Southtowns Record

Village Board agenda — July 20, 2026

Government
Village of East Aurora
Board
Village Board
Meeting
Jul 20, 2026
Kind
Agenda
Topics
Zoning and land use, Water, sewer and drainage, Public safety, Budget and taxes, Housing, Audits and oversight, Parks and recreation, Roads and traffic

Original document

Same meeting

Text · page 85 of 149

Read the whole document on one page (all 149 pages, each with its own heading)

d. The proposed action may result in light shining onto adjoining properties.  D2n  □
  ✔  SI  □

e. The proposed action may result in lighting creating sky-glow brighter than existing  D2n, E1a  □
  ✔
  NI  □
  area conditions.

f. Other impacts:  □  □

16. Impact on Human Health
  The proposed action may have an impact on human health from exposure  □ NO  □
  ✔ YES
  to new or existing sources of contaminants. (See Part 1.D.2.q., E.1. d. f. g. and h.)
  If “Yes”, answer questions a - m. If “No”, go to Section 17.
  Relevant  No, or  Moderate
  Part I  small  to large
  Question(s)  impact  impact may
  may occur  occur
a. The proposed action is located within 1500 feet of a school, hospital, licensed day  E1d  □  □
  ✔

  care center, group home, nursing home or retirement community.
b. The site of the proposed action is currently undergoing remediation.  E1g, E1h  □
  ✔  NI  □

c. There is a completed emergency spill remediation, or a completed environmental site  E1g, E1h  □
  ✔
  SI  □
  remediation on, or adjacent to, the site of the proposed action.
d. The site of the action is subject to an institutional control limiting the use of the  E1g, E1h  □
  ✔  NI  □
  property (e.g., easement or deed restriction).
e. The proposed action may affect institutional control measures that were put in place  E1g, E1h  □
  ✔
  NI  □
  to ensure that the site remains protective of the environment and human health.
f. The proposed action has adequate control measures in place to ensure that future  D2t  □
  ✔  □
  generation, treatment and/or disposal of hazardous wastes will be protective of the  NI
  environment and human health.
g. The proposed action involves construction or modification of a solid waste  D2q, E1f  □
  ✔
  NI  □
  management facility.
h. The proposed action may result in the unearthing of solid or hazardous waste.  D2q, E1f  □
  ✔  NI  □

i. The proposed action may result in an increase in the rate of disposal, or processing, of  D2r, D2s  □
  ✔
  NI  □
  solid waste.
j. The proposed action may result in excavation or other disturbance within 2000 feet of  E1f, E1g  □
  ✔
  NI  □
  a site used for the disposal of solid or hazardous waste.  E1h

k. The proposed action may result in the migration of explosive gases from a landfill  E1f, E1g  □
  ✔
  NI  □
  site to adjacent off-site structures.
l. The proposed action may result in the release of contaminated leachate from the  D2s, E1f,  □
  ✔
  NI  □
  project site.  D2r

m. Other impacts:
  □  □

  Page 10 of 13  FEAF 2026