PBA01.08.2026packet (full text)
Page 1
WEST SENECA
PLANNING BOARD
1300 Union Road, West Seneca, NY 14224
6:00 PM in the Community Center
January 8, 2026
AGENDA
Meeting # 2026-01
CALL TO ORDER
APPROVAL OF PROOFS OF PUBLICATION
APPROVAL OF MINUTES
1. Minutes of Meeting #2025-12
OLD BUSINESS
2024-005
A request from LaBella Associates for property located at 2544 Clinton St to amend the
granted special use permit and permit a multi-unit residential development.
2025-006
A request from Carmina Wood Design for for property located at 1475 Orchard Park Rd to
permit a 29 unit townhouse development.
NEW BUSINESS
SPR2025-006
A request of Green Philosophy 716 for property located at 101 Slade Ave. to permit a
second sign.
SPR2025-007
A request of Fund Raising Barn LLC for property located at 1325 Orchard Park Rd. to
allow the construction of a 1,200 SF addition to the existing business.
ADJOURN
Page 1 of 110
Page 2
WEST SENECA COMMUNITY CENTER Planning Board PROCEEDINGS
1300 Union Road Minutes #2025-12
West Seneca, NY 14224 December 11, 2025
ROLL CALL: Present: Chairperson Margaret Bebak
Planning Board Member Eric Sailer
Planning Board Member Jim Frick
Planning Board Member Dale McCabe
Planning Board Member Joseph Sherman
Planning Board Member Tim Hayes
Absent:
CALL TO ORDER
Motion by Chairperson Bebak, seconded by Planning Board Member Hayes, to open the public
hearing.
Ayes: 6 Noes: 0 Abstain: 0 Motion Carried
APPROVAL OF PROOFS OF PUBLICATION
Motion by Chairperson Bebak, seconded by Planning Board Member Sherman, to approve the proofs
of publication.
Ayes: 6 Noes: 0 Abstain: 0 Motion Carried
APPROVAL OF MINUTES
1. Minutes of Meeting #2025-11
Motion by Planning Board Member McCabe, seconded by Planning Board Member Sherman, to
approve Meeting Minutes 2025-11 of November 13, 2025.
Ayes: 6 Noes: 0 Abstain: 0 Motion Carried
OLD BUSINESS
SPR2025-004
A request of Studio T3 Engineering, PLLC for site plan approval for property located at 484 Harlem
Road to permit an expansion of the existing building and parking lot.
Andrew Terragnoli of Studio T3 Engineering along with the owners of Don Juan Mexican Restaurant
presented updated plans that addressed the review comments and revision requests received from
the Engineering Department.
Chairperson Bebak stated there were engineering concerns that were addressed in a letter. Mr.
Schieber stated technical civil engineering adjustments were required, which were made and
accepted by the Engineer. Additionally, the owners have agreed to work out minor items, including
future sanitary sewer connections with the Code Enforcement and Engineering Departments.
Chairperson Bebak asked whether the issues of screening and the placement of new trees were
addressed. Mr. Terragnoli confirmed this and referred the Planning Board members to new
landscape plans C4.0. Mr. McCabe stated that it appears some trees would be removed and
1
Page 2 of 110
Page 3
WEST SENECA COMMUNITY CENTER Planning Board PROCEEDINGS
1300 Union Road Minutes #2025-12
West Seneca, NY 14224 December 11, 2025
replaced. Mr. Terragnoli confirmed this is correct. Mr. McCabe asked what type of trees would be
planted. Mr. Terragnoli stated Black Cedar trees around the dumpster and Harvest Gold Crabapple
trees.
Mr. Frick asked if the concerns about the dumpster location were addressed. Mr. Terragnoli
confirmed the refuse company has indicated the location and orientation was adequate.
Chairperson Bebak stated one of the concerns in the letter was from the Fire Marshall about planting
the trees too close to the fire pits and asked if this was addressed. Mr. Schieber stated the Fire
Marshall referred to in the letter is the Fire Inspector in his office and the local Fire Chief has not
provided comments and, as the project progresses, the Fire Inspector from the Code Enforcement
Office can visit to advise safe placement.
No public comments were received.
Motion by Chairperson Bebak, seconded by Planning Board Member McCabe, to approve the site
plan for property located at 484 Harlem Road to permit an expansion of the existing building and
parking lot subject to the approval of the Fire Marshall on the additional plantings and the submission
and approval of the revised plan set and drainage report as requested in the engineering report.
Ayes: 6 Noes: 0 Abstain: 0 Motion Carried
NEW BUSINESS
SPR2025-006
A request of William Sahlem and Brian Hillery for rezoning and special permit for property located at
1475 Orchard Park Road to allow construction of five (5) 12 unit multi family buildings
Mr. Schieber stated the property owners have requested to postpone the application and the town
will perform neighbor notifications when the application will be heard by the Planning Board.
Motion by Chairperson Bebak, seconded by Planning Board Member Hayes, to table SPR2025-006,
request for rezoning and special permit for property located at 1475 Orchard Park Road to allow
construction of five (5) 12 unit multi family buildings.
Ayes: 6 Noes: 0 Abstain: 0 Motion Carried
SPR2025-007
A request of 120 South Avenue LLC for rezoning for property located at 120 South Avenue to allow
construction of two (2) warehouse buildings.
Attorney Sean Hopkins, along with Todd Czarcinski of Hamburg Floor Coverings, Doug Feyes of
Carmina Wood Design, and Dave Sutton of Sutton Architecture were present.
2
Page 3 of 110
Page 4
WEST SENECA COMMUNITY CENTER Planning Board PROCEEDINGS
1300 Union Road Minutes #2025-12
West Seneca, NY 14224 December 11, 2025
Mr. Hopkins provided the following information:
- Request to rezone a portion of 120 South Avenue from R-50 to C-1
- The parcel is 2.2 acres
- Existing use is a flooring business
- Property owner to occupy a portion of the two new buildings
- Front of the property is zoned C-1, the rear of the property is R-50 and are requesting rezoning to
C-1
- Proposed use is two flex warehouse buildings and 26 parking spaces
- Applicant owns the adjacent vacant parcel of 134 South Avenue which is .89 acres and 60' wide
- Proposing this parcel would remain permanent open space with a deed restriction and remain
undeveloped to provide a buffer to the residential neighborhood
- Concept site plan includes rezoning of 1.06 acres from R-50 to C-1; 2 flex warehouse buildings of
6,000-sf each; 26 parking spaces; on-site water management area; and a T-turnaround for
emergency vehicles
- If the rezoning is granted, the applicant will return to the Planning Board for site plan approval with
fully engineered plans
- Erie County Department of Environment and Planning had no recommendation and determined the
application to be of local concern; the comments on the proposed action included compatibility,
landscaping, operations, and lighting noting they are topics that can be addressed and EC was not
adware of the proposed green space for 134 South Avenue
- C-1 zoning allows a variety of uses and the applicant is only interested in the expansion of the
existing business and some rental space
- SEQRA: unlisted action, short EAF submitted with rezoning application, no environmentally
protected resources, project will require site plan approval and compliance with applicable
stormwater quality and quantity standards, project will not result in any potentially significant adverse
environmental impacts, and the issuance of a Negative Declaration is justified
- Requesting the Planning Board recommend rezoning a portion of the project site from R-50 to C-1
subject to the condition that the parcel at 134 South Avenue shall be merged with 120 South Avenue
and shall be subject to a Declaration of Restrictions stating it shall consist of permanent open space
to remain undeveloped
Mr. Sherman asked if the new buildings would have tenants or be for the owner's personal use. Mr.
Hopkins stated there would be both. Mr. Sherman commented that SHPO would have to be
contacted and asked if other agencies have been contacted. Mr. Feyes stated they would contact the
agencies during the site plan approval process. Mr. Sherman stated C-1 zoning does not list
warehousing and proposed amending the rezoning to C-2(S) with the Special Permit for indoor
storage only for the additional warehouses. Mr. Hopkins stated Mr. Schieber communicated with
himself and stated his client was amenable to this. Mr. Sherman asked if the owner was amicable for
indoor storage only. Mr. Hopkins stated there is presently limited outdoor storage. Mr. Czarcinski
stated that other than his installation vehicles parked outside, there would be no outdoor storage. Mr.
Sherman stated materials and things of that nature would be stored indoors at all times. Mr.
Czarcinski stated that was acceptable.
Mr. Frick referred to the EAF and commented that an archeological site had been identified. Mr.
Hopkins stated they would do their due diligence and noted the fact that the site shows up as
potentially significant does not mean there are resources onsite.
3
Page 4 of 110
Page 5
WEST SENECA COMMUNITY CENTER Planning Board PROCEEDINGS
1300 Union Road Minutes #2025-12
West Seneca, NY 14224 December 11, 2025
Mr. McCabe referred to 134 South Avenue and the screening requirements along the side adjoining
the residential property. Mr. Schieber stated the undeveloped parcel is 60' wide and would act as a
buffer. Chairperson Bebak asked if this would be a conservation area or how best to define it. Mr.
Hopkins stated the intent is to leave it as is and is familiar with deed restriction but Mr. Trapp could
confirm the correct term.
No public comments were received.
Motion by Chairperson Bebak, seconded by Sailer, to recommend the rezoning for property located
at 120 South Avenue to allow construction of two (2) warehouse buildings with the following
conditions: 1) merge the 2 lots into one lot, 134 South Avenue and 120 South Avenue, with a
declaration restriction stating it shall consist of permanent open space on the most westerly 60' of the
property and the trees remain; 2) the zoning is changed to C-2 that no business or storage of
materials take place on the exterior of the building.
On the question, Mr. Sherman stated the Special Permit should be designated.
