Village Board agenda — May 4, 2026 (full text)
Page 1
AGENDA
Village Board of East Aurora
May 4, 2026 Regular Meeting at 7 pm
1. CALL MEETING TO ORDER
A. Pledge of Allegiance
B. Roll Call
2. PUBLIC HEARINGS
A. Village of East Aurora Annual MS-4 Report.
3. SPEAKERS & COMMUNICATIONS – Agenda Items Only
4. CONSENT CONSIDERATIONS
A. Minutes of Village Board Meeting for April 20, 2026
B. Payment for May 4 Abstract 2025/2026 fiscal year for a total of $248,622.22.
C. Permission for the Mayor or his designee to sign the MS4 report
D. Temporary Use Permit for EA Union Free School, Jackey Rabey - 5th & 6th Grade Field Day on June 9th (rain date June
10th), from 7:30 am -1:30 pm.
E. Temporary Use Permit for The Roycroft Campus Corp, Samantha Lehsten, Summer Art and Antique Show on June 27th -
28th, from 10 am-5 pm.
F. Temporary Use Permit for The Roycroft Campus Corp, Samantha Lehsten, Fall Festival October 3rd - 4th 10 am-5 pm
G. Permission for the Chief of Police Patrick Welch to attend a technology training summit with Axon June 2-3 Scottsdale, AZ
H. Permission for the Mayor or his designee to sign the PERMA Workers' Comp Insurance renewal for 2026/27
I. Permission for the Mayor or his designee to sign the GIS Service renewal for 2026/27
J. Permission for the Mayor or his designee to sign the ESRI Service renewal for 2026/27
K. Permission for the Mayor or his designee to sign the Lift Off renewal for 2026- 2029
L. Permission for the Mayor or his designee to sign the Village Engineer, Barton Loguidice, renewal for 2026/27
M. Intermunicipal Agreement for joint ERT contract with the Town of Orchard Park, as written May 5, 2025
N. New members of the East Aurora Fire Department: Roy Draves & John Phillips (Out of district), Kenneth Craft, and Bobby
Eccleston Jr
O. Budget modification for the 2025-26 fiscal year
P. Declare surplus properties for Auction a 2016 Chevy and a 1988 Sidewalk Plow
5. OFFICIAL CONSIDERATIONS
A. Appoint Patrick Richey & Monique Brannon to the Historic Preservation Commission for a 4-year term ending April 1, 2030
B. Assign Christine Cappola to the duties of “Fire Department Clerk” commencing June 1, 2026
6. OLD BUSINESS
A. Local law amending the Village Code Chapter §112 Demolitions.
B. Pine Street traffic study
7. NEW BUSINESS
A. Village Engineer Water Report/Plan
8. SPEAKERS & COMMUNICATIONS (II)
A. Town application - GML 239-m Referral Area Variance request 559 South Street
9. DEPARTMENT HEAD REPORT
10. EXECUTIVE SESSION
11. ADJOURNMENT
Page 2
Page 3
Page 4
Page 5
Page 6
Page 7
Page 8
Page 9
Page 10
Page 11
Page 12
Page 13
Page 14
Page 15
Page 16
Page 17
Page 18
Stormwater Management
Program Plan
(SWMP Plan)
Village of East Aurora
SPDES General Permit for Stormwater Discharges from Municipal
Separate Storm Sewer Systems (MS4s)
Permit No. GP-0-24-001
Effective Date: January 3, 2024
Expiration Date: January 2, 2029
Page 19
Table of Contents
Stormwater Management Program Contacts 2
Alternative Implementation Agreements 4
Minimum Control Measure 1: Public Education and Outreach Program 5
Minimum Control Measure 2: Public Involvement/Participation 11
Minimum Control Measure 3: Illicit Discharge Detection and Elimination 13
Minimum Control Measure 4: Construction Site Stormwater Runoff Control 20
Minimum Control Measure 5: Post-Construction Stormwater Management 30
Minimum Control Measure 6: Pollution Prevention and Good Housekeeping 34
List of Appendices
Appendix A: Map of Erie and Niagara County MS4 Regulated Area
Appendix B: SWMP Plan Compliance Documentation
Appendix C: Monitoring Locations Inspection and Sampling Field Sheet
Appendix D: Illicit Discharge Detection and Elimination Track Down Program
Appendix E: Construction Activities that Require SWPPP
Appendix F: SWPPP Review Checklist
Appendix G: Construction Site Inspection Report Form
Appendix H: No Exposure Certification
Appendix I: Storm Event Data Form; Visual Monitoring Form
Appendix J: Municipal Facility Assessment Form
Appendix K: Notice of Intent
Appendix L: Staffing Plan/Organizational Chart
Appendix M: WNY Stormwater Coalition Online Mapper/SOP
Appendix N: Resolution: Local Laws
Appendix O: Enforcement Response Plan
Appendix P: Part VIII: Enhanced Requirements for Impaired Waters
Page 20
Village of East Aurora
Stormwater Management Program Contacts
Stormwater Program Coordinator oversees the development, implementation, and enforcement of
the SWMP; coordinates all elements of the SWMP to ensure compliance with this SPDES general
permit; and develops and submits the Annual Report.
Name: Brian Halt
Title: Storm Water Management Officer
Phone: 716-652-6057
Email: [email protected]
Stormwater Management Officer for questions related to this Stormwater Management Program
(SWMP) Plan, or to obtain compliance-related documentation cited throughout this document.
Name: Brian Halt
Title: Storm Water Management Officer
Phone: 716-652-6057
Email: [email protected]
Local point of contact to receive and respond to public concerns/complaints regarding stormwater
management and compliance with permit requirements:
Name: Brian Halt
Title: SMO
Phone: 716-652-6057
Email: [email protected]
To report illicit discharges in the Village of East Aurora contact:
Name: Elizabeth Cassidy
Title: SMO, Code Enforcement Officer
Phone: 716-652-7591
Email: [email protected]
Page 21
To report stormwater complaints related to construction activity in the Village of East Aurora
contact:
Name: Elizabeth Cassidy
Title: SMO, Code Enforcement Officer
Phone: 716-652-7591
Email: [email protected]
Page 22
Alternative Implementation Agreements
Inventory of Other Entities Assisting with Implementation of SWMP Plan
List any entities assisting with any portion of the SWMP development, implementation, or
enforcement.
Name of Entity Permit Requirement
Town of Aurora MCM 3,4,5 Construction/post construction
inspections, IDDE
GHD MCM 6- SWPPP Review
WNY Stormwater MCM 1, 2, 3, 4, 5, 6 Education, Training, Development
Coalition
Although not included as an Appendix, Alternative Implementation Agreements are considered part
of this SWMP Plan, and are available by contacting the Stormwater Program Coordinator or
Stormwater Management listed Officer on page 2 of this document.
Page 23
SPDES General Permit for Stormwater Discharges from Municipal Separate
Storm Sewer Systems (MS4s) Permit No. GP-0-24-001
A. MCM1 – Public Education and Outreach Program
The MS4 Operator must develop and implement an education and outreach program to increase
public awareness of pollutant generating activities and behaviors. This MCM is designed to inform
the public about the impacts of stormwater on water quality, the general sources of stormwater
pollutants, and the steps the general public can take to reduce pollutants in stormwater runoff.
1. Development
Within three (3) years
a. Focus Areas
i. Surface waters classified as Class A-S, A or B
Listed below are surface waters classified as Class A-S, A or B according to New York State’s
Part 701 Classifications--Surface Waters and Groundwaters. Areas discharging to these
waters are focus areas for the education and outreach program. Because the Class A-S, Class
A and Class B surface waters have nearly identical best uses, and because all MS4 Operators
in Erie and Niagara County are in within the watershed of a Class A-S, Class A surface water
(i.e. Lake Erie, Niagara River or Lake Ontario), the focus area for education and outreach will
encompass the entire geographical area of GP-0-24-001 regulated MS4s as depicted in
Appendix A. All education and outreach materials will approach water quality protection
from the high standards inherent in Class A-S, A and B surface waters.
Class A-S and Class A fresh surface waters are a source of water supply for drinking, culinary
or food processing purposes; primary and secondary contact recreation; and fishing. The
waters are suitable for fish, shellfish and wildlife propagation and survival.
• Lake Erie Class A-S
• Niagara River Class A-S
• Lake Ontario Class A
• Eighteen Mile Creek, Middle, and tribs (0104-0017): Class A
• Eighteenmile Creek, Upper, and tribs (0104-0039): Class A
• Buffalo Creek, Lower, and tribs (0103-0004): Class A
• Buffalo Creek, Upper, and minor tribs (0103-0003): Class A
Class B fresh surface waters are primary and secondary contact recreation and fishing.
These waters are suitable for fish, shellfish and wildlife propagation and survival.
• Cayuga Creek, Middle, and minor tribs (0103-0017): Class B
• Eighteenmile Creek, Lower, minor tribs (0104-0030): Class B
• S. Branch Eighteenmile, Lower, and tribs (0104-0016): Class B
• Scajaquada Creek, Upper, and tribs (0101-0034): Class B
• Ellicott Creek, Lower, and tribs (0102-0018): Class B
• Grand Island, all tribs to Niagara R (0101-0011): Class B
• Hampton Brook and Tribs (0104-0041): Class B
Page 24
• Hyde Park Lake (0101-0030): Class B
• Tonawanda Creek, Middle, Main Stem (0101-0006): Class B
ii. Sewersheds for impaired waters
N/A: For the Village of East Aurora , there are no surface waters identified as impaired in
Appendix C of the MS4 General Permit (GP-0-24-001).
iii. TMDL watersheds:
N/A: there are no TMDL watersheds in Erie County or Niagara County.
iv. Areas with construction activities:
Education will be targeted to specific construction sites/operators that are identified during
Construction General Permit oversight and/or inspections as impacting water
quality/generating stormwater pollutants. In addition, construction-related activities are an
education and outreach topic for the following target audiences: contractors, developers,
design professionals, and Village of East Aurora municipal staff.
v. Areas with on-site wastewater systems:
Education will be targeted to specific sewersheds that are identified during illicit discharge
detection monitoring as discharging pathogens/fecal coliform. In addition, on-site
wastewater treatment systems (i.e. septic systems) are an education and outreach topic for
the residential target audience.
vi. Residential, commercial, and industrial areas
Education will take a variety of forms for these audiences. Residential/household education
will include tabling at community and regional events, stormwater displays in the main
municipal building, school-based programming such as the annual rain barrel painting
contest, and classroom presentations. Commercial audiences will be targeted for education
on topics most relevant to their primary operation (i.e. restaurants, landscaping and lawn
care, mobile washers); industrial areas will be targeted for education on outdoor materials
storage and other issues as they are discovered.
vii. Stormwater hotspots; and
Stormwater hotspots targeted for education: commercial container nurseries, vehicle fueling
stations, and vehicle service and maintenance facilities.
viii. Areas with illicit discharges.
Education will be targeted to specific sewersheds that are identified during illicit discharge
detection monitoring as discharging stormwater pollutants, specifically related to discharges
from activities such as landscaping and lawn care, dog waste; household hazardous waste
disposal, vehicle washing.
b. Target Audiences and Associated Pollutant Generating Activities
Within three (3) years
Page 25
i. Residents: landscaping and lawn care; dog waste; household hazardous waste disposal;
vehicle washing
ii. Commercial: Business owners and staff: landscaping and lawn care; vehicle fueling; vehicle
service and maintenance; uncovered materials exposure/storage
iii. Institutions: Managers, staff, and students: uncovered materials exposure/storage
(institutions not subject to SPDES MS4 Stormwater Permit)
iv. Construction: Developers, contractors, and design professionals: soil disturbance (erosion
and sediment control); uncontained construction waste
v. Industrial: Owners and staff: uncovered materials exposure/storage (ONLY industry not
subject to SPDES MSGP Stormwater Permit)
vi. MS4 Operator’s municipal staff: uncovered materials exposure; preventative
maintenance; spill prevention and response; erosion and sediment controls; managing
vegetated areas and open space; salt storage; waste, garbage and floatable debris.
c. Education and Outreach Topics
Within three (3) years
The table below summarizes the education and outreach topics, target audience(s), and how the
education and outreach topics reduce the potential for pollutants to be generated by the target
audience(s) for the focus area(s).
Topic Target Audience How Topic Reduces Potential for
Pollutants to be Generated by
Target Audience(s)
Household Guide Residents Addresses common household
activities that contaminate
stormwater and how to prevent
Rain Garden How-To-Guide Residents Reduces stormwater runoff and
potential to carry pollutants to the
MS4
Your Septic System Residents, MS4 staff Addresses proper use and
maintenance of septic systems to
ensure they are functioning as
designed
Pet Waste Residents, MS4 staff Addresses the importance of
cleaning up and proper disposal of
pet waste to ensure pathogens are
not exposed to runoff
Illicit Discharge Citizen's Guide Residents, MS4 staff Provides information on storm
sewers, illicit discharges, how to
Page 26
recognize them and where to
report the incident
Stormwater Ponds Residents, MS4 staff, Provides information on
Commercial sites, HOAs stormwater ponds, their purpose
and maintenance.
DIY Rain Barrel & Home Residents Reduces stormwater runoff, use of
Composting lawn care chemicals and potential
to carry pollutants to the MS4
Rain Barrel Use/Installation Residents Reduces stormwater runoff and
potential to carry pollutants to the
MS4
Litter in Waterways Residents, MS4 staff Addresses how litter pollutes and
impacts local waterways
Moving Dirt/Soil Disturbance/ Contractors, developers, MS4 Addresses soil disturbance, the
Construction General Permit staff CGP, and importance of erosion
and sediment control
d. Illicit Discharge Education
Within six (6) months
The brochure entitled: Illicit Discharge Detection and Elimination: A Citizen’s Guide to Identifying
and Preventing Stormwater Pollution will be made available to municipal
employees, businesses, and the public as follows:
i. Municipal employees: email announcement
ii. Businesses: municipal web page; public library
iii. Public: municipal web page; public library
2. Implementation and Frequency
a. Distribution Method of Educational Messages
A variety of the following methods of distribution will be utilized:
• Printed materials (e.g., mail inserts, brochures, and newsletters);
• Electronic materials (e.g., websites, email listservs);
• Mass media (e.g., newspapers, public service announcements on radio or cable);
• Workshops or focus groups;
• Displays in public areas (e.g., town halls, library, parks); or
• Social Media (e.g., Facebook, Twitter, blogs).
b. Frequency
Once every 5 years, the Village of East Aurora directs an educational message to each target
audience(s) for each focus area(s) based on the defined education and outreach topic(s) listed in
this Stormwater Management Program Plan; and, documents the date of completion and method of
distribution for each message.
Page 27
Compliance documentation is listed in Appendix B.
c. Updates to the Public Education and Outreach Program
Annually, by April 1: The Village of East Aurora reviews and updates, if necessary, the focus areas,
target audiences, and/or education and outreach topics.
Compliance documentation is listed in Appendix B.
Page 28
B. MCM 2 - Public Involvement/Participation
The MS4 Operator must provide opportunities to involve the public in the development, review, and
implementation of the SWMP. This MCM is designed to give the public the opportunity to include
their opinions in the implementation of this SPDES general permit.
1. Public Involvement/Participation
Public involvement/participation in the development and implementation of the Village of East
Aurora Stormwater Management Program includes opportunities to: review the SWMP Plan;
submit comments; ask questions; and, become involved in the SWMP.
The Village of East Aurora informs the public of the opportunity they have to review the SWMP
Plan; submit comments; ask questions; and, become involved in the SWMP via the following
avenues of communication:
• Public hearings or meetings
• Coordination with other pre-existing public involvement/participation opportunities
• Reporting concerns about activities or behaviors observed
• Stewardship activities
Methods of distribution used to inform public of opportunity:
• Printed materials (e.g., mail inserts, brochures, and newsletters);
• Electronic materials (e.g., websites, email listserves);
• Mass media (e.g., newspapers, public service announcements on radio or cable);
• Workshops or focus groups;
• Displays in public areas (e.g., town halls, library, parks); or
Compliance documentation is listed in Appendix B.
a. Local point of contact to receive and respond to public concerns regarding stormwater
management and compliance with permit requirements:
Name: Brian Halt
Title: Storm Water Management Officer
Phone: 716-652-6057
Email: [email protected]
The name or title of this individual, with contact information, will be published on public outreach
and public participation materials.
2. Public Notice and Input Requirements
a. Public Notice and Input Requirements for SWMP Plan
This requirement is included above in B.1 Public Involvement/Participation
Page 29
b. Public Notice and Input Requirements for Draft Annual Report
Annually, provide an opportunity for the public to review and comment on the draft Annual Report.
Document the opportunity below.
1. For public review and comment, the draft Annual Report will be presented at a regular
meeting of an existing board (e.g., administrative, planning, zoning) or a separate meeting
specifically for stormwater, as designated by the MS4 or if requested by the public. The
public must have the ability to ask questions about and make comments on the draft annual
report during that presentation; or
2. For public review and comment, the draft Annual Report will be posted on the Village of
East Aurora website: www.east-aurora.ny.us/government/public-works-department . The
website includes information on the timeframes and procedures to submit comments
and/or request a meeting. If a public meeting is requested by two or more persons, the MS4
Operator must hold such a meeting.
Compliance documentation is listed in Appendix B.
c. Consideration of Public Input
Annually, the Village of East Aurora documents a summary of comments received on the SWMP
Plan and draft Annual Report.
Compliance documentation is listed in Appendix B.
Page 30
C. MCM 3 - Illicit Discharge Detection and Elimination
The Village of East Aurora has a program to systematically detect illicit discharges to its municipal
separate storm sewer system (MS4), track down the source of the illicit discharge, and eliminate it.
This program is designed to manage the MS4 so it is not conveying pollutants associated with flows
other than those directly attributable to stormwater runoff. The Village of East Aurora Illicit
Discharge Detection and Elimination Program is supported by Local law 12-2007 Village of East
Aurora, NY Stormwater Management (ecode360.com)
1. Illicit Discharge Detection
a. Public Reporting of Illicit Discharges
i. To report illicit discharges in the Village of East Aurora contact:
Contact: Elizabeth Cassidy
Phone: 716-652-7591
Email: [email protected]
ii. Within thirty (30) days of an illicit discharge, each report of an illicit discharge is
documented in the Village of East Aurora SWMP Plan.
Compliance documentation is listed in Appendix B.
b. Monitoring Locations
The three types of monitoring locations used to detect illicit discharges are identified as follows:
i. MS4 outfalls: Any point of stormwater discharge from pipes, ditches, and swales, as well as
other points of concentrated flow, to surface waters of New York State from the Village of
East Aurora municipal separate storm sewer system (MS4).
ii. Interconnections: Any point of stormwater discharge from pipes, ditches, and swales, as
well as other points of concentrated flow, to another MS4 or private storm sewer system.
iii. Municipal facility intraconnections: Any point where stormwater is conveyed from a
municipal facility property to its own MS4. This is the most down-drainage end of the MS4
infrastructure located on the municipal facility prior to discharge to the MS4.
c. Monitoring Locations Inventory
The Village of East Aurora maintains an inventory of monitoring locations that are within the
boundaries of its MS4 Regulated area (see Appendix A). The inventory is available for public review
and comment as follows:
• Appendix B
• Upon request: contact the Stormwater Program Coordinator or Stormwater Management
Officer listed on page 2 of this document
Page 31
• On the Village of East Aurora webpage: www.east-aurora.ny.us/government/public-
works-department
• At the Village of East Aurora municipal building as follows:
o Hardcopy: DPW
o Electronically:
Public: Upon Request
• Internally: C:\Users\Water Foreman\Documents\Storm Water\Monitoring Locations
For each monitoring location, the following information is included:
a) Inventory information for MS4 outfalls
• ID;
• Prioritization (high or low);
• Type of monitoring location;
• Name of MS4 Operator’s municipal facility, if located at a municipal
facility;
• Receiving waterbody name and class;
• Receiving waterbody WI/PWL Segment ID;
• Land use in drainage area;
• Type of conveyance (open drainage or closed pipe);
• Material;
• Shape;
• Dimensions;
• Submerged in water; and
• Submerged in sediment.
b) Inventory information for interconnections
• ID;
• Prioritization (high or low);
• Type of monitoring location;
• Name of MS4 Operator receiving discharge or private storm system;
• Name of MS4 Operator’s municipal facility, if located at a municipal
facility; and
• Receiving waterbody name and class.
c) Inventory information for municipal facility intraconnections
• ID;
• Prioritization (high or low);
• Type of monitoring location;
• Name of MS4 Operator’s municipal facility; and
• Receiving waterbody name and class.
Page 32
ii. Annually, the Village of East Aurora updates the inventory if monitoring locations are
constructed or discovered; or if information for existing monitoring locations change.
Prioritization determinations and updates, as noted below, are also addressed in the update.
Compliance documentation pertaining to updating the monitoring locations inventory is listed in
Appendix B.
d. Monitoring Locations Prioritization
i. The Village of East Aurora prioritizes its monitoring locations which are included in the
monitoring locations inventory as follows:
a) High priority monitoring locations are as follows:
• At a high priority municipal facility, defined as a municipal facility that has one
or more of the following on site and exposed to stormwater:
o Storage of chemicals, salt, petroleum, pesticides, fertilizers, antifreeze,
lead-acid batteries, tires, waste/debris;
o Fueling stations; and/or
o Vehicle or equipment maintenance/repair.
• Discharging to impaired waters;
• Discharging within a TMDL watershed (Not applicable in the Village of East
Aurora);
• Directly discharging to waters with Class AA-S, A-S, AA, A, B, SA, or SB; and/or
• Confirmed citizen complaints on three or more separate occasions in the last
twelve (12) months.
b) All other monitoring locations are considered low priority.
ii. Monitoring locations that are newly constructed, or discovered, will be prioritized within
30 days; and
iii. Annually, the Village of East Aurora updates the monitoring location prioritization in the
inventory based on information gathered as part of the monitoring location inspection and
sampling program.
Compliance documentation pertaining to updating prioritization for monitoring locations in the
inventory is listed in Appendix B. The inventory is available for public review and comment as
indicated above.
e. Monitoring Locations Inspection and Sampling Program
The Village of East Aurora has a program to inspect monitoring locations and sample dry weather
flow discharging from the MS4.
i. The monitoring locations inspection and sampling procedures are as follows:
a) During dry weather, one (1) inspection of each monitoring location identified in the
inventory every five (5) years;
b) Inspections and sampling results (if flowing during dry weather) are documented
with a Monitoring Locations Inspection and Sampling Field Sheet (Appendix C).
Page 33
Although not included as an appendix, all completed forms for inspection and
sampling are considered part of this SWMP Plan and are available for public review
and comment as follows:
• Upon request: contact the Stormwater Program Coordinator or Stormwater
Management Officer listed on page 2 of this document
• At the Village of East Aurora municipal building as follows:
o Hardcopy: (DPW
o Electronically:
Public: Upon Request
c) Following a monitoring location inspection, all inspections which resulted in a
“suspect” or “obvious” illicit discharge characterization are subject to sampling unless
the source of the illicit discharge is clear and discernable (e.g., sewage), in which case
sampling is not necessary;
d) Sampling is conducted using field test strips and/or field instrumentation that are
sufficiently sensitive to detect the parameter below the sampling action level used.
As per the MS4 General Permit (Part VI.C.d), analytical methods are not subject to
New York State’s 40 CFR Part 136 requirements for approved methods and certified
laboratories;
e) Source track down is initiated for monitoring locations that are characterized as
“suspect” or “obvious” illicit discharge, or that exceed any sampling action level used;
f) All monitoring locations are re-inspected within thirty (30) days of the initial
inspection, if there is a physical indicator not related to flow, that is indicative of an
intermittent or transitory discharges. In layman’s terms, a monitoring location may
not be flowing at the time of the dry weather inspection, but there may be evidence
(i.e. physical indicators) of an illicit discharge such as oil stains or toilet paper. If those
same physical indicators persist, the Village of East Aurora will initiate illicit discharge
track down procedures.
ii. The Village of East Aurora, in partnership with the Western NY Stormwater Coalition, has
an employee training program addressing Illicit Discharge Detection and Elimination
procedures. This training engages employees in a classroom setting as well as in hands-on
monitoring location Inspection, sampling, results interpretation, and source track down and
elimination.
a) All new staff that are charged with performing monitoring location inspections and
sampling procedures will receive training on procedures prior to doing so;
Page 34
b) All existing staff, that are charged with performing monitoring location inspections
and sampling procedures will receive training on procedures prior to doing so, and,
once every five (5) years, thereafter; and
c) If the monitoring locations inspection and sampling procedures are updated, all
staff will receive training on the updates prior to conducting monitoring locations
inspections and sampling.
iii. The names, titles, and contact information for the individuals who have received
monitoring locations inspection and sampling procedures training is updated annually; and
iv. Annually, by April 1, the Village of East Aurora reviews and updates its monitoring
location inspection and sampling procedures based on results (e.g., trends, patterns, areas
with illicit discharges, and common problems).
Compliance documentation is listed in Appendix B for:
• Staff that have received monitoring location inspection and sampling procedures training;
and,
• Updates to the monitoring location inspection and sampling procedures.
2. Illicit Discharge Track Down Program
Within two (2) years
The Village of East Aurora has an illicit discharge track down program to identify the source of illicit
discharges and the responsible party.
a. The illicit discharge track down program includes the following:
i. The illicit discharge track down program is part of the Illicit Discharge Detection and
Elimination Track Down Program detailed in Appendix D. It includes procedures and steps to
take for illicit discharge track down;
ii. Timeframes to initiate illicit discharge track down are as follows:
a) Within twenty-four (24) hours of discovery, or 72 hours of dry weather
conditions, the Village of East Aurora will initiate track down procedures for
flowing MS4 monitoring locations with obvious illicit discharges;
b) Within two (2) hours of discovery, the Village of East Aurora will initiate track
down procedures for obvious illicit discharges of sanitary wastewater that would
affect bathing areas during bathing season, shell fishing areas or public water
intakes and report orally or electronically to the NYSDEC Regional Water Engineer
and local health department; and
c) Within five (5) days of discovery, or 72 hours of dry weather conditions, the
Village of East Aurora will initiate track down procedures for suspect illicit
discharges.
Page 35
b. As noted above, the Village of East Aurora, in partnership with the Western NY Stormwater
Coalition, has an employee training program addressing Illicit Discharge Detection and Elimination
procedures. This training includes source track down. Requirements pertaining to employee training
for existing staff, new staff and updates to the illicit discharge source track down procedures are
identical.
c. The names, titles, and contact information for the individuals who have received illicit discharge
track down procedures training is updated annually; and
d. Annually, by April 1, the Village of East Aurora reviews and updates its illicit discharge track down
procedures.
Compliance documentation is listed in Appendix B for:
• Staff that have received illicit discharge track down procedures training; and,
• Updates to the illicit discharge track down procedures.
3. Illicit Discharge Elimination Program
Within two (2) years
The Village of East Aurora has an illicit discharge elimination program. Once an illicit discharge is
track downed and a source identified, steps are taken to eliminate the source/discharge. As noted
previously, the Village of East Aurora Illicit Discharge Detection and Elimination Program is
supported by Local law 12-2007 Village of East Aurora, NY Stormwater Management
(ecode360.com)
• Although not included in this SWMP Plan, documentation of enforcement measures to
eliminate illicit discharges is available upon request by contacting the Stormwater Program
Coordinator or Stormwater Management Officer listed on page 2 of this document.
a. The illicit discharge elimination procedures including
i. Provisions for escalating enforcement and tracking enforcement actions are in the Village
of East Aurora Enforcement Response Plan detailed in Appendix O;
ii. To confirm the corrective actions have been taken, the monitoring location will be
inspected, and sampled if flowing, within 30 days of receiving notice that the source of
contamination has been eliminated;
iii. Steps taken for illicit discharge elimination procedures; and
iv. Timeframes for illicit discharge elimination are as follows:
• Within twenty-four (24) hours of identification of an illicit discharge that
has a reasonable likelihood of adversely affecting human health or the
environment, the Village of East Aurora will eliminate the illicit discharge;
• Within five (5) days of identification of an illicit discharge that does not
Page 36
have a reasonable likelihood of adversely affecting human health or the
environment, the Village of East Aurora will eliminate the illicit discharge; and
• Where elimination of an illicit discharge within the specified timeframes
above is not possible, the Village of East Aurora will notify the NYSDEC
Regional Water Engineer.
b. As noted above, the Village of East Aurora, in partnership with the Western NY Stormwater
Coalition, has an employee training program addressing Illicit Discharge Detection and Elimination
procedures. This training includes illicit discharge elimination procedures. General requirements
pertaining to employee training for existing staff, new staff and updates to the illicit discharge
elimination are identical.
c. The names, titles, and contact information for the individuals who have received illicit discharge
elimination procedures training is updated annually; and
d. Annually, by April 1, the Village of East Aurora reviews and updates the illicit discharge
elimination procedures.
Compliance documentation is listed in Appendix B for:
• Staff that have received illicit discharge elimination procedures training; and,
• Updates to the illicit discharge elimination procedures.
Page 37
D. MCM 4 - Construction Site Stormwater Runoff Control
The Village of East Aurora has a program to ensure construction sites subject to the NYSDEC
General Permit for Stormwater Discharges from Construction Activity (CGP) are effectively
controlled. This program is designed to prevent pollution from construction related activities, as well
as ensure for proper planning and installation of post-construction SMPs. The Village of East Aurora
Construction Site Stormwater Runoff Control Program is supported by Local law 11-2007 Village of
East Aurora, NY Stormwater Management (ecode360.com)
1. Applicable Construction Activities/Projects/Sites
a. The construction site stormwater runoff control program addresses stormwater runoff to the
MS4 from sites with construction activities that:
i. Result in a total land disturbance of greater than or equal to one acre; or
ii. Disturb less than one acre if part of a larger common plan of development or sale (even if
additional development/phase is years away).
b. For construction activities where the Village of East Aurora is listed as the owner/operator on
the Notice of Intent for coverage under the CGP. The Village of East Aurora will ensure its own
compliance with the CGP. The additional requirements for Section 3: Construction Oversight;
Section 6: SWPPP Review; Section 7: Pre-Construction Meeting; Section 8: Construction Site
Inspection; and Section 9: Construction Close-Out below are not required.
2. Public Reporting of Construction Site Complaints
a. To report stormwater complaints related to construction in the Village of East Aurora contact:
Contact: Elizabeth Cassidy
Phone: 716-652-7591
Email: [email protected]
b. The Village of East Aurora documents reports of construction site complaints with the following
information:
i. Date of the report;
ii. Location of the construction site;
iii. Nature of complaint;
iv. Follow up actions taken or needed; and
v. Inspection outcomes and any enforcement taken.
Page 38
Although not included as an appendix, this documentation is considered part of the Village of East
Aurora SWMP Plan. It is available for public review upon request; contact the Stormwater Program
Coordinator or Stormwater Management Officer listed on page 2 of this document www.east-
aurora.ny.us/government/public-works-department.
3. Construction Oversight Program
Within one (1) year of the EDC
The Village of East Aurora has a construction oversight program. It is important to note that the
program encompasses the entire municipality, within and beyond the MS4 regulated area.
a. Construction oversight procedures in the Village of East Aurora are as follows:
i. The construction site stormwater control program applies to all construction sites that are
subject to the NYSDEC General Permit for Stormwater Discharges from Construction Activity
(GP-0-20-001);
ii. As per the NYSDEC General Permit for Stormwater Discharges from Construction Activity
(GP-0-20-001), construction activities that require a Stormwater Pollution Prevention Plan
(SWPPP) are listed in Appendix E;
iii. Procedures for submitting SWPPPs to the Village of East Aurora are as follows:
a. For all land development activities subject to review and approval by the Planning
Commission or Village Board of the Village of East Aurora under floodplain
development permit or subdivision regulations, the applicant or developer shall be
required to submit an SWPPP that complies with the requirements of the Village
code chapter 220 to the Storm Water Management Officer. Village of East Aurora,
NY Stormwater Management (ecode360.com)
•
b. For all land development activities not subject to review by the Planning
Commission or Village Board of the Village of East Aurora, the applicant or
developer shall be required to submit an SWPPP prepared in accordance with the
standards contained in Village code chapter 220 to the Storm Water Management
Officer.
iv. The Village of East Aurora reviews Stormwater Pollution Prevention Plans (SWPPPs)
for all CGP-regulated constructed projects for conformance with NYS standards (Detailed below in
Part 6: SWPPP Review);
v. Prior to commencement of CGP-regulated construction activity, the Village of East Aurora
requires a pre-construction meeting (Detailed below in Part 7: Pre-Construction Meeting);
vi. The Village of East Aurora inspects CGP-regulated construction sites to ensure
compliance with the conditions of the CGP and is authorized to escalate enforcement actions
as is necessary by 11-2007 Village of East Aurora, NY Stormwater Management
(ecode360.com) . (Detailed below in Part 8: Construction Site Inspections);
vii. All CGP-regulated construction projects in the Village of East Aurora are subject to
construction site close-out requirements in conformance with the CGP (Detailed below in
Page 39
Part 9: Construction site close-out);
viii. The Village of East Aurora follows an enforcement process that includes expectations
for compliance for CGP-regulated construction sites that fail to comply with the conditions of
the CGP and their SWPPP. See Appendix O for the Enforcement Response Plan. For
information on enforcement actions pertaining to specific construction sites in the Village of
East Aurora contact:
Contact: Elizabeth Cassidy
Phone: 716-652-7591
Email: [email protected]
ix. Although not included in this SWMP Plan, documentation of enforcement measures
addressing non-compliance with the Construction General Permit (GP-0-20-001) is available
upon request by contacting the Stormwater Program Coordinator or Stormwater
Management Officer listed on page 2 of this document.
x. Other procedures associated with the control of stormwater runoff from applicable
construction activities.
Not Applicable
b. The Village of East Aurora, in partnership with the Western NY Stormwater Coalition, has an
employee training program addressing its Construction Site Stormwater Runoff Control Program.
This training engages employees in a classroom setting, and as appropriate, a SWPPP compliance
inspection at a construction site.
i) All new staff that are charged with conducting any construction oversight activities
will receive training on procedures prior to doing so;
ii) All existing staff, that are charged with conducting any construction oversight
activities will receive training on procedures prior to doing so, and, once every five (5)
years, thereafter; and
iii) If the construction oversight procedures are updated, all staff will receive training
on the updates prior to conducting construction oversight.
c. The names, titles, and contact information for the individuals who have received construction
oversight training are updated annually;
d. All individuals involved in construction activity in the Village of East Aurora (e.g., contractor,
subcontractor, qualified inspector, SWPPP reviewers) will be certified and maintain four (4) hours of
NYSDEC endorsed training in proper erosion and sediment control principles by attending the
NYSDEC 4-Hour Erosion and Sediment Control Training. This training is offered annually by Erie and
Niagara County Soil and Water Conservation Districts, as well as online by other Soil and Water
Conservation Districts across the state.
Page 40
i) Individuals responsible for reviewing SWPPPs on behalf of the Village of East
Aurora will maintain certification.
ii) In conformance with the NYS CGP, contractors, subcontractors and qualified
inspectors will maintain certification throughout the project. Contractors and and
subcontractors will include a current copy of their NYS certification in the on-site
SWPPP.
e. Annually, by April 1, the Village of East Aurora reviews and updates its construction oversight
procedures.
Compliance documentation is listed in Appendix B for:
• Staff that have received construction oversight training;
• Updates to the construction oversight procedures; and,
• NYSDEC 4-Hour Erosion and Sediment Control Training for individuals involved in
construction activity.
4. Construction Site Inventory & Inspection Tracking
Within six (6) months of the EDC
a. The Village of East Aurora maintains an inventory of CGP-regulated construction sites that
encompasses the entire municipality, within and beyond the MS4 regulated area. Although not
included as an appendix, the inventory is considered part of the Village of East Aurora SWMP Plan.
The inventory is available for public review and comment as follows:
• Upon request: contact Stormwater Program Coordinator or Stormwater Management
Officer listed on page 2 of this document
• At the Village of East Aurora municipal building as follows:
o Hardcopy: DPW
o Electronically:
Public: Upon Request
Internally: C:\Users\Water Foreman\Documents\Storm Water\Construction
Sites
The following information is included in the inventory:
• Location of the construction site;
• Owner/operator contact information, if other than the MS4 Operator;
• Receiving waterbody name and class;
• Receiving waterbody WI/PWL Segment ID;
• Prioritization (high or low);
• Construction project SPDES identification number;
• SWPPP approval date;
• Inspection history, including dates and ratings (satisfactory, marginal, or unsatisfactory,
when available); and
Page 41
• Current status of the construction site/project (i.e., active, temporarily shut down,
complete).
b. Annually, the Village of East Aurora updates the inventory if construction projects are approved
or completed.
5. Construction Site Prioritization
Within one (1) year
a. The Village of East Aurora prioritizes all CGP-regulated construction sites which are included in
the construction site inventory as follows:
i. High priority construction sites include construction sites:
a) With a direct conveyance (e.g., channel, ditch, storm sewer) to a surface water of
the State:
i) Classified as impaired by silt/sediment, phosphorus, or nitrogen as the
Pollutant of Concern;
ii) Classified as AA-S, AA, or A; or
b) With greater than five (5) acres of disturbed earth at any one time;
c) With earth disturbance within one hundred (100) feet of any lake or pond; and/or
d) Within fifty (50) feet of any rivers or streams.
ii. All other construction sites are considered low priority.
b. All CGP-regulated construction sites are prioritized within thirty (30) days of becoming active; and
c. Annually, after the initial prioritization, the Village of East Aurora updates the construction site
prioritization in the inventory based on information gathered as part of the construction oversight.
i. If the prioritization of the construction site changes priority based on
information gathered as part of the construction oversight program, the
MS4 Operator must comply with the requirements that apply to that
prioritization.
As noted above, the CGP-regulated construction sites inventory is available for public review and
comment as follows:
• Upon request: contact Stormwater Program Coordinator or Stormwater Management
Officer listed on page 2 of this document
• At the Village of East Aurora municipal building as follows:
o Hardcopy: DPW
Page 42
o Electronically:
Public: Upon Request
Internally: C:\Users\Water Foreman\Documents\Storm
Water\Construction Sites
6. SWPPP Review
a. All individual(s) responsible for reviewing SWPPPs for acceptance will complete four (4) hours of
NYSDEC endorsed training in proper erosion and sediment control principles by attending the
NYSDEC 4-Hour Erosion and Sediment Control Training. This training is offered annually by Erie and
Niagara County Soil and Water Conservation Districts, as well as online by other Soil and Water
Conservation Districts across the state. This training will be completed within three (3) years of the
EDC and every three (3) years thereafter to maintain active certification.
b. SWPPP reviewers for the Village of East Aurora receive this training prior to
conducting SWPPP reviews for acceptance.
i. Individuals without these trainings cannot review SWPPPs for acceptance.
ii. Individuals who meet the definition of a qualified professional or qualified inspector are
exempt from this requirement.
c. To ensure individuals responsible for reviewing SWPPPs review all SWPPPs for applicable
construction activities and for conformance with the requirements of the CGP, the NYSDEC SWPPP
Review Checklist will be utilized (Appendix F). SWPPP reviews will include the following:
i. Erosion and sediment controls will be reviewed for conformance with the
NYS Standards and Specifications for Erosion and Sediment Control 2016, or equivalent;
ii. Individuals responsible for review of post-construction SMPs must be qualified
professionals or under the supervision of a qualified professional; and
iii. Post-construction SMPs must be reviewed for conformance with the NYS
Stormwater Management Design Manual (NYS SWMDM) 2015 or equivalent, including:
• All post-construction SMPs must meet the sizing criteria contained in the CGP and NYS
SWMDM 2015.
• Deviations from the performance criteria of the NYS SWMDM 2015 must demonstrate
that they are equivalent.
• The SWPPP must include an Operation & Maintenance Plan that includes inspection and
maintenance schedules and actions to ensure continuous and effective operation of each
post-construction SMP. The SWPPP must identify the entity that will be responsible for
the long-term operation and maintenance of each practice.
Compliance documentation is listed in Appendix B for:
• Staff involved in SWPPP reviews that have received NYSDEC 4-Hour Erosion and Sediment
Control Training
Page 43
d. Although not included as an appendix, SWPPP reviews, as documented by the NYSDEC SWPPP
Review Checklist, are considered part of the Village of East Aurora SWMP Plan. The SWPPP reviews
are available for public review and comment as follows:
• Upon request: contact Stormwater Program Coordinator or Stormwater Management
Officer listed on page 2 this document
• At the Village of East Aurora municipal building as follows:
o Hardcopy: DPW
o Electronically:
• Public: Upon Request
• Internally: C:\Users\Water Foreman\Documents\Storm Water\SWPP
e. As new construction activities are added to the construction site inventory, they will be prioritized
as noted previously; and
f. The Village of East Aurora will notify construction site owner/operators that their SWPPP has
been accepted using the MS4 SWPPP Acceptance Form created by the Department and required by
the CGP, signed in accordance with Part X.J: Signatories and Certifications (MS4 General Permit: GP-
0-24-001).
7. Pre-Construction Meeting
Prior to commencement of construction activities, the Village of East Aurora requires a pre-
construction meeting. The date and content of the preconstruction inspection/meeting is
documented in the construction site inventory of this SWMP Plan. The owner/operator listed on the
CGP NOI, the Village of East Aurora, contractor(s) responsible for implementing the SWPPP for the
construction activity, and the qualified inspector (if required for the construction activity) must
attend the meeting in order to:
a. Confirm the approved project has received, or will receive26, coverage under
the CGP or an individual SPDES permit;
b. Verify contractors and subcontractors selected by the owner/operator of the
construction activity have identified at least one individual that has received four (4)
hours of Department endorsed training in proper erosion and sediment control
principles from a Soil & Water Conservation District or other endorsed entity as
required by the CGP; and, a copy of the certification(s) for those individuals is added
to the on-site SWPPP.
c. Verify each of the contractors and subcontractors identified have signed a copy of
the following certification statement below before they commence any construction
activity:
"I hereby certify under penalty of law that I understand and agree to comply
with the terms and conditions of the SWPPP and agree to implement any
Page 44
corrective actions identified by the qualified inspector during a site inspection.
I also understand that the owner or operator must comply with the terms and
conditions of the most current version of the New York State Pollutant
Discharge Elimination System ("SPDES") general permit for stormwater
discharges from construction activities and that it is unlawful for any person
to cause or contribute to a violation of water quality standards. Furthermore,
I am aware that there are significant penalties for submitting false
information, that I do not believe to be true, including the possibility of fine
and imprisonment for knowing violations"
In addition to providing the certification statement above, the certification page must
also identify the following:
• Specific elements of the SWPPP that each contractor and subcontractor will
be responsible for, and include the name and title of the person providing the
signature;
• The name and title of the trained contractor responsible for SWPPP
implementation;
• The name, address and telephone number of the contracting firm;
• The address (or other identifying description) of the site; and
• The date the certification statement is signed.
The owner or operator of the Construction General Permit must attach the
certification statement(s) to the copy of the SWPPP that is maintained at the
construction site. If new or additional contractors are hired to implement measures
identified in the SWPPP after construction has commenced, they must also sign the
certification statement and provide the information listed above.
d. Review the construction oversight program and expectations for compliance.
8. Construction Site Inspections
The Village of East Aurora inspects CGP-regulated construction sites to ensure they are in
compliance with the SWPPP that pertains to the site.
a. All individual(s) responsible for construction site inspection will complete four (4) hours of
NYSDEC endorsed training in proper erosion and sediment control principles by attending
the NYSDEC 4-Hour Erosion and Sediment Control Training. This training is offered annually
by Erie and Niagara County Soil and Water Conservation Districts, as well as online by other
Soil and Water Conservation Districts across the state. This training will be completed every
three (3) years thereafter to maintain active certification.
b. All MS4 Construction Site Inspectors will receive this training prior to conducting
construction site inspections.
i. Individuals without these trainings cannot inspect construction sites.
ii. Individuals who meet the definition of a qualified professional or qualified inspector are
exempt from this requirement.
Page 45
c. All sites with construction activity identified in the inventory will be inspected annually
during active construction, after the pre-construction meeting, or sooner if deficiencies are
noted that require attention.
i. Follow up to construction site inspections must confirm corrective actions are
completed within timeframes established by the CGP and the MS4 Operator’s
Enforcement Response Plan.
d. The names, titles, and contact information for the individuals who have received the NYSDEC
4-Hour Erosion and Sediment Control Training are updated annually;
e. All construction inspections are documented using the NYSDEC Construction Site Inspection
Report Form (Appendix G) or an equivalent form containing the same information. The
completed Construction Site Inspection Reports are considered part of the Village of East
Aurora SWMP Plan and are available as follows:
• Upon request: contact Stormwater Program Coordinator or Stormwater
Management Officer listed on page 2 of this document
• At the Village of East Aurora municipal building as follows:
o Hardcopy: DPW
o Electronically:
• Public: Upon Request
• Internally: C:\Users\Water Foreman\Documents\Storm
Water\Construction Inspections
Compliance documentation is listed in Appendix B for:
• Staff conducting construction inspections that have received NYSDEC 4-Hour Erosion and
Sediment Control Training
9. Construction Site Close-out
a. To close out a CGP-regulated construction site, the Village of East Aurora conducts and
documents a final construction site inspection. The final construction site inspection is
documented using the Construction Site Inspection Report Form (Appendix G), or an
equivalent form containing the same information, or accept the construction site
owner/operator’s qualified inspector final inspection certification that is required by the
CGP. The completed (final) Construction Site Inspection Reports are considered part of the
Village of East Aurora SWMP Plan and are available as follows:
• Upon request: contact Stormwater Program Coordinator or Stormwater
Management Officer listed on page 2 of this document
• At the Village of East Aurora municipal building as follows:
o Hardcopy: DPW
o Electronically:
Page 46
• Public: Upon Request
• Internally: C:\Users\Water Foreman\Documents\Storm
Water\Construction Inspections
b. The Notice of Termination (NOT) is signed by the Village of East Aurora as required by the
CGP for projects determined to be complete. The NOT is signed in accordance with Part X.J:
Signatories and Certifications (MS4 General Permit: GP-0-24-001).
Page 47
E. MCM 5 – Post-Construction Stormwater Management
The Village of East Aurorahas a program to ensure proper operation and maintenance of post-
construction Stormwater Management Practices (SMPs) for new or redeveloped sites. This program
is designed to promote the long-term performance of post-construction SMPs in removing
pollutants from stormwater runoff. The Village of East Aurora Post-Construction Stormwater
Management Program is supported by Local law 11-2007 Village of East Aurora, NY Stormwater
Management (ecode360.com)
1. Applicable Post-Construction SMPs
The Village of East Aurora post-construction SMP program addresses stormwater runoff to the MS4
from publicly owned/operated and privately owned/operated post-construction SMPs that meet
the following:
a. Post-construction SMPs that have been installed as part of any CGP regulated construction site or
individual SPDES permit since March 10, 2003; and
b. All new post-construction SMPs constructed as part of the construction site stormwater runoff
control program.
2. Post-Construction SMP Inventory & Inspection Tracking
The Village of East Aurora maintains an inventory of post-construction SMPs that encompasses the
entire municipality, within and beyond the MS4 regulated area.
a. The Village of East Aurora under its continuing MS4 General Permit coverage:
i. Maintains the inventory from previous iterations of the MS4 General Permit requirement
for post-construction SMPs installed after March 10, 2003; and
ii. Will update the inventory for post-construction SMPs installed after March 10,
2003 as post-construction SMPs are approved or discovered; or after an owner/operator of
CGP-regulated construction activity has filed a NOT with the NYSDEC.
b. Annually, the Village of East Aurora updates the inventory of post-construction SMPs to include
the post-construction SMPs as noted above.
c. Within five (5) years
The following information will be included in the inventory either by using Village of East Aurora
maintenance records or by verification of maintenance records provided by the owner of the post-
construction SMP:
i. Street address or tax parcel;
ii. Type;
iii. Receiving waterbody name and class;
iv. Receiving waterbody WI/PWL Segment ID
v. Date of installation (if available) or discovery;
Page 48
vi. Ownership;
vii. Responsible party for maintenance;
viii. Contact information for party responsible for maintenance;
ix. Location of documentation depicting O&M requirements and legal agreements for post-
construction SMP;
x. Frequency for inspection of post-construction SMP, as specified in the New York State
Department of Environmental Conservation Maintenance Guidance: Stormwater
Management Practices, March 31, 2017 (NYS DEC Maintenance Guidance 2017) or as
specified in the O&M plan contained in the approved SWPPP;
xi. Reason for installation (e.g., new development, redevelopment, retrofit, flood control), if
known;
xii. Date of last inspection;
xiii. Inspection results; and
xiv. Any corrective actions identified and completed.
d. Although the Village of East Aurora inventory of post-construction SMPs is considered part of this
SWMP Plan and is available as follows:
• Upon request: contact Stormwater Program Coordinator or Stormwater Management
Officer listed on page 2 of this document
• At the Village of East Aurora municipal building as follows:
o Hardcopy: (Department Info)
o Electronically:
• Public: Upon Request
•■Internally: C:\Users\Water Foreman\Documents\Storm Water\Post
Construction Inventory
3. SWPPP Review
As noted above, post-construction SMP SWPPP review requirements address the following:
a. Individuals responsible for review of post-construction SMPs must be qualified professionals or
under the supervision of a qualified professional; and
b. Post-construction SMPs must be reviewed for conformance with the NYS Stormwater
Management Design Manual (NYS SWMDM) 2015 or equivalent, including:
Page 49
i. All post-construction SMPs must meet the sizing criteria contained in the CGP and NYS
SWMDM 2015.
ii. Deviations from the performance criteria of the NYS SWMDM 2015 must demonstrate
that they are equivalent.
c. The SWPPP must include an O&M plan that includes inspection and maintenance schedules and
actions to ensure continuous and effective operation of each post-construction SMP. The SWPPP
must identify the entity that will be responsible for the long-term operation and maintenance of
each practice.
4. Post-Construction SMP Inspection & Maintenance Program
Within one (1) year
The Village of East Aurora has an inspection and maintenance program for publicly
owned/operated and privately owned/operated post-construction SMPs.
a. The post-construction SMP inspection and maintenance procedures are as follows:
i. All post-construction SMPs identified in the inventory are inspected at the frequency
specified in the NYSDEC Maintenance Guidance 2017 or as specified in the O&M plan
contained in the approved SWPPP, if available;
ii. The Post-Construction SMP Inspection Checklist in the NYSDEC Maintenance Guidance or
an equivalent form containing the same information must be used to document post-
construction SMP inspections. The Village of East Aurora will only accept Level 1
inspections (NYS DEC Maintenance Guidance 2017) by private owners inspecting post-
construction SMPs. Level 2 and Level 3 inspections must be performed by qualified
individuals as indicated in the checklist document.
The completed Post-Construction SMP Inspection Checklists are considered part of this
SWMP Plan and are available as follows:
• Upon request: contact Stormwater Program Coordinator or Stormwater
Management Officer listed on page 2 of this document
• At the Village of East Aurora municipal building as follows:
o Hardcopy: DPW
o Electronically:
• Public: Upon Request
• Internally: C:\Users\Water Foreman\Documents\Storm
Water\Post Construction Inspections
iii. Upon receipt of a completed inspection checklist, the Village of East Aurora will inform
the owner that follow-up actions indicated on the checklist (i.e. maintenance, repair, or
higher level inspection) must occur within thirty (30) days of the post-construction SMP
inspection; and
Page 50
iv. The Village of East Aurora will initiate enforcement within sixty (60) days of the
inspection if follow-up actions are not complete. See Appendix O Enforcement Response
Plan for course of action.
v. Although not included in this SWMP Plan, documentation of enforcement measures
pertaining to inspection and maintenance of post-construction stormwater management
practices is available upon request by contacting the Stormwater Program Coordinator or
Stormwater Management Officer listed on page 2 of this document.
b. The Village of East Aurora, in partnership with the Western NY Stormwater Coalition, has an
employee training program addressing its post-construction SMP inspection and maintenance
procedures. This training utilizes the NYSDEC Maintenance Guidance and includes a classroom
setting, followed by a post-construction SMP inspection.
i) All new staff that are charged with conducting post-construction SMP inspection and
maintenance activities will receive training on procedures prior to doing so;
ii) All existing staff, that are charged with conducting any post-construction SMP inspection
and maintenance activities will receive training on procedures prior to doing so, and, once
every five (5) years, thereafter; and
iii) If the post-construction SMP inspection and maintenance procedures are updated, all
staff will receive training on the updates prior to conducting post-construction SMP
inspection and maintenance.
iv) All inspectors will meet minimum qualifications for Level 1, 2, 3 inspections as per the
NYSDEC Maintenance Guidance document (2017).
c. The names, titles, and contact information for the individuals who have received post-
construction SMP inspection and maintenance procedures training are updated annually;
d. Annually, by April 1, the Village of East Aurora reviews and updates its post-construction SMP
inspection and maintenance procedures.
Compliance documentation is listed in Appendix B for:
• Staff that have received post-construction SMP inspection and maintenance procedures
training; and,
• Updates to the post-construction SMP inspection and maintenance procedures.
Page 51
F. MCM 6 – Pollution Prevention and Good Housekeeping
The Village of East Aurora has a pollution prevention and good housekeeping program for
municipal facilities and municipal operations to minimize pollutant discharges. This MCM is
designed to ensure the Village of East Aurora’s own activities do not contribute pollutants to
surface waters of the State.
1. Best Management Practices (BMPs) for Municipal Facilities & Operations
Within three (3) years
The Village of East Aurora has a municipal facility program and municipal operations program with
best management practices (BMPs) that will minimize the discharge of pollutants associated with
municipal facilities and municipal operations, respectively. The BMPs to be considered are as
follows and are documented in this SWMP Plan:
a. Minimize Exposure
i. Exposure of materials to rain, snow, snowmelt, and runoff must be minimized, unless not
technologically possible or not economically practicable and achievable in light of best
industry practices, including areas used for loading and unloading, storage, disposal,
cleaning, maintenance, and fueling operations, with the following BMPs:
a) Locate materials and activities inside or protect them with storm resistant
coverings;
b) Use grading, berming, or curbing to prevent runoff of contaminated flows and
divert run-on away from these areas;
c) Locate materials, equipment, and activities so leaks and spills are contained in
existing containment and diversion systems;
d) Clean up spills and leaks promptly using dry methods (e.g., absorbents) to prevent
the discharge of pollutants;
e) Store leaky vehicles and equipment indoors or, if stored outdoors, use drip pans
and absorbents;
f) Use spill/overflow protection equipment;
g) Perform all vehicle and/or equipment cleaning operations indoors, under cover, or
in bermed areas that prevent runoff and run-on and also captures any overspray;
h) Drain fluids, indoors or under cover, from equipment and vehicles that will be
decommissioned, and, for any equipment and vehicles that will remain unused for
extended periods of time, inspect at least monthly for leaks; and/or
i) Minimize exposure of chemicals by replacing with a less toxic alternative (e.g., use
non-hazardous cleaners).
Page 52
ii. No Exposure Certification for High Priority Municipal Facilities
a) Municipal facilities may qualify for No Exposure Certification (Appendix H) when all
activities and materials are completely sheltered from exposure to rain, snow,
snowmelt and/or runoff.
b) High priority municipal facilities with uncovered parking areas for vehicles awaiting
maintenance may be considered a low priority municipal facility if only routine
maintenance is performed inside and all other no exposure criteria are met. Details
on high/low priority municipal facilities are addressed later in this section.
c) Municipal facilities accepting or repairing disabled vehicles and/or vehicles that
have been involved in accidents are not eligible for the No Exposure Certification.
d) Municipal facilities must maintain the No Exposure Certification and document in
the SWMP Plan. The No Exposure Certification ceases to apply when activities or
materials become exposed.
b. Follow a Preventive Maintenance Program
i. The Village of East Aurora has a preventative maintenance program that includes routine
inspection, testing, maintenance, and repair of all fueling areas, vehicles and equipment and
systems to prevent leaks, spills and other releases.
This includes:
a) Performing inspections and preventive maintenance of stormwater drainage,
source controls, treatment systems, and plant equipment and systems;
b) Maintaining non-structural BMPs (e.g., keep spill response supplies available,
personnel appropriately trained, containment measures, covering fuel areas); and
c) Ensuring vehicle washwater is not discharged to the MS4 or to surface waters of
the State. Washing equipment/vehicles in a designated and/or covered area where
washwater is collected to be recycled or discharged to the sanitary sewer is required.
ii. Routine maintenance is performed to ensure BMPs are operating properly.
iii. When a BMP is not functioning to its designed effectiveness and needs repair or
replacement:
a) Maintenance is performed before the next anticipated storm event, or as
necessary to maintain the continued effectiveness of stormwater controls. If
maintenance prior to the next anticipated storm event is impracticable, maintenance
must be scheduled and accomplished as soon as practicable; and
b) Interim measures are taken to prevent or minimize the discharge of pollutants
until the final repair or replacement is implemented, including cleaning up any
contaminated surfaces so that the material will not be discharged during subsequent
Page 53
storm events.
c. Spill Prevention and Response Procedures
i. The Village of East Aurora follows Spill Prevention and Response Procedures designed to
minimize the potential for leaks, spills and other releases that may be exposed to
stormwater and provide for effective response to such spills if or when they occur. The Spill
Prevention and Response Procedures are as follows:
a) Store materials in appropriate containers;
b) Label containers (e.g., “Used Oil,” “Spent Solvents,” “Fertilizers and Pesticides”)
that could be susceptible to spillage or leakage to encourage proper handling and
facilitate rapid response if spills or leaks occur;
c) Implement procedures for material storage and handling, including the use of
secondary containment and barriers between material storage and traffic areas, or a
similarly effective means designed to prevent the discharge of pollutants from these
areas;
d) Develop procedures for stopping, containing, and cleaning up leaks, spills, and
other releases. As appropriate, execute such procedures as soon as possible;
e) Keep spill kits on-site, located near areas where spills may occur or where a rapid
response can be made;
f) Develop procedures for notification of the appropriate facility personnel,
emergency response agencies, and regulatory agencies when a leak, spill, or other
release occurs. If possible, one of these individuals should be a member of the
stormwater pollution prevention team. Any spills must be reported in accordance
with 6 NYCRR 750-2.7; and
g) Following any spill or release, the MS4 Operator must evaluate the adequacy of
the BMPs identified in the municipal facility specific SWPPP. If the BMPs are
inadequate, the SWPPP must be updated to identify new BMPs that will prevent
reoccurrence and improve the emergency response to such releases.
ii. Measures for cleaning up spills or leaks must be consistent with applicable petroleum bulk
storage, chemical bulk storage, or hazardous waste management regulations at 6 NYCRR
Parts 596-599, 613 and 370-373.
iii. This SPDES general permit does not relieve the Village of East Aurora of any reporting or
other requirements related to spills or other releases of petroleum or hazardous substances.
Any spill of a hazardous substance must be reported in accordance with 6 NYCRR 597.4. Any
spill of petroleum must be reported in accordance with 6 NYCRR 613.6 or 17 NYCRR 32.3.
Page 54
d. Erosion and Sediment Controls31
i. Stabilize exposed areas and control runoff using structural and/or nonstructural controls to
minimize onsite erosion and sedimentation.
ii. The Village of East Aurora will consider:
a) Structural and/or non-structural controls found in the NYS E&SC 2016;
b) Areas that, due to topography, land disturbance (e.g., construction), or other
factors, have potential for significant soil erosion;
c) Whether structural, vegetative, and/or stabilization BMPs are needed
to limit erosion;
d) Whether velocity dissipation devices (or equivalent measures) are needed at
discharge locations and along the length of any channel to provide a non-erosive flow
velocity from the structure to a water course; and
e) Address erosion or areas with poor vegetative cover, especially if the erosion is
within fifty (50) feet of a surface water of the State.
e. Manage Vegetated Areas and Open Space on Municipal Property
i. Maintain vegetated areas on Village of East Aurora owned/operated property and
right of ways:
a) Specify proper use, storage, and disposal of pesticides, herbicides, and fertilizers
including minimizing the use of these products and using only in accordance
manufacturer’s instruction;
b) Use lawn maintenance and landscaping practices that are protective of water
quality. Protective practices include: reduced mowing frequencies; proper disposal of
lawn clippings; and use of alternative landscaping materials (e.g., drought resistant
planting);
c) Place pet waste disposal containers and signage concerning the proper collection
and disposal of pet waste at all parks and open space where pets are permitted; and
d) Address waterfowl congregation areas where needed to reduce waterfowl
droppings from entering the MS4.
f. Salt Storage Piles or Pile Containing Salt
Enclose or cover storage piles of salt, or piles containing salt, used for deicing or maintenance of
paved surfaces, except during loading, unloading, and handling. Implement appropriate measures
(e.g., good housekeeping, routine sweeping, diversions, containment) to minimize exposure
resulting from adding to or removing materials from the pile.
g. Waste, Garbage, and Floatable Debris
Page 55
i. Keep all dumpster lids closed when not in use. For dumpsters and roll off boxes that do not
have lids and could leak, ensure that discharges have a control (e.g., secondary containment,
treatment); and
ii. Keep exposed areas free of waste, garbage, and debris or intercept them before they are
discharged:
a) Manage trash containers at parks and open space (scheduled cleanings; sufficient
number);
b) Pick up trash and debris on Village of East Aurora owned/operated property and
rights of way; and
c) Clean out catch basins within the appropriate timeframes as noted later in this
section.
h. Alternative Implementation Options
When alternative implementation options are utilized, require the parties performing municipal
operations as contracted services, including but not limited to street sweeping, snow removal, and
lawn/grounds care, to meet permit requirements as the requirements apply to the activity
performed.
2. Municipal Facilities33
a. Municipal Facility Program
Within three (3) years
The Village of East Aurora has a municipal facility program that includes BMPs to minimize
stormwater pollution from municipal operations, differentiation of BMPs applicable to high or low
priority facilities, and employee training. The municipal facility program is documented for this
SWMP Plan as follows:
i. Municipal facility procedures:
a) All BMPs incorporated into the municipal facility program;
b) High priority municipal facility requirements, that are specific to municipal
operations occurring at each high priority facility; and
c) Low priority municipal facility requirements that are specific to municipal
operations occurring at each low priority facility.
ii. The Village of East Aurora, in partnership with the Western NY Stormwater Coalition, has
an employee training program addressing its municipal facility procedures. This training
addresses on-site facility operations and is conducted concurrently with municipal
operations procedures.
a) All new staff that are charged with conducting municipal facility
procedures/BMPs will receive training on procedures prior to doing so;
Page 56
b) All existing staff, that are charged with conducting any municipal facility
procedures/BMPs will receive training on procedures prior to doing so, and, once
every five (5) years, thereafter; and
c) If the municipal facility procedures/BMPs are updated, all staff will receive
training on the updates prior to conducting municipal facility procedures.
iii. The names, titles, and contact information for the individuals who have received
municipal facility procedures training are updated annually;
iv. Annually, by April 1, the Village of East Aurora reviews and updates its municipal facility
procedures.
Compliance documentation is listed in Appendix B for:
• Staff that have received municipal facility procedures training; and,
• Updates to the municipal facility procedures.
b. Municipal Facility Inventory
i. Within two (2) years
The Village of East Aurora maintains an inventory of all municipal facilities in the SWMP
Plan. The following information is included in the inventory:
a) Name of municipal facility;
b) Street address;
c) Type of municipal facility;
d) Prioritization (high or low);
e) Receiving waterbody name and class;
f) Receiving waterbody WI/PWL Segment ID;
g) Contact information;
h) Responsible department;
i) Location of SWPPP (if high priority; when completed);
j) Type of activities present on site;
k) Size of facility (acres);
l) Date of last assessment;
Page 57
m) BMPs identified; and
n) Projected date of next comprehensive site assessment as per the municipal facility
prioritization.
ii. Annually, the Village of East Aurora updates the inventory if new municipal facilities are
added.
c. Municipal Facility Prioritization
i. Within three (3) years
The Village of East Aurora prioritizes all known municipal facilities as follows:
a) High priority municipal facilities include municipal facilities that have one or more of the
following on site and exposed to stormwater:
i) Storage of chemicals, salt, petroleum, pesticides, fertilizers, antifreeze, lead-acid
batteries, tires, waste/debris;
ii) Fueling stations; and/or
iii) Vehicle or equipment maintenance/repair.
b) Low priority municipal facilities include any municipal facilities that do not meet the
criteria for a high priority municipal facility.
c) High priority municipal facilities which qualify for a No Exposure Certification (Appendix H)
are low priority municipal facilities.
ii. Within thirty (30) days of when a municipal facility is added to the inventory, the Village of East
Aurora prioritizes it; and
iii. Annually, after the initial prioritization, the Village of East Aurora will update the municipal
facility prioritization in the inventory based on information gathered as part of the municipal facility
program, including cases where a No Exposure Certification ceases to apply. Although not included
as an appendix, the inventory and all required updates is considered part of the Village of East
Aurora SWMP Plan. The inventory is available for public review and comment as follows:
• Upon request: contact Stormwater Program Coordinator or Stormwater Management
Officer listed on page 2 of this document
• At the Village of East Aurora municipal building as follows:
o Hardcopy: DPW
o Electronically:
• Public: Upon Request
•■Internally: C:\Users\Water Foreman\Documents\Storm
Water\Municipal Facilities
Page 58
d. High Priority Municipal Facility Requirements
i. Municipal Facility Specific SWPPP
Within five (5) years
The Village of East Aurora has a municipal facility specific SWPPP for each high priority municipal
facility. A copy of the municipal facility specific SWPPP is retained on site at the respective municipal
facility. The Village of East Aurora SWPPP contains the following:
a) Stormwater Pollution Prevention Team
The municipal facility specific SWPPP must identify the individuals (by name and/or title) and
their role/responsibilities in developing, implementing, maintaining, and revising the
municipal facility specific SWPPP. The activities and responsibilities of the team must address
all aspects of the municipal facility specific SWPPP.
b) General Site Description
A written description of the nature of the activities occurring at the municipal facility with a
potential to discharge pollutants, type of pollutants expected, and location of key features as
detailed in the site map.
c) Summary of potential pollutant sources
The municipal facility specific SWPPP must identify each area at the municipal facility where
materials or activities are exposed to stormwater or from which authorized non-stormwater
discharges originate, including any potential pollutant sources for which the municipal
facility has reporting requirements under the Emergency Planning and Community Right-To-
Know Act (EPCRA), Section 313.
i) Materials or activities include: machinery; raw materials; intermediate products;
byproducts; final products or waste products; and, material handling activities which
includes storage, loading and unloading, transportation or conveyance of any raw
material, intermediate product, final product or waste product.
ii) For each separate area identified, the description must include:
• Activities - A list of the activities occurring in the area (e.g., material
storage, equipment fueling and cleaning);
• Pollutants - A list of the associated pollutant(s) for each activity. The
pollutant(s) list must include all materials that are exposed to stormwater;
and
• Potential for presence in stormwater - For each area of the municipal
facility that generates stormwater discharges, a prediction of the direction
of flow, and the likelihood of the activity to contaminate the stormwater
discharge. Factors to consider include the toxicity of chemicals, quantity of
chemicals used, produced or discharged, the likelihood of contact with
stormwater; and history of leaks or spills of toxic or hazardous pollutants.
d) Spills and Releases
For areas that are exposed to precipitation or that otherwise drain to a stormwater
conveyance to be covered under this SPDES general permit, the municipal facility specific
Page 59
SWPPP must include a list of spills or releases of petroleum and hazardous substances or
other pollutants, including unauthorized non-stormwater discharges, that
may adversely affect water quality that occurred during the last three-year period. The list
must be updated when spills or releases occur.
e) Site Map
The municipal facility specific SWPPP must include a site map identifying the following, as
applicable:
i) Property boundaries and size in acres;
ii) Location and extent of significant structures (including materials shelters), and
impervious surfaces;
iii) Monitoring locations with its approximate sewershed. Each monitoring location
must be labeled with the monitoring location identification;
iv) Location of all post-construction SMPs and MS4 infrastructure (i.e. storm sewer
system);
v) Locations of discharges authorized under other SPDES permits;
vi) Locations where potential spills or releases can contribute to pollutants in
stormwater discharges and their accompanying drainage points;
vii) Locations of haul and access roads;
viii) Rail cars and tracks;
ix) Arrows showing direction of stormwater flow;
x) Location of all receiving waters in the immediate vicinity of the municipal facility,
indicating if any of the waters are impaired and, if so, whether the waters have
TMDLs established for them;
xi) Locations where stormwater flows have significant potential to cause erosion;
xii) Location and source of run-on from adjacent property containing significant
quantities of pollutants and/or volume of concern to the municipal facility; and
xiii) Locations of the following areas where such areas are exposed to precipitation or
stormwater:
(a) Fueling stations;
(b) Vehicle and equipment maintenance and/or cleaning areas;
Page 60
(c) Loading/unloading areas;
(d) Locations used for the treatment, storage or disposal of wastes;
(e) Liquid storage tanks;
(f) Processing and storage areas;
(g) Locations where significant materials, fuel or chemicals are stored and
transferred;
(h) Locations where vehicles and/or machinery are stored when not in use;
(i) Transfer areas for substances in bulk;
(j) Location and description of non-stormwater discharges (Part I.A.3.);
(k) Locations where spills35 or leaks have occurred; and
(l) Locations of all existing structural BMPs.
f) Stormwater Best Management Practices (BMPs)
The municipal facility specific SWPPP also documents the location and type of BMPs
implemented at the municipal facility. The municipal facility specific SWPPP must describe
how each BMP is being implemented for all the potential pollutant sources.
g) Municipal facility assessments
The municipal facility specific SWPPP includes a schedule for completing and recording
results of routine and comprehensive site assessments.
ii. Municipal Facility Assessments
a) Wet Weather Visual Monitoring (High Priority Municipal Facilities ONLY)
i) Once every five (5) years, the Village of East Aurora conducts wet weather visual
monitoring at all monitoring locations and other sites of stormwater leaving the site
that are discharging stormwater from fueling areas, storage areas, vehicle and
equipment maintenance/fueling areas, material handling areas and similar potential
pollutant generating areas.
(a) All samples must be collected from discharges resulting from a qualifying
storm event. The storm event must be documented using the Storm Event
Data Form (Appendix I) and kept with the municipal facility specific SWPPP.
The sample must be taken during the first thirty (30) minutes (or as soon as
practical, but not to exceed one hour) of the discharge at the monitoring
location.
(b) No analytical tests are required to be performed on the samples
Page 61
for the purpose of meeting the visual monitoring requirements.
(c) The visual examination must document observations of color, odor, clarity,
floating solids, settled solids, suspended solids, foam, oil sheen, and any other
obvious indicators of stormwater pollution.
(d) The visual examination of the sample must be conducted in a well-lit area.
(e) Where practicable, the same individual should carry out the collection and
examination of discharges for the entire permit term for consistency.
(f) The MS4 Operator must document the visual examination using the Visual
Monitoring Form (Appendix I) and keep it with the municipal facility specific
SWPPP to record:
(i) Monitoring location ID;
(ii) Examination date and time;
(iii) Personnel conducting the examination;
(iv) Nature of the discharge (runoff or snowmelt);
(v) Visual quality of the stormwater discharge including observations
of color, odor, clarity, floating solids, settled solids, suspended solids,
foam, oil sheen, and other obvious indicators of stormwater pollution;
and
(vi) Probable sources of any observed stormwater contamination.
(vii) Corrective and follow up actions – If the visual examination
indicates the presence of color, odor, floating solids, settled solids,
suspended solids, foam, oil sheen, or other indicators of stormwater
pollution, at minimum, the Village of East Aurora will complete and
document the following actions:
(1) Evaluate the facility for potential sources;
(2) Remedy the problems identified;
(3) Revise the municipal facility specific SWPPP; and
(4) Perform an additional visual inspection during the first
qualifying storm event following implementation of the
corrective action. If the first qualifying storm event does
not occur until the next visual monitoring period, this
follow up action may be used as the next visual
inspection.
Page 62
b) The monitoring locations inspection and sampling program (MCM 3: Illicit Discharge
Detection and Elimination) includes all Village of East Aurora municipal facilities.
c) Comprehensive Site Assessments
i) Once every five (5) years following the most recent assessment, the Village of East
Aurora will complete a comprehensive site assessment for each high priority
municipal facility as identified in the inventory using the Municipal Facility
Assessment Form (Appendix J) or an equivalent form containing the same
information, and document it in the municipal facility specific SWPPP and SWMP Plan
that:
(a) The municipal facility is in compliance with the terms and conditions of the
NYSDEC SPDES General Permit for Stormwater Discharges from Municipal
Separate Storm Sewer Systems (GP-0-24-001;
(b) Deficiencies were identified and all reasonable steps taken to minimize
any discharge in violation of the permit, which has a reasonable likelihood of
adversely affecting human health or the environment;
(i) Within twenty-four (24) hours, the MS4 Operator must prepare a
schedule that includes corrective actions and specific interim
milestones to be implemented until the corrective action is
implemented; or
(c) Deficiencies were identified and all reasonable steps taken to minimize any
discharge in violation of the permit, which does not have a reasonable
likelihood of adversely affecting human health or the environment;
(i) Within seven (7) days, the MS4 Operator must prepare a
schedule that includes corrective actions and specific interim
milestones to be implemented until the corrective action is
implemented.
e. Low Priority Municipal Facility Requirements
i. The MS4 Operator must identify procedures outlining BMPs for the types of activities that occur at
the low priority municipal facilities. A municipal facility specific SWPPP is not required.
ii. Municipal Facility Assessments
a) Low priority municipal facilities are not required to conduct wet weather visual
monitoring.
b) The monitoring locations inspection and sampling program is conducted at the municipal
facility.
c) Comprehensive Site Assessments
i) Once every five (5) years following the most recent assessment, the Village of East
Aurora will complete a comprehensive site assessment for each low priority
municipal facility as identified in the inventory using the Municipal Facility
Page 63
Assessment Form (Appendix J) or an equivalent form containing the same
information, and document in the SWMP Plan that:
(a) The municipal facility is in compliance with the terms and conditions of the
NYSDEC SPDES General Permit for Stormwater Discharges from Municipal
Separate Storm Sewer Systems (GP-0-24-001);
(b) Deficiencies were identified and all reasonable steps taken to minimize
any discharge in violation of the permit, which has a reasonable likelihood of
adversely affecting human health or the environment;
• Within twenty-four (24) hours, the Village of East Aurora must
prepare a schedule that includes corrective actions and specific
interim milestones to be implemented until the corrective action is
implemented; or
(c) Deficiencies were identified and all reasonable steps taken to minimize any
discharge in violation of the permit, which does not have a reasonable
likelihood of adversely affecting human health or the environment;
• Within seven (7) days, the MS4 Operator must prepare a
schedule that includes corrective actions and specific interim
milestones to be implemented until the corrective action is
implemented.
3. Municipal Operations & Maintenance
a. Municipal Operations Program
Municipal operations in the Village of East Aurora are: street and bridge maintenance; winter road
maintenance; MS4 maintenance; open space maintenance; solid waste management; new
construction and land disturbances; right-of-way maintenance.
Within three (3) years
The Village of East Aurora has a municipal operations program. The municipal operations program
is documented in the SWMP Plan specifying:
i. The municipal operations procedures as follows:
a) The BMPs incorporated into the municipal operations program;
b) The municipal operations corrective actions requirements;
d) Roads, bridges, parking lots, and right of way maintenance requirements; and
e) All other municipal operations maintenance requirements.
ii. The Village of East Aurora, in partnership with the Western NY Stormwater Coalition, has
an employee training program addressing its municipal operations procedures. This training
addresses municipal operations procedures and is conducted concurrently with municipal
facility procedures.
Page 64
a) All new staff that are charged with conducting municipal operations procedures
will receive training prior to conducting municipal operations procedures;
b) All existing staff, that are charged with conducting any municipal operations
procedures will receive training prior to conducting municipal operations
procedures and, once every five (5) years, thereafter; and
c) If the municipal operations procedures are updated, all staff will receive training
on the updates prior to conducting municipal operations procedures.
iii. The names, titles, and contact information for the individuals who have received
municipal operations procedures training is updated annually;
iv. Annually, by April 1, the Village of East Aurora reviews and updates its municipal
operations procedures.
Compliance documentation is listed in Appendix B for:
• Staff that have received municipal operations procedures training; and,
• Updates to the municipal operations procedures.
b. Municipal Operations Corrective Actions
i. For municipal operations, Village of East Aurora must either:
a) Ensure compliance with the terms and conditions of the NYSDEC SPDES General Permit for
Stormwater Discharges from Municipal Separate Storm Sewer Systems (GP-0-24-001; or
b) Implement corrective actions according to the following schedule and, after
implementation, ensure the operations are in compliance with the terms and conditions of
the NYSDEC SPDES General Permit for Stormwater Discharges from Municipal Separate
Storm Sewer Systems (GP-0-24-001):
i) Within twenty-four (24) hours of discovery for situations that have a
reasonable likelihood of adversely affecting human health or the
environment;
ii) Initiated within seven (7) days of inspection and completed within
thirty (30) days of inspection for situations that do not have a
reasonable likelihood of adversely affecting human health or the
environment; and
iii) For corrective actions that require special funding or construction
that will take longer than thirty (30) days to complete, a schedule
will be prepared that specifies interim milestones to ensure
compliance in the shortest reasonable time.
c. Catch Basin Inspection and Maintenance
Page 65
Within three (3) years of the EDC,
The Village of East Aurora has a catch basin inspection and maintenance program that targets its
MS4 Regulated area (see map Appendix A). The program entails the following:
i. Identifies when catch basin inspection is needed with consideration for:
a) Areas with construction activities;
b) Residential, commercial, and industrial areas;
c) Recurring or history of issues; or
d) Confirmed citizen complaints on three or more separate occasions in the last
twelve (12) months.
ii. An inventory of catch basin inspection information is maintained and includes the
following information
a) Date of inspection;
b) Approximate level of trash, sediment, and/or debris captured at time of clean-out
• no trash, sediment, and/or debris;
• <50% of the depth of the sump;
• >50% of the depth of the sump);
c) Depth of structure;
d) Depth of sump; and
e) Date of clean out, if applicable.
iii. Based on inspection results, catch basins will be cleaned out within the following
timeframes:
a) Within six (6) months after the catch basin inspection, catch basins which had
trash, sediment, and/or debris exceeding 50% of the depth of the sump must be
cleaned out;
b) Within one (1) year after the catch basin inspection, catch basins which had trash,
sediment, and/or debris at less than 50% of the depth of the sump must be cleaned
out; and
c) MS4 Operators are not required to clean out catch basins if the catch basins are
operating properly and:
i. There is no trash, sediment, and/or debris in the catch basin; or
ii. The sump depth of the catch basin is less than or equal to two (2) feet.
Page 66
iv. The Village of East Aurora catch basin inspection and maintenance program includes the
following practices for properly managing materials removed from catch basins during clean
out operations (handling and disposal) so that:
a) Water removed during the catch basin cleaning process will not reenter the MS4 or
surface waters of the State;
b) Material removed from catch basins is disposed of in accordance with any applicable
environmental laws and regulations; and
c) Material removed during the catch basin cleaning process will not
reenter the MS4 or surface waters of the State.
v. The catch basin inspection and maintenance operations process can be used to determine
if there are signs/evidence of illicit discharges and procedures for referral/follow-up if illicit
discharges are encountered.
d. Roads, Bridges, Parking Lots, & Right of Way Maintenance
i. Sweeping
Within six (6) months
The Village of East Aurora has procedures for sweeping and/or cleaning municipal streets, bridges,
parking lots, and right of ways owned/operated by the Village of East Aurora.
a) All roads, bridges, parking lots, and right of ways must be swept and/or cleaned once
every five (5) years in the spring (following winter activities such as sanding). This
requirement is not applicable to:
i) Uncurbed roads with no catch basins;
ii) High-speed limited access highways; or
iii) Roads defined as interstates, freeways and expressways, or arterials by the United
States Department of Transportation, Federal Highway Administration, Highway
Functional Classification Concepts, Criteria and Procedures, 2013.
b) Annually, from April 1 through October 31, roads in business and commercial areas must
be swept. This requirement is not applicable to:
i) Uncurbed roads with no catch basins;
ii) High-speed limited access highways; or
iii) Roads defined as interstates, freeways and expressways, or arterials by the USDOT
2013.
ii. Maintenance
Within five (5) years
In addition to the BMPs, the Village of East Aurora adheres to the following provisions:
Page 67
a) Pave, mark, and seal in dry conditions;
b) Stage road operations and maintenance activity (e.g., patching, potholes) to reduce the
potential discharge of pollutants to the MS4 or surface waters of the State;
c) Restrict the use of herbicides/pesticide application to roadside vegetation; and
d) Contain pollutants associated with bridge maintenance activities (e.g., paint chips, dust,
cleaning products, other debris).
iii. Winter Road Maintenance
Within five (5) years
In addition to the BMPs, the Village of East Aurora adheres to the following provisions:
a) Routinely calibrate equipment to control salt/sand application rates; and
b) Ensure that routine snow disposal activities comply with the Division of Water Technical
and Operation Guidance Series 5.1.11, Snow Disposal.
Although not included as an appendix in the SWMP Plan, documentation of the procedures and
completion of permit requirements pertaining to Pollution Prevention and Good Housekeeping for
Municipal Operations are available as follows:
• Upon request: contact Stormwater Program Coordinator or Stormwater Management
Officer listed on page 2 of this document
• At the Village of East Aurora municipal building as follows:
o Hardcopy: DPW
o Electronically:
• Public: Upon Request
• Internally: C:\Users\Water Foreman\Documents\Storm
■
Water\Good Housekeeping for Municipal Operations
Page 68
Map of Erie and Niagara County MS4 Regulated Area Appendix A
':t I , ;!~,
t' , ,.
··-
•
,
.... ~TU, ~
t
..
