2

The responsible agency must make an initial determination regarding whether an environmental
impact statement is required:
  • As early as possible in the formulation of the proposed action; and
  • No later than one year after the establishment of a lead agency.

Creates deadline for EIS completion and release (amends ECL § 8-0109[5])
An agency must prepare and make the EIS available within two years after determining that a draft
EIS is required.
  • The agency may extend the deadline in writing after consulting with the applicant.
  • The decision to extend the deadline remains within the agency’s discretion.
  • Any extension may provide only the additional time necessary to complete the draft EIS.

In determining whether additional time is necessary, the agency may consider:
  • Changes made by the applicant to the project design after scoping that result in new
  significant environmental impacts;
  • Additional actions that could not reasonably have been anticipated during scoping;
  • The applicant’s failure to timely provide necessary information despite the agency’s good-
  faith efforts; or
  • Delays caused by circumstances beyond the control of the agency or the applicant.

Creates new SEQRA exemptions for “qualified actions” (amends ECL § 8-
0111)
One of the most significant changes in TED Part S is the creation of five new categories of
“qualified actions” that are exempt from SEQRA review. In determining whether an application is
exempt, the responsible agency must consider the project as a whole and determine that every aspect
of the action either:

  •  Meets the criteria for one of the new exemptions; or
  •  Is otherwise exempt from SEQRA.

The five new qualified actions are:

1. Certain housing projects in municipalities outside New York City
Qualifying housing construction must:
  • Be connected to existing community or public water and sewer systems at the
  commencement of habitation;
  • Be located on a previously disturbed site;
  • Contain no more than 20 percent commercial, retail, community facility, or other non-
  industrial non-residential uses by gross floor area;
  • Not exceed 100 dwelling units;
  • Not exceed 20 dwelling units if located in a city, town, or village without zoning;
  • Not exceed 300 dwelling units if located within a Census-defined urban area; and
  • Not consist only of the construction of one single-family residence on a parcel of one acre
  or more.

2. Certain public park and trail projects on a previously disturbed site
Qualifying projects include: