Text · page 9 of 9
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
Highway Superintendent Report for February 2026 Road Work: ¢ Cleaned drop inlets. ¢ Cleared gutter from ice on Canada St. Equipment: e Installed amber lights on all trucks. e Installed new cutting edge on 2020 F350 Pickup plow. e Replaced O-ring hydraulic hose on 2010 Kenworth, e Replaced wing cylinder on 2010 Kenworth. © Brutte Spring repaired front passenger side spring on 2010 Kenworth. e Power washed all trucks. e Greased all trucks. e Serviced John Deere sidewalk blower. e Serviced skid steer. e Serviced John Deere drag box tractor. e Worked on power washer. e Serviced excavator. e Generator at Highway building being installed. e Changed wing rubbers on 3 trucks. Snow Removal: « Patrolled roads 34 times. e ~=Plowed roads with pickup 11 times. e Plowed with trucks 24 times. Plowed lots 22 times. « Cleared sidewalks 12 times. e Monthly reports submitted to the Department of Health. « Monthly samples submitted to the Department of Health. « Dig safe locates, e Fixed broken meters. e Tearing apart old meters for scrap. @ Worked on workbench at highway building. ¢ Parker Bray worked on a contest for Holland students to design logo for water tank on Vermont. Facilities: * Had Ed from Simoncelli Electric take down overhead power line for trooper building on Water Street and install underground service. ¢ Notified Rich Potter of ice buildup on highway building, he was checking with Transit buildings to come up with a solution. ® Met with Parker Bray about putting the town logo on the highway building. March Tasks: ¢ Service equipment. e Get sweepers ready for road clean up.