Chairperson Bebak acknowledged this and amended the motion to indicate C-2(S).
Ayes: 6 Noes: 0 Abstain: 0 Motion
ADJOURN
Future meetings are held the second Thursday of the month at 6:00pm
Chairperson Bebak recognized and thanked Dale McCabe for the many years of service he has given
to the Town of West Seneca. Mr. McCabe thanked the Planning Baord members, Town Clerk, Code
Enforcement Office, and Town Attorney for their professionalism.
Motion by Chairperson Bebak, seconded by McCabe, to adjourn the meeting at 6:25 P.M.
Ayes: 6 Noes: 0 Abstain: 0 Motion Carried
4
Page 5 of 110
Page 6
December 22, 2025
Jeffery Schieber
Code Enforcement Officer
1250 Union Road – Room 210
West Seneca, New York 14224
RE: 2544 Clinton Street – Home Leasing Development
Special Use Permit Amendment
Mr. Schieber:
On behalf of Home Leasing, I am pleased to submit the attached package seeking an Amendment to
the Special Use Permit for the previously approved development at 2544 Clinton Street. The project
is located on Tax parcel #124.00-2-5, which is a 11.7-acre parcel bounded by Clinton Street to the
south, Cayuga Creek to the north and west, and a vacant property to the east.
The modification to the site plan was driven by our commitment to improving the overall functionality
and livability of the community. In response to comments from the Planning Board, Town Board, and
various financing partners, we have developed a plan that better meets these objectives. By
consolidating the layout into a single building set back further from the street, we can best meet
accessibility standards, preserve mature vegetation, increase open space, improve shelter-in-place
accommodations, improve parking and bus accessibility, improve playground safety, reduced
electrical demand, and provide a better overall design for residents.
Home Leasing previously received approval (1/27/2025) from the Town Board to rezone the parcel
to R 50 and issuance of a Special Use Permit - allowing for multiple-family dwellings. Home Leasing
is seeking to amend the existing Special Use Permit based on a revised conceptual site layout. We
are first seeking a positive recommendation from the Planning Board before presenting it in front of
the Town Board.
The amended site layout includes ±75 units split between a proposed singular 3-story building - in
the rear of the property - and a repurposing of the existing mansion – to include residential units. The
previously approved layout included six townhouse buildings and reuse of the mansion. As with the
original version of the project, the site will include the code required 150 parking spaces, site access
will utilize the existing site entrance (to be widened), sidewalks, playground, landscaping and
stormwater management facilities. Additional improvements to the existing mansion will include
amenities for residents, modification (interior and exterior) to make the first floor ADA accessible.
Also included as parts of this package are the following: revised conceptual plan, updated FEAF and
appendices including reports/studies/supplemental information. After amendment of the Special
Use Permit, Home Leasing intends to submit a fully engineered package to the Planning Board for
Site Plan Approval.
The revised site layout, with a singular apartment building - instead of six scattered townhouse
buildings - will result in a variety of benefits for the project as a whole:
Page 6 of 110
Page 7
Building Location
The proposed building will be located behind (north of) the existing mansion which will screen much
of the view of the new building. It’s greater setback – significantly farther than the scattered
townhouses – preserves the view of mansion and open space in the front of the property. This
placement also enables the majority of the parking to be placed between the mansion and the
proposed building, using the mansion and the existing trees to provide visual screening from Clinton
Street.
Improved ADA accessibility
Throughout the site and within interior common areas - Common areas for the residents will now be
in the new building (previously proposed in the mansion), this will allow for interior areas to meet and
exceed code requirements. Sidewalks throughout the site will be ADA accessible including
pedestrian access to Clinton Street.
Preservation of Open Space and Existing Mature Vegetation
Consolidating the project into a single building reduces the overall developments area of
disturbance. This approach preserves more green space across the site and eliminates a less
efficient building layout. The parking layout becomes more efficient and consolidated, fire access is
simplified, and the reduced disturbance area ensure that more existing trees are maintained.
Positioning the new building behind the mansion conserves additional trees in the front yard,
protecting the existing feel of the property.
Improved Shelter-In-Place Accommodations
Common areas and shelter-in-place zones will be relocated to the new building (previously proposed
in the mansion), ensuring that these essential spaces are easily accessible to the majority of
residents. This rearrangement significantly improves both daily convenience and access during
emergencies. The designated shelter-in-place areas will be supported by the backup generator and
are designed to accommodate all residents – including residents of the mansion – in the event of a
power outage.
Improved Parking Layout and Bus Access
The proposed design meets the minimum code requirement for parking (150 spaces, 2 per unit).
Parking will be located closer to both the new building and the mansion than the previous layout,
improving convenience for residents and visitors. Additional parking will be provided behind the new
building which will also serve as additional fire access. The consolidated parking design also
promotes improved bus circulation and allows residents to remain protected from within the shelter
of the common lobby of the main building while awaiting bus pick-up.
Playground Safety
The playground will be located adjacent to the new building, which provides safe and convenient
access from both the new building and mansion. This placement minimizes the need for children to
cross internal roads or parking areas and provides improved sight lines for parents and guardians.
2
Page 7 of 110
Page 8
Electrical Capacity
Despite increasing the unit count from 67 to 75 units, the overall building square footage is reduced
creating an opportunity for a more efficient energy design and thereby reducing the building's
proposed load from 1.62MVA in the original design to 1.20MVA, which only increases the load on the
existing NYSEG/RGE 12.5kV circuit from 46.89% to 56.10%.
Summary
Below is a table summarizing the proposed impacts of the revised site layout in relation to the
original design. Categories are based on previous areas of concern as identified by the Town Board.
Impacts of Revised Layout
Design Element Proposed Impact
Building Location Improved
ADA Accessibility Improved
Preservation of Open Space / Existing Vegetation Improved
Shelter-In-Place Accommodations Improved
Parking Layout Improved
Playground Safety Improved
Electrical Demand Reduced
Sewer Impact Not Impacted
Traffic Impact Not Impacted
Sidewalk Connectivity Not Impacted
Project History – June 2024 to January 2025
An application package for rezoning and a special use permit was originally submitted to the town in
May 2024. The project appeared in front of the Planning Board on 6/13/2024, where it received a
positive referral to the Town Board. The project appeared in front of the Town Board serval times in
summer/fall 2024 before receiving a SEQR negative declaration and approval for Rezoning and a
Special Use Permit on 1/27/2025.
Throughout the approval process a variety of supplemental reports and studies were performed to
address comments and concerns raised by residents, staff and board members. A summary of the
information is provided below - detailed reports are included in the appendices. These reports have
been updated (as needed) to reflect the revised layout and updated unit count.
Appendix A - Sewer Study (updated)
Appendix B - DOT Traffic Concerns
Appendix C - Electrical Capacity (updated)
Appendix D - Sidewalk Along Clinton Street – DOT Correspondence
Appendix E - Correspondence with Seneca Nation & SHPO
Appendix F - West Seneca Schools – Correspondence (pending)
3
Page 8 of 110
Page 9
Appendix A - Sewer Study – (Study regarding the sewer capacity)
Labella Associates completed a sewer study to analyze the potential impact of the proposed
development would have on the existing sewer infrastructure and to confirm the available capacity.
Results from the sewer study conclude that the existing sewer has sufficient capacity to handle the
proposed project. The increased unit count (75 units) did not increase the impact on the sewer load.
Of the three sample locations, the highest existing flows recorded during the monitoring period
showed the existing 60” Sewer (Casmier Street) peaking at 34.6% of its total capacity. The proposed
project would increase the load to 34.8% (dry weather weekend day peak). At the two other sample
locations (Mathews Cemetery NW Corner and 8 Cable Street), the proposed project would increase
peak flows to 10.3% and 33.3% of the total sewer pipe capacity respectively (dry weather weekend
day peak).
TEC Smith was contracted to install monitoring nodes in existing manholes as directed by Erie County
Department of Health. Sanitary flows were monitored in three downstream manholes from August
13, 2024 – September 18, 2024. The data was provided and Labella Associates completed the
sewer analysis report. Attached in Appendix A, with all supplemental node data provided to the town
under separate cover.
Refer to Appendix A for the sewer report, as prepared by LaBella Associates (Kristopher Winkler, P.E.)
Appendix B - DOT – Traffic Study Correspondence
Labella and Home Leasing met with the New York State Department of Transportation, Region 5
staff on 8/6/2024 to discuss if any traffic studies would be required in addition to the original traffic
assessment prepared by Labella Associates (Traffic assessment dated 6/13/2024). The meeting
was held with Casey Gordon, Ronald Frei and Carl Calarco of the DOT.
The DOT is not requesting any additional traffic assessments at this time. The Traffic Assessment
originally provided is sufficient. The original traffic study is based on 75 units – an update was not
needed as part of this resubmission. Email correspondence confirming the DOT position via Casey
Gordon, Transportation Analyst is provided in Appendix B.
Appendix C - Electrical Capacity – Grid Capacity Evaluation (GCE)
Labella Associates has prepared a Grid Capacity Evaluation (GCE) to provide insight into the
available electrical capacity for the proposed project.
The original report was updated to reflect 75 units and the gross square footage of the new building
layout. The singular building design results in more efficient layout in regard to energy usage.
Updated results from the Grid Capacity Evaluation found that the proposed project would increase
the load on the 12.5kV circuit to 56.1% (in leu of 83.5% with the original layout) of its available
capacity (if constructed at the time of the report). This is well below the maximum peak percentage,
therefore is Labella’s opinion that the project can be serviced without additional upgrades from
NYSEG. Based on previous experience, if the total peak percentage is below 90%, the proposed
developments can be serviced without upgrades.