; ~
q ,. ....,
.• 0 . ~
-- • ...J,
--1 _J
P~OJECT AREA WESTERN NY STORMWATER COALITION
UA PROJECTAREA
Page 69
SWMP Plan Compliance Documentation Appendix B
A. MCM1 – Public Education and Outreach Program
Compliance Documentation
Once every 5 years, the Village of East Aurora directs an educational message to target audience(s)
for each focus area(s) based on the defined education and outreach topic(s) listed in this
Stormwater Management Program Plan. Listed below are the date(s) of completion and method of
distribution for each message.
i. Residents:
Landscaping and lawn care:
Date of completion: January 2, 2024 - present
Method used: Brochure Household Guide to Preventing Stormwater Pollution
posted online: www.erie.gov/stormwater; www.east-
aurora.ny.us/government/public-works-department; brochure handout at public
education tabling events (2024: 14; 2025: 18); brochure available at municipal
building
Dog waste:
Date of completion: January 2, 2024 - present
Method used: Brochure Pick Up Your Pet Waste: It’s Your Doody posted online:
www.erie.gov/stormwater; www.east-aurora.ny.us/government/public-works-
department; brochure handout Pick Up Your Pet Waste: It’s Your Doodie at public
education tabling events (2024: 14; 2025: 18); brochure available at municipal
building
Household hazardous waste disposal:
Date of completion: Annually
Method used: : Brochure Household Guide to Preventing Stormwater Pollution at
public education tabling events (2024: 14; 2025: 18); brochure available at municipal
building
• Erie County: County website, multiple press releases, County newsletters;
multiple social media posts
Page 70
• Niagara County: Direct mailing throughout each host community and adjacent
municipalities; County website, Email list-serve; multiple County press
releases
Vehicle washing:
Date of completion: January 2, 2024 - present
Method used: Brochure Household Guide to Preventing Stormwater Pollution
posted online: www.erie.gov/stormwater; www.east-
aurora.ny.us/government/public-works-department; brochure handout at public
education tabling events (2024: 14; 2025: 18); brochure available at municipal
building
Illicit Discharge:
Date of completion: June 15, 2024 (libraries); January 2, 2024 – present
Method used: Distributed Illicit Discharge Detection and Elimination: A Citizen’s
Guide to Identifying and Preventing Stormwater Pollution brochure to Erie and
Niagara Public Libraries; posted online: www.erie.gov/stormwater; ; www.east-
aurora.ny.us/government/public-works-department ; brochure at public education
events (2024: 14; 2025: 18); brochure available at municipal building
Ii. Commercial: Business Owners and Staff:
Landscaping and lawn care:
Date of completion:
Method used: Stormwater pollution prevention information provided at time of
municipal fire inspections (1x/3 year)
Vehicle fueling:
Date of completion:
Method used: Stormwater pollution prevention information provided at time of
municipal fire inspections (1x/3 year)
Page 71
Vehicle maintenance:
Date of completion:
Method used: Stormwater pollution prevention information provided at time of
municipal fire inspections (1x/3 year)
Uncovered materials exposure/storage:
Date of completion:
Method used: Stormwater pollution prevention information provided at time of
municipal fire inspections (1x/3 year)
Illicit Discharge:
Date of completion:
Method used: Stormwater pollution prevention information provided at time of
municipal fire inspections (1x/3 year)
Iii. Institutions: Managers, Staff, and Students (Institutions Not Subject to SPDES
MS4/MSGP Stormwater Permitting)
Uncovered materials exposure/storage:
Date of completion:
Method used: Stormwater pollution prevention information provided at time of
municipal fire inspections (1x/3 year)
Iv. Construction: Developers, Contractors, And Design Professionals:
Soil disturbance:
Date of completion: 1/1/2025; 2/19/2025; 1/14/2026; 2/10/2026
Method used: NYSDEC 4 Hour Erosion & Sediment Control Training
Uncontained construction waste:
Date of completion: 1/1/2025; 2/19/2025; 1/14/2026; 2/10/2026
Method used: NYSDEC 4 Hour Erosion & Sediment Control Training
Page 72
V. Industrial: Owners and Staff: (Industry Not Subject to SPDES MSGP Stormwater Permit)
Uncovered materials exposure/storage:
Date of completion:
Method used: Stormwater pollution prevention information provided at time of
municipal fire inspections (1x/3 year)
Vi. MS4 Operator’s Municipal Staff:
Uncovered materials exposure/storage
Date of completion: 10/14/25
Method used: Pollution Prevention - Good Housekeeping Training
Preventative maintenance:
Date of completion: 10/14/25
Method used: Pollution Prevention - Good Housekeeping Training
Spill prevention and response:
Date of completion: 10/14/25
Method used: Pollution Prevention - Good Housekeeping Training
Erosion and Sediment Controls:
Date of completion: 10/14/25
Method used: Pollution Prevention - Good Housekeeping Training
Vegetated areas and open space:
Date of completion: 10/14/25
Method used: Pollution Prevention - Good Housekeeping Training
Salt storage:
Date of completion: 10/14/25
Method used: Pollution Prevention - Good Housekeeping Training
Waste, garbage and floatable debris:
Page 73
Date of completion: 10/14/25
Method used: Pollution Prevention - Good Housekeeping Training
Illicit Discharge:
Date of completion: 10/7/25
Method used: Illicit Discharge Detection & Elimination Training
Updates to the Public Education and Outreach Program
Annually, by April 1: The Village of East Aurora reviews and updates, if necessary, the focus areas,
target audiences, and/or education and outreach topics. Listed below are the date(s) of review and
description of update.
Date of Review Description of Update (including “No Update”)
3/23/26 No Update
Page 74
SWMP Plan Compliance Documentation Appendix B (continued)
B. MCM 2 - Public Involvement/Participation
Public involvement/participation in the development and implementation of the Village of East
Aurora SWMP includes opportunities to: review the SWMP Plan; submit comments; ask questions;
and, become involved in the SWMP.
To document (annually), enter date(s) of completion:
Public hearings or meetings
Description:
Method used:
Dates of completion:
Coordination with other pre-existing public involvement/participation opportunities
Description:
Method used:
Dates of completion:
Reporting concerns about activities or behaviors observed
Description:
Method used:
Dates of completion:
Public Notice and Input Requirements for Draft Annual Report
Annually, the Village of East Aurora provides an opportunity for the public to review and comment
on the draft Annual Report. Listed below are the date(s) of review and description of the
opportunity provided.
Date of Review Description of Opportunity
3/23/26 No Update
Page 75
Consideration of Public Input
Annually, the Village of East Aurora documents a summary of comments received on the SWMP
Plan and draft Annual Report. Listed below are the comments and date received (if no comments
were received, date and note in description).
Date Received Description of SWMP Plan Comments
Date Received Description of Draft Annual Report Comments
Within thirty (30) days of when public input is received, the MS4 Operator must update the SWMP
Plan, where appropriate, based on the public input received. Listed below are the updates and
effective date (if no updates are made, note in description).
Date of Update Description of SWMP Plan Update or “No Update” if applicable
Page 76
SWMP Plan Compliance Documentation Appendix B (continued)
C. MCM 3 - Illicit Discharge Detection and Elimination
1. Illicit Discharge Detection
Public Reporting of Illicit Discharges
Within thirty (30) days of an illicit discharge, each report of an illicit discharge is documented below.
Date of the report:
Location of the illicit discharge:
Nature of the illicit discharge:
Follow up actions taken or needed (including response times):
Inspection outcomes and any enforcement taken:
■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■
Date of the report:
Location of the illicit discharge:
Nature of the illicit discharge:
Follow up actions taken or needed (including response times):
Inspection outcomes and any enforcement taken:
■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■
Date of the report:
Location of the illicit discharge:
Nature of the illicit discharge:
Follow up actions taken or needed (including response times):
Inspection outcomes and any enforcement taken:
Page 77
Annually, the Village of East Aurora updates the inventory for new monitoring locations that are
constructed or discovered; or if information for existing monitoring locations change. Prioritization
determinations and updates are also addressed below.
Date of Update Description Inventory Update(s); or “No Update” if applicable
3/23/26 No Update
Annually, the Village of East Aurora reviews and updates the names, titles, and contact information
for the individuals who have received illicit discharge training on the following:
• Monitoring locations inspection;
• Sampling procedures;
• Results interpretation;
• Source track down; and,
• Source elimination.
The Illicit Discharge Detection and Elimination training provided by the Western New York
Stormwater Coalition is comprehensive and addresses all training requirements applicable to the
IDDE Program.
Date of Update Name, title & email of individual trained Training Date
3/23/26 Brian Halt, SMO, [email protected] 10/7/25
Annually, by April 1, the Village of East Aurora reviews and updates its monitoring location
inspection and sampling procedures based on results (e.g., trends, patterns, areas with illicit
discharges, and common problems).
Date of Update Description Inspection and Sampling Procedures Update(s); or “No Update” if
applicable
6/9/25 Updated Inspection Forms
SWMP Plan Compliance Documentation Appendix B (continued)
D. MCM 3 – Construction Site Stormwater Runoff Control
Page 78
Annually, the Village of East Aurora reviews and updates the names, titles, and contact information
for the individuals who have received Construction Oversight Training.
Date of Update Name, Title & Email of Individual Trained Training Date
3/23/26 Elizabeth Cassidy, SMO, Code Enforcement Officer 1/15/2021
Annually, by April 1, the Village of East Aurora reviews and updates its construction oversight
procedures.
Date of Update Description Construction Oversight Procedures Update(s); or “No Update”
if applicable
3/23/26 No Update
Annually, the Village of East Aurora updates it CGP-regulated construction sites inventory.
Date of Update Description Inventory Update(s); or “No Update” if applicable
3/23/26 No Update
Individuals involved in construction activity, SWPPP review, construction site inspections in the
Village of East Aurora have received four (4) hours of Department endorsed training in proper
erosion and sediment control principles from a Soil & Water Conservation District, or other
Department endorsed entity. Individuals who meet the definition of a qualified professional or
qualified inspector are exempt from this requirement.
Date of Training Name, Title & Email of Individual Trained Task : Oversight;
SWPPP Review;
Inspection
Page 79
6/30/24 Elizabeth Cassidy, SMO, Code Enforcement Officer All
6/30/24 Camie Jarell, PE GHD SWPPP Review
Page 80
SWMP Plan Compliance Documentation Appendix B (continued)
E. MCM 5 – Post-Construction Stormwater Management
Annually, the Village of East Aurora reviews and updates the names, titles, and contact information
for the individuals who have received Post-Construction SMP Inspection And Maintenance
Training.
Date of Update Name, Title & Email of Individual Trained Training Date
3/23/26 Elizabeth Cassidy 1/15/21
Annually, the Village of East Aurora updates its inventory of post-construction SMPs.
Date of Update Description Inventory Update(s); or “No Update” if applicable
3/23/26 No Update
Annually, by April 1, the Village of East Aurora reviews and updates its post-construction SMP
inspection and maintenance procedures.
Date of Update Description Post-construction SMP Inspection and Maintenance Procedures
Update(s); or “No Update” if applicable
3/23/26 No Update
Page 81
SWMP PLAN COMPLIANCE Appendix B (continued)
F. MCM 6 – Pollution Prevention and Good Housekeeping
Annually, the Village of East Aurora reviews and updates the names, titles, and contact information
for the individuals who have received Municipal Facility Procedures Training And Municipal
Operations Procedures Training.
Date of Update Name, Title & Email of Individual Trained Training Date
6/30/24 Brian Halt, SMO 10/14/25
Annually, by April 1, the Village of East Aurora reviews and updates its municipal facility procedures
and its municipal operations procedures.
Date of Update Description Municipal Facility Procedures Update(s)
August 2026 Updated existing municipal facility BMPs to conform to new MS4 Permit.
Date of Update Description Municipal Operations Procedures Update(s)
August 2026 Updated existing municipal operations BMPs to conform to new MS4 Permit.
Annually, the Village of East Aurora updates its inventory of all municipal facilities.
Date of Update Description Inventory Update(s); or “No Update” if applicable
3/23/26 Municipal Facilities Mapped
Page 82
Monitoring Locations Inspection and Sampling Field Sheet Appendix C
Monit oring Locations Inspection and Sampling Field Sheet
Section 1: Bockground Dato
s ut>Watff&llea: Moni:Oflog Locaton 10 :
Today'Sdate: Tlme(Mlllbry):
Jnvest~al01$: f orm completeo tiy:
Tempaa!Ure ("f ): I Ralnt..lll l)rl ): L.3$124 DOUIS: Last 48 hOOl'S.'.
t alltude; I Longr:uda?: GPS U,nlt I GPSLMK £
camera: PhOto ; s:
t.an<I O$E' kl Drain.age Area(Clleei all tnal apP"J>:
0 lot1J6;'Jlal □ o penSpace
□ Uttra-Uroan ReolOenjjat 0 ll'IS'JlutlOBal
D SUbl.Wl)J,!'1 ResklelUUI Other.
□ commercu Known lndttSttlK:
Notes (e.g., Oflgfil, II' known):
Section 2: Moojtorino Location Desai >tion
LOCATION MATERIAL -SHAPE OIMENSJONS (IN. ) SUBMERGED
□ "°" 0 CM? O CtrCUl,U o SIIICJ!e Dla.T1-EtK1 ~06I0M: lnWr.ec
D No
O PVC 0 tlD?E 0 ElllpGca' □ Doollfe 0 PolU!ty
0 f UII)'
0 CIOHdPlpe
□ ..,~ o eox 0 Tdple Wl!h seameot
0 No
□ o- O 011'1P.,r:_ _ _ o ol!>Er. _ _ 0 Fartla.."')'
D ' "'Y
u concrete D Trape?Ol(J Oep,m: _
D Elrttlen □ Parabollc TopWIOllt_ @'~
O Open dratn.age
~ -~~
□ ID•Sueam
0 Ri~
D omer:_
p o o~r: _ 8 0:tom WIOln:
-
~~l~
~ w ,m•mfi
0
r / / //I',;'/F///////✓I'/ ,r.
(appO~bJ& wnen cOOe<:ttng earnp1ea.J
Row Present? O YK IfNo, Slr.tp t o secoon s
o ••
fiow oesct1pt1on
D Tl1Ctie □ Moderate D SUCiSlantlal
11tp,reunt>
Section 3· Quantitative Characterization
...,.
FIELD DATA fOR FLOW1NG MONITORltfG LOCA.n0N$
PARAMETER RESULT UHIT EQUFMEtfT
VCi'Ume Llier
D flOWS't
TimelOU se<
FlowCScptb T':lp ,: tne¥Ul'e
FIOWWkJttl
'"
f l. In Tape ffle,)$Uf'e
0 FlOW ..2
Meastna 1engtt1 f l;, ln Tape mea&ure
Time or travel s stopwa:-cn
Tempaalure
., TiwlTOOmeter
pH pH U!'i!I$ Te&UtrtpJProbec
Ammonia mgil TK'l&tfip
Monitoring Locations Inspection and Sampling Field Sheet Appendix C (continued)
Page 83
Monitoring Locations Inspection and Sampling Field Sheet
Section 4: PhysJcal Indicators tor Flowing Monitoring Locations Only
Are hYy Physical lndca1Drs Present in the flow? 0 Yes O No ( IfNo, Sl<p lo Secoon 5J
CHECKl'I
INDICATOR DESCRIPTION REI...OTIVE SEVEIUJY INDEX (1-3)
Pn,. .nl
□ se...age D ~c:14,'Sour O PelJO!eum/gas D 3 - NOCICUO!e/lOOI •
Odor □ D I - Faint D 2 - Easily detected
□ sumdE 0 Other. e11,~
□ Clear □ Bm•,n QGray 0 Yellow □ I - f JIM C0!NO'I O 2 - Clearl)' l/i$lllle In
COIO'f □ □ 3-Cle3fl)' ,1o11te a, no..
0 GieEfl □ orange □ Reel D 0ll'ler. 'aft\Pfe DOt:le , ample Doll! e
TU,..<111)' □ se-e ,e,,rerny 0 I - Sllgt'l ClOUCll1e5' 0 2 · CID•<IY D 3- opaque
Floaiallle5 0 Sf'Ka!I'! !TOlle1 Paper. e:c.1□ s- 2 - same: 1101cancn, or 3 - some: ortgr, crear (e.g..
D 1-F.,A'/&i9l't;orgln D Cll!#n (e.g.. pou!!>te □ oGI/IOU& oil sn-een_,U<!$, <x
-Does Notlnclllda □ ~at CC~IOCI&
Tra5fl~!
0 l't,IIOle:Jm (00 &M!!II) O 01ner. wasor o1,neeo) noat,ng san.t1a,y malella15J
Section S: Physical Indicators for Both Flowing and Non-Flowing Monitoring Locations
Are physical indicators that are not related to flow present? D Yes D No {If No, Skip to Section 6)
INDICATOR CHECK tr Pttatnl OESCR.IPOON COIIIIEHTS
MoniorJlg Loca.llcn □ spa::ing. crac&:ng or C~illg 0 Pffllllg Pillltl
□
Damage □ corr..1011
Deposli..JSlaln,; □ □ OP! □ FkMLlr..e 0 Paint 0 Oilier:
AD<IOlfflal V ege:allOn □ □ aee,;q,e 0 ll'lllll>llea
0 0dalo □ CCll011i □ Floa\ilb.U □ ousneen
Poor f00! 1"allty □
0 SUOf, □ EXce5'Ne Algae □ 0l!ler:
Pipe beMl'IIC gn>t/11'1 D 0 Bl'l>'l'B D orange D Green 0 0l!ler.
Section & Overall Monitorin_!!_ Location Characterization
o Unfikely □ Potential (presence of two or n10re incficatas) □ Suspect (one or more indicators with a severiiy of 3) □ OtMous
Section 7: Data Collection
1, s ampre ror Ille tab? □ Ye• O r.o
2. ff Ye6. coneeieo nom: □ rlO'W 0 POOi
3. 10:emuttent ~• arap'6e~? ove, □ 1.1o ,r Yeo. 1)1>e: O OIIM. □ caio.cam
Section 8: Arry Non-lllicit Discharge Concerns (e.g., trash or needed infrastructure repairs)?
Page 84
Illicit Discharge Detection and Elimination Track Down Program Appendix D
OUTFALL AND MONITORING LOCATIONS GUIDANCE
Procedures for Dry Weather Inspection, Sampling, Track Down and Elimination
Dry weather: No precipitation/snow melt for at least 48 hours (minimum; consider longer during
periods of prolonged wet weather).
I. Choose Monitoring Locations (outfalls, interconnections, intraconnections)
a. Review previous outfall inspections; identify monitoring locations/outfalls requiring
inspection or any that may require re-inspection.
b. Prepare for dry weather inspection: Monitoring Locations Inspection and Sampling
Field Sheet, outfall report/current data for all to be inspected, storm system
maps/route, clip board, pen.
c. Each outfall has a detailed report listing dimensions/composition of the pipe or ditch
and also visual observations of the flow, if it was flowing at the time data were
collected.
d. The outfall report should be updated to reflect any changes, especially the “Outfall
Discharging” answer.
i. Submit an Outfall Map Update Request form.
OR
ii. The Outfall Editor App can be used in the field to make real time changes to
your outfall report, including a new picture. Do not change ownership or
Outfall IDs.
II. Inspect/Sample Monitoring Locations/Outfalls
Dry weather inspections and sampling can be done at the same time.
a. Inspection
i. Inspect each monitoring location scheduled for the year.
ii. If you cannot find the end of the pipe or ditch, or it is inaccessible or unsafe to
reach, locate the first upstream catch basin/access point to determine
whether there is flow. Note the inspection point on the form if it deviates
from the mapped monitoring location. Make a note in your files for future
inspections.
iii. If no flow is present, complete Sections 1, 2 and 5 on the Monitoring
Locations Inspection and Sampling Field Sheet. If flow is present, complete
Sections 4 and 6 too.
b. Sampling
i. Schedule (or proceed with) sampling for monitoring locations discharging flow
during dry weather based on completion of Sections 2, 4, 5 and 6 of the
Monitoring Locations Inspection and Sampling Field Sheet. Complete Sections
Page 85
3 and 7 if sampling. If the source of the illicit discharge is clear and discernable
(e.g. sewage), sampling is not necessary.
ii. Suggested sampling equipment and supplies
Note: The equipment listed below, including the black light, was provided to
all WNY Stormwater Coalition members in 2011.
The WNY Stormwater Coalition has test strips and equipment available to
borrow. Purchasing information can be provided upon request.
Contact for both: Mary Rossi at [email protected].
• Equipment
o Hanna pH/Temp/Conductivity/TDS Meter
o 6' Dipper Sample Collector
o Nalgene Wash Bottle
o Safety Glasses
o 600 mL plastic beakers (2)
o Glass jar/bottle with tight lid
o Disposable Gloves
o Tape Measure
o Distilled Water
o Paper Towels
o Trash Bag
o Hand Sanitizer
o Black Light Fixture and Cotton Pads
• Test Strips
o Ammonia (Hach # 4315-70)
o pH (LaMotte # 5049-36)
o Total Chlorine (LaMotte # 5049-36)
o Nitrite (LaMotte # 5049-39)
o Nitrate (LaMotte # 5049-39)
o Phosphate (Hach # 4315-75)
iii. Use the Outfall and Monitoring Location Sampling Guide (follows) to conduct on-
site sampling using field meter and test strips; if detergent contamination is
suspected (bubbles/suds/etc.), a sample will need to be brought back for exposure to
black light. Record results in Section 3 on the Monitoring Locations Inspection and
Sampling Field Sheet.
c. Retain forms as documentation of inspection/sampling for 5 years.
III. Illicit Discharge Track Down
For all flows characterized as “suspect” or “obvious” in Section 6 of the Monitoring Locations
Inspection and Sampling Field Sheet, source track down must be conducted according to the
following timeframe:
Page 86
a. Following inspection and sampling, within twenty-four (24) hours of discovery, the
MS4 Operator must initiate track down procedures for flowing MS4 monitoring
locations with obvious illicit discharges.
b. Within two (2) hours of discovery, the MS4 Operator must initiate track
down procedures for obvious illicit discharges of sanitary wastewater
that would affect bathing areas during bathing season, shell fishing
areas or public water intakes and report orally or electronically to the
NYSDEC Regional Water Engineer and local health department; and
c. Within five (5) days of discovery, the MS4 Operator must initiate track
down procedures for suspect illicit discharges.
d. Consult sewer and land use maps to evaluate potential contributing area and
characteristics of the area.
e. Visually inspect catch basins/manholes/ditches progressively upstream from the
outfall/monitoring location to identify contributing areas with no flow that can be
eliminated from further consideration.
f. It is possible that the visual inspections indicate the source of flow/contamination is
from another MS4 entering your system at an interconnection. Contact their
stormwater coordinator, in writing, and describe your findings along with a precise
location for the point where flow from their system enters your system. Keep this
documentation for 5 years. Add a note in your files or on the outfall report itself to
save time and trouble for the next inspection.
g. See Track Down Techniques table for additional track down options.
Track Down Techniques to Locate the Discharge
Technique Best Applications Limitations
Dye Testing Discharge limited to a ve ry • May be difficult to gain
small drainage access to some properties
area (°<10 properties is
ideal)
• Discharge probably
caused by a connection
from an individual property
• Commercial or industri al
land use
Video Testing • Contin uous discha rges • Relativel y expensive
• Discharge limited to a eq uipment
singl e pipe segment • Ca nnot capture non-
• Communities w ho own flowing discharges
equipment for other • Often cannot capt ure
invest igations discha rges from pipes
submerge d in the storm
drain
Smoke Testing • Cross-connecti on with the • Poor notificati on to public
sanitary sewer can cause alarm
• Identifying other • Ca nnot det ect all illicit
underground sources (e.g., discha rges
leaking storage t echniques)
caused by damage to t he
storm drain
(Illicit Discharge Detection and Elimination: A Guidance Manual for Program Development and Technical
Assistance, Center for Watershed Protection October 2004)
Page 87
IV. Illicit Discharge Elimination
a. Eliminate source of contamination or if nature of the source prohibits elimination,
utilize targeted education to inform/minimize the source
(e.g. pet waste or pool/spa water disposed in storm sewers: distribute information
on proper disposal throughout neighborhood).
b. The following timeframes are required for illicit discharge elimination:
i. Within twenty-four (24) hours of identification of an illicit discharge that
has a reasonable likelihood of adversely affecting human health or the
environment, the MS4 Operator must eliminate the illicit discharge;
ii. Within five (5) days of identification of an illicit discharge that does not
have a reasonable likelihood of adversely affecting human health or
the environment, the MS4 Operator must eliminate the illicit discharge;
iii. Where elimination of an illicit discharge within the specified timeframes
is not possible, the MS4 Operator must notify the Regional Water Engineer.
c. Refer to your Stormwater Management Plan (Appendix O) for detailed provisions for
escalating enforcement and tracking. Your municipality has a local law specific to
illicit discharges to assist with enforcement as needed.
V. Documentation
The Monitoring Locations Inspection and Sampling Field Sheet completed in the field is to be
filed and retained as compliance documentation for inspection and sampling. You may also
scan the completed forms. If you opt to scan, create a new folder for each year or indicate
year of inspection in the file name (this will be helpful for planning inspections to meet your
compliance goal and for state/federal compliance audits). Retain all documentation for 5
years.
a. Inspection Frequency (20%/year)
i. Completed Monitoring Locations Inspection and Sampling Field Sheets.
ii. Record monitoring locations inspected on spreadsheet or whatever you use
to track inspections. It doesn’t have to be elaborate, just a tool to identify
outfalls inspected and those in need of inspection.
e.g. Outfall ID and date inspected are adequate. Additional information such
as whether it was flowing and a “Notes” column are also useful.
b. Sampling
The Monitoring Locations Inspection and Sampling Field Sheet documents both
inspection and sampling.
c. Track Down and Elimination
All steps and actions utilized to track down and eliminate illicit discharges should be
carefully documented. There is no “one size fit” as each instance will be unique.
Documentation should include all efforts taken to identify and eliminate the source
of contamination: how track down was done, results of track down, actions to
eliminate source of contamination, additional details, and any enforcement
measures utilized.
Page 88
Outfall and Monitoring Location Sampling Guide
This document was prepared to serve as quick reference for sampling flowing outfalls using your Hanna
meter for pH, temperature, Total Dissolved Solids (TDS) and Conductivity, test strips for Ammonia, pH,
Total Chlorine, Nitrite/Nitrate and Phosphate, and black light/cotton pad for detergents. Depending on
the results and visual observations at the outfall, source identification and elimination of that source
may be necessary as well as additional sampling.
Sample collection
1. When possible, sample flow directly in a clean, wide mouth beaker (rinse dipper and beakers 2x
with flow for conditioning). Dump the contents downstream from sample collection point.
2. Collect two samples: one for the field meter analyses and one for the test strips.
Note: I use the beaker for one sample and the dipper for the second.
pH, Temperature, Total Dissolved Solids (TDS) and Conductivity (Hanna Meter)
This meter should be calibrated periodically as per the instruction manual. If you cannot find your
meter, there is a test strip for pH (below) and a basic thermometer will work.
1. Turn on the Hanna Instruments pH /Temperature/Conductivity meter.
2. Remove cap on probe and rinse the probe end with distilled water.
3. In the field, place the probe in the sample collected for on-site analyses.
4. Record the results on the Monitoring Locations Inspection and Sampling Field Sheet.
5. Rinse the probe with distilled water and replace the cap. For extended time of storage,
probe cap must be filled with pH Electrode Storage Solution or pH 4 Buffer solution.
Detailed instructions in folder see Care and Storage of pH Electrode.
Test Strips
When using test strips, keep wet fingers out of the container. Close cap tightly after use.
Store in a cool, dry place.
Ammonia (HACH # 4315-70)
Ammonia levels are tested to indicate presence of sanitary sewage in stormwater. Should high levels be
detected, further investigation and source track down are required. If the illicit discharge is clearly and
discernably sewage, sampling is not necessary.
1. Dip strip into water sample.
2. Vigorously move it up and down in water sample for 30 seconds, making sure
both pads are always submerged.
3. Remove test strip and shake off excess water.
4. Hold the strip level, with pad side up, for 30 seconds.
Page 89
5. To read the result, turn the test strip over so that both pads face away from
you.
6. Compare the color of the small pad to the color chart on the container.
7. Read the result through the clear plastic of the test strip.
8. Record the result on the Monitoring Locations Inspection and Sampling Field
Sheet.
pH and Total Chlorine (LaMotte # 5049-36)
pH is measured to indicate potential industrial discharges.
Total chlorine is measured to indicate a tap water leak into the storm sewer system or possibly
discharge of chlorinated pool/spa water.
1. Immerse test strip and remove with pads face up.
2. Do not shake off excess water.
3. Wait 15 seconds and immediately hold up vertically
against the color chart on container.
4. Record the pH result on the Monitoring Locations
Inspection and Sampling Field Sheet.
5. Using the same strip, record the results for Total Chlorine
Nitrite and Nitrate (LaMotte # 5049-39)
Sources of nitrite (NO2) and nitrate (NO3) in urban stormwater runoff include lawn and garden
fertilizers, pet waste and failing septic tanks.
1. Using at least a cup-size sample, immerse test strip for 2 seconds and remove
with pads face up.
2. Do not shake off excess water.
3. Wait 60 seconds and immediately hold up vertically against the color chart on
container.
4. Record the Nitrite result on the Monitoring Locations Inspection and Sampling
Field Sheet.
5. Using the same strip, record the results for Nitrate.
Phosphate (HACH # 4315-75)
Sources of phosphate/phosphorus in urban runoff include plant and leaf litter, soil
particles, pet waste, road salt and lawn fertilizer. Lawns and roads account for the greatest loading.
1. Dip a strip into water for 5 seconds and remove.
2. Hold the strip level, with pad side up, for 45 seconds.
3. Do not shake excess water from the strip.
4. Compare the color of the small pad to the color chart on the container.
5. Record the result on the Monitoring Locations Inspection and Sampling Field
Sheet.
Additional Testing
1
Page 90
Detergents – Black Light/Cotton Pad
Indicates presence of optical brighteners, used in detergents to whiten fabrics, which fluoresce under
ultraviolet light. Sources of detergents include failing septic systems, improperly connected laundry
discharges and industrial sources.
1. Soak cotton pad with sample.
2. Place under black light. If it fluoresces, detergents are present.
3. Under bright light conditions, you may have to move to a dark area
or devise a box to block light.
4. Record the detection or absence of detergents on the Monitoring
Locations Inspection and Sampling Field Sheet.
Note: If an intermittent discharge is suspected, the cotton pad can be
secured at the outfall or an upstream point (such as suspended in a storm
DI) for a given length of time during dry weather before black light exposure. A suet feeder cage works
well.
Construction Activities that Require SWPPP Appendix E
(from NYS Construction General Permit (GP-0-20-001)
Appendix B-Table 1 and Table 2
2
Page 91
Table 1
Construction Activities that Require the Preparation of a SWPPP That Only
Includes Erosion and Sed iment Controls
The following construct ion act ivities that involve soil dist urbances of one (1) or more acres of
land, but less than five (5) acres:
• Single family home not located in one of the watersheds listed in Appendix C or not directly
discharging to one of the 303(d) segments listed in Appendix E
• Single family residential subdivisions with 25% or less impervious cover at total site build-out and
not located in one of the watersheds listed in Appendix C and not directly discharging to one of the
303(d) segments listed in Appendix E
• Construction of a bam or other agricultural building, silo, stock yard or pen.
The following construct ion act ivities that involve soil dist urbances between five thousand (5000)
squar e feet and one (1) acre of land:
All construction activities located in the watersheds identified in Appendix D that involve soil
disturbances between five thousand (5,000) square feet and one (1) acre of land.
The following construct ion act ivities that involve soil dist urbances of one (1) or more acres of
land:
• Installation of underground, linear utilities; such as gas lines, fiber-optic cable, cable TV,
electric, telephone, sewer mains, and water mains
• Environmental enhancement projects, such as wetland mitigation projects, stormwater retrofits and
stream restoration projects
• Pond construction
• Linear bike paths running through areas with vegetative cover, including bike paths surfaced with an
impervious cover
• Cross-country ski trails and walking/hiking trails
• Sidewalk, bike path or walking path projects, surfaced with an impervious cover, that are not part of
residential, commercial or institutional development;
• Sidewalk, bike path or wal king path projects, surfaced with an impervious cover, that include
incidental shoulder or curb work along an existing highway to support construction of the sidewalk,
bike path or walking path.
• Slope stabilization projects
• Slope flattening that changes the grade of the site, but does not significantty change the runoff
characteristics
Construction Activities that Require SWPPP Appendix E (continued)
3
Page 92
Table 1 (Continued) CONSTRUCTION A CTIVITIES THAT REQUIRE THE P REPARATION OF A
SWPPP
THAT ONLY INCLUDES EROSION AND SEDIMENT C ONTROLS
The following construction activities that involve so il dist urbances of o ne (1) or more acres of
Jana:
Spoil areas that will be cov ered with vegetation
Vegetated open space projects (i.e. recreational parks, lawns, meadows, fields, downhill skj traits)
excluding projects that alter hydrology from pre to post development conditions,
Athletic fields (natural grass) that do not include the construction or reconstruction of impeNious
Dre'1 and do not alter hydrology from pre to post development conditions
Demolition project where vegetation will be established, and no redevelopment is planned
Overhead electric transmission line project that does not include the constructK>n of permanent
access roads or parking areas surfaced with impervious cover
Structural practices as identified in Table II in the •Agricultural Management Practices Catalog for
Nonpoint Source Pollution in New York State•, excluding projects that involve soi1disturtJances of
greater than five acres and construction activities that include the construction or reconstruction of
impervious area
Temporary access roads, median crossovers, detour roads, lanes, or other temporary impervious
areas that will be restored to pre-construction conditions once the construction activity is complete
4
Page 93
Construction Activities that Require SWPPP Appendix E (continued)
Table 2
C ONSTRUCTION A CTIVITIES THAT REQUIRE THE PREPARATION OF A SWPPP T HAT INCLUDES
POST-CONSTRUCTION STORMWATER MANAGEMENT P RACTICES
The following construction activities that involve soil dis turbances of one (1 ) or more acres of
land:
Single family home located in one of the watersheds listed in Appendix C or dir ectly discharging to
one of the 303(d) segments listed in Appendix E
Single family home that disturbs five (5) or more acres of land
Single family residential subdivisions located in one of the watersheds listed in Appendix C or
directly discharging to one of the 303(d) segments listed in Appendix E
Single family residential subdivisions that invotve soil disturbances of between one (1) and five (5)
acres of land with greater than 25% impervious cover at total site build-out
Single family residentiaJ subdivisions that invotve soil disturbances of five (5) or more acres of land,
and singfe fam ily residential subdivisions that involve soil disturbances of less than five (5) acres
that are part of a larger common plan of development or sale that will ultimately di sturb five or more
acres of land
Multi-family residential deveiopments; includes duptexes, townhomes, condominfllms, senior
housing complexes, apartment complexes, and mobi~ home parks
Airports
Amusement parks
Breweries, cideries, and wineries, including establishments constructed on agricultural land
Campgrounds
Cemeteries that include the construction or reconstruction of impervious area (>5% of disturbed
area) or alter the hydrology from pre to post development conditions
Commercial developments
Churches and other places of worship
Construction of a barn or other agricultural building (e.g. silo) and structural practices as identified in
Table II in the "Agricultural Management Practices Catalog for Nonpoint Source Pollution in New
York State• that inctude the construction or reconstruction of impeNious area, excluding proj ects
that invotve soil disturbances of ~ ss than five acres.
Golf c·ou rses
Institutional dev elopment; indudes hospitals, prisons, schools and colle-g es
lndustriaJ facilities; ·includes industrial pari<.s
Landfills
Municipal facilities; includes highway gar ages, transfer stations, office buildin_
g s, POTW's , water
treatment plants, and water storage tanks
Office complexes
Playgrounds thett include the construction or reconstruction of impervious area
Sports comp)exes
Racetracks; includes racetracks with earthen (dirt) surface
Road construction or reconstruction, including roads constructed as part of the construction
activities listed in Table 1
5
Page 94
Construction Activities that Require SWPPP Appendix E (continued)
Table 2 (Continued)
C ONSTRUCTION ACTIVITIES THAT REQUIRE THE PREPARATION OF A SWPPP THAT INCLUDES
POST-CONSTRUCTION STORMWATER MANAGEMENT P RACTICES
The following construction activities that involve soil disturbances of one (1) or more acres of
land:
Parking lot construction or reconstruction, including parking lots constructed as part of the
construction activities listed in Table 1
Athletic fields (natural grass) that include the construction or reconstruction of impervious area (>5%
of disturbed area) or alter the hydrology from pre to post development conditions
Athletic fields with artificial turt
Pem,anent access roads, parking areas, substations, compressor.stations and well driUing pads,
surfaced with impeNious cove~ and constructed as part of an over-head electric transmission line
project. wind.power project, ceO tower project. oil or gas well drilling proj ect, sewer or water main
project or other linear utility project
Sidewalk, bike path or walking path projects, surfaced with an impervious cover, that are part of a
residential, commercial or institutional development
Sidewalk, bike path or walking path projects, surfaced with an impervjous cover, that are part of a
highway construction or reconstruction project
• AHother construction activities that include the construction or reconstruction of impervious area or
alter the hydrology from pre co post development conditions, and are not listed in Table 1
6
Page 95
SWPPP Review Checklist Appendix F
NEW YORK STATE DEPARTMENT Of ENVIRONMENTAL CONSERVATION
DIVISION Of WATER
SPDES General ?errr,t for Stormwoter Discharges fro m Construction Activi1y (GP-0- 15-002)
Stormwoter Pollution Prevention Plan Review Checklist
Project Name:
□ Basic SWPPP (E&SC Plan) □ fullSWPPP
Site Address: Water.hed: Date:
Municipali1y:
Appendix E 303(d) segment SPDES Gene<al Pem,if ID Number:
County:
NYRl
OWne</ Ope<atoc Phone: Reviewer.
Address: fax:
General Reauireme:ots
Yes No N/A or N/R Cijafton
□ □ □ SW PPP contains completed final NOi Ill.A.I .
□ □ □ SWPPP iden tifies poten tial sources of polruto nts. in runoff 111.A.2.
□ □ □ SWPPP identifies Trojned Contractor. 111.A.6.
□ □ □ Confroctor/Subcontroctor certification st atements have been sig ned. 111.A.6.
□ □ □ SWPPP is signed by 1esponsible cotporate o fficer~general partner, proprietor, VII.H.2.
principal executive officer, rooking eected official, or duty o<.Jthorized representative.
□ □ □ MS4 requirements...?
□ □ □ OPRHP documentation. .?
Erosion & Sediment Control Regui"ements
Yes No N/A or N/R Cijafton
□ □ □ Looatior,, type and me of projecf are described. 111.,B.l.a.
□ □ □ Phasing plan o nd seq.>ence of opetations 01e described. 111.B.l.d .
□ □ □ HSG ~ identified. 111.B.l.c .
□ □ □ SW PPP iden tifies cootractor/subcordroctor responsib'ie for installin g. 111.A.6.
conrtructing, repairing, replacing, inspecting o nd maintaining the E&SCs.
□ □ □ SW PPP documents selection, design. dimensions, material specifications. Ill.A.I.
instoflation details, implementation & maintenance of E&SCs. 111.B.IJ.
including soi stabilization pla ns 111.B. l.h.
□ □ □ E&SCs ore designed in conformonce with the NYSStandards and Specificatio~ 111.B. i .
for Erosion a nd Sediment Control; or equivoJence to this s1andord is
demonstrated and ,eason fot the a lternative is provided. 111.B.l.l.
□ □ □ Maps of general location and site are present showing: 111.B.l.b .
Legend, scale, north arrow IILS.i .
fotal 01ea, oJI improvements, a reas di.sturbed and not d isturbed, exisfing
vegetation, onsite and aqocent o ffsite surface waters, ftoodpiain/floodway
boundaries. wetlands and drainage patters that could be affected the project.
7
Page 96
SWPPP Review Checklist Appendix F (continued)
NEW YORK STATE DEPARTMENT OF ENVIRONMENTALCONSERVATION
DIVISION OF WATER
SPDES General ?ermil ! 0< Stwm, ater Discharges from COnstruc tion ActM ty (G P-0-15-002)
Stormwater Pollution Prevention Plan Review Checklist
eXisting a nd final contours. tocotions o f soil types & boundaries,
material/Waste/borrow/ equip ment storage areas, locations o f stormwoter
discharges, and locotion/size/ lenglh o/ each E&SC 111.B.l.g .
□ □ □ Location a nd sizing o f any tempotary sediment basins. or struc tural prac tices Ol.8.1.h.
planned to divert flows from exposed soils are inc luded
□ □ □ Maintenance inspection schedule, in occordonce with the NYS Standards & 111.B. l .i.
Specs tor E&SC.s is induded
□ □ □ Pollution Prevention measures to control litter, c hemicals, debris are described. 111.B.1.j.
□ □ □ Description & location of any indusfrial stormwoter dscharges 111.3.1 .k.
~.e .. c oncrete, a sphault, etc .} is inciuded
Post.construc tion Stormwater Mcmagernent Practices
Yes No N/A or N/R Cijafton
□ □ □ SW PPP is prepared by a Qualified Professional. IIIA.3.
□ □ □ SWPPP identifies contracfor/subcontractor responsible for constructing the SMPs. ULA.6.
□ □ □ Des,gn Manual planning process f0< reducing runoff is employed: 111.B.2.
Site planning to preserve natural features and reduce impervious cover,
Co1culotion o f the WQ, fot the site,
Incorporation of runoff ,eduction techniques a nd standard S"'-Ps with Runoff Reduction
Volume (RR,) capacity,
Determine ninimum R:R" regufred
Use o f standard SMPs where applicable to freo:t the rerooiniog WO... not oddressed by
runoff reduction technic:,.>es and stondad SMPs with RRv c ap acity,
design of volume a nd peak rot e control practices where required
□ □ □ SW PPP documents selection, d esign. installation. implementation a nd Ill.A 1
maintenance of SMPs
□ □ □ SMPs o re designed in conformance with the applicable sizing a nd performance 111.B.2.
Cliteria in the NYS Stormwater Manag ement Design 1'1,anuo1 (Jan. 2015);
or equivd:ence to this standard is demonstrated a nd reason for the altemative is
provided. 111.B.2.c .vi.
□ □ □ .AJJSMPs ore identified, induding dimertSfOns, material specs & ins1allation details. 111.B.2.o .
□ □ □ location & size of SMPs are shown oo a site mop o r construction drawing. 111.B.2.b .
□ □ □ SWPPP indudes a Stormwater 1\1\odefing and Analysis Report that c ootoin:;: 111.8.2.c .
Predevelo pment mop w/ watershed/subcotchment boundaries. flO"N paths &design
points, /Ust further d etcil per App. G Design Monvol>J
post-development map showing some plus SMPs,
hydrology & hydraulic results for 1equfred storm ev ents includ.ng supporting colcl.Aations,
methodobgy ond o summary fable comparing pre & post-development runoff rates &
volumes tor the different storm ev en1s,
summary table w/ c alculations showing th:::11 ea. SMP conforms w/ the [)esjgn Manual
sizing c riteria
8
Page 97
SWPPP Review Checklist Appendix F (continued)
NEW YORK STATE DEPARTMENT OF ENVIRONMENTAl CONSERVATION
DIVISION OF WATER
SP0ES General Perrrit for Stormwa1er Discharges from Construction Activity (G P~ 15-002)
Stormwater Pollution Prevention Pion Review Checklist
id entification of any Design Manua l sizin g criteria that are not required unde: the
General Peroit
□ □ □ Soil testing results and locations Oi test pits a nd borings a e inc luded 111.8.2.d .
