13. Impact on Transportation
  The proposed action may result in a change to existing transportation systems.  ✔
  † NO  † YES
  (See Part 1. D.2.j)
  If “Yes”, answer questions a - f. If “No”, go to Section 14.
  Relevant  No, or  Moderate
  Part I  small  to large
  Question(s)  impact  impact may
  may occur  occur
a. Projected traffic increase may exceed capacity of existing road network.  D2j  9  9
b. The proposed action may result in the construction of paved parking area for 500 or  D2j  9  9
  more vehicles.
c. The proposed action will degrade existing transit access.  D2j  9  9

d. The proposed action will degrade existing pedestrian or bicycle accommodations.  D2j  9  9

e. The proposed action may alter the present pattern of movement of people or goods.  D2j  9  9
f. Other impacts: ______________________________________________________  9  9
  __________________________________________________________________

14. Impact on Energy
  The proposed action may cause an increase in the use of any form of energy.  † NO
  ✔  † YES
  (See Part 1. D.2.k)
  If “Yes”, answer questions a - e. If “No”, go to Section 15.
  Relevant  No, or  Moderate
  Part I  small  to large
  Question(s)  impact  impact may
  may occur  occur
a. The proposed action will require a new, or an upgrade to an existing, substation.  D2k  9  9
b. The proposed action will require the creation or extension of an energy transmission  D1f,  9  9
  or supply system to serve more than 50 single or two-family residences or to serve a  D1q, D2k
  commercial or industrial use.
c. The proposed action may utilize more than 2,500 MWhrs per year of electricity.  D2k  9  9

d. The proposed action may involve heating and/or cooling of more than 100,000 square  D1g  9  9
  feet of building area when completed.
e. Other Impacts: ________________________________________________________
  ____________________________________________________________________

15. Impact on Noise, Odor, and Light
  The proposed action may result in an increase in noise, odors, or outdoor lighting.  † NO  † YES
  (See Part 1. D.2.m., n., and o.)
  If “Yes”, answer questions a - f. If “No”, go to Section 16.
  Relevant  No, or  Moderate
  Part I  small  to large
  Question(s)  impact  impact may
  may occur  occur
a. The proposed action may produce sound above noise levels established by local  D2m  ✔9  9
  regulation.

b. The proposed action may result in blasting within 1,500 feet of any residence,  D2m, E1d  9
  ✔  9
  hospital, school, licensed day care center, or nursing home.
c. The proposed action may result in routine odors for more than one hour per day.  D2o  9
  ✔  9