Text · page 294 of 322
Read the whole document on one page (all 322 pages, each with its own heading)
David Hardenbrook March 24, 2026 Page 2 Please note, there is an option for people who have hired consultants, and for other environmental professionals with wetland expertise, to bypass the Albany Parcel Jurisdictional Determination (JD) and follow the Parcel JD-Consultant Option. Guidance on that process is online (via the above referenced link). Please note that Region 9 has some information that is required in addition to the statewide requirements for the Consultant Option (attached). The project sponsor should utilize the attached Region 9 List of Requirements for their submission. The project sponsor must submit these requirements to the Region 9 Bureau of Ecosystem Health email address ([email protected]) with a request to utilize the Consultant Option, and a request to schedule a boundary verification. Please be aware that this option is only to be used to positively confirm wetland presence on the property. A delineation showing no wetlands would not be acceptable and would require the standard Jurisdictional Determination Request Form NYS Freshwater Wetlands Jurisdictional Determination Request Form. If the property contains regulated freshwater wetlands or adjacent areas, further delineation of the wetland boundaries and a Project Jurisdictional Determination (Project JD) may be required. A Project JD is a determination made by the regional DEC office about whether a proposed activity within a parcel containing regulated freshwater wetlands or adjacent areas requires an Article 24 Freshwater Wetlands permit. Project JD requests should be sent to the Region 9 Bureau of Ecosystem Health (BEH) at [email protected]. If regulated freshwater wetlands or adjacent areas are present, all efforts must be made to first avoid disturbing the wetland and adjacent area. If disturbance to the wetland and/or adjacent area cannot be avoided, the project sponsor must submit a Freshwater Wetland permit application and obtain a permit to conduct a regulated activity. In accordance with DEC’s Freshwater Wetlands Permit Requirements Regulations (6 NYCRR Part 663), the applicant would need to justify the disturbance, discuss alternatives and minimize impacts as part of the Freshwater Wetlands permit application. More information on application procedures and permit issuance standards is available on DEC’s website at: https://dec.ny.gov/regulatory/permits-licenses/waterways-coastlines- wetlands/freshwater-wetlands#Determine . 2. The project area may include federally regulated wetlands based on a review of the National Wetlands Inventory wetland mapping. The project sponsor should consult with the United States Army Corps of Engineers (USACE), telephone: 716/879-4330, concerning USACE regulatory jurisdiction to determine if the project will impact federally regulated wetlands or require any other approval from that agency. If federal wetlands are involved, USACE may require the project sponsor to obtain a Section 401 Water Quality Certification (WQC) from NYSDEC. More information related to this requirement can be found on NYSDEC’s website at https://dec.ny.gov/nature/waterbodies/wetlands/freshwater-wetlands- program/conserve/federal-regulatory-programs.