□ □ □ Infiltration test results are inc luded if needed 111.B.2.e .
□ □ □ O&M plan. inc luding inspection & maintena nce schedules, is inc luded and 111.B.2.i.
Identifies the responsible entity
□ □ □ Enhanced Phosphorus Removal Standards sizing criteria are included if required . 111.B.3.
9
Page 98
Construction Site Inspection Report Form Appendix G
ll<BVYORKSTAIT
DEP.-IRThl.ENT Of .EN\<1RON!IIENT,'\L CONSERVATION
Dl\'li,lON Of WAT.ER
~ ~,1=
""-- New York State Department of Enviroomental Conservation
Construction Site Inspection Report for SPDES MS4 General Penni! GP--0-24-001
Pro)eci N ame: o.ate:
Pro)!C! Loca'llon: weather.
Permit ' (II' any'): NYR I c ontacted: OYe& ONo Enby Time: I Exft Tkne:
Mame ot S:POES Pi:-rm1ttee: Jn s ~ T)'pe: ~NOT =, COnv,t)IOl
PhOf!e Number{&):: a comp113nce a 1terierra1
OM!le Re~&enlallve(s) ana COfn?.Jny(s}: MS.s Operator Name:
MS~ Pe~ ; ro: NYR2M
SPDES Authority
YN No HfA Citation
I. a a □ ooes me proj ect nave pama coverage? GP-0-20-001: I.A& II, B
2. a □ □ 1, a CtJPY 01 the NOi and AcknowIeogment Leter .n'a!la06e oo see a.nd acceU111Ie ror 'Mwlng? GP-0·20-001: lt D.2
3. a a □ 1, a copy 01 the MS4 S\V?PP Accepunce Foml avaua1:iIe on site anef accest=ID!e ror 'lle-..,.lng? GP-0-20-0J1: I1.D.2
4. a a □ t5 an up-1t><1a~ copy or lhe signed SY/PPP re1a.l'!e:t at ttte cons.iructlon st:e ?" GP-0-20-0J1: ll.0 .2. & II A.4
s. a a □ 1, a copy 01 the SPOf S ~ eral Permit r euIoe<1 at the conslt\lclloo sue? GP-0+20-t'<l1: ll.0 .2
•• a a □ Does Ine NOi accura:ety ri.pon •'!ne mrnbel or acres l o ce alsturtiecr? GP-0·20-001: ll.B..4
:SWPPP coottDt
Yea NO NIA Citation
1. a a □ Does .ne S\V?PP aescrlbe a.tWJ fOffltll'y me ero&IOC'I and &ed!ment con:rot measures to r,e emproye<I? GP-0-20-0:11: ID.6.1.e
•• a a □ Doe6 the S\VPP-P pro\ildie .an rnspecllon sehedtlle ana m.1In1enance re~lranenl5 ror the E&SC measurK? GP-0-20-0:11: IU.6.1.1
9. a a □ Doe6 the SWPP-P aesct10e .lf'l(I klentl!y the slormwa:e, m.3tl~menl pracik:es 10 be- employea? GP-0-20-0:>1: IH.6.2
10. a a □ Does the- S\VPP-P kJenuty tne- contraC:o,{s} and SUbcontrac1or(s} te&pon$1))Ie- tor e-acn measure-? GP-0-20-001: IU.A.6
11. a a □ o oes Ihe S\VPPP raen1lf)' a1Iea.st one 1ra1neo InaI-ri0w I erom t-acn cootractof(s) ana &UDOOntractor(s) companies? GP-0-20-001: IU.A.6
12. a a □ Does t~ S\V?PP l'ICIUde aitne necK&ary C«tl1actor certtteanoo Sbtemen.a ana Signatures? GP--0-20·001: IO.A.6
u . a a □ I&UV! SWPPP ~ e<I 1:/'f the- pennltlee? GP-0-20-0:11: VIUt.2
14. a □ a 1, 'il'Le SWPPP pre,pare<1 by a qt.UlllleO prote6S(onal (Jr po61:-cons:lrucifon stormwal er management requlrea)? GP-0-20-0J1: IH.A.3
,s. □ □ a Do !Tie SM.?s con10nn 10 ltle E.nnanceo Pll06p(lorus Removat su.:,oaras (pn1ec".s rn TMDt wa~enneos)? GP--0-20·0-J1: IU.6.3
Recortt1.aeptng
YN No NfA Citation
16. a □ a Are- ,e,r-inspec:ions per1orme<1 as requr ed oy me perm!I (weekly, o, twice -.-eet ly tor >S au es ail.Wbed} ? GP-0·20-0-J1:Iv .c .2.a. & o
11. □ a a Are me serr-insp?Cbons performe<1 and 6lgne<1 1:>y a quai!le<1 '1&pector ana retaIne<1 on &t:e? GP-0-20·t'<'J1:II.C.2.,IV.C.6 & VILH.3
18. a □ a Do the cr.rallfled ~ specto(s reports lneluele ltle mtntmin f'!POrtlf'.19 req.-emems? GP-0-20-0:11: IV.C.~
19. a □ a Do hspecton reports klenlll'y con?cit,•e mus\#e& trot n.ave not tieen 1mpr,emen1e<1 or arE reclM'flng? GP-0-20-0J1: IV.C.5
10
Page 99
Construction Site Inspection Report Form Appendix G (continued)
J'l"EW YORKSTATE
DEP.~ nlENT or E!\"\JRON!,IENTAL CONSER\'ATION
Dl\lSIO1' OJ WATER
v isual Observation,
YN No NIA Citatio n
20. a a Are all l:f'O®n Yid se<11men.: con1ro1meawm 1n,talle<1 property?
□ GP-0.-20-001: \111.t
2 1. a □ a Are all ff'O&ron an<1 ,eotmen.i control rne3$Ure:& being rn.Jlnta1n.ed property? GP-0-20-001: 1v .A.1
22.. a □ a wa, wrttl.eo a1rJ10rtzallon 1ssue<1 fOI a11y a:uroance-greater man s acrK? GP-0-20-001: ILD.J
23. a □ a H;rre s1abGz.Jtron meastns been tnfiemen.!ed In lnactve aieas per:Permlt {►Slcres} or : sc Sbrutard? GP-0-2().0()1: ILD.J.o &. IU..6.U
24. a a Are p06t-construcllon stomwrat.er management praCG'ces constructeQ'lnsta!IE<I ootrl:Clly?
□ GP-0-20-001: m.&.2
25.. a □ a H as llnal site s,;aomzallon Deen acnteved an<1 temporary E&SC measures removed pr10r ;o NOT w omtrtal ? GP-0-20-00 t : V.A.2
25. a □ a wa, tnff'e a <11sc:t1arge trom !hulte on Irle aay orrnspectron?
27. a □ a ts thm ev1aenee mJt a crse;harge tat.16E<I or oontt!blf.eo so a-v101a:10n orwa:er~all!y stanoaro s? ECL 17-0&11, 6 NYCRR 703.2 &:
GP-0-20-001: ID
Water ouanty ODa&rvattons
oescnoe me <Jl6ci\.1.rge-{s): IOca!lon, so~ (s~ rn.paC'! on r~ Mng watef'(s). etc
oesoooe me qw llty a: me receMng 'N3tel'{s) oolh up,s.: ru m and oo-a11s-:ream or me ol5cnasge:
oe,a10e any o:ti,er >1·ater quay &-·1anoarosor permit v101auons:
11
Page 100
Construction Site Inspection Report Form Appendix G (continued)
NE\YYORKSTATI:
DEP.-IRThlENT OF E.""\lRONl\lE.NTAL C:ONSE!l\".UION
DI\1s101' OF W.HER
AOClll:onai ~ :
o PtlO!•apns albctieo
o.-aau 1nspect on Rating: □ s a11SraC-:OfY ::I 1,Catglrtal a unsall5fac'lory
NameJA~ocy or Leaa tnspector:
I sig:iatu~ 0-1 LUO IMpee>:oc.
Nama-S!A~nele& or O!Mr rnspee«>rg:
12
Page 101
No Exposure Certification Appendix H
NO EXPOSURE CERTIFICATION
For High Priority Municipal Facilities
4
EW Department of
RK in SPDES MS4 General Permit, GP-0-24-001
ATE Environmental
Conservation The co~ leted No Exposure- Certffication mus1be documented in lhe SWMP Plan.
Ptease do nor submit chis form ro rhe Depanmem u.nle&S requested.
I. Owner/Facility lnfonnation
Owned()perator Name:
Maling Address: I C'ity/StatelZip:
Contact Name: Phone No.:
Faci!ity Name:
Sireet Address:. I City/ S1ate/Zip,
Comly:
I Latitude: ILongitude:
U. Exposure Checkli-st
Ate any of the folowng materials or actiwies exposed to p-Eq).~ now or in the foreseeable future? (Please check ffher -Yes'" or
·No" ii the appropriate box.) If you anSWEf' "'Yes~k> any of these quesiions ( 1) through ( 11), 'fOJ are not eligible for no exposure-.
'\'ES NO
1 Usilg. st0mQ or cleri,g mac:hr.a:y or equpnE'nL and are..,s where residuals tom usi,g. st0mQ or d eaning machinery or
e.qu'pment fM'la~ and are exposed 10 stormwater
2 Materills or re.-sidu.is on ~ t,Otfld oc in stoonwater inlets from spills/leaks.
4 Material handling equpnent (except adequately maintained vehicles)
5 Materi:.lls or products <bing badingi\.rio.lding or transporting actMt,e,s
6 ~faterills oc products stored outdoors (except in.al products intended for outside t6e [e.g.• new cars] ¥fflefe exposure to
somwater does not resu'Rfl the discharge of pollutants)
7 Materi3Is contained in open, de-1eriorated or leaking storage dn.rns. barrels.. tanks. and simi:v con~
8 Matffl.'lls oc products hanciedlsl:l:lred on roads or ratt,ays owned Of rnantained by the discharger
9 Wa.s1e nuterial (exoept waste in covered, non-lea.king cutainers (e.g.. dumpsterD
UL Certification
I cer1ify \lldeJ penalty of law that I have- read ~ oodersa-w:I the eligb i ty requirat'IE'l'ts rot d arning a oonditoo d ·no exposure~and obtainif'JQ an
exdusion from SPOES stormwater permitting. I certify under penally d law !hat 1here are no discharges o; storm water cortbmnated by exposise to
indus'lrfal ac:6vities or materia'ls:trom the m us-tlu facility orsi!e identified in !his docunent (except as all owed under .;,o CFR 122.26(g)(2)). I
undersbnd chat I am obligated to submit a no expos1n certif£ation form ~ reqJeSt to the NPOES pamitting aithcriy cclO lhe Operai.Of d the 10¢31
l'l'Kricipal separate storm sewer system (MS4) into which the bcfty dscharges{where applicable). I t.ndascand that I must allow the SPOES
perm,~g authority. or MS4 Operator where the discharge is S'lt o the local MS4, to perfonn inspections to confinn the conclilion d no exposure and to
make such inspection reports publicly avail~ upon request.
Printed Name: Tide/Positiori:
Signature: Date:
13
Page 102
Storm Event Data Form Appendix I
Visual Monitoring Form
Storm Event Data Fonn
4 EW
RK
ATE
Department of
Environmental
Conservation
for SPDES MS4 General Pennit,
GP-0-24-001
Do not SUDfn!l ltlls 101m fo the Department keep l nl6 tom, Wll!I tile munk:tpa1 taell!ty'&, S\V?PP and In tne MS:1 OperatOf'& SWMP Platt
Permit N'Jm!>er:
HI y I RI 2 0 A
I I I
Fac11rfy ttame:
CCll'ltaCC ~ 1Nam~
eoniact Last Name:
Coot.let P"°11e:
COOtJQEmalt
S10ffll Event Oai e-;
Si Offl'I DIRllort (In 00Ut6):
Rafntall Measurement trom Stotlll Event {In 1ncn=6):
I
Oa:;e 01 l ast MUSUratlle storm E\'Mt:
I
OtGtfoB Be!ween Storm E~en.1Sampled .vie End DC' Prevtoo, Mea,1.-ao!e S1orm l'Jfl hoin):
I
Cen ification
I eM!..'")' uo0ier penalty oruw :nat !his aocumfflt a.10 all attad'lmerc, •we prepared unaer my a1reet1on or $.UpeM6t<IO 1n aecortbnce wetha
.&)'$:an deSlg:'led to assure tte.tt qw'.lr.ed pasonn-el prol)MY ga!tlff ano:evaiu.r.e 1he-l(lrotma110n w orn~CI. 6ase<1 on my Inquiry or me
p,enon or pe,&0~ 'A1lo manage tile &)1,'tem, Of ~ person4 dk"eeuy rK ponslble ror gatner1n,g me 1nrorma11on., fne 1ntorma11on , imm1te<1
$, to tne bKtor rny t r,owie~:;e and oella-t ~ruer accurate-, and oompie:er 1am aware 1.hat mere a.re &rgl'l."lea<'l1pa,allles t0fst.t>mltt1n9 false
J1rormatron, 1n::1001ng?he l)05$!bHttyoHlne ano 1mpmonmfflt ror 1t00Mt19 vf,o1a110ns.
Fa::tt, 0,..-.WAr,U-,.,.!~ 11\dOfJ, ~ s;id•C,,.•-• ._...,._~,-~u,.,..-j
,,_ I I
.at1•• 1Jr11
m
14
Page 103
Storm Event Data Form Appendix I (continued)
Visual Monitoring Form
Department of Visual
Environmental
Conservation
Monitoring Form
MS4 GP-0-24-001
AU bigh pr1onl)' lll\lD.lc1p.il b,cdii,csc:o\'tred on<lcr 1be MS.1 GP-0-2+-001 m\lst p«fomt Vt~ial Moaitl"nog rn,ioe.fl pennu tc::ltD,
~ par,· u~ Ii)•~ mm.imom of OM t I) ~ar. .Ple.i~:;,ee ti.¢ permit Pon VL.F1VU.F fo, llddibOJW ri:q,ulm~n1S, Th.is lrum iJ pan oftbt-
t11c;ilioo ~ords iUJd :1boutd be rct.itlX'O OflSll( t\•,lll tbc f11e ifoy's 5fOOUW?it¢r Pollndoo r ro,·m1100 Plau. .P/c.as-e do nqt sutnnl1 thh
fQr,n w ilre De-pq.rmw•I.
MS-i ~J;),lor P.tnnU JD /'Fn,<1,.,'li~•r"'N,',m,,",-~~~~~~~~~~~~~~~~~~~~~~~
I ILi 111111111111111111111111111111111111
Outfall N1.t1Ube:t E.x:amllie,•9; Name Ex:lluiaei~ Iide
IIII I I I I I I I I I I I I I I I 1~11-1-1-1-1~1~1~1~1~1~1~1~1~1I
I Rep.:111io.g Year R».udi,:UAmoum QtmldymgStom1? RuooO'Sovr.:t-1
IIIII o-.. 0,-. ()RaJl.i&U O.suuw1iu-t1
Da1e/Tin..e Col~ted
[D / [D / [D [D:[Dw],I@!
l Doc:s tb;-..stonnw1uer.11ppe-;i,r IQ~ coloied'/ .,,,.,,. ..., ..............................................., ...,.,., ....................,.,.,.,,,.,.,.,,,.,., QYe;. 0 -o
JJ\<..)s. deseribe
:!, ls 11)1! SiQrQ.l.W'<1lerclc,nroru11n1p.uc,oJ1 ......... ,............................ - ......................................................................., .• QY('S QNo
U'rcs, ,~h1ch l)f l h.:fotlzy,VU)g best 4<:&ertbc.s-tbe c.l.atn)' o f lbJ: ,${(1UllWil.\ct; .. ,............ """' {)cle31 o,u11.,.
lfye$. ,~·li..dl. l)c,,,r,tdc:o.!nbieli 1.l ie ,:bt-ea? .... ,..........., ........... ,., .............., ...................... QR-mtx,,.vS~ QFl.i;sting OilGlobul~:i
~, Ones,b.c:-s ampl~h,v,:;anodor? ................ , ......................... ,............................................................ Q•fey ~ o
15
Page 104
Storm Event Data Form Appendix I (continued)
Visual Monitoring Form
.$. b tbmaCtlWCb.ing tlo$1:i.ng 011 lbe s111fflc4of1bl'l a,un,I♦? .,_,_.,,...,,.,,...,_.,,...,,.,,...,_.,,...,,.,,...,_.,,...,,.,,...,_.,,...,,.,,... Q YCJ ry◊
Jf,.- c,~~ribt
,~--
8, h 1btt'$ f011tn « 1))(1.h:Uitl fo11niu,gon 1be cop of lb♦ a111nple $~1rf3-ce?.......... ,.... ,.... ,.... ,.... ,.... ,.... ,,.,.,,.,.,,.,.,,.,.,,.,.,,.,.,,. Q vcs O,:o
16
Page 105
Municipal Facility Assessment Form Appendix J
q w
RK
ATE
Department of
EnVironme-ntal.
Conservation
Municipal Facility Assessment Fonn
For SPDES MS4 General Pem1it,
GP-0-24-001
Assessments must be condlcted by a person with lhe knowledge and skills to assess conditions and activities that
crud impact s!OITllwater quality at the facility and evaluate the effectiveness of best management practices required by
the SPDES MS4 General Pennrt (GP-0-2+001).
MS4 Permit ID: MS4 opera!.Or tfame:
f'aemty N:a...1\e: Faemty Type: I oa;e:
w eamer COf'.1£131'1&:-
I& siormwater n.raoll' pre&er11miring ~ as.se66rnent? ore, □ No
commen.is:
General YN No
1:s mis a n~ n pllOrtty m1r11e1pa1 raemiy? □ □
2
' ff 1n1, 15 a nlgh priority rnunl::'lpal t.dlty. does me tacllty quallty ror a No Exp0&1.n cert1tea11on? □ □
J n tn1, 15 a nign pr1011ty rnun1etpa1racmy, 115 there a complete-a SW?PP ~ l>te? □ □
• Does ttle tat:ty nave aay MS-4 outran,? □ □
s Does trle racmy nave any 1meroonnecooos? □ □
•
c ommem, :
DOK tile racmy nave any m1.r110l)a1 racuny 1nuaoonneo!IOC1&? □ □
Good HoosekeeQing YN No
1 Ate paved &Urrace, tree or trarsl\, seam.mt. and.'o< aetlf'i&? □ □
• Date Ute pave~ atea was tasi , wepl or vacuume<1. □ □
9 Do oooooor waste receptacies nave co"Ye15? □ □
10 Are lrlew3&te reeeptacff l:tl'pted on a regUla, Das!$? □ □
Are ~nae 6'gns-or INS&. oootamin-ar,15 orowdil!lng a'! me wa&te receptaele area? □ □
"
12 Are tn= ro1,ow.ng f.:tc:1111)' airea, tree 01.aocmw1a1eo trasn. si:OlmE:!11. oe'X!s, oontam1nanl5., and splils.:: □ □
. s an storage arws □ □
. OOOtalnff storage arws □ □
. l.tatntenance areas □ □
17
Page 106
Municipal Facility Assessment Form Appendix J (continued)
. sug1ng areas □ □
. M a:et1a1 &.ioct~ e arE.as □ □
commen.: , :
Vehicle and Egui12ment Areas Ia Ht:.. v.. NO
13 Are \'~!Cl:el'eqlipmem part.e/J lnOOOI$ or untter a root? □ □
,, Are \'e-fl!Ciestequipmem 'A'aUleOIn only ~&fgnated ar~s? □ □
IS Are nnrcces ••·a&heo regu1any io remo.•e conum.'rlauon and pwtent tnen ttom potuttng &tOrmwater? □ □
1s a1wasn water ~ea:ea In 3n 011 wat:r iepatat.or pnor :o dlSocrusge? □ □
"
17 1s a• W3$D water rn al\age<i so ll O~s w, enier me MS4? □ □
c omment6
v..
Vehkle/EguiDment Maintenance
I= No
,. 1s equ1pmern &.:oreo un~r m et et or eievated ana oove-re<1? □ □
19 1-Je ~llos dra1ne<1 over a Clf1p pan or p.10? □ □
20 Are ~n~s °'pump& 1.1&e<1 wnen :ransrermg nukls? □ □
21 Are Vi'3$:e r3gs ana useo: a:06oroem pa.<1s olspOG~ of proper.y? □ □
22 Are any whr.:tes an0..'04 eqi.,pmen.1 1e.u1ng fiUfOs? □ □
23 Ate Ortppam IIM'IE<llai!M)' ptaceo l.t'ldff ft=aU? □ □
2, '°
Are matenaJ&. equ1pc,-.em. anc ac:til:les IOcateo t!\at leas are contal~ In e.~ tlngeootalntr.em ana OIVeF'$iOn Sy-61=-:ns □ □
(con.i., e the-storage 011e.my or lieat.•pron.e veM::fes a.10 equipment awa111ng maln.ienance to pro:ect~ areas)?
25 Are VffllCles 1mpecteo e1a.i.y for teau7
Commems:
Fueling areas I□ NIA. v.. NO
26 is f\leliog pertonneo unoer a canopy or roort □ □
27 Are &plll ciean1tp mated.n av3113!lle a; th: fUl:!ing :i.rn !- □ □
2a Are brelbway v31vet. use:ton tuet.ng llous? □ □
29 is me rui.11ngttanoie loct d)S.connec!e:uo me- operator mU&t at:nc ir.e IU£'11ng? □ □
JO is stormwa:1:t runol'f t.om rue:ng.area treated In an oll!Water separator?" □ □
JI l"6 Ille rui.1109 automa~ mp ,~pecteo regwny :o ensure It 15 wortitlg propefly! □ □
J2 Are au rue :tellYef!es mon!.~:we:t? □ □
Commems:
18
Page 107
Municipal Facility Assessment Form Appendix J (continued)
Salt Storgge Piles or Pile Containing Salt Ia NIA Y&S No
JJ 164ali mreain a s.JII s:orage DUlkllng orunoer a roof? □ □
J• Are control.$ 10 place io m1nrnuze spU1$ wnre ao:tng or remo-.-rig ma:em1rrom Ille p11e? □ □
35 Are $.JII Spill& O'e;J'led u;, prompt.y? □ □
Jo IS ~ari.<:HI an<1 :rac:teo 6-lll retn0\'1:CI prompuy trom roa.<111"') are-Js? □ □
37 1$ ,tormwa:a draining away trom Ille s.JII pue Clte,.,""teato a veget.lt.eo flnl:f a-ea □ □
c omments:
Fluids Mana~nent I tJ..llla
Y&S No
JS Are all drums af'IO' conta!~'5 or tltfdss;oreo wttn propa- cover ana oontammem? □ □
J9 Are niio, , .:on;,o l:l app o~aie contalnm ~c•oc.storage cal)I~:$? □ □
40 Are all l!UICI$ kept 1n on~ai coota1ner; or 1at,e1eo In a ma-iner mat :resct1tiestne cootentt.ad:qua:ety? □ □
., Are Matel'UI s~~':Y 0313 SMelS (MSOSISDS) f'E.JClt)' au~laOle? □ □
42 Are all COR.lalnel$ tna1are s~oiteo ttee or ~ar, or Oej)C<Sr.s? □ □
..
•J
~s
Are coota1ners or proouct 1nspec;ea regu!'.Jrty?
1, U6~ Oil and an!L~eze 61.oreo 1ocsoors anaror on S►-01 cornainment p,ane:s!
1$ U:$e<I OIi and atttl!reeze property dlsp,weo O! or tec)'Cled?
□
□
□
□
□
□
c ommen:,:
Lead Acid Batteries I tJ..llla
Y&S No
•• Are ieaa-a¢1C! o.att.er,?s &.:0i1ea 1nooors on spu1eootalM'.ent paret.s Of fl OIM:' □ □
., Are Intact oattenes storeo on ~ ac1~s1Stam rack or ND? □ □
•• Are erac.s.eo or 1ea11ng oanen:,ssiorea 1n 1a.;:ie~. cwse:i. leak-proof ooniat1er;? □ □
.!9 1, tne ~t:e ea.en t.Jttery •..,..,. r_ta:ed In ,:cag,e re:ocoeo? □ □
50 Are oatteM:'s sta:teo more tl'lan s nlgn? □ □
SI m Datte~, ll1$J)eeled regllaN)' tor JEaks? □ □
c ommen.;s:
s12m Prevention and ResQonse Procedures I□ Nit. Yn No
52 AJe venlCIK tlspe~o :l.llly tor teaks? □ □
19
Page 108
Municipal Facility Assessment Form Appendix J (continued)
SJ ,, spn cootrol: equipmem ana aOG~ts 1t:acny ava11ao1e.? □ □
s, >.re emergency pnone nurnti=" postea: 10 coo,pJCuous at'N&? □ □
ss >.re &f,1116 contained an<1 cieaneo up 1mme<11a:eiy? □ □
c ommen.:r;:
General Material Stora~ Areas Ia NIA Yea No
56 Are te.utng or elma~ ma:a1.ts stofff in,ioe a t>ur4lng or anothff type ~ , term resl$.; aoce ~:er? □ □
S7 >.re all m.Tier.at"6toc«pues Wltt'lh contalnrMnt &-:r.icture& (e➔g., concre:e o.arr~rs. :-armai Dffm&) or st<Wed II a marmfcr ma1 □ □
ooe5not a110-• d&er1arge oflmpl!C'.e<I s:tmwater?
S8 >.re useo rue, ta!III& a!ld olher scrap me.tat a.10 pans a,a1nea 01 l!UICI"$ ano stofff unaer cover? □ □
59 Are outdoor con.~ r& co"llaeCI? □ □
60 >.re pll:$ 016f>OC'$. aspna;, oeom, et . 6'~red unda a roOl' or CO\'ff? □ □
°'deD(ls e1ear.e<1 up procr.pt!y? □ □
"
62
Are s;,1116 or ma:a1a1
>.re uM'O !!re storage pffes placed nay ttom storm oralns or conveyancK ? □ □
>.re .:ires recyueo tfe<~ ny t.o keep tit<= nlmber « sr.ore<1 nre&-managea111e? □ □
"
c ommen.:,:
Stonnwater Mana~nent Yea No
6~ Are employees tralned on the murucrpal f3ci!lly Pf<>Oeduru ? □ □
., Are BMP& ano .reatmen.; StruciutK WM!ng as<P.stgMd? □ □
67 Are BMPs and .realmen.: ,tructure5 tree rom e1eor1s burctu_por overgro-•11 \'egeiailon !!lo: may !mpa:r l mctrof\? □ □
•• cat.en oa.si:nu.noukl tie.c!Nneo 1n .1econ,ance wltll !he mi:rr.cne, at~ h .?l.lt vtf.3.cJU. I PanVll.F.J.c.a. O?penolllg on
thee MS.4 Operator type. eat.ea on uts, do any eaten b-Jtln& neeo to be c!Nneo?
□ □
69 Are berm,, curwig or oltler me-mods usea to Cll'o'M ltld o.ract dl6Ctiarg€.'$ a:P.quate and In g:-od conolllon? □ □
70 Are ,ooliop o7rah t <frected to ate.a away rrompavemenl ! □ □
commen.:,:
Erosion and Sediment Controls Yea NO
71 Are s011s:abllZai:!On measures (e.g., seed ano mUlct\ roced eroooo corurOI pro® o;s) conslct-:ri:o In areas !bat lla\'e me □ □
pG:aiuai tor , 1gnmcart: son eL'061on?
72 Are natural b~ ef$ makltalned arouad S'lll'face watEfS? □ □
73 Are tiow-v£ioctty <1wpa-Joo o:evlCK h pl~e ai rnonltortlg locauoos ano Cl'l.1nne1 ou.ets (roe« l'.pra;,, , -tone one.ct oan,, □ □
ooncrete baffles)?-
7< oo cor,:ro1, conrorm to me NYS stanGar.,.s and Spec:fflcat:ons ror Erosloo and secr.meot con:rol (_2016). or equtvalent r □ □
20
Page 109
Municipal Facility Assessment Form Appendix J (continued)
Commen.1&:
Corrective Actions and Comment
oescrme 111speC1Jon ltn(lng&ana rr neee&&ary. ,ne eorreCGVe ac11on, taken
1n.spect0f signature
I I oa, e:
I
21
Page 110
Notice of Intent: Village of East Aurora Appendix K
NIIWYOlttC StA11 DIMR TMI-NT Of- 1.N\llMONMfH1At C-..:ON 'llflVATtON
M s , O per ator Certification Form f or e Repor1s
arDe:8 0-•n•UI ,..,ml1 ,Of"
M1Jnt~ff>al . .:~:t:.:~;,, 0
.;:!:.~'a;:,~~tO~ 0 14-001)
ln.etnJc.tlona
Pltalffle f'9YIOW Pnrt X J uf G? 0 ;,M.oo, bofuro •1~"'"1.1 ttl I fofm /\ itlUMture by
■n un•u!Jianz-.<t pef'WOf1 w"1 d•ln( r>fW'TI'l'I ClOWntQfl
Th•• tom'I musl be 1tgn0<1 by ON1 ot tho followng
1 Fe, ■ ~ l i O O by II r0til)O'llibl0 COfJX)fWtO ofr,c.e,
2 For• pnrtnerslllp: by B gonoral portnor-
3 For a eole propnetorshlp b,' lhe p(Opl1o1e>r
4 For a m.JnOpallty. s101e. f&dernl or othor public egor1ey by a pflncpel exoeut:t...,. affl091"
or ranUng oroctOd official
MS.. Op<trator Name: \/, l1 "-'!)' o[ E.0•J- A,,rQ(G',
eReport Submhulloo Number. HG 1 - E6 rl { _ tJ B y z..1
MS.C Operator C•rtl11eatlon
1certJfy under peno1ty of !aw !hat t,!s dccumont and al' atlAchmenta _,. _ . . . . - m y
dlrect1cn or supervielon In accords nc:9 wllh o sy&tem de1igned to a......-. that .....,._. pet9CWWIIII
pr(lp8(ty gathered and eva1uated the 1nformal'on eubm 11e<J, Based on my lnqulty d ._ S - -
or porsons who manage the sysl8ffl. or lhosa persona clrecUV reaponalt>a for gattwt,,g ._
lnfor,nat.cn, the information aubmllled '•· to the belt of my krowtadQe and t)ella(, - • _,,__
end completa. I am aware lhat lhere ara sl gnlflcanl .,.nal l • f o r ~ . . . . _ ~ ...........
Including ,he posaloillty or nna ■no 1mpriaonmanl for knowing vlolallona.
/.¾Jee OJer(u, p
Name Cp l - prtnl ar type)
(]ff/~
22
Page 111
Staffing Plan/Organizational Chart Appendix L
23
Page 112
Village of East Aurora
Departments at the Village Responsible for Implementation of the
Six Minimum Control Measures (MCM)
MS4 Coordinator - Stormwater Management Officer - Brian Halt
MCM 1 MCM 2 MCM 3 MCM 4 MCM 5 MCM 6
ILLICIT DISCHARGE
POST CONSTRUCTION
PUBLIC EDUCATION PUBLIC INVOLVEMENT DETECTION AND CONSTRUCTION SITES GOOD HOUSEKEEPING
MANAGEMENT
ELIMINATION
WNYSC WNYSC DPW Building Department Building Department DPW
The Coalition creates WNYSC schedules 2 (B.Halt) - Inspects outfalls, Once the SWPPP is approved and All long term post construction Implements best management
graphics and designs public meetings a year and field reconnaissance before any clearing activities can measures are inspected by the practices for operational and
presentations. Prepares to educate key associated with regular take place a kick-off meeting is Building Deparment before capital improvements. Staff is
postcards and mailers. individuals and groups. inspections and potential held on site to be attended by the construction is completed and trained annually.
Creates K-12 Education illicit discharge. Project Manager, Site NOT signed by E. Cassidy or
Packages. Organizes a Conducts staff training, Superintendent and Owner's Village Supervisor.
stormwater conference performs inspections, and SWPPP Inspector. Construction
once in 2 years, Invites issues notices of violation. sites are monitored by the Building
Guest speakers, Department.
Engineering Consultants,
Landscape Architects and
MS4 communities.
Makes presentations to TOA presents the draft (B.Halt) - Recieves calls from E. Cassidy closely monitors the The owner signs a maintenance DPW maintains facilities
educate MS4 Annual Report at a residents, Code Enforcement construction sites by reviewing the agreement and files it at including buildings, salt storage,
Communities and Town public meeting to Officers, Highway weekly inspection reports and County Clerk's office to ensure fueling station, Village roadways,
Boards when needed. educate key individuals employees, regarding illicit issuing notice of voilations (NOV) if that the post-construction drainage infrastructures, and
Maintains a website and for public input. discharges into storm system. necessary. Fourth NOV maybe measures will not be altered village facilities.
related to stormwater The complaints are accompained with an admintrative without notification and will be
management. investigated and necessary fine. A stop work order may also be maintained in the future. Also
violations issued. issued with the help of the Code the owner file an easement
Enforcement Officer. agreement the County Clerk's
office to allow for period
inspections by TOA.
TOA posts the draft TOA participates in After the NOV is issued the site is DPW - Maintains
SWMP Plan on the different Environmental inspected again in 14 days as a Village maintenance facilities
website, has a groups that have follow up on the voilations including buildings, salt
Stormwater Management interest in the storage, fueling station, Village
webpage, reviews the stormwater roadways, drainage
SWMP Plan at a public management program. infrastructures.
meeting, and has a These local groups assist
brochure display in the with public education
Municipal Center. and involvement.
24
Page 113
WNY Stormwater Coalition Online Mapper/SOP Appendix M
Guide to Utilizing the Online Stormwater Mapper
WNY Stormwater Coalition
PURPOSE:
This web application was created using ArcGIS enterprise to provide the WNY Stormwater Coalition
members with a method for viewing all of their stormwater conveyance data in an online interactive
map.
Online mapper Link:
https://erieny.maps.arcgis.com/apps/webappviewer/index.html?id=717984bd03e74f23b0
296461e3ea9957
After clicking the above link, you are prompt for an ArcGIS Login to sign into Erie County.
Login Credentials: Sign in to Erie County, New York
Q esri·
Username: WNY_Storm with
Password: $tormW@ter20
Recommended Web Browsers:
• Google Chrome ArcGIS login
• Internet Explorer
• iOS Safari [I WNY_Storm
1 ~ ............
[ ) Keep me signed in
Sign In
Forgot username? or Forgot password?
Not a member of this organization?
Sign in to your account on ArcGIS Online
Privacy
LEGEND:
II
Upon opening the mapper, layers automatically turn on. As you zoom in more layers become
visible. To view the legend click the icon above, located in the upper left corner of the mapper.
25
Page 114
The Legend is dynamic and will change to show you which layers are
active as you zoom in and out of the map. At the default scale you see Stormwater Base Layers
MS4 boundaries (2000,2010), Municipalities and Areas Without MS4 2000
D
Municipal Sewer are the active layers. MS4 2010
D
More Layers
Areas Wtho1,;t ,-.1w,< ~ S.¥<-.,
LAYER LIST: D
26
Page 115
The layer list is located to the right of the legend in the upper left
portion of the mapper. The layer list is also dynamic, similar to the
legend. Data layers that are not visible at certain scales appear
greyed out. The image on the left shows that Stormwater Point
Features, Flow and Ditch layers appearing grey. These layers will only
turn on at a larger scale as they are not clearly visible at smaller
scales. You can also turn on/off any layers you choose by simply
checking the blue box. Notice the three little dots next to each layer.
~ &!'J lmpaired_Waters •••
When you click the three little dots a menu appears:
Zoom to Zoom to: Zooms to the scale of the entire layer
Transparency Transparency: Allows you to adjust the transparency of the layer
Setvis"bf 1tyra'l9e Visibility Range: Lets you turn on/off layers at range of scales
Enable pop--uo
Enable Pop-up: Lets you turn on/off pop capability on a layer
Move Up/Down: Will move a layer up or down in ranking in the TOC
Move up
View in Attribute Table: Pulls up attribute table for the feature
Move down
Stormwater Point Features Flow Ditch Outfalls DEC Streams
V:ew in Attribute Table
iiJ Options • [ Fi ter by m a ~ 0 Zoom to (8) Oear selection 0
MUNIID OUTOWNER OUTlD P1PESIZEIN
Show item deta''s WS362 TownofWe'i/t Interconnect 12
Seneca
EC1 312 Erie County• Outfall 18
Aurora District
Show Item Details: Takes you to the item detail page on ArcGIS online
27
Page 116
SEARCH BY OUTFALL ID:
The search widget is in the upper-left hand portion of the mapper next to the layer list icon. Once
clicked the widget panel drop downs on the left side and a small search box appears next to the
search symbol.
IIJ Search bl/ Outfall ID
The search box gives you results as you begin to type the outfall ID.
NT xi 0..
NT064
NT001
conAc,.
NT018
NT019
NT020
NT027
MUNICIPAL FILTER:
II This widget allows you to apply a filter to all of
Municipal Filter
the stormwater conveyance and outfall data based
Filter Outfalls and Stormwater Features by
Municipality on municipality.
Chvose filter type Once you select a municipality, click Apply.
Outfalls and Stormwater Conveyance by Municipality It will zoom to that municipality and the only data
Choose a municipality then click Apply showing on the map will be for that particular
municipality.
~ nof Evans
·I Depending on the size of the municipality,
you may need to zoom in further to see the
M stormwater data.
Notice in the attribute table pull up, the only
data available is the selected municipality
28
Page 117
Stormwater Point Features Flow Ditch Ovtfal:s DEC Streams MS4 2000 MS4 2010 Municipal.ties lmoa•reCWaters Impaired Waters (Polygon) Areas WrtholJ't Municipal Sewer
Bi Options ..,. j R iter by map extent IO Zoom to ~ a ~r :Jelection C Refresh
1YPE MUNIPAU1Y CON DITION BMP CON STRUC EP_POSIT EP_INVERT EP_DIAM EP_COMP EP_BMP IPl _POSIT IPI_INVERT IPl _DI O
CB Town of Evans Fair N one P,ecast NW 27.00 8 HDPE SE 26.00
CB Town of Evans Fair N one Precast NW 42.00 12 Concrete SE 40.00 12
CB Town of Evans d ean me None Precast 0.00 0.00
CB Town of Evans Good N one Precast N 30.50 18 HDPE w 30.50 18
CB Town of Evans Gocd None Precast w 18.00 10 CMP 19.00
CB Town of Evans Good None Pre cast N 42.50 12 HOPE 42.50 10
CB Town of Evans Good None P,ecast NE 23.75 8 HDPE SW 22.50
CB Town of Evans dean me None Precast w 26.00 8 HDPE 25.00
11 Ofeatures O sefected
··- -
OTHER WIDGETS:
Notice a few other remaining widgets on
the inside portion of the mapper.
Basic Zoom Function: You can use
these buttons to zoom. You can also
use your mouse capability to scroll
in/out to zoom throughout the mapper.
I
Double-clicking any area on the map will
also do a partial zoom-in.
Home Button:
The home button takes you to the default extent of the map.
My Location:
The button uses your device’s location when you have it enabled. This is particularly helpful if using
the mapper in the field.
Measurement:
29
Page 118
Allows you to measure Area, Distance and
can give you a precise location. Measurement x
iii (:;] £1 Feet •
To measure distance, select the middle icon
Me-1sorement Result
and then single click you starting point and as 1,667 .3 Feet
many points in between your last point. To
end your segment, double-click on the last
point in your measurement. You can change
your measure type from feet to miles etc. in
the drop down list.
Measurement ><
To measure area use the icon on the far left.
~ ~ II I Acres ""'
Single click to begin drawing your polygon, and
double-click to finish it. Use the measurement
type drop-down to change your area
-
15.9 Acre s
measurement unit.
To capture the precise location of a point select
Measurement x
the third icon to the right. It will take the location ~
..
""' @]1 Degrees•
of you mouse at all times, and then also allow Measurement Result
you to click a point on the map to give you Latitude Longitude
precise location in longitude/latitude base on ~ 42.818491
either Decimal Degrees, or Degree, Minutes, ; 42.820726
-78.693584
-78.699935
;
Seconds. (use drop-down)
¥414
*For all three measurements, you can use
CTRL (on your keyboard) to enable snapping to
features in the map such as manholes, pipes,
ditches, outfalls etc. This makes tracing Pren CTRL to e n1ble sn1oprn9
polygons very easy.
Printing Widget:
30
Page 119
The print widget lets you export the map to various X
file types to be saved or printed. The current view of
the map generates when you click print. The default Map t itle: ArcGISWe b Map
layout is “A3 Landscape” and default format is JPG.
You have the option to select different types in the Layout: />.3 Landscape
drop down. You can title your map. Format: JPG
0 Advanced
11,¥1
A file is generated after clicking print. To view the file click
on the file name. It will open the map in another tab in your
browser. Map ttle: ArcGISWebM ap
Layout: A3 Landscape
Format: JPG
i·►iii:lf+F
Below is an example of a JPG map generated from the
widget
~9/2020, 11:08:02 AM
007 0 :'Jml
Dllch • MH e CULVERr Q lnterconnec1
■
0 13 025 05km
- Flow O PIPE
DI r~ MunSlpali1les ■ Impaired Wat~s (POIY901l )
S!0<mwater Pol O D - DEC Stre.ims Impaired Wa:ers
• Other nt Fea1ures
OWl~SPOUT Outfalls 0 Areas WithOUl Munldpal Sewer
• CB
Notice that all of the active layers in your current map view are included in the legend at the bottom
of the map. Also included are map data references, a scale, and the title of the map.
