TB Workshop, Thursday, April 16, 2026
TOWN BOARD WORKSHOP MEETING
Colden Town Hall – 6:00 pm  Page 1

WORKSHOP CALLED TO ORDER AT 6:00 pm
PRESENT
  Councilman Dennis Robinson
  Councilman Jesse Hrycik
  Councilman Patricia Zurbrick
  Councilman Gerald Pietraszek
  Supervisor James DePasquale

ALSO PRESENT
  Highway Superintendent Lee Wohlhueter
  Parks Worker Scott Kirby
  CEO Tom Dziulko
  Asst Recreation Supervisor Carrie DePasquale
  Planning Board Chairman Walter Kammer
  Approximately 1 resident

Supervisor DePasquale opened the workshop at 6:00 pm to discuss Mill St bridge removal and
Kummer Park improvement projects.

Mill St Bridge Removal Project
Chairman Kammer described the proposed Nussbaumer and Clarke design project to eliminate
the Mill St bridge by removing the bridge and backfilling and leveling the roadway. The
estimated cost of the project is $429,061 and construction would last 4-5 weeks. A temporary 2-
lane access roadway for residents would be needed for the duration of the project and if left in
place permanently, would lower the total project cost. Superintendent Wohlhueter requested the
proposed roadbed paving material be changed from hot asphalt to cold mix, which would last
longer and reduce the project cost. The bridge materials are likely hazardous but could possibly
be disposed of by the railroad, also lowering the overall cost. An outside contractor would
perform the work as the Town doesn’t have the equipment, but the Highway Department may be
able to assist with hauling some materials. Procurement would take at least 90 days to complete,
however if the site is declared an emergency due to the potential red flagging of the bridge, the
timeline could be expedited.

A meeting will be set up with G&W Railroad, the owner of the bridge, to present the proposed
design. If they decide against doing the project, the NYDOT, Town of Colden, and Colden Fire
Department will likely request they replace the bridge with one complying with current weight
and safety standards.

Mill St resident Louise Krolikowski asked about road access during the project. Chairman
Kammer said there might be one day with limited access during the bridge demolition and
construction of the temporary access road. Supervisor DePasquale said the EMS services would
have an ATV ready for emergencies.

Supervisor DePasquale paused the meeting at 6:50 pm and restarted the meeting at 7:10 pm.