GEMCOR-BUILDING SUPPLIES 203 ABC LOCKSMITH S 00000 47131 20252995 INV 12/31/2025 193.80 49620 23695 #97 KEY, RINK-DUP KEYS 213 ADMAR SUPPLY CO 00000 47167 20253011 INV 01/05/2026 540.35 49656 23696 GEMCOR-SCISSOR LIFT RENTAL 4 ADVANCE STORE C 00000 47216 20260040 INV 01/09/2026 103.90 49708 23697 #11 filters 4 ADVANCE STORE C 00000 47217 20260040 INV 01/09/2026 7.16 49709 23697 epoxy 4 ADVANCE STORE C 00000 47218 20260040 INV 01/09/2026 67.21 49710 23697 shop supplies 4 ADVANCE STORE C 00000 47219 20260040 INV 01/09/2026 485.63 49711 23697 #819 brake pads, rotors 4 ADVANCE STORE C 00000 47220 20260040 INV 01/13/2026 183.66 49712 23697 #812 muffler 4 ADVANCE STORE C 00000 47226 20260040 INV 01/15/2026 139.68 49718 23697 SHOP LED'S 4 ADVANCE STORE C 00000 47227 CRM 01/12/2026 -105.00 49719 23697 CREDIT RETURN BRAKE CALIPE 4 ADVANCE STORE C 00000 47228 20260040 INV 01/12/2026 60.40 49720 23697 #819 BRAEK FLUID, #101 WHE 4 ADVANCE STORE C 00000 47264 20252336 INV 12/31/2025 13.50 49756 23697 #29 TEE CONN 4 ADVANCE STORE C 00000 47287 20260040 INV 01/14/2026 10.52 49780 23697 #812 HARDWARE CLAMP, STRAP 4 ADVANCE STORE C 00000 47288 20260040 INV 01/14/2026 148.08 49781 23697 SHOP SUPPLIES 4 ADVANCE STORE C 00000 47289 20260040 INV 01/14/2026 19.14 49782 23697 #812 TAIL PIPE, HARDWARE C 4 ADVANCE STORE C 00000 47360 CRM 01/19/2026 -69.99 49859 23697 CREDIT-LED RETURNS 1311 AIS 00000 47147 20253000 INV 01/12/2026 1,792.00 49636 23698 NEW LAPTOPS FOR TOWN COUNC 1311 AIS 00000 47148 20253003 INV 01/12/2026 4,044.00 49637 23698 NEW LAPTOPS FOR SECRETATIE 1311 AIS 00000 47153 20260020 INV 01/12/2026 2,429.00 49642 23698 ANNUAL FORTIGATE JANUARY 2 1311 AIS 00000 47154 20260021 INV 01/12/2026 300.00 49643 23698 IT SUPPORT GEMCOR JANUARY 1311 AIS 00000 47155 20260022 INV 01/12/2026 1,644.42 49644 23698 IT SUPPORT JANUARY 2026 1311 AIS 00000 47159 20260026 INV 01/12/2026 8,433.27 49648 23698 IT SUPPORT JANUARY 2026 1311 AIS 00000 47234 20260029 INV 01/14/2026 4,492.08 49726 23698 Monthly IT-January 1570 AMAZON 00000 47149 20253002 INV 01/12/2026 487.11 49638 23699 SUPPLIES FOR COMMITTEE SEC 1570 AMAZON 00000 47171 20260030 INV 01/06/2026 20.77 49661 23699 HWY 2026 PLANNERS 1570 AMAZON 00000 47208 20260046 INV 01/08/2026 157.56 49700 23699 HWY OFFICE-BATTERIES 1570 AMAZON 00000 47318 20253009 INV 01/16/2026 383.18 49814 23699 office supplies/ refreshme 7 AMERICAN ROCK S 00000 47132 20252994 INV 01/02/2026 2,241.87 49621 23700 ORDER# 668598 BULK ICE CON 7 AMERICAN ROCK S 00000 47192 20253019 INV 01/05/2026 2,155.16 49683 23700 ORDER# 668598 BULK ICE CON 1461 APPLIED 00000 47215 20260039 INV 01/09/2026 59.08 49707 23701 SHOP SUPPLIES 1607 ASSOCIATION OF 00000 47276 20260065 INV 01/14/2026 40.00 49769 23702 NYS Youth Courts membershi 9 ASSOCIATION OF 00001 47150 20260027 INV 01/07/2026 125.00 49639 23703 2026 ANYSYB Dues 1869 AT&T MOBILITY L 00000 47258 INV 01/14/2026 830.24 49750 23704 acct# 287342241097-decembe 251 BASIL FORD, INC 00000 47236 20260047 INV 01/12/2026 711.40 49729 23705 #819 parts 251 BASIL FORD, INC 00000 47238 20260047 INV 01/12/2026 170.80 49730 23705 #819 radiator hose 251 BASIL FORD, INC 00000 47239 CRM 01/12/2026 -155.27 49731 23705 RETURN RAD HOSE 251 BASIL FORD, INC 00000 47280 20260062 INV 01/12/2026 31.05 49773 23705 #807 WIRE ASY 251 BASIL FORD, INC 00000 47306 20260086 INV 01/14/2026 90.36 49802 23705 #812 WIRE ASY 1539 BENZINGERS CLOT 00000 47303 20250530 INV 01/16/2026 52.80 49799 23706 Towels/ Kitchen supplies 1539 BENZINGERS CLOT 00000 47309 20250530 INV 01/16/2026 45.00 49805 23706 Towels/ Kitchen supplies 1539 BENZINGERS CLOT 00000 47311 20253008 INV 01/16/2026 72.00 49807 23706 Towels/ Kitchen supplies 909 BRENNTAG NORTH 00000 47224 20260049 INV 01/15/2026 502.51 49716 23707 BULK SHOP OILS 297 BUFFALO CITY CL 00000 46982 20252929 INV 12/18/2025 104.57 49463 23708 Safety paper 169 CHARTER COMMUNI 00001 47320 INV 01/26/2026 1,987.10 49816 23709 244966701 JANUARY 169 CHARTER COMMUNI 00001 47321 INV 01/26/2026 156.98 49818 23710 145205701 JANUARY 169 CHARTER COMMUNI 00001 47322 INV 01/26/2026 1,657.30 49819 23711 145764501 JANUARY 169 CHARTER COMMUNI 00001 47323 INV 01/26/2026 40.00 49820 23712 145718401 JANUARY Report generated: 01/22/2026 15:14 Page 2 User: mwnek Program ID: apwarrnt Page 227 of 301

Page 228

Munis Production Database PREPAID INVOICE LIST CHECK RUN: TB0126 01/26/2026 VENDOR VENDOR NAME R DOCUMENT PO TYPE DUE DATE AMOUNT VOUCHER CHECK COMMENT 169 CHARTER COMMUNI 00001 47324 INV 01/26/2026 89.97 49821 23713 141749801010726 JANUARY 169 CHARTER COMMUNI 00004 47201 INV 01/26/2026 239.98 49692 23714 8358106990052686 JANUARY 31 CHILD & FAMILY 00000 47160 20260028 INV 01/12/2026 1,555.00 49649 23715 EMPLOYEE ASSISTANCE PROGRA 325 CHUDY PAPER CO. 00000 47195 20260001 INV 01/08/2026 1,288.28 49686 23716 cleaning supplies 325 CHUDY PAPER CO. 00000 47301 20260001 INV 01/15/2026 562.68 49797 23716 cleaning supplies 33 CINTAS CORP 00001 47222 20260042 INV 01/15/2026 106.43 49714 23717 MECHANICS CLOTHING 33 CINTAS CORP 00001 47290 20260042 INV 01/14/2026 106.43 49783 23717 MECHANICS CLOTHING 36 COMPASS MINERAL 00000 47162 20253006 INV 01/05/2026 2,855.64 49651 23718 ORDER# 3157930 BULK ICE CO 36 COMPASS MINERAL 00000 47206 20253028 INV 12/31/2025 21,466.06 49698 23718 ORDER# 3156848 BULK ICE CO 36 COMPASS MINERAL 00000 47212 20260043 INV 01/09/2026 6,537.02 49704 23718 ORDER# 3159590 BULK ICE CO 36 COMPASS MINERAL 00000 47214 20260043 INV 01/09/2026 7,868.38 49706 23718 ORDER# 3159590 BULK ICE CO 36 COMPASS MINERAL 00000 47291 20260043 INV 01/14/2026 9,800.76 49784 23718 ORDER# 3156848 BULK ICE CO 36 COMPASS MINERAL 00000 47331 20253040 INV 12/31/2025 3,997.79 49828 23718 ORDER# 3157930 BULK ICE CO 41 DARYLL'S ELECTR 00000 47256 20253010 INV 01/14/2026 3,975.00 49748 23719 pd 26 - new equipment 41 DARYLL'S ELECTR 00000 47257 20253010 INV 01/14/2026 650.00 49749 23719 pd 22 equipment 356 DAY & NIGHT PLU 00000 47166 20253012 INV 01/05/2026 243.00 49655 23720 TH-DRAIN CLEANING W/ SMALL 44 DELACY FORD, IN 00000 47281 20260061 INV 01/13/2026 62.11 49774 23721 #12 NUTS, WEATHERSTRIPPING 44 DELACY FORD, IN 00000 47316 20260085 INV 01/15/2026 6.40 49812 23721 #812 NUTS 385 EATON OFFICE SU 00000 47151 20253001 INV 01/12/2026 5.19 49640 23722 OFFICE SUPPLIES HISTORICAL 385 EATON OFFICE SU 00000 47196 20253023 INV 01/26/2026 168.00 49687 23722 Eaton Signature Stamps- Ju 1752 ELLIOTT AUTO 00001 47223 20260048 INV 01/15/2026 25.84 49715 23723 SPARK PLUGS 54 ERIE COUNTY HEA 00001 47294 20260068 INV 01/07/2026 376.00 49787 23724 2026 Permit Fees 1022 ERIE COUNTY TOW 00000 47297 20260070 INV 01/15/2026 30.00 49791 23725 ECTCTCA dues - MM 1022 ERIE COUNTY TOW 00000 47298 20260071 INV 01/15/2026 30.00 49792 23725 ECTCTCA dues - KN 56 ERIE COUNTY WAT 00000 47189 INV 01/26/2026 5,662.45 49680 23726 705501600 OCTOBER 56 ERIE COUNTY WAT 00000 47202 INV 01/26/2026 54.00 49694 23727 606894334 DECEMBER 56 ERIE COUNTY WAT 00000 47375 INV 01/26/2026 78.05 49876 23728 170772505 OCTOBER 56 ERIE COUNTY WAT 00000 47376 INV 01/26/2026 78.05 49878 23729 171824507 OCTOBER 56 ERIE COUNTY WAT 00000 47377 INV 01/26/2026 78.05 49879 23730 171257009 OCTOBER 414 FERRY, INC. 00000 47279 20260063 INV 01/12/2026 30.66 49772 23731 SHOP SUPPLIES 1858 FIRST DUE EMERG 00000 47260 20260058 INV 01/15/2026 563.04 49752 23732 break in at 1 Preble Ct 420 FLEET MAINTENAN 00000 47140 CRM 11/20/2025 -15.58 49622 23733 #97 KEY, RINK-DUP KEYS 420 FLEET MAINTENAN 00000 47165 20253013 INV 01/05/2026 42.31 49654 23733 #100 HARNESS 420 FLEET MAINTENAN 00000 47315 20260080 INV 01/15/2026 148.40 49811 23733 #112 PARTS 446 GEORGE & SWEDE 00000 47314 20260081 INV 01/15/2026 281.19 49810 23734 #54 HEATER MOTOR, GRAB HOO 448 GEORGE'S COLLIS 00000 47247 20252999 INV 01/14/2026 1,617.97 49738 23735 repair to pd 25 1682 GO CAR WASH 01682 47329 20260094 INV 01/19/2026 4,680.00 49826 23736 basic wash annual plan ren 69 GRAINGER INC. 00000 47163 20253015 INV 01/05/2026 179.76 49652 23737 SHOP UTILITY CART 69 GRAINGER INC. 00000 47164 20253015 INV 01/05/2026 13.09 49653 23737 STEEL 462 GREAT PLATE GLA 00000 47253 20252980 INV 01/14/2026 1,236.00 49745 23738 wall mirrors for Police We 467 HANES SUPPLY, I 00000 47194 20260034 INV 01/07/2026 396.24 49685 23739 SLINGS 478 HAUN WELDING SU 00000 47146 20260009 INV 01/05/2026 172.78 49635 23740 RINK-PROPANE 478 HAUN WELDING SU 00000 47233 20260009 INV 01/12/2026 172.78 49725 23740 RINK PROPANE 72 HEALTHWORKS-WNY 00000 47071 20252949 INV 01/12/2026 115.00 49556 23741 DRUG SCREEN NOVEMBER 1728 HNI WORKPLACE 00001 47319 20253016 INV 01/16/2026 1,957.63 49815 23742 LL award/ storage Cabinet 75 HOME DEPOT CRED 00001 47332 20253041 INV 01/05/2026 2,575.63 49829 23743 HOME DEPOT ACCT# 603532250 938 Irby electrical 00001 47207 20260036 INV 01/05/2026 171.44 49699 23744 TAP CONN FOR STREET LIGHTS 938 Irby electrical 00001 47210 20260044 INV 01/09/2026 51.90 49702 23744 STREET LIGHTS- SPLICES 504 IRISH PROPANE C 00000 47141 20250250 INV 12/31/2025 32.75 49630 23745 CYLINDER RENTAL Report generated: 01/22/2026 15:14 Page 3 User: mwnek Program ID: apwarrnt Page 228 of 301

Page 229

Munis Production Database PREPAID INVOICE LIST CHECK RUN: TB0126 01/26/2026 VENDOR VENDOR NAME R DOCUMENT PO TYPE DUE DATE AMOUNT VOUCHER CHECK COMMENT 523 JOHN W. DANFORT 00000 47313 20260082 INV 01/14/2026 1,120.82 49809 23746 RINK-LOW PRESSURE SWITCH 1813 KAMCO SUPPLY CO 00000 47278 20260064 INV 01/12/2026 34.89 49771 23747 GEMCOR-SCREWS 531 KAMINSKI AND SO 00000 47193 20260035 INV 01/07/2026 696.97 49684 23748 #3 REPLACED BAD POWER CORD 1805 KATE NEWTON 00000 47190 20253021 INV 01/09/2026 125.03 49681 23749 Office supplies 603 MC CANN, WENDY 00000 47379 20253039 INV 01/21/2026 1,900.00 49882 23750 McCann 12/25 112 NATIONAL FUEL 00002 47325 INV 01/26/2026 7,666.40 49822 23751 908950601 DECEMBER 114 NATIONAL GRID P 00001 47326 INV 01/26/2026 36.18 49823 23752 1486339101 DECEMBER 114 NATIONAL GRID P 00001 47387 INV 01/26/2026 116.84 49894 23753 6509927106 DECEMBER 114 NATIONAL GRID P 00001 47388 INV 01/26/2026 20.27 49895 23754 2883134005 DECEMBER 1227 NEOPOST 00001 46970 20252926 INV 01/12/2026 2,214.51 49451 23755 POSTAGE 2025 1534 NOCO ENERGY COR 00001 47221 20260041 INV 01/15/2026 17,700.99 49713 23756 7560 GALLONS DIESEL 671 OLD DOMINION BR 00001 47295 20253035 INV 12/31/2025 405.67 49788 23757 #1508 IMPELLER SHAFT 1005 OMNI 00000 46905 20252861 INV 12/01/2025 1,885.00 49385 23758 Workers Comp - FutureComp 1669 POWERDMS, INC. 00001 47237 20260010 INV 01/14/2026 4,300.20 49728 23759 PowerTime (PlanIt) subscri 1669 POWERDMS, INC. 00001 47330 20260093 INV 01/19/2026 11,525.28 49827 23759 PowerDMS electronic subscr 589 QUADIENT LEASIN 00001 47152 20260019 INV 01/12/2026 829.14 49641 23760 MAIL LEASE 1/16/2026-4/15/ 719 REGIONAL INT'L 00000 47168 20260032 INV 01/05/2026 588.85 49657 23761 #36 POD DRIVE CONTROL 719 REGIONAL INT'L 00001 47169 20260032 INV 01/06/2026 1,177.70 49658 23762 #31 POD DRIVE CONTROL 719 REGIONAL INT'L 00001 47308 20260084 INV 01/14/2026 108.77 49804 23762 #34 ELBOW HOSE, HOSE RAD 1535 ROTELLA GRANT 00000 47145 20260015 INV 01/12/2026 2,500.00 49634 23763 JANUARY 2026 GRANT RETAINE 739 S & S ELECTRIC 00000 47304 20260087 INV 01/07/2026 138.56 49800 23764 CCL-ELECTRICAL REPAIRS 146 S & S WORLDWIDE 00000 47059 20252320 INV 12/11/2025 2.71 49543 23765 Craft Supplies for Rec Dep 745 SCHIEBER, JEFFR 00000 47261 20260057 INV 01/15/2026 93.80 49753 23766 NEC code books 749 SCHRODER, JOSEP 00000 46906 20252862 INV 12/08/2025 162.00 49386 23767 Legal Services Rendered - 757 SEWING TECHNOLO 00000 47249 20253027 INV 01/14/2026 162.00 49741 23768 embroidered police badge p 1784 SHEILA MARIE TO 00000 47248 20252997 INV 01/14/2026 207.88 49740 23769 PSD Uniform reimbursement 156 SITEONE LANDSCA 00000 47170 20260031 INV 01/06/2026 600.25 49660 23770 ICE MELT 1975 STARK TECH SERV 00001 47225 20260050 INV 01/15/2026 3,610.94 49717 23771 TH-GENERATOR MAINTENANCE 1 1788 STEFANIE MATTA 00000 47235 20260011 INV 01/14/2026 7,514.71 49727 23772 behavioral health services 789 SUBURBAN PEST C 00000 47283 20260067 INV 01/13/2026 59.81 49776 23773 BRCHFLD-PEST CONTROL 789 SUBURBAN PEST C 00000 47285 20260067 INV 01/13/2026 75.00 49778 23773 HWY-PEST CONTROL 789 SUBURBAN PEST C 00000 47286 20260067 INV 01/13/2026 45.00 49779 23773 B&G PEST CONTROL 1893 SUGARMAN LAW FI 00000 46907 20252871 INV 11/30/2025 4,720.00 49387 23774 Legal Services Rendered - 2061 SUR-TEC, INC. 00000 47277 20260052 INV 01/14/2026 2,963.00 49770 23775 Casper connections-12 mont 804 TERMINAL SUPPLY 00001 47310 20250080 INV 12/31/2025 32.08 49806 23776 SHOP SUPPLIES 809 THRUWAY BUILDER 00000 47191 20253020 INV 12/31/2025 102.00 49682 23777 plow stakes 2041 TOLLS BY MAIL 00000 47317 20253007 INV 01/16/2026 7.80 49813 23778 tolls 1654 TREAD CITY TIRE 00000 47205 20253022 INV 12/31/2025 900.00 49697 23779 #5 tires 1524 TREE PLUCKER LL 00000 47161 20253005 INV 12/13/2025 4,200.00 49650 23780 TREE TAKEDOWN-200 KIRKWOOD 1588 UDIG NY INC 00000 47130 20252996 INV 12/31/2025 94.00 49619 23781 LATE UFPO FEES 846 UPSTATE STEEL I 00001 47209 20260045 INV 01/08/2026 875.00 49701 23782 #1101 & STOCK STEEL 180 VERIZON 00000 47327 INV 01/26/2026 99.00 49824 23783 852734149000104 JANUARY 181 VERIZON WIRELES 00000 47203 INV 01/26/2026 37.99 49695 23784 78726516100001 DECEMBER 185 WB MASON COMPAN 00000 47250 20252932 INV 01/14/2026 229.54 49742 23785 water cooler/jugs for Poli 1487 WELLS FARGO VEN 00000 47157 20260024 INV 01/12/2026 129.16 49646 23786 PRINTER RENTAL JANUARY 1487 WELLS FARGO VEN 00000 47259 20260059 INV 01/15/2026 126.13 49751 23786 copier maintanence 867 WEST PUBLISHING 00000 47254 20250326 INV 01/14/2026 432.97 49746 23787 CLEAR-December billing 868 WEST SENECA CHA 00001 47158 20260025 INV 01/12/2026 5,000.00 49647 23788 COMMUNITY DEVELOPMENT Q1 2 874 WEST SENECA PRI 00000 47230 20252876 INV 12/11/2025 144.00 49722 23789 Updated cards for Lauren a Report generated: 01/22/2026 15:14 Page 4 User: mwnek Program ID: apwarrnt Page 229 of 301