The GCE evaluation looks at the current capacity of the electrical grid in the area and estimates the
electrical load that the proposed project would potentially add to the existing infrastructure. The
4
Page 9 of 110
Page 10
evaluation report includes research from the Electrification Capacity online resource and a site visit
for observation of existing feeds. The GCE report is provided in Appendix C.
Per NYSEG protocol, “Will Serve” letters cannot be provided until the project has an official address
as issued by the local 911 department. Thus, until the project is further along a letter cannot be
obtained.
Refer to Appendix C for the GCE prepared by Labella Associates (Anthony Sanganetti, P.E.).
Appendix D - DOT - Connecting Sidewalk on Clinton Steet
Labella and Home Leasing met with the New York State Department of Transportation, Region 5
staff on 8/6/2024 to discuss the possibility of adding a sidewalk to Clinton Street to help connect
the proposed project to the retail areas to the west. The meeting was held with Casey Gordon,
Ronald Frei and Carl Calarco of the DOT.
Labella provided a conceptual sketch to the DOT of a sidewalk from the proposed development
connecting the shoulder of Clinton Street (included in Appendix E). At this time the DOT does not
intend to upgrade/widen the road shoulder and/or bridge over Cayuga Creek or allow modification to
the guardrail. The DOT does not object to the routing shown in blue (sidewalk in ROW, up to existing
guardrail) on the above-mentioned sketch and as shown on the revised conceptual plan (Appendix
D). Email correspondence confirming the DOT position via Casey Gordon, Transportation Analyst is
provided in Appendix D.
The sidewalk connection was not updated as a part of this resubmission. Connectivity along the new
driveway to Clinton Street remains unchanged from the original layout/plans presented to DOT staff.
Appendix E - Communication with Seneca Nation – (SHPO No Effect Letter)
As previously shared with the town, Home Leasing has received a No Effect Letter from SHPO on
9/15/2023. As a part of the SHPO review process the NYS staff reached out to the local Native
American tribes, with no comments/objections received. Additionally Home Leasing also reached out
to local tribes as a part of the SHPO and geoarchaeological studies, with no comments/objects
received.
Prior to receiving the No Effect Letter, Home Leasing contracted out geoarchaeological studies as
requested by SHPO, completing a Phase 1, Phase 1a and Phase 1b study and “Site Avoidance Plan”.
Home Leasing will avoid all development in sensitive areas, avoid disturbance within the buffer
zones and strictly follow the site avoidance plan as referenced and approved by SHPO and as
provided by Deuel Archaeology & CRM (Jeremy Deuel, M.A.).
Included in Appendix E is a copy of the SHPO No Effect Letter and a copy of the Site Avoidance Plan
(appendix E of the Phase 1b report).
Appendix F - Correspondence with West Seneca Schools
Home Leasing met with the Superintendent of the West Seneca School District (Dr. Lisa Krueger) on
10/22/2024. The school district is very supportive of the proposed project and will welcome any
students that live in the proposed development into the district, whether they are existing or new
students.
5
Page 10 of 110
Page 11
Based on the average number of children in Home Leasing's other multi-family communities, it was
originally expected that 31 of the 67 proposed units at the proposed West Seneca site will be
occupied by school-aged children. Specifically using two of Home Leasing’s existing communities
with similar bedroom counts (communities with predominantly 2BR and 3BR units), Home Leasing
would expect the number of school-aged children in residence to increase to 54. Based on Home
Leasing’s other family communities, it is estimated that over 80% of these children would already be
part of the existing school district.
Home Leasing has reached out to the superintendent for her input on the updated unit count now
expected to be 59 (+4). An updated correspondence letter will be supplied to the board upon receipt.
Included as part of this submission are the following drawings and documents:
• Revised Concept
• Revised FEAF
• Appendix A – Sewer Report (abbreviated report)
• Appendix B – DOT Traffic Correspondence
• Appendix C – Grid Capacity Evaluation
• Appendix D – DOT sidewalk Correspondence
• Appendix E – SHPO No Effect & Site Avoidance
• Appendix F – Correspondence with West Seneca School District (pending)
We look forward to presenting this project to the Planning Board on January 8th, 2026. If you have
any questions or need any additional information, please feel free to contact me at 585-770-2525 or
[email protected].
Respectfully submitted,
LaBella Associates
Shelby Vakiener
Civil Engineer
6
Page 11 of 110
Page 12
Page 12 of 110
Page 13
Appendix a:
Sewer report
(updated report)
Page 13 of 110
Page 14
Page 14 of 110
Page 15
Prepared For:
Home Leasing, LLC
75 South Clinton Avenue, Suite 700
Rochester, NY 14604
Submitted by:
LaBella Associates
300 State Street, Suite 201
Rochester, NY 14614
(716) 551-6281
SEWER REPORT FOR WEST SENECA
Date: October 2024
Last Revised: December 2025
LBA Project No. 2241067
Page 15 of 110
Page 16
West Seneca Sewer Report | Page 1
Table of Contents
Section 1 – Introduction .................................................................................................................... 2
Section 2 – General.............................................................................................................................. 2
Section 3 – Proposed Facilities .................................................................................................. 3
Appendices
Attachment A - Site Location Map
Attachment B - TECsmith Flow Monitoring
Attachment C - TECsmith Time Tables
Attachment D - Erie County Flow Monitoring
Attachment E - Erie County Time Tables
Page 16 of 110
Page 17
West Seneca Sewer Report | Page 2
Section 1 – Introduction
Home Leasing is proposing the development of a new affordable housing complex on a +/-
11.7-acre parcel in West Seneca, NY. Home Leasing is seeking rezoning of the parcel from M
1 to R 50, allowing for multiple-family dwellings with the issuance of a special use permit by
the Town Board. Home Leasing is also seeking Site Plan Approval from West Seneca and
HCR 9% funding from New York State. The proposed development includes 75 units split
between a repurposing of the existing mansion on site to now include apartment building in
the rear of the property. Improvements to the existing mansion include the dwelling units,
administrative offices, community room for residents and modifications (interior and exterior)
to make the first floor ADA accessible. The project includes a private road accessing the
apartments, parking, sidewalks, playground, landscaping and stormwater management
facilities.
Site Location
The 11.7-acre site is nestled between Clinton Street (State Route 354) to the south and Cayuga
Creek to the North and West. Within a quarter mile of the development there are multiple
commercial uses and Interstate 90. The neighborhood is predominately comprised of
agricultural land, single- and two-family homes and industrial/manufacturing facilities. See
appendix A for location site map.
Section 2 – General
Existing Site Conditions
The existing site includes the above-mentioned mansion, two barns, a stone wall along
Clinton Street and parking areas. The barns and parking areas will be demolished, while the
existing stone wall will remain, with the entrance being widened to allow for emergency
vehicle access to the site.
The site topography is relatively flat with elevations generally ranging from 600 to 580.
Storm water runoff from site drains either via sheet flow directly to Cayuga Street, or to
drainage inlets that drain to Cayuga Creek. The existing drainage system on site is minimal
and consists of a small swale and dry detention basis which collects and re-directs off-site
drainage from the east. Drainage is then conveyed to Cayuga Creek via storm pipes and open
drainage swales.
Proposed Site Conditions
The proposed development includes 75 units split between a repurposing of the existing
mansion on site to now include apartments and one apartment building in the rear of the
property.
Page 17 of 110
Page 18
West Seneca Sewer Report | Page 3
Project Data:
Facility Type: Affordable Housing
No. of Buildings: 2 (Including one existing)
Section 3 – Proposed Facilities
Stormwater
Storm and sanitary are separate systems within the project site.
Building Utility Services – Sanitary
The following summarizes the sanitary sewer service sizes for each building.
Table 1: Sanitary Lateral Sizes
Sanitary Lateral
Building # Description
Size
Existing Mansion
1 6”
2 Proposed Building 6”
Sanitary Sewer
The project requires a Down Stream Sewer Capacity analysis (DSCA) to conform with
NYSDEC regulations considering proposed sanitary flows are intended to convey a flow
greater than 2,500 gallons per day.
In accordance with Erie County policy a downstream, dry weather sanitary capacity analysis
is included. The monitoring report is included in the appendices.
Based on the flow depth measurements recorded the following conclusions are reached:
• At no time did the flow depth exceed pipe diameter at any of the downstream
monitoring points during the wet weather events monitored.
• One time during the monitoring period the depth of flow exceeded the diameter of
the pipe.
DSCA Summary:
Erie County provided three (3) nodes, described below:
Flow Monitoring Period: August 13, 2024, to September 18, 2024
Page 18 of 110
Page 19
West Seneca Sewer Report | Page 4
Dry Week Days Monitored: Aug 13-15, Aug 20-23, Aug 26-30, Sept 2-5, Sept 10-13, and Sept
16-18.
Dry Weekend Days Monitored: Aug 24-25, Sept 8, and Sept 14-15.
