David Hardenbrook
March 24, 2026
Page 2

  Please note, there is an option for people who have hired consultants, and for other
  environmental professionals with wetland expertise, to bypass the Albany Parcel
  Jurisdictional Determination (JD) and follow the Parcel JD-Consultant Option.
  Guidance on that process is online (via the above referenced link). Please note that
  Region 9 has some information that is required in addition to the statewide
  requirements for the Consultant Option (attached). The project sponsor should utilize
  the attached Region 9 List of Requirements for their submission. The project
  sponsor must submit these requirements to the Region 9 Bureau of Ecosystem
  Health email address ([email protected]) with a request to utilize the Consultant
  Option, and a request to schedule a boundary verification. Please be aware that
  this option is only to be used to positively confirm wetland presence on the
  property. A delineation showing no wetlands would not be acceptable and
  would require the standard Jurisdictional Determination Request Form NYS
  Freshwater Wetlands Jurisdictional Determination Request Form.

  If the property contains regulated freshwater wetlands or adjacent areas, further
  delineation of the wetland boundaries and a Project Jurisdictional Determination
  (Project JD) may be required. A Project JD is a determination made by the regional
  DEC office about whether a proposed activity within a parcel containing regulated
  freshwater wetlands or adjacent areas requires an Article 24 Freshwater Wetlands
  permit. Project JD requests should be sent to the Region 9 Bureau of Ecosystem
  Health (BEH) at [email protected].

  If regulated freshwater wetlands or adjacent areas are present, all efforts must be
  made to first avoid disturbing the wetland and adjacent area. If disturbance to the
  wetland and/or adjacent area cannot be avoided, the project sponsor must submit a
  Freshwater Wetland permit application and obtain a permit to conduct a regulated
  activity. In accordance with DEC’s Freshwater Wetlands Permit Requirements
  Regulations (6 NYCRR Part 663), the applicant would need to justify the
  disturbance, discuss alternatives and minimize impacts as part of the Freshwater
  Wetlands permit application. More information on application procedures and permit
  issuance standards is available on DEC’s website at:
  https://dec.ny.gov/regulatory/permits-licenses/waterways-coastlines-
  wetlands/freshwater-wetlands#Determine .

  2. The project area may include federally regulated wetlands based on a review of the
  National Wetlands Inventory wetland mapping. The project sponsor should consult
  with the United States Army Corps of Engineers (USACE), telephone: 716/879-4330,
  concerning USACE regulatory jurisdiction to determine if the project
  will impact federally regulated wetlands or require any other approval from that
  agency. If federal wetlands are involved, USACE may require the project sponsor to
  obtain a Section 401 Water Quality Certification (WQC) from NYSDEC. More
  information related to this requirement can be found on NYSDEC’s website
  at https://dec.ny.gov/nature/waterbodies/wetlands/freshwater-wetlands-
  program/conserve/federal-regulatory-programs.