Text · page 8 of 12
Read the whole document on one page (all 12 pages, each with its own heading)
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
5. Is the proposed action, NO ne Gp n sci Z > a. A permitted use under the zoning regulations? [] LisOK b. Consistent with the adopted comprehensive plan? [ sot 6. Is the proposed action consistent with the predominant character of the existing built or natural ml DN landscape? 7. Is the site of the proposed action located in, or does it adjoin, a state listed Critical Environmental Area? 7.) Zz mn se ) If Yes, identify: 8. a. Will the proposed action result in a substantial increase in traffic above present levels? oe) Z ira LO b. Are public transportation service(s) available at or near the site of the proposed action? K] |é Bowe c. Are any pedestrian accommodations or bicycle routes available on or near site of the proposed action? 9. Does the proposed action meet or exceed the state energy code requirements? gpl as 7) If the proposed action will exceed requirements, describe design features and technologies: 10. Will the proposed action connect to an existing public/private water supply? E me DN If No, describe method for providing potable water: LJ 11. Will the proposed action connect to existing wastewater utilities? E as 2 ) N If No, describe method for providing wastewater treatment: LL [IL 7.) [ 12. a. Does the site contain a structure that is listed on either the State or National Register of Historic cpl me DINE MA s Places? b. Is the proposed action located in an archeological sensitive area? 13. a. Does any portion of the site of the proposed action, or lands adjoining the proposed action, contain as 7) = wetlands or other waterbodies regulated by a federal, state or local agency? b. Would the proposed action physically alter, or encroach into, any existing wetland or waterbody? If Yes, identify the wetland or waterbody and extent of alterations in square feet or acres: 14. Identify the typical habitat types that occur on, or are likely to be found on the project site. Check all that apply: [7] Shoreline [_] Forest J Agricultural/grasslands [JEarly mid-successional [J] Wetland Egurban ‘TaSuburban 15. Does the site of the proposed action contain any species of animal, or associated habitats, listed NO | YES by the State or Federal government as threatened or endangered? LI Met 16. Is the project site located in the 100 year flood plain? YES 17. Will the proposed action create storm water discharge, either from point or non-point sources? NO | YES If Yes, ; a. Will storm water discharges flow to adjacent properties? [ZNO [ ]YES IM L] b. Will storm water discharges be directed to established conveyance systems (runoff and storm drains)? If Yes, briefly describe: [S4NO [_]vES Page 2 of 3