Page 230

Munis Production Database PREPAID INVOICE LIST CHECK RUN: TB0126 01/26/2026 VENDOR VENDOR NAME R DOCUMENT PO TYPE DUE DATE AMOUNT VOUCHER CHECK COMMENT 874 WEST SENECA PRI 00000 47262 20260056 INV 01/15/2026 220.00 49754 23789 800 Building permit applic 1868 WILLIAM WEIXLMA 00000 47263 20252937 INV 12/31/2025 175.00 49755 23790 2025 BOOT/CLOTHING ALLOWAN 884 WINKELMAN SALES 00000 47282 20260060 INV 01/13/2026 15.00 49775 23791 WELD STAPLES 888 WNY IMAGING SYS 00000 47255 20252998 INV 01/14/2026 117.62 49747 23792 records copier-monthly cha 888 WNY IMAGING SYS 00000 47293 20260069 INV 01/07/2026 199.00 49786 23792 Recreation letterhead func 207,783.88 CASH ACCOUNT 99000000 10200 TOTAL Report generated: 01/22/2026 15:14 Page 5 User: mwnek Program ID: apwarrnt Page 230 of 301

Page 231

Munis Production Database DETAIL INVOICE LIST CASH ACCOUNT: 99000000 10200 Cash CHECK RUN: TB0126 01/26/2026 DUE DATE: 01/26/2026 VENDOR G/L ACCOUNTS R PO TYPE DUE DATE INVOICE/AMOUNT DOCUMENT VOUCHER CHECK 781 STATE OF NEW YORK WORK 00000 INV 01/26/2026 1/13/26-9160.53 47328 49825 1 01904000 50803 Workers' C Workers' C 6,861.23 2 02904000 50803 Workers' C Workers' C 2,033.64 3 05050000 50803 SD Workers' C 265.66 Invoice Net 9,160.53 CHECK TOTAL 9,160.53 ----------- 1 INVOICES CHECK RUN TOTAL 9,160.53 9,160.53 CASH ACCOUNT BALANCE .00 Report generated: 01/22/2026 15:14 Page 6 User: mwnek Program ID: apwarrnt Page 231 of 301

Page 232

Munis Production Database CHECK RUN SUMMARY CHECK RUN: TB0126 01/26/2026 DUE DATE: 01/26/2026 FUND ORG ACCOUNT AMOUNT AVLB BUDGET 01 01904000 Workers' Compensat 01-9040-00-50803 Workers' Comp Insuranc 6,861.23 493,282.93 FUND TOTAL 6,861.23 CASH ACCOUNT 99000000 10200 BALANCE .00 02 02904000 Workers' Compensat 02-9040-00-50803 Workers' Comp Insuranc 2,033.64 843,034.96 FUND TOTAL 2,033.64 CASH ACCOUNT 99000000 10200 BALANCE .00 05 05050000 SD 05-0500-00-50803 SD.Workers' Comp Insur 265.66 -245,407.35 FUND TOTAL 265.66 CASH ACCOUNT 99000000 10200 BALANCE .00 CHECK RUN SUMMARY TOTAL 9,160.53 GRAND TOTAL 216,944.41 Report generated: 01/22/2026 15:14 Page 7 User: mwnek Program ID: apwarrnt Page 232 of 301

Page 233

Munis Production Database CHECK RUN LIST BY VOUCHER CHECK RUN: TB0126 01/26/2026 DUE DATE: 01/26/2026 VOUCHER VENDOR VENDOR NAME DOCUMENT PO TYPE DUE DATE AMOUNT COMMENT 49825 781 STATE OF NEW YORK WORKERS COMPENSATI 47328 INV 01/26/2026 9,160.53 WCB#878383 Q4 2025 CHECK RUN TOTAL 9,160.53 ** END OF REPORT - Generated by Megan Wnek ** Report generated: 01/22/2026 15:14 Page 8 User: mwnek Program ID: apwarrnt Page 233 of 301

Page 234

Munis Production Database YEAR-TO-DATE BUDGET REPORT FOR 2026 01 ORIGINAL TRANFRS/ REVISED AVAILABLE PCT APPROP ADJSTMTS BUDGET YTD ACTUAL ENCUMBRANCES BUDGET USE/COL 01 General Fund 01000100 General Fund 01-0001-00-41001 Real Property Taxes -16,815,926 0 -16,815,926 .00 .00 -16,815,926.00 .0% 01-0001-00-41081 In Lieu of Taxes -100,164 0 -100,164 .00 .00 -100,164.00 .0% 01-0001-00-41090 Interest & Penalties on RPT -300,000 0 -300,000 .00 .00 -300,000.00 .0% 01-0001-00-41116 Tax on Adult Use Cannibus -150,000 0 -150,000 .00 .00 -150,000.00 .0% 01-0001-00-41120 Non-Prop Tax Dist by County -8,000,000 0 -8,000,000 .00 .00 -8,000,000.00 .0% 01-0001-00-41170 TV Cable Franchise Fees -850,000 0 -850,000 .00 .00 -850,000.00 .0% 01-0001-00-41255 Clerk Fees -30,000 0 -30,000 .00 .00 -30,000.00 .0% 01-0001-00-41603 Vital Statistics -25,000 0 -25,000 .00 .00 -25,000.00 .0% 01-0001-00-41670 Police Service WS Schools -325,000 0 -325,000 .00 .00 -325,000.00 .0% 01-0001-00-42065 Recreation Charges -350,000 0 -350,000 .00 .00 -350,000.00 .0% 01-0001-00-42069 Senior Center -110,000 0 -110,000 .00 .00 -110,000.00 .0% 01-0001-00-42110 Zoning Fees -9,000 0 -9,000 .00 .00 -9,000.00 .0% 01-0001-00-42115 Planning Fees -20,000 0 -20,000 .00 .00 -20,000.00 .0% 01-0001-00-42390 Share of Joint Acty Other Govt -63,654 0 -63,654 .00 .00 -63,654.00 .0% 01-0001-00-42401 Interest Earnings -50,000 0 -50,000 .00 .00 -50,000.00 .0% 01-0001-00-42402 Interest Casualty & Liability -20,000 0 -20,000 .00 .00 -20,000.00 .0% 01-0001-00-42406 Investment Interest -320,000 0 -320,000 .00 .00 -320,000.00 .0% 01-0001-00-42410 Rental of Real Property -65,000 0 -65,000 .00 .00 -65,000.00 .0% 01-0001-00-42530 Games of Chance -1,400 0 -1,400 .00 .00 -1,400.00 .0% Report generated: 01/22/2026 09:55 Page 1 User: smith Program ID: glytdbud Page 234 of 301

Page 235

Munis Production Database YEAR-TO-DATE BUDGET REPORT FOR 2026 01 ORIGINAL TRANFRS/ REVISED AVAILABLE PCT APPROP ADJSTMTS BUDGET YTD ACTUAL ENCUMBRANCES BUDGET USE/COL 01-0001-00-42540 Bingo Licenses -2,000 0 -2,000 .00 .00 -2,000.00 .0% 01-0001-00-42544 Dog License Fees -35,000 0 -35,000 .00 .00 -35,000.00 .0% 01-0001-00-42555 Building & Alteration Permits -350,000 0 -350,000 .00 .00 -350,000.00 .0% 01-0001-00-42565 Plumbing Permits -35,000 0 -35,000 .00 .00 -35,000.00 .0% 01-0001-00-42610 Fines and Forfeited Bail -900,000 0 -900,000 .00 .00 -900,000.00 .0% 01-0001-00-42651 Recycling Income -8,000 0 -8,000 .00 .00 -8,000.00 .0% 01-0001-00-42655 Minor Sales -3,000 0 -3,000 .00 .00 -3,000.00 .0% 01-0001-00-42665 Sale of Surplus Equipment -50,000 0 -50,000 .00 .00 -50,000.00 .0% 01-0001-00-42701 Refund of Prior Year Expenses -3,000 0 -3,000 .00 .00 -3,000.00 .0% 01-0001-00-42801 Interfund Revenue -1,477,151 0 -1,477,151 .00 .00 -1,477,151.00 .0% 01-0001-00-42802 Interfund Revenue - Highway -352,000 0 -352,000 .00 .00 -352,000.00 .0% 01-0001-00-43001 Per Capita -348,552 0 -348,552 .00 .00 -348,552.00 .0% 01-0001-00-43005 Mortgage Tax -1,250,000 0 -1,250,000 .00 .00 -1,250,000.00 .0% 01-0001-00-43089 State Aid - Other General Gove -60,000 0 -60,000 .00 .00 -60,000.00 .0% 01-0001-00-43820 State Aid - Youth Program -7,500 0 -7,500 .00 .00 -7,500.00 .0% 01-0001-00-59998 Suspense 0 0 0 1,299.77 .00 -1,299.77 100.0% TOTAL General Fund -32,486,347 0 -32,486,347 1,299.77 .00 -32,487,646.77 .0% 01101000 Town Board 01-1010-00-50100 Salaries of Board Members 86,520 0 86,520 3,327.68 .00 83,192.32 3.8% TOTAL Town Board 86,520 0 86,520 3,327.68 .00 83,192.32 3.8% 01111000 Town Justice 01-1110-00-50100 Salaries of Department Heads Report generated: 01/22/2026 09:55 Page 2 User: smith Program ID: glytdbud Page 235 of 301

Page 236

Munis Production Database YEAR-TO-DATE BUDGET REPORT FOR 2026 01 ORIGINAL TRANFRS/ REVISED AVAILABLE PCT APPROP ADJSTMTS BUDGET YTD ACTUAL ENCUMBRANCES BUDGET USE/COL 94,722 0 94,722 3,643.16 .00 91,078.84 3.8% 01-1110-00-50133 Salaries of Justice Clerks 138,214 0 138,214 1,139.14 .00 137,074.86 .8% 01-1110-00-50135 Stipend for Administrative Cle 6,000 0 6,000 .00 .00 6,000.00 .0% 01-1110-00-50137 Salaries of Account Clerks 276,428 0 276,428 2,052.42 .00 274,375.58 .7% 01-1110-00-50138 Salaries of Part Time Clerks 47,000 0 47,000 158.03 .00 46,841.97 .3% 01-1110-00-50197 Longevity and Incentives 5,982 0 5,982 .00 .00 5,982.00 .0% 01-1110-00-50199 OVERTIME 20,000 0 20,000 .00 .00 20,000.00 .0% 01-1110-00-50200 Equipment 3,500 0 3,500 .00 .00 3,500.00 .0% 01-1110-00-50202 Equipment - JCAP 30,000 0 30,000 .00 .00 30,000.00 .0% 01-1110-00-50404 Court Stenographer Fees 26,000 0 26,000 .00 .00 26,000.00 .0% 01-1110-00-50406 Membership Dues 1,900 0 1,900 .00 730.00 1,170.00 38.4% 01-1110-00-50414 Continuing Edu and Training 9,000 0 9,000 .00 .00 9,000.00 .0% 01-1110-00-50448 Print, Literature and Other 7,000 0 7,000 .00 89.25 6,910.75 1.3% TOTAL Town Justice 665,746 0 665,746 6,992.75 819.25 657,934.00 1.2% 01122000 Supervisor 01-1220-00-50100 Salaries of Department Heads 75,300 0 75,300 2,896.15 .00 72,403.85 3.8% 01-1220-00-50101 Salaries of Deputy Supervisor 81,550 0 81,550 .00 .00 81,550.00 .0% 01-1220-00-50130 Salaries of Secretaries 0 0 0 3,304.00 .00 -3,304.00 100.0% 01-1220-00-50200 Equipment 500 0 500 .00 .00 500.00 .0% 01-1220-00-50414 Continuing Edu and Training 2,000 0 2,000 .00 .00 2,000.00 .0% TOTAL Supervisor 159,350 0 159,350 6,200.15 .00 153,149.85 3.9% 01131000 Finance Report generated: 01/22/2026 09:55 Page 3 User: smith Program ID: glytdbud Page 236 of 301

Page 237

Munis Production Database YEAR-TO-DATE BUDGET REPORT FOR 2026 01 ORIGINAL TRANFRS/ REVISED AVAILABLE PCT APPROP ADJSTMTS BUDGET YTD ACTUAL ENCUMBRANCES BUDGET USE/COL 01-1310-00-50100 Salaries of Department Heads 90,200 0 90,200 960.00 .00 89,240.00 1.1% 01-1310-00-50137 Salaries of Account Clerks 164,818 0 164,818 1,515.39 .00 163,302.61 .9% 01-1310-00-50138 Salaries of Part Time Clerks 11,000 0 11,000 .00 .00 11,000.00 .0% 01-1310-00-50197 Longevity and Incentives 988 0 988 .00 .00 988.00 .0% 01-1310-00-50199 OVERTIME 2,500 0 2,500 .00 .00 2,500.00 .0% 01-1310-00-50200 Equipment 500 0 500 .00 .00 500.00 .0% 01-1310-00-50216 Computer Software 24,000 0 24,000 .00 .00 24,000.00 .0% 01-1310-00-50400 Contractual Expenses 500 0 500 .00 .00 500.00 .0% 01-1310-00-50414 Continuing Edu and Training 2,000 0 2,000 .00 .00 2,000.00 .0% 01-1310-00-50419 Reference Materials 800 0 800 .00 .00 800.00 .0% TOTAL Finance 297,306 0 297,306 2,475.39 .00 294,830.61 .8% 01132000 Independent Auditing 01-1320-00-50451 Professional Services 29,000 0 29,000 .00 .00 29,000.00 .0% TOTAL Independent Auditing 29,000 0 29,000 .00 .00 29,000.00 .0% 01135500 Assessor 01-1355-00-50100 Salaries of Department Heads 136,700 0 136,700 5,257.69 .00 131,442.31 3.8% 01-1355-00-50105 Salaries of RPT Appraiser 62,800 0 62,800 460.18 .00 62,339.82 .7% 01-1355-00-50137 Salaries of Account Clerks 49,675 0 49,675 366.52 .00 49,308.48 .7% 01-1355-00-50138 Salaries of Warr Clerks - PT 17,000 0 17,000 .00 .00 17,000.00 .0% Report generated: 01/22/2026 09:55 Page 4 User: smith Program ID: glytdbud Page 237 of 301

Page 238

Munis Production Database YEAR-TO-DATE BUDGET REPORT FOR 2026 01 ORIGINAL TRANFRS/ REVISED AVAILABLE PCT APPROP ADJSTMTS BUDGET YTD ACTUAL ENCUMBRANCES BUDGET USE/COL 01-1355-00-50197 Longevity and Incentives 936 0 936 .00 .00 936.00 .0% 01-1355-00-50200 Equipment 2,000 0 2,000 .00 .00 2,000.00 .0% 01-1355-00-50402 Board of Review 2,750 0 2,750 .00 .00 2,750.00 .0% 01-1355-00-50406 Membership Dues 300 0 300 .00 250.00 50.00 83.3% 01-1355-00-50414 Continuing Edu and Training 3,200 0 3,200 .00 .00 3,200.00 .0% 01-1355-00-50416 Gasoline 250 0 250 .00 .00 250.00 .0% 01-1355-00-50419 Supplies 2,000 0 2,000 .00 .00 2,000.00 .0% TOTAL Assessor 277,611 0 277,611 6,084.39 250.00 271,276.61 2.3% 01141000 Town Clerk 01-1410-00-50100 Salaries of Department Heads 74,984 0 74,984 2,884.11 .00 72,099.89 3.8% 01-1410-00-50135 Salaries of Deputy Clerks 3,250 0 3,250 201.92 .00 3,048.08 6.2% 01-1410-00-50136 Salaries of Deputy Tax Receive 2,000 0 2,000 .00 .00 2,000.00 .0% 01-1410-00-50137 Salaries of Account Clerks 165,752 0 165,752 1,243.49 .00 164,508.51 .8% 01-1410-00-50138 Salaries of Part Time Clerks 30,000 0 30,000 141.40 .00 29,858.60 .5% 01-1410-00-50156 Salaries of Bingo Inspector - 1,200 0 1,200 .00 .00 1,200.00 .0% 01-1410-00-50197 Longevity and Incentives 988 0 988 .00 .00 988.00 .0% 01-1410-00-50199 OVERTIME 6,000 0 6,000 .00 .00 6,000.00 .0% 01-1410-00-50406 Membership Dues 175 0 175 60.00 .00 115.00 34.3% 01-1410-00-50411 Postage 17,000 0 17,000 .00 .00 17,000.00 .0% 01-1410-00-50414 Continuing Edu and Training 2,000 0 2,000 .00 .00 2,000.00 .0% 01-1410-00-50419 Supplies 4,200 0 4,200 .00 .00 4,200.00 .0% Report generated: 01/22/2026 09:55 Page 5 User: smith Program ID: glytdbud Page 238 of 301

Page 239

Munis Production Database YEAR-TO-DATE BUDGET REPORT FOR 2026 01 ORIGINAL TRANFRS/ REVISED AVAILABLE PCT APPROP ADJSTMTS BUDGET YTD ACTUAL ENCUMBRANCES BUDGET USE/COL 01-1410-00-50426 Advertising 850 0 850 .00 .00 850.00 .0% 01-1410-00-50442 Records Management Expense 3,500 0 3,500 .00 .00 3,500.00 .0% 01-1410-00-50444 Programmed Maintenance 45,000 0 45,000 .00 .00 45,000.00 .0% 01-1410-00-50448 Print, Literature and Other 6,500 0 6,500 .00 713.48 5,786.52 11.0% TOTAL Town Clerk 363,399 0 363,399 4,530.92 713.48 358,154.60 1.4% 01142000 Town Attorney 01-1420-00-50100 Salaries of Department Heads 77,063 0 77,063 2,963.96 .00 74,099.04 3.8% 01-1420-00-50101 Salaries of Town Prosecutors 30,600 0 30,600 .00 .00 30,600.00 .0% 01-1420-00-50138 Salaries of Part Time Clerks 22,000 0 22,000 89.28 .00 21,910.72 .4% 01-1420-00-50419 Supplies 1,500 0 1,500 .00 .00 1,500.00 .0% 01-1420-00-50435 Travel and Conferences 1,400 0 1,400 .00 .00 1,400.00 .0% 01-1420-00-50448 Print, Literature and Other 800 0 800 .00 .00 800.00 .0% 01-1420-00-50449 Codification Updating 4,500 0 4,500 .00 .00 4,500.00 .0% 01-1420-00-50452 Professional Serv - Litigation 175,000 0 175,000 46.15 .00 174,953.85 .0% TOTAL Town Attorney 312,863 0 312,863 3,099.39 .00 309,763.61 1.0% 01143000 Personnel 01-1430-00-50100 Salaries of Department Heads 83,000 0 83,000 .00 .00 83,000.00 .0% 01-1430-00-50216 Computer Software 13,000 0 13,000 .00 .00 13,000.00 .0% 01-1430-00-50451 Professional Services 0 0 0 3,192.31 .00 -3,192.31 100.0% Report generated: 01/22/2026 09:55 Page 6 User: smith Program ID: glytdbud Page 239 of 301

Page 240

Munis Production Database YEAR-TO-DATE BUDGET REPORT FOR 2026 01 ORIGINAL TRANFRS/ REVISED AVAILABLE PCT APPROP ADJSTMTS BUDGET YTD ACTUAL ENCUMBRANCES BUDGET USE/COL TOTAL Personnel 96,000 0 96,000 3,192.31 .00 92,807.69 3.3% 01144000 Town Engineer 01-1440-00-50102 Salaries of Principal Eng Ass 101,000 0 101,000 753.34 .00 100,246.66 .7% 01-1440-00-50103 Salaries of Eng Draftsman 90,141 0 90,141 1,216.46 .00 88,924.54 1.3% 01-1440-00-50137 Salaries of Account Clerks 56,255 0 56,255 366.52 .00 55,888.48 .7% 01-1440-00-50197 Longevity and Incentives 2,445 0 2,445 .00 .00 2,445.00 .0% 01-1440-00-50199 OVERTIME 4,700 0 4,700 .00 .00 4,700.00 .0% 01-1440-00-50200 Equipment 5,000 0 5,000 255.29 379.00 4,365.71 12.7% 01-1440-00-50414 Continuing Edu and Training 2,000 0 2,000 .00 .00 2,000.00 .0% 01-1440-00-50416 Gasoline 2,000 0 2,000 .00 .00 2,000.00 .0% 01-1440-00-50419 Supplies 2,000 0 2,000 .00 .00 2,000.00 .0% 01-1440-00-50443 Equipment Repair & Maintenance 2,500 0 2,500 .00 .00 2,500.00 .0% 01-1440-00-50451 Professional Services 140,250 0 140,250 .00 .00 140,250.00 .0% TOTAL Town Engineer 408,291 0 408,291 2,591.61 379.00 405,320.39 .7% 01162000 Buildings 01-1620-00-50417 Cleaning and Other Supplies 35,350 0 35,350 1,850.96 13,149.04 20,350.00 42.4% 01-1620-00-50420 Telephone 42,844 0 42,844 2,903.44 .00 39,940.56 6.8% 01-1620-00-50421 Electricity 141,400 0 141,400 .00 .00 141,400.00 .0% 01-1620-00-50422 Gas 24,493 0 24,493 .00 .00 24,493.00 .0% Report generated: 01/22/2026 09:55 Page 7 User: smith Program ID: glytdbud Page 240 of 301