Nodes (manholes):
Node 1 MH BAA8A – 48” RCP (Matthews Cemetery NW Corner)
Node 2 MH BAA9A – 60” RCP (Casimer Street)
Node 3 MH BAAA8 – 66” RCP (8 Cable Street)
Design Parameters:
Hydraulic Loading rates per NYS Design Standards for Intermediate Wastewater Treatment
Systems, March 5, 2014. Calculations included below:
Apartments – Bedroom Units = 110 gpd/unit
Office Space= 15 gpd / employee
Average Daily Design Flow:
One Bdrm Units:(25 units) x (1 bdrm/unit)x 110gpd/bdrm=2,750 gpd
Two Bdrm Units:(25 units) x (2 bdrm/unit)x110gpd/bdrm=5,500 gpd
Three Bdrm Units:(25 units) x (3 bdrm/unit)x110gpd/bdrm=8,250 gpd
Office Space: 4 Employees x 15 gpd = 60 gpd
Total = 16,560 gpd
Peak Hourly Flow (Sanitary): 16,560 gpd x Peak Factor
Total Population=[(25x1)+(25x2)+(25x3)]x2 people per bedroom=
=150x2= 300People (assume 2 people per bedroom)+4 office employees=304. P = 0.304 (in
thousands)
Peaking Factor = (18 + √P) / (4+√P) = (18+0.5514)/(4+0.5514)=4.08
Peak Sanitary Demand =16,560x 4.08 = 67,565 gpd
0.06800 MGD
(0.10 CFS)
Sanitary Demand Calculations:
Node 1 – Average 16,560 gpd (0.017 MGD)
Entire Site:
110-gal/d/unit x 1bdrmx25 units=2,750 gpd
+ 110-gal/d/unit x 2bdrmx25 units=5,500 gpd
+110-gal/d/unitx3bdrmx25 units=8,250 gpd
4 employees x 15 gpd=60 gpd
Site total= 16,560 gpd
Ave. Total = 16,560 gpd (0.017 MGD)
Assume 2 people per bedroom. 2 x 150 bedrooms = 300 people + 4 office employees = 304
people. P = 0.304 (in thousands)
Peaking Factor = (18 + √P) / (4+√P) = 4.08
Peak Sanitary Demand = 16,560 x 4.08 = 67,565 gpd
Page 19 of 110
Page 20
West Seneca Sewer Report | Page 5
0.0680 MGD
(0.10 CFS)
Node 2 – Average 16,560 gpd (0.017 MGD)
Entire Site:
110-gal/d/unit x 1bdrmx25 units=2,750 gpd
+ 110-gal/d/unit x 2bdrmx25 units=5,500 gpd
+110-gal/d/unitx3bdrmx25 units=8,250 gpd
4 employees x 15 gpd=60 gpd
Site total= 16,560 gpd
Ave. Total = 16,560 gpd (0.017 MGD)
Assume 2 people per bedroom. 2 x 150 bedrooms = 300 people + 4 office employees = 304
people. P = 0.304 (in thousands)
Peaking Factor = (18 + √P) / (4+√P) = 4.08
Peak Sanitary Demand = 16,560 x 4.08 = 67,565 gpd
0.0680 MGD
(0.10 CFS)
Node 3 – Average 16,560 gpd (0.017 MGD)
Entire Site:
110-gal/d/unit x 1bdrmx25 units=2,750 gpd
+ 110-gal/d/unit x 2bdrmx25 units=5,500 gpd
+110-gal/d/unitx3bdrmx25 units=8,250 gpd
4 employees x 15 gpd=60 gpd
Site total= 16,560 gpd
Ave. Total = 16,560 gpd (0.017 MGD)
Assume 2 people per bedroom. 2 x 150 bedrooms = 300 people + 4 office employees = 304
people. P = 0.304 (in thousands)
Peaking Factor = (18 + √P) / (4+√P) = 4.08
Peak Sanitary Demand = 16,560 x 4.08 = 67,565 gpd
0.0680 MGD
(0.10 CFS)
Page 20 of 110
Page 21
West Seneca Sewer Report | Page 6
Table 2: Dry Weather Peak Weekday
Proposed
Total
Existing Peak Theoretical
Ave. Daily Peak Available Capacity
Node Sewer Peak Flow Sanitary Capacity
Flow (mgd) Flow (Y/N)
(mgd) Flow (mgd)
(mgd)
(mgd)
1-MH 48” RCP @ 0.41%
BAA8A (Matthews
0.017 7.953* 0.068 8.021 59.6 Y
Cemetery NW
Corner)
2-MH 60” RCP @ 0.042%
BAA9A 0.017 11.619** 0.068 11.687 34.6 Y
(Casimer Street)
3-MH 66” RCP @ 0.026%
BAAA8 0.017 10.614*** 0.068 10.682 35.1 Y
(8 Cable Street)
Notes:
*Peak Dry Week Day for Nodes 1 on Aug 27,2024
**Peak Dry Week Day for Node 2 on Aug 21,2024
***Peak Dry Week Day for Node 3 on Aug 21,2024
Table 3: Dry Weather Peak Weekend Day
Proposed
Total
Ave. Daily Existing Peak Theoretical
Peak Available Capacity
Node Sewer Flow Peak Flow Sanitary Capacity
Flow (Y/N)
(mgd) (mgd) Flow (mgd)
(mgd)
(mgd)
1-MH 48” RCP @ 0.41%
BAA8A (Matthews
0.017 6.070* 0.068 6.138 59.6 Y
Cemetery NW
Corner)
2-MH 60” RCP @ 0.042%
BAA9A 0.017 11.972** 0.068 12.040 34.6 Y
(Casimer Street)
3-MH 66” RCP @ 0.026%
BAAA8 0.017 11.615*** 0.068 11.683 35.1 Y
(8 Cable Street)
Notes:
*Peak Dry Weekend Day for Nodes 1 on Aug 25,2024
**Peak Dry Weekend Day for Node 2 on Sept 14,2024
***Peak Dry Weekend Day for Node 3 on Sept 14,2024
Page 21 of 110
Page 22
West Seneca Sewer Report | Page 7
DSCA CONCLUSION
Based on the analysis and flow monitoring results the flow depth peak increases are
described below. The combined sewer has sufficient capacity to handle projected peak
flows.
• Node 1 projected peak 0.068 MGD flow (0.10 CFS) result in approximately a 1.6 inch water level
increase within the 48” RCP sewer.
• Node 2 projected peak 0.068 MGD flow (0.10 CFS) result in approximately 2.6 inch water level
increase within the 60” RCP sewer.
• Node 3 projected peak 0.068 MGD flow (0.10 CFS) result in approximately 2.9 inch water level
increase within the 66” RCP sewer.
Page 22 of 110
Page 23
Appendix B:
Dot traffic study
correspondence
Page 23 of 110
Page 24
Page 24 of 110
Page 25
Vakiener, Shelby
From: Gordon, Casey (DOT) <[email protected]>
Sent: Tuesday, October 15, 2024 10:19 AM
To: Vakiener, Shelby
Cc: Calarco, Carl (DOT)
Subject: RE: [Ext] RE: Proposed Residential Development at 2542 Clinton Street, West Seneca -
NYSDOT Comments on sidewalk proposal
Follow Up Flag: Follow up
Flag Status: Flagged
Good morning Shelby,
NYSDOT has reviewed the Traffic Assessment for 2544 Clinton Street dated 6/13/2024 which was provided in response
to the NYSDOT SEQR comments dated 6/17/2024. NYSDOT has no addi.onal comments or concerns regarding traffic for
this site. The driveway design as described in the Traffic Assessment for the expected traffic counts will be subject to an
addi.onal engineering review as part of the NYSDOT Highway Work Permit process.
Casey Gordon
Transportation Analyst
New York State Department of Transportation
100 Seneca Street, Buffalo, NY 14203
716-847-3580 | [email protected]
dot.ny.gov
From: Vakiener, Shelby <[email protected]>
Sent: Thursday, October 10, 2024 4:53 PM
To: Gordon, Casey (DOT) <[email protected]>
Cc: Calarco, Carl (DOT) <[email protected]>
Subject: RE: [Ext] RE: Proposed Residential Development at 2542 Clinton Street, West Seneca - NYSDOT Comments on
sidewalk proposal
ATTENTION: This email came from an external source. Do not open attachments or click on links from unknown senders or
unexpected emails.
Casey,
Thanks for sending your response over regarding the sidewalk connection/future sidewalks. We have passed it
along to the town as work on addressing Town Board comments.
One more open item that we have with the town is an email response stating the DOT’s position on if a tra!ic
study, TDMP or any further tra!ic analysis is required or if the DOT is satisfied with the data (tra!ic analysis) that
has been provided. Would you be able to send over to me stating the DOT’s position?
1
Page 25 of 110
Page 26
Appendix c:
Grid capacity evaluation
(updated report)
Page 26 of 110
Page 27
Page 27 of 110
Page 28
Utility Grid Capacity Evaluation
GCE West Seneca
2544 Clinton St,
West Seneca, NY 14224
LaBella Project No. 2243432
Prepared For: Home Leasing
75 S Clinton Avenue, Suite 700
Rochester, NY 14604
Adam Driscoll, Development Manager
[email protected]
Prepared By: LaBella Associates, DPC
300 State Street, Suite 201
Rochester, New York 14614
Date: December 2025
300 State Street, Suite 201 | Rochester, NY 14614 | p 585-454-6110| f 585-454-3066
www.labellapc.com
Page 28 of 110
Page 29
TABLE OF CONTENTS
1.0 INTRODUCTION................................................................................................................................. 1
2.0 SUMMARY OF EXISTING CONDITIONS ............................................................................................ 1
3.0 SUMMARY OF PROPOSED LOADING CONDITIONS ........................................................................ 2
4.0 GRID CAPACITY EVALUATION ........................................................................................................... 2
5.0 OPINION OF PROBABLE CONSTRUCTION COST ............................................................................. 3
6.0 CONCLUSION .................................................................................................................................... 3
LIST OF APPENDICES
APPENDIX A – LOCATION MAP
APPENDIX B – EXISTING CONDITIONS
APPENDIX C – LOAD SHEETS OR ESTIMATED LOADS
APPENDIX D – CALCULATIONS
APPENDIX E – PROPOSED SITE DESIGN
Page 29 of 110
Page 30
1.0 INTRODUCTION
Home Leasing is intending to re-develop an 11.7-acre parcel in the Town of West Seneca into 75
affordable family housing units. The project will include repurposing the existing mansion on site and
proposing a new 3-story building for offices, amenities and residential use.
