Southtowns Record

TB 2026-05-06 Agenda Packet

Government
Town of Boston
Board
Town Board
Meeting
May 6, 2026
Posted by publisher
May 22, 2026
Kind
Agenda packet
Topics
Budget and taxes, Water, sewer and drainage, Public safety, Zoning and land use, Parks and recreation, Audits and oversight, Roads and traffic, Energy and data center siting, Housing, Moratoriums

Original document

Same meeting

Text · page 255 of 322

Read the whole document on one page (all 322 pages, each with its own heading)

v. Is the project site subject to an institutional control limiting property uses?  9 Yes 9 No
  • If yes, DEC site ID number: ____________________________________________________________________________
  • Describe the type of institutional control (e.g., deed restriction or easement): ____________________________________
  • Describe any use limitations: ___________________________________________________________________________
  • Describe any engineering controls: _______________________________________________________________________
  • Will the project affect the institutional or engineering controls in place?  9 Yes 9 No
  • Explain: ____________________________________________________________________________________________
  ___________________________________________________________________________________________________
  ___________________________________________________________________________________________________

E.2. Natural Resources On or Near Project Site
a. What is the average depth to bedrock on the project site?  ________________
  ~6 feet

b. Are there bedrock outcroppings on the project site?  9 Yes 9 No
  ✔
If Yes, what proportion of the site is comprised of bedrock outcroppings? __________________%
  0.2

c. Predominant soil type(s) present on project site:  ___________________________
  Farnham channery silt loam  __________%
  7.3
  ___________________________
  Schuyler silt loam  __________%
  7.2
  ____________________________
  Mardin-Valois complex  __________%
  6.0

d. What is the average depth to the water table on the project site? Average: _________
  2.4 feet

  9 Well Drained:
e. Drainage status of project site soils: ✔  _____%
  20.90 of site
  9 Moderately Well Drained:
  ✔  _____%
  44.50 of site
  9 Poorly Drained
  ✔  _____%
  1.00 of site
  9 0-10%:
f. Approximate proportion of proposed action site with slopes: ✔  _____%
  64.6  of site
  9 10-15%:
  ✔  _____%
  14.8  of site
  9 15% or greater:
  ✔  _____%
  20.5  of site
g. Are there any unique geologic features on the project site?  9 Yes ✔
  9 No
 If Yes, describe: _____________________________________________________________________________________________
  ________________________________________________________________________________________________________
h. Surface water features.
  i. Does any portion of the project site contain wetlands or other waterbodies (including streams, rivers,  9 Yes 9 No
  ✔
  ponds or lakes)?
 ii. Do any wetlands or other waterbodies adjoin the project site?  9 Yes 9 No
  ✔
If Yes to either i or ii, continue. If No, skip to E.2.i.
iii. Are any of the wetlands or waterbodies within or adjoining the project site regulated by any federal,  ✔
  9 Yes 9 No
  state or local agency?
 iv. For each identified regulated wetland and waterbody on the project site, provide the following information:
  • Streams:  837-252
  Name ____________________________________________  A
  Classification _______________________
  •  Lakes or Ponds: Name ____________________________________________ Classification _______________________
  • Wetlands:  Name ____________________________________________
  Federal Waters, Federal Waters, Federal Waters,...  Approximate Size ___________________
  • Wetland No. (if regulated by DEC) _____________________________
v. Are any of the above water bodies listed in the most recent compilation of NYS water quality-impaired  ✔ No
  9 Yes 9
  waterbodies?
If yes, name of impaired water body/bodies and basis for listing as impaired: _____________________________________________
___________________________________________________________________________________________________________
i. Is the project site in a designated Floodway?  9 Yes ✔
  9 No
j. Is the project site in the 100-year Floodplain?  9 Yes ✔
  9 No
k. Is the project site in the 500-year Floodplain?  9 Yes ✔
  9 No
l. Is the project site located over, or immediately adjoining, a primary, principal or sole source aquifer? ✔
  9 Yes 9 No
If Yes:
  i. Name of aquifer: Principal Aquifer
  _________________________________________________________________________________________

  Page 11 of 13