To start over the print process, select Clear Prints button.
31
Page 120
The Advanced print button lets the user:
0 Advanced
Fi@&
Map scale/ extent:
-Adjust the map scale/extent
Preserve:
' !: map scale
( _ map extent
Force scale: 1- 1
current
Output spatial reference WKID :
102100 -Edit the spatial reference
h.3.__ ·---
1~~,_ -=r--:ir_
Layout metadata:
Author: Web AppBuilder for Arc' -Add an author and copyright to the map
Copyright:
Include legend: ~ -Option to include the legend
Scale bar unit: E
~ _M
_i-le-s~]~
MAP_ONLYsize:
-Change the unit used for the scale bar
Width (px\: 670
-Edit the size of the map portion of the print
Height (px}: 500
Print quality:
DPI: 96 -Change the DPI of the file output
Feature attributes:
Include attributes: 0 -Option to include attributes in the map
Basemap
m Gallery: Basemap Gallery x
This lets the user change active basemap used in
E}J
.- 1•
the mapper. The default basemap is called
‘Topographic’ ·/ .· • ,F°= ~
i .•• -,
Depending on how you’re using the mapper, other Navigation (Local Newspaper Map Nova Map
basemaps might be more useful than others. Language)
Streets (Night •
Local Language)
• E!J
Imagery Hybrid Modern Antique
Map
Full Screen: II
This button will set the mapper to fill your
entire screen rather than just within your
u•Op enStreetMap
Vector Basemap
Firefly Imagery
Hybrid
Topographic
browser.
32
Page 121
The Attribute Table:
The attribute table can be pulled up from the bottom of the map screen at any time. All
layers that contain attributes can be found in the is table. Each layer has its own tab. By
default ‘Filter by map extent’ is checked. This means that you can only see attributes for
features that are currently displayed in the map. Feel free to uncheck this setting, but it
may slow down you mapper due to the large amounts data stored in each layer.
1
-
Storr'l"M'.i.rPooM.F..-iui-.t
18~,0N ..
,_
r-•..-b-,'"'6091('[...t """
Oi.Af,it OECStr••IIU
0 lOOITll0 1&1~......«t,o,,.
MS42000 MS,& 201()
OIWl-•th
M-~tin wnp.--.dWtllen 1~,lfdW,trt(~) ~W1,',ou'1Mt,,,oc,~IS..,,...,,
~'"
-·
1Yl'E MUfiCPAUTV CONO!llON CONSfflUC EP.,PO'ln Ef>JNVEftT EP...OIAM Ef'. C.OMP EF'. 8~ IPT.JOSrr l'°!JNVE'ff ,~1. 0!AM 1P1.COMP IP2)'0SIT 1"2.JeMO
cs Bride 21.SO CMP 21.00 o.oo I
TOYonoffl"NI Good
" N 12 CM;>
co ToW"lof!IPT'II Cm Non• Brio< ..... "
o,, N 15.00 12 CMP o.oo
,,
--·
CB ro,,,.,'lore...... 12 HOP! 16.00 HOPE 0.00
-♦
10.00
'" B""'
cs Tov,."f'lofEl~ w
c,
Good Sri~ JO.SO
,,.,. " """ N 27.50 12 HOPE 28.00
Tc'il,iof!.'1"11 12 so" 2~.50
"°'' 0.00
Good
,_
l'l'KU1 N
"
2,.so
CB TOW!'lorei....,. Good PA«• N
,....
12 rOP!' 21.SO
" Ho,f 0.00
cs 1ov,noffJ'N Good ..... Brick N
" """' 20.so
"
Ho,E o.oo
1
33
Page 122
Resolution: Local Laws Appendix N
I, Maureen Jerackas, Village Clerk-Treasurer of the Village of East Aurora, Erie County, New
York, do hereby certify that the attached motion is a true copy of the original motions adopted by the
Village Board of the Village of East Aurora, at a meeting of the said Board held on the 26th day of
November 2007.
IN WITNESS WHEREOF, I have hereunto set my hand and seal of the Village of East Aurora,
New York, this 26th day of September 2024.
34
Page 123
20071126
Motion for Local Law # 11 of 2007
On a motion by Trustee McDonnell, seconded by Trustee Mercurio to Approve a
LOCAL LAW amending Chapter 142, Flood Damage Prevention; Chapter 227,
Subdivision of Land; and Chapter 285, Zoning, of the Code of the Village of East
Aurora, in relation to stormwater pollution prevention was passed with all Trustees
voting in favor.
35
Page 124
VILLAGE OF EAST AURORA
LOCAL LAW NO. 11-2007
A LOCAL LAW amending Chapter 142, Flood Damage Prevention; Chapter 227, Subdivision of Land; and Chapter
285, Zoning, of the Code of the Village of East Aurora, in relation to stormwater pollution prevention.
BE IT ENACTED BY THE VILLAGE BOARD OF THE VILLAGE OF EAST AURORA AS FOLLOWS:
Section 1.
STATUTORY AUTHORITY. In accordance with Section 10 of the Municipal Home Rule Law of the State ofNew
York, the Board of Trustees of the Village of East Aurora has the authority to enact local laws and amend local laws
for the purpose of promoting the health, safety or general welfare of the Vil lage of East Aurora and for the protection
and enhancement of its physical environment. In addition, Section IOof the Municipal Home Rule Law of the State
of New York grants the Board of Trustees of the Village of East Aurora the authority to exercise any of the powers
granted to it in the Statute of Local Governments, including the power to adopt, amend, or repeal zoning regulations,
through the enactment of local laws or the amendment of local laws. In any such local law, the Village Board of
Trustees may provide for the appointment of any municipal officer, employee, or independent contractor to effectuate,
administer and enforce such local law.
Section 2.
Section 285-8 of Chapter 285, Zoning, of the Code of the V illage of East Aurora is hereby amended by adding the
following definitions:
AGRICULTURAL ACTIVITY - The activ ity of an active farm, including grazing and watering livestock, irrigating
crops, harvesting crops, using land for growing agricultural products, and cutting timber for sale, but shall not include
the operation of a dude ranch or similar operation, or the construction of new structures associated w ith agricultural
activities.
APPLICANT - A property owner or agent of a property owner who has filed an application for a land development
activity as defined herein.
CHANNEL - A natural or artificial watercourse w ith a definite bed and banks that conducts continuously or
periodically flowing water.
CLEARING - Any activity that removes the vegetative surface cover.
CODE - The Code of the Village of East Aurora
DEDICATION - The deliberate appropriation of property by its owner for general public use.
DEPARTMENT - The New York State Department of Environmental Conservation.
36
Page 125
DESIGN MANUAL - The New York Stale Sior111water Management Design Manual (New York State Department of
Environmental Conservation), most recent version or its successor, including applicable updates, which serves as the
official guide for stormwater management principles, methods and practices.
DEVELOPER - A person who unde1takes land development activities.
EROSION CONTROL MANUAL- The New York Standards and Specifications for Erosion and Sediment Control
(Empire State Chapter of the Soil and Water Conservation Society, 2004), most current version or its successor,
commonly known as the "Blue Book."
GRADING - Excavation or fill of material, including the resulting conditions thereof.
IMPERVIOUS COVER - Those surfaces, improvements and structures that cannot effectively infiltrate rainfall, snow
melt and water (e.g., building rooftops, pavement, sidewalks, driveways, etc.).
INDUSTRIAL STORMWATER PERMIT - a State Pollutant Discharge Elimination System (SPDES) permit issued
to a commercial industry or group of industries which regulates the pollutant levels associated with industrial
stormwater discharges or specifies on-site pollution control strategies.
INFILTRATION -The process of percolating stormwater into the subsoil.
JURISDICTIONAL WETLAND - An area that is inundated or saturated by surface water or groundwater at a
frequency and dmation sufficient to support a prevalence of vegetation typically adapted for life in saturated soil
conditions, commonly known as "hydrophytic vegetation."
LAND DEVELOPMENT ACTIVITY - Construction activity including clearing, grading, excavating, soil disturbance
or placement of fill that results in land disturbance of equal to or greater than one acre, or activities distmbing less
than one acre of total land area that is part of a larger common plan of development or sale [Ed itor's Note: There may
be text missing here; perhaps the phrase "and/or" or "or."] disturbing one acre or more in the aggregate, even though
multiple separate and distinct land development activities may take place at different times on different schedules.
LANDOWNER - The legal or beneficial owner of land, including those holding the right to pmchase or lease the
land, or any other person holding proprietaiy rights in the land.
MAINTENANCE AGREEMENT - A legally recorded document that acts as a property deed restriction, and which
provides for long-term maintenance of stormwater management practices.
NONPOINT SOURCE POLLUTION - Pollution from any source other than from any discernible, confined, and
discrete conveyances, and shall include, but not be limited to, pollutants from agricultural, silvicultural, mining,
construction, subsurface disposal and urban runoff sources.
PHASING - Clearing a parcel of land in distinct pieces or parts, with the stabilization of each piece completed before
the clearing of the next.
2
37
Page 126
PLANNING BOARD -The Planning Board of the Village of East Aurora.
POLLUTANT OF CONCERN - Sediment or a water quality measurement that addresses sediment (such as total
suspended solids, turbidity or siltation) and any other pollutant that has been identified as a cause of impairment of
any water body that will receive a discharge from the land development activity.
PROJECT - A land development activity.
RECHARGE - The replenishment of underground water reserves.
SEDIMENT CONTROL - Measures that prevent eroded sediment from leaving the site.
SENSITIVE AREAS - Cold-water fisheries, shellfish beds, swimming beaches, groundwater recharge areas, water
supply reservoirs, or habitats for threatened, endangered or special concern species.
SPDES GENERAL PERMIT FOR CONSTRUCTION ACTIVITIES GP-02-0 I - A permit under the New York State
Pollutant Discharge Elimination System (SPDES) issued to developers of construction activities to regulate
disturbance of one or more acres of land.
SPDES GENERAL PERMIT FOR STORMWATER DISCHARGES FROM MUNICIPAL SEPARATE
STORMWATER SEWER SYSTEMS GP-02-02 - A permit under the New York State Pollutant Discharge
Elimination System (SPDES) issued to municipalities to regulate discharges from municipal separate storm sewers for
compliance with EPA-established water quality standards and/or to specify stormwater control standards.
STABILIZATION - The use of practices that prevent exposed soil from erod ing.
STOP-WORK ORDER - An order issued which requires that all construction activity on a site be stopped.
STORMWATER - Rainwater, surface ru noff, snowmelt and drainage.
STORMWATER HOTSPOT - A land use or activity that generates higher concentrations of hydrocarbons, trace
metals or toxicants than are found in typical stormwater runoff, based on monitoring studies.
STORM WATER MANAGEMENT - The use of structural or nonstructural practices that are designed to reduce
storm water runoff and mitigate its adverse impacts on properly, natural resources and the environment.
STORMWATER MANAGEMENT FACILITY - One or a series of stormwater management practices installed,
stabilized and operating for the purpose of controlling stormwater runoff.
STORMWATER MANAGEMENT OFFICER (SMO) - An employee or officer of the Village of East Aurora
designated by the Village Board to accept and review stonnwater pollution prevention plans (SWPPPs), forward the
plans to such agency or board of the Village of East Aurora which may be reviewing any application for a land
development activity requiring submission ofa SWPPP, and inspect stormwater management practices.
3
38
Page 127
STORMWATER MANAGEMENT PRACTICES (SMPs) - Measures, either structural or nonsh·uctural, that arc
determined to be the most effective, practical means of preventing flood damage and preventing or reducing point
source or non point source pollution inputs to stormwater runoff and water bodies.
STORMWATER POLLUTION PREVENTION PLAN (SWPPP) - A plan for controlling stonnwater runoff and
pollutants from a site during and after construction activities.
STORMWATER RUNOFF - Flow on the surface of the ground, resulting from precipitation.
SURFACE WATERS OF THE STATE OF NEW YORK- Lakes, bays, sounds, ponds, impounding reservoirs,
springs, wells, rivers, streams, creeks, estuaries, marshes, inlets, canals, the Atlantic Ocean within the territorial seas
of the State ofNew York and all other bodies of surface water, natural or artificial, inland or coastal, fresh or sa lt,
public or private (except those private waters that do not combine or effect a junction with natural surface or
underground waters), which are wholly or partially within or bordering the state or within its jurisdiction. Storm
sewers and waste treatment systems, including treatment ponds or lagoons which also meet the criteria of this
definition, are not waters of the state. This exclusion applies only to man-made bodies of water which neither were
originally created in waters of the state (such as a disposal area in wetlands) nor resulted from impoundment of waters
of the state.
VILLAGE BOARD- The Board of Trustees of the Village of East Aurora.
WATERCOURSE - A permanent or intermittent stream or other body of water, either natural or man-made, which
gathers or carries surface water.
WATERWAY - A channel that directs surface nmoffto a watercourse or to the public storm drain.
Section 3.
Chapter 285, Zoning, of the Code of the Village of East Aurora is hereby amended by adding a new Atiicle X\/,
entitled Storrnwater Management, to read as follows:
ARTICLE XV Stormwater Management
§ 285-77. Findings; purpose.
A. Findings. It is hereby determined that:
( l) Land development activities and associated increases in site impervious cover often a lter the hydrologic
response of local watersheds and increase stonnwater runoff rates and volumes, flooding, stream channel
erosion, or sediment transport and deposition;
(2) This stormwater runoff contributes to increased quantities of water-borne pollutants, including siltation of
aquatic habitat for fish and other desirable species;
(3) Clearing and grading duri11g construction tends to increase soil erosion and add to the loss of native
vegetation necessary for terrestrial and aquatic habitat;
4
39
Page 128
(4) Improper design and construction ofstormwater management practices can increase the velocity of
stormwater runoff, thereby increasing stream bank erosion and sedimentation;
(S) Impervious surfaces allow less water to percolate into the soil, thereby decreasing groundwater recharge and
stream baseflow;
(6) Substantial economic losses can result from these adverse impacts on the waters of the Village;
(7) Stormwater runoff, soil erosion and nonpoint source pollution can be controlled and minimized through the
regulation of stormwater runoff from land development activities;
(8) The regulation of stormwater runoff discharges from land development activities in order to control and
minimize increases in storm water runoff rates and volumes, soil erosion, stream channel erosion, and
nonpoint source pollution associated with stormwater runoff is in the public interest and will minimize threats
to public health and safety; and
(9) Regulation of land development activities by means of performance standards governing storm water
management and site design will produce development compatible with the natural functions of a particular
site or an entire watershed and thereby mitigate the adverse effects of erosion and sedimentation from
development.
B. Purpose. The purpose of this article is to establish minimum storm water management requirements and controls
to protect and safeguard the general health, safety, and welfare of the public residing within this j urisdiction and
to address the findings of fact in § 285-77 A of this chapter. This article seeks to meet those purposes by
achieving the following objectives:
(I) Meet the requirements of minimum measures 4 and 5 of the New York State Department of Environmental
Conservation State Pollutant Discharge Elimination System (SPDES) General Permit for Stonnwater
Discharges from Municipal Separate Stonnwater Sewer Systems (MS4s), PennitNo. GP-02-02 or as
amended or revised;
(2) Require land development activities to conform to the substantive requirements of the New York State
Department of Environmental Conservation State Pollutant Discharge Elimination System (SPDES) General
Permit for Constrnction Activities, Permit No. GP-02-01 or as amended or revised;
(3) Minimize increases in stormwater runoff from land development activities in order to reduce flooding,
siltation, increases in stream temperature, and stream bank erosion and maintain the integrity of stream
channels;
(4) Minimize increases in pollution caused by stormwater runoff from land development activities which would
otherwise degrade local water quality;
(5) Minimize the total annual volume ofstonnwater runoff which flows from any specific site during and
following development to the maximum extent practicable; and
(6) Reduce stormwater nmoffrates and volumes, soil erosion and nonpoint source pollution, wherever possible,
through stormwater management practices and ensure that these management practices are properly
maintained and eliminate threats to public safety.
5
40
Page 129
§ 285-78. Applicability; exemptions; conflicts with other requirements.
A. Applicability. This article shall be applicable to all land development activities within the Village of East Aurora.
B. Exemptions. The following activities shall be exempt from review under this article:
( 1) Agricultural activity;
(2) Silvicultural activity, except that landing areas and log haul roads are subject to this article;
(3) Routine maintenance activities that disturb fewer than five acres and are performed to maintain the original
line and grade, hydraulic capacity or original purpose of a facility;
( 4) Repairs to any storm water management practice or facility deemed necessary by the SMO;
(5) Any part of a subdivision if a plat for the subdivision has been approved by the V illage of East Aurora on or
before the effective date of this article;
(6) Land development activities for which a building permit has been approved on or before the effective date of
this article;
(7) Cemetery graves;
(8) Installation of fence, sign, telephone, and electric poles and other kinds of posts or poles;
(9) Emergency activity immediately necessary to protect life, property or natural resources;
(JO) Activities of an individual engaging in home gardening by growing flowers, vegetables or other plants
primarily for use by that person and his or her family; and
( 11) Landscaping and horticultural activities in connection with an existing struch1re.
C. Conflict. Where the conditions imposed by any provisions of this article are either more restr ictive or less
restrictive tha n comparable conditions imposed by any other applicable law, ordinance, resolution, rnle or
regulation of any kind, the regulations which are more restrictive and impose higher standards or requirements
shall govern.
§ 285-79. Review and appl'oval ofstormwate1· pollution prevention plans.
A. The Village of East Aurora shall designate an SMO, who shall accept and review all SWPPPs. The SMO may:
(1) Review the SWPPPs;
(2) Upon approval by the Village Board, engage the services of a registered professional engineer to review the
SWPPPs, specifications and related documents at a cost not to exceed a fee schedule established by the
Village Board ; or
(3) Accept the certification ofa licensed professional that the SWPPPs conform to the requirements of this
article.
B. For all land development activities subject to review and approval by the Planning Board or Village Board of the
Village of East Aurora under floodplain development permit or subdivision regulations, the applicant or developer
shall be required to submit a SWPPP that complies w ith the requirements in this article to the SMO, and the land
development activity shall be reviewed subject to the standards contained in this article. Within 45 days of receipt
ofa SWPPP, the SMO sha ll forward the SWPPP, together with his or her written recommendation to approve,
approve with modifications, or disapprove the SWPPP, to such agency or board of the Village of East Aurora
which may be reviewing the application for approval of a land development activity requiring subm ission of a
SWPPP. A recommendation of approval shall on ly be given if the SWPPP complies w ith the requ irements of this
6
41
Page 130
article. In making a recommendation to approve with modifications or disapprove the SWPPP, the SMO shall
state the reasons for the decision in writing. If the SMO recommends to approve with modifi cations or
disapprove the SWPPP, the applicant shall revise such SWPPP in accordance with the recommendations of the
SMO and shall submit the rev ised SWPPP to the SMO for review. The agency or board of the Village of East
Aurora reviewing the application for approval of a land development activity shall not approve such application
unless the SWPPP complies with the requirements of this article.
C. For all land development activities not subject to review by the Planning Board or Village Board of the Village of
East Aurora as stated in§ 285-79B of this chapter, the applicant or developer shall be required to submit a
SWPPP prepared in accordance with the standards contained in this article to the SMO. Within 45 days of receipt
ofa SWPPP, the SMO shall approve, approve with modifications, or disapprove the SWPPP. Approval shall only
be given if the SWPPP complies with the requirements of this a1ticle. In approving with modifications or
disapproving the SWPPP, the SMO sha ll state the reasons for the decision in writing. In order to be approved, an
applicant shall revise a SWPPP that has been approved with modifications or disapproved in accordance with the
recommendations of the SMO and shall submit the revised SWPPP to the SMO for review.
§ 285-80. Stormwater pollution prevention plans required; contents.
A. Stonnwater pollution prevention plan requirement. No application for approval of a land development activity
shall be reviewed until the SMO or such agency or board of the Village of East Aurora which may be reviewing
any application for approval of a land development activity requiring submission of a SWPPP has received a
SWPPP prepared in accordance with the specifications in this a1ticle.
B. Contents of storm water pollution prevention plans.
(1) All SWPPPs shall provide the following background information and erosion and sediment controls:
(a) Background information about the scope of the project, including the location, type and size of the
project;
(b) Site map/construction drawing(s) for the project, including a general location map. The site map should
be at a scale ofno smaller than one inch to JOO feet. At a minimum, the site map should show the total
site area; all improvements; areas of disturbance; areas that will not be distmbed; existing vegetation; on-
site and adjacent off-site surface water(s); wetlands and drainage patterns that could be affected by the
land development activity; existing and final slopes; locations of off-site material, waste, borrow or
equipment storage areas; and location(s) of the stormwater discharge(s);
(c) Description of the soil(s) present at the site;
(d) Construction phasing plan describing the intended sequence of construction activities, including c learing
and grubbing, excavation and grading, utility and infrastructme installation and any other activity at the
site that results in soil disturbance. Consistent with the Erosion Control Manual, not more than five
acres shall be disturbed at any one time unless pursuant to an approved SWPPP;
(e) Description of the pollution prevention measmes that will be used to control litter, construction
chemicals and construction debris from becoming a pollutant source in stormwater runoff;
(f) Description of construction and waste materials expected to be stored on site with updates as appropriate,
and a description of controls to reduce pollutants from these materials, including storage practices to
minimize exposure of the materials to stormwater, and spill prevention and response;
(g) Temporary and permanent structural and vegetative measmes to be used for soil stabilization, rnnoff
control and sediment control for each stage of the project, from initial land clearing and grubbing to
proj ect c lose-out;
7
42
Page 131
(h) A site map/construction drawing(s) specifying the location(s), size(s) and lengtb(s) of each erosion and
sediment control practice;
(i) Dimensions, material specifications and installation details for a ll erosion and sediment control practices,
including the siting and sizing of any temporary sediment basins;
(j) Temporary practices that will be converted to permanent control measures;
(k) Implementation schedule for staging temporary erosion and sediment control practices, including the
timing of initial placement and duration that each practice should remain in place;
(I) Maintenance schedule to ensure continuous and effective operation of the erosion and sediment control
practice;
(m) Name(s) of the receiving water(s);
(n) Delineation ofSWPPP implementation responsibilities for each part of the site;
(o) Description of structural practices designed to divert flows from exposed soils, store flows, or otherwise
limit runoff and the discharge of pollutants from exposed areas of the site to the degree attainable; and
(p) Any existing data that describes the stonnwater runoff at tile site.
(2) Land development activities meeting Condition A, B or C below shall also include water quantity and water
quality controls (postconstruction stormwater runoff controls) as set forth in § 285-808(3) of this chapter as
applicable:
(a) Condition A: Storm water runoff from land development activity discharging a pollu tant of concern to
either an impaired water identified on the Department's 3 03(d) list of impaired waters or a total maximum
daily load (TMDL) designated watershed for which pollutants in stormwater have been identified as a
source of the impairment.
(b) Condition B: Stormwater runoff from land development activity disturbing five or more acres.
(c) Condition C: Stormwater runoff from land development activity disturbing between one acres and five
acres of land during the course of the project, exclusive of the construction of single-family residences
and construction activities at agricultural properties.
(3) SWPPP requirements for Condition A, B or C (postconstruction stormwater runoff controls):
(a) All information in§ 285-808(1) of this chapter;
(b) Description of each postconstruction stormwater management practice;
(c) Site map/construction drawing(s) showing the specific location(s) and size(s) of each postconstruction
stonnwater management practice;
(d) Hydrologic and hydraulic analysis for a ll structural components of the stonnwater management system
for the applicable design storms;
(c) Comparison of postdevclopment stormwater runoff conditions w ith predevelopment conditions;
(f) Dimensions, material specifications and installation details for each postconstruction stormwater
management practice;
(g) Maintenance schedule to ensure continuous and effective operation of each postconstruction storm water
management practice;
(h) Maintenance easements to ensure access to all storm water management practices at the site for the
purpose of inspection and repair. Easements shall be recorded on the plan and shall remain in effect with
transfer of title to the property;
8
43
Page 132
(i) Inspection and maintenance agreement binding on all subsequent landowners served by the on-site
stormwater management measures in accordance with§ 285-82 of this chapter.
(4) The SWPPP shall be prepared by a landscape architect, certified professional or professional engineer and
must be signed by the professional preparing the plan, who shall certify that the design of all storm water
management practices meets the requirements in this article.
C. Other environmental permits. The applicant shall assure that all other applicable environmental permits have
been or will be acquired for the land development activity prior to approval of the final stormwater design
plan. Any notice of intent (NOi) submitted to the Department pursuant to the SPDES General Permit for
Construction Activities GP-02-0 I shall be submitted to the SMO concurrently therewith.
D. Contractor certification.
(I) Each contractor and subcontractor identified in the SWPPP who will be involved in soil disturbance
and/or stormwater management practice installation shall sign and date a copy of the following
certification statement before undertaking any land development activity: "I certify under penalty of law
that I understand and agree to comply with the terms and conditions of the Stormwater Pollution
Prevention Plan. I also understand that it is unlawful for any person to cause or contribute to a violation
of water quality standards."
(2) The ce1tification must include the name and title of the person providing the signature, address and
telephone number of the contracting firm; the address (or other identifyi ng description) of the site; and
the date the certification is made.
(3) The certification statement(s) shall be included with and become part of the SWPPP for the land
development activity.
E. A copy of the SWPPP shall be retained at the site of the land development activity during construction, from
the date of initiation of construction activities to the date of final stabilization.
§ 285-81. Performance a nd design criteria for stormwatcr management and erosion and sediment control.
All land development activities shall be subject to the following performance and design criteria:
A. Technical standards. For the purposes of this article, the following documents shall serve as the official guides
and specifications for stormwater management. Stormwater management practices that are designed and
constructed in accordance with these technical documents shall be presumed to meet the standards imposed by
this article:
(I) The Design Manual; and
(2) The Erosion Control Manual.
B. Equivalence to technical standards. Where stormwater management practices are not in accordance with
technical standards set fmih in§ 285-8 lA of this chapter, the applicant or developer must demonstrate
equivalence to such technica l standards.
C. Water quality standards. No land development activity shall cause an increase in turbidity that will result in
substantial visible contrast to natural conditions in surface waters of the State of New York.
§ 285-82. Maintenance, inspection and repair of stol'lnwater facilities.
A. Maintenance and inspection during construction.
(I) The applicant or developer of the land development activity or his or her representative shall at all times
properly operate and maintain all fac ilities and systems of treatment and control (and related appurtenances)
9
44
Page 133
which are installed or used by the applicant or developer to achieve compliance with the conditions of this
article. Sediment shall be removed from sediment traps or sediment ponds whenever their design capacity
has been reduced by 50%.
(2) For land development activities meeting Condition A, B or C in § 285-806(2) of this chapter, the applicant
shall have a qualified professional conduct site inspections and document the effectiveness of all erosion and
sediment control practices every seven days and within 24 hours of any storm event producing 0.5 inch of
precipitation or more. Inspection reports shall be maintained in a site log book.
B. Maintenance easement(s). Prior to the issuance of any approval that has a storm water management facility as one
of the requirements, the applicant or developer must execute a maintenance easement agreement that shall be
binding on all subsequent landowners served by the stonnwater management facility. The easement shall provide
for access to the facility at reasonable times for periodic inspection by the Village of East Aurora to ensure that
the facility is maintained in proper working condition to meet design standards and any other provisions
established by this article. The easement shall be recorded by the grantor in the office of the County Clerk after
approval by the counsel for the Village of East Aurora.
C. Maintenance after construction. The owner or operator of permanent stormwater management practices installed
in accordance with this article shall ensure they are operated and maintained to achieve the goals of this atiicle.
Proper operation and maintenance also includes, at a minimum, the following :
(1) A preventive/corrective maintenance program for all critical facilities and systems of treatment and control
(or related appmienances) which are installed or used by the owner or operator to achieve the goals of this
article.
(2) Written procedures for operation and maintenance and training new maintenance personnel.
(3) Discharges from the SMPs shall not exceed design criteria or cause or contribute to water quality standard
violations in accordance with § 285-81 of this chapter.
(4) Maintenance agreements. The Village of East Aurora shall approve a formal maintenance agreement for
storm water management facilities binding on all subsequent landowners and recorded in the office of the
County Clerk as a deed restriction on the prope1iy prior to final plan approval. The maintenance agreement
shall be consistent with the terms and conditions of Appendix A of this chapter, entitled "Sample Stormwater
Control Facility Maintenance Agreement." The Village of East Aurora, in lieu of a maintenance agreement, at
its sole discretion, may accept dedication of any existing or future storm water management facility, provided
such facility meets all the requirements of this article and includes adequate and perpetual access and
sufficient area, by easement or otherwise, for inspection and regular maintenance.
§ 285-83. Inspections; administration and enforcement; penalties for offenses.
A. Construction inspections.
(I) Erosion and sediment control inspection.
(a) The SMO may require such inspections as necessary to determine compliance with this article and may either
approve that portion of the work completed or notify the applicant wherein the work fails to comply with the
requirements of this article and the SW PPP as approved. To obtain inspections, the ap plicant shall notify the
SMO at least 48 hours before any of the following, as required by the SMO:
[ 1] Start of construction;
[2] Installation of sediment and erosion control measures;
[3] Completion of site clearing;
[4] Compl etion of rough grading;
10
45
Page 134
[5] Completion of final grading;
[6] Close of the construction season;
[7] Completion of final landscaping; or
[8] Successful establishment of landscaping in public areas.
(b) If any violations are found, the applicant and developer shall be notified in writing of the nature of the
violation and the required corrective actions. No further work shall be conducted, except for site stabil ization,
until any violations are corrected and all work previously completed has received approval by the SMO.
(2) Stonnwater management practice inspections. The SMO is responsible for conducting inspections of SMPs.
All applicants are required to submit "as-built" plans for any SMPs located on site after final constrnction is
completed, The plan must show the final design specifications for all stormwater management facilities and
must be certified by a professional engineer.
(3) Inspection of storm water facilities after project completion. Inspection programs shall be established on any
reasonable basis, including, but not limited to: routine inspections; random inspections; inspections based
upon complaints or other notice of possible violations; inspection of drainage basins or areas identified as
higher than typical sources of sediment or other contaminants or pollutants; inspections of businesses or
industries of a type associated with higher than usual discharges of contaminants or pollutants or with
discharges of a type which are more likely than the typical discharge to cause violations of state or federal
water or sediment quality standards or the SP DES stormwater permit; and j oint inspections with other
agencies inspecting under environmental or safety laws. Inspections may include, but are not limited to:
reviewing maintenance and repair records; sampling discharges, surface water, groundwater, and material or
water in drainage control facilities; and evaluating the condition of drainage control fac ilities and other
stormwater management practices.
(4) Submission ofreports. The SMO may require monitoring and reporting from entities subj ect to this atiicle as
are necessary to determine compliance with this article.
(5) Right-of-entry for inspection. When any new storm water management facility is installed on private property
or when any new connection is made between private property and the public stormwater system, the
landowner sha ll grant to the Village of East Aurora the right to enter the property at reasonable times and in a
reasonable manner for the purpose of inspection as specified in§ 285-83A(3) of this chapter.
B. Performance guarantees; recordkeeping.
( I) Constrnction completion guarantee. In order to ensure the full and faithfu l completion of all land
development activities related to compliance with all conditions set forth by the Village of East Aurora in its
approval ofthe SWPPP, the Village of East Aurora may require the applicant or developer to provide, prior to
construction, a performance bond, cash escrow, or irrevocable letter of credit from an appropriate financial or
surety institution which guarantees satisfactory completion of the project and names the V illage of East
Aurora as the beneficiary. The security shall be in an amount to be determined by the Village of East Aurora
based on submission of final design plans, with reference to actual construction and landscaping costs. The
performance guarantee shall remain in force until the surety is released from liability by the Village of East
Aurora, provided that such period shall not be less than one year from the date of final acceptance or such
other certification that the facility(ies) has (have) been constructed in accordance with the approved plans and
specifications and that a one-year inspection has been conducted and the faci lities have been fou nd to be
acceptable to Village of East Aurora. Per-annum interest on cash escrow deposits shall be reinvested in the
account until the surety is released from liability.
(2) Maintenance guarantee. Where stonnwater management and erosion and sediment control facilities are to be
operated and maintained by the developer or by a corporation that owns or manages a commercial or
industrial facility, the developer, prior to construction, may be required to provide the Village of East Aurora
11
46
Page 135
with an irrevocable letter of credit from an approved financial institution or surety to ensme proper operation
and maintenance of all stormwater management and erosion control facilities both during and after
construction, and until the facilities are removed from operation. If the developer or landowner fails to
properly operate and maintain storm water management and erosion and sediment control facilities, the
Village of East Aurora may draw upon the account to cover the costs of proper operation and maintenance,
including engineering and inspection costs.
(3) Recordkeeping. The Village of East Aurora may require entities subject to this article to maintain records
demonstrating compliance with this article.
C. Enforcement and penalties.
(1) Notice of violation. When the SMO determines that a land development activity is not being carried out in
accordance with the requirements of this article, it may issue a written notice of violation to the landowner.
The notice of violation shall contain:
(a) The name and address of the landowner, developer or applicant;
(b) The address, when available, or a description of the building, structure or land upon which the violation is
occurring;
(c) A statement specifying the nature of the violation;
(d) A description of the remedial measures necessaiy to bring the land development activity into compliance
with this article and a time schedule for the completion of such remedial action;
(e) A statement of the penalty or penalties that shall or may be assessed against the person to whom the
notice of violation is directed; and
(f) A statement that the determination of violation may be appealed to the Village by filing a written notice of
appeal within 15 days of service of the notice of violation.
(2) Stop-work orders. The SMO may issue a stop-work order for violations of this ai1icle. Persons receiving a
stop-work order shall be required to halt all land development activities, except those activities that address
the violations leading to the stop-work order. The stop-work order shall be in effect until the SMO confirms
that the land development activity is in compliance and the violation has been satisfactorily addressed. Failure
to address a stop-work order in a timely manner may result in civil, criminal, or monetary penalties in
accordance with the enforcement measures authorized in this ai1icle.
(3) Violations. Any land development activity that is commenced or is conducted contrnry to this article may be
restrained by injunction or otherwise abated in a manner provided by law.
(4) Pena lties. In addition to or as an a lternative to any penalty provided herein or by law, any person who
violates the provisions of this article shall be subject to penalties as set forth in § 286-65 of this chapter.
(5) Withholding of certificate of occupancy. If any building or land development activity is installed or
conducted in violation of this article, the SMO may prevent the occupancy of said building or land.
(6) Restoration of lands. Any violator may be required to restore land to its undisturbed condition. In the event
that restoration is not unde11aken within a reasonable time after notice, the Village of East Aurora may take
necessary corrective action, the cost of which shall become a lien upon the property until paid.
D. Fees for services. The Village of East Aurora may require any person unde11aking land development activities
regulated by this article to pay reasonable costs at prevailing rates for review of SWPPPs, inspections, or SMP
maintenance performed by the Village of East Aurora or performed by a third party for the Village of East
Aurora. The fee shall be set by the Village Board by resolution.
Section 4.
12
47
Page 136
Section 142-13 of Chapter 142, Flood Damage Prevention, of the Code of the Village of East Aurora is hereby
amended by adding the following subsection:
H. A storm water pollution prevention plan (SWPPP), if required for the proposed development under Article
XV, Stormwater Management, of Chapter 285, Zoning, of this Code, together with the recommendation of the
Stormwater Management Officer to approve, approve with modifications, or disapprove the SWPPP pursuant
to § 285-79B of this Code.
Section 5,
Section l42-14A of Chapter 142, Flood Damage Prevention, of the Code of the V illage of East Aurora is hereby
amended by adding the following subsection:
(5) If a stormwater pollution prevention plan (SWPPP) was submitted together with the development permit
application pursuant to § l 42-13H, determine that the SWPPP and proposed development meet the
performance and design criteria and standards in Article XV, Stormwater Management, of Chapter 285,
Zoning, of this Code.
Section 6.
Section 142-15A of Chapter 142, Flood Damage Prevention, of the Code of the Village of East Aurora is hereby
amended to read as follows:
A. Subdivision proposals. The following standards apply to all new subdivision proposals and other proposed
development in areas of special flood hazard (including proposals for manufactured home and recreational
vehicle parks and subdivisions):
(I) Proposals shall be consistent with the need to minimize flood damage;
(2) Public utilities and facilities such as sewer, gas, electrical and water systems shall be located and
constructed so as to minimize flood damage; and
(3) Adequate drainage shall be provided to reduce exposure to flood damage. Drainage facilities shall comply
with any stormwater pollution prevention plan submitted pmsuant to§ 142-13H of this chapter.
13
48
Page 137
Section 7.
Section 227-6D of Chapter 227, Subdivision of Land, of the Code of the Village of East Aurora, is hereby amended to
read as follows:
D. Separate documents.
(l) Draft of any protective covenants whereby the subdivider proposes to regulate land use in the subdivision
and to otherwise protect the proposed development.
(2) A storm water pollution prevention plan (SWPPP), if required for the proposed subdivision under Article
XV, Stormwater Management, of Chapter 285, Zoning, of this Code, together with the recommendation of the
Stormwater Management Officer to approve, approve w ith modifications, or disapprove the SWPPP pursuant
to § 285-798 of this Code. If a SWPPP is submitted together with a preliminary plat pursuant to this section,
such plat shall not be approved unless the SWPPP and plat meet the performance and design criteria and
standards in Article XV, Stonnwater Management, of Chapter 285, Zoning, of this Code.
Section 8.
Section 227- 14B of Chapter 227, Subdivision of Land, of the Code of the Village of East Aurora is hereby amended
to read as follows:
B. Separate documents.
( l) Agreements covering the improvement and maintenance of unceded public spaces and the conditions and
time limits, if any, applying to site reservations.
(2) A statement by the Village Attorney approving as to legal sufficiency all offers of cession, all covenants
governing the maintenance of unceded public open space and any action taken to establish or extend water
and/or sewer districts, and also approving the legal sufficiency of any bond or agreement offered in lieu of
the completion of required subdivision improvements.
(3) Protecting covenants in form for recording.
(4) A stormwater pollution prevention plan (SWPPP), if required for the proposed subdivision under A11ic le
XV, Stormwater Management, of Chapter 285, Zoning, of th is Code, together with the recommendation of
the Stonnwater Management Officer to approve, approve with modifications, or disapprove the SWPPP
pursuant to§ 285-79B of this Code. If a SW PPP is submitted together with a final plat pmsuant to this
section, such plat shall not be approved unless the SWPPP and plat meet the performance and design criteria
and standards in Article XV, Stormwater Management, of Chapter 285, Zoning, of this Code.
(5) Other requirements. Such other certificates, affidavits, endorsements or other agreements as may be required
by the V illage Board in the enforcement of these regulations. In special cases where there are potential
hazards of flooding or other hazards, the Village Board may require the services ofan independent e ngineer
or expe1t to recommend conditions under which the subdivision may be approved. The expense of such
engineer or expert shall be borne by the subdivider.
14
49
Page 138
Section 9.
Section 227-l 6A( 17) of Chapter 227, Subdivision of Land, is hereby amended by adding to read as follows:
(17) Except in accordance with an approved Stonnwater Pollution Prevention Plan, in order to facilitate drainage,
no street grade shall be less than 2% when possible, but in no event less than 1%.
Section 10.
Section 227-16A of Chapter 227, Subdivision of Land, is hereby amended to add the following subsection:
(18) Streets shall be designed in accordance with any stormwater pollution prevention plan submitted pursuant to
the requirements of this chapter.
Section 11.
Section 227-21 of Chapter 227, Subdivision of Land, is hereby amended to read as follows:
§ 227-21. Minot· subdivision application.
A. Any owner of a parcel of land applying for minor subdivision approval shall submit to the Village Board a
request for minor subdivision approval on a form provided by the Village of East Aurora. In addition thereto,
such owner shall submit a survey showing the following:
(1) Required setbacks.
(2) Existing water and sewer mains.
(3) Natural features.
(4) Existing and proposed improvements.
(5) Finished floor elevation of all structures.
(6) Drives, parking and all paved areas.
(7) Existing structures on adjoining properties.
(8) Direction of surface water runoff.
(9) All trees greater than four inches in diameter.
(I 0) Sewer and water service locations.
B. The provisions of the State Environmental Quality Review Act shall apply to minor subdivisions.
C. A stormwater pollution prevention plan (SWPPP), if required for the proposed subdivision under Article XV,
Stormwater Management, of Chapter 285, Zoning, of this Code, shall be submitted, together with the
recommendation of the Stormwater Management Officer to approve, approve with modifications, or
disapprove the SWPPP pursuant to§ 285-79B of this Code. If a SWPPP is submitted together with a minor
subdivision plat pursuant to this section, such plat shall not be approved unless the SWPPP and plat meet the
performance and design criteria and standards in Article XV, Stormwater Management, of Chapter 285,
Zoning, of this Code.
15
50
Page 139
D. The Village Board of Trustees shall review such request for minor subdivision approval and, after holding a
public hearing thereon, approve or disapprove of the same.
E . No building permit shall be issued for a parcel of land constituting a minor subdivision as defined herein
prior to the approval of such minor subdivision by the Village Board of Trustees as provided for herein.
Section 12.
Section 285-3 IB of Chapter 285, Zoning, of the Code of the Vi llage of East Aurora, is hereby amended by adding the
following subsection:
(3) Fewer spaces would reduce storm water runoff rates and volumes, soil erosion, and/or nonpoint source
pollution in accordance with Article XV, Stonnwater Management, of this chapter.
Section 13.
SEVERABILITY. If the provisions of any article, section, subsection, paragraph, subdivision or clause of this local
law shall be judged invalid by a court of competent jurisdiction, such order of judgment sha ll not affect or invalidate
the remainder of any article, section, subsection, paragraph, subdivision or clause of this local law.
