Gowanda Water Department MONTHLY BOARD REPORT Gowanda- Processed 10,010,600 gallons for the month of March for a daily average of 322,900 gallons. 10 Ufpo. Processed 8 work orders, Unhook hose bibs and sort the usage out. Install 2 new valve box on chestnut. Read meters. Install 2 new meters on chestnut. Cleaned the gatehouse with sewer assistance. Fix Nissan van serpentine belt tensioner. Start installing new vfd at point peter. Collins 1- Processed 1,563,000 gallons for a daily average of 50,400 gallons. 8 Ufpo. Processed 3 work orders. Read meters. Tap and install new service on Flavia with help from highway digging with backhoe. Work onthe chlorine fitting to try and stop the air problem. Collins 3- Processed 945,683 gallons for a daily average of 30,505 gallons Read meters. Use vac truck to vac a hole on a leaking service on north division to fix the . leak. Replaced the towns side of the service from the main to the curbbox.