Text · page 5 of 34
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
July 14, 2026 Mr. Charles Snyder — Supervisor Town of Aurora 575 Oakwood Avenue East Aurora, NY 14052 RE: West Falls NY Forward Grant — Construction Documents Proposal Dear Supervisor Snyder, Included within is our proposal to provide Professional Architectural and Engineering Services to complete Construction Documents for the referenced project, based on the Town’s provided Concept Study. Architectural Project Scope : VETERAN’S PARK 1). NEW PAVILION — 20’ OCTAGON (Seating for 16 People) A). Construction Documents for bidding and permitting of the new pavilion 2). CONSTRUCTION DOCUMENTS FOR IMPROVEMENTS A). Site Plan drawing, notes and details 1. New fencing — existing posts to remain 2. Tree Clearing for better visibility of dam 3. Extension to paver pathway 4. Siting of new Pavilion COMMUNITY PARK 1). CONSTRUCTION DOCUMENTS FOR IMPROVEMENTS A). Site Plan drawing, notes and details 1. New fencing 2. New Asphalt Parking Spaces 3. New Concrete Curb and Sidewalk 4. Placement of Playground and ground surfacing materials 2). Provide support to assist with obtaining Agency approvals for work in the in the right-of-way 1|Page