Electrical Capacity

Despite increasing the unit count from 67 to 75 units, the overall building square footage is reduced
creating an opportunity for a more efficient energy design and thereby reducing the building's
proposed load from 1.62MVA in the original design to 1.20MVA, which only increases the load on the
existing NYSEG/RGE 12.5kV circuit from 46.89% to 56.10%.

Summary

Below is a table summarizing the proposed impacts of the revised site layout in relation to the
original design. Categories are based on previous areas of concern as identified by the Town Board.

  Impacts of Revised Layout
  Design Element  Proposed Impact
  Building Location  Improved
  ADA Accessibility  Improved
  Preservation of Open Space / Existing Vegetation  Improved
  Shelter-In-Place Accommodations  Improved
  Parking Layout  Improved
  Playground Safety  Improved
  Electrical Demand  Reduced
  Sewer Impact  Not Impacted
  Traffic Impact  Not Impacted
  Sidewalk Connectivity  Not Impacted

Project History – June 2024 to January 2025

An application package for rezoning and a special use permit was originally submitted to the town in
May 2024. The project appeared in front of the Planning Board on 6/13/2024, where it received a
positive referral to the Town Board. The project appeared in front of the Town Board serval times in
summer/fall 2024 before receiving a SEQR negative declaration and approval for Rezoning and a
Special Use Permit on 1/27/2025.

Throughout the approval process a variety of supplemental reports and studies were performed to
address comments and concerns raised by residents, staff and board members. A summary of the
information is provided below - detailed reports are included in the appendices. These reports have
been updated (as needed) to reflect the revised layout and updated unit count.

  Appendix A - Sewer Study (updated)
  Appendix B - DOT Traffic Concerns
  Appendix C - Electrical Capacity (updated)
  Appendix D - Sidewalk Along Clinton Street – DOT Correspondence
  Appendix E - Correspondence with Seneca Nation & SHPO
  Appendix F - West Seneca Schools – Correspondence (pending)