As part of the Homes and Community Renewal (HCR) and Housing Finance Agency (HFA) approval
process, Home Leasing needs to obtain a “Will Serve” letter from all utilities including electric. The
purpose of this report is to provide an evaluation of the existing electric lines in the immediate
vicinity of the project site and to provide a reasonable cost estimate of the service connection or the
required upgrades the project will need.
All information contained in this report, including existing electrical circuit and rating information is
based on publicly available information and not from any coordination with NYSEG/RGE. LaBella
gives no warranty, express or implied, as to accuracy, description, quality, fitness for any particular
purpose, or any other matter, of the evaluations and estimates contained in this report that are
based on the publicly available information of NYSEG/RGE and others.
2.0 SUMMARY OF EXISTING CONDITIONS
The proposed project will re-develop the 11.7-acre area in the Town of West Seneca, NY. The
property currently has one main building, the existing mansion served by NYSEG/RGE. Refer to
Appendix A for project location map.
Per NYSEG/RGE Housing Capacity Portal the project site has an existing overhead 12.5kV (feeder ID
3104002) running along Clinton St.
The table below summarizes the information available from the Electrification Capacity online
resource.
Table 1. Existing Circuit Information
Parameters Value
Circuit Feeder 3104002
Operating Voltage (kV) 12.5
Maximum Rating, Summer (MVA) 13.01
2025 Peak (MVA) 6.10
Based on field observations, the existing circuit is three phase overhead armless construction along
Clinton St. For photos of the existing site and nearby electric circuits refer to Appendix B.
-1-
Utility Grid Capacity Evaluation
GCE West Seneca
LaBella Project No. 2243432
Page 30 of 110
Page 31
3.0 SUMMARY OF PROPOSED LOADING CONDITIONS
When calculating the electrical load of a development two variables are evaluated, the total
connected load and the diversified load. The total connected load of the proposed building
represents the amount of electricity being consumed when all devices within the building are
connected and drawing power at the same time. The total connected load scenario is the maximum
value and may not represent realistic conditions, therefore the diversified load should also be
analyzed. The diversified load is an estimate of the expected electric consumption during peak
hours.
The existing building is currently served from the 12.5kV line, however electric consumption for the
building has not been provided and cannot be estimated. As a conservative approach the capacity
evaluation will consider the total area of development as a new load and not as a net increase from
the existing load of the building. For the basis of this analysis, this estimated load will be the
diversified load which is the one used to determine potential electric system upgrades. The table
below summarizes the estimated load and the information considered to calculate these. Refer to
Appendix C for detailed calculations of the estimated loading.
Table 2. Proposed Loads
Parameters Quantities
New Building 50,100
Total Interior
Existing Building 25,703
Gross Area (sq-ft)
TOTAL 75,803
Elevator 0
EV Charging Units 5
Estimated Load (kW) 1,199
Estimated Load (MVA) 1.20
4.0 GRID CAPACITY EVALUATION
Based on the proposed diversified load, the new West Seneca project will increase the total peak
load of the existing circuit to 6.91MVA. This additional load will increase the peak percentage rating
of the existing conditions to 56.1%. Refer to Appendix D for detailed calculations.
Based on experience, if the total peak percentage of the circuit is less than 90% the development
can be serviced without any upgrades, this will be considered a GREEN condition. If the total peak
percentage of the circuit post development is between 90% and 100% minor upgrades may be
required, such as increasing conductor size, replacing equipment, increasing the size of service
transformers, etc. This will be considered a YELLOW condition. If the total peak percentage of the
circuit post development exceeds 100% then major infrastructure upgrades may be required, such
as a new circuit design or substation upgrades. This will be considered a RED condition.
The West Seneca project is in a GREEN condition, see chart below.
-2-
Utility Grid Capacity Evaluation
GCE West Seneca
LaBella Project No. 2243432
Page 31 of 110
Page 32
14
13.01 13.01
12
Load (MVA) 10
8
6 7.30
6.1
4
2
46.89% 56.10%
0
2025 Peak Diversified Load
(Pre-construction) (Post Construction)
Chart 1. Peak Load Capacity
Based on the post development conditions, we believe that the new development may be able to be
serviced without any upgrades needed to the existing circuit. The most cost-effective solution would
be to utilize the existing service, however new transformers and conductors may be required due to
the additional load.
5.0 OPINION OF PROBABLE CONSTRUCTION COST
A conceptual construction cost estimate for this project was not developed at this time since the post
construction loading is well below the assumed limit for upgrades. Please note that there will be a
cost payable to NYSEG/RGE for the installation of service equipment.
6.0 CONCLUSION
Based on this evaluation, the proposed project will increase the load on the existing 12.5kV circuit to
56.1% of its capacity. This is below the anticipated maximum peak percentage; therefore, it is our
opinion that project can be serviced without additional upgrades from the utility.
-3-
Utility Grid Capacity Evaluation
GCE West Seneca
LaBella Project No. 2243432
Page 32 of 110
Page 33
APPENDIX A
Location Map
Page 33 of 110
Page 34
N
.
RD
EM CREEKSIDE DR.
RL
HA
PROJECT SITE
VIOLA DR.
CLIN
TON
ST.
It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147 Sec. 7307, for any person, unless acting under the ISSUED FOR:
direction of a licensed architect, professional engineer, or land surveyor, to alter an item in any way. If an item bearing the seal of an
architect, engineer, or land surveyor is altered; the altering architect, engineer, or land surveyor shall affix to the item their seal and ISSUED FOR REVIEW
8/15/2024 10:56 AM
notation "altered by" followed by their signature and date of such alteration, and a specific description of the alteration.
DRAWING NAME: DRAWN BY: DATE: PROJECT NO.:
LOCATION MAP AJD 08/15/2024 2243432
VERSION 23.1
300 State Street, Suite 201
Rochester, NY 14614 PROJECT NAME: DRAWING NUMBER:
C.A. NUMBER:
585-454-6110 GEOLOGICAL: 018750 GCE WEST SENECA
LAND SURVEYING: 017976
labellapc.com PROFESSIONAL ENGINEERING: 018281 West Seneca, NY 14224
Page 34 of 110
Page 35
APPENDIX B
Existing Conditions
Page 35 of 110
Page 36
Figure 1. Summer NYSEG/RGE New York System Data Portal Information for Line in front of Project Site
Page 36 of 110
Page 37
Photo 1. Close Up of Existing Pole on Project Site (Facing North Towards Project Site)
Page 37 of 110
Page 38
Photo 2. Existing Poles on Project Site (Facing North Towards Project Site)
Page 38 of 110
Page 39
Photo 3. Existing Line on Clinton St (Looking West)
Page 39 of 110
Page 40
Photo 4. Existing Tap to Project Site on Clinton St (Looking West)
Page 40 of 110
Page 41
Photo 5. Existing Line on Clinton St (Looking West)
Page 41 of 110
Page 42
Photo 6. Existing Tap to Project Site on Clinton St (Looking East)
Page 42 of 110
Page 43
Photo 7. Existing Line on Clinton St (Looking East)
Page 43 of 110
Page 44
APPENDIX C
Estimated Load
Page 44 of 110
Page 45
General Assumptions
Description Density Units
Lightning Load 1.0 VA/sq-ft
Receptacle Load 1.0 VA/sq-ft
Electric Heating Load (heat pumps, hot water) 12.0 VA/sq-ft
Air-Handling Equip 1 CFM/sq-ft.
Pumping Equipment 50 BTU/hr/sq-ft
Elevator 25** HP*
EV Charging 6,700** VA
Service Factor 125 %
*To be conservative, we will assume 1HP = 1kW
**Taken from previous projects
Page 45 of 110
Page 46
Area Load
Density Units
Description (sq-ft) (kVA)
Gross Floor Area: 75,803
Lighting Load 1 VA/sq-ft 75,803 76
Receptacle Load 1 VA/sq-ft 75,803 76
Elec Heating Load 12 VA/sq-ft 75,803 910
Typical Mechanical Conditions
Conv.
Static Conv.
Area Fan Effic. Factor Load (HP Service
Airflow Press Factor
(sq-ft) (unitless) (PSI/ in or kW) Factor
(in WC) (HP/CFM)
WC)
Air-Handling Equipment 1 CFM/sq-ft 75,803 75,803 3 0.5 5.2 0.00095 72 125% 90
Area Heat Load Delta-T Flow
(sq-ft) (BTU’s/hr) (Degrees) (GPM)
BTU/hr/sq-
50 75,803 3,790,000 20 379 0.01010 4 125% 5
Pumping Equipment ft
Units
Elevator 25 HP 0 25 125% 0
EV Chargers 6.7 kW 5 33.5 125% 42
TOTAL 1,199
Page 46 of 110
Page 47
APPENDIX D
Calculations
Page 47 of 110
Page 48
For an AC single-phase
P = I x V x PF
Where,
P = power (watts)
I = current (MVA)
V = voltage (volts)
PF = power factor; for this effort we will assume it is equal to 1
P
Therefore, I =
V x PF
For an AC three-phase
P = I x V x √3 x PF
Where,
P = power (watts)
I = current (MVA)
V = voltage (volts)
PF = power factor; for this effort we will assume it is equal to 1
P
Therefore, I =
V x √3 x PF
Existing Circuit Information
Voltage, kV 12.5
Capacity, MVA 13.01
Summer Peak, MVA 6.1
Phase 3
Current Peak Rating 46.89%
Diversified Load
Estimated Apartment Load = 807kW; 807/1000 = 0.81MVA
Proposed new peak load = 6.1 + 0.81 = 6.91MVA
Peak Rating % = (6.91/13.01) x 100 = 53.09%
Diversified
Total Power, kW 1,199
Total Load, MVA 1.20
New Peak Circuit Load,
MVA 7.30
Peak Rating 56.10%
Page 48 of 110
Page 49
APPENDIX E
Proposed Site Design
Page 49 of 110
Page 50
Page 50 of 110
Page 51
Appendix d:
Dot - sidewalk
correspondence
Page 51 of 110
Page 52
Page 52 of 110
Page 53
Vakiener, Shelby
From: Gordon, Casey (DOT) <[email protected]>
Sent: Friday, August 23, 2024 12:43 PM
To: Vakiener, Shelby
Cc: Winkler, Kristopher; Calarco, Carl (DOT); Adam Driscoll
Subject: RE: [Ext] RE: Proposed Residential Development at 2542 Clinton Street, West Seneca -
NYSDOT Comments on sidewalk proposal
Follow Up Flag: Follow up
Flag Status: Flagged
Good morning,
NYSDOT has reviewed the sidewalk proposals as provided for the development at 2542 Clinton Street . At this "me,
NYSDOT does not intend to make any changes to the guardrails as installed at this loca"on. NYSDOT does not object to
the rou"ng shown as the “blue path” in the concept plans which installs a new sidewalk along the entrance driveway
and ties into the shoulder pavement and allows pedestrians to continue on the existing shoulder to access the
bridge.
