Southtowns Record

PBA03.12.2026packet

Government
Town of West Seneca
Board
Planning Board
Meeting
Mar 12, 2026, 6:00 p.m.
Posted by publisher
Feb 25, 2026
Kind
Agenda packet
Topics
Water, sewer and drainage, Roads and traffic, Zoning and land use

Original document

Same meeting

Text · page 30 of 65

Read the whole document on one page (all 65 pages, each with its own heading)

25-4181 storm calcs - existing  Type II 24-hr 100-Year Rainfall=5.23"
Prepared by Carmina Wood Design  Printed 2/11/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC  Page 5

  Summary for Subcatchment 1S: Existing Site

Runoff  =  6.75 cfs @ 12.05 hrs, Volume=  20,044 cf, Depth= 4.54"

Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Type II 24-hr 100-Year Rainfall=5.23"

  Area (sf)  CN  Description
  8,670  98  Roofs, HSG D
  31,405  98  Paved parking, HSG D
  12,963  80  >75% Grass cover, Good, HSG D
  53,038  94  Weighted Average
  12,963  24.44% Pervious Area
  40,075  75.56% Impervious Area

  Tc Length Slope Velocity Capacity Description
  (min) (feet)  (ft/ft) (ft/sec) (cfs)
  14.1  94 0.0250  0.11  Sheet Flow,
  Grass: Dense n= 0.240 P2= 2.50"

  Subcatchment 1S: Existing Site
  Hydrograph

  Runoff
  6.75 cfs
  7
  Type II 24-hr
  6  100-Year Rainfall=5.23"
  Runoff Area=53,038 sf
  5
  Runoff Volume=20,044 cf
  Flow (cfs)

  4  Runoff Depth=4.54"
  Flow Length=94'
  3
  Slope=0.0250 '/'
  2
  Tc=14.1 min
  CN=94
  1

  0
  5  10  15  20  25  30  35  40  45  50  55  60  65  70
  Time (hours)

  Page 30 of 65