Section 14.
EFFECTIVE DATE. This local law shall be effective on the first day after it shall have been filed with the Office of
the Secretary of State pursuant to Section 27 of the New York State Municipal Home Rule Law and Section 7-706 of
the Village Law.
16
51
Page 140
I, Maureen Jerackas, Village Clerk-Treasurer of the Village of East Aurora, Erie County, New
York, do hereby certify that the attached motion is a true copy of the original motions adopted by the
Village Board of the Village of East Aurora, at a meeting of the said Board held on the 26th day of
November 2007.
IN WITNESS WHEREOF, I have hereunto set my hand and seal of the Village of East Aurora,
New York, this 26th day of September 2024.
52
Page 141
20071126
Motion for Local Law # 12 of 2007
On a motion by Trustee McDonnell, seconded by Trustee Scheer to Approve, a
LOCAL LAW amending Chapter 205, Sewers, of the Code of the Village of East
Aurora, in relation to the prohibition of illicit discharges, activities, and
connections to the municipal separate storm sewer system was passed with all
Trustees voting in favor.
53
Page 142
VILLAGE OF EAST AURORA
LOCAL LAW NO. 12-2007
BE IT ENACTED BY THE BOARD OF TRUSTEES OF THE VILLAGE OF EAST AURORA AS
FOLLOWS:
A LOCAL LAW amending Chapter 205, Sewers, of the Code of the Village of East Aurora, in relation to
the prohibition of illicit discharges, activities, and connections to the municipal separate storm sewer
system.
Section 1.
LEGISLATIVE INTENT. The purpose of this local law is to provide for the health, safety, and general
welfare of the citizens of the Village of East Aurora through the regulation of non-stormwater discharges to
the municipal separate storm sewer system to the maximum extent practicable as required by federal and
state law. This local law establishes methods for controlling the introduction of pollutants into the
Municipal Separate Storm Sewer System in order to comply with the requirements of the State Pollutant
Discharge Elimination System (SPDES) General Permit for Municipal Separate Storm Sewer Systems
(MS4s). In addition, this local law establishes the legal authority to carry out all inspection, smveillance
and monitoring procedmes necessaiy to ensure compliance with this local law.
Section 2.
Chapter 205, Sewers, of the Code of the Village of East Aurora, is hereby amended by adding the following
definitions to Section 205-lA:
303(d) LIST - A list of all surface waters in the state for which beneficial uses of the water (drinking,
recreation, aquatic habitat, and industrial use) are impaired by pollutants, prepared periodically by
NYSDEC as required by Section 303(d) of the Clean Water Act. 303(d) listed waters are estuaries,
lakes and streams that fall short of state surface water quality standards and are not expected to
improve within the next two years.
BEST MANAGEMENT PRACTICES (BMPs) - Schedules of activities, prohibitions of practices,
general good housekeeping practices, pollution prevention and educational practices, maintenance
procedmes, and other management practices to prevent or reduce the discharge of pollutants directly
or indirectly to storm water, receiving waters, or stormwater conveyance systems. BMPs also include
treatment practices, operating procedures, and practices to control site rnnoff, spillage or leaks, sludge
or water disposal, or drainage from raw materials storage.
CLEAN WATER ACT - The Federal Water Pollution Control Act (33 U.S.C. § 1251 et seq.), and
any subsequent amendments thereto.
CONSTRUCTION ACTIVITY - Any activity requiring authorization under the SPDES permit for
stonnwater discharges from construction activity, GP-02-01, as amended or revised, including
construction projects resulting in land disturbance of one or more acres. Constrnction activities
include but are not limited to clearing and grubbing, grading, excavating, and demolition.
Page 1 of 10
54
Page 143
HAZARDOUS MATERIALS - Any material, including any substance, waste, or combination
thereof, which because of its quantity, concentration, or physical, chemical, or infectious
characteristics may cause, or significantly contribute to, a substantial present or potential hazard to
human health, safety, property, or the environment when improperly treated, stored, transported,
disposed of, or otherwise managed.
ILLICIT CONNECTION -Any drain or conveyance, whether on the surface or subsmface, which
allows an illegal discharge to enter the MS4, including, but not limited to:
(I) Any conveyance which allows any nonstormwater discharge including treated or untreated
sewage, process wastewater, and wash water to enter the MS4 and any connection to the storm
sewer system from indoor drains and sinks, regardless of whether said drain or connection had
been previously allowed, permitted, or approved by an authorized enforcement agency; or
(2) Any drain or conveyance connected from a commercial or industrial land use to the MS4 which
has not been documented in plans, maps, or equivalent records and approved by an authorized
enforcement agency.
ILLICIT DISCHARGE -Any direct or indirect 11011-stormwater discharge to the MS4, except as
exempted in§ 205-57 of this article.
INDUSTRIAL ACTIVITY -Activities requiring the SPDES permit for discharges from industrial
activities except construction, GP-98-03, as amended or revised.
MS4 - Municipal separate storm sewer system.
MUNICIPAL SEPARATE STORM SEWER SYSTEM - A conveyance or system of conveyances
(including roads with drainage systems, municipal streets, catch basins, curbs, gutters, ditches, man-
made channels, or storm sewers):
(1) Owned or operated by the Village of East Aurora;
(2) Designed or used for collecting or conveying stormwater;
(3) Which is not a combined sewer; and
(4) Which is not part of a publicly owned treatment works (POTW) as defined at 40 CFR 122.2.
NONSTORMWATER DISCHARGE - Any discharge to the MS4 that is not composed entirely of
stormwater.
POLLUTANT - Dredged spoil, filter backwash, solid waste, incinerator residue, treated or untreated
sewage, garbage, sewage sludge, munitions, chemical wastes, biological materials, radioactive
materials, heat, wrecked or discarded equipment, rock, sand and industrial, municipal, and agricultural
waste and ballast discharged into water, any of which may cause or might reasonably be expected to
cause pollution of the waters of the state in contravention of water quality standards.
PREMISES - Any building, lot, parcel of land, or pmiion of land, whether improved or unimproved,
including adj acent sidewalks and parking strips.
SPECIAL CONDITIONS -
(I) Discharge compliance with water quality standards. The condition that applies where the
Pag e 2 of 10
55
Page 144
Village has been notified that the discharge of stormwater authorized under its MS4 permit may
have caused or has the reasonable potential to cause or contribute to the violation of an applicable
water quality standard. Under this condition, the Village must take all necessary actions to ensure
future discharges do not cause or contribute to a violation of water quality standards.
(2) 303(d) listed waters. The condition in the Village's MS4 permit that applies where the MS4
discharges to a 303(d) listed water. Under this condition, the stonnwater management program
must ensure no increase of the listed pollutant of concern to the 303(d) listed water.
(3) Total maximum daily load (TMDL) strategy. The condition in the Village's MS4 permit where a
TMDL including requirements for control of storm water discharges has been approved by the
EPA for a water body or watershed into which the MS4 discharges. If the discharge from the MS4
did not meet the TMDL stormwater allocations prior to September 10, 2003, the Village was
required to modify its stonnwater management program to ensure that reduction of the pollutant of
concern specified in the TMDL is achieved.
(4) The condition in the Village's MS4 permit that applies if a TMDL is approved in the future by the
EPA for any water body or watershed into which an MS4 discharges. Under this condition, the
Village must review the applicable TMDL to see ifit includes requirements for control of
stonnwater discharges. If an MS4 is not meeting the TMDL stonnwater allocations, the Village
must, within six months of the TMDL's approval, modify its stormwater management program to
ensure that reduction of the pollutant of concern specified in the TMDL is achieved.
STATE POLLUTANT DISCHARGE ELIMINATION SYSTEM (SPDES) STORMWATER
DISCHARGE PERMIT- A permit issued by NYSDEC that authorizes the discharge of pollutants to
waters of the state.
STORM WATER - Rainwater, surface runoff, snowmelt and drainage.
STORMWATER MANAGEMENT OFFICER (SMO) -An employee or officer designated by the
Village of East Aurora to enforce the illicit discharge provisions of this chapter [Editor's Note: or "Article
XI, Storm Sewers, of this chapter."). The SMO shall, within the time prescribed by law, obtain such basic
training, in-service training, advanced in-service training and other training as the State of New York
shall require for code enforcement personnel.
TMDL - Total maximum daily load.
TOTAL MAX1MUM DAILY LOAD - The maximum amount of a pollutant to be allowed to be
released into a water body so as not to impair uses of the water, allocated among the sources of that
pollutant.
WASTEWATER- Water that is not stonnwater, is contaminated with pollutants and has been or will
be discarded.
Page 3 of 10
56
Page 145
Section 3.
Chapter 205, Sewers, of the Code of the Village of East Aurora, is hereby amended by adding a new Article
XI, entitled Storm Sewers, to read as follows:
ARTICLE XI Storm Sewers
§ 205-55. Purpose and intent.
The purpose of this article is to provide for the health, safety , and general welfare of the citizens of the Village
of East Aurora through the regulation of nonstormwater discharges to the MS4 to the maximum extent
practicable as required by federal and state law. This article establishes methods for controlling the
introduction of pollutants into the MS4 in order to comply with the requirements of the SPDES General Permit
for MS4s. The objectives of this article are:
A. To meet the requirements of the SPDES General Permit for Stormwater Discharges from MS4s, Permit
No. GP-02-02 or as amended or revised;
B. To regulate the contribution of pollutants to the MS4 since such systems are not designed to accept,
process or discharge nonstormwater wastes;
C. To prohibit illicit connections, activities and discharges to the MS4;
D. To establish legal authority to carry out all inspection, smveillance a nd monitoring procedures
necessary to ensure compliance with this article; and
E. To promote public awareness of the hazards involved in the improper discharge of trash, yard waste,
lawn chemicals, pet waste, wastewater, grease, oil, petroleum products, cleaning products, paint
products, hazardous waste, sediment and other pollutants into the MS4.
§ 205-56. Applicability; administration; conflict with other pl'Ovisions.
A. Applicability. This article shall apply to all water entering the MS4 generated on any developed or
undeveloped lands unless explicitly exempted by an authorized enforcement agency.
B. Responsibility for administration. The SMO shall administer, implement, and enforce the provisions of
this article. Such powers granted or duties imposed upon the authorized enforcement official may be
delegated in writing by the SMO as may be authorized by the Vi llage.
C. Conflict. Where the conditions imposed by any provisions of this article are either more restrictive or less
restrictive than comparable cond itions imposed by any other applicable law, ordinance, resolution, ru le or
regulation of any kind, the regulations which are more restrictive and impose higher standards or
requirements shall govern.
§ 205-57, Discharge prohibitions; exceptions.
A. Prohibition of illegal discharges. No person shall discharge or cause to be discharged into the MS4 any
materials other than storm water except as provided below. The commencement, conduct or continuance of
any illegal discharge to the MS4 is prohibited except as described as follows:
Page 4 of 10
57
Page 146
(I) The following discharges are exempt from discharge prohibitions established by this article, unless
NYSDEC or the Village has determined them to be substantial contributors of pollutants: water line
flushing or other potable water sources, landscape irrigation or lawn watering, existing diverted stream
flows, rising groundwater, uncontaminated groundwater infiltration to storm sewers, uncontaminated
pumped groundwater, foundation or footing drains, crawl space or basement sump pumps, air-
conditioning condensate, irrigation water, springs, water from individual residential car washing,
natural riparian habitat or wetland flows, dechlorinated swimming pool discharges, residential street
wash water, water from fire-fighting activities, and any other water source not containing pollutants.
Such exempt discharges shall be made in accordance with an appropriate plan for reducing pollutants.
(2) Discharges approved in writing by the SMO to protect life or property from imminent harm or damage
are permitted, provided that such approval shall not be construed to constitute compliance with other
applicable laws and requirements, and further provided that such discharges may be permitted for a
specified time period and under such conditions as the SMO may deem appropriate to protect such life
and properly while reasonably maintaining the purpose and intent of this article.
(3) Dye testing in compliance with applicable state and local laws is an allowable discharge, but requires a
verbal notification to the SMO prior to the time of the test.
(4) T he prohibition of illegal discharges shall not apply to any discharge permitted under an SPDES
permit, waiver, or waste discharge order issued to the discharger and administered under the author ity
ofNYSDEC, provided that the discharger is in full compliance with all requirements of the permit,
waiver, or order and other applicable laws and regulations, and provided that written approval has been
granted for any discharge to the MS4.
B. Prohibition of illicit connections.
(I) The construction, use, maintenance or continued existence of illicit connections to the MS4 is
prohibited.
(2) This prohibition expressly includes, without limitation, illicit connections made in the past, regardless
of whether the connection was permissible under law or practices applicable or prevailing at the time
of connection.
(3) A person is considered to be in violation of this atticle if the person connects a line conveying sewage
to the MS4, or allows such a connection to continue.
§ 205-58. Pl'Obibition against activities contaminating stonnwater.
A. Activites contaminating stormwater are prohibited. Activities that are subject to the requirements of this
section are those types of activities that:
(I) Cause or contribute to a violation of the Village's MS4 SPDES stormwater discharge permit; or
(2) Cause or contribute to the Village being subject to a special condition.
B. Such activities include improper management of pet waste or any other activity that causes or contributes to
violations of the Village's MS4 SPDES permit authorization.
C. Upon notification to a person that he or she is engaged in activities that cause or contribute to violations of
Page 5 of JO
58
Page 147
the Village's MS4 SPDES stormwater discharge permit authorization, that person shall take all reasonable
actions to correct such activities such that he or she no longer causes or contributes to violations of the
Village's MS4 SPDES stormwater discharge permit authorization.
§ 205-59. Use of best management practices to prevent, control and reduce stormwater pollutants.
Where the SMO has identified illicit discharges or an activity contaminating stonnwater, as defined in § 205-
58 of this article, the Village may require implementation of BMPs to control those illicit discharges and
activities.
A. The owner or operator of a commercial or industrial establishment shall provide, at its own expense,
reasonable protection from accidental discharge of prohibited materials or other wastes into the MS4
through the use of structural and nonstructural BMPs.
B. Any person responsible for a property or premises which is, or may be, the source of an illicit
discharge, or an activity contaminating stormwater, as defined in§ 205-58 of this article, may be
required to implement, at said person's expense, additional strnctmal and nonstructural BMPs to
reduce or eliminate the source ofpo!lutant(s) to the MS4.
C. Compliance with all terms and conditions ofa valid SPDES permit authorizing the discharge of
stormwater associated with industrial activity, to the extent practicable, shall be deemed compliance
with the provisions of this article.
§ 205-60. lnclustl'ial or constrnction activity discharges.
Any person subject to an industrial or constrnction activity SPDES stormwater discharge permit shall comply
with all provisions of such permit, Proof of compliance with said permit may be required in a form acceptable
to the Village prior to the allowing of discharges to the MS4.
§ 205-61. Suspension of access to MS4.
A. Illicit discharges in emergency situations. The SMO may, without prior notice, suspend MS4 discharge
access to a person when such suspension is necessary to stop an actual or threatened discharge which
presents or may present imminent and substantial danger to the environment, to the health or welfare of
people, or to the MS4. The SMO shall notify the person of the reasons for the suspension, in writing,
within a reasonable time thereafter . If the violator fails to comply with a suspension order issued in an
emergency, the SMO may take such steps as deemed necessary to prevent or minimize damage to the MS4
or to minimize danger to people.
B. Suspension due to the detection of illicit discharge. Any person discharging to the MS4 in violation of this
article may have his or her MS4 access terminated if such termination would abate or reduce an illicit
discharge. The SMO will notify a violator in writing of the proposed termination of its MS4 access and the
reasons therefor. The violator may petition the SMO for a reconsideration and hearing. Access may be
granted by the SMO if he/she finds that the illicit discharge has ceased and the discharger has taken steps
to prevent its recurrence. Access may be denied if the SMO determines in writing that the illicit discharge
has not ceased or is likely to reoccur. A person commits an offense if the person reinstates MS4 access to
the premises terminated pursuant to this article, without the prior approval of the SMO.
§ 205-62. Access to facilities; monitol'ing of discha1·ges.
Pa ge 6 of 10
59
Page 148
A. Applicability. This section applies to all facilities that the SMO must inspect to enforce any provision of
this article, or whenever the authorized enforcement agency has cause to believe that there exists, or
potentially exists, in or upon any premises any eondition whieh eonstitutes a violation ofthis article.
B. Access to facilities.
(I) The SMO shall be permitted to enter and inspect facilities subject to regulation under this article as
often as may be necessary to detenn ine compliance with this article. If a discharger has security
measures in force which require proper identification and clearance before entry into its premises, the
discharger shall make the necessary arrangements to allow access to the SMO.
(2) Facility operators shall allow the SMO ready access to all parts of the premises for the purposes of
inspection, sampling, examination and copying of records as may be required to implement this article.
(3) The Village shall have the right to set up on any facility subject to this aiiicle such devices as are
necessary, in the opinion of the SMO, to conduct monitoring and/or sampling of the facility 's
stormwater discharge.
(4) The Village has the right to require the facilities subject to this miicle to install monitoring equipment
as is reasonably necessary to determine compliance with this article. The facility's sampling and
monitoring equipment shall be maintained at all times in a safe and proper operating condition by the
discharger at its own expense. All devices used to measme stormwater flow and quality shall be
calibrated to ensure their accuracy.
(5) An unreasonable delay in allowing the SMO access to a facility subject to this article is a violation of
this article. A person who is the operator of a facility subject to this a1ticle commits an offense if the
person denies the SMO reasonable access to the facility for the purpose of conducting any activity
authorized or required by this article.
(6) lfthe SMO has been refused access to any part of the premises from which stormwater is discharged,
and he/she is able to demonstrate probable cause to believe that there may be a violation of this article,
or that there is a need to inspect and/or sample as pati of a routine inspection and sampling program
designed to verify compliance with this article or any order issued hereunder, then the SMO may seek
issuance of a search warrant from any court of competent jurisdiction.
§ 205-63. Notification of spills.
Notwithstanding other requirements of law, as soon as any person responsible for a facility or operation, or
responsible for emergency response for a facility or operation, has information of any known or suspected
release of materials which is resulting or may result in illegal discharges or pollutants discharging into the
MS4, said person shall take all necessary steps to ensure the discovery, containment, and cleanup of such
release. In the event of such a release of hazardous materials, said person sha ll immediately notify emergency
response agencies of the occurrence via emergency dispatch services. In the event of a release of nonhazardous
materials, said person shall notify the Village in person or by telephone or facsimile no later than the next
business day. Notifications in person or by telephone sha ll be confirmed by written notice addressed and
mailed to the Village within three business days of the telephone notice. If the discharge of prohibited
materials emanates from a commercial or industrial establishment, the owner or operator of such establishment
shall also retain an on-site written record of the discharge and the actions taken to prevent its recurrence. Such
records shall be retained for at least three years.
§ 205-64. Enforcement; penalties for offenses.
Page 7 of JO
60
Page 149
A. Notice of violation.
(1) When the SMO finds that a person has violated a prohibition or failed to meet a requirement of this article,
he or she may order compliance by written notice of violation to the
responsible person. Such notice may require, without limitation:
(a) The elimination of illicit connections or discharges;
(b) That violating discharges, practices, or operations shall cease and desist;
(c) The abatement or remediation ofstormwater pollution or contamination hazards and the restoration of
any affected property;
(d) The performance of monitoring, analyses, and reporting;
(e) Payment of a fine; and
(t) The implementation of somce control or treatment BMPs.
(2) If abatement of a violation and/or restoration of affected property is required, the notice shall set forth a
deadline within which such remediation or restoration must be completed. Said notice shall further advise
that, should the violator fail to remediate or restore before the established deadline, the work will be done
by a designated governmental agency or a contractor and the expense thereof shall be charged to the
violator.
B. Penalties. In addition to or as an alternative to any penalty provided herein or by law, any person who
violates the provisions of this article shall be guilty ofa violation punishable by a fine not exceeding $350
or imprisonment for a period not to exceed six months, or both, for conviction of a first offense; for
conviction of a second offense, both of which were committed within a period of five years, punishable by
a fine not less than $350 nor more than $700 or imprisonment for a period not to exceed six months, or
both; and upon conviction for a third or subsequent offense, all of which were committed within a period
of five years, punishable by a fine not less than $700 nor more than $ 1,000 or imprisonment for a period
not to exceed six months, or both. However, for the purposes of conferring jurisdiction upon courts and
judicial officers generally, violations of this article shall be deemed misdemeanors, and for such purpose
only all provisions oflaw relating to misdemeanors shall apply to such violations. Each week's continued
violation shall constitute a separate additional violation.
§ 205-65. Appeal of notice of violation.
Any person receiving a notice of violation may appeal the determination of the SMO to the Village Board
within 15 days of its issuance, which Board shall heat· the appeal within 30 days after the filing of the appeal,
and, within five days of making its decision, file its decision in the office of the Village Clerk and mail a copy
of its decision by ce1iified mail to the discharger.
§ 205-66. Conectivc measu!'es aftel' appeal.
A. If the violation has not been corrected pursuant to the requirements set forth in the notice of violation, or, in
the event of an appeal, within five business days of the decision of the Village Board upholding the
decision of the SMO, then the SMO shall request the owner's permission for access to the subject private
property to take any and all measures reasonably necessaty to abate the violation and/or restore the
Page 8 of 10
61
Page 150
property.
B. If refused access to the subject private property, the SMO may seek a warrant in a court of competent
jurisdiction to be authorized to enter upon the property to determine whether a violation has occurred.
Upon determination that a violation has occurred, the SMO may seek a court order to take any and all
measures reasonably necessary to abate the violation and/or restore the property. The cost of implementing
and maintaining such measures shall be the sole responsibility ofthe discharger.
§ 205-67. Injunctive relief.
It shall be unlawful for any person to violate any provision or fail to comply with any of the requirements of
this article. If a person has violated or continues to violate the provisions of this article, the SMO may petition
for a preliminary or permanent injunction restraining the person from activities which would create further
violations or compelling the person to perform abatement or remediation of the violation.
§ 205-68. Alternative remedies,
A. Where a person has violated a provision of this article, he/she may be given alternative remedies in lieu of
a civil penalty, upon recommendation of the Village Attorney and concurrence of the SMO, where:
( 1) The violation was unintentional;
(2) The violator has no hist01y of previous violations of this chapter;
(3) Environmental damage was minimal;
(4) The violator acted quickly to remedy violation; and/or
(5) The violator cooperated in investigation and resolution.
B. Alternative remedies may consist of one or more of the following:
(I) Attendance at compliance workshops;
(2) Storm sewer stenciling or storm sewer marking; and/or
(3) River, stream, or creek cleanup activities.
§ 205-69. Violations deemed public nuisance.
In addition to the enforcement processes and penalties provided, any condition caused or permitted to exist in
violation of any of the provisions of this article is a threat to public health, safety, and welfare, and is declared
and deemed a nuisance, and may be summarily abated or restored at the violator's expense, and/or a civil
action to abate, e11ioin, or otherwise compel the cessation of such nuisance may be taken.
§ 205-70. Remedies not exclusive.
The remedies listed in this article are not exclusive of any other remedies available under any appl icable
federal, state or local law and it is within the discretion of the authorized enforcement agency to seek
cumulative remedies.
Page 9 of IO
62
Page 151
Section 4.
Section 205-23 of Chapter 205, Sewers, of the Code of the Village of East Aurora, is hereby amended to read
as follows:
§ 205-23. Permitted discharge of stormwater and other unpolluted waters; prohibited d ischarge of
materials other than stormwater. (Amended 7-15-1985 by L.L. No. 22-1985)
A. Stonnwater and all other unpolluted drainage shall be discharged to such sewers as are specifically
designated as storm sewers or to a natural outlet approved by the Village. Industrial cooling waters or
unpolluted process waters may be discharged, on approval of the Village, to a storm sewer or natural
outlet.
B. Notwithstanding any other provisions of this chapter, no materials other than stonnwater or water
containing no pollutants shall be discharged into the storm sewers except as provided in Article XI of
this chapter.
Section 205-4 1 of Chapter 205, Sewers, of the Code of the Village of East Aurora, is hereby amended to read
as follows:
§ 205-41. Penalties for offenses.
Except as provided in Article XI,§ 205-64, any person violating any of the provisions of this chapter shall be
guilty of a misdemeanor and shall be punished, upon conviction, by a fine of not less than $500 nor more than
$1,000 for each violation. Each day that a violation of or fa ilure to comply with any provision of this
enactment or any regulation promulgated hereunder by the Board of Trustees occurs, shall constitute a separate
and distinct misdemeanor.
Section 5.
SEVERABILITY. The provisions of this local law are hereby declared to be severable. Jfany provision,
clause, sentence, or paragraph of this local law or the application thereof to any person, establishment, or
circumstances shall be held invalid, such invalidity shall not affect the other provisions or application of this
local law.
Section 6.
EFFECTIVE DATE. This local law shall be effective immediately upon filing with the Office of the New
York Secreta1y of State, in accordance with Section 27 of the New York State Municipal Home Rule Law.
Page 10 of 10
63
Page 152
Enforcement Response Plan Appendix O
The Enforcement Response Plan (ERP) describes the action(s) to be taken for violations
pertaining to MCM 3: Illicit Discharge Detection and Elimination, MCM 4: Construction Site
Stormwater Runoff Control, and MCM 5: Post-Construction Stormwater. The ERP provides a
protocol to address repeat and continuing violations through progressively stricter responses
(i.e., escalation of enforcement) as needed to achieve compliance with the terms and
conditions of the MS4 General Permit (GP-0-24-001) and/or Construction General Permit (GP-
0-20-001). Enforcement responses are based on the type, magnitude, and duration of the
violation, effect of the violation on the receiving water, compliance history of the violator(s),
and good faith of the violator(s) in compliance efforts. See subsequent pages for specific illicit
discharge, construction, and post-construction stormwater management practice enforcement
responses.
Efforts to obtain a voluntary correction of deficiencies through informal enforcement, such as
verbal warnings or written notices, must not exceed sixty (60) days in duration from the time of
initial determination of the violation(s) until a return to compliance.
The Village of East Aurora will use the following types of enforcement responses or
combination of responses for illicit discharge, construction, and post-construction
stormwater management practice violations per Village of East Aurora Code Chapter 220-12:
Village of East Aurora, NY Stormwater Management (ecode360.com)
Customize: you must describe/explain process for all listed below and include the title and
department of the person(s) responsible for each enforcement response listed below.
i. Verbal warnings; given directly to contractor/job foreman on site,
property owner, or operator with description of violation and instructions
on remedy, timeframe in which it is to be completed
ii. Written notices; When the SMO determines that a land development
activity is not being carried out in accordance with the requirements , it
may issue a written notice of violation to the landowner.
iii. Citations (and associated fines);
iv. Stop work orders; The SMO may issue a stop-work order for
violations. Persons receiving a stop-work order shall be required to
halt all land development activities, except those activities that
address the violations leading to the stop-work order. The stop-work
order shall be in effect until the SMO confirms that the land
development activity is in compliance and the violation has been
satisfactorily addressed. Failure to address a stop-work order in a
timely manner may result in civil, criminal, or monetary penalties in
accordance with the enforcement measures
v. Withholding of plan approvals or other authorizations affecting the
ability to discharge to the MS4; If any building or land development
64
Page 153
activity is installed or conducted in violation of this chapter, the SMO
may prevent the occupancy of said building or land.
vi. Additional measures, supported in local legal authorities, such as
collecting against the project’s bond or directly billing the responsible
party to pay for work and materials to correct violations.
Enforcement Tracking
The Village of East Aurora documents instances of non-compliance in this SWMP Plan. The
enforcement case documentation includes, at a minimum, the following:
a. Name of the owner/operator of the facility or site of the violation (can be
redacted from the publicly available SWMP Plan);
b. Location of the stormwater source (e.g., construction project);
c. Description of the violation;
d. Schedule for returning to compliance;
e. Description of enforcement response used, including escalated responses if
repeat violations occur or violations are not resolved in a timely manner;
f. Accompanying documentation of enforcement response (e.g., notices of
noncompliance, notices of violations);
g. Any referrals to different departments or agencies; and
h. Date violation was resolved.
All documentation pertaining to Enforcement Response is considered part of tis SWMP Plan
and is available upon request: contact Stormwater Program Coordinator or Stormwater
Management Officer listed on page 2 of this document (Internally: C:\Users\Water
Foreman\Documents\Storm Water\Enforcement Response
65
Page 154
Enforcement Response Plan: Illicit Discharge Detection and Elimination
Violation Issue Minimum Response
Unauthorized discharge to MS4 i) Any direct or indirect non-stormwater discharge to i) Warning letter with schedule for
the MS4 correction/imlementation of BMPs (NOV Optional)
Enforcement Response Plan:
ii) Failure to eliminate discharge/cease practice or ii) NOV
implement BMPs in accordance with schedule:
violation continued for 30 or more days after notice
iii) Failure to eliminate discharge/cease practoice or iii) Formal Enforcement/Fines
implement BMPs in accordance with schedule:
Illicit Discharge Detection and Elimination
violation continued for 60 or more days after notice
Unauthorized/Illicit Connection to MS4 i) Any drain or conveyance, whether on the surface or i) Warning letter with schedule for
subsurface, which allows an illegal discharge to enter correction/imlementation of BMPs (NOV Optional)
the MS4
ii) Failure to eliminate illicit connection to the MS4 in ii) NOV
accordance with schedule: violation continued for 30
or more days after notice
iii) Failure to eliminate illicit connection to the MS4 in iii) Formal Enforcement/Fines
accordance with schedule: violation continued for 60
or more days after notice
Appendix O (continued)
66
Page 155
Enforcement Response Plan: Appendix O (continued)
Construction General Permit
Enforcement Response Plan: Construction General Permit
Violation Issue Minimum Response
Failure to obtain coverage under the i) One or more acres of disturbed area i) Notice of Violation
Construction General Permit WITH appropriate
erosion & sediment control practices ii) One or more acres of disturbed area - violation ii) Cease and Desist
continued for 30 or more days after discovery
iii) One or more acres of disturbed area - violation iii) Formal Enforcement/Fines
continued for 60 or more days after discovery
Failure to obtain coverage under the i) One up to five acres of disturbed area i) Notice of Violation
Construction General Permit and WITHOUT or
MINIMAL erosion & sediment control practices ii) One up to five acres of disturbed area - violation ii) Cease and Desist
continued for 15 or more days, after discovery
iii) One up to five acres of disturbed area - iii) Formal Enforcement/Fines
violation continued for 30 or more days after
discovery
iv) Five or more acres iv) Cease and Desist
v) Five or more acres - violation continued for 30 or v) Formal Enforcement/Fines
more days after discovery
Has coverage under the Construction General i) One up to five acres of disturbed area i) Warning letter with schedule for
Permit and has significant violations of permit correctve action(s) (NOV Optional)
ii) Failure to correct deficiencies in accordance ii) NOV and/or Stop Work Order
with schedule: One up to five acres of disturbed
area
iii) Five or more acres iii) NOV and/or Stop Work Order
Failure to meet significant permit requirements. i) Unsatisfactory compliance inspection i) Warning letter with Inspection report
Including, but not limited to: listing deficiencies and schedule for
correctve action(s)
- lack of or a substantially inadequate SWPPP; ii) Failure to correct deficiencies in accordance
with schedule ii) NOV and/or Stop Work Order
- failure to implement or maintain BMPs;
iii) Duration of noncompliance is longer than 60
- failure to perform required inspections days. iii) Formal Enforcement/Fines
67
Page 156
Enforcement Response Plan: Post-Construction Stormwater Management Practice Inspection & Maintenance
-
Violation Issue Minimum Response
Failure to perform required inspections and/or i) No SMP inspection report submitted i) Warning letter with schedule for correction (NOV
Maintenance
submit inspection report. Optional)
NYS DEC Stormwater Management Practices ii) No inspection report submitted - violation ii) NOV
Inspection Checklists 2017: continued for 30 or more days after notice
https://www.dec.ny.gov/docs/water_pdf/smpin
spchklist.pdf iii) No inspection report submitted - violation iii) Formal Enforcement/Fines
continued for 60 or more days after notice
Enforcement Response Plan:
Failure to perform required maintenance as i) SMP maintenance not performed i) Warning letter with schedule for correction (NOV
called for in the Maintenance Agreement Optional)
associated with the post-construction
stormwater management practice(s); or, in the ii) Maintenance not performed - violation ii) NOV
absence of a formal Maintenance Agreement, continued for 30 or more days after notice
NYS DEC Maintenance Guidance for
Stormwater Management Practices 2017: iii) Maintenance not performed - violation iii) Formal Enforcement/Fines
https://extapps.dec.ny.gov/docs/water_pdf/sm continued for 60 or more days after notice
pmaintguidance.pdf
Failure to address deficiencies, corrective i) Failure to correct SMP deficiencies i) Warning letter with schedule for correction (NOV
actions, or further investigation (if Optional)
recommended in inspection report)
ii) Failure to correct deficiencies in accordance ii) NOV
with schedule: violation continued for 30 or more
days after notice
Post-Construction Stormwater Management Practice Inspection &
iii) Failure to correct deficiencies in accordance iii) Formal Enforcement/Fines
with schedule: violation continued for 60 or more
days after notice
Appendix O (continued)
68
Page 157
VILLAGE OF EAST AURORA
VILLAGE BOARD MEETING
April 20, 2026 – 7:00 PM
Present:
Trustee Lazickas
Trustee Cameron
Trustee Kamp
Trustee Rabey
Trustee Root
Mayor Wochensky
Also Present:
Maureen Jerackas, Clerk-Treasurer
Pat Welch, Police Chief
Jeff Stoll, General Foreman
Chris Trapp, Village Attorney
Liz Cassidy, Code Enforcement Officer
19 Members of the public
PUBLIC HEARINGS
• Mayor Wochensky opened the Public Hearing at 7:04 pm to consider the Special Use Permit from
Michelle Baco, Store Manager of Five Below at 123 Grey Street, to stage merchandise for sale outside
of the storefront.
Mayor Wochensky closed the Public Hearing at 7:04 pm
• Mayor Wochensky opened a Public Hearing at 7:04 pm to consider a Special Use Permit from Erin
Redding and Zachary Goodrich of 533 Prospect Ave to construct a 22'x45' detached garage with a one-
bedroom ADU for the owner-occupied single-family dwelling.
o Susan Russell- 159 Sycamore- She said that she is located in the rear, adjacent to the property,
and is in favor of this application. She said that the applicant is extremely considerate of all the
neighbors. She said that she supports the ADU and improves her yard by giving her more
privacy.
o Kevin Lewandowski- 122 Sycamore- He expressed concerns over the size of the variance, and
he said that he would be against the property being used as an Airbnb.
Mayor Wochensky closed the Public Hearing at 7:08 pm
• Mayor Wochensky re-opened a Public Hearing to consider approving the 2026-2027 Tentative Village
Budget and Capital Plan.
o Mayor Wochensky did a presentation of the Village Budget
Mayor Wochensky closed the Public Hearing at 7:08 pm
SPEAKERS & COMMUNICATIONS (I) - None
Page 158
CONSENT CONSIDERATIONS
• A Motion by Trustee Rabey to
o Approve the Village Board minutes for April 20, 2026
o Approve the payment of Abstract for April 20, 2026, with a total of $41,454.10
o Refer to the Planning Commission, May 5, at Special Use Permit for application for 635 Main
St, Sylvia Walworth of Valvoline Instant Oil Change, for a vehicle service shop
o Set a Public Hearing on May 18, for the Site Plan application for the Aurora Village Shopping
Center at 123 Grey Street to replace the existing parking lot lighting with new quad, dark sky-
compliant LED fixtures.
o Approve a Hamlin Park Temporary Use Permit for Aurora Players for theatrical productions on
various dates in the summer of 2026.
o Approve a Temporary Use Permit for East Aurora Art Society, Sarah Tobin, for a Fine Art
Exhibit and Sale June 27th & 28th, 11 am-5 pm, contingent on receipt of certificate of insurance at
the Clerk-Treasurer’s office.
o Approve a Temporary Use Permit for Roycroft Campus Curt Maranto, for their Founder’s Day
celebration on June 6th, 4:30-7:30 pm.
o Approve a Temporary Use Permit for Victoria Stuman, EA Chamber of Commerce, Sun to
Sunset in EA on July 24th, 12-8 pm.
o Approve a Temporary Use Permit for Victoria Stuman, EA Chamber of Commerce, EA Summer
Street Festival on July 25th 10-4 pm.
o Approve a Temporary Use Permit for Victoria Stuman, EA Chamber of Commerce Taste of East
Aurora on September 12th 11-3 pm.
o Approve a Temporary Use Permit for the Town of Aurora, Backyard Bash Concert Series on
Thursdays July 9- August 30 from 4-9 pm
o Approve budget adjustments for the 2025-2026 fiscal year
Budget Transfers 2025-2026
FROM TO
A.5.5142.0470 Highway Snow Removal-Equ $ 1,200.00 A.5.1640.0431 Central Garage-Electric $ 1,200.00
A.5.3410.0200 Fire Equiptment $ 3,500.00 A.5.3410.0431 Fire Dept- Electric $ 3,500.00
A.5.9010.0801 Police Retirement $11,000.00 A.5.5182.0431 Street Lighting- Electric $ 11,000.00
A.5.5142.0470 Highway Snow Removal-Equ $ 300.00 A.5.7140.0431 Playground- Electric $ 300.00
A.5.5142.0470 Highway Snow Removal-Equ $ 2,000.00 A.5.1620.0431 Buildings- Electric $ 2,000.00
A.5.5110.0420 Streets- Maintenance $10,000.00 A.5.1640.0460 Central Garage- Vehicle Maint & Parts $ 10,000.00
A.5.1670.0420 Central Printing & Mail- Maint $ 2,000.00 A.5.1670.0470 Central Printing & Mailing- Postage $ 2,000.00
A.5.5142.0470 Highway Snow Removal-Equ $ 100.00 A.5.1640.0433 Central Garage- Water $ 100.00
A.5.5142.0470 Highway Snow Removal-Equ $ 7,000.00 A.5.1640.0460 Central Garage- Vehicle Maint & Parts $ 7,000.00
A.5.8560.0410 Shade Trees- Contract $ 335.00 A.5.8560.0420 Shade Trees- Maint & Repairs $ 335.00
A.5.5110.0420 Streets- Maintenance $ 1,600.00 A.5.1620.0470 Buildings- Department Supplpies $ 1,600.00
A.5.3120.0460 Police Dept- Vehicle Maint $ 1,000.00 A.5.3120.0465 Police Dept- Accident Repair $ 100.00
F.5.8340.0480 Transfs & Dist- Uniforms $ 136.00 F.5.8340.0490 Transfs & Dist- Water Testing $ 136.00
F.5.1380.0410 Fiscal Agent Fees $ 1,000.00 F.5.8310.0403 Water Postage $ 1,000.00
F.5.8340.0126 Transfs & Dist- Def Comp $ 100.00 F.5.8340.0140 Transfs & Dist- Overtime $ 100.00
o BE IT RESOLVED, the Clerk–Treasurer is hereby authorized to modify the 2025/2026 Budget
in the following manner:
Revenue – 4.2770 Unclassified - $ 6,657.55
Expenditures – 5.3120.0465 Police- Accident Repairs, Ins - $6,657.55
Car accident insurance payment
Revenue – 4.2770 Unclassified - $ 2,472.33
Expenditures – 5.3120.0465 Police- Accident Repairs, Ins - $ 2,472.33
Car accident insurance payment
Revenue – 4.2770 Unclassified - $ 500.00
Expenditures – 5.8560.0430 Shade Trees-Tree Purchase - $ 500.00
Donation for trees, Arbor Day
Page 159
Revenue – 4.2770 Unclassified - $ 762.00
Expenditures – 5.7140.0018 Park Recreation Bathroom - $ 762.00
Refund check
Seconded by Trustee Kamp and unanimously approved.
OFFICIAL CONSIDERATIONS
• A motion by Trustee Lazickas,
An Application of a Request for an Amended Special Use Permit, received by the Office of the
Village Clerk on May 27, 2025, is hereby:
APPROVED, as submitted, for applicant Michelle Baco, Store Manager for Five Below, for staging
merchandise outside of their storefront for sale.
The Village Board shall be Lead Agency under the State Environmental Quality Review Act (SEQRA).
A Negative Declaration is made under SEQRA, and said application is determined to be an Unlisted
Action.
The following findings and conditions from the Village Planning Commission are incorporated herein:
Findings:
The proposed action will not interfere with pedestrian traffic flow on the sidewalk or create any unsafe
situations.
The proposed action is consistent with the practice of other stores in the Plaza.
Conditions:
Merchandise is displayed only during the hours of operation of the store.
The outdoor displays cannot impede ADA or pedestrian access on the sidewalk.
If approved, the following additional language should be part of the approval:
Approval is granted for the above-referenced Special Use Permit Application, as written and submitted,
and with the following additional modifications and/or conditions*:
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
seconded by Trustee Root, and unanimously approved.
• A motion by Trustee Lazickas
An Application of a Request for an Amended Special Use Permit, received by the Office of the
Village Clerk on January 16, 2026, is hereby:
APPROVED, as submitted, for applicant Erin Redding & Zachary Goodrich of 533 Prospect Avenue to
construct a 22'x45' detached garage with an Access01y Dwelling Unit (ADU). The ADU will at grade
and at the rear of the structure with side entry. The one-bedroom ADU will be for family and occasional
guests of the property owners that owner-occupy the primary singlefamily dwelling on the property. The
current 12.86'x23.53' (303 sq. ft.) detached garage will be demolished for the construction of this new
proposed structure.
The Village Board shall be Lead Agency under the State Environmental Quality Review Act (SEQRA).
A Negative Declaration is made under SEQRA and said application is determined to be an Unlisted
Action.