This sidewalk, along with all other entrance features within the State Right of Way, will require an additional
engineering review with more detailed plans as part of the NYSDOT Highway Work Permit process if the
development is approved by the Town.
Respectfully,
Casey Gordon
Transportation Analyst
Planning and Program Management
New York State Department of Transportation, Region 5
100 Seneca Street, Buffalo, NY 14203
(716) 847-3580
[email protected]
www.dot.ny.gov
From: Vakiener, Shelby <[email protected]>
Sent: Tuesday, August 6, 2024 10:30 AM
To: Gordon, Casey (DOT) <[email protected]>
Cc: Winkler, Kristopher <[email protected]>; Frei, Ronald A (DOT) <[email protected]>; Calarco, Carl (DOT)
<[email protected]>; Adam Driscoll <[email protected]>
Subject: RE: [Ext] RE: Proposed Residential Development at 2542 Clinton Street, West Seneca
ATTENTION: This email came from an external source. Do not open attachments or click on links from unknown senders or
unexpected emails.
1
Page 53 of 110
Page 54
Casey, Ron, Carl,
Thanks for meeting with us this morning, it was very helpful to talk through the project. Attached are the sketches
of the conceptual sidewalk options that we discussed on the call.
Let me know if you need anything else to facilitate email responses to Je+ Schieber and I.
Thanks,
Shelby
Shelby Vakiener
LaBella Associates | Civil Engineer
585-770-2525 direct
585-454-6110 office
From: Gordon, Casey (DOT) <[email protected]>
Sent: Thursday, August 1, 2024 1:49 PM
To: Vakiener, Shelby <[email protected]>
Cc: Winkler, Kristopher <[email protected]>; Frei, Ronald A (DOT) <[email protected]>; Calarco, Carl (DOT)
<[email protected]>
Subject: RE: [Ext] RE: Proposed Residential Development at 2542 Clinton Street, West Seneca
That looks good for us.
Respectfully,
Casey Gordon
Transportation Analyst
Planning and Program Management
New York State Department of Transportation, Region 5
100 Seneca Street, Buffalo, NY 14203
(716) 847-3580
[email protected]
www.dot.ny.gov
From: Vakiener, Shelby <[email protected]>
Sent: Thursday, August 1, 2024 1:40 PM
To: Gordon, Casey (DOT) <[email protected]>
Cc: Winkler, Kristopher <[email protected]>; Frei, Ronald A (DOT) <[email protected]>; Calarco, Carl (DOT)
<[email protected]>
Subject: RE: [Ext] RE: Proposed Residential Development at 2542 Clinton Street, West Seneca
You don't often get email from [email protected]. Learn why this is important
ATTENTION: This email came from an external source. Do not open attachments or click on links from unknown senders or
unexpected emails.
2
Page 54 of 110
Page 55
Page 55 of 110
Page 56
Appendix e:
Shpo no effect Letter & site
avoidance plan
Page 56 of 110
Page 57
Page 57 of 110
Page 58
KATHY HOCHUL ERIK KULLESEID
Governor Commissioner
September 15, 2023
Adam Driscoll
Home Leasing
75 S Clinton Ave
Rochester, NY 14604
Re: HTF
Clinton Street Affordable Housing Project
2544 Clinton St, Buffalo, NY 14224
22PR06904
Dear Adam Driscoll:
Thank you for continuing to consult with the New York State Historic Preservation Office
(SHPO). We have reviewed the project in accordance with Section 106 of the National Historic
Preservation Act of 1966. These comments are those of the SHPO and relate only to
Historic/Cultural resources. They do not include potential environmental impacts to New York
State Parkland that may be involved in or near your project.
We are in receipt of the Phase IB survey report (23SR00435; August 2023). The survey
identified the CSRH Indigenous Site (USN 02925.000612) among 5 lithic artifact loci within the
project’s Area of Potential Effects (APE). The SHPO concurs with the intent to avoid Locus 5
including a 50ft buffer, and approves of the implementation of the Site Avoidance Plan included
as Attachment E with the following additions:
• The site boundary including buffer will be clearly delineated on the final construction plans
and identified as “Environmentally Sensitive Area—No Access.” The SHPO requests
submission of this updated Avoidance Map.
• A preconstruction meeting with the construction contractor(s) is required to notify those in
charge of the requirements to protect and avoid the archaeological site.
• In the event that human remains are encountered during construction, all work must stop in
the vicinity of the find and be reported to SHPO and the lead agency.
We note the potential to demolish a building that is partially within the 50ft buffer and concur
with the measures as outlined in the Avoidance Plan if this option is selected, including
continued consultation with this office. There are no additional archaeological concerns with
artifact loci 1-4. Based on discussions with the lead agency, SHPO has consulted with
interested Indian Nations regarding the Phase IB survey results.
New York State Office of Parks, Recreation and Historic Preservation
Division for Historic Preservation, Peebles Island, PO Box 189, Waterford, New York 12188-0189
(518) 237-8643 • https://parks.ny.gov/shpo
Page 58 of 110
Page 59
Based upon this review, it is the opinion of the New York SHPO that no historic properties,
including archaeological and/or historic resources, will be Adversely Affected by this undertaking
with the condition that the avoidance measures outlined above and in the Avoidance Plan are
implemented.
If you have any questions, you can call or e-mail me at the contact information below.
Sincerely,
Andrew Farry, Ph.D.
Scientist/Archaeology
518-268-2185 | [email protected]
New York State Office of Parks, Recreation and Historic Preservation
Division for Historic Preservation, Peebles Island, PO Box 189, Waterford, New York 12188-0189
(518) 237-8643 • https://parks.ny.gov/shpo
Page 59 of 110
Page 60
"Appendix E" of Phase 1B Field Investigation Report, as prepared by Deuel Archeology & CRM (August 2023)
Avoidance
Plan
for
Locus
5
of
the
CSRH
Indigenous
Site
(DACRM
Site
ERI
P001)
The
Phase
IB
Archaeological
Field
Investigation
conducted
by
Deuel
Archaeology
&
CRM
(DACRM)
from
June
22
through
July
7,
2023
identified
a
previously
unrecorded
Indigenous
Site
distributed
across
5
loci
within
the
area
of
potential
effect
(APE)
for
the Proposed
Development
of
2544-‐2574
Clinton
Street,
Town
of
West
Seneca,
Erie
County,
New
York.
Loci
1-‐4
have
low
artifact
densities
and
exhibited
evidence
of
prior
ground
disturbances
resulting
in
a
lack
of
archaeological
integrity.
Therefore,
no
mitigation
measures
have
been
proposed
for
loci
1-‐4.
Locus
5
of
the
site
has
temporally
and
functionally
diagnostic
artifacts
with
further
research
potential
and
fair
archaeological
integrity.
The
developer
has
selected
to
avoid
potential
adverse
impacts
to
locus
5
of
the
site
through
archaeological
monitoring
and
site
avoidance.
The
proposed
avoidance
plan
will
consist
of
the
following:
• A
fence
will
be
installed
around
the
50-‐foot
buffer
for
the
duration
of
construction.
No
disturbance
will
occur
in
any
portion
of
the
locus
5
of
the
site
area
without
prior
consultation
with
the
SHPO.
• If
the
developer
opts
to
demolish
the
larger
outbuilding,
which
overlaps
with
the
50-‐foot
buffer,
they
will
engage
the
services
of
a
36
CFR
61
qualified
archaeologist
to
monitor
the
demolition.
An
archaeological
monitoring
protocol
will
be
submitted
to
the
SHPO
for
review
and
comment
prior
to
demolition.
The
building
would
be
demolished
and
its
foundation
removed
in
its
entirety,
to
an
assumed
depth
of
approximately
8
feet
below
grade;
excavation
for
the
foundation
would
extend
outward
only
approximately
2
feet
from
the
foundation.
Once
removed,
a
layer
of
clean
fill
and
topsoil
will
be
brought
in,
and
the
fence
will
be
installed
along
the
50-‐foot
buffer
line.
If
the
developer
decides
not
to
demolish
the
larger
outbuilding,
the
50-‐
foot
buffer
fence
will
include
the
outbuilding
to
preserve
the
integrity
of
the
buffered
area.
• The
developer
plans
to
demolish
the
smaller
outbuilding
adjacent
to
the
50-‐foot
buffer.
If
the
buffer
overlaps
with
the
building,
it
will
be
removed
in
the
same
manner
as
described
above
for
the
larger
outbuilding.
