ERIE COUNTY WATER AUTHORITY
  3030 Union Road « Buffalo, New York  14227
  716-684-1510 ° FAX 716-684-3937

  June 16, 2020

The Honorable Jason Keding
Supervisor of Town of Boston
8500 Boston State Rd.
Boston, NY  14025

  RE:  2021 Construction Projects
  ECWA Project No.: 199300453

Dear Supervisor Keding:

  In an effort to provide continual safe and affordable water to all of the citizens within your
municipality, and as you prepare for your 2021 annual budget, we urge you to secure funding for capital
improvement projects to your water system. We have suggested projects we believe would provide the most
benefit to your water system.

  We have attached a list of recommended improvement to the system which are based upon
watermain break and leak history and the age and size of existing water lines and in some cases the capacity
of the existing mains. As shown on the attached list, these recommended improvements have been prioritized
into three categories (high, medium and low). These priorities serve as our recommendation as to the order
in which we feel the projects should be completed. In general these priorities are based on the level of risk
we feel is posed by the failure of a given line including the number of properties impacted, the type of
property impacted (e.g.; hospitals or other health care facilities or large commercial or industrial facility) as
well as the complexity of the emergency repair that would be necessary should the line fail.

  You should review the list with your Engineering Department or outside consultant to determine
how to proceed with implementing these important capital improvement projects and feel free to contact
ECWA if you would like to discuss further. We feel that that main replacement programs are imperative to
help limit interruptions of service, to maintain quality fire protection, to avoid property damage and limit the
overall risk to your residents posed by unplanned failures of this critical infrastructure.

  Attached to this letter is a map that depicts the Town’s distribution system and shows the locations of
the recommended projects. Each project has been numbered to coincide with the attached list and we
have also provided the number of breaks/leaks associated with that project.

  We recognize that some of these projects may already be planned and if so please advise us of these
projects so that we may update our records.

P:\TOWN\P9300453\LETTERS0 (2021 Construction Proj-Lease Managed).docx