Text · page 59 of 67
Read the whole document on one page (all 67 pages, each with its own heading)
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
Gowanda Water Department MONTHLY BOARD REPORT Gowanda- Processed 10,523,200 gallons for the month of January for a daily average of 339,500 gallons. 25 Ufpo. Processed 7 work orders. Plowed water stuff. Spent a lot of time searching for leaks. Found a few house leaks. Shoveled a few fire hydrants. Need a new VED for reservoir have received quotes from two different companies. Coordinate with EPA for potholing service lines.. Tentative start date 3-30-26. Collins 1- Processed 1,669,000 gallons for a daily average of 53,800 gallons. 12 Ufpo. Processed 3 work orders. Lot of plowing. Water withdrawal. reports. Coordinate with EPA for potholing service lines. Tentative start date 3-30-26 Fix the issue with the clx monitor. Collins 3- Processed 830,678 gallons for a daily average of 26,796 gallons. Coordinate with EPA for potholing service lines. Tentative start date 3-30-26, Plow driveway many times.