Text · page 2 of 2
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
TOWN OF BOSTON ECWA PROPOSED CAPTIAL IMPROVEMENT PLAN FOR TOWN WATER DISTRICTS FOR 2019/2020 PRIORITY LOCATION RECOMMENDATION Initial Year of Recommendation Route 391 and Meadow Drive Replace valve 1G 2012 Zimmerman Rd. Replace 600 LF of 12” 2012 Heinrich Road to Back Creek Road main Eighteen Mile Creek Crossing Abandon 8” watermain 2008 From Boston State Road & Aspen Drive to under creek Back Creek Road at Rice Road Herman Hill Road Replace 2200 LF of 8” 2008 From Boston State Road to South Abbott Road Main Liebler Road Replace 1270 LF of 8” 2009 From Boston State Road to House #6698 Main South Abbott Road Replace 1800 LF of 8” 2013 From Meadow Drive North Main Boston State Road Replace 900 LF of 12” 2016 #7083 to #7107 main Boston State Road Replace 2,400 LF of 12” 2016 #7895 to #8081 main Boston Colvin Road Replace 1,900 LF of 8” 2016 Boston State to Powerline main 10. Eckhardt Road Replace 500 LF of 6” main 2016 #4844 to #4864 11. Feddick Road Replace 1,250 LF of 6” 2016 #7956 to #8030 main 12. Valley Circle Lane Replace 2500 LF of 6-inch 2019 main 13. Heinrich Road Replace 2000 LF of 12-inch 2019 From Rt. 219 to Zimmerman Road main P:\TOWN\P9300453\LETTER49 (2020 Construction Proj-Lease Managed).docx