Page 241

Munis Production Database YEAR-TO-DATE BUDGET REPORT FOR 2026 01 ORIGINAL TRANFRS/ REVISED AVAILABLE PCT APPROP ADJSTMTS BUDGET YTD ACTUAL ENCUMBRANCES BUDGET USE/COL 01-1620-00-50445 Repair and Maintenance 30,000 0 30,000 3,749.50 243.00 26,007.50 13.3% TOTAL Buildings 274,087 0 274,087 8,503.90 13,392.04 252,191.06 8.0% 01162100 Buildings - Town Community Cen 01-1621-00-50200 Equipment 10,000 0 10,000 .00 .00 10,000.00 .0% 01-1621-00-50417 Cleaning and Other Supplies 23,000 0 23,000 .00 .00 23,000.00 .0% 01-1621-00-50422 Gas 14,696 0 14,696 .00 .00 14,696.00 .0% 01-1621-00-50437 Landscaping & Maintenance 1,000 0 1,000 .00 .00 1,000.00 .0% TOTAL Buildings - Town Community Cen 48,696 0 48,696 .00 .00 48,696.00 .0% 01167000 Central Printing and Mailing 01-1670-00-50138 Salaries of Part Time Clerks 11,000 0 11,000 .00 .00 11,000.00 .0% 01-1670-00-50200 Equipment 1,600 0 1,600 .00 .00 1,600.00 .0% 01-1670-00-50411 Postage 45,000 0 45,000 829.14 .00 44,170.86 1.8% 01-1670-00-50419 Supplies 20,000 0 20,000 .00 937.22 19,062.78 4.7% 01-1670-00-50420 Telephone 4,000 0 4,000 .00 600.00 3,400.00 15.0% 01-1670-00-50440 Copy Machine Expense 25,000 0 25,000 .00 181.40 24,818.60 .7% 01-1670-00-50448 Print, Literature and Other 1,000 0 1,000 .00 48.00 952.00 4.8% 01-1670-00-50460 Computer/Software Maintenace 190,000 0 190,000 12,806.69 .00 177,193.31 6.7% TOTAL Central Printing and Mailing 297,600 0 297,600 13,635.83 1,766.62 282,197.55 5.2% 01191000 Special Items 01-1910-00-50425 General Lia, Fire & Theft Cons 580,750 0 580,750 .00 .00 580,750.00 .0% Report generated: 01/22/2026 09:55 Page 8 User: smith Program ID: glytdbud Page 241 of 301

Page 242

Munis Production Database YEAR-TO-DATE BUDGET REPORT FOR 2026 01 ORIGINAL TRANFRS/ REVISED AVAILABLE PCT APPROP ADJSTMTS BUDGET YTD ACTUAL ENCUMBRANCES BUDGET USE/COL 01-1910-00-50451 Professional Services 30,000 0 30,000 2,500.00 .00 27,500.00 8.3% 01-1910-00-50477 Insurance Administration 30,000 0 30,000 .00 .00 30,000.00 .0% TOTAL Special Items 640,750 0 640,750 2,500.00 .00 638,250.00 .4% 01191100 Special Items 01-1911-00-50445 Reimbursement Expense 1,400 0 1,400 .00 .00 1,400.00 .0% TOTAL Special Items 1,400 0 1,400 .00 .00 1,400.00 .0% 01192000 Special Items 01-1920-00-50406 Membership Dues 2,050 0 2,050 .00 300.00 1,750.00 14.6% 01-1920-00-50464 Judgments & Claims 70,000 0 70,000 .00 .00 70,000.00 .0% 01-1920-00-50465 Erie County Chargebacks 13,287 0 13,287 .00 .00 13,287.00 .0% TOTAL Special Items 85,337 0 85,337 .00 300.00 85,037.00 .4% 01195000 Special Items 01-1950-00-50462 Taxes & Ass on Town Property 5,500 0 5,500 .00 .00 5,500.00 .0% TOTAL Special Items 5,500 0 5,500 .00 .00 5,500.00 .0% 01198900 Special Items 01-1989-00-50401 Pre-employment Screening 18,000 0 18,000 115.00 -115.00 18,000.00 .0% Report generated: 01/22/2026 09:55 Page 9 User: smith Program ID: glytdbud Page 242 of 301

Page 243

Munis Production Database YEAR-TO-DATE BUDGET REPORT FOR 2026 01 ORIGINAL TRANFRS/ REVISED AVAILABLE PCT APPROP ADJSTMTS BUDGET YTD ACTUAL ENCUMBRANCES BUDGET USE/COL TOTAL Special Items 18,000 0 18,000 115.00 -115.00 18,000.00 .0% 01199000 Special Items 01-1990-00-50480 Contingent Account 164,850 0 164,850 .00 .00 164,850.00 .0% TOTAL Special Items 164,850 0 164,850 .00 .00 164,850.00 .0% 01312000 Police 01-3120-00-50100 Salaries of Department Heads 164,313 0 164,313 1,435.59 .00 162,877.41 .9% 01-3120-00-50104 Salaries of Assistant Chief 145,419 0 145,419 3,044.90 .00 142,374.10 2.1% 01-3120-00-50137 Salaries of Account Clerks 242,706 0 242,706 4,141.62 .00 238,564.38 1.7% 01-3120-00-50139 Salaries of Warr Clerks - PT 7,000 0 7,000 .00 .00 7,000.00 .0% 01-3120-00-50142 Salaries of Police Sec Off 39,800 0 39,800 .00 .00 39,800.00 .0% 01-3120-00-50148 Salaries of Safety Dispat - PT 95,000 0 95,000 998.46 .00 94,001.54 1.1% 01-3120-00-50150 Salaries of Captains 505,774 0 505,774 6,661.72 .00 499,112.28 1.3% 01-3120-00-50153 Salaries of Detectives 1,201,545 0 1,201,545 19,094.88 .00 1,182,450.12 1.6% 01-3120-00-50154 Salaries of Police Officers 3,662,467 0 3,662,467 57,626.59 .00 3,604,840.41 1.6% 01-3120-00-50155 Salaries of Public Saf Disp 613,877 0 613,877 6,234.90 .00 607,642.10 1.0% 01-3120-00-50157 Salaries of Police Matron - PT 4,500 0 4,500 .00 .00 4,500.00 .0% 01-3120-00-50159 Salaries of School CG - PT 36,000 0 36,000 .00 .00 36,000.00 .0% 01-3120-00-50161 Salaries of Police Lieutenants 963,442 0 963,442 9,288.84 .00 954,153.16 1.0% 01-3120-00-50163 Salaries of Detective Lieu 240,860 0 240,860 1,550.06 .00 239,309.94 .6% Report generated: 01/22/2026 09:55 Page 10 User: smith Program ID: glytdbud Page 243 of 301

Page 244

Munis Production Database YEAR-TO-DATE BUDGET REPORT FOR 2026 01 ORIGINAL TRANFRS/ REVISED AVAILABLE PCT APPROP ADJSTMTS BUDGET YTD ACTUAL ENCUMBRANCES BUDGET USE/COL 01-3120-00-50164 Salaries of Comm Policing Prog 65,000 0 65,000 .00 .00 65,000.00 .0% 01-3120-00-50197 Longevity and Incentives 192,237 0 192,237 .00 .00 192,237.00 .0% 01-3120-00-50198 PBA HOLIDAY 270,576 0 270,576 .00 .00 270,576.00 .0% 01-3120-00-50199 OVERTIME 360,000 0 360,000 .00 .00 360,000.00 .0% 01-3120-00-50200 Equipment 150,000 0 150,000 .00 1,340.41 148,659.59 .9% 01-3120-00-50208 Police Vehicles 225,000 0 225,000 .00 .00 225,000.00 .0% 01-3120-00-50209 Rifles and Body Bunker 7,000 0 7,000 .00 .00 7,000.00 .0% 01-3120-00-50211 Dispatch Equipment 5,000 0 5,000 .00 .00 5,000.00 .0% 01-3120-00-50403 Transport and Prisoner Meals 500 0 500 .00 .00 500.00 .0% 01-3120-00-50407 Uniform Allowance 97,360 0 97,360 .00 2,320.94 95,039.06 2.4% 01-3120-00-50409 Ammunition 14,000 0 14,000 .00 .00 14,000.00 .0% 01-3120-00-50412 Reimbursement Expense 1,600 0 1,600 .00 .00 1,600.00 .0% 01-3120-00-50415 Other Contractual Expenses 258,000 0 258,000 35,475.27 95,110.97 127,413.76 50.6% 01-3120-00-50416 Gasoline 94,000 0 94,000 .00 .00 94,000.00 .0% 01-3120-00-50419 Supplies 25,250 0 25,250 .00 2,800.00 22,450.00 11.1% 01-3120-00-50420 Telephone 13,000 0 13,000 .00 .00 13,000.00 .0% 01-3120-00-50441 Eqiupment Rental 2,000 0 2,000 .00 .00 2,000.00 .0% 01-3120-00-50443 Equipment Repair & Maintenance 60,000 0 60,000 .00 4,922.50 55,077.50 8.2% 01-3120-00-50447 Micro Filming 500 0 500 .00 .00 500.00 .0% 01-3120-00-50454 Professional Services - Legal 10,000 0 10,000 .00 .00 10,000.00 .0% 01-3120-00-50459 Police Training Course 40,000 0 40,000 .00 .00 40,000.00 .0% 01-3120-00-50468 Juvenile Programs 9,000 0 9,000 .00 .00 9,000.00 .0% Report generated: 01/22/2026 09:55 Page 11 User: smith Program ID: glytdbud Page 244 of 301

Page 245

Munis Production Database YEAR-TO-DATE BUDGET REPORT FOR 2026 01 ORIGINAL TRANFRS/ REVISED AVAILABLE PCT APPROP ADJSTMTS BUDGET YTD ACTUAL ENCUMBRANCES BUDGET USE/COL 01-3120-00-50471 Community Service 7,500 0 7,500 .00 .00 7,500.00 .0% 01-3120-00-50479 Youth Court Program 1,000 0 1,000 40.00 .00 960.00 4.0% TOTAL Police 9,831,226 0 9,831,226 145,592.83 106,494.82 9,579,138.35 2.6% 01331000 Traffic Control 01-3310-00-50443 Equipment Repair & Maintenance 30,000 0 30,000 .00 .00 30,000.00 .0% TOTAL Traffic Control 30,000 0 30,000 .00 .00 30,000.00 .0% 01341000 Electrical Department 01-3410-00-50143 Salaries of Maintenance Men 156,680 0 156,680 3,605.12 .00 153,074.88 2.3% 01-3410-00-50197 Longevity and Incentives 1,910 0 1,910 .00 .00 1,910.00 .0% 01-3410-00-50199 OVERTIME 8,000 0 8,000 .00 .00 8,000.00 .0% 01-3410-00-50200 Equipment 1,000 0 1,000 .00 .00 1,000.00 .0% 01-3410-00-50400 Contractual Expenses 2,000 0 2,000 .00 .00 2,000.00 .0% 01-3410-00-50443 Equipment Repair & Maintenance 15,000 0 15,000 .00 .00 15,000.00 .0% 01-3410-00-50446 Maint to Dispatch Console 1,000 0 1,000 .00 .00 1,000.00 .0% TOTAL Electrical Department 185,590 0 185,590 3,605.12 .00 181,984.88 1.9% 01341100 Buildings and Grounds - Electr 01-3411-00-50421 Electricity 12,000 0 12,000 .00 .00 12,000.00 .0% 01-3411-00-50422 Gas 700 0 700 .00 .00 700.00 .0% Report generated: 01/22/2026 09:55 Page 12 User: smith Program ID: glytdbud Page 245 of 301

Page 246

Munis Production Database YEAR-TO-DATE BUDGET REPORT FOR 2026 01 ORIGINAL TRANFRS/ REVISED AVAILABLE PCT APPROP ADJSTMTS BUDGET YTD ACTUAL ENCUMBRANCES BUDGET USE/COL 01-3411-00-50423 Water 520 0 520 .00 .00 520.00 .0% TOTAL Buildings and Grounds - Electr 13,220 0 13,220 .00 .00 13,220.00 .0% 01351000 Dog Control 01-3510-00-50100 Salaries of Department Heads 7,000 0 7,000 269.23 .00 6,730.77 3.8% 01-3510-00-50200 Equipment 1,000 0 1,000 .00 .00 1,000.00 .0% 01-3510-00-50416 Gasoline 3,200 0 3,200 .00 .00 3,200.00 .0% 01-3510-00-50443 Eqiupment Repair & Maintenance 1,200 0 1,200 .00 .00 1,200.00 .0% 01-3510-00-50445 Repair and Maintenance 1,200 0 1,200 .00 .00 1,200.00 .0% 01-3510-00-50461 Service of Animals 1,500 0 1,500 .00 .00 1,500.00 .0% 01-3510-00-50470 Dog Food 500 0 500 .00 107.58 392.42 21.5% TOTAL Dog Control 15,600 0 15,600 269.23 107.58 15,223.19 2.4% 01351100 Buildings and Grounds - Animal 01-3511-00-50420 Telephone 1,700 0 1,700 129.00 .00 1,571.00 7.6% 01-3511-00-50421 Electricity 8,000 0 8,000 .00 .00 8,000.00 .0% 01-3511-00-50422 Gas 1,300 0 1,300 .00 .00 1,300.00 .0% 01-3511-00-50423 Water 280 0 280 .00 .00 280.00 .0% TOTAL Buildings and Grounds - Animal 11,280 0 11,280 129.00 .00 11,151.00 1.1% 01352000 Animal Control - Other 01-3520-00-50419 Supplies 20,000 0 20,000 .00 .00 20,000.00 .0% Report generated: 01/22/2026 09:55 Page 13 User: smith Program ID: glytdbud Page 246 of 301

Page 247

Munis Production Database YEAR-TO-DATE BUDGET REPORT FOR 2026 01 ORIGINAL TRANFRS/ REVISED AVAILABLE PCT APPROP ADJSTMTS BUDGET YTD ACTUAL ENCUMBRANCES BUDGET USE/COL TOTAL Animal Control - Other 20,000 0 20,000 .00 .00 20,000.00 .0% 01361000 Board of Plumbing Examiners 01-3610-00-50400 Contractual Expenses 1,670 0 1,670 .00 .00 1,670.00 .0% TOTAL Board of Plumbing Examiners 1,670 0 1,670 .00 .00 1,670.00 .0% 01362000 Code Enforcement 01-3620-00-50106 Salaries of Ast Inspectors 223,023 0 223,023 1,699.46 .00 221,323.54 .8% 01-3620-00-50137 Salaries of Account Clerks 61,340 0 61,340 471.80 .00 60,868.20 .8% 01-3620-00-50139 Salaries of Warr Clerks - PT 89,308 0 89,308 686.98 .00 88,621.02 .8% 01-3620-00-50141 Salaries of Electrical Insp 105,945 0 105,945 1,839.94 .00 104,105.06 1.7% 01-3620-00-50149 Salaries of Seasonal & Tempora 23,250 0 23,250 .00 .00 23,250.00 .0% 01-3620-00-50197 Longevity and Incentives 4,838 0 4,838 .00 .00 4,838.00 .0% 01-3620-00-50199 OVERTIME 7,000 0 7,000 .00 .00 7,000.00 .0% 01-3620-00-50200 Equipment 1,000 0 1,000 .00 .00 1,000.00 .0% 01-3620-00-50400 Contractual Expenses 1,000 0 1,000 .00 .00 1,000.00 .0% 01-3620-00-50405 Fire Prevention Supplies 600 0 600 .00 .00 600.00 .0% 01-3620-00-50406 Membership Dues 3,000 0 3,000 .00 .00 3,000.00 .0% 01-3620-00-50414 Continuing Edu and Training 1,850 0 1,850 .00 .00 1,850.00 .0% 01-3620-00-50416 Gasoline 4,500 0 4,500 .00 .00 4,500.00 .0% 01-3620-00-50419 Supplies 3,600 0 3,600 .00 .00 3,600.00 .0% Report generated: 01/22/2026 09:55 Page 14 User: smith Program ID: glytdbud Page 247 of 301

Page 248

Munis Production Database YEAR-TO-DATE BUDGET REPORT FOR 2026 01 ORIGINAL TRANFRS/ REVISED AVAILABLE PCT APPROP ADJSTMTS BUDGET YTD ACTUAL ENCUMBRANCES BUDGET USE/COL 01-3620-00-50444 Programmed Maintenance 2,000 0 2,000 .00 .00 2,000.00 .0% 01-3620-00-50445 Repair and Maintenance 3,000 0 3,000 .00 .00 3,000.00 .0% 01-3620-00-50448 Print, Literature and Other 2,500 0 2,500 313.80 .00 2,186.20 12.6% 01-3620-00-50481 Clothing Allowance 1,000 0 1,000 .00 .00 1,000.00 .0% TOTAL Code Enforcement 538,754 0 538,754 5,011.98 .00 533,742.02 .9% 01402000 Vital Statistics 01-4020-00-50100 Salaries of Department Heads 4,500 0 4,500 200.00 .00 4,300.00 4.4% 01-4020-00-50137 Salaries of Account Clerks 2,500 0 2,500 69.23 .00 2,430.77 2.8% TOTAL Vital Statistics 7,000 0 7,000 269.23 .00 6,730.77 3.8% 01501000 Superintendent of Highways 01-5010-00-50100 Salaries of Department Heads 98,792 0 98,792 3,799.70 .00 94,992.30 3.8% 01-5010-00-50108 Salaries of Deputy Super 6,700 0 6,700 257.69 .00 6,442.31 3.8% 01-5010-00-50137 Salaries of Account Clerks 122,680 0 122,680 .00 .00 122,680.00 .0% 01-5010-00-50149 Salaries of Seasonal & Tempora 16,000 0 16,000 .00 .00 16,000.00 .0% 01-5010-00-50197 Longevity and Incentives 2,341 0 2,341 .00 .00 2,341.00 .0% 01-5010-00-50199 OVERTIME 500 0 500 .00 .00 500.00 .0% 01-5010-00-50414 Continuing Edu and Training 4,000 0 4,000 .00 .00 4,000.00 .0% 01-5010-00-50445 Repair and Maintenance 17,000 0 17,000 .00 .00 17,000.00 .0% TOTAL Superintendent of Highways 268,013 0 268,013 4,057.39 .00 263,955.61 1.5% 01513200 Highway Garage Report generated: 01/22/2026 09:55 Page 15 User: smith Program ID: glytdbud Page 248 of 301

Page 249

Munis Production Database YEAR-TO-DATE BUDGET REPORT FOR 2026 01 ORIGINAL TRANFRS/ REVISED AVAILABLE PCT APPROP ADJSTMTS BUDGET YTD ACTUAL ENCUMBRANCES BUDGET USE/COL 01-5132-00-50420 Telephone 9,181 0 9,181 289.00 .00 8,892.00 3.1% 01-5132-00-50421 Electricity 34,000 0 34,000 .00 .00 34,000.00 .0% 01-5132-00-50422 Gas 45,000 0 45,000 170.00 .00 44,830.00 .4% 01-5132-00-50423 Water 6,500 0 6,500 .00 .00 6,500.00 .0% 01-5132-00-50439 Radio Installation 5,000 0 5,000 .00 .00 5,000.00 .0% 01-5132-00-50445 Repair and Maintenance 20,000 0 20,000 .00 825.00 19,175.00 4.1% TOTAL Highway Garage 119,681 0 119,681 459.00 825.00 118,397.00 1.1% 01518200 Street Lighting 01-5182-00-50421 Electricity 500,000 0 500,000 .00 .00 500,000.00 .0% TOTAL Street Lighting 500,000 0 500,000 .00 .00 500,000.00 .0% 01651000 Veteran Services 01-6510-00-50410 Veteran Services 1,800 0 1,800 .00 .00 1,800.00 .0% TOTAL Veteran Services 1,800 0 1,800 .00 .00 1,800.00 .0% 01698900 Oth Econ Opport & Development 01-6989-00-50451 Professional Services 20,000 0 20,000 5,000.00 .00 15,000.00 25.0% TOTAL Oth Econ Opport & Development 20,000 0 20,000 5,000.00 .00 15,000.00 25.0% 01711000 Buildings and Grounds 01-7110-00-50110 Salaries of Crew Chief 82,541 0 82,541 -1,159.50 .00 83,700.50 -1.4% Report generated: 01/22/2026 09:55 Page 16 User: smith Program ID: glytdbud Page 249 of 301

