Draft Colden Chapter #101 Battery Energy Storage Systems Planning Board Revision #15 (dated 8/10/26) delivered the notice by first class mail to adjoining landowners or landowners within 1,000 feet of the property at least 14 days prior to such a hearing. Proof of mailing shall be provided to the Town Board at the public hearing. (3) Referral to the Erie County Department of Environment and Planning pursuant to General Municipal Law § 239-m. (4) Upon closing of the public hearing, the Town Board shall take action on the application within 62 days of the public hearing, which can include approval, approval with conditions, or denial. The 62-day period may be extended upon consent by both the Town Board and the Applicant. B. Utility Lines and Electrical Circuitry. All on-site utility lines shall be placed underground to the extent feasible and as permitted by the serving utility, with the exception of the main service connection at the utility company right-of-way and any new interconnection equipment, including without limitation any poles, with new easements and right-of-way. C. BESS Signage. (1) The signage shall be in compliance with ANSI Z535 and shall include the type of technology associated with the battery energy storage systems, any special hazards associated, the type of suppression system installed in the area of battery energy storage systems, and 24-hour emergency contact information, including reach-back phone number. (2) As required by the NEC, disconnect and other emergency shutoff information shall be clearly displayed on a light reflective surface. A clearly visible warning sign concerning voltage shall be placed at the base of all pad-mounted transformers and substations. D. Lighting. Lighting of the battery energy storage systems shall be limited to that minimally required for safety and operational purposes and shall be reasonably shielded and downcast from abutting properties. All lighting design and fixtures shall be compliant to the current NYS and Federal Dark-Skies goals and criteria as applicable at the time of application. E. Vegetation and tree-cutting. Areas within 50 feet on each side of Tier 2 Battery Energy Storage Systems shall be cleared of combustible vegetation and other combustible growth. Single specimens of trees, shrubbery, or cultivated ground cover such as green grass, ivy, succulents, or similar plants used as ground covers shall be permitted to be exempt provided that they do not form a means of readily transmitting fire. Removal of trees should be minimized to the extent possible. F. Noise. The 1-hour average noise generated from the battery energy storage systems, components, and associated ancillary equipment shall not exceed a noise level of 60 dBA as measured at the property line / boundary line of any non-participating residence or occupied community building adjoining or adjacent parcel. Applicants may submit equipment and component manufacturers noise ratings to demonstrate compliance and a NYS Licensed Professional Engineer certification is supplied which indicates that the manufacturer’s ratings are technically valid and applicable for the specific site plan of the BESS project. The applicant may be required to provide Operating Sound Pressure Level measurements from a reasonable number of sampled locations at the parcel’s perimeter of the battery energy storage system to demonstrate compliance with this standard. In all cases the methodology and standards for engineering calculations and field measurements shall be consistent with ANSI S12.9 as currently applicable. TOWN OF COLDEN – BATTERY ENERGY STORAGE SYSTEMS 9