Posted by publisher
Feb 25, 2026
Kind
Agenda packet
Topics
Water, sewer and drainage, Roads and traffic, Zoning and land use

Original document

Same meeting

Text · page 4 of 65

Read the whole document on one page (all 65 pages, each with its own heading)

sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145

  Greensboro
  Utica
  Buffalo
  EX. CATCH BASIN AND  SILT FENCE/SILT SOCK
  ASSOCIATED PIPING
  TO BE REMOVED  EROSION CONTROL NOTES

  THE FOLLOWING EROSION CONTROL PROCEDURES SHALL BE ADHERED TO BY THE CONTRACTOR:

  1.  INSTALL TEMPORARY SILT FENCE BARRIERS AS DIRECTED BY THE OWNER AND AT ALL EXISTING STORMWATER CATCH BASINS WITHIN THE WORK AREA
  TO PREVENT SEDIMENT MIGRATION. ALL SILT FENCE BARRIERS SHALL BE INSTALLED IN ACCORDANCE WITH THE DETAILS SHOWN ON THE PLANS.

  2.  TOPSOIL SHALL BE STRIPPED AND STOCKPILED ON SITE FOR RE-USE AS DIRECTED BY THE OWNER. ALL LOCAL ORDINANCES REGARDING THE SALE OF
  TOPSOIL MUST BE FOLLOWED. TOPSOIL MAY NOT BE REMOVED WITHOUT A PERMIT.

  3.  ALL SILT FENCE BARRIERS SHALL BE REPLACED WHEREVER THEY BECOME CLOGGED OR INOPERABLE.

  EQUIPMENT AND MATERIAL STORAGE AREA
  4.  THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTENANCE AND REMOVAL OF TEMPORARY SEDIMENTATION CONTROLS.
  8
  5.  THE CONTRACTOR MUST CONTROL DUST DURING CONSTRUCTION. DURING EARTHWORK OPERATIONS, WATER-SPREADING EQUIPMENT SHALL BE
  PROVIDED BY THE CONTRACTOR, AND SPREAD WATER AS NECESSARY AND AS DIRECTED BY THE OWNER IN ORDER TO CONTROL DUST.

  6.  DIRT OR DEBRIS LEFT ON LOCAL PUBLIC ROADS AS A RESULT OF THIS CONSTRUCTION PROJECT SHALL BE REMOVED AND ROAD SURFACES CLEANED BY

  Proposed Bank
  EXISTING 2-STORY  THE CONTRACTOR ON A DAILY BASIS.
  OFFICE BUILDING
  3,150 S.F. FOOTPRINT  7.  ALL DISTURBED AREAS (EXCEPT AREAS TO BE PAVED OR BUILT UPON) SHALL BE TOPSOILED TO A MINIMUM 4" DEPTH AND SEEDED IMMEDIATELY AFTER
  F.F.E. = 530.90  FINE GRADING TAKES PLACE AND AS SOON AS PHYSICALLY POSSIBLE.

  8.  THE CONTRACTOR IS RESPONSIBLE FOR THE MAINTENANCE OF DOWNSTREAM STORM SEWERS, DITCHES, AND CULVERTS. SILT BUILDUP FOUND TO BE
  A RESULT OF THIS SITE CONSTRUCTION WORK SHALL BE REMOVED FROM DOWNSTREAM CULVERTS BY THE CONTRACTOR AT NO ADDITIONAL EXPENSE
  © CARMINA WOOD DESIGN

  TO THE OWNER OR THE TOWN/CITY.

  West Seneca, NY
  1465 Union Road
  9.  ALL SOIL EROSION AND SEDIMENT CONTROL DEVICES AND MATERIALS SHALL BE IN PLACE PRIOR TO BEGINNING EARTHWORK OPERATIONS AND SHALL
  SILT FENCE/SILT SOCK  BE MAINTAINED UNTIL THE NEW SLOPES ARE STABILIZED WITH SEEDING AND/OR SLOPE PROTECTION, AS DIRECTED BY THE ENGINEER.

  10. INSTALL TEMPORARY SILT FENCE AROUND THE BASE OF STOCKPILES.

  11. THE PROFESSIONAL CERTIFYING COMPLIANCE TO NYSDEC PHASE II STORMWATER REGULATION REQUIREMENTS MUST INSPECT AT A MINIMUM WEEKLY
  AND SHALL PROVIDE THESE INSPECTION REPORT WITH A WRITTEN CERTIFICATION OF CONSTRUCTION COMPLIANCE WEST
  TO THESENECA
  TOWN OF
  WEEKLY.

  12. THE ENGINEER OF RECORD FOR THIS PROJECT CERTIFIES THAT THESE DESIGN PLANS MEET THE REQUIREMENTS AND ARE IN COMPLIANCE WITH THE
  NEW YORK STORMWATER MANAGEMENT DESIGN MANUAL AND NYSDEC PHASE II STORMWATER REGULATION REQUIREMENTS. DUE TO SOIL
  DISTURBANCE BEING GREATER THAN ONE ACRE, A NYSDEC SPDES PERMIT MUST BE OBTAINED BEFORE ANY ON-SITE DISTURBANCE IS MADE.

  CONCRETE
  STABILIZED  WASHOUT PIT

  Date
  CONSTRUCTION
  ENTRANCE  NOTES:

  1.  THE CONTRACTOR SHALL TAKE PRECAUTIONS TO PROTECT THOSE ITEMS TO REMAIN, SUCH AS TREES, PROPERTY CORNER
  PINS, UTILITY POLES, VALVES, HYDRANTS, CURBS, MANHOLES AND CATCH BASINS.

  2.  TEMPORARY SILT FENCE AND STRAW BALES TO BE INSTALLED AS DIRECTED BY THE OWNERS FIELD REPRESENTATIVE.
  MAINTAIN UNTIL VEGATATION IS ESTABLISHED AND PAVEMENT IS INSTALLED.

  3.  FOR THOSE STRUCTURES TO BE DEMOLISHED, ALL EXISTING UTILITY SERVICES SHALL BE ABANDONED IN ACCORDANCE WITH
  LOCAL REGULATIONS, ALL METERS SHALL BE RETURNED TO PROPER OWNERS.

  No. Description
  4.  THE CONTRACTOR SHALL INSTALL STABILIZED CONSTRUCTION ENTRANCES WHERE ACCESSING THE SITE FROM PAVED

  REVISIONS:
  ROADWAYS.

  5.  THE CONTRACTOR SHALL INSTALL TEMPORARY TRAFFIC CONTROL DEVICES IN ACCORDANCE WITH NYS M.U.T.C.D.
  15  STANDARDS PRIOR TO STARTING WORK.

  ARY
  CTION
  CONSTRU
  PRELIMIN
  NOT FOR
  EX. UNDERGROUND DETENTION SYSTEM

  DEMO & EROSION CONTROL LEGEND:

  INSTALL STORM DRAINAGE INLET PROTECTION
  DRAWING NAME:

  Demo & Erosion
  PROPOSED SILT FENCE/SILT SOCK
  Control Plan

  Date:  1/20/26

  Demo & Erosion Control Plan  Drawn By:
  Scale:
  A. Pandolfe
  As Noted
  NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS,  DRAWING NO.
  SCALE: 1"=30'  CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.

  20'
  20  0  20  40Ft.

  C-001
  Project No:  25-4181