Page 250

Munis Production Database YEAR-TO-DATE BUDGET REPORT FOR 2026 01 ORIGINAL TRANFRS/ REVISED AVAILABLE PCT APPROP ADJSTMTS BUDGET YTD ACTUAL ENCUMBRANCES BUDGET USE/COL 01-7110-00-50115 Salaries of Working Crew Chief 80,163 0 80,163 4,106.31 .00 76,056.69 5.1% 01-7110-00-50144 Salaries of Laborers 1,097,937 0 1,097,937 8,562.30 1,026.67 1,088,348.03 .9% 01-7110-00-50149 Salaries of Seasonal & Temp 230,000 0 230,000 1,081.44 .00 228,918.56 .5% 01-7110-00-50197 Longevity and Incentives 22,703 0 22,703 .00 .00 22,703.00 .0% 01-7110-00-50199 OVERTIME 130,000 0 130,000 .00 .00 130,000.00 .0% 01-7110-00-50200 Equipment 100,000 0 100,000 .00 .00 100,000.00 .0% 01-7110-00-50414 Continuing Education and Train 1,750 0 1,750 .00 .00 1,750.00 .0% 01-7110-00-50416 Gasoline 35,000 0 35,000 .00 .00 35,000.00 .0% 01-7110-00-50418 Athletic Field Supplies 45,000 0 45,000 .00 .00 45,000.00 .0% 01-7110-00-50419 Supplies 1,800 0 1,800 .00 .00 1,800.00 .0% 01-7110-00-50420 Telephone 5,050 0 5,050 389.61 .00 4,660.39 7.7% 01-7110-00-50421 Electricity 11,554 0 11,554 .00 .00 11,554.00 .0% 01-7110-00-50422 Gas 4,080 0 4,080 .00 .00 4,080.00 .0% 01-7110-00-50423 Water 70,000 0 70,000 .00 .00 70,000.00 .0% 01-7110-00-50424 Rodent & Vermin Control 5,000 0 5,000 179.81 2,620.20 2,199.99 56.0% 01-7110-00-50443 Equipment Repair & Maintenance 50,000 0 50,000 762.67 7,746.28 41,491.05 17.0% 01-7110-00-50445 Repair and Maintenance 80,000 0 80,000 600.25 771.03 78,628.72 1.7% TOTAL Buildings and Grounds 2,052,578 0 2,052,578 14,522.89 12,164.18 2,025,890.93 1.3% 01714000 Recreation 01-7140-00-50100 Salaries of Department Heads 80,154 0 80,154 2,045.72 .00 78,108.28 2.6% 01-7140-00-50102 Salaries of Principal Engineer 50,000 0 50,000 .00 .00 50,000.00 .0% Report generated: 01/22/2026 09:55 Page 17 User: smith Program ID: glytdbud Page 250 of 301

Page 251

Munis Production Database YEAR-TO-DATE BUDGET REPORT FOR 2026 01 ORIGINAL TRANFRS/ REVISED AVAILABLE PCT APPROP ADJSTMTS BUDGET YTD ACTUAL ENCUMBRANCES BUDGET USE/COL 01-7140-00-50138 Salaries of Part Time Clerks 40,000 0 40,000 285.50 .00 39,714.50 .7% 01-7140-00-50149 Salaries of Seasonal & Temp 140,000 0 140,000 -1,024.85 .00 141,024.85 -.7% 01-7140-00-50197 Longevity and Incentives 936 0 936 .00 .00 936.00 .0% 01-7140-00-50199 OVERTIME 1,000 0 1,000 .00 .00 1,000.00 .0% 01-7140-00-50216 Computer Software 6,000 0 6,000 .00 .00 6,000.00 .0% 01-7140-00-50230 Sports & Recreation Equipment 7,000 0 7,000 .00 234.29 6,765.71 3.3% 01-7140-00-50408 Clothing Allowance 3,300 0 3,300 .00 .00 3,300.00 .0% 01-7140-00-50414 Continuing Edu and Training 2,633 0 2,633 125.00 60.00 2,448.00 7.0% 01-7140-00-50419 Supplies 6,500 0 6,500 .00 434.40 6,065.60 6.7% 01-7140-00-50420 Telephone 1,500 0 1,500 .00 .00 1,500.00 .0% 01-7140-00-50443 Equipment Repair & Maintenance 400 0 400 .00 .00 400.00 .0% 01-7140-00-50448 Print, Literature and Other 350 0 350 199.00 .00 151.00 56.9% 01-7140-00-50476 Youth Summer Day Camp 27,500 0 27,500 .00 308.45 27,191.55 1.1% TOTAL Recreation 367,273 0 367,273 1,630.37 1,037.14 364,605.49 .7% 01714200 Buildings and Grounds - Ice Ri 01-7142-00-50230 Sports & Recreation Equipment 500 0 500 .00 .00 500.00 .0% 01-7142-00-50420 Telephone 9,500 0 9,500 .00 .00 9,500.00 .0% 01-7142-00-50422 Gas 5,000 0 5,000 .00 .00 5,000.00 .0% 01-7142-00-50423 Water 4,800 0 4,800 .00 .00 4,800.00 .0% 01-7142-00-50445 Repair and Maintenance 84,000 0 84,000 1,724.48 6,396.34 75,879.18 9.7% 01-7142-00-50450 Service Contracts 12,000 0 12,000 .00 .00 12,000.00 .0% Report generated: 01/22/2026 09:55 Page 18 User: smith Program ID: glytdbud Page 251 of 301

Page 252

Munis Production Database YEAR-TO-DATE BUDGET REPORT FOR 2026 01 ORIGINAL TRANFRS/ REVISED AVAILABLE PCT APPROP ADJSTMTS BUDGET YTD ACTUAL ENCUMBRANCES BUDGET USE/COL TOTAL Buildings and Grounds - Ice Ri 115,800 0 115,800 1,724.48 6,396.34 107,679.18 7.0% 01718000 Veteran's Swimming Pool 01-7180-00-50100 Salaries of Department Heads 33,000 0 33,000 .00 .00 33,000.00 .0% 01-7180-00-50149 Salaries of Seasonal & Temp 140,000 0 140,000 417.25 .00 139,582.75 .3% 01-7180-00-50230 Sports & Recreation Equipment 2,700 0 2,700 .00 .00 2,700.00 .0% 01-7180-00-50231 Aquatics Training Equipment 10,000 0 10,000 .00 .00 10,000.00 .0% TOTAL Veteran's Swimming Pool 185,700 0 185,700 417.25 .00 185,282.75 .2% 01718100 Buildings and Grounds - Pool 01-7181-00-50445 Repair and Maintenance 35,000 0 35,000 .00 .00 35,000.00 .0% TOTAL Buildings and Grounds - Pool 35,000 0 35,000 .00 .00 35,000.00 .0% 01742000 Cultural Center 01-7420-00-50200 Equipment 1,000 0 1,000 .00 .00 1,000.00 .0% 01-7420-00-50420 Telephone 4,400 0 4,400 413.97 .00 3,986.03 9.4% 01-7420-00-50421 Electricity 10,000 0 10,000 .00 .00 10,000.00 .0% 01-7420-00-50422 Gas 3,000 0 3,000 .00 .00 3,000.00 .0% 01-7420-00-50423 Water 2,100 0 2,100 .00 .00 2,100.00 .0% 01-7420-00-50445 Repair and Maintenance 8,000 0 8,000 .00 .00 8,000.00 .0% TOTAL Cultural Center 28,500 0 28,500 413.97 .00 28,086.03 1.5% Report generated: 01/22/2026 09:55 Page 19 User: smith Program ID: glytdbud Page 252 of 301

Page 253

Munis Production Database YEAR-TO-DATE BUDGET REPORT FOR 2026 01 ORIGINAL TRANFRS/ REVISED AVAILABLE PCT APPROP ADJSTMTS BUDGET YTD ACTUAL ENCUMBRANCES BUDGET USE/COL 01751000 Historian 01-7510-00-50100 Salaries of Department Heads 4,500 0 4,500 173.08 .00 4,326.92 3.8% 01-7510-00-50419 Supplies 2,000 0 2,000 .00 .00 2,000.00 .0% TOTAL Historian 6,500 0 6,500 173.08 .00 6,326.92 2.7% 01752000 Historical Property 01-7520-00-50421 Electricity 1,200 0 1,200 .00 .00 1,200.00 .0% 01-7520-00-50422 Gas 2,020 0 2,020 .00 .00 2,020.00 .0% 01-7520-00-50423 Water 300 0 300 .00 .00 300.00 .0% 01-7520-00-50445 Repair and Maintenance 6,000 0 6,000 .00 .00 6,000.00 .0% TOTAL Historical Property 9,520 0 9,520 .00 .00 9,520.00 .0% 01755000 Celebrations 01-7550-00-50473 Patrotic Observances 2,000 0 2,000 .00 .00 2,000.00 .0% 01-7550-00-50474 July 4th Celebration 37,500 0 37,500 .00 .00 37,500.00 .0% 01-7550-00-50475 Burchfest 1,000 0 1,000 .00 .00 1,000.00 .0% TOTAL Celebrations 40,500 0 40,500 .00 .00 40,500.00 .0% 01762000 Senior Citizens 01-7620-00-50100 Salaries of Department Heads 72,485 0 72,485 557.62 .00 71,927.38 .8% Report generated: 01/22/2026 09:55 Page 20 User: smith Program ID: glytdbud Page 253 of 301

Page 254

Munis Production Database YEAR-TO-DATE BUDGET REPORT FOR 2026 01 ORIGINAL TRANFRS/ REVISED AVAILABLE PCT APPROP ADJSTMTS BUDGET YTD ACTUAL ENCUMBRANCES BUDGET USE/COL 01-7620-00-50137 Salaries of Account Clerks 30,000 0 30,000 .00 .00 30,000.00 .0% 01-7620-00-50138 Salaries of Part Time Clerks 80,000 0 80,000 410.87 .00 79,589.13 .5% 01-7620-00-50146 Salaries of Driv, Inst & Fd Sv 145,000 0 145,000 502.08 .00 144,497.92 .3% 01-7620-00-50199 OVERTIME 500 0 500 .00 .00 500.00 .0% 01-7620-00-50200 Equipment 2,000 0 2,000 .00 .00 2,000.00 .0% 01-7620-00-50400 Contractual Expenses 5,000 0 5,000 .00 .00 5,000.00 .0% 01-7620-00-50416 Gasoline 12,000 0 12,000 .00 .00 12,000.00 .0% 01-7620-00-50417 Cleaning and Other Supplies 7,000 0 7,000 .00 1,500.00 5,500.00 21.4% 01-7620-00-50420 Telephone 11,615 0 11,615 199.95 .00 11,415.05 1.7% 01-7620-00-50445 Repair and Maintenance 9,000 0 9,000 .00 1,500.00 7,500.00 16.7% 01-7620-00-50478 Craft Material & Supplies 15,000 0 15,000 .00 1,500.00 13,500.00 10.0% 01-7620-00-50484 Fitness Consultant 31,000 0 31,000 118.45 .00 30,881.55 .4% TOTAL Senior Citizens 420,600 0 420,600 1,788.97 4,500.00 414,311.03 1.5% 01762100 Buildings and Grounds - Senior 01-7621-00-50421 Electricity 50,000 0 50,000 270.00 .00 49,730.00 .5% 01-7621-00-50422 Gas 6,790 0 6,790 .00 .00 6,790.00 .0% 01-7621-00-50423 Water 2,100 0 2,100 .00 .00 2,100.00 .0% 01-7621-00-50445 Repair and Maintenance 20,000 0 20,000 .00 .00 20,000.00 .0% TOTAL Buildings and Grounds - Senior 78,890 0 78,890 270.00 .00 78,620.00 .3% 01798900 Recreation Commission 01-7989-00-50138 Salaries of Part Time Clerks 1,500 0 1,500 .00 .00 1,500.00 .0% Report generated: 01/22/2026 09:55 Page 21 User: smith Program ID: glytdbud Page 254 of 301

Page 255

Munis Production Database YEAR-TO-DATE BUDGET REPORT FOR 2026 01 ORIGINAL TRANFRS/ REVISED AVAILABLE PCT APPROP ADJSTMTS BUDGET YTD ACTUAL ENCUMBRANCES BUDGET USE/COL TOTAL Recreation Commission 1,500 0 1,500 .00 .00 1,500.00 .0% 01801000 Zoning Board 01-8010-00-50100 Salaries of Department Heads 6,300 0 6,300 .00 .00 6,300.00 .0% 01-8010-00-50109 Salaries of Board Members 17,400 0 17,400 .00 .00 17,400.00 .0% 01-8010-00-50138 Salaries of Part Time Clerks 4,650 0 4,650 178.85 .00 4,471.15 3.8% TOTAL Zoning Board 28,350 0 28,350 178.85 .00 28,171.15 .6% 01802000 Planning Board 01-8020-00-50100 Salaries of Department Heads 6,300 0 6,300 .00 .00 6,300.00 .0% 01-8020-00-50109 Salaries of Board Members 26,100 0 26,100 .00 .00 26,100.00 .0% 01-8020-00-50138 Salaries of Part Time Clerks 4,650 0 4,650 178.85 .00 4,471.15 3.8% TOTAL Planning Board 37,050 0 37,050 178.85 .00 36,871.15 .5% 01805000 Ethics Committee 01-8050-00-50138 Salaries of Part Time Clerks 1,500 0 1,500 .00 .00 1,500.00 .0% TOTAL Ethics Committee 1,500 0 1,500 .00 .00 1,500.00 .0% 01807000 Historical Preserv. Committee 01-8070-00-50138 Salaries of Part Time Clerks 1,500 0 1,500 .00 .00 1,500.00 .0% Report generated: 01/22/2026 09:55 Page 22 User: smith Program ID: glytdbud Page 255 of 301

Page 256

Munis Production Database YEAR-TO-DATE BUDGET REPORT FOR 2026 01 ORIGINAL TRANFRS/ REVISED AVAILABLE PCT APPROP ADJSTMTS BUDGET YTD ACTUAL ENCUMBRANCES BUDGET USE/COL 01-8070-00-50415 Other Contractual Expenses 1,800 0 1,800 .00 .00 1,800.00 .0% TOTAL Historical Preserv. Committee 3,300 0 3,300 .00 .00 3,300.00 .0% 01809000 Environmental Committee 01-8090-00-50138 Salaries of Part Time Clerks 1,500 0 1,500 .00 .00 1,500.00 .0% 01-8090-00-50415 Other Contractual Expenses 1,000 0 1,000 .00 .00 1,000.00 .0% TOTAL Environmental Committee 2,500 0 2,500 .00 .00 2,500.00 .0% 01816000 Sanitation 01-8160-00-50110 Salaries of Crew Chief 82,541 0 82,541 .00 .00 82,541.00 .0% 01-8160-00-50144 Salaries of Laborers 913,096 0 913,096 4,015.25 1,026.67 908,054.08 .6% 01-8160-00-50145 Salaries of Laborers - PT 220,000 0 220,000 1,483.59 .00 218,516.41 .7% 01-8160-00-50197 Longevity and Incentives 7,002 0 7,002 .00 .00 7,002.00 .0% 01-8160-00-50199 OVERTIME 60,000 0 60,000 .00 .00 60,000.00 .0% 01-8160-00-50200 Equipment 5,000 0 5,000 .00 .00 5,000.00 .0% 01-8160-00-50408 Clothing Allowance 3,500 0 3,500 .00 .00 3,500.00 .0% 01-8160-00-50416 Gasoline 55,000 0 55,000 .00 .00 55,000.00 .0% 01-8160-00-50419 Supplies 1,000 0 1,000 15.00 .00 985.00 1.5% 01-8160-00-50421 Electricity 5,050 0 5,050 .00 .00 5,050.00 .0% 01-8160-00-50422 Gas 6,060 0 6,060 .00 .00 6,060.00 .0% 01-8160-00-50427 Sanitary Landfill Disposal 1,093,044 0 1,093,044 .00 .00 1,093,044.00 .0% Report generated: 01/22/2026 09:55 Page 23 User: smith Program ID: glytdbud Page 256 of 301

Page 257

Munis Production Database YEAR-TO-DATE BUDGET REPORT FOR 2026 01 ORIGINAL TRANFRS/ REVISED AVAILABLE PCT APPROP ADJSTMTS BUDGET YTD ACTUAL ENCUMBRANCES BUDGET USE/COL 01-8160-00-50443 Equipment Repair & Maintenance 100,000 0 100,000 1,184.25 22,501.25 76,314.50 23.7% 01-8160-00-50445 Repair and Maintenance 5,000 0 5,000 .00 .00 5,000.00 .0% 01-8160-00-50492 Tires 55,550 0 55,550 .00 .00 55,550.00 .0% TOTAL Sanitation 2,611,843 0 2,611,843 6,698.09 23,527.92 2,581,616.99 1.2% 01816100 Recycling 01-8161-00-50200 Equipment 30,000 0 30,000 .00 .00 30,000.00 .0% 01-8161-00-50425 General Lia, Fire & Theft Cons 10,000 0 10,000 .00 .00 10,000.00 .0% 01-8161-00-50428 Recycling Collection 870,000 0 870,000 .00 3,000.00 867,000.00 .3% 01-8161-00-50429 Television Disposal 3,000 0 3,000 .00 66.00 2,934.00 2.2% 01-8161-00-50448 Print, Literature and Other 1,000 0 1,000 .00 .00 1,000.00 .0% TOTAL Recycling 914,000 0 914,000 .00 3,066.00 910,934.00 .3% 01854000 Drainage 01-8540-00-50421 Electricity 2,101 0 2,101 .00 .00 2,101.00 .0% 01-8540-00-50498 Culvt, Pipe, Lumber, Sand, etc 20,000 0 20,000 .00 .00 20,000.00 .0% TOTAL Drainage 22,101 0 22,101 .00 .00 22,101.00 .0% 01856000 Tree Maintenance 01-8560-00-50415 Other Contractual Expenses 4,000 0 4,000 .00 .00 4,000.00 .0% 01-8560-00-50485 Consultant and Replacement 34,000 0 34,000 .00 .00 34,000.00 .0% Report generated: 01/22/2026 09:55 Page 24 User: smith Program ID: glytdbud Page 257 of 301

Page 258

Munis Production Database YEAR-TO-DATE BUDGET REPORT FOR 2026 01 ORIGINAL TRANFRS/ REVISED AVAILABLE PCT APPROP ADJSTMTS BUDGET YTD ACTUAL ENCUMBRANCES BUDGET USE/COL TOTAL Tree Maintenance 38,000 0 38,000 .00 .00 38,000.00 .0% 01876000 Disaster Preparedness 01-8760-00-50100 Salaries of Department Heads 11,000 0 11,000 230.77 .00 10,769.23 2.1% 01-8760-00-50111 Salaries of Ast Disaster Cord 2,500 0 2,500 .00 .00 2,500.00 .0% 01-8760-00-50200 Equipment 1,000 0 1,000 .00 .00 1,000.00 .0% 01-8760-00-50207 Disaster Preparedness Vehicle 1,000 0 1,000 .00 .00 1,000.00 .0% 01-8760-00-50414 Continuing Edu and Training 500 0 500 .00 .00 500.00 .0% 01-8760-00-50415 Other Contractual Expenses 500 0 500 .00 .00 500.00 .0% 01-8760-00-50416 Gasoline 400 0 400 .00 .00 400.00 .0% 01-8760-00-50438 Disaster Prep Mass Notif Sys 25,000 0 25,000 .00 .00 25,000.00 .0% 01-8760-00-50443 Equipment Repair & Maintenance 500 0 500 .00 .00 500.00 .0% TOTAL Disaster Preparedness 42,400 0 42,400 230.77 .00 42,169.23 .5% 01901000 State Retirement 01-9010-00-50801 State Retirement 1,100,000 0 1,100,000 .00 .00 1,100,000.00 .0% 01-9010-00-50826 Retirement Benefits 225,000 0 225,000 .00 .00 225,000.00 .0% TOTAL State Retirement 1,325,000 0 1,325,000 .00 .00 1,325,000.00 .0% 01901500 Police & Fire Retirement 01-9015-00-50825 Police Retirement 2,654,416 0 2,654,416 .00 .00 2,654,416.00 .0% Report generated: 01/22/2026 09:55 Page 25 User: smith Program ID: glytdbud Page 258 of 301

