Proposed Bank
1465 Union Road
West Seneca, NY 14224
Page 1 of 3
2/11/2026

Section 1 – Location & Description

This redevelopment project involves the construction of a single-story bank with drive-thru located at 1465
Union Road in the Town of West Seneca. Construction will also consist of associated parking, storm water
management, utility, lighting, and landscaping improvements. The site is part of a larger redevelopment
project that includes the existing two-story office building located on the adjacent parcel of 1471 Union
Road. Existing improvements as part of that project included parking for the office building and the curb
cuts on Union Road and Center Road. The area of disturbance for this phase of redevelopment is
approximately 0.5 acres. The site is currently zoned C-2 (S) – Commercial District and is in the Union Road
Corridor.

See Appendix A for Site Location Map.

Section 2 – Water System

The proposed domestic water service will connect to an existing 6” CIP water main located on the north
side of Center Road. The proposed 1” copper water service will tap the existing main. A 1” RPZ and meter
will be provided inside the mechanical room on the south wall of the building. Drainage due to testing or
failure will be via gravity to the nearest drainage inlet. Water inside the building will be used for typical
bathroom and janitorial uses.

Domestic Summary:
  Peak Operating Demand:  1.98 gpm
  Water Main:  10” PVC water main along Jeffrey Boulevard
  Static Pressure:  69 psi
  Friction Loss:  0.01 psi
  Elevation Loss:  1.52 psi
  Meter & RPZ Loss:  13 psi
  Pressure after RPZ & Meter:  54.5 psi

Repairs to all devices will be made during off hours; dual backflow preventers are not required. The site is
not located in a 100-year flood plain.

Disinfection of the water service following installation will be continuous feed, according to AWWA C-651,
latest revision.

See Appendix B for Sanitary Sewer & Water Calculations.

Section 3 – Sanitary Sewer Service

The proposed sanitary sewer service will connect to an existing 8” VTP sanitary sewer main located on the
east side of Union Road. The proposed service will consist of approximately 68 LF of 6” SDR-35 PVC sanitary
sewer lateral at a minimum slope of 1.0%.

  Design Parameters:
  Contractor Shops: 8 employees x 15 gpd/employee = 120 gpd

The hydraulic loading rates per “Design Standard for Wastewater Treatment Works” 2014, NYSDEC.

See Appendix B for Sanitary Sewer & Water Calculations