The following findings and conditions from the Village Planning Commission are incorporated herein:
1. The application architecture, roof pitch, siding, windows, and colors will match the main house.
2. The applicant has committed to not removing any mature trees.
3. The application meets the intent of the ADU code in providing Village residents with the ability to
provide temporary residence to family.
If approved, the following additional language should be part of the approval:
Page 160
Approval is granted for the above-referenced Special Use Permit Application, as written and submitted,
and with the following additional modifications and/or conditions*:
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
seconded by Trustee Root, and unanimously approved.
o Code Enforcement Officer Cassidy said the current regulation is that you're only allowed a one-
bedroom. She said that's fairly size-limited, but an accessory building in the village is maxed out
at 25% of the rear yard. She said that she always checks that if it gets close, but it's very rare that
it happens. She said that this is a one-bedroom to be used for their purposes, and the planning
commission did have a discussion with them about the fact that a short-term rental is not
allowed.
• A motion by Trustee Cameron, to approve the 2026-2027 Capital Plan as submitted by the Capital
Committee, seconded by Trustee Root, and unanimously approved.
• ADOPT 2026-2027 BUDGET
Trustee Kamp, offered the following resolution and moved for its adoption:
BE IT RESOLVED, the Budget for the Village of East Aurora for the fiscal year 2026/2027 is hereby
ADOPTED with a tax rate of $ 22.657 per thousand.
BE IT FURTHER RESOLVED, the pay raises for the nonunion staff for the 2026/2027 fiscal year are
included in the budget.
The following resolution was seconded by Trustee Bojanowski, and duly put to a roll call vote which
resulted in the following:
Trustee Lazickas - Aye
Trustee Cameron - Aye
Trustee Bojanowski – Aye
Trustee Kamp- Aye
Trustee Rabey- Aye
Trustee Root- Aye
Mayor Wochensky – Aye
• RESOLUTION April 20, 2026
ADOPT 2026-2027 WATER BUDGET AND RATE SCHEDULE
Trustee Cameron, offered the following resolution and moved for its adoption:
BE IT RESOLVED, the $1,884,358 Water Budget for the
2026-2027 WATER RATES
2026-27 ECWA RATES
2025-26 RATE 2026-27 INCREASE PERCENT
RATE
4.04 4.37 $ 0.33 8.17%
Inside Village RATE/1000 Gallons
Consumption Current Proposed Difference
0-5 $5.62 $5.95 $0.33
6-75 $7.09 $7.42 $0.33
Page 161
OVER 75 $6.71 $7.04 $0.33
Outside Village
Consumption Current Proposed Difference
0-5 $8.43 $8.93 $0.50
6-75 $10.62 $11.12 $0.50
OVER 75 $10.01 $10.51 $0.50
Inside Village RATE/CUBIC FEET (748
Gallons)
Consumption Current Proposed Difference
0-6 $4.22 $4.46 $0.24
7-100 $5.32 $5.57 $0.24
OVER 100 $5.03 $5.28 $0.25
DEBT SERVICE COST
2024-25 2025-26
Current Proposed Difference
$30.75 $26.26 -$4.49
Operation and Maintenance
2024-25 2025-26
Current Proposed Difference
5/8" $40.58 $44.74 $4.16
1" $54.92 $60.41 $5.49
1.5" $78.44 $86.29 $7.85
2" $133.36 $146.70 $13.34
3" $156.89 $172.58 $15.69
4" $313.77 $345.15 $31.38
6" $549.10 $604.01 $54.91
8" $705.99 $776.59 $70.60
The following resolution was seconded by Trustee Rabey, and duly put to a roll call vote which resulted in the
following:
Trustee Lazickas - Aye
Trustee Cameron - Aye
Trustee Bojanowski – Aye
Trustee Kamp- Aye
Trustee Rabey- Aye
Trustee Root- Aye
Mayor Wochensky – Aye
• A motion by Trustee Lazickas, to give permission for the mayor to sign the 2026-2027 Tax Warrant,
seconded by Trustee Kamp, and duly put to a roll call vote, which resulted in the following:
Trustee Lazickas - Aye
Page 162
Trustee Cameron - Aye
Trustee Bojanowski – Aye
Trustee Kamp- Aye
Trustee Rabey- Aye
Trustee Root- Aye
Mayor Wochensky – Aye
• No motion was made to approve a local law amending the Village Code Chapter §112 Demolitions
o Trustee Kamp has some concerns with the demo code changes. He thanked Code Enforcement
Officer Cassidy for all of her help. He believes that the proposed demo code is restrictive to
homeowners and said that he thinks the 40% definition is arbitrary. He said that he is concerned
about the affordability for families and wants to reopen the public hearing. Trustee Root agreed
and spoke of her own home. Trustee Lazickas asked how we should proceed. Mayor Wochensky
asked about a subcommittee of Trustees and Code Enforcement Officer Cassidy. Trustee Kamp
would like this process to be done quickly, as he knows there are building applications waiting.
He discussed having a public comment on this at the next meeting. Trustee Cameron suggested
that the HPC should be invited because they did a lot of work on the proposed code. Mayor
Wochensky said Trustee Bojanowski, Trustee Root, and Trustee Lazickas will be on the
committee to review.
• A motion by Trustee Rabey, to Permission for the mayor to sign a contract with Robbyn Drake as an
independent contractor for Grant writing services at a rate of $77.00 per hr, seconded by Trustee
Cameron, and unanimously approved.
o Mayor Wochensky spoke about her history working with the town and WNY Land Conservancy.
He said that she is highly recommended and will be meeting with him, the Trustees, and Clerk-
Treasurer Jerackas to see what opportunities are worth using her to do the grants. Trustee
Lazickas spoke about funding for the playground and park improvements.
• A motion by Trustee Kamp, to appoint Mark Hartley to the position of Emergency Manager and Dan
Dytchkowsky as Deputy Emergency Manager for a term of one year to expire April 5, 2027, seconded
by Trustee Root, and unanimously approved.
o Mayor Wochensky reviewed the emergency managers and their duties. He also spoke about
emerging management training for the new trustees.
• A motion by Trustee Lazickas, to give permission for the Mayor to sign a contract in conjunction with
the Town of Aurora for Skylighter for the 3rd of July Fireworks, seconded by Trustee Bojanowski, and
unanimously approved.
o Mayor Wochensky spoke about this program. He said that there is no cost to taxpayers and that
the town gets donations.
OLD BUSINESS- None
NEW BUSINESS
• Social Media Policy- Mayor Wochensky discussed a social media policy for using multiple platforms to
keep the Village residents informed. He also discussed how to use social media to inform more people
about Code Red. Trustee Kamp offered to assist.
SPEAKERS & COMMUNICATIONS
• Susan Russell- 159 Sycamore- She said that National Fuel is doing work by her house and wanted to
know if they would be coming back to fix the mess they made of her landscaping. General Foreman
Stoll said that he will follow up, but would imagine it would be in May.
Page 163
• Mayor Wochensky spoke about the road repairs by the utility companies in the Village. He said that he
met with the county executive and asked if they would come out and do a presentation on the Maple
Road project and how it would impact the community. Trustee Root noted that 15 trees are coming out
with that project and will be replaced, but maybe not in the same place. Mayor Wochensky asked when
the project would start, and General Foreman Stoll said maybe June.
• Chris Contento- 2434 Latham Rd- He said he has concerns about the demolition moratorium. He says
that he believes in the intent of the moratorium, but said that small projects are being held up because of
it. He asked if the moratorium could be adjusted. Mayor Wochensky said that he believes that the
demolition code should be done soon, and that it is a better solution in the end rather than just adjusting
the moratorium.
Department Head and Trustee Reports
General Foreman- He said electronics recycling pick up is this week. The Hamlin Park trees are finished with
Bradley Tree Company and said that they are coming back in May for the aeration of 20 trees. He said that the
DPW has a few more removals to do. He said that he has a meeting to discuss and schedule milling and paving.
Police Chief- He has been working on budget considerations. The police department escorted the bike bus last
Friday. He said that he is starting to put speed monitoring devices out where he feels that there may be
problems, and also take input from the community on where as well. They are pulling over more people for cell
phone distracted driving because of the governor’s safety grant. He is hoping that the new grant writer can find
ways around the Villages' demographics to get more funding. He said that he would like to increase the full-
time dispatcher number to five, especially with the surveillance trailer in Hamlin Park. He thanked General
Foreman Stoll because the Lyons Club reached out to him and wants to help remodel and repair the police
satellite office building at Hamlin Park. He said that McDonald's reached out and wanted to do more
community engagement, so they are hosting a coffee with a cop on Saturday, May 2nd, from 9 am-11 am. He
said that Mayor Wochensky and Safety Pup will be there as well. Mayor Wochensky and Trustee Kamp thanked
Police Chief Welch for the bike bus escort.
Code Enforcement Officer- She said that 326 Olean had a fire last March, and they have been in contact with a
demolition contractor to get it taken down due to it being a safety hazard. She said that it is not affected by the
demolition moratorium, but the property will have to be cleaned up in the next few weeks. They have received
two of the three permits for the land on Pine and Girard. They are looking into storm drainage on Olean Road.
She reminded everyone that yard bags are not going to get picked up anymore, so you either need to put them in
your bins or take them to the DPW on Saturday mornings. Mayor Wochensky and Clerk-Treasurer Jerackas will
be meeting with Waste Management soon to talk and see if there are any potential options to tweak the contract.
Village Clerk-Treasurer- She said that she attended the GFOA training last week and got a lot of information
on AI and phishing schemes. She said that she will be working on implementing the new tax software this week.
Trustee Lazickas- He said that last week was his first meeting with the tree board, and it was great. He had a
Hamlin Park Committee meeting and discussed Rotary making a donation to help replenish trees. He said that
they saw a playground presentation and discussed the new playground. He said that the park bathrooms will
hopefully be done in June, and hope to get the plumbing cost reduced. He would like stronger language on signs
in the park to prevent damage and theft. He thanked the Rotary and the Lyons for their donations toward
improvements.
Trustee Cameron- She would like more traffic studies from the county during the warmer season. She said on
Pine and on Center and South St., Mayor Wochensky suggested a public comment and is looking for feedback
on the area.
Trustee Root- She attended the Tree Board meeting and was very hopeful after the meeting with NYSEG.
Trustee Rabey- none
Trustee Kamp- none
Trustee Bojanowski- He attended the HPC, ZBA, and Hamlin Park meetings. He was at the Great Wolf Lodge
and spoke with the Mayor of Niagara Falls, Canada. Mayor Wochensky said that he reached out to the mayor of
Niagara-on-the-Lake about beautification and would like to set up a meeting with General Stoll and their crew.
Page 164
Mayor Wochensky- We are continuing to get applications and are doing interviews for the Administrator
position. Trustee Rabey and Trustee Kamp are helping with interviews and thanked Trustee Rabey for ranking
the applications. He said that he met with NYSEG and is waiting for an agreement to come, and he hopes it will
help in the future. He spoke at the American Legion for Vietnam Veterans dinner, and he was very thankful for
the invitation. He will be attending Arbor Day activities at the High School and at Parkdale. He will attend the
Association of Erie County Governments meeting on Thursday. He is meeting with the engineers tomorrow and
talking about converting our contract for the windows at the police station to include a more thorough look at
the facility. The July 4th committee meeting is tomorrow. He is still looking for anyone interested in being on the
Climate Smart communities. He met with the county executive today and discussed projects that the county is
doing in the Village. He said that the Pedestrian Bike Board is meeting tomorrow. He said that on April 27th the
governor’s office is sending representatives to discuss some things to look forward to, including grant
opportunities. Village Attorney Trapp said that in regard to the demolition code change, if major changes are
made that it would require a public hearing. Trustee Kamp said that he does plan to make changes that would be
considered major.
• A motion by Trustee Kamp, to set a Public Hearing on 5/18/2026 for Local Law Amending chapter 112
Demolition , seconded by Trustee Lazickas, and unanimously approved.
Trustee Lazickas asked about the sign change or new signs being put up for pickleball and said that he will
come up with the language. Mayor Wochensky said that he will have someone order that.
ADJOURNMENT
A motion was made by Trustee Bojanowski to adjourn the meeting at 8:23pm, seconded by Trustee Lazickas
and unanimously carried.
Respectfully submitted,
Maureen Jerackas
Village Clerk-Treasurer
Page 165
Expense Approval Report 5.4.2026
Village of East Aurora, NY By Vendor Name
Payable Dates 5/4/2026 - 5/4/2026 Post Dates 5/4/2026 - 5/4/2026
Payable Number Vendor Name Payable Date Description (Item) Account Number Account Name Purchase Order Number Amount
Vendor: 10033 - ADVANCED ALARM
inv 0109153 ADVANCED ALARM 05/04/2026 DPW fire alarm inspections A.5.1640.0420 CENTRAL GARAGE - MAINT &… 270.00
Vendor 10033 - ADVANCED ALARM Total: 270.00
Vendor: 10054 - Amazon
17W6-T7RG-H99R Amazon 05/04/2026 Charging Cords for PO Cars & A.5.3120.0403 POLICE DEPT - OFFICE SUPPLI… 97.94
HDMI Transmitter
1G3C-GR9F-GT77 Amazon 05/04/2026 VEA supplies A.5.1325.0403 VILLAGE ADMIN - OFFICE SU… 23.79
1G3C-GR9F-GT77 Amazon 05/04/2026 Pickleball Balls A.5.7140.0420 PLAYGROUNDS & REC CTRS. -… 56.36
1G9M-7H4J-JDNR Amazon 05/04/2026 Drop ceiling hooks, desk & A.5.1325.0403 VILLAGE ADMIN - OFFICE SU… 231.25
office supplies
1GCX-L9XD-7WGR Amazon 05/04/2026 VEA Office Supplies A.5.1325.0403 VILLAGE ADMIN - OFFICE SU… 25.41
1GCX-L9XD-7WGR Amazon 05/04/2026 EAPD TV mount A.5.3120.0403 POLICE DEPT - OFFICE SUPPLI… 45.09
2026000193 Amazon 05/04/2026 EAFD Amazon order- ems & A.5.3410.0200 FIRE DEPT - EQUIP 2026000193 900.20
supplies order
2026000193 Amazon 05/04/2026 presentation remote A.5.3410.0440 FIRE DEPT - TRAINING, TRAV… 2026000193 28.16
2026000193 Amazon 05/04/2026 EAFD Amazon order- ems & A.5.3410.0497 FIRE DEPT-EMS SUPPLIES 2026000193 16.88
supplies order
Vendor 10054 - Amazon Total: 1,425.08
Vendor: 10058 - American Heart Association
20260000195 American Heart Association 05/04/2026 EMS training A.5.3410.0440 FIRE DEPT - TRAINING, TRAV… 2026000195 173.00
Vendor 10058 - American Heart Association Total: 173.00
Vendor: 11386 - Arthur J. Gallagher Risk Management Services LLC
6089366 Arthur J. Gallagher Risk 05/04/2026 Pollution Liability Renewal A.5.1910.0410 UNALLOCATED INSURANCE -… 4,048.49
Management Services LLC
Vendor 11386 - Arthur J. Gallagher Risk Management Services LLC Total: 4,048.49
Vendor: 10165 - Boston Hill Nursery Inc
inv 89665 Boston Hill Nursery Inc 05/04/2026 HS arbor day trees A.5.8560.0430 SHADE TREES - TREE PURCHA… 450.00
Vendor 10165 - Boston Hill Nursery Inc Total: 450.00
Vendor: 10170 - BRADLEY TREE & LANDSCAPE
16075-2 BRADLEY TREE & LANDSCAPE 05/04/2026 HP pruning project A.5.7140.0420 PLAYGROUNDS & REC CTRS. -… 45,000.00
Vendor 10170 - BRADLEY TREE & LANDSCAPE Total: 45,000.00
Vendor: 10229 - Charter Communications
115006201041426 Charter Communications 05/04/2026 EAPD INTERNET A.5.1480.0410 PUBINFO SVCS-PUB INFO SUP… 449.00
115006201041426 Charter Communications 05/04/2026 EAFD CABLE A.5.1480.0410 PUBINFO SVCS-PUB INFO SUP… 59.95
115006201041426 Charter Communications 05/04/2026 TAXES & FEES - FRANCHISE A.5.1480.0410 PUBINFO SVCS-PUB INFO SUP… 2.97
FEE
5/1/2026 10:02:32 AM Page 1 of 10
Page 166
Expense Approval Report 5.4.2026 Payable Dates: 5/4/2026 - 5/4/2026 Post Dates: 5/4/2026 - 5/4/2026
Payable Number Vendor Name Payable Date Description (Item) Account Number Account Name Purchase Order Number Amount
115006201041426 Charter Communications 05/04/2026 EAFD INTERNET A.5.1480.0410 PUBINFO SVCS-PUB INFO SUP… 160.00
Vendor 10229 - Charter Communications Total: 671.92
Vendor: 10240 - CINTAS CORPORATION
2026000150 CINTAS CORPORATION 05/04/2026 building mats/uniforms A.5.1620.0420 BUILDINGS - MAINT & REPAI… 2026000150 319.50
2026000150 CINTAS CORPORATION 05/04/2026 building mats/uniforms A.5.1640.0420 CENTRAL GARAGE - MAINT &…2026000150 319.04
2026000150 CINTAS CORPORATION 05/04/2026 building mats/uniforms A.5.1640.0480 CENTRAL GARAGE - UNIFOR… 2026000150 295.68
Vendor 10240 - CINTAS CORPORATION Total: 934.22
Vendor: 10275 - Conway Beam Truck Group
inv 103467 Conway Beam Truck Group 05/04/2026 DPW #507 repairs A.5.1640.0460 CENTRAL GARAGE - VEHICLE… 210.60
Vendor 10275 - Conway Beam Truck Group Total: 210.60
Vendor: 10296 - CSEA EMPL BENEFIT FUND
12314052May2026 CSEA EMPL BENEFIT FUND 05/04/2026 Dental/ Vision A.5.9061.0807 DENTAL INS - DENTAL INS 6,644.04
12314052May2026 CSEA EMPL BENEFIT FUND 05/04/2026 Dental/ Vision A.5.9062.0808 OPTICAL - OPTICAL 1,066.65
12314052May2026 CSEA EMPL BENEFIT FUND 05/04/2026 Dental/ Vision F.5.9061.0807 DENTAL INS - DENTAL INS 511.08
12314052May2026 CSEA EMPL BENEFIT FUND 05/04/2026 Dental/ Vision F.5.9062.0808 OPTICAL - OPTICAL 82.05
Vendor 10296 - CSEA EMPL BENEFIT FUND Total: 8,303.82
Vendor: 10318 - DELACY FORD
inv 609117/519189 DELACY FORD 05/04/2026 EAPD vehicle repairs A.5.3120.0460 POLICE DEPT - VEHICLE MAI… 894.14
Vendor 10318 - DELACY FORD Total: 894.14
Vendor: 10320 - DELL MARKETING L.P.
2026000200 DELL MARKETING L.P. 05/04/2026 Dell Pro Micro QCM1250 & A.5.3420.0200 POLICE & FIRE DISPATCH - E… 2026000200 1,919.25
Keyboard & Mouse-
KM5221W
Vendor 10320 - DELL MARKETING L.P. Total: 1,919.25
Vendor: 10348 - E J PRESCOTT INC.
inv 6624330 E J PRESCOTT INC. 05/04/2026 Water service parts F.5.8340.0470 TRANSFS & DIST - SUPPLIES &… 53.50
Vendor 10348 - E J PRESCOTT INC. Total: 53.50
Vendor: 10359 - EAST AURORA AUTO PARTS
March and April invoices EAST AURORA AUTO PARTS 05/04/2026 751474/751693/751793/7522 A.5.1640.0460 CENTRAL GARAGE - VEHICLE… 267.02
42/753359/753856
March and April invoices EAST AURORA AUTO PARTS 05/04/2026 751474/751693/751793/7522 A.5.3410.0460 FIRE DEPT - VEHICLE MAINT … 36.28
42/753359/753856
Vendor 10359 - EAST AURORA AUTO PARTS Total: 303.30
Vendor: 10376 - EIGHTY FOUR LUMBER
inv 756074/756098/756412 EIGHTY FOUR LUMBER 05/04/2026 hamlin park lumber A.5.7140.0420 PLAYGROUNDS & REC CTRS. -… 202.60
Vendor 10376 - EIGHTY FOUR LUMBER Total: 202.60
Vendor: 10403 - ERIE COUNTY COMPTROLLER
1800083892 ERIE COUNTY COMPTROLLER 05/04/2026 571 Main St Village Hall Acct A.5.1620.0431 BUILDINGS - ELECTRIC 519.31
7933856
1800083892 ERIE COUNTY COMPTROLLER 05/04/2026 Pine St DPW Offices and A.5.1640.0431 CENTRAL GARAGE - ELECTRIC 193.06
garage acct 256115
5/1/2026 10:02:32 AM Page 2 of 10
Page 167
Expense Approval Report 5.4.2026 Payable Dates: 5/4/2026 - 5/4/2026 Post Dates: 5/4/2026 - 5/4/2026
Payable Number Vendor Name Payable Date Description (Item) Account Number Account Name Purchase Order Number Amount
1800083892 ERIE COUNTY COMPTROLLER 05/04/2026 33 Center St A.5.3410.0431 FIRE DEPT - ELECTRIC 662.60
1800083892 ERIE COUNTY COMPTROLLER 05/04/2026 ST LIGHTING R2 ACCT 719336 A.5.5182.0431 STREET LIGHTING - ELECTRIC 298.12
1800083892 ERIE COUNTY COMPTROLLER 05/04/2026 Elmwood & Chestnut Hill A.5.5182.0431 STREET LIGHTING - ELECTRIC 248.58
Booster Pump Station Acct
1800083892 ERIE COUNTY COMPTROLLER 05/04/2026 Elm St Signal Acct 3514288 A.5.5182.0431 STREET LIGHTING - ELECTRIC 3.29
1800083892 ERIE COUNTY COMPTROLLER 05/04/2026 Girard Ave Acct 893560 A.5.5182.0431 STREET LIGHTING - ELECTRIC 0.94
1800083892 ERIE COUNTY COMPTROLLER 05/04/2026 ST LIGHTING ACCT 4086039 A.5.5182.0431 STREET LIGHTING - ELECTRIC 441.31
1800083892 ERIE COUNTY COMPTROLLER 05/04/2026 PINE ST WATER PLANT ACCT F.5.1620.0431 BUILDINGS - ELECTRIC 14.81
288597
Vendor 10403 - ERIE COUNTY COMPTROLLER Total: 2,382.02
Vendor: 10406 - ERIE COUNTY PUBLIC HEALTH LAB
2026000166 ERIE COUNTY PUBLIC HEALTH 05/04/2026 Water Samples- Sept F.5.8340.0490 TRANSFS & DIST - WATER TE… 2026000166 126.00
LAB
Vendor 10406 - ERIE COUNTY PUBLIC HEALTH LAB Total: 126.00
Vendor: 10436 - Firematic Supply Co. Inc.
2026000188 Firematic Supply Co. Inc. 05/04/2026 Engine #1 seatbelt A.5.3410.0460 FIRE DEPT - VEHICLE MAINT … 2026000188 695.73
replacement
Vendor 10436 - Firematic Supply Co. Inc. Total: 695.73
Vendor: 11385 - Gable Automatic Sprinkler Co Inc
2026000198 Gable Automatic Sprinkler Co 05/04/2026 sprinkler inspection A.5.3410.0420 FIRE DEPT - DEPT SUPPLIES 2026000198 1,750.00
Inc work/testing at EAFD bldg
2026000199 Gable Automatic Sprinkler Co 05/04/2026 additional sprinkler inspection A.5.3410.0420 FIRE DEPT - DEPT SUPPLIES 2026000199 900.00
Inc work at EAFD bldg
Vendor 11385 - Gable Automatic Sprinkler Co Inc Total: 2,650.00
Vendor: 11387 - Gorenflo's Buffalo Wholesale Lock
192427 Gorenflo's Buffalo Wholesale 05/04/2026 Key with shipping cost A.5.1325.0403 VILLAGE ADMIN - OFFICE SU… 30.32
Lock
Vendor 11387 - Gorenflo's Buffalo Wholesale Lock Total: 30.32
Vendor: 10511 - GRAINGER
inv 9891040058 GRAINGER 05/04/2026 EAPD cable ties A.5.1640.0420 CENTRAL GARAGE - MAINT &… 18.28
Vendor 10511 - GRAINGER Total: 18.28
Vendor: 10529 - HAMBURG OVERHEAD DOOR
inv 541197 HAMBURG OVERHEAD DOOR 05/04/2026 black rolls of track for doors A.5.3410.0420 FIRE DEPT - DEPT SUPPLIES 500.00
Vendor 10529 - HAMBURG OVERHEAD DOOR Total: 500.00
Vendor: 10547 - Highmark Blue Cross & Blue Shield of Western New York
260420371805 Highmark Blue Cross & Blue 05/04/2026 Health Insurance A.5.9060.0805 HOSPITAL & MEDICAL INS - H… 46,236.80
Shield of Western New York
260420371805 Highmark Blue Cross & Blue 05/04/2026 Health Insurance A.5.9060.0806 HOSPITAL & MEDICAL INS - H… 20,178.64
Shield of Western New York
260420371805 Highmark Blue Cross & Blue 05/04/2026 Health Insurance F.5.9060.0805 HOSPITAL & MEDICAL INS - H… 4,811.89
Shield of Western New York
5/1/2026 10:02:32 AM Page 3 of 10
Page 168
Expense Approval Report 5.4.2026 Payable Dates: 5/4/2026 - 5/4/2026 Post Dates: 5/4/2026 - 5/4/2026
Payable Number Vendor Name Payable Date Description (Item) Account Number Account Name Purchase Order Number Amount
260420371805 Highmark Blue Cross & Blue 05/04/2026 Health Insurance F.5.9060.0806 HOSPITAL & MEDICAL INS - H… 950.51
Shield of Western New York
Vendor 10547 - Highmark Blue Cross & Blue Shield of Western New York Total: 72,177.84
Vendor: 10559 - Home Depot Credit Services
inv 1457325 Home Depot Credit Services 05/04/2026 DPW desk A.5.1490.0403 PUBLIC WORKS ADMIN - OFF… 87.78
Vendor 10559 - Home Depot Credit Services Total: 87.78
Vendor: 10645 - KURK FUEL COMPANY
inv 75902 KURK FUEL COMPANY 05/04/2026 DPW diesel fuel 3/3/26- A.5.1640.0450 CENTRAL GARAGE - GASOLIN… 3,744.19
4/9/26
inv 75902 KURK FUEL COMPANY 05/04/2026 EAFD diesel fuel 3/3/26- A.5.3410.0450 FIRE DEPT - GASOLINE, OIL &… 621.57
4/9/26
Vendor 10645 - KURK FUEL COMPANY Total: 4,365.76
Vendor: 10669 - Lardon Construction Corp.
inv 8943 Lardon Construction Corp. 05/04/2026 topsoil/park A.5.7140.0420 PLAYGROUNDS & REC CTRS. -… 680.00
Vendor 10669 - Lardon Construction Corp. Total: 680.00
Vendor: 10691 - LINSTAR INC.
129405 LINSTAR INC. 05/04/2026 ID cards for PT Disp K. A.5.3420.0470 POLICE & FIRE DISPATCH - D… 25.60
DiJoseph
Vendor 10691 - LINSTAR INC. Total: 25.60
Vendor: 10706 - M and T BANK
April 2026 Credit Card M and T BANK 05/04/2026 Buffalo News A.5.1325.0403 VILLAGE ADMIN - OFFICE SU… 36.99
April 2026 Credit Card M and T BANK 05/04/2026 Marriott - Maureen hotel stay A.5.1325.0440 VILLAGE ADMIN - TRAINING, … 300.00
for conference
April 2026 Credit Card M and T BANK 05/04/2026 ZOOM INV348408063 A.5.1480.0410 PUBINFO SVCS-PUB INFO SUP… 149.90
April 2026 Credit Card M and T BANK 05/04/2026 ADOBE A.5.1480.0410 PUBINFO SVCS-PUB INFO SUP… 21.74
April 2026 Credit Card M and T BANK 05/04/2026 JetBlue - EAPD Chief to A.5.3120.0440 POLICE DEPT - TRAINING, TR… 426.80
Conference
April 2026 Credit Card M and T BANK 05/04/2026 ASP - Instructor Course for Lt. A.5.3120.0440 POLICE DEPT - TRAINING, TR… 100.00
O'Hara
April 2026 Credit Card M and T BANK 05/04/2026 IACP Conference Registration A.5.3120.0440 POLICE DEPT - TRAINING, TR… 500.00
- Police Chief
April 2026 Credit Card M and T BANK 05/04/2026 Amazon - EAPD Supplies A.5.3120.0470 POLICE DEPT - DEPTAL SUPPL… 89.21
Vendor 10706 - M and T BANK Total: 1,624.64
Vendor: 10720 - Manny's Ace Hardware
2026000179 Manny's Ace Hardware 05/04/2026 Misc Supplies- Oct A.5.1620.0420 BUILDINGS - MAINT & REPAI… 2026000179 40.23
2026000179 Manny's Ace Hardware 05/04/2026 Misc Supplies- Oct A.5.1640.0420 CENTRAL GARAGE - MAINT &…2026000179 82.56
2026000179 Manny's Ace Hardware 05/04/2026 EAFD purchases A.5.3410.0420 FIRE DEPT - DEPT SUPPLIES 49.93
2026000179 Manny's Ace Hardware 05/04/2026 park supplies A.5.7140.0420 PLAYGROUNDS & REC CTRS. -… 90.06
Vendor 10720 - Manny's Ace Hardware Total: 262.78
5/1/2026 10:02:32 AM Page 4 of 10
Page 169
Expense Approval Report 5.4.2026 Payable Dates: 5/4/2026 - 5/4/2026 Post Dates: 5/4/2026 - 5/4/2026
Payable Number Vendor Name Payable Date Description (Item) Account Number Account Name Purchase Order Number Amount
Vendor: 11324 - MAUREEN JERACKAS
Reimbursement 4/15/26 MAUREEN JERACKAS 05/04/2026 Milage and tolls - NYGFO A.5.1325.0440 VILLAGE ADMIN - TRAINING, … 437.67
conference
Vendor 11324 - MAUREEN JERACKAS Total: 437.67
Vendor: 10767 - MES SERVICE COMPANY LLC
inv 2467662 MES SERVICE COMPANY LLC 05/04/2026 repair of jaws for EAFD A.5.3410.0200 FIRE DEPT - EQUIP 1,125.00
Vendor 10767 - MES SERVICE COMPANY LLC Total: 1,125.00
Vendor: 10746 - Michael Lennon
Reimbursement 4/2026 Michael Lennon 05/04/2026 MILEAGE AND LODGING - NYS A.5.7520.0440 HISTORIC PRESERVATION - T… 483.94
PRESERVATION CONFERENCE
Vendor 10746 - Michael Lennon Total: 483.94
Vendor: 10829 - NYS Assoc. of Fire Chiefs
2026000189 NYS Assoc. of Fire Chiefs 05/04/2026 EMS training A.5.3410.0440 FIRE DEPT - TRAINING, TRAV… 2026000189 625.00
Vendor 10829 - NYS Assoc. of Fire Chiefs Total: 625.00
Vendor: 10864 - NYSEG
1001-0483-419 2/19- NYSEG 05/04/2026 ELMWOOD & CHEST 1 PH A.5.5182.0431 STREET LIGHTING - ELECTRIC 361.94
2/19-
1001-1111-704 3/19-4/20/26 NYSEG 05/04/2026 400 Pine St 3/19-4/20/26 A.5.1640.0431 CENTRAL GARAGE - ELECTRIC 291.19
1001-1111-712 3/19-4/20/26 NYSEG 05/04/2026 Pine St 3/19-4/20/26 F.5.1620.0431 BUILDINGS - ELECTRIC 51.30
1001-3143-531 3/12-4/10/26 NYSEG 05/04/2026 NEAR 21 ELM ST SIGNL 3/12- A.5.5182.0431 STREET LIGHTING - ELECTRIC 29.36
4/10/26
1003-3707-877 3/20-4/21/26 NYSEG 05/04/2026 Near 163 Main St @ Trfic Cir A.5.5182.0431 STREET LIGHTING - ELECTRIC 47.68
3/20-4/21/26
1003-3707-893 3/20-4/21/26 NYSEG 05/04/2026 Buffalo Rd @ Grey St 3/20- A.5.5182.0431 STREET LIGHTING - ELECTRIC 23.12
4/21/26
1004-1637-827 3/19-4/20/26 NYSEG 05/04/2026 33 Center St 3/19-4/20/26 A.5.3410.0431 FIRE DEPT - ELECTRIC 558.25
Vendor 10864 - NYSEG Total: 1,362.84
Vendor: 10874 - OFFICE DEPOT
2026000203 OFFICE DEPOT 05/04/2026 CD's, DVD's, Sleeves A.5.3120.0403 POLICE DEPT - OFFICE SUPPLI…2026000203 75.37
2026000203 OFFICE DEPOT 05/04/2026 Copy paper A.5.3120.0403 POLICE DEPT - OFFICE SUPPLI…2026000203 226.75
2026000203 OFFICE DEPOT 05/04/2026 Highlighters, sharpie pens, A.5.3120.0403 POLICE DEPT - OFFICE SUPPLI…2026000203 55.33
tape, white out + disc
2026000203 OFFICE DEPOT 05/04/2026 Copy paper A.5.3420.0470 POLICE & FIRE DISPATCH - D… 2026000203 226.75
2026000203 OFFICE DEPOT 05/04/2026 Highlighters, sharpie pens, A.5.3420.0470 POLICE & FIRE DISPATCH - D… 2026000203 55.32
tape, white out + disc
2026000203 OFFICE DEPOT 05/04/2026 CD's, DVD's, Sleeves A.5.3420.0470 POLICE & FIRE DISPATCH - D… 2026000203 75.36
Vendor 10874 - OFFICE DEPOT Total: 714.88
Vendor: 10950 - QUALIFICATION TARGETS INC
2026000197 QUALIFICATION TARGETS INC 05/04/2026 Immigrations and Customs A.5.3120.0470 POLICE DEPT - DEPTAL SUPPL…2026000197 33.50
Enforcement Qualification
2026000197 QUALIFICATION TARGETS INC 05/04/2026 NYS Division of Criminal A.5.3120.0470 POLICE DEPT - DEPTAL SUPPL…2026000197 33.50
Justice 23" X 35"
5/1/2026 10:02:32 AM Page 5 of 10
Page 170
Expense Approval Report 5.4.2026 Payable Dates: 5/4/2026 - 5/4/2026 Post Dates: 5/4/2026 - 5/4/2026
Payable Number Vendor Name Payable Date Description (Item) Account Number Account Name Purchase Order Number Amount
2026000197 QUALIFICATION TARGETS INC 05/04/2026 5 Bullseyes-3 Shaded Zones- A.5.3120.0470 POLICE DEPT - DEPTAL SUPPL…2026000197 33.50
23" X 35" - Green Ink
2026000197 QUALIFICATION TARGETS INC 05/04/2026 FREIGHT A.5.3120.0470 POLICE DEPT - DEPTAL SUPPL…2026000197 58.66
2026000197 QUALIFICATION TARGETS INC 05/04/2026 USPSA/IPSC Target on Paper - A.5.3120.0470 POLICE DEPT - DEPTAL SUPPL…2026000197 35.00
Black Ink - 23" X 35"
2026000197 QUALIFICATION TARGETS INC 05/04/2026 ProTimerBT shot timer(CEI- A.5.3120.0470 POLICE DEPT - DEPTAL SUPPL…2026000197 167.95
4720) built-in Bluetooth
Vendor 10950 - QUALIFICATION TARGETS INC Total: 362.11
Vendor: 11016 - SAF-GARD SAFETY SHOE CO.
inv 4652702 SAF-GARD SAFETY SHOE CO. 05/04/2026 DPW workboots- Shane A.5.5110.0480 STREET MAINT - UNIFORMS 184.99
Goerke
Vendor 11016 - SAF-GARD SAFETY SHOE CO. Total: 184.99
Vendor: 11033 - Schroder Joseph & Associates LLP
27310 Schroder Joseph & Associates 05/04/2026 SERVICES FOR MARCH 2026 A.5.1420.0411 VILLAGE ATTORNEY - OTHER … 710.70
LLP
Vendor 11033 - Schroder Joseph & Associates LLP Total: 710.70
Vendor: 11052 - SEWING TECHNOLOGY UNIFORM
51487 SEWING TECHNOLOGY 05/04/2026 Flashlight for new PO Pierce A.5.3120.0127 POLICE DEPT - UNIFORM ALL… 159.99
UNIFORM
51488 SEWING TECHNOLOGY 05/04/2026 ERT Helmet & Vest panel A.5.3120.0470 POLICE DEPT - DEPTAL SUPPL… 976.67
UNIFORM patches Lt. OHara
51517 SEWING TECHNOLOGY 05/04/2026 Shirts & Embroidered Chief A.5.3120.0480 POLICE DEPT - UNIFORMS, B… 80.99
UNIFORM
Vendor 11052 - SEWING TECHNOLOGY UNIFORM Total: 1,217.65
Vendor: 11133 - THE HARTFORD
509153856593 THE HARTFORD 05/04/2026 Life Insurance A.5.9045.0803 LIFE INS - LIFE INS 858.00
509153856593 THE HARTFORD 05/04/2026 Life Insurance A.5.9045.0804 LIFE INS - LIFE INS-RETIREES 468.85
509153856593 THE HARTFORD 05/04/2026 Life Insurance F.5.9045.0803 LIFE INS - LIFE INS 88.00
509153856593 THE HARTFORD 05/04/2026 Life Insurance F.5.9045.0804 LIFE INS - LIFE INS-RETIREES 30.97
Vendor 11133 - THE HARTFORD Total: 1,445.82
Vendor: 11169 - TRI-COUNTY TOOL RENTAL & SALES
inv 33982 TRI-COUNTY TOOL RENTAL & 05/04/2026 concrete- HP A.5.7140.0420 PLAYGROUNDS & REC CTRS. -… 15.98
SALES
Vendor 11169 - TRI-COUNTY TOOL RENTAL & SALES Total: 15.98
Vendor: 11185 - Tyler Technologies Inc.
025-549535 Tyler Technologies Inc. 05/04/2026 Incode Annual SaaS Fees - A.5.1480.0410 PUBINFO SVCS-PUB INFO SUP… 37,118.00
Year 3
025-549757 Tyler Technologies Inc. 05/04/2026 Preparing Property Tax A.5.1325.0400 VILLAGE ADMIN - OPERATING… 240.00
Software
Vendor 11185 - Tyler Technologies Inc. Total: 37,358.00
Vendor: 11225 - VERIZON WIRELESS
6140161759 VERIZON WIRELESS 05/04/2026 716-344-7361 DPW GIS A.5.1490.0434 PUBLIC WORKS ADMIN - TEL… 37.29
5/1/2026 10:02:32 AM Page 6 of 10
Page 171
Expense Approval Report 5.4.2026 Payable Dates: 5/4/2026 - 5/4/2026 Post Dates: 5/4/2026 - 5/4/2026
Payable Number Vendor Name Payable Date Description (Item) Account Number Account Name Purchase Order Number Amount
6140161759 VERIZON WIRELESS 05/04/2026 716-344-5189 PATRICK A.5.3120.0434 POLICE DEPT - TELEPHONE 37.29
WELCH
6140161759 VERIZON WIRELESS 05/04/2026 716-359-0911 DETECTIVE A.5.3120.0434 POLICE DEPT - TELEPHONE 37.29
OFFICE
6140161759 VERIZON WIRELESS 05/04/2026 716-913-1761 POLICE A.5.3120.0434 POLICE DEPT - TELEPHONE 37.29
SUPERVISOR (LIETENANTS)
6140161759 VERIZON WIRELESS 05/04/2026 716-383-4934 Fire Dept EMS A.5.3410.0434 FIRE DEPT - TELEPHONE 20.00
Tablet 2
6140161759 VERIZON WIRELESS 05/04/2026 716-383-4933 Fire Dept EMS A.5.3410.0434 FIRE DEPT - TELEPHONE 20.00
Tablet 1
6140161759 VERIZON WIRELESS 05/04/2026 716-256-0983 FIRE CHIEF A.5.3410.0434 FIRE DEPT - TELEPHONE 37.99
MOBILE WIFI
6140161759 VERIZON WIRELESS 05/04/2026 716-383-4936 Fire Dept EMS A.5.3410.0434 FIRE DEPT - TELEPHONE 20.00
Tablet 3
Vendor 11225 - VERIZON WIRELESS Total: 247.15
Vendor: 11357 - WM CORPORATE SERVICES INC.
5260772-1342-3 WM CORPORATE SERVICES 05/04/2026 Hand Pickup Town Barrels A.5.8160.0410 REFUSE & GARBAGE 1,170.00
INC.