Page 259

Munis Production Database YEAR-TO-DATE BUDGET REPORT FOR 2026 01 ORIGINAL TRANFRS/ REVISED AVAILABLE PCT APPROP ADJSTMTS BUDGET YTD ACTUAL ENCUMBRANCES BUDGET USE/COL 01-9015-00-50826 Retirement Benefits 300,000 0 300,000 .00 .00 300,000.00 .0% TOTAL Police & Fire Retirement 2,954,416 0 2,954,416 .00 .00 2,954,416.00 .0% 01903000 Social Security 01-9030-00-50802 Social Security 1,166,434 0 1,166,434 14,933.32 .00 1,151,500.68 1.3% TOTAL Social Security 1,166,434 0 1,166,434 14,933.32 .00 1,151,500.68 1.3% 01904000 Workers' Compensation Insuranc 01-9040-00-50803 Workers' Comp Insurance 400,000 0 400,000 .00 .00 400,000.00 .0% TOTAL Workers' Compensation Insuranc 400,000 0 400,000 .00 .00 400,000.00 .0% 01906000 Hospital & Medical Insurance 01-9060-00-50807 Hospital & Medical Insurance 4,126,012 0 4,126,012 3,250.02 .00 4,122,761.98 .1% TOTAL Hospital & Medical Insurance 4,126,012 0 4,126,012 3,250.02 .00 4,122,761.98 .1% 01907000 Unemployment Insurance 01-9070-00-50805 Unemployment Insurance 6,335 0 6,335 .00 .00 6,335.00 .0% TOTAL Unemployment Insurance 6,335 0 6,335 .00 .00 6,335.00 .0% 01908000 Health & Welfare Insurance 01-9080-00-50804 Health & Welfare Insurance 238,594 0 238,594 .00 .00 238,594.00 .0% Report generated: 01/22/2026 09:55 Page 26 User: smith Program ID: glytdbud Page 259 of 301

Page 260

Munis Production Database YEAR-TO-DATE BUDGET REPORT FOR 2026 01 ORIGINAL TRANFRS/ REVISED AVAILABLE PCT APPROP ADJSTMTS BUDGET YTD ACTUAL ENCUMBRANCES BUDGET USE/COL TOTAL Health & Welfare Insurance 238,594 0 238,594 .00 .00 238,594.00 .0% 01908200 Employee Assistance Program 01-9082-00-50806 Employee Assistance Program 8,848 0 8,848 1,555.00 .00 7,293.00 17.6% TOTAL Employee Assistance Program 8,848 0 8,848 1,555.00 .00 7,293.00 17.6% 01908900 Other Employee Benefits 01-9089-00-50820 Work Boot Allowance 7,002 0 7,002 .00 .00 7,002.00 .0% TOTAL Other Employee Benefits 7,002 0 7,002 .00 .00 7,002.00 .0% 01971000 Serial Bonds 01-9710-00-50910 Principal 510,000 0 510,000 .00 .00 510,000.00 .0% 01-9710-00-50911 Interest 279,275 0 279,275 139,637.63 .00 139,637.37 50.0% TOTAL Serial Bonds 789,275 0 789,275 139,637.63 .00 649,637.37 17.7% 01971100 Bond Anticipation Notes 01-9711-00-50910 Principal 48,108 0 48,108 .00 .00 48,108.00 .0% 01-9711-00-50911 Interest 37,000 0 37,000 .00 .00 37,000.00 .0% TOTAL Bond Anticipation Notes 85,108 0 85,108 .00 .00 85,108.00 .0% 01978500 Energy Performance Contract I 01-9785-00-50910 Principal 271,352 0 271,352 .00 .00 271,352.00 .0% Report generated: 01/22/2026 09:55 Page 27 User: smith Program ID: glytdbud Page 260 of 301

Page 261

Munis Production Database YEAR-TO-DATE BUDGET REPORT FOR 2026 01 ORIGINAL TRANFRS/ REVISED AVAILABLE PCT APPROP ADJSTMTS BUDGET YTD ACTUAL ENCUMBRANCES BUDGET USE/COL 01-9785-00-50911 Interest 17,718 0 17,718 .00 .00 17,718.00 .0% TOTAL Energy Performance Contract I 289,070 0 289,070 .00 .00 289,070.00 .0% 01978600 Energy Performance Contract II 01-9786-00-50910 Principal 463,430 0 463,430 109,596.55 .00 353,833.45 23.6% 01-9786-00-50911 Interest 37,278 0 37,278 10,328.64 .00 26,949.36 27.7% TOTAL Energy Performance Contract II 500,708 0 500,708 119,925.19 .00 380,782.81 24.0% 01995000 Interfund Transfers 01-9950-00-50975 Interfund Transfers 200,000 0 200,000 .00 .00 200,000.00 .0% TOTAL Interfund Transfers 200,000 0 200,000 .00 .00 200,000.00 .0% TOTAL General Fund 2,450,000 0 2,450,000 536,471.60 175,624.37 1,737,904.03 29.1% TOTAL REVENUES -32,486,347 0 -32,486,347 .00 .00 -32,486,347.00 TOTAL EXPENSES 34,936,347 0 34,936,347 536,471.60 175,624.37 34,224,251.03 02 Highway Fund 02000200 Highway Fund 02-0002-00-41001 Real Property Taxes -11,813,849 0 -11,813,849 .00 .00 -11,813,849.00 .0% 02-0002-00-41789 Other Trans -220,000 0 -220,000 .00 .00 -220,000.00 .0% 02-0002-00-42300 Services for Other Governments -120,000 0 -120,000 .00 .00 -120,000.00 .0% 02-0002-00-42401 Interest Earnings -150,000 0 -150,000 .00 .00 -150,000.00 .0% Report generated: 01/22/2026 09:55 Page 28 User: smith Program ID: glytdbud Page 261 of 301

Page 262

Munis Production Database YEAR-TO-DATE BUDGET REPORT FOR 2026 01 ORIGINAL TRANFRS/ REVISED AVAILABLE PCT 02 Highway Fund APPROP ADJSTMTS BUDGET YTD ACTUAL ENCUMBRANCES BUDGET USE/COL 02-0002-00-42650 Sale of Scrap & Ex Material -2,000 0 -2,000 .00 .00 -2,000.00 .0% 02-0002-00-42801 Interfund Revenue -1,244,355 0 -1,244,355 .00 .00 -1,244,355.00 .0% TOTAL Highway Fund -13,550,204 0 -13,550,204 .00 .00 -13,550,204.00 .0% 02511000 General Repairs 02-5110-00-50110 Salaries of Crew Chief 82,541 0 82,541 .00 .00 82,541.00 .0% 02-5110-00-50115 Salaries of Working Crew Chief 320,650 0 320,650 .00 .00 320,650.00 .0% 02-5110-00-50144 Salaries of Laborers 3,246,290 0 3,246,290 42,258.35 1,026.66 3,203,004.99 1.3% 02-5110-00-50145 Salaries of Laborers - PT 35,000 0 35,000 127.50 .00 34,872.50 .4% 02-5110-00-50197 Longevity and Incentives 73,096 0 73,096 .00 .00 73,096.00 .0% 02-5110-00-50199 OVERTIME 445,000 0 445,000 .00 .00 445,000.00 .0% 02-5110-00-50200 Equipment 550,000 0 550,000 59,083.11 .00 490,916.89 10.7% 02-5110-00-50416 Gasoline 490,000 0 490,000 18,203.50 221,796.50 250,000.00 49.0% 02-5110-00-50419 Contractual Expenses 9,000 0 9,000 178.33 .00 8,821.67 2.0% 02-5110-00-50430 Pool Cars - Engineering 1,000 0 1,000 .00 .00 1,000.00 .0% 02-5110-00-50431 Pool Cars - Building & Plumb 1,000 0 1,000 .00 .00 1,000.00 .0% 02-5110-00-50455 Guard Rail & Curbing Repairs 28,000 0 28,000 .00 .00 28,000.00 .0% 02-5110-00-50496 Highway Towing 3,000 0 3,000 .00 .00 3,000.00 .0% 02-5110-00-50497 Blacktop Paving 600,000 0 600,000 .00 .00 600,000.00 .0% 02-5110-00-50498 Culvert, Pipe, Lumber, Sand 25,000 0 25,000 .00 .00 25,000.00 .0% 02-5110-00-50499 Stone, Gravel, Road Sur Treat 23,000 0 23,000 .00 1,678.62 21,321.38 7.3% TOTAL General Repairs 5,932,577 0 5,932,577 119,850.79 224,501.78 5,588,224.43 5.8% Report generated: 01/22/2026 09:55 Page 29 User: smith Program ID: glytdbud Page 262 of 301

Page 263

Munis Production Database YEAR-TO-DATE BUDGET REPORT FOR 2026 01 ORIGINAL TRANFRS/ REVISED AVAILABLE PCT APPROP ADJSTMTS BUDGET YTD ACTUAL ENCUMBRANCES BUDGET USE/COL 02513000 Machinery 02-5130-00-50115 Salaries of Working Crew Chief 80,552 0 80,552 1,454.12 .00 79,097.88 1.8% 02-5130-00-50116 Salaries of Auto Mechanics 238,406 0 238,406 5,921.95 .00 232,484.05 2.5% 02-5130-00-50197 Longevity and Incentives 7,585 0 7,585 .00 .00 7,585.00 .0% 02-5130-00-50199 OVERTIME 55,000 0 55,000 .00 .00 55,000.00 .0% 02-5130-00-50200 Equipment 5,000 0 5,000 .00 .00 5,000.00 .0% 02-5130-00-50441 Equipment Rental 5,000 0 5,000 .00 .00 5,000.00 .0% 02-5130-00-50445 Repair and Maintenance 120,000 0 120,000 .00 .00 120,000.00 .0% 02-5130-00-50492 Tires 50,000 0 50,000 .00 .00 50,000.00 .0% 02-5130-00-50493 Parts 280,000 0 280,000 4,351.98 49,527.33 226,120.69 19.2% TOTAL Machinery 841,543 0 841,543 11,728.05 49,527.33 780,287.62 7.3% 02514000 Snow and Miscellaneous 02-5140-00-50433 Rugs 1,000 0 1,000 .00 .00 1,000.00 .0% 02-5140-00-50481 Chemical Sprays, Weed & Brush 1,000 0 1,000 .00 .00 1,000.00 .0% 02-5140-00-50482 Interfund Transfer 352,000 0 352,000 .00 .00 352,000.00 .0% 02-5140-00-50487 Insurance Charges 265,000 0 265,000 .00 .00 265,000.00 .0% 02-5140-00-50488 Coveralls & Rain Gear 2,500 0 2,500 .00 .00 2,500.00 .0% 02-5140-00-50489 Tool House Supplies 15,000 0 15,000 396.24 .00 14,603.76 2.6% TOTAL Snow and Miscellaneous 636,500 0 636,500 396.24 .00 636,103.76 .1% 02514200 Snow Removal - Town Highways 02-5142-00-50483 Salt and Chemicals Report generated: 01/22/2026 09:55 Page 30 User: smith Program ID: glytdbud Page 263 of 301

Page 264

Munis Production Database YEAR-TO-DATE BUDGET REPORT FOR 2026 01 ORIGINAL TRANFRS/ REVISED AVAILABLE PCT APPROP ADJSTMTS BUDGET YTD ACTUAL ENCUMBRANCES BUDGET USE/COL 350,000 0 350,000 24,206.16 6,239.66 319,554.18 8.7% TOTAL Snow Removal - Town Highways 350,000 0 350,000 24,206.16 6,239.66 319,554.18 8.7% 02514800 Services for Other Governments 02-5148-00-50416 Gasoline 27,000 0 27,000 .00 27,000.00 .00 100.0% TOTAL Services for Other Governments 27,000 0 27,000 .00 27,000.00 .00 100.0% 02901000 State Retirement 02-9010-00-50801 State Retirement 750,000 0 750,000 .00 .00 750,000.00 .0% TOTAL State Retirement 750,000 0 750,000 .00 .00 750,000.00 .0% 02903000 Social Security 02-9030-00-50802 Social Security 348,502 0 348,502 3,785.88 .00 344,716.12 1.1% TOTAL Social Security 348,502 0 348,502 3,785.88 .00 344,716.12 1.1% 02904000 Workers' Compensation Insuranc 02-9040-00-50803 Workers' Comp Insurance 800,000 0 800,000 .00 .00 800,000.00 .0% TOTAL Workers' Compensation Insuranc 800,000 0 800,000 .00 .00 800,000.00 .0% 02906000 Hospital & Medical Insurance 02-9060-00-50807 Hospital & Medical Insurance 2,063,006 0 2,063,006 .00 .00 2,063,006.00 .0% Report generated: 01/22/2026 09:55 Page 31 User: smith Program ID: glytdbud Page 264 of 301

Page 265

Munis Production Database YEAR-TO-DATE BUDGET REPORT FOR 2026 01 ORIGINAL TRANFRS/ REVISED AVAILABLE PCT APPROP ADJSTMTS BUDGET YTD ACTUAL ENCUMBRANCES BUDGET USE/COL TOTAL Hospital & Medical Insurance 2,063,006 0 2,063,006 .00 .00 2,063,006.00 .0% 02908000 Health & Welfare Insurance 02-9080-00-50804 Health & Welfare Insurance 98,100 0 98,100 .00 .00 98,100.00 .0% TOTAL Health & Welfare Insurance 98,100 0 98,100 .00 .00 98,100.00 .0% 02908900 Other Employee Benefits 02-9089-00-50820 Work Boot Allowance 9,625 0 9,625 .00 .00 9,625.00 .0% 02-9089-00-50821 Mechanic Clothing 6,000 0 6,000 212.86 6,787.14 -1,000.00 116.7% TOTAL Other Employee Benefits 15,625 0 15,625 212.86 6,787.14 8,625.00 44.8% 02971000 Serial Bonds 02-9710-00-50910 Principal 1,625,000 0 1,625,000 .00 .00 1,625,000.00 .0% 02-9710-00-50911 Interest 242,505 0 242,505 106,556.25 .00 135,948.75 43.9% TOTAL Serial Bonds 1,867,505 0 1,867,505 106,556.25 .00 1,760,948.75 5.7% 02971100 Bond Anticipation Notes 02-9711-00-50910 Principal 140,000 0 140,000 .00 .00 140,000.00 .0% 02-9711-00-50911 Interest 129,846 0 129,846 .00 .00 129,846.00 .0% TOTAL Bond Anticipation Notes 269,846 0 269,846 .00 .00 269,846.00 .0% Report generated: 01/22/2026 09:55 Page 32 User: smith Program ID: glytdbud Page 265 of 301

Page 266

Munis Production Database YEAR-TO-DATE BUDGET REPORT FOR 2026 01 ORIGINAL TRANFRS/ REVISED AVAILABLE PCT APPROP ADJSTMTS BUDGET YTD ACTUAL ENCUMBRANCES BUDGET USE/COL TOTAL Highway Fund 450,000 0 450,000 266,736.23 314,055.91 -130,792.14 129.1% TOTAL REVENUES -13,550,204 0 -13,550,204 .00 .00 -13,550,204.00 TOTAL EXPENSES 14,000,204 0 14,000,204 266,736.23 314,055.91 13,419,411.86 03 Capital Projects Fund 03000000 Capital Projects 03-0000-00-42401 Interest Earnings 0 0 0 -212,591.12 .00 212,591.12 100.0% TOTAL Capital Projects 0 0 0 -212,591.12 .00 212,591.12 100.0% 03000012 Sanitaiton Trucks 03-0000-12-42710 Premium on Obligations 0 0 0 -349.88 .00 349.88 100.0% 03-0000-12-45031 Interfund Transfers In 0 0 0 -288,000.00 .00 288,000.00 100.0% TOTAL Sanitaiton Trucks 0 0 0 -288,349.88 .00 288,349.88 100.0% 03000304 Sanitary Sewer Project 03-0003-04-43089 State Aid - General Gov Aid 0 0 0 -5,362,658.47 .00 5,362,658.47 100.0% 03-0003-04-50910 Principal 0 0 0 3,274,175.69 .00 -3,274,175.69 100.0% TOTAL Sanitary Sewer Project 0 0 0 -2,088,482.78 .00 2,088,482.78 100.0% 03000306 CCL Project 03-0003-06-43089 State Aid - General Gov Aid 0 0 0 -592,467.88 .00 592,467.88 100.0% Report generated: 01/22/2026 09:55 Page 33 User: smith Program ID: glytdbud Page 266 of 301

Page 267

Munis Production Database YEAR-TO-DATE BUDGET REPORT FOR 2026 01 ORIGINAL TRANFRS/ REVISED AVAILABLE PCT APPROP ADJSTMTS BUDGET YTD ACTUAL ENCUMBRANCES BUDGET USE/COL TOTAL CCL Project 0 0 0 -592,467.88 .00 592,467.88 100.0% 03000308 Seneca Place Project 03-0003-08-43089 State Aid - General Gov Aid 0 0 0 -100,000.00 .00 100,000.00 100.0% TOTAL Seneca Place Project 0 0 0 -100,000.00 .00 100,000.00 100.0% 03030001 Road Projects 03-0300-01-45031 Interfund Transfers 0 0 0 -56,400.00 .00 56,400.00 100.0% TOTAL Road Projects 0 0 0 -56,400.00 .00 56,400.00 100.0% 03030002 ECCDBG Street Projects 03-0300-02-42401 Interest Earnings 0 0 0 -9,001.26 .00 9,001.26 100.0% 03-0300-02-42710 Premium on Obligations 0 0 0 -575,017.56 .00 575,017.56 100.0% 03-0300-02-43089 State Aid - General Gov Aid 0 0 0 -50,000.00 .00 50,000.00 100.0% 03-0300-02-45031 Interfund Transfers 0 0 0 -1,035,000.00 .00 1,035,000.00 100.0% 03-0300-02-50451 Professional Services 0 0 0 51,582.44 .00 -51,582.44 100.0% 03-0300-02-50950 BAN Anticipation Note Interest 0 0 0 795,020.04 .00 -795,020.04 100.0% TOTAL ECCDBG Street Projects 0 0 0 -822,416.34 .00 822,416.34 100.0% 03030003 Sidewalk Replacement 03-0300-03-41563 SIDEWALK REPLACEMENT FEES 0 0 0 -96,386.98 .00 96,386.98 100.0% Report generated: 01/22/2026 09:55 Page 34 User: smith Program ID: glytdbud Page 267 of 301

Page 268

Munis Production Database YEAR-TO-DATE BUDGET REPORT FOR 2026 01 ORIGINAL TRANFRS/ REVISED AVAILABLE PCT APPROP ADJSTMTS BUDGET YTD ACTUAL ENCUMBRANCES BUDGET USE/COL TOTAL Sidewalk Replacement 0 0 0 -96,386.98 .00 96,386.98 100.0% 03030004 Sanitary Sewer Project 03-0300-04-42710 Premium on Obligations 0 0 0 -22,034.67 .00 22,034.67 100.0% TOTAL Sanitary Sewer Project 0 0 0 -22,034.67 .00 22,034.67 100.0% 03030005 Energy Performance Contract Ph 03-0300-05-42401 Interest Earnings 0 0 0 -1,812.67 .00 1,812.67 100.0% 03-0300-05-42710 Premium on Obligations 0 0 0 -114,794.00 .00 114,794.00 100.0% 03-0300-05-50950 BAN Anticipation Note Interest 0 0 0 17,736.00 .00 -17,736.00 100.0% TOTAL Energy Performance Contract Ph 0 0 0 -98,870.67 .00 98,870.67 100.0% 03030006 CCL Project 03-0300-06-42401 Interest Earnings 0 0 0 -.27 .00 .27 100.0% TOTAL CCL Project 0 0 0 -.27 .00 .27 100.0% 03030010 Town Hall/CCL Parking Lot 03-0300-10-43089 State Aid - Other General Gove -150,000 0 -150,000 -150,000.00 .00 .00 100.0% 03-0300-10-45031 Interfund Transfers In -150,000 0 -150,000 -127,463.90 .00 -22,536.10 85.0% TOTAL Town Hall/CCL Parking Lot -300,000 0 -300,000 -277,463.90 .00 -22,536.10 92.5% 03030011 Animal Shelther Rehab Report generated: 01/22/2026 09:55 Page 35 User: smith Program ID: glytdbud Page 268 of 301

