Text · page 8 of 131
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
DBALER: FOR z6 QUOTE: ea ==I 3280 CUSTOMER : CROSS LAUREL Zz5 Sira PART _ DESIGN" ZzGg 24 CEA Bt x 41" x 6" +5 aypM 46°-5 5/8 39'-3 5/8" Z2 FOR BEAY POCKET HATER DuY DROP Bx tit xe" & FOUNDATION FOR BEAM POCKET a FEDERAL a i ------- +. —= 1 > z hier Bt on-site Porc H | 57° = 3= Hay t % H St x 19" x 6% Tet x x ast tay & i if t FOR BEAM POCKET FOR BEAM POCKET BUILT BY OTHERS } = hog I i i i Hi 5 WITH BEAM 3 i rai Bt x gtx 8" uud : ow a a p y be i | pit il FOR BEAN POCKET prey Lt +> i 8= 2: IN COMPLIANCE FE ie CROSS = ih - 52 ce ee I ao"-44/a" ~ Ipt } Le HH 3 x ii i ELECT i gs i 3 Pa ON BASEMENT 1 ; : ! x x x 4a"dt x 6 e r SY =a 8 HOW x Bt gt x art im haa ayae ol z (PFGMH) * pec” ron seam Pocest Lgl 367-14 3/4 3 Hye r w 7 a 23'-8" a TO BE po a4 i 1 2 STK7K ose Sorel 1 ra !i ae x BS HOUSING ATTACHED t FOR Beam PocKeT FL | Re in PU g IS DESIGNED NOEL TE = 6 1 toe ayas tf <a éwo re boos i t 40'-14 4/2 i ™ et' | FOR MANUFACTURED i i za THE sa sae le" 4 30 LB. ROOF Loan’ = 1 FOR BEAM POCKET POH BEM POCKET 4 1 REFERENCE om FOUNDATION H1 ] ! eet we “\ 1 1 5 “x x to is x 8 xB ot rox x 19" 187 xx 6 Bt Saxe of OR BEAM POCKET 7t Nai! 1 = r=]= i FOR BEAN POCKET FOR BEAM POCKET 5 I z= a i i irs ‘ es “PLEASE “THIS GUIDE CRAWLSPACE ACCE! F 18" X 24" MIND 48°-0" m] 3) BEAVICE ENTRANCE LEGEND i 20 ar varus expos [E]- erectrzca, once PZ) ~ swwort iceR waTIN WALL [W]= waren inet [D}= oy PLowaine oRoP [seven wces tne oemne GAS INLET THIS BIAGRAM IS NOT OAPTA-APPAOVED AND IS BEING PROVIDED NOTE: ALL LOCATIONS ARE APPROXIMATE AS A CONVENIENCE FOR ESTIMATING PURPOSES ONLY. REFER TO [T= serecrr woes na teat CRAM SPACE VENTILATION NOTE: THE FOUNDATION WIDTH SHOWN 23-8" THE DAPIA APPROVED INSTALLATION MANUAL FOR THE OFFICIAL PIEA LOAD, [SZ] = SUPPORT UNOER PERIMETER MALL 1S IDENTICAL TO THE OYERMLL FLOOR KIOTH OF THE HOKE. VENTILATION 1 GAGEO ON 444 S_ IN. OF VENT FOR EVERY £500 SO. FT. eee ae 2 VENTS (EEDED f 52 80. JK, EAC! eee ne BRTLATIN, STALLED WINDMN THE FORGATION RAY BE COMSTRUCTED UP TO $ 3/2" RIDER [TO COODRATE FOR PROMETION 0 ASSDGLY TERS [2+ sem ar css 2cas sis Fa RS Te ae Set SPACING, AND FOOTING REQUIREMENTS DRAWINS TTILE NOGEL NAME y FT. ‘SSIES AEVISTONS BY] DATE BENEAAL NOTES ‘BRAND FOOTING SIZES VARY BASED ON SOD. BEARING CAPACITY AND PIER LOADS 99 1/2 CROSS I-BEA SSBH4824~32-4 1055 MARLETTE Teed _ Kas 3BR-28A MOCEL THE LAUREL FEFER 70 INSTALLATION MANUSL FOR PROPER FOOTING SIZING CLAYTON FOUNDATION PERF [onan [tes HOME BUILDING GROUP MES | 03/05/2026 | 04/08/2026 | 21-CT-S9