If
the
building
is
outside
the
buffer,
the
fence
will
be
installed
along
the
buffer
and
the
building
will
be
carefully
dismantled
and
removed
in
a
manner
that
avoids
ground
disturbing
activities
within
the
buffered
area.
• All
new
construction
and
associated
sitework
will
occur
outside
the
buffered
area.
• The
developer
plans
to
install
an
interpretive
plaque
or
panel
in
the
lobby
of
the
new
development,
which
will
inform
residents
and
visitors
of
the
history
of
the
site.
The
locations
of
the
recovered
artifacts
will
not
be
identified
to
protect
the
site
from
potential
looting.
Page 60 of 110
Page 61
Appendix f:
Correspondence w/ west
seneca school district
Page 61 of 110
Page 62
pending
Page 62 of 110
Page 63
EXISTING SEWER
EASEMENT
LIMITS OF
ARCHEOLOGICAL
BUFFER ZONE
DUMPSTER PAD
7
3-STORY 8 8
67-75 UNIT
PROPOSED BUILDING
PLAYGROUND
LOCATION
15 12
11
15 15
15 15
PROJECT DATA
15 8
PARCEL INFORMATION
APPLICANT/OWNER HOME LEASING
PARCEL ADDRESS 2544 CLINTON STREET
SLB # 124.00-2-5
PARCEL AREA (TOTAL) 11.7 ACRES
TOTAL PROJECT AREA ±7.0 ACRES
TOTAL DISTURBANCE AREA ±3.5 ACRES
EXISTING BUILDING
TO REMAIN
ZONING INFORMATION
REQUIRED PROPOSED
CLASSIFICATION R-50 R-50
FRONT SETBACK 30 FT ±443 FT
SIDE SETBACK 25 FT** ±111 FT
REAR SETBACK 30 FT* ±255 FT
6
GREEN SPACE - 8.5 ACRES
PARKING INFORMATION
REQUIRED PROPOSED
PARKING SPACES 150 150
EXISTING TREES *OR A DISTANCE EQUAL TO THE HEIGHT OF PRINCIPAL BUILDING, WHICHEVER IS
TO REMAIN GREATER.
**FOR MULTIFAMILY DWELLINGS, EACH SIDE YARD SHALL BE 25 FEET OR A
DISTANCE EQUAL TO ONE-HALF (1/2) THE HEIGHT OF SUCH BUILDING,
WHICHEVER IS GREATER. THE TOTAL OF THE TWO SIDE YARDS SHALL BE TWICE
THAT REQUIRED FOR ONE SIDE YARD. THE TOWN BOARD SHALL HAVE THE
POWER TO REDUCE SAID SIDE YARD REQUIREMENTS UPON SHOWING OF
EXISTING WALL TO REMAIN SPECIAL CIRCUMSTANCES OR HARDSHIP.
WEST SENECA 12/18/2025
N
1" = 50'
AMENDED CONCEPT PLAN
Page 63 of 110
Page 64
Revised 12/22/2025.
*Text in red has been revised
Home Leasing proposes the development of a new affordable housing complex on an +/- 10.9-acre parcel in West Seneca, NY. Home Leasing is seeking rezoning
of the parcel from M 1 to R 50, allowing for multiple-family dwellings with the issuance of a special use permit by the Town Board. Home Leasing is seeking Site
Plan Approval from West Seneca and HCR 9% funding from New York State. The proposed development includes ±75 units split between a re-purposing of the
existing mansion on site to include apartments and one new apartment building in the rear of the property. Improvements to the existing mansion include the
residential units, modifications (interior and exterior) to make the first floor ADA accessible. The project includes a private road accessing the new apartment
building, parking, sidewalks, playground, landscaping and stormwater management facilities.
The existing site includes the above-mentioned mansion, two barns, a stone wall along Clinton and parking areas. The barns and parking areas will be demolished,
while the existing stone wall will remain, with the entrance being widened to allow for emergency vehicle access to the site.
585-262-6210
Home Leasing - Angela Eicholtz, Development Manager
[email protected]
45 East Avenue, 2nd Floor
Page 64 of 110
Page 65
Revised 12/22/2025.
*Text in red has been revised
Winter 2026
Spring/Summer 2026
Spring/Summer 2026
Spring 2026
HCR - Fall 2026; DEC - Spring 2026; SHPO -
Sept. 2023; DOT - Spring/Summer 2026
Spring 2026
Page 65 of 110
Page 66
Revised 12/22/2025.
*Text in red has been revised
+/- 10.9
+/- 4.3
+/- 10.9
Page 66 of 110
Page 67
Revised 12/22/2025.
*Text in red has been revised
+/- 75 Units (two buildings)
Page 67 of 110
Page 68
Revised 12/22/2025.
*Text in red has been revised
+/- 16,500
Page 68 of 110
Page 69
Revised 12/22/2025.
*Text in red has been revised
+/- 112,000 +/- 2.5
+/- 476,963 +/- 10.9
Page 69 of 110
Page 70
Page 70 of 110
Page 71
Page 71 of 110
Page 72
Page 72 of 110
Page 73
Page 73 of 110
Page 74
Page 74 of 110
Page 75
Page 75 of 110
Page 76
Revised 12/22/2025.
*Text in red has been revised
Angela Eicholtz 12/19/2025
Authorized Signatory
Page 76 of 110
Page 77
Page 77 of 110
Page 78
Page 78 of 110
Page 79
Revised 12/22/2025.
*Text in red has been revised
Page 79 of 110
Page 80
Page 80 of 110
Page 81
Page 81 of 110
Page 82
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
Greensboro
20'x8.5' MAIL KIOSK, RPZ
ENCLOSURE & BUS SHELTER
Utica
ACK
ETB
DE S
25'
I
25' S
S ID
1-S /ATT
ES
1
TO AC
W
Buffalo
E TBA
RY HE
5U DG
CK
NIT AR
1
PROPOSED 1-STORY 4 UNIT BUILDING
BU AGE
2
ILD S
ING
W/ATTACHED GARAGES
1
40'
FRO
1 9
NT
2 2
SET
ING
PROPOSED 1-STORY 4 UNIT BUILDING
ILD
BAC
2 B U
NIT GES
30' REAR SETBACK
1
K
W/ATTACHED GARAGES
8 U
Y 4 RA
2
1 S T OR D GA
1- CHE
O SED ATTA
P /
PRO W
4
Multifamily Development
1
EMERGENCY VEHICLE TURNAROUND
25' SIDE SETBACK
STORM WATER EXISTING CEMETERY
MANAGEMENT AREA
1425 & 1475 Orchard Park Rd
BACK
WETLAND BOUNDARY
T
DE SE
25' SI
100-FT WETLAND BUFFER 1 2 1 3 1 2 1 3 1 2 1
© CARMINA WOOD DESIGN
West Seneca, NY
PROPOSED 1-STORY 4 UNIT BUILDING PROPOSED 1-STORY 4 UNIT BUILDING PROPOSED 1-STORY 4 UNIT BUILDING EX. CHURCH
W/ATTACHED GARAGES W/ATTACHED GARAGES W/ATTACHED GARAGES 1475 ORCHARD
PARK ROAD
30' REAR SETBACK
Date
100-FT WETLAND BUFFER
No. Description
WETLAND BOUNDARY
REVISIONS:
WETLAND BOUNDARY
100-FT WETLAND BUFFER
ARY
CTION
CONSTRU
25' SIDE SETBACK
PRELIMIN
NOT FOR
SITE DATA ( REZONED TO C-1 (S) ) - 1425 & 1475 ORCHARD PARK RD - 16.59 ACRES
MULTI-FAMILY ALLOWED BY SPECIAL PERMIT Site Plan
MIN. LOT WIDTH = 50 FT FOR FIRST DWELLING UNIT, PLUS 10 FT FOR EACH ADDITIONAL UNIT NEED NOT EXCEED 100 FT
SCALE: 1"=50'
MIN. LOT AREA = 8,000 SF FOR FIRST DWELLING UNIT, PLUS 5,000 FOR EACH ADDITIONAL DWELLING UNIT
FRONT SETBACK = 40 FT
1
SIDE SETBACK = 25 FT MIN. OR A DISTANCE EQUAL
2 HGT.
TO OF SUCH BUILDING, WHICHEVER IS GREATER DRAWING NAME:
REAR SETBACK = 30 FT or EQUAL TO THE HEIGHT OF THE BUILDING
MAXIMUM BUILDING HEIGHT = 40 FT (MULTI-FAMILY) Site Plan
DRIVEWAY: 30 FT WIDE REQUIRED FOR MULTI-FAMILY Concept
DWELLING SIZE: 500 SF EACH MULTI-FAMILY UNIT
GROUP DWELLING: NO BUILDING SHALL BE NEARER TO ANY OTHER PRINCIPAL STRUCTURE THAN A DISTANCE EQUAL TO THE AVERAGE HEIGHT OF
SUCH BUILDINGS
Date: 12/22/25
Drawn By: A. Pandolfe
DENSITY CALCULATION (16.59 AC) Scale: As Noted
PARKING CALCULATION: REQ'D = 8,000 SF FOR FIRST DWELLING UNIT, PLUS 5,000 FOR EACH DRAWING NO.
NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS,
MULTI-FAMILY: ADDITIONAL DWELLING UNIT CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
REQ'D = 2 SPACES PER UNIT + 5/25 UNITS VISITORS
REQ'D = 2 SPACES x 29 UNITS + (29/25 x645)SPACES
=
TOTAL PROVIDED = 56 SPACES + 29 GARAGE SPACES
85 SPACES
=
ALLOWED NUMBER OF UNITS:
1ST UNIT: 722,660 SF - 8,000 SF = 714,660 SF REMAINING
ADDITIONAL UNITS: 714,660 SF / 5,000 SF = 142 UNITS
50'
50 0 50 100Ft.