Page 269

Munis Production Database YEAR-TO-DATE BUDGET REPORT FOR 2026 01 ORIGINAL TRANFRS/ REVISED AVAILABLE PCT APPROP ADJSTMTS BUDGET YTD ACTUAL ENCUMBRANCES BUDGET USE/COL 03-0300-11-43089 State Aid - Other General Gove 0 0 0 -117,657.00 .00 117,657.00 100.0% 03-0300-11-45031 Interfund Transfers In 0 0 0 -50,820.00 .00 50,820.00 100.0% TOTAL Animal Shelther Rehab 0 0 0 -168,477.00 .00 168,477.00 100.0% 03030013 Veterans' Park Pavilion 03-0300-13-43089 State Aid - Other General Gove 0 0 0 -127,082.28 .00 127,082.28 100.0% TOTAL Veterans' Park Pavilion 0 0 0 -127,082.28 .00 127,082.28 100.0% 03030014 Watermain Replacement 03-0300-14-42710 Premium on Obligations 0 0 0 -10,115.97 .00 10,115.97 100.0% 03-0300-14-45031 Interfund Transfers In -384,141 -56,029 -440,170 -440,169.00 .00 -1.00 100.0% 03-0300-14-50451 Professional Services 384,141 56,029 440,170 2,163,663.94 .00 -1,723,493.94 491.6% TOTAL Watermain Replacement 0 0 0 1,713,378.97 .00 -1,713,378.97 100.0% 03030015 Bike Track 03-0300-15-43089 State Aid - Other General Gove 0 0 0 -200,000.00 .00 200,000.00 100.0% 03-0300-15-45031 Interfund Transfers In 0 0 0 -198,271.06 .00 198,271.06 100.0% 03-0300-15-50451 Professional Services 0 0 0 398,271.06 .00 -398,271.06 100.0% TOTAL Bike Track 0 0 0 .00 .00 .00 .0% 03030016 Flow Metering Project 03-0300-16-45031 Interfund Transfers In -2,291,120 0 -2,291,120 -2,967,898.91 .00 676,778.91 129.5% Report generated: 01/22/2026 09:55 Page 36 User: smith Program ID: glytdbud Page 269 of 301

Page 270

Munis Production Database YEAR-TO-DATE BUDGET REPORT FOR 2026 01 ORIGINAL TRANFRS/ REVISED AVAILABLE PCT APPROP ADJSTMTS BUDGET YTD ACTUAL ENCUMBRANCES BUDGET USE/COL 03-0300-16-50451 Professional Services 2,291,120 0 2,291,120 3,213,737.24 .00 -922,617.24 140.3% TOTAL Flow Metering Project 0 0 0 245,838.33 .00 -245,838.33 100.0% 03030017 Fireman's Park 03-0300-17-42710 Premium on Obligations 0 0 0 -938.33 .00 938.33 100.0% 03-0300-17-45031 Interfund Transfers In -205,330 0 -205,330 -206,322.00 .00 992.00 100.5% 03-0300-17-50451 Professional Services 205,330 0 205,330 782,136.15 .00 -576,806.15 380.9% TOTAL Fireman's Park 0 0 0 574,875.82 .00 -574,875.82 100.0% 03030018 Manhole Repair 03-0300-18-45031 Interfund Transfers In -497,007 0 -497,007 -497,006.75 .00 -.25 100.0% 03-0300-18-50451 Professional Services 497,007 0 497,007 594,168.00 .00 -97,161.00 119.5% TOTAL Manhole Repair 0 0 0 97,161.25 .00 -97,161.25 100.0% 03030019 Highway Garage 03-0300-19-42650 Sale of Scrap & Excess Materia 0 0 0 -32,464.28 .00 32,464.28 100.0% 03-0300-19-42680 Insurance Recoveries 0 0 0 -6,599,720.22 .00 6,599,720.22 100.0% 03-0300-19-42710 Premium on Obligations 0 0 0 -2,600.00 .00 2,600.00 100.0% 03-0300-19-50200 Equipment 0 0 0 4,425,498.93 .00 -4,425,498.93 100.0% 03-0300-19-50443 Equipment Repair and Maintenan 0 0 0 138,364.50 310.76 -138,675.26 100.0% 03-0300-19-50445 Repair and Maintenance 0 0 0 2,070,492.89 100,761.54 -2,171,254.43 100.0% Report generated: 01/22/2026 09:55 Page 37 User: smith Program ID: glytdbud Page 270 of 301

Page 271

Munis Production Database YEAR-TO-DATE BUDGET REPORT FOR 2026 01 ORIGINAL TRANFRS/ REVISED AVAILABLE PCT APPROP ADJSTMTS BUDGET YTD ACTUAL ENCUMBRANCES BUDGET USE/COL 03-0300-19-50451 Professional Services 0 0 0 2,586,784.71 .00 -2,586,784.71 100.0% TOTAL Highway Garage 0 0 0 2,586,356.53 101,072.30 -2,687,428.83 100.0% 03030021 Water Sysstem Improvements WD8 03-0300-21-50451 Professional Services 0 0 0 1,507,701.25 .00 -1,507,701.25 100.0% TOTAL Water Sysstem Improvements WD8 0 0 0 1,507,701.25 .00 -1,507,701.25 100.0% 03131007 Accounting System - Finance 03-1310-07-50200 Equipment 0 0 0 287,258.08 .00 -287,258.08 100.0% TOTAL Accounting System - Finance 0 0 0 287,258.08 .00 -287,258.08 100.0% 03138005 Energy Performance Contract Ph 03-1380-05-50451 Professional Services 0 0 0 10,752.55 .00 -10,752.55 100.0% TOTAL Energy Performance Contract Ph 0 0 0 10,752.55 .00 -10,752.55 100.0% 03144003 Sidewalk Replacement - Enginee 03-1440-03-50200 Equipment 0 0 0 33,305.97 .00 -33,305.97 100.0% TOTAL Sidewalk Replacement - Enginee 0 0 0 33,305.97 .00 -33,305.97 100.0% 03144004 Sanitary Sewer Project 03-1440-04-45031 Interfund Transfers In -657,308 0 -657,308 -657,307.05 .00 -.95 100.0% Report generated: 01/22/2026 09:55 Page 38 User: smith Program ID: glytdbud Page 271 of 301

Page 272

Munis Production Database YEAR-TO-DATE BUDGET REPORT FOR 2026 01 ORIGINAL TRANFRS/ REVISED AVAILABLE PCT APPROP ADJSTMTS BUDGET YTD ACTUAL ENCUMBRANCES BUDGET USE/COL 03-1440-04-50200 Equipment 0 657,308 657,308 16,624,847.67 291,358.14 -16,258,897.81 2573.6% TOTAL Sanitary Sewer Project -657,308 657,308 0 15,967,540.62 291,358.14 -16,258,898.76 100.0% 03144006 CCL Project 03-1440-06-50200 Equipment 0 0 0 29,777.53 .00 -29,777.53 100.0% TOTAL CCL Project 0 0 0 29,777.53 .00 -29,777.53 100.0% 03198908 Seneca Place Project 03-1989-08-50200 Equipment 0 0 0 38,812.11 .00 -38,812.11 100.0% TOTAL Seneca Place Project 0 0 0 38,812.11 .00 -38,812.11 100.0% 03511001 Road Projects - Maintenance of 03-5110-01-50200 Equipment 0 0 0 56,400.00 .00 -56,400.00 100.0% TOTAL Road Projects - Maintenance of 0 0 0 56,400.00 .00 -56,400.00 100.0% 03511010 Town Hall/CCL Parking Lot 03-5110-10-50200 Equipment 300,000 0 300,000 277,463.90 .00 22,536.10 92.5% TOTAL Town Hall/CCL Parking Lot 300,000 0 300,000 277,463.90 .00 22,536.10 92.5% 03511011 Animal Shelter Rehab Project 03-5110-11-50200 Equipment 0 0 0 156,876.00 .00 -156,876.00 100.0% Report generated: 01/22/2026 09:55 Page 39 User: smith Program ID: glytdbud Page 272 of 301

Page 273

Munis Production Database YEAR-TO-DATE BUDGET REPORT FOR 2026 01 ORIGINAL TRANFRS/ REVISED AVAILABLE PCT APPROP ADJSTMTS BUDGET YTD ACTUAL ENCUMBRANCES BUDGET USE/COL TOTAL Animal Shelter Rehab Project 0 0 0 156,876.00 .00 -156,876.00 100.0% 03518203 Sidewalk Replacement 03-5182-03-50200 Street Lighting Equipment 0 0 0 1,597,385.90 .00 -1,597,385.90 100.0% TOTAL Sidewalk Replacement 0 0 0 1,597,385.90 .00 -1,597,385.90 100.0% 03710005 Energy Performance Contract Ph 03-7100-05-50200 C&R - Equipment 0 0 0 4,308,517.77 .00 -4,308,517.77 100.0% TOTAL Energy Performance Contract Ph 0 0 0 4,308,517.77 .00 -4,308,517.77 100.0% 03710006 CCL Project - Culture and Recr 03-7100-06-50200 C&R - Equipment 0 0 0 -793.00 .00 793.00 100.0% TOTAL CCL Project - Culture and Recr 0 0 0 -793.00 .00 793.00 100.0% 03711013 Veterans' Park Pavilion 03-7110-13-50200 Equipment 0 0 0 127,082.28 .00 -127,082.28 100.0% TOTAL Veterans' Park Pavilion 0 0 0 127,082.28 .00 -127,082.28 100.0% 03741003 Sidewalk Replacement 03-7410-03-50200 CCL Equipment 0 0 0 1,139,178.53 .00 -1,139,178.53 100.0% Report generated: 01/22/2026 09:55 Page 40 User: smith Program ID: glytdbud Page 273 of 301

Page 274

Munis Production Database YEAR-TO-DATE BUDGET REPORT FOR 2026 01 ORIGINAL TRANFRS/ REVISED AVAILABLE PCT APPROP ADJSTMTS BUDGET YTD ACTUAL ENCUMBRANCES BUDGET USE/COL TOTAL Sidewalk Replacement 0 0 0 1,139,178.53 .00 -1,139,178.53 100.0% 03741005 Energy Performance Contract Ph 03-7410-05-50200 Library - Equipment 0 0 0 4,189,137.91 .00 -4,189,137.91 100.0% TOTAL Energy Performance Contract Ph 0 0 0 4,189,137.91 .00 -4,189,137.91 100.0% 03742000 Burchfield Reno 03-7420-00-42705 Gifts and Donations 0 0 0 -1,500.00 .00 1,500.00 100.0% 03-7420-00-43089 State Aid - Other General Gove 0 0 0 -26,070.95 .00 26,070.95 100.0% 03-7420-00-50200 Equipment 0 0 0 15,066.27 .00 -15,066.27 100.0% 03-7420-00-50445 Repair and Maintenance 0 0 0 52,556.86 .00 -52,556.86 100.0% 03-7420-00-50451 Professional Services 0 0 0 68,328.70 .00 -68,328.70 100.0% TOTAL Burchfield Reno 0 0 0 108,380.88 .00 -108,380.88 100.0% 03810002 ECCDBG Street Projects 03-8100-02-50200 Equipment 0 0 0 3,060,010.28 .00 -3,060,010.28 100.0% TOTAL ECCDBG Street Projects 0 0 0 3,060,010.28 .00 -3,060,010.28 100.0% 03816012 Sanitation Trucks 03-8160-12-50200 Equipment 0 0 0 357,426.00 .00 -357,426.00 100.0% Report generated: 01/22/2026 09:55 Page 41 User: smith Program ID: glytdbud Page 274 of 301

Page 275

Munis Production Database YEAR-TO-DATE BUDGET REPORT FOR 2026 01 ORIGINAL TRANFRS/ REVISED AVAILABLE PCT APPROP ADJSTMTS BUDGET YTD ACTUAL ENCUMBRANCES BUDGET USE/COL TOTAL Sanitation Trucks 0 0 0 357,426.00 .00 -357,426.00 100.0% TOTAL Capital Projects Fund -657,308 657,308 0 33,518,801.69 392,430.44 -33,911,232.13 100.0% TOTAL REVENUES -4,334,906 -56,029 -4,390,935 -19,838,522.46 .00 15,447,587.46 TOTAL EXPENSES 3,677,598 713,337 4,390,935 53,357,324.15 392,430.44 -49,358,819.59 05 Sanitary Sewer Fund 05050000 SD 05-0500-00-42113 Revenue District 13 -4,137,778 0 -4,137,778 .00 .00 -4,137,778.00 .0% 05-0500-00-50117 SD.Sal of Lift Stat Maint Crew 227,500 0 227,500 3,925.06 .00 223,574.94 1.7% 05-0500-00-50118 SD.Sal of SS Maint Crew 223,288 0 223,288 2,045.13 .00 221,242.87 .9% 05-0500-00-50144 SD Salaries of Sewer Crew-Eng 75,000 0 75,000 .00 .00 75,000.00 .0% 05-0500-00-50199 OVERTIME 200,000 0 200,000 .00 .00 200,000.00 .0% 05-0500-00-50200 Equipment 8,000 0 8,000 .00 .00 8,000.00 .0% 05-0500-00-50416 SD.Gasoline 28,000 0 28,000 .00 .00 28,000.00 .0% 05-0500-00-50419 SD.Supplies 20,000 0 20,000 .00 242.87 19,757.13 1.2% 05-0500-00-50420 SD.Utilities 8,000 0 8,000 238.99 .00 7,761.01 3.0% 05-0500-00-50443 SD.Equipment Repair & Maint 12,000 0 12,000 .00 .00 12,000.00 .0% 05-0500-00-50445 SD.Repair and Maintenance 235,000 0 235,000 .00 .00 235,000.00 .0% 05-0500-00-50511 SD.Alloc of Gen Fund Costs 1,386,291 0 1,386,291 .00 .00 1,386,291.00 .0% 05-0500-00-50512 SD.Alloc of Highway Fund Costs 1,244,355 0 1,244,355 .00 .00 1,244,355.00 .0% 05-0500-00-50801 SD.State Retirement 111,059 0 111,059 .00 .00 111,059.00 .0% 05-0500-00-50802 SD.Social Security 40,349 0 40,349 455.29 .00 39,893.71 1.1% Report generated: 01/22/2026 09:55 Page 42 User: smith Program ID: glytdbud Page 275 of 301

Page 276

Munis Production Database YEAR-TO-DATE BUDGET REPORT FOR 2026 01 ORIGINAL TRANFRS/ REVISED AVAILABLE PCT 05 Sanitary Sewer Fund APPROP ADJSTMTS BUDGET YTD ACTUAL ENCUMBRANCES BUDGET USE/COL 05-0500-00-50803 SD.Workers' Comp Insurance 16,000 0 16,000 .00 .00 16,000.00 .0% 05-0500-00-50804 SD.Health & Welfare Insurance 11,100 0 11,100 .00 .00 11,100.00 .0% 05-0500-00-50807 SD.Hospital & Medical Ins 281,200 0 281,200 .00 .00 281,200.00 .0% 05-0500-00-50808 SD.Medicare 9,436 0 9,436 .00 .00 9,436.00 .0% 05-0500-00-50820 SD.Work Boot Allowance 1,200 0 1,200 .00 .00 1,200.00 .0% TOTAL SD 0 0 0 6,664.47 242.87 -6,907.34 100.0% 05050100 SD 1 05-0501-00-41001 SD 1.Real Property Taxes -180,028 0 -180,028 .00 .00 -180,028.00 .0% 05-0501-00-50597 SD 1.Sewer Depart Allocation 97,948 0 97,948 .00 .00 97,948.00 .0% 05-0501-00-50960 SD 1.EPC - Principal 10,401 0 10,401 .00 .00 10,401.00 .0% 05-0501-00-50970 SD 1.EPC - Interest 679 0 679 .00 .00 679.00 .0% 05-0501-00-51486 SD 1.BSA Charge 71,000 0 71,000 .00 .00 71,000.00 .0% TOTAL SD 1 0 0 0 .00 .00 .00 .0% 05050200 SD 2 05-0502-00-41001 SD 2.Real Property Taxes -77,577 0 -77,577 .00 .00 -77,577.00 .0% 05-0502-00-50597 SD 2.Sewer Depart Allocation 38,256 0 38,256 .00 .00 38,256.00 .0% 05-0502-00-50908 SD 2.Appropriated Fund Balance 6,000 0 6,000 .00 .00 6,000.00 .0% 05-0502-00-50960 SD 2.EPC - Principal 4,056 0 4,056 .00 .00 4,056.00 .0% 05-0502-00-50970 SD 2.EPC - Interest 265 0 265 .00 .00 265.00 .0% Report generated: 01/22/2026 09:55 Page 43 User: smith Program ID: glytdbud Page 276 of 301

Page 277

Munis Production Database YEAR-TO-DATE BUDGET REPORT FOR 2026 01 ORIGINAL TRANFRS/ REVISED AVAILABLE PCT APPROP ADJSTMTS BUDGET YTD ACTUAL ENCUMBRANCES BUDGET USE/COL 05-0502-00-51486 SD 2.BSA Charge 29,000 0 29,000 .00 .00 29,000.00 .0% TOTAL SD 2 0 0 0 .00 .00 .00 .0% 05050300 SD 3 05-0503-00-41001 SD 3.Real Property Taxes -22,487 0 -22,487 .00 .00 -22,487.00 .0% 05-0503-00-50597 SD 3.Sewer Depart Allocation 5,852 0 5,852 .00 .00 5,852.00 .0% 05-0503-00-50960 SD 3.EPC - Principal 596 0 596 .00 .00 596.00 .0% 05-0503-00-50970 SD 3.EPC - Interest 39 0 39 .00 .00 39.00 .0% 05-0503-00-51486 SD 3.BSA Charge 16,000 0 16,000 .00 .00 16,000.00 .0% TOTAL SD 3 0 0 0 .00 .00 .00 .0% 05050400 SD 4 05-0504-00-41001 SD 4.Real Property Taxes -62,096 0 -62,096 .00 .00 -62,096.00 .0% 05-0504-00-50597 SD 4.Sewer Depart Allocation 17,572 0 17,572 .00 .00 17,572.00 .0% 05-0504-00-50960 SD 4.EPC - Principal 1,732 0 1,732 .00 .00 1,732.00 .0% 05-0504-00-50970 SD 4.EPC - Interest 113 0 113 .00 .00 113.00 .0% 05-0504-00-51486 SD 4.BSA Charge 23,000 0 23,000 .00 .00 23,000.00 .0% 05-0504-00-51487 SD 4.Rent Payable to SD 6 24,679 0 24,679 .00 .00 24,679.00 .0% TOTAL SD 4 5,000 0 5,000 .00 .00 5,000.00 .0% 05050500 SD 5 05-0505-00-41001 SD 5.Real Property Taxes -278,480 0 -278,480 .00 .00 -278,480.00 .0% Report generated: 01/22/2026 09:55 Page 44 User: smith Program ID: glytdbud Page 277 of 301

