Text · page 11 of 11
Read the whole document on one page (all 11 pages, each with its own heading)
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
for September 2026 Highway Superintendent Report Road Work: Park paving. Sent two trucks to help Orchard on various roads. Cleaned up brush from windstorm . Had street sweeper pick up the town am Road. Cleaned up tree in road on Burlingh signs. Center for youth soccer and town Poured concrete pads at Community Swept Parker Road. ns of Aurora and Colden helped). Oiled and chipped Parker Road (Tow Roads. Cherrywood Ridge and Burlingham Cut shoulders under guardrails on County Highway). Rt 16 to railroad tracks (helped Erie Oiled and chipped Warner Hill from County donated millings to Town). Put shoulders on Parker Road (Erie Equipment: Road shoulders. Got road widener ready for Parker pusher. Welded up and repaired guard rail Kenworth. Worked on spreader plate on 2016 Greased loader. d. New 2025 Kenworth was delivere body and frame repainted). 2007 International delivered (new Greased trucks Snow Removal: N/A Water: Department of Health. Monthly reports submitted to the the Department of Health. Monthly samples submitted to phouse for panel box. Poured concrete pad in Water St. pum and Glenwood. Installed service line at 11644 Holl Burlingham tank. Working on equalization valve for es on Water St. Poured concrete around water valv house. to do pipe work at Water Street pump Koester scheduled for week of 28" Buffalo water pump station. Attended water class at Colonel Ward water tank. Fixed vent screen on Burlingham Facilities: Center. Windows are done at Community Park. Installed new frost hydrant at Town Fixed spigot at Town Hall. boilers on town buildings. Lined up Kibler Mechanical to service October Tasks: Mix sand and salt. Get trucks ready for winter.