C-100
TOTAL ALLOWED UNITS = 143 UNITS Project No: 23-4121
Page 82 of 110
Page 83
Short Environmental Assessment Form
Part 1 - Project Information
Instructions for Completing
Part 1 – Project Information. The applicant or project sponsor is responsible for the completion of Part 1. Responses become part of the
application for approval or funding, are subject to public review, and may be subject to further verification. Complete Part 1 based on
information currently available. If additional research or investigation would be needed to fully respond to any item, please answer as
thoroughly as possible based on current information.
Complete all items in Part 1. You may also provide any additional information which you believe will be needed by or useful to the
lead agency; attach additional pages as necessary to supplement any item.
Part 1 – Project and Sponsor Information
Name of Action or Project:
Multifamily Development
Project Location (describe, and attach a location map):
1475 Orchard Park Road, West Seneca, NY
Brief Description of Proposed Action:
Construction of three (3) 4-unit multifamily buildings with associated parking, stormwater management, on-site utility improvements, site lighting and
landscaping. The site is currently zoned C-1 & R-75, it is proposed to rezone the entire site to C-1(s) to allow the development.
Name of Applicant or Sponsor: Telephone: 716-842-3165
William Sahlem & Brian Hillery c/o Anthony J. Pandolfe, PE (Carmina Wood Design) E-Mail: [email protected]
Address:
80 Silo City Row, Suite 100
City/PO: State: Zip Code:
Buffalo NY 14203
1. Does the proposed action only involve the legislative adoption of a plan, local law, ordinance, NO YES
administrative rule, or regulation?
If Yes, attach a narrative description of the intent of the proposed action and the environmental resources that
✔
may be affected in the municipality and proceed to Part 2. If no, continue to question 2.
2. Does the proposed action require a permit, approval or funding from any other government Agency? NO YES
If Yes, list agency(s) name and permit or approval: Planning Board (site plan), ZBA (variances), NYSDOT (curb cut),
NYSDEC (SPDES Permit) ✔
3. a. Total acreage of the site of the proposed action? __________
16.59+/- acres
b. Total acreage to be physically disturbed? __________
9.0+/- acres
c. Total acreage (project site and any contiguous properties) owned
or controlled by the applicant or project sponsor? 16.59+/- acres
__________
4. Check all land uses that occur on, are adjoining or near the proposed action:
5. Urban Rural (non-agriculture) Industrial ✔ Commercial ✔ Residential (suburban)
□ Forest Agriculture Aquatic ✔ Other(Specify): School, church
□ Parkland
Page 1 of 3
Page 83 of 110
Page 84
5. Is the proposed action, NO YES N/A
a. A permitted use under the zoning regulations?
✔
b. Consistent with the adopted comprehensive plan? ✔
NO YES
6. Is the proposed action consistent with the predominant character of the existing built or natural landscape?
✔
7. Is the site of the proposed action located in, or does it adjoin, a state listed Critical Environmental Area? NO YES
If Yes, identify: ________________________________________________________________________________
✔
NO YES
8. a. Will the proposed action result in a substantial increase in traffic above present levels?
✔
b. Are public transportation services available at or near the site of the proposed action?
✔
c. Are any pedestrian accommodations or bicycle routes available on or near the site of the proposed
action?
✔
9. Does the proposed action meet or exceed the state energy code requirements? NO YES
If the proposed action will exceed requirements, describe design features and technologies:
_____________________________________________________________________________________________
✔
_____________________________________________________________________________________________
10. Will the proposed action connect to an existing public/private water supply? NO YES
If No, describe method for providing potable water: _________________________________________
✔
_____________________________________________________________________________________________
11. Will the proposed action connect to existing wastewater utilities? NO YES
If No, describe method for providing wastewater treatment: ______________________________________
✔
_____________________________________________________________________________________________
12. a. Does the project site contain, or is it substantially contiguous to, a building, archaeological site, or district NO YES
which is listed on the National or State Register of Historic Places, or that has been determined by the
Commissioner of the NYS Office of Parks, Recreation and Historic Preservation to be eligible for listing on the ✔
State Register of Historic Places?
✔
b. Is the project site, or any portion of it, located in or adjacent to an area designated as sensitive for
archaeological sites on the NY State Historic Preservation Office (SHPO) archaeological site inventory?
13. a. Does any portion of the site of the proposed action, or lands adjoining the proposed action, contain NO YES
wetlands or other waterbodies regulated by a federal, state or local agency?
✔
b. Would the proposed action physically alter, or encroach into, any existing wetland or waterbody?
✔
If Yes, identify the wetland or waterbody and extent of alterations in square feet or acres: _____________________
_____________________________________________________________________________________________
_____________________________________________________________________________________________
Page 2 of 3
Page 84 of 110
Page 85
14. Identify the typical habitat types that occur on, or are likely to be found on the project site. Check all that apply:
□Shoreline □
✔ Forest Agricultural/grasslands Early mid-successional
✔ Wetland □ Urban ✔ Suburban
15. Does the site of the proposed action contain any species of animal, or associated habitats, listed by the State or NO YES
Federal government as threatened or endangered?
✔
16. Is the project site located in the 100-year flood plan? NO YES
✔
NO YES
17. Will the proposed action create storm water discharge, either from point or non-point sources?
If Yes, ✔
a. Will storm water discharges flow to adjacent properties? ✔
b. Will storm water discharges be directed to established conveyance systems (runoff and storm drains)? ✔
If Yes, briefly describe:
_____________________________________________________________________________________________
Storm water runoff will be conveyed to an existing on-site ditch.
_____________________________________________________________________________________________
18. Does the proposed action include construction or other activities that would result in the impoundment of water NO YES
or other liquids (e.g., retention pond, waste lagoon, dam)?
If Yes, explain the purpose and size of the impoundment:______________________________________________
Storm water detention area(s) will be designed in accordance with local and State requirements. ✔
____________________________________________________________________________________________
_ Has the site of the proposed action or an adjoining property been the location of an active or closed solid waste
19. NO YES
management facility?
If Yes, describe: _______________________________________________________________________________
✔
_____________________________________________________________________________________________
20.Has the site of the proposed action or an adjoining property been the subject of remediation (ongoing or NO YES
completed) for hazardous waste?
If Yes, describe: _______________________________________________________________________________
✔
_____________________________________________________________________________________________
I CERTIFY THAT THE INFORMATION PROVIDED ABOVE IS TRUE AND ACCURATE TO THE BEST OF
MY KNOWLEDGE
Applicant/sponsor/name: ____________________________________________________
Anthony J. Pandolfe, PE Date: 12/23/25
__________________________
_____________________
Project Engineer
Signature: _____________________________________________________Title:__________________________________
PRINT FORM Page 3 of 3
Page 85 of 110
Page 86
EAF Mapper Summary Report Tuesday, November 4, 2025 3:47 PM
Disclaimer: The EAF Mapper is a screening tool intended to assist
project sponsors and reviewing agencies in preparing an environmental
assessment form (EAF). Not all questions asked in the EAF are
answered by the EAF Mapper. Additional information on any EAF
question can be obtained by consulting the EAF Workbooks. Although
the EAF Mapper provides the most up-to-date digital data available to
DEC, you may also need to contact local or other data sources to
confirm data provided by the Mapper or to obtain data not provided by
the Mapper.
Part 1 / Question 7 [Critical Environmental No
Area]
Part 1 / Question 12a [National or State Yes
Register of Historic Places or State Eligible
Sites]
Part 1 / Question 12b [Archeological Sites] Yes
Part 1 / Question 13a [Wetlands or Other Digital mapping data are not available or are incomplete. Refer to EAF
Regulated Waterbodies] Workbook.
Part 1 / Question 15 [Threatened or No
Endangered Animal]
Part 1 / Question 16 [100 Year Flood Plain] No
Part 1 / Question 20 [Remediation Site] No
Short Environmental Assessment Form - EAF Mapper Summary Report Page 86 of 110
1
Page 87
12/23/25
Multifamily Development
1475 Orchard Park Road (100 ft northwest of Reserve Road)
Carmina Wood Design c/o Anthony Pandolfe 716-842-3165
80 Silo City Row, Suite 100, Buffalo, NY 14203
William Sahlem & Brian Hillery
2260 Southwestern Blvd., West Seneca, NY 14224
Carmina Wood Design 716-842-3165
80 Silo City Row, Suite 100, Buffalo, NY 14203
152.07-1-1 & 143.19-1-9
Construction of three (3) 4-unit multifamily buildings with associated parking, stormwater management,
on-site utility improvements, site lighting and landscaping.
16.59 ac. 13.38 ac.
Orchard Park Road - 258-ft
C-1 & R-75 C-1(S)
Daycare/vacant land
Multifamily
Gas station (C-2 (S)), church, daycare, school, single-family homes (C-1 and/or R-75)
✔ ✔
Site Plan Approval
Page 87 of 110
Page 88
Page 88 of 110
Page 89
Page 89 of 110
Page 90
Page 90 of 110
Page 91
Page 91 of 110
Page 92
Page 92 of 110
Page 93
Page 93 of 110
Page 94
Page 94 of 110
Page 95
Page 95 of 110
Page 96
Page 96 of 110
Page 97
Page 97 of 110
Page 98
Page 98 of 110
Page 99
Page 99 of 110
Page 100
Page 100 of 110
Page 101
Page 101 of 110
Page 102
Page 102 of 110
Page 103
Page 103 of 110
Page 104
Page 104 of 110
Page 105
Page 105 of 110
Page 106
Page 106 of 110
Page 107
Page 107 of 110
Page 108
Page 108 of 110
Page 109
Page 109 of 110
Page 110
Page 110 of 110