Page 278

Munis Production Database YEAR-TO-DATE BUDGET REPORT FOR 2026 01 ORIGINAL TRANFRS/ REVISED AVAILABLE PCT APPROP ADJSTMTS BUDGET YTD ACTUAL ENCUMBRANCES BUDGET USE/COL 05-0505-00-42101 SD 5.Rev Covington & Slade Ext -384,308 0 -384,308 .00 .00 -384,308.00 .0% 05-0505-00-42113 SD 5.Revenue District 13 -66,945 0 -66,945 .00 .00 -66,945.00 .0% 05-0505-00-50513 SD 5.Operation of Plant 10,000 0 10,000 .00 .00 10,000.00 .0% 05-0505-00-50515 SD 5.Operation of Lift Station 13,000 0 13,000 .00 .00 13,000.00 .0% 05-0505-00-50518 SD 5.Rental Pay for RR Ease 600 0 600 .00 .00 600.00 .0% 05-0505-00-50597 SD 5.Sewer Dept Allocation 316,692 0 316,692 .00 .00 316,692.00 .0% 05-0505-00-50908 SD 5.Appropriated Fund Balance 80 0 80 .00 .00 80.00 .0% 05-0505-00-50910 Principal 21,262 0 21,262 .00 .00 21,262.00 .0% 05-0505-00-50911 Interest 17,022 0 17,022 8,531.70 .00 8,490.30 50.1% 05-0505-00-50940 SD 5.BAN - Principal 15,293 0 15,293 .00 .00 15,293.00 .0% 05-0505-00-50950 SD 5.BAN - Interest 18,610 0 18,610 .00 .00 18,610.00 .0% 05-0505-00-50960 SD 5.EPC - Principal 14,499 0 14,499 .00 .00 14,499.00 .0% 05-0505-00-50970 SD 5.EPC - Interest 947 0 947 .00 .00 947.00 .0% 05-0505-00-51488 SD 5.Rent Payable to SD 13 301,728 0 301,728 .00 .00 301,728.00 .0% TOTAL SD 5 0 0 0 8,531.70 .00 -8,531.70 100.0% 05050600 SD 6 05-0506-00-41001 SD 6.Real Property Taxes -772,230 0 -772,230 .00 .00 -772,230.00 .0% 05-0506-00-42102 SD 6.Revenue EC District 1 -101,098 0 -101,098 .00 .00 -101,098.00 .0% 05-0506-00-42104 SD 6.Revenue District 4 -24,679 0 -24,679 .00 .00 -24,679.00 .0% 05-0506-00-42107 SD 6.Revenue District 7 -113,742 0 -113,742 .00 .00 -113,742.00 .0% 05-0506-00-42108 SD 6.Revenue District 8 -253,955 0 -253,955 .00 .00 -253,955.00 .0% Report generated: 01/22/2026 09:55 Page 45 User: smith Program ID: glytdbud Page 278 of 301

Page 279

Munis Production Database YEAR-TO-DATE BUDGET REPORT FOR 2026 01 ORIGINAL TRANFRS/ REVISED AVAILABLE PCT APPROP ADJSTMTS BUDGET YTD ACTUAL ENCUMBRANCES BUDGET USE/COL 05-0506-00-42111 SD 6.Revenue District 11 -12,976 0 -12,976 .00 .00 -12,976.00 .0% 05-0506-00-50495 Erie County Chargebacks 1,000 0 1,000 .00 .00 1,000.00 .0% 05-0506-00-50514 SD 6.Operation of Ret Facility 35,000 0 35,000 120.00 .00 34,880.00 .3% 05-0506-00-50518 SD 6.Rental Pay for RR Ease 300 0 300 .00 .00 300.00 .0% 05-0506-00-50597 SD 6.Sewer Dept Allocation 363,955 0 363,955 .00 .00 363,955.00 .0% 05-0506-00-50599 SD 6.Rent Pay to ECSD No. 4 836,000 0 836,000 .00 .00 836,000.00 .0% 05-0506-00-50960 SD 6.EPC - Principal 39,825 0 39,825 .00 .00 39,825.00 .0% 05-0506-00-50970 SD 6.EPC - Interest 2,600 0 2,600 .00 .00 2,600.00 .0% TOTAL SD 6 0 0 0 120.00 .00 -120.00 100.0% 05050700 SD 7 05-0507-00-41001 SD 7.Real Property Taxes -172,280 0 -172,280 .00 .00 -172,280.00 .0% 05-0507-00-50597 SD 7.Sewer Dept Allocation 50,819 0 50,819 .00 .00 50,819.00 .0% 05-0507-00-50960 SD 7.EPC - Principal 5,368 0 5,368 .00 .00 5,368.00 .0% 05-0507-00-50970 SD 7.EPC - Interest 351 0 351 .00 .00 351.00 .0% 05-0507-00-51487 SD 7.Rent Payable to SD 6 113,742 0 113,742 .00 .00 113,742.00 .0% TOTAL SD 7 -2,000 0 -2,000 .00 .00 -2,000.00 .0% 05050800 SD 8 05-0508-00-41001 SD 8.Real Property Taxes -500,908 0 -500,908 .00 .00 -500,908.00 .0% 05-0508-00-50597 SD 8.Sewer Dept Allocation 215,358 0 215,358 .00 .00 215,358.00 .0% Report generated: 01/22/2026 09:55 Page 46 User: smith Program ID: glytdbud Page 279 of 301

Page 280

Munis Production Database YEAR-TO-DATE BUDGET REPORT FOR 2026 01 ORIGINAL TRANFRS/ REVISED AVAILABLE PCT APPROP ADJSTMTS BUDGET YTD ACTUAL ENCUMBRANCES BUDGET USE/COL 05-0508-00-50908 SD 8.Appropriated Fund Balance 5,000 0 5,000 .00 .00 5,000.00 .0% 05-0508-00-50960 SD 8.EPC - Principal 24,965 0 24,965 .00 .00 24,965.00 .0% 05-0508-00-50970 SD 8.EPC - Interest 1,630 0 1,630 .00 .00 1,630.00 .0% 05-0508-00-51487 SD 8.Rent Payable to SD 6 253,955 0 253,955 .00 .00 253,955.00 .0% TOTAL SD 8 0 0 0 .00 .00 .00 .0% 05050900 SD 9 05-0509-00-41001 SD 9.Real Property Taxes -38,999 0 -38,999 .00 .00 -38,999.00 .0% 05-0509-00-50597 SD 9.Sewer Dept Allocation 10,819 0 10,819 .00 .00 10,819.00 .0% 05-0509-00-50960 SD 9.EPC - Principal 1,108 0 1,108 .00 .00 1,108.00 .0% 05-0509-00-50970 SD 9.EPC - Interest 72 0 72 .00 .00 72.00 .0% 05-0509-00-51486 SD 9.BSA Charge 32,000 0 32,000 .00 .00 32,000.00 .0% TOTAL SD 9 5,000 0 5,000 .00 .00 5,000.00 .0% 05051000 SD 10 05-0510-00-41001 SD 10.Real Property Taxes -22,088 0 -22,088 .00 .00 -22,088.00 .0% 05-0510-00-50597 SD 10.Sewer Dept Allocation 10,897 0 10,897 .00 .00 10,897.00 .0% 05-0510-00-50960 SD 10.EPC - Principal 1,118 0 1,118 .00 .00 1,118.00 .0% 05-0510-00-50970 SD 10.EPC - Interest 73 0 73 .00 .00 73.00 .0% 05-0510-00-51486 SD 10.BSA Charge 11,000 0 11,000 .00 .00 11,000.00 .0% TOTAL SD 10 1,000 0 1,000 .00 .00 1,000.00 .0% 05051100 SD 11 Report generated: 01/22/2026 09:55 Page 47 User: smith Program ID: glytdbud Page 280 of 301

Page 281

Munis Production Database YEAR-TO-DATE BUDGET REPORT FOR 2026 01 ORIGINAL TRANFRS/ REVISED AVAILABLE PCT APPROP ADJSTMTS BUDGET YTD ACTUAL ENCUMBRANCES BUDGET USE/COL 05-0511-00-41001 SD 11.Real Property Taxes -19,741 0 -19,741 .00 .00 -19,741.00 .0% 05-0511-00-50597 SD 11.Sewer Dept Allocation 6,070 0 6,070 .00 .00 6,070.00 .0% 05-0511-00-50960 SD 11.EPC - Principal 652 0 652 .00 .00 652.00 .0% 05-0511-00-50970 SD 11.EPC - Interest 43 0 43 .00 .00 43.00 .0% 05-0511-00-51487 SD 11.Rent Payable to SD 6 12,976 0 12,976 .00 .00 12,976.00 .0% TOTAL SD 11 0 0 0 .00 .00 .00 .0% 05051200 SD 12 05-0512-00-41001 SD 12.Real Property Taxes -321,107 0 -321,107 .00 .00 -321,107.00 .0% 05-0512-00-50515 SD 12.Operation Lift Station 10,000 0 10,000 .00 .00 10,000.00 .0% 05-0512-00-50597 SD 12.Sewer Dept Allocation 150,760 0 150,760 .00 .00 150,760.00 .0% 05-0512-00-50960 SD 12.EPC - Principal 16,283 0 16,283 .00 .00 16,283.00 .0% 05-0512-00-50970 SD 12.EPC - Interest 1,064 0 1,064 .00 .00 1,064.00 .0% 05-0512-00-51493 SD 12.Erie County Joint SD 3 143,000 0 143,000 .00 .00 143,000.00 .0% TOTAL SD 12 0 0 0 .00 .00 .00 .0% 05051300 SD 13 05-0513-00-41001 SD 13.Real Property Taxes -6,023,062 0 -6,023,062 .00 .00 -6,023,062.00 .0% 05-0513-00-42100 SD 13.Revenue EWAL District -1,018,594 0 -1,018,594 .00 .00 -1,018,594.00 .0% 05-0513-00-42103 Revenue EC District 3 -140,000 0 -140,000 .00 .00 -140,000.00 .0% 05-0513-00-42105 Revenue District 5 -301,728 0 -301,728 .00 .00 -301,728.00 .0% Report generated: 01/22/2026 09:55 Page 48 User: smith Program ID: glytdbud Page 281 of 301

Page 282

Munis Production Database YEAR-TO-DATE BUDGET REPORT FOR 2026 01 ORIGINAL TRANFRS/ REVISED AVAILABLE PCT APPROP ADJSTMTS BUDGET YTD ACTUAL ENCUMBRANCES BUDGET USE/COL 05-0513-00-42114 SD 13.Revenue District 14 -104,553 0 -104,553 .00 .00 -104,553.00 .0% 05-0513-00-42116 SD 13.Revenue OP District 16 -27,843 0 -27,843 .00 .00 -27,843.00 .0% 05-0513-00-42117 SD 13.Revenue OP District 17 -6,007 0 -6,007 .00 .00 -6,007.00 .0% 05-0513-00-42118 SD 13.Revenue OP District 18 -11,540 0 -11,540 .00 .00 -11,540.00 .0% 05-0513-00-42120 SD 13.Revenue Elma District 2 -20,632 0 -20,632 .00 .00 -20,632.00 .0% 05-0513-00-50508 SD 13.SD 5 for DS, Op & Main 18,590 0 18,590 .00 .00 18,590.00 .0% 05-0513-00-50515 SD 13.Operation Lift Station 21,000 0 21,000 .00 .00 21,000.00 .0% 05-0513-00-50518 SD 13.Rental Pay for RR Ease 1,700 0 1,700 .00 .00 1,700.00 .0% 05-0513-00-50520 SD 13.SD 5 for Op of Disp Pl 48,355 0 48,355 .00 .00 48,355.00 .0% 05-0513-00-50597 SD 13.Sewer Dept Allocation 2,817,732 0 2,817,732 .00 .00 2,817,732.00 .0% 05-0513-00-50598 SD 13.Union Road Lift Station 50,000 0 50,000 .00 .00 50,000.00 .0% 05-0513-00-50910 SD 13.Bond - Principal 435,886 0 435,886 .00 .00 435,886.00 .0% 05-0513-00-50911 SD 13.Bond - Interest 348,976 0 348,976 174,148.30 .00 174,827.70 49.9% 05-0513-00-50940 SD 13.BAN - Principal 313,532 0 313,532 .00 .00 313,532.00 .0% 05-0513-00-50950 SD 13.BAN - Interest 381,539 0 381,539 .00 .00 381,539.00 .0% 05-0513-00-50960 SD 13.EPC - Principal 297,240 0 297,240 .00 .00 297,240.00 .0% 05-0513-00-50970 SD 13.EPC - Interest 19,409 0 19,409 .00 .00 19,409.00 .0% 05-0513-00-50995 Interfund Transfers - Capital 500,000 0 500,000 .00 .00 500,000.00 .0% 05-0513-00-51486 SD 13.BSA Charge 3,000,000 0 3,000,000 .00 .00 3,000,000.00 .0% TOTAL SD 13 600,000 0 600,000 174,148.30 .00 425,851.70 29.0% 05051400 SD 14 05-0514-00-41001 SD 14.Real Property Taxes -103,828 0 -103,828 .00 .00 -103,828.00 .0% Report generated: 01/22/2026 09:55 Page 49 User: smith Program ID: glytdbud Page 282 of 301

Page 283

Munis Production Database YEAR-TO-DATE BUDGET REPORT FOR 2026 01 ORIGINAL TRANFRS/ REVISED AVAILABLE PCT APPROP ADJSTMTS BUDGET YTD ACTUAL ENCUMBRANCES BUDGET USE/COL 05-0514-00-42119 SD 14.Revenue OP District 14 -6,792 0 -6,792 .00 .00 -6,792.00 .0% 05-0514-00-50960 SD 14.EPC - Principal 5,695 0 5,695 .00 .00 5,695.00 .0% 05-0514-00-50970 SD 14.EPC - Interest 372 0 372 .00 .00 372.00 .0% 05-0514-00-51488 SD 14.Rent Pay to SD 13 104,553 0 104,553 .00 .00 104,553.00 .0% TOTAL SD 14 0 0 0 .00 .00 .00 .0% 05051500 SD 15 05-0515-00-41001 SD 15.Real Property Taxes -13,046 0 -13,046 .00 .00 -13,046.00 .0% 05-0515-00-50597 SD 15.Sewer Dept Allocation 9,072 0 9,072 .00 .00 9,072.00 .0% 05-0515-00-50960 SD 15.EPC - Principal 914 0 914 .00 .00 914.00 .0% 05-0515-00-50970 SD 15.EPC - Interest 60 0 60 .00 .00 60.00 .0% 05-0515-00-51486 SD 15.BSA Charge 3,000 0 3,000 .00 .00 3,000.00 .0% TOTAL SD 15 0 0 0 .00 .00 .00 .0% 05051800 SD 18 05-0518-00-41001 SD 18.Real Property Taxes -13,481 0 -13,481 .00 .00 -13,481.00 .0% 05-0518-00-50597 SD 18.Sewer Dept Allocation 4,983 0 4,983 .00 .00 4,983.00 .0% 05-0518-00-50960 SD 18.EPC - Principal 467 0 467 .00 .00 467.00 .0% 05-0518-00-50970 SD 18.EPC - Interest 31 0 31 .00 .00 31.00 .0% 05-0518-00-51487 SD 18.Rent Pay to EC SD 6 8,000 0 8,000 .00 .00 8,000.00 .0% TOTAL SD 18 0 0 0 .00 .00 .00 .0% 05051900 SD 19 Report generated: 01/22/2026 09:55 Page 50 User: smith Program ID: glytdbud Page 283 of 301

Page 284

Munis Production Database YEAR-TO-DATE BUDGET REPORT FOR 2026 01 ORIGINAL TRANFRS/ REVISED AVAILABLE PCT APPROP ADJSTMTS BUDGET YTD ACTUAL ENCUMBRANCES BUDGET USE/COL 05-0519-00-41001 SD 19.Real Property Taxes -45,630 0 -45,630 .00 .00 -45,630.00 .0% 05-0519-00-50597 SD 19.Sewer Dept Allocation 14,965 0 14,965 .00 .00 14,965.00 .0% 05-0519-00-50960 SD 19.EPC - Principal 1,563 0 1,563 .00 .00 1,563.00 .0% 05-0519-00-50970 SD 19.EPC - Interest 102 0 102 .00 .00 102.00 .0% 05-0519-00-51487 SD 19.Rent Pay to EC SD 6 29,000 0 29,000 .00 .00 29,000.00 .0% TOTAL SD 19 0 0 0 .00 .00 .00 .0% 05052000 SD 20 05-0520-00-41001 SD 20.Real Property Taxes -1,267,749 0 -1,267,749 .00 .00 -1,267,749.00 .0% 05-0520-00-42121 SD 20.Revenue NYS School -84,963 0 -84,963 .00 .00 -84,963.00 .0% 05-0520-00-50910 Principal 81,111 0 81,111 .00 .00 81,111.00 .0% 05-0520-00-50911 Interest 64,938 0 64,938 32,691.57 .00 32,246.43 50.3% 05-0520-00-50940 SD 20.BAN - Principal 58,343 0 58,343 .00 .00 58,343.00 .0% 05-0520-00-50950 SD 20.BAN - Interest 70,998 0 70,998 .00 .00 70,998.00 .0% 05-0520-00-50960 SD 20.EPC - Principal 55,128 0 55,128 .00 .00 55,128.00 .0% 05-0520-00-50970 SD 20.EPC - Interest 3,600 0 3,600 .00 .00 3,600.00 .0% 05-0520-00-51488 SD 20.Rent Payable to SD 13 1,018,594 0 1,018,594 .00 .00 1,018,594.00 .0% TOTAL SD 20 0 0 0 32,691.57 .00 -32,691.57 100.0% 05052100 SD 5 EXT 05-0521-00-41001 SD 5Ext.Real Property Taxes -515,140 0 -515,140 .00 .00 -515,140.00 .0% Report generated: 01/22/2026 09:55 Page 51 User: smith Program ID: glytdbud Page 284 of 301

Page 285

Munis Production Database YEAR-TO-DATE BUDGET REPORT FOR 2026 01 ORIGINAL TRANFRS/ REVISED AVAILABLE PCT APPROP ADJSTMTS BUDGET YTD ACTUAL ENCUMBRANCES BUDGET USE/COL 05-0521-00-50910 Principal 31,742 0 31,742 .00 .00 31,742.00 .0% 05-0521-00-50911 Interest 25,414 0 25,414 12,803.44 .00 12,610.56 50.4% 05-0521-00-50940 SD 5 Ext.BAN - Principal 22,832 0 22,832 .00 .00 22,832.00 .0% 05-0521-00-50950 SD 5 Ext.BAN - Interest 27,785 0 27,785 .00 .00 27,785.00 .0% 05-0521-00-50960 SD 5 Ext.EPC - Principal 21,646 0 21,646 .00 .00 21,646.00 .0% 05-0521-00-50970 SD 5 Ext.EPC - Interest 1,413 0 1,413 .00 .00 1,413.00 .0% 05-0521-00-51485 SD 5 Ext.Rent Payable to SD 5 384,308 0 384,308 .00 .00 384,308.00 .0% TOTAL SD 5 EXT 0 0 0 12,803.44 .00 -12,803.44 100.0% 05052200 PART I LA 05-0522-00-41001 SD 12P1.Real Property Taxes -45,752 0 -45,752 .00 .00 -45,752.00 .0% 05-0522-00-50597 Part I LA.Sewer Dept Alloc 6,027 0 6,027 .00 .00 6,027.00 .0% 05-0522-00-50960 Part I LA.EPC - Principal 681 0 681 .00 .00 681.00 .0% 05-0522-00-50970 Part I LA.EPC - Interest 44 0 44 .00 .00 44.00 .0% 05-0522-00-51487 Rent Payable to Sewer District 39,000 0 39,000 .00 .00 39,000.00 .0% TOTAL PART I LA 0 0 0 .00 .00 .00 .0% TOTAL Sanitary Sewer Fund 609,000 0 609,000 234,959.48 242.87 373,797.65 38.6% TOTAL REVENUES -17,313,842 0 -17,313,842 .00 .00 -17,313,842.00 TOTAL EXPENSES 17,922,842 0 17,922,842 234,959.48 242.87 17,687,639.65 06 Water Districts Fund 06060100 WD 1 06-0601-00-50911 WD 1.Bond - Interest 0 0 0 6,388.97 .00 -6,388.97 100.0% Report generated: 01/22/2026 09:55 Page 52 User: smith Program ID: glytdbud Page 285 of 301

Page 286

Munis Production Database YEAR-TO-DATE BUDGET REPORT FOR 2026 01 ORIGINAL TRANFRS/ REVISED AVAILABLE PCT 06 Water Districts Fund APPROP ADJSTMTS BUDGET YTD ACTUAL ENCUMBRANCES BUDGET USE/COL TOTAL WD 1 0 0 0 6,388.97 .00 -6,388.97 100.0% 06060200 WD 2 06-0602-00-50911 Interest 0 0 0 1,166.50 .00 -1,166.50 100.0% TOTAL WD 2 0 0 0 1,166.50 .00 -1,166.50 100.0% 06060300 WD 3 06-0603-00-50911 WD 3.Bond - Interest 0 0 0 11,436.22 .00 -11,436.22 100.0% TOTAL WD 3 0 0 0 11,436.22 .00 -11,436.22 100.0% 06060400 WD 4 06-0604-00-50911 Interest 0 0 0 1,013.52 .00 -1,013.52 100.0% TOTAL WD 4 0 0 0 1,013.52 .00 -1,013.52 100.0% 06060600 WD 6 06-0606-00-50911 Interest 0 0 0 1,861.28 .00 -1,861.28 100.0% TOTAL WD 6 0 0 0 1,861.28 .00 -1,861.28 100.0% 06060700 WD 7 06-0607-00-50911 Interest 0 0 0 85.25 .00 -85.25 100.0% Report generated: 01/22/2026 09:55 Page 53 User: smith Program ID: glytdbud Page 286 of 301

