Text · page 245 of 322
Read the whole document on one page (all 322 pages, each with its own heading)
Full Environmental Assessment Form Part 1 - Project and Setting Instructions for Completing Part 1 Part 1 is to be completed by the applicant or project sponsor. Responses become part of the application for approval or funding, are subject to public review, and may be subject to further verification. Complete Part 1 based on information currently available. If additional research or investigation would be needed to fully respond to any item, please answer as thoroughly as possible based on current information; indicate whether missing information does not exist, or is not reasonably available to the sponsor; and, when possible, generally describe work or studies which would be necessary to update or fully develop that information. Applicants/sponsors must complete all items in Sections A & B. In Sections C, D & E, most items contain an initial question that must be answered either “Yes” or “No”. If the answer to the initial question is “Yes”, complete the sub-questions that follow. If the answer to the initial question is “No”, proceed to the next question. Section F allows the project sponsor to identify and attach any additional information. Section G requires the name and signature of the applicant or project sponsor to verify that the information contained in Part 1is accurate and complete. A. Project and Applicant/Sponsor Information. Name of Action or Project: Town of Boston Water System Improvements Phase 2 Project Location (describe, and attach a general location map): Various Locations in the Town of Boston (See map). Brief Description of Proposed Action (include purpose or need): The project involves the installation of approximately 32,000 LF of new 8, 10, and 12 inch diameter water main, valves, hydrants, services, and appurtenances. Project Limits include Back Creek Rd. from Zimmerman to Cloverfield Dr., Old Orchard Drive from Back Creek Rd. to Johns Terrace, Boston State Rd from Chestnut Ridge Rd. to Patchin Rd., Back Creek Rd from Hillcroft Dr. to Aspen Dr., Boston State Rd. from Mill St. to Boston Colden Rd., Boston Colden Rd from Boston State Rd. to Cole Rd., and Lango Rd. This project is a continuation of Phase 1. In recent years, due to the history of main breaks in the system, the Town has experienced the inability to provide its residents with reliable water, both for consumption and fire protection. At times, residents have reported cloudy water and air in their plumbing due to broken joints and debris entering the system. Name of Applicant/Sponsor: Telephone: 716-941-6518 Town of Boston E-Mail: [email protected] Address: 8500 Boston State Road City/PO: Boston State: NY Zip Code: 14025 Project Contact (if not same as sponsor; give name and title/role): Telephone: 716-472-4899 Roderick Green E-Mail: [email protected] Address: 726 Exchange St Suite 920 City/PO: State: Zip Code: Buffalo NY 14210 Property Owner (if not same as sponsor): Telephone: 716-941-6518 (T) Boston - Jason Keding E-Mail: [email protected] Address: 8500 Boston State Road City/PO: Boston State: NY Zip Code:14025 Page 1 of 13