Text · page 24 of 34
Read the whole document on one page (all 34 pages, each with its own heading)
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
LACKAWANNA PUBLIC LIBRARY Ae 960 Ridge Rd. TUNDO Lackawanna, NY 14218 CONSTRUCTION June 15th, 2026 Estimate for Work: Window and door installations Bill To Send To Customer City of Lackawanna Recipient- Tom Nicometto Customer ID# CL-1 Dan Geerken Lackawanna, NY 14218 Previous Quotes None Delivery Date June 15, 2026 Salesperson Matthew Tundo Delivery Method Email Payment Terms 30% down payment, Balance paid on completion Scope of Work Price Quote Quote Includes- EXCLUSIONS- All material and labor for scope specified below Unforeseen conditions All work is to be performed within OSHA safety specs. Any work outside our scope All Scope related debris removal. Asbestos testing and abatement All administrative fees. Any mechanical work DOOR and WINDOW INSTALLATIONS Museum, kitchen and staff room- e Supply and install qty 6 windows to match existing historic windows. ~ TAL DDICC- te2 onn Mm TOTAL PRICE: $63,800.00 e Install includes all trim, caulk & seal and aluminum coil e Removal of existing patio double doors e Supply and install double doors to match existing e Includes all trim, accessories and sealant TOTAL PRICE: $12,200.06 Total Price Quote lotal-$76,000.00 Tundo Construction 3049 Lake Shore Road, Box #10, Blasdell, NY 14219 | TundoConstruction.Com p. 716.572.5408 | [email protected] or [email protected]