Page 287

Munis Production Database YEAR-TO-DATE BUDGET REPORT FOR 2026 01 ORIGINAL TRANFRS/ REVISED AVAILABLE PCT APPROP ADJSTMTS BUDGET YTD ACTUAL ENCUMBRANCES BUDGET USE/COL TOTAL WD 7 0 0 0 85.25 .00 -85.25 100.0% 06060800 WD 8 06-0608-00-50911 Interest 0 0 0 143.50 .00 -143.50 100.0% TOTAL WD 8 0 0 0 143.50 .00 -143.50 100.0% 06060900 WD 9 06-0609-00-50911 Interest 0 0 0 345.26 .00 -345.26 100.0% TOTAL WD 9 0 0 0 345.26 .00 -345.26 100.0% TOTAL Water Districts Fund 0 0 0 22,440.50 .00 -22,440.50 100.0% TOTAL EXPENSES 0 0 0 22,440.50 .00 -22,440.50 09 Electric Lighting Fund 09090000 EL Central 09-0900-00-51421 Electricity 0 0 0 223.34 .00 -223.34 100.0% TOTAL EL Central 0 0 0 223.34 .00 -223.34 100.0% 09090100 EL 1 09-0901-00-50960 EL 1.EPC - Principal 0 0 0 498.77 .00 -498.77 100.0% 09-0901-00-50970 EL 1.EPC - Interest 0 0 0 46.98 .00 -46.98 100.0% Report generated: 01/22/2026 09:55 Page 54 User: smith Program ID: glytdbud Page 287 of 301

Page 288

Munis Production Database YEAR-TO-DATE BUDGET REPORT FOR 2026 01 ORIGINAL TRANFRS/ REVISED AVAILABLE PCT APPROP ADJSTMTS BUDGET YTD ACTUAL ENCUMBRANCES BUDGET USE/COL TOTAL EL 1 0 0 0 545.75 .00 -545.75 100.0% 09090200 EL 2 09-0902-00-50960 EL 2.EPC - Principal 0 0 0 692.46 .00 -692.46 100.0% 09-0902-00-50970 EL 2.EPC - Interest 0 0 0 65.23 .00 -65.23 100.0% TOTAL EL 2 0 0 0 757.69 .00 -757.69 100.0% 09090300 EL 3 09-0903-00-50960 EL 3.EPC - Principal 0 0 0 304.79 .00 -304.79 100.0% 09-0903-00-50970 EL 3.EPC - Interest 0 0 0 28.73 .00 -28.73 100.0% TOTAL EL 3 0 0 0 333.52 .00 -333.52 100.0% 09090400 EL 4 09-0904-00-50960 EL 4.EPC - Principal 0 0 0 221.61 .00 -221.61 100.0% 09-0904-00-50970 EL 4.EPC - Interest 0 0 0 20.96 .00 -20.96 100.0% TOTAL EL 4 0 0 0 242.57 .00 -242.57 100.0% 09090500 EL 5 09-0905-00-50960 EL 5.EPC - Principal 0 0 0 166.35 .00 -166.35 100.0% 09-0905-00-50970 EL 5.EPC - Interest 0 0 0 15.72 .00 -15.72 100.0% Report generated: 01/22/2026 09:55 Page 55 User: smith Program ID: glytdbud Page 288 of 301

Page 289

Munis Production Database YEAR-TO-DATE BUDGET REPORT FOR 2026 01 ORIGINAL TRANFRS/ REVISED AVAILABLE PCT APPROP ADJSTMTS BUDGET YTD ACTUAL ENCUMBRANCES BUDGET USE/COL TOTAL EL 5 0 0 0 182.07 .00 -182.07 100.0% 09090600 EL 6 09-0906-00-50960 EL 6.EPC - Principal 0 0 0 249.53 .00 -249.53 100.0% 09-0906-00-50970 EL 6.EPC - Interest 0 0 0 23.49 .00 -23.49 100.0% TOTAL EL 6 0 0 0 273.02 .00 -273.02 100.0% 09090700 EL 7 09-0907-00-50960 EL 7.EPC - Principal 0 0 0 166.35 .00 -166.35 100.0% 09-0907-00-50970 EL 7.EPC - Interest 0 0 0 15.72 .00 -15.72 100.0% TOTAL EL 7 0 0 0 182.07 .00 -182.07 100.0% 09090800 EL 8 09-0908-00-50960 EL 8.EPC - Principal 0 0 0 249.53 .00 -249.53 100.0% 09-0908-00-50970 EL 8.EPC - Interest 0 0 0 23.49 .00 -23.49 100.0% TOTAL EL 8 0 0 0 273.02 .00 -273.02 100.0% 09090900 EL 9 09-0909-00-50960 EL 9.EPC - Principal 0 0 0 1,218.31 .00 -1,218.31 100.0% 09-0909-00-50970 EL 9.EPC - Interest 0 0 0 114.55 .00 -114.55 100.0% Report generated: 01/22/2026 09:55 Page 56 User: smith Program ID: glytdbud Page 289 of 301

Page 290

Munis Production Database YEAR-TO-DATE BUDGET REPORT FOR 2026 01 ORIGINAL TRANFRS/ REVISED AVAILABLE PCT APPROP ADJSTMTS BUDGET YTD ACTUAL ENCUMBRANCES BUDGET USE/COL TOTAL EL 9 0 0 0 1,332.86 .00 -1,332.86 100.0% 09091000 EL 10 09-0910-00-50960 EL 10.EPC - Principal 0 0 0 221.61 .00 -221.61 100.0% 09-0910-00-50970 EL 10.EPC - Interest 0 0 0 20.96 .00 -20.96 100.0% TOTAL EL 10 0 0 0 242.57 .00 -242.57 100.0% 09091100 EL 11 09-0911-00-50960 EL 11.EPC - Principal 0 0 0 166.35 .00 -166.35 100.0% 09-0911-00-50970 EL 11.EPC - Interest 0 0 0 15.72 .00 -15.72 100.0% TOTAL EL 11 0 0 0 182.07 .00 -182.07 100.0% 09091200 EL 12 09-0912-00-50960 EL 12.EPC - Principal 0 0 0 387.68 .00 -387.68 100.0% 09-0912-00-50970 EL 12.EPC - Interest 0 0 0 36.50 .00 -36.50 100.0% TOTAL EL 12 0 0 0 424.18 .00 -424.18 100.0% 09091300 EL 13 09-0913-00-50960 EL 13.EPC - Principal 0 0 0 138.72 .00 -138.72 100.0% 09-0913-00-50970 EL 13.EPC - Interest 0 0 0 13.01 .00 -13.01 100.0% Report generated: 01/22/2026 09:55 Page 57 User: smith Program ID: glytdbud Page 290 of 301

Page 291

Munis Production Database YEAR-TO-DATE BUDGET REPORT FOR 2026 01 ORIGINAL TRANFRS/ REVISED AVAILABLE PCT APPROP ADJSTMTS BUDGET YTD ACTUAL ENCUMBRANCES BUDGET USE/COL TOTAL EL 13 0 0 0 151.73 .00 -151.73 100.0% 09091400 EL 14 09-0914-00-50960 EL 14.EPC - Principal 0 0 0 582.23 .00 -582.23 100.0% 09-0914-00-50970 EL 14.EPC - Interest 0 0 0 54.98 .00 -54.98 100.0% TOTAL EL 14 0 0 0 637.21 .00 -637.21 100.0% 09091500 EL 15 09-0915-00-50960 EL 15.EPC - Principal 0 0 0 166.35 .00 -166.35 100.0% 09-0915-00-50970 EL 15.EPC - Interest 0 0 0 15.72 .00 -15.72 100.0% TOTAL EL 15 0 0 0 182.07 .00 -182.07 100.0% 09091600 EL 16 09-0916-00-50960 EL 16.EPC - Principal 0 0 0 1,135.97 .00 -1,135.97 100.0% 09-0916-00-50970 EL 16.EPC - Interest 0 0 0 106.98 .00 -106.98 100.0% TOTAL EL 16 0 0 0 1,242.95 .00 -1,242.95 100.0% 09091700 EL 17 09-0917-00-50960 EL 17.EPC - Principal 0 0 0 111.09 .00 -111.09 100.0% 09-0917-00-50970 EL 17.EPC - Interest 0 0 0 10.48 .00 -10.48 100.0% Report generated: 01/22/2026 09:55 Page 58 User: smith Program ID: glytdbud Page 291 of 301

Page 292

Munis Production Database YEAR-TO-DATE BUDGET REPORT FOR 2026 01 ORIGINAL TRANFRS/ REVISED AVAILABLE PCT APPROP ADJSTMTS BUDGET YTD ACTUAL ENCUMBRANCES BUDGET USE/COL TOTAL EL 17 0 0 0 121.57 .00 -121.57 100.0% 09091800 EL 18 09-0918-00-50960 EL 18.EPC - Principal 0 0 0 277.16 .00 -277.16 100.0% 09-0918-00-50970 EL 18.EPC - Interest 0 0 0 26.20 .00 -26.20 100.0% TOTAL EL 18 0 0 0 303.36 .00 -303.36 100.0% 09091900 EL 19 09-0919-00-50960 EL 19.EPC - Principal 0 0 0 332.42 .00 -332.42 100.0% 09-0919-00-50970 EL 19.EPC - Interest 0 0 0 31.26 .00 -31.26 100.0% TOTAL EL 19 0 0 0 363.68 .00 -363.68 100.0% 09092000 EL 20 09-0920-00-50960 EL 20.EPC - Principal 0 0 0 387.68 .00 -387.68 100.0% 09-0920-00-50970 EL 20.EPC - Interest 0 0 0 36.50 .00 -36.50 100.0% TOTAL EL 20 0 0 0 424.18 .00 -424.18 100.0% 09092100 EL 21 09-0921-00-50960 EL 21.EPC - Principal 0 0 0 360.05 .00 -360.05 100.0% 09-0921-00-50970 EL 21.EPC - Interest 0 0 0 33.97 .00 -33.97 100.0% Report generated: 01/22/2026 09:55 Page 59 User: smith Program ID: glytdbud Page 292 of 301

Page 293

Munis Production Database YEAR-TO-DATE BUDGET REPORT FOR 2026 01 ORIGINAL TRANFRS/ REVISED AVAILABLE PCT APPROP ADJSTMTS BUDGET YTD ACTUAL ENCUMBRANCES BUDGET USE/COL TOTAL EL 21 0 0 0 394.02 .00 -394.02 100.0% 09092200 EL 22 09-0922-00-50960 EL 22.EPC - Principal 0 0 0 166.35 .00 -166.35 100.0% 09-0922-00-50970 EL 22.EPC - Interest 0 0 0 15.72 .00 -15.72 100.0% TOTAL EL 22 0 0 0 182.07 .00 -182.07 100.0% 09092300 EL 23 09-0923-00-50960 EL 23.EPC - Principal 0 0 0 166.35 .00 -166.35 100.0% 09-0923-00-50970 EL 23.EPC - Interest 0 0 0 15.72 .00 -15.72 100.0% TOTAL EL 23 0 0 0 182.07 .00 -182.07 100.0% 09092400 EL 24 09-0924-00-50960 EL 24.EPC - Principal 0 0 0 83.46 .00 -83.46 100.0% 09-0924-00-50970 EL 24.EPC - Interest 0 0 0 7.77 .00 -7.77 100.0% TOTAL EL 24 0 0 0 91.23 .00 -91.23 100.0% 09092500 EL 25 09-0925-00-50960 EL 25.EPC - Principal 0 0 0 942.27 .00 -942.27 100.0% 09-0925-00-50970 EL 25.EPC - Interest 0 0 0 88.73 .00 -88.73 100.0% Report generated: 01/22/2026 09:55 Page 60 User: smith Program ID: glytdbud Page 293 of 301

Page 294

Munis Production Database YEAR-TO-DATE BUDGET REPORT FOR 2026 01 ORIGINAL TRANFRS/ REVISED AVAILABLE PCT APPROP ADJSTMTS BUDGET YTD ACTUAL ENCUMBRANCES BUDGET USE/COL TOTAL EL 25 0 0 0 1,031.00 .00 -1,031.00 100.0% 09092600 EL 26 09-0926-00-50960 EL 26.EPC - Principal 0 0 0 775.92 .00 -775.92 100.0% 09-0926-00-50970 EL 26.EPC - Interest 0 0 0 73.19 .00 -73.19 100.0% TOTAL EL 26 0 0 0 849.11 .00 -849.11 100.0% 09092700 EL 27 09-0927-00-50960 EL 27.EPC - Principal 0 0 0 55.26 .00 -55.26 100.0% 09-0927-00-50970 EL 27.EPC - Interest 0 0 0 5.24 .00 -5.24 100.0% TOTAL EL 27 0 0 0 60.50 .00 -60.50 100.0% 09092800 EL 28 09-0928-00-50960 EL 28.EPC - Principal 0 0 0 277.16 .00 -277.16 100.0% 09-0928-00-50970 EL 28.EPC - Interest 0 0 0 26.20 .00 -26.20 100.0% TOTAL EL 28 0 0 0 303.36 .00 -303.36 100.0% 09092900 EL 29 09-0929-00-50960 EL 29.EPC - Principal 0 0 0 193.98 .00 -193.98 100.0% 09-0929-00-50970 EL 29.EPC - Interest 0 0 0 18.25 .00 -18.25 100.0% Report generated: 01/22/2026 09:55 Page 61 User: smith Program ID: glytdbud Page 294 of 301

Page 295

Munis Production Database YEAR-TO-DATE BUDGET REPORT FOR 2026 01 ORIGINAL TRANFRS/ REVISED AVAILABLE PCT APPROP ADJSTMTS BUDGET YTD ACTUAL ENCUMBRANCES BUDGET USE/COL TOTAL EL 29 0 0 0 212.23 .00 -212.23 100.0% 09093000 EL 30 09-0930-00-50960 EL 30.EPC - Principal 0 0 0 221.61 .00 -221.61 100.0% 09-0930-00-50970 EL 30.EPC - Interest 0 0 0 20.96 .00 -20.96 100.0% TOTAL EL 30 0 0 0 242.57 .00 -242.57 100.0% 09093100 EL 31 09-0931-00-50960 EL 31.EPC - Principal 0 0 0 914.64 .00 -914.64 100.0% 09-0931-00-50970 EL 31.EPC - Interest 0 0 0 86.20 .00 -86.20 100.0% TOTAL EL 31 0 0 0 1,000.84 .00 -1,000.84 100.0% 09093200 EL 32 09-0932-00-50960 EL 32.EPC - Principal 0 0 0 471.14 .00 -471.14 100.0% 09-0932-00-50970 EL 32.EPC - Interest 0 0 0 44.45 .00 -44.45 100.0% TOTAL EL 32 0 0 0 515.59 .00 -515.59 100.0% 09093300 EL 33 09-0933-00-50960 EL 33.EPC - Principal 0 0 0 803.55 .00 -803.55 100.0% 09-0933-00-50970 EL 33.EPC - Interest 0 0 0 75.72 .00 -75.72 100.0% Report generated: 01/22/2026 09:55 Page 62 User: smith Program ID: glytdbud Page 295 of 301

Page 296

Munis Production Database YEAR-TO-DATE BUDGET REPORT FOR 2026 01 ORIGINAL TRANFRS/ REVISED AVAILABLE PCT APPROP ADJSTMTS BUDGET YTD ACTUAL ENCUMBRANCES BUDGET USE/COL TOTAL EL 33 0 0 0 879.27 .00 -879.27 100.0% 09093400 EL 34 09-0934-00-50960 EL 34.EPC - Principal 0 0 0 193.98 .00 -193.98 100.0% 09-0934-00-50970 EL 34.EPC - Interest 0 0 0 18.25 .00 -18.25 100.0% TOTAL EL 34 0 0 0 212.23 .00 -212.23 100.0% 09093500 EL 35 09-0935-00-50960 EL 35.EPC - Principal 0 0 0 471.14 .00 -471.14 100.0% 09-0935-00-50970 EL 35.EPC - Interest 0 0 0 44.45 .00 -44.45 100.0% TOTAL EL 35 0 0 0 515.59 .00 -515.59 100.0% 09093800 EL 38 09-0938-00-50960 EL 38.EPC - Principal 0 0 0 304.79 .00 -304.79 100.0% 09-0938-00-50970 EL 38.EPC - Interest 0 0 0 28.73 .00 -28.73 100.0% TOTAL EL 38 0 0 0 333.52 .00 -333.52 100.0% 09093900 EL 39 09-0939-00-50960 EL 39.EPC - Principal 0 0 0 138.72 .00 -138.72 100.0% 09-0939-00-50970 EL 39.EPC - Interest 0 0 0 13.01 .00 -13.01 100.0% Report generated: 01/22/2026 09:55 Page 63 User: smith Program ID: glytdbud Page 296 of 301

Page 297

Munis Production Database YEAR-TO-DATE BUDGET REPORT FOR 2026 01 ORIGINAL TRANFRS/ REVISED AVAILABLE PCT APPROP ADJSTMTS BUDGET YTD ACTUAL ENCUMBRANCES BUDGET USE/COL TOTAL EL 39 0 0 0 151.73 .00 -151.73 100.0% 09094000 EL 40 09-0940-00-50960 EL 40.EPC - Principal 0 0 0 138.72 .00 -138.72 100.0% 09-0940-00-50970 EL 40.EPC - Interest 0 0 0 13.01 .00 -13.01 100.0% TOTAL EL 40 0 0 0 151.73 .00 -151.73 100.0% 09094100 EL 41 09-0941-00-50960 EL 41.EPC - Principal 0 0 0 249.53 .00 -249.53 100.0% 09-0941-00-50970 EL 41.EPC - Interest 0 0 0 23.49 .00 -23.49 100.0% TOTAL EL 41 0 0 0 273.02 .00 -273.02 100.0% 09094200 EL 42 09-0942-00-50960 EL 42.EPC - Principal 0 0 0 471.14 .00 -471.14 100.0% 09-0942-00-50970 EL 42.EPC - Interest 0 0 0 44.45 .00 -44.45 100.0% TOTAL EL 42 0 0 0 515.59 .00 -515.59 100.0% 09095500 EL 55 09-0955-00-50960 EL 55.EPC - Principal 0 0 0 529.53 .00 -529.53 100.0% 09-0955-00-50970 EL 55.EPC - Interest 0 0 0 49.87 .00 -49.87 100.0% TOTAL EL 55 0 0 0 579.40 .00 -579.40 100.0% Report generated: 01/22/2026 09:55 Page 64 User: smith Program ID: glytdbud Page 297 of 301

Page 298

Munis Production Database YEAR-TO-DATE BUDGET REPORT FOR 2026 01 ORIGINAL TRANFRS/ REVISED AVAILABLE PCT APPROP ADJSTMTS BUDGET YTD ACTUAL ENCUMBRANCES BUDGET USE/COL TOTAL Electric Lighting Fund 0 0 0 17,298.15 .00 -17,298.15 100.0% TOTAL EXPENSES 0 0 0 17,298.15 .00 -17,298.15 GRAND TOTAL 2,851,692 657,308 3,509,000 34,596,707.65 882,353.59 -31,970,061.24 1011.1% ** END OF REPORT - Generated by Kim Smith ** Report generated: 01/22/2026 09:55 Page 65 User: smith Program ID: glytdbud Page 298 of 301

Page 299

TO: Honorable Town Board FROM: Jason Foote, Town Engineer DATE: January 26, 2026 SUBJECT: Town Engineer re Capital Project Report January 2026 Requested Action: Please find attached the Capital Project Report for January 2026 for your review and filing. The report has been updated to reflect current expenditures to date, as well as the remaining budget balances for all active capital projects. Should you have any questions or need further clarification, please don't hesitate to reach out. RESOLUTION: ATTACHMENTS: 1. January 2026 Capital Projet Report Page 299 of 301

Page 300

Page 300 of 301

Page 301

TO: Honorable Town Board FROM: Gary Dickson, Supervisor DATE: January 26, 2026 SUBJECT: Supervisor Dickson re Executive session to interview candidates for deputy town attorney/prosecutor and to discuss current litigation, 1000 Queens Grant LLC v. Town of West Seneca, Town of West Seneca Town Board et al. Requested Action: RESOLUTION: ATTACHMENTS: Page 301 of 301

Back to the document