Southtowns Record

Chapter 200 Zoning Law

Government
Town of Wales
Kind
Other
Topics
Zoning and land use, Water, sewer and drainage, Parks and recreation, Roads and traffic, Budget and taxes

Original document

Text · page 23 of 39

Read the whole document on one page (all 39 pages, each with its own heading)

6. The Planning Board shall render a decision to approve, approve with conditions, or deny the site
  plan application based on its conformance with the standards and requirements set forth in this
  Zoning Law. The Planning Board may impose such conditions as it deems necessary to ensure
  compliance with applicable regulations and to mitigate potential impacts, including but not
  limited to conditions related to access, traffic circulation, screening, buffering, drainage, lighting,
  hours of operation, and other site-specific concerns.
  7. Ensure the project remains in full compliance with the approved Special Use Permit, including
  adherence to all conditions or requirements imposed as part of the permit approval.
  8. The final decision of the Planning Board, including any conditions of approval, shall be filed with
  the Town Clerk and provided in writing to the applicant.

B. Site Plan Application Requirements.
  1. Application Form. A completed application form, signed by the property owner or authorized
  representative.
  2. Application Fee. Payment of the required application fee in accordance with the Town’s adopted
  fee schedule.
  3. Site Plan Drawing(s). A site plan prepared by a licensed professional (engineer, architect, or
  surveyor, as appropriate) when applicable, drawn to scale, and including the following
  information:
  a. Title block, north arrow, scale, and date of preparation
  b. Boundaries of the property with dimensions and area
  c. Existing and proposed structures with setbacks from lot lines
  d. Driveways, parking areas, loading zones, sidewalks, and access points
  e. Existing and proposed topography (if applicable)
  f. Utilities and stormwater management systems
  g. Landscaping, screening, and buffer areas
  h. Lighting locations and specifications
  i. Signage (if applicable)
  4. Project Narrative. A written description of the proposed use, including hours of operation,
  number of employees, expected traffic, and any other relevant operational details.
  5. If the SEQRA review process has not been completed, the applicant shall submit a completed
  Short Environmental Assessment Form (SEAF) or Full Environmental Assessment Form (FEAF),
  as required under the State Environmental Quality Review Act (SEQRA).
  6. Other Supporting Materials. Any other documents or studies deemed necessary by the Planning
  Board or Code Enforcement Officer to evaluate the application, such as traffic studies, drainage
  reports, or architectural renderings.
  7. Waiver Requests (if any). A list of any specific application requirements the applicant is
  requesting to be waived, with justifications for each.  Commented [NB11]: Would we want to add a timing for
  approvals? If a project got site plan approval but didn’t start
  construction for say 365 days, do they need to get
  reapproval?

  ARTICLE VIII
  Supplementary Regulations  Commented [NZ12]: Strategy 6 - Consider allowing
  additional value-added and secondary businesses on farms
§ 200-39. Applicability to all districts. [Amended 12-29-2005 by Ord. No. 2-2005]  with a special use permit. The permit would be required for
  businesses that would not be considered part of the farm
  operation and protected through NYS Agricultural Districts
A.  The provisions of Articles III, IV, V and VI shall be subject to additional requirements, limitations  Law, such as businesses that manufacture products using
  and exceptions in accordance with the remaining sections of this article. Unless otherwise specified,  ingredients that are only partially produced on the farm, or
  such supplementary regulations shall apply in all districts.  for businesses such as equipment repair that are not strictly
  farming.

  23