WEST SENECA COURT ROOM  TOWN BOARD PROCEEDINGS
1250 Union Road  Minutes - Meeting # 2026-07
West Seneca, NY 14224  April 13, 2026

$100,000; and

WHEREAS, the total estimated cost of the engineering planning study is $237,800; and

WHEREAS, the EPG program requires a minimum local match of at least 20% and that any project
costs exceeding the grant award are the responsibility of the municipality;

NOW, THEREFORE, BE IT RESOLVED that the Town of West Seneca hereby commits to funding
the required local match and all additional project costs not covered by the grant, for a total estimated
local share of $137,800; and

BE IT FURTHER RESOLVED that the local share shall be funded from the Town’s Sanitary Sewer
Fund balance and/or other available funding sources as determined appropriate by the Town; and

BE IT FURTHER RESOLVED that the Town Supervisor is hereby authorized to execute all
agreements, certifications, and documentation necessary to implement and administer the grant
funding; and

BE IT FURTHER RESOLVED that the Town Board supports the advancement of this project and the
completion of the engineering report to guide future sanitary sewer system improvements and
regulatory compliance efforts.

Ayes: 4  Noes: 0  Abstain: 0  Motion Carried
5. Town Engineer re Phase 8 Sanitary Sewer Improvements

Motion by Supervisor Dickson, seconded by Councilmember Sherman, to authorize the Supervisor to
sign the attached Change Order No. 3 to reallocate funds within the Phase 8 Sanitary Sewer contract
from completed pay items to Pay Item 14 (Allowance), noting this will allow the remaining allowance
funds to be used to complete sanitary sewer replacement work along West Willowdale Drive, as well
as address other deficiencies identified as part of the project. Further noting the Change Order
extends the contract completion date and a table summarizing the adjustments for each pay item is
included.

Ayes: 4  Noes: 0  Abstain: 0  Motion Carried
  *Appendices*

6. Town Engineer re Proposal - Phase 1 Environmental Study

Motion by Supervisor Dickson, seconded by Councilmember Robertson, to award the Phase I
Environmental Site Assessment services for the properties located at 4393 and 4397 Seneca Street
to Roux Environmental Engineering and Geology, D.P.C. in the total amount of $3,000, noting that
while this was not the lowest, Roux’s proposal provides a comprehensive and well-documented
scope of services that fully meets the requirements of ASTM E1527-21 and the All Appropriate
Inquiries (AAI) standard under CERCLA.

On the question, Councilmember Breidenstein asked CPL representative Mark DiPasquale to speak
about the additional value that Roux's proposal provides the town. Mr. DiPasquale stated Roux did a
very thorough preliminary investigation and had more information about the site than LaBella

  7