5260772-1342-3 WM CORPORATE SERVICES 05/04/2026 Curb Service Curbside A.5.8160.0410 REFUSE & GARBAGE 48,751.51
INC. Collections
Vendor 11357 - WM CORPORATE SERVICES INC. Total: 49,921.51
Vendor: 11287 - WNYNETWORKS
00006526 WNYNETWORKS 05/04/2026 IT SERVICES FOR MARCH 2026 A.5.1480.0410 PUBINFO SVCS-PUB INFO SUP… 875.00
- VEA
00006526 WNYNETWORKS 05/04/2026 IT SERVICES FOR MARCH 2026 A.5.1490.0420 PUBLIC WORKS ADMIN - MA… 187.50
- DPW
00006526 WNYNETWORKS 05/04/2026 IT SERVICES FOR MARCH 2026 A.5.3120.0420 POLICE DEPT - MAINT. SERVI… 500.00
- EAPD
00006526 WNYNETWORKS 05/04/2026 IT SERVICES FOR MARCH 2026 A.5.3410.0420 FIRE DEPT - DEPT SUPPLIES 250.00
- EAFD
Vendor 11287 - WNYNETWORKS Total: 1,812.50
Grand Total: 248,512.41
5/1/2026 10:02:32 AM Page 7 of 10
Page 172
Expense Approval Report 5.4.2026 Payable Dates: 5/4/2026 - 5/4/2026 Post Dates: 5/4/2026 - 5/4/2026
Report Summary
Fund Summary
Fund Expense Amount
A - GENERAL FUND 241,792.30
F - ENTERPRISE WATER 6,720.11
Grand Total: 248,512.41
Account Summary
Account Number Account Name Expense Amount
A.5.1325.0400 VILLAGE ADMIN - OPER… 240.00
A.5.1325.0403 VILLAGE ADMIN - OFFICE… 347.76
A.5.1325.0440 VILLAGE ADMIN - TRAIN… 737.67
A.5.1420.0411 VILLAGE ATTORNEY - OT… 710.70
A.5.1480.0410 PUBINFO SVCS-PUB INFO… 38,836.56
A.5.1490.0403 PUBLIC WORKS ADMIN -… 87.78
A.5.1490.0420 PUBLIC WORKS ADMIN -… 187.50
A.5.1490.0434 PUBLIC WORKS ADMIN -… 37.29
A.5.1620.0420 BUILDINGS - MAINT & R… 359.73
A.5.1620.0431 BUILDINGS - ELECTRIC 519.31
A.5.1640.0420 CENTRAL GARAGE - MAI… 689.88
A.5.1640.0431 CENTRAL GARAGE - ELEC… 484.25
A.5.1640.0450 CENTRAL GARAGE - GAS… 3,744.19
A.5.1640.0460 CENTRAL GARAGE - VEH… 477.62
A.5.1640.0480 CENTRAL GARAGE - UNI… 295.68
A.5.1910.0410 UNALLOCATED INSURA… 4,048.49
A.5.3120.0127 POLICE DEPT - UNIFORM… 159.99
A.5.3120.0403 POLICE DEPT - OFFICE S… 500.48
A.5.3120.0420 POLICE DEPT - MAINT. S… 500.00
A.5.3120.0434 POLICE DEPT - TELEPHO… 111.87
A.5.3120.0440 POLICE DEPT - TRAINING,… 1,026.80
A.5.3120.0460 POLICE DEPT - VEHICLE … 894.14
A.5.3120.0470 POLICE DEPT - DEPTAL S… 1,427.99
A.5.3120.0480 POLICE DEPT - UNIFORM… 80.99
A.5.3410.0200 FIRE DEPT - EQUIP 2,025.20
A.5.3410.0420 FIRE DEPT - DEPT SUPPLI… 3,449.93
A.5.3410.0431 FIRE DEPT - ELECTRIC 1,220.85
A.5.3410.0434 FIRE DEPT - TELEPHONE 97.99
A.5.3410.0440 FIRE DEPT - TRAINING, T… 826.16
A.5.3410.0450 FIRE DEPT - GASOLINE, O… 621.57
A.5.3410.0460 FIRE DEPT - VEHICLE MA… 732.01
A.5.3410.0497 FIRE DEPT-EMS SUPPLIES 16.88
A.5.3420.0200 POLICE & FIRE DISPATCH… 1,919.25
A.5.3420.0470 POLICE & FIRE DISPATCH… 383.03
5/1/2026 10:02:32 AM Page 8 of 10
Page 173
Expense Approval Report 5.4.2026 Payable Dates: 5/4/2026 - 5/4/2026 Post Dates: 5/4/2026 - 5/4/2026
Account Summary
Account Number Account Name Expense Amount
A.5.5110.0480 STREET MAINT - UNIFO… 184.99
A.5.5182.0431 STREET LIGHTING - ELEC… 1,454.34
A.5.7140.0420 PLAYGROUNDS & REC C… 46,045.00
A.5.7520.0440 HISTORIC PRESERVATION… 483.94
A.5.8160.0410 REFUSE & GARBAGE 49,921.51
A.5.8560.0430 SHADE TREES - TREE PU… 450.00
A.5.9045.0803 LIFE INS - LIFE INS 858.00
A.5.9045.0804 LIFE INS - LIFE INS-RETIR… 468.85
A.5.9060.0805 HOSPITAL & MEDICAL IN… 46,236.80
A.5.9060.0806 HOSPITAL & MEDICAL IN… 20,178.64
A.5.9061.0807 DENTAL INS - DENTAL INS 6,644.04
A.5.9062.0808 OPTICAL - OPTICAL 1,066.65
F.5.1620.0431 BUILDINGS - ELECTRIC 66.11
F.5.8340.0470 TRANSFS & DIST - SUPPL… 53.50
F.5.8340.0490 TRANSFS & DIST - WATER… 126.00
F.5.9045.0803 LIFE INS - LIFE INS 88.00
F.5.9045.0804 LIFE INS - LIFE INS-RETIR… 30.97
F.5.9060.0805 HOSPITAL & MEDICAL IN… 4,811.89
F.5.9060.0806 HOSPITAL & MEDICAL IN… 950.51
F.5.9061.0807 DENTAL INS - DENTAL INS 511.08
F.5.9062.0808 OPTICAL - OPTICAL 82.05
Grand Total: 248,512.41
Project Account Summary
Project Account Key Expense Amount
**None** 248,512.41
Grand Total: 248,512.41
5/1/2026 10:02:32 AM Page 9 of 10
Page 174
Expense Approval Report 5.4.2026 Payable Dates: 5/4/2026 - 5/4/2026 Post Dates: 5/4/2026 - 5/4/2026
Authorization Signatures
***** Certificate of Financial Officer *****
I hereby certify that the attached Voucher Listing is complete and accurate to the best
of my knowledge, and payment is hereby approved.
Signed:________________________________________ Date:__________________
5/1/2026 10:02:32 AM Page 10 of 10
Page 175
VILLAGE OF EAST AURORA
APPLICATION FOR TEMPORARY USE PERMIT
Not less than 60 da s or more than 75 da s be ore date o
$25 .00 Application Fee_ __ __ $50.00 Permit Fee _ _ __
$100.00 Mailer Fee (300 fe t for road/publi c parking lot closure and/or outdoor music) _ _ __
4/22/26
Date Application Filed : _ _ _ _ _ _ __ _
Date of V.B. Action : _ _05/04/26
_ _ _ _ _ _ __ Approved: _ _ _ Disapproved: - - -
Conditions of approval will be listed In the permit.
Sect. 285-52 Participants of an urea activity, such as, but not necessarily limited to, a sidewalk sale, art, antique, craft
show and/ or sales, farmers market, or community/civic promotion activities and slmllar.
Please type or print legibly
Name of Organization : Cos.-\: ~ )(bro.. \)o \of\ tree Sct<;;d b ·,5
I ( I Ct
Is Organization a: not-for-profit Char~le/Service Business ~
Name Address of Individual Responsible: . l... .5 0 ~<"'\
Phone Number: ~-'--'---'"::.....J.:i~'---,--
Event ame: \!5 -\- IJi> -n:,... f·
Oa~~(s) of ~vent:\l}('S(\a.f.rJ\:i'e 9
th Time(s) of Event. !5~W'1\ - \'.3oprrestimated # of People: 300
~ ,n ~\-e. ·Wc~~f, Jvf'e. \ 6~ .
Please describe activity/purpose of rt,is evert: 5hl6en ~ ~ '.\\ a<,,,chc i p:--k It"'\ ~ vur1ebJ ol--
O ~"'l.fd. o..C.\-\v ,hes k:r -rr\e.rcJ\'/ ( O ~ h h Ci> ,- 1
Loc)tion (include all areas of the event): furn J-\:;e \ :::)()S..Q..hs,\\ c\ , p.,Y)'\(>()(\ b e..., \, \-o ~ \ J-\.-\e. \~ l
(attach map) ' ~ \ I +1 ~'Cf
Will this event be donating a portion of proceeds to one or more charities and publicizing that in promotional
material? Yes@
If yes, list charities and the percentage of proceeds to be donated: _ _ _ _ _ _ _ _ _ _ _ _ _ __
Will this event be held entirely in the Village of East Aurora?@ No
If no, s p e c i f y : - - - - - - - - - - - - - = = - - - - - - - - - - - - - - -
Will the event inclu de more than one vendor/organization? Yes@(if Yes, attach list of vendors/participants)
Will the event involve a street or parking lot closure/usage? Yes@ If yes, please note:
Road/Lot Name(s): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Date(s) of Closure: _ _ _ _ _ _ _ _ _ _ _ _
Will the event include:
Parade or motorcade Yes
Walk or Run Yes
Will there be outdoor music? Yes
o
f Time(s):_ _ _ _ _ _ _ _ __
(If Yes, attach Map of route)
(If Yes, attach Map of route)
Time & Location:
----------------
Amplification: Yes Type: Live DJ Multiple/Mixed
Will you be providing or selling alcohol? Yes ®)
Will people be allowed to bring alcohol? Yes ®
Will there be Security Guards? Yes ~ Volunteers or Private Paid Entity
Please List Entity Name_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Will there be temporary food stands? Yes €)
How many? _ _ __
Food Truck? If yes, name of vendor: _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ __ _ _ _ _ __
(additiona l permit required)
Will a tent or other structure be erected for the event? Yes~ Size: _ _ __ __ _ __ _ _ _ __
Date & Time to be installed _ _ _ _ _ _ __ _ __ _ Date & Time to be removed _ __ _ _ _ _ __ _
Page 176
Will any prep work be done on/or before the event? Yes
Please describe: - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - -
Set up Date: _ _ __ Time: - - - - - -
Clean up Date: _ _ _ _ Time:
------
Will additional garbage cans be needed? Yes ~ How many _ _ Drop Off Location : ______
Do you have a Recycling Plan? Yes ~ Pl ease describe :__._N_+-/_/A-__,_________________
Will each vendor/organization be respo nsible for th ei r own garbage? Yes
Will a dumpster be used? Yes ® If yes, location: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Will there be portable lavatories? Yes ~ How M any? _ __
Location(s): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Will there Bell Jar or Games of Chance? Yes @ (if yes, separate permit required)
What is the source of electricity, if applicable? _f'-JL...::::.../2r...:.~~------------------
/
Please list any extras e.g. Light show, loudspeakers, decorations, paints, or dyes:
NoDC.
Police Services Requested: _.._f\.>..L..
l .o:..:.n....1....:e...=--------
:::: ------------------
(Crossing Guards may be requi red dependent upon event and is a decision of the Police Department)
DPW Services Requested: - • N - = - c v - e ' - - - = - - - - - - - - - - - - - - - - - - - - - - - - -
Fire/Other: No'{\e_
- Attach a map or sketch showing the location of the event. Such map shall include:
Location of parking facilities, indicating number of parki ng spaces being provided; location of toilet facilities
including the location of port-a-potties; location of public entrance(s) and exit(s) to the event site; location of vendor
facilities (if applicable) including booths, tents and food service facilities; explanation of steps being taken to control
traffic and provide security (if applicable) and the number of security personnel that will be present.
_ L Requesting organization shall attach a completed Certificate of Insurance w ith minimum limits including public
liability coverage of limits of $1,000,000 each occurrence; property damage insurance with limits of $1,000,000 each
occurrence. The policy shall be endorsed to include Village of East Aurora as an additional named insured.
~ Requesting organization shall attach Indemnification Agreement on organization letterhead, signed by
authorized app licant or officer of company and duly notarized (sample included)
"Applicant named herein is fully responsible for obtaining any & all licensing w ith regard to the presentation or
playing of music, pursuant to music copyright laws. The Village of East Aurora assumes no liability in this regard».
Police Department: Conditions/Comments________________________
Dept of Public Works: Conditions/Comments_ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Fire Dept/Disaster Coordinator: Conditions/Comments_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
~i n Permits are to be obtained from the Town of Aurora Bulldin De artment 575 Oakwood Ave, 716.652.7591
ClukShued/formsN1ll•c• Permit Apphc,t1on rorms/Apphut1on Ttmpo,,ry UH Pttmk.
Page 177
I
I l
I
r
I
i iI I
I
I I
I
\
I
I
I
V)
~
~
n
BO ""'>
1 ---,~
•
~ ,-::--n~~::,i
.. .
I I
' -• - ~
13. •
Page 178
I
DATE (MM/DDIYYYY)
ACORD~ CERTIFICATE OF LIABILITY INSURANCE
~ 4/16/2026
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVE LY AMEND, EXTE ND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT C ONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDE R .
IMPORTANT: If the ce rtificate holder Is an ADDITIONAL INS URED , the policy(les) mus t h av e ADDITIONAL INS URED p rovisions or be endorsed .
If SUBROGATION IS WAIVED, s ubj ec t to th e t erms and c onditio n s of the p o licy , certa i n p olicies m ay require an endorsem ent. A stat ement on
this certificate d oes not c onfer r ights to the certifi cate h o lder In lie u o f such endorsem ent(s ).
CONtACT
PRODUCER NAME·
A rthur J. Gallagher Risk Management Services , LLC PHONE
200 Delaware Avenue ~C. No,_ExtJ· NoJ: I r~
Suite 1100 ~l~hs· [email protected]
Buffalo NY 14202 INSUR_ER(S) AFFORDING COVERAGE NAIC I
INSURE~ A : Utica National Insurance Comoanv of Ohio 13998
INSURED EASTAUR-05
INSURER B:
East Aurora Union Free School District
INSURER C:
430 Main Street
East Aurora 14052 INSURER D :
INSURER E :
INSURERF :
COVERAGES CERTIFICATE NUMBER· 1301178357 REVISION NUMBER·
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLIC IES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
INSR ADDL 1SUBR POLICY EFF
H'R TYPE OF INSURANCE ' ••••n '·~-POLICY NUMBER ' IMM/QDIVVVVI /~~rJi~ I LIMITS
A
-- D
X I COMMERCIAL GENERAL UABIUTY
Cl.AIMS-MADE 0 OCCUR
y CPP4051326 7/1/2025 7/1/2026 EACH OCCURRENCE $1 ,000,000
p~:S'eJ?E~~~ence' $1 ,000,000
--
GEN'\. AGGREGATE LIMIT APPLIES PER
MEO EXP (A~ one pe"®l
PERSONAL & ADV INJURY
GENERAL AGGREGATE
S 10,000
$1 ,000,000
$3,000,000
POLICY □ ~~ 0 LOC
A
R OniER
AUTOMOBILE LIABILITY BAC4051327 7/1/2025 7/1/2026
PRODUCTS • COMP/OP AGG
COMBINED SINGLE LIMIT
$3,000,000
s
S 1,000,000
-X NfYAUTO iEa arodentl-
BODILY INJURY (Per person) s
- - SCHEDULED
- X
OWNED
AUTOS ONLY
HIRED
AUTOS ONLY
-X AUTOS
-
NON-OWNED
AUTOS ONLY
BODILy INJURY (Per acadenl)
fP~~~Zc~d°Z,8AMAGE
s
$
s
M
A X UM8REU..A UAB CULP4055492 7/1/2025 7/1/2026 EACH OCCURRENCE s 10,000,000
OCCUR
- EXCESSUAB ClAJMS-MAOE AGGREGATE S 10,000,000
I
OED I X RETENTION$ 1 n n M $
WORKERS COMPENSATION
AND EMPLOYERS' LIABILITY I ~ffTuTE I TOTH•
ER
Y/ N
ANYPROPRJETOM>ARTNER/EXEC\JTIVE E.L EACH ACCIDENT s
OFACER/MEMBEREXCLUDE07
(Mandato,y In NH) □ N/ A E.L DISEASE • EA EMPLOYEE S
i r s t : ~ ~OPERATIONS below E.L. DISEASE· POLICY LIMIT s
I
DESCRIPTION OF OPERATIONS I LOCATIONS / VEHICLES (ACORD 101, AddlUonol Rtmarks Schtdult, moy be attached II more space Is rt qulred)
RE: Event: 5th and 6th grade Field Day at Hamlin Park on 6/9/26 (with a rain date of 6/ 10/26).
Village of East Aurora Is included as A dditional insured is on the GL under form number BE3042, as per written and executed contract.
CERTIFICATE HOLDER CANCELLATION
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
ACCORDANCE WITH THE POLICY PROVISIONS.
Village o f East A urora
585 Oakwood A venue
East Aurora NY 14052
.
AUTHORIZED REPRESENTATIVE
I
t:
p:?J-? -
© 1988-2015 ACORD CORPORATION. All rights r eserved.
ACORD 25 (2016/03) The ACORD name and logo are registered marks of ACORD
Page 179
Indemnification Agreement
To the full est extent perm itted by law, I/We shall Indemnify and hold harmless the Village of
East Aurora and Its employees from and against claims, damages, losses and expenses,
Including but not limited to attorney's f ees, arising out of or resulting from performance of our
work under this contract, provided that such claim, damage, loss or expense Is attributable to
bodily Injury, sickness, disease or death, or Injury to or destruction of tangible property,
Including the loss of use resulting there from but only to the extent caused In whole or In part
by negligent acts or omissions of our organization, anyone directly or indirectly employed by us
or for anyone for whose acts they may be liable, regard less of whet her or not such claim,
damage, loss or expense Is caused In part by a party Indemnified hereunder. Such obligation
shall not be cons ed to otherwise exist as to a party or person described In this paragraph.
State of New York)
County of Erie)
Subscribed and sworn to before me this cl_day of_.AL....LJ,p""-'-r--"i...../.____,, 20 g}_(o
MELISSA A WEBSTER
Notary Public, State of New York
~AR~ Reg. No. 01WE6394780
Qualified In Erie County r-1
Commission Expires 07/15/2~ I
Qualified in Erie County, New York/ - /
My commission expires: '1 15 I <XD«.7
Page 180
Page 181
Page 182
Page 183
Page 184
Page 185
April 20, 2026
VILLAGE OF EAST
AURORA
June 2026 – May 2027 GIS Services
Maureen Jerackas, CMFO, RMC
Village Clerk Treasurer
585 Oakwood Ave
East Aurora, NY 14052
ARCHITECTURE | ENGINEERING | PLANNING | ENERGY EFFICIENCY | CONSTRUCTION MANAGEMENT
Page 186
2
VILLAGE OF EAST AURORA | 2026-2027 GIS SERVICES
SUBJ ECT: VILLAGE OF EAST AURORA 2026-2027 GIS SERVICES
Dear Ms. Jerackas:
Wendel is pleased to submit this
proposal for professional services
associated with the Village of East
Aurora’s GIS. Since 2010, Wendel has
administered the Village’s GIS, which
assists staff with the management of
their infrastructure and assets. The
following scope of work outlines the
annual administrator and GIS data
hosting fee for Wendel to manage the
Village of East Aurora’s ArcGIS Online
Account from June 2026 to May 2027.
A. SCOPE OF WORK
The following represents our understanding of the scope of services required of Wendel for this term
agreement.
ArcGIS Online Annual Subscription
As of March 2026, the Village has the following license types in their ArcGIS Online annual subscription:
Lic en s e Typ e # of Users Cu rren tly A s s ign ed
Creator 1 True Capalbo, Wendel
Ed itor 1 Christine Cappola
Mob ile Worker 2 Jeff Stoll, Brian Halt
V iewer 2 Melanie Walker, Maureen Jerackas
Task 1 – Annual GIS Data Hosting and ArcGIS Online Administration
Wendel will host the Village’s GIS data on our secure ArcGIS Server environment. This data is then served
to the Village via Esri’s ArcGIS Online environment. Wendel will host the data and provide the Village with
access to their data from June 1, 2026, to May 31, 2027. The Village of East Aurora owns any data
collected and maintained with this GIS solution. Should the Village want a copy of their GIS data, Wendel
will provide an Esri file geodatabase containing all of the Village’s GIS data layers that are maintained on
Wendel’s ArcGIS Server.
wendelcompanies.com
Page 187
3
VILLAGE OF EAST AURORA | 2026-2027 GIS SERVICES
Wendel will administer and maintain the Village of East Aurora’s ArcGIS Online account and named users
so staff can continue to focus on their daily tasks regarding the Village’s operations. Wendel will provide
base layer data updates for the Village’s ArcGIS Online which shall include updates of parcel information
and environmental data when available.
Task 2 – Trimble Catalyst DA2 Annual Subscription
In December 2022, the Village purchased a Trimble Catalyst DA2 GNSS Receiver for GPS data collection.
The Trimble Catalyst Receiver is a subscription-based GPS unit, meaning the unit is purchased, and then
each year after that, a subscription is paid for the specific accuracy required. The Village is currently
subscribed to the sub-meter accuracy (60cm) plan.
Below are the subscription plan options that Trimble offers:
Please note that the pricing for the annual subscription is subject to price changes that are dictated by
Trimble.
Task 3 – GIS/GPS Support Services
Wendel will provide ongoing GIS/GPS technical support and training for the Village’s GIS solution. The
support and training include but are not limited to; training sessions for staff on the use of the GIS Web
Map apps and/or mobile GPS, answering technical GIS or database and computer-related questions from
staff, providing guidance and recommendations of GIS procedures, and adding new data layers to the GIS
Web Map apps and GPS data collection app (Field Maps). The above-listed training and support services
may be provided via phone, remote web access and/or site visits.
Should any tasks/requested services go above and beyond the yearly allotted GIS/GPS Support budget,
Wendel shall prepare a new proposal with an associated fee schedule.
wendelcompanies.com
Page 188
4
VILLAGE OF EAST AURORA | 2026-2027 GIS SERVICES
B. ASSUMPTIONS
wendelcompanies.com
Page 189
5
VILLAGE OF EAST AURORA | 2026-2027 GIS SERVICES
C. PROPOSAL FEE:
We trust the above scope of work meets the Village of East Aurora’s requirements. The proposed fee for
the project is detailed below.
PROPOSAL FEE
Task Proposed Fee
A n n u al A rc GI S On lin e Su b s c rip tion – Paid to Es ri $1,565 (Lump Sum)1,2
Task 1 – Annual GIS Data Hosting and ArcGIS Online Administration $3,600 (Lump Sum)
Tas k 2 – Trimble Catalyst DA2 Annual Subscription $ 501 (Lump Sum)2
Tas k 3 – GIS/GPS Support Services $2,000 (Time & Expense)3
TOTAL $7,666
1To be purchased by the Village of East Aurora through that vendor.
2Please note that this amount is subject to change as dictated by the vendor.
3Time & Expense – this line item will only be billed if work is requested by the Village.
Fee Notes:
1.) Should Wendel be required to perform additional services beyond those outlined above, Wendel shall
be compensated on an hourly or fixed-sum basis for a mutually agreed scope of services.
2.) Our fee and schedule proposal is valid for 60 days. If we do not receive a signed notice to proceed
before that date, we reserve the right to re-evaluate our proposal.
3.) The Village of East Aurora’s ArcGIS Online Subscription is paid through June 13, 2026.
TERMS
wendelcompanies.com
Page 190
6
VILLAGE OF EAST AURORA | 2026-2027 GIS SERVICES
This proposal and the attached Professional Services Terms are intended to represent the entire
contractual relationship. Please contact me if you have any questions. If this proposal and attached
general conditions are acceptable to you, please indicate your acceptance by signing both originals and
return one (1) executed original to our office.
Respectfully Submitted,
True Capalbo Robert D. Klavoon, PE
GIS Manager Project Sponsor
Enc.
Should Wendel’s proposal be accepted, Wendel Consulting Services, LLC, that is part of a consolidated
group of Wendel Companies, will contract to undertake the work. Our letterhead and plans will still
prominently say “Wendel” and we will refer to ourselves as Wendel throughout the project.
ACCEPTANCE / AUTHORIZATION:
Accepted this _______________ day of ________________________, 20________
Print Name: __________________________________________________________
Signature: ___________________________________________________________
Title: ________________________________________________________________
RETURN TO:
Wendel
Attn: True Capalbo
375 Essjay Road, Suite 200
Williamsville, NY 14221
wendelcompanies.com
Page 191
Esri Inc
380 New York St
Redlands CA 92373-8118
Subject: Renewal Quotation
Date: 03/15/2026
To: Maureen Jerackas
Organization: Village of East Aurora
Village Hall
Fax #: Phone #: (716) 652-6000
From: Pete Bennett
Fax #: 909-307-3083 Phone #: +19093692063 Ext. 2063
Email: [email protected]
Number of pages transmitted Quotation #26342737
(including this cover sheet): 4 Document Date: 03/15/2026
Please find the attached quotation for your forthcoming term. Keeping
your term current may entitle you to exclusive benefits, and if you choose
to discontinue your coverage, you will become ineligible for these valuable
benefits and services.
If your quote is regarding software maintenance renewal, visit the
following website for details regarding the maintenance program benefits
at your licensing level
https://www.esri.com/en-us/cp/maintenance
All maintenance fees from the date of discontinuation will be due and
payable if you decide to reactivate your coverage at a later date.
Please note: Certain programs and license types may have varying
benefits. Complimentary User Conference registrations, software support,
and software and data updates are not included in all programs.
Customers who have multiple copies of certain Esri licenses may have the
option of supporting some of their licenses with secondary maintenance.
For information about the terms of use for Esri products as well as
purchase order terms and conditions, please visit
http://www.esri.com/legal/licensing/software-license.html
If you have any questions or need additional information, please contact
Customer Service at 888-377-4575 option 5.
Page 192
380 New York St
Redlands, CA 92373-8118 Quotation
Phone: +190936920632063
Fax #: 909-307-3083
Date: 03/15/2026 Quotation Number: 26342737 Contract Number: 00044013.6
_______________________________________________________________________________
Send Purchase Orders To:
Environmental Systems Research Institute, Inc.
380 New York Street
Redlands, CA 92373-8100
Village of East Aurora Attn: Pete Bennett
Village Hall Please include the following remittance address
585 Oakwood Ave on your Purchase Order:
East Aurora NY 14052-2353 Environmental Systems Research Institute, Inc.
Attn: Maureen Jerackas P.O. Box 741076
Email: [email protected] Los Angeles, CA 90074-1076
Phone: 716-652-6000
Customer Number: 230697
For questions regarding this document, please contact Customer Service at 888-377-4575.
_______________________________________________________________________________
Item Qty Material# Unit Price Extended Price
_______________________________________________________________________________
For customers purchasing from the State of New York Centralized Contract No.PM67345/Esri Contract No.
305303, supplemental licensing terms and conditions for the Esri products also apply and can be found here
http://www.esri.com/legal/software-license
10 2 153147 123.92 247.84
ArcGIS Online Viewer User Type Annual Subscription
Start Date: 06/14/2026
End Date: 06/13/2027
Subscription ID: 1062800389
1010 1 153148 689.13 689.13
ArcGIS Online Creator User Type Annual Subscription
Start Date: 06/14/2026
End Date: 06/13/2027
Subscription ID: 1062800389
2010 1 165531 246.84 246.84
ArcGIS Online Contributor (formerly Editor) User Type Annual Subscription
Start Date: 06/14/2026
End Date: 06/13/2027
_______________________________________________________________________
Please note Esri has introduced a price change and this quote reflects current pricing for your organization. It is important to us that we are
able to continue to deliver value through enhancements to products, solutions, and capabilities.
Your renewal provides access to all the benefits you are familiar with, which you can review at https://go.esri.com/maintenance
For questions related to the price change, please reach out to your assigned Esri Account Manager.
Quotation is valid for 90 days from document date.
Any estimated sales and/or use tax has been calculated as of the date of this quotation and is merely provided as a convenience for your
organization's budgetary purposes. Esri reserves the right to adjust and collect sales and/or use tax at the actual date of invoicing. If your
organization is tax exempt or pays state taxes directly, then prior to invoicing, your organization must provide Esri with a copy of a current
tax exemption certificate issued by your state's taxing authority for the given jurisdiction.
Esri may charge a fee to cover expenses related to any customer requirement to use a proprietary vendor management, procurement, or
invoice program.
To expedite your order, please reference your customer number and this quotation number on your purchase order.
Page 193
380 New York St
Redlands, CA 92373-8118 Quotation
Phone: +190936920632063 Page 2
Fax #: 909-307-3083
Date: 03/15/2026 Quotation Number: 26342737 Contract Number: 00044013.6
_______________________________________________________________________________
Item Qty Material# Unit Price Extended Price
_______________________________________________________________________________
Subscription ID: 1062800389
3010 2 165533 393.93 787.86
ArcGIS Online Mobile Worker User Type Annual Subscription
Start Date: 06/14/2026
End Date: 06/13/2027
Subscription ID: 1062800389
Item Subtotal 1,971.67
Estimated Tax 0.00
Total USD 1,971.67
DUNS/CEC: 06-313-4175 CAGE: 0AMS3
Page 194
380 New York St
Redlands, CA 92373-8118 Quotation
Phone: +190936920632063 Page 3
Fax #: 909-307-3083
Date: 03/15/2026 Quotation No: 26342737 Customer No: 230697 Contract No: 00044013.6
_______________________________________________________________________________
Item Qty Material# Unit Price Extended Price
_______________________________________________________________________________
To expedite processing, please reference the quotation number and any/all applicable Esri contract number(s) (e.g. MPA, EA,
GSA, BPA) on your ordering document.
If you choose to discontinue your support, you will become ineligible for support benefits and services. All maintenance fees
from the date of discontinuation will be due and payable if you decide to reactivate your support coverage at a later date.
The items on this quotation are subject to and governed by the terms of this quotation, the most current
product specific scope of use document
found at http://assets.esri.com/content/dam/esrisites/media/legal/product-specific-terms-of-use/e300.pdf, and
your applicable signed agreement with Esri. If no such agreement covers any item quoted, then Esri's standard terms and
conditions found at http://assets.esri.com/content/dam/esrisites/media/legal/ma-full/ma-full.pdf apply to your purchase of
that item. Federal government entities and government prime contractors authorized under FAR 51.1 may purchase under
the terms of Esri's GSA Federal Supply Schedule. Supplemental terms and conditions
found at http://www.esri.com/en-us/legal/terms/state-supplemental apply to some state and local government purchases.
All terms of this quotation will be incorporated into and become part of any additional agreement regarding Esri's
offerings. Acceptance of this quotation is limited to the terms of this quotation. Esri objects to and expressly rejects any
different or additional terms contained in any purchase order, offer, or confirmation sent to or to be sent by buyer. Unless
prohibited by law, the quotation information is confidential and may not be copied or released other than for the express
purpose of system selection and purchase/license. The information may not be given to outside parties or used for any other
purpose without consent from Esri. Delivery is FOB Origin.
Page 195
QUOTE
as of 4/17/2026
Bill to: Ship to:
Village of East Aurora, NY Village of East Aurora, NY
585 Oakwood Avenue 585 Oakwood Avenue
East Aurora, NY 14052 East Aurora, NY 14052
Reseller (Remit To):
LiftOff LLC
Attn: Ron Braatz
1667 Patrice Circle
Crofton, MD 21114
Terms:
Due on Receipt
Payment Options:
ACH Payment (preferred) or check
Quote Description
Term in Price/User/
G SKU Item Name Part Number Licenses Cost/Year
Months Month
Exchange Online Plan 1
3MS-00001 12 3.80 50 $2,280.00
GCC
Office 365 G3 GCC AAA-11894 12 27.83 6 $2,003.76
M365 Apps GCC 3WS-00001 12 13.20 1 $158.40
Total: $4,442.16
Pricing Information:
• All prices are displayed in United States Dollars.
• Product and pricing data are updated frequently and may change without notice.
• Pricing valid for 14 days
• License orders are paid up front, are non-refundable, and are one-year licenses that renew each year.
• License reductions, upgrades, or cancellations may only occur at the annual renewal date.
In order to proceed, send a Purchase Order to [email protected]. Once we have the Pur-
chase Order, we will order the licenses from Microsoft. We will immediately invoice the full amount
when we place the order.
© 2025 LiftOff, LLC. All Rights Reserved
www.LiftoffOnline.com
Page 196
Customer Terms for Cloud Services Agreement
US Public Sector
This agreement is between LiftOff LLC (“we”, “us”, and “our”) and Village of East Aurora, NY (“you” and
“your”). It is effective when we accept it. Key terms are defined in § 8.
1. General.
Right to use. You may access and use Office 365, and install and use a Client (if any) included with your
Subscription, only as described in this agreement. All other rights are reserved.
Acceptable use. You will use Office 365 only per the AUP. You will not use Office 365 in any way that
infringes a third party’s patent, copyright, or trademark or misappropriates its trade secret. You may not reverse
engineer, decompile, work around technical limits in, or disassemble Office 365, except if applicable law permits
despite this limit. You may not rent, lease, lend, resell, transfer, or host Office 365 to or for third parties.
Compliance. You will comply with all laws and regulations applicable to your use of Office 365. In providing
Office 365, we and our Providers will comply with all laws and regulations (including applicable security breach
notification law) that generally apply to IT service providers. You will obtain any consents required: (1) to allow
you to access, monitor, use, and disclose user data; and (2) for us to provide Office 365. If you are an educational
institution, you will obtain any parental consent for end users’ use of Office 365 as required by applicable law.
Customer Data. Customer Data is used only to provide you Office 365. This use may include troubleshooting
to prevent, find and fix problems with Office 365’s operation. It may also include improving features for finding
and protecting against threats to users. Neither we nor our Providers will derive information from Customer
Data for any advertising or other commercial purposes. We will enable you to keep Customer Data separate
from consumer services. Customer Data will not be disclosed unless required by law or allowed by this agree-
ment. Your contact information may be provided so that a requestor can contact you. If law requires disclosure,
we will use commercially reasonable efforts to notify you, if permitted. Customer Data may be transferred to,
and stored and processed in, any country we or our Providers maintain facilities, unless you provision your
tenant in the United States, If you do, Microsoft will provide Office 365 from data centers in the United States,
and storage of the following customer data at rest will be located in data centers only in the United States: (i)
Exchange Online mailbox content (e-mail body, calendar entries, and the content of e-mail attachments), and
(ii) SharePoint Online site content and the files stored within that site.
Changes. Office 365 may be changed periodically, after which you may need to agree to new terms. You may
be required to run a client software upgrade on devices using Office 365 after a change to maintain full func-
tionality.
Use rights. Use rights specific to Office 365 are posted online at the link to the AUP.
2. Confidentiality and Security.
We and our Providers will (a) maintain appropriate technical and organizational measures, internal controls,
and data security routines intended to protect Customer Data against accidental loss or change, unauthorized
disclosure or access, or unlawful destruction and (b) not disclose Customer Data, except as required by law or
expressly allowed. Neither party will make any public statement about this agreement’s terms without the
other’s prior written consent.
© 2025 LiftOff, LLC. All Rights Reserved
www.LiftoffOnline.com
Page 197
3. Term, Termination, and Suspension.
Term and termination. This agreement will remain in effect for three years subject to your right under appli-
cable law to terminate for convenience.
Customer Data. You may extract Customer Data at any time. If your Subscription expires or terminates, we
will keep your Customer Data in a limited account for at least 90 days so you may extract it. We may delete
your Customer Data after that.
Regulatory. If a government rule or regulation applies to us or our Providers, but not generally to other busi-
nesses, and makes it difficult to operate Office 365 without change, or we or our Providers believe this agree-
ment or Office 365 may conflict with the rule or regulation, we may change Office 365 or terminate the agree-
ment. If we change Office 365 to come into compliance, and you do not like the change, you may terminate.
Suspension. We may suspend use of Office 365: (1) if reasonably needed to prevent unauthorized
Customer Data access; (2) if you do not promptly respond under §5 to intellectual property claims; or (3) for
non-payment; or (4) if you violate the AUP. A suspension will be in effect only while the condition or need
exists and, if under clause (1) or (2), will apply to the minimum extent necessary. We will notify you before we
suspend, unless doing so may increase damages. We will notify you at least 30 days before suspending for non-
payment. If you do not fully address the reasons for suspension within 60 days after we suspend, we may
terminate your Subscription.
4. Limited warranty; disclaimer.
We warrant that Office 365 will meet the SLA terms during the Subscription; your only remedy for breach of
warranty is stated in the SLA. We provide no (and disclaim to the extent permitted by law any) other warranties, express,
implied, or statutory, including warranties of merchantability or fitness for a particular purpose.
5. Duty to protect.
Defense. We or our Providers will defend you against any claims made by an unaffiliated third party that Office
365 infringes its patent, copyright, or trademark or misappropriates its trade secret.
Remedies. If we or our Providers reasonably believe that a claim under §5 may bar your use of Office 365, we
or our Providers will seek to: (1) obtain the right for you to keep using it; or (2) modify or replace it with a
functional equivalent and notify you to stop use of the prior version. If these options are not commercially
reasonable, we or our Providers may terminate your rights to Office 365 and refund any payments for unused
Subscription rights.
Other obligations. To the extent permitted by law, you will (1) notify us promptly of a claim under this §5
and (2) allow us or our Providers to assist in your defense or settlement. You will provide reasonable help to
defend. We or our Providers will reimburse you for reasonable out-of-pocket expenses incurred in giving that
help and pay the amount of any resulting adverse final judgment (or settlement the protecting party consents
to). Neither we nor our Providers will be bound by any settlement to which we do not agree in writing, this §
5 provides the exclusive remedy for these claims.
Limits. The obligations of us and our Providers in this §5 won’t apply to a claim or award based on: (1)
Customer Data; (2) software not provided by us or our Providers; (3) modifications you make to Office 365,
or materials you provide or make available as part of using Office 365; (4) your combination of Office 365 with,
or damages based on the value of, a product, data, or business process not provided by us or our Providers; or
(5) your use of a Microsoft trademark without their express, written consent, or your use of Office 365 after
being notified to stop due to a third-party claim.
© 2025 LiftOff, LLC. All Rights Reserved
www.LiftoffOnline.com
Page 198
6. Limited liability.
Each party’s (and our Providers’) maximum aggregate liability for any claim related to this agreement is limited
to direct damages up to the fees that you paid for Office 365 during the 12 months before the claim arose (or
$5,000.00 if you paid no fees). Neither party nor our Providers will be liable for lost revenues or indirect, special, incidental,
consequential, punitive, or exemplary damages, even if the party knew they were possible. The limits and exclusions in this §6
apply to the extent permitted by law, but do not apply to (1) obligations under §5; or (2) intellectual property
infringement or misappropriation.
7. Agreement mechanics.
You must send notice by regular mail, return receipt requested, to the address on the Portal (effective when
delivered). We may email notice to your account administrators (effective when sent). You may not assign this
agreement, or any right or duty under it. If part of this agreement is held unenforceable, the rest remains in
force. Failure to enforce this agreement is not a waiver. The parties are independent contractors. This agreement
does not create an agency, partnership, or joint venture. This agreement is governed by the laws applicable to
Customer, without regard to conflict of laws. This agreement (including the SLA and AUP) and our price sheet
are the parties’ entire agreement on this subject and supersedes any concurrent or prior communications. Agree-
ment terms that require performance, or apply to events that may occur, after termination or expiration will
survive, including §5. Office 365 and the Client are subject to U.S. export jurisdiction. You must comply with
the U.S. Export Administration Regulations, the International Traffic in Arms Regulations, and end-user, end-
use, and destination restrictions. For more information, see http://www.microsoft.com/exporting/. Our Pro-
viders may deliver Office 365, and the rights granted to us also apply to them.
8. Definitions.
“AUP” means the acceptable use policy at http://www.microsoftvolumelicensing.com/Down-
loader.aspx?DocumentId=5502.
“Client” means device software that we or our Providers provide you with Office 365.
“Customer Data” means all data, including all text, sound, or image files that are provided to us or our Providers
by, or on behalf of, you through your use of Office 365.
“Office 365” means (1) Exchange Online, Exchange Online Archiving, SharePoint Online, Lync Online, and
Office Web Apps included in Office 365 Enterprise Plans E1, E2, E3, E4, K1, and K2; and Office 365 Gov-
ernment Plans G1, G2, G3, G4, K1, and K2; and (2) Exchange Online Archiving; Exchange Online Protection;
Exchange Online Plans 1, 2, Basic, and Kiosk; SharePoint Online Plans 1, 2, and Kiosk; Office Web Apps
Plans 1 and 2; and Lync Online Plans 1, 2, and 3.
“Portal” means the Online Services Portal for Office 365 (see http://www.microsoft.com/online).
“Providers” means our affiliates, licensors, and suppliers, including Microsoft and its applicable affiliates.
“SLA” means the service level commitments we or our Providers make regarding delivery and performance of
Office 365 (see http://www.microsoft.com/licensing/contracts).
“Subscription” means an order for a quantity of Office 365.
© 2025 LiftOff, LLC. All Rights Reserved
www.LiftoffOnline.com
Page 199
MASTER SERVICES AGREEMENT
BETWEEN
VILLAGE OF EAST AURORA
AND
BARTON & LOGUIDICE, D.P.C.
FOR
PROFESSIONAL SERVICES
It is hereby agreed by and between the Village of East Aurora, 585 Oakwood Avenue,
East Aurora, New York (hereina er referred to as “Village”) and Barton & Loguidice (hereina er
referred to as “Engineer”), that the Engineer is retained for the purposes of providing
professional services to the Village pursuant to the following terms and condi ons:
1. The ini al term of this Agreement shall be from April 1, 2026, un l March 31, 2027, but
may be extended by the Village for addi onal one-year periods therea er.
2. General Considera ons:
A. The standard of care for all professional or related services performed or furnished
by Engineer under this Agreement will be the care and skill ordinarily used by
members of the subject profession prac cing under similar circumstances at the
same me and in the same locality. Engineer makes no warran es, express or
implied, under this Agreement or otherwise, in connec on with Engineer’s services.
B. Engineer and its Subconsultants may use and rely upon the informa on, work product
and services provided or performed by others, including, but not limited to, Village’s
representa ves, contractors, and suppliers.
C. Engineer shall commence to provide its services upon the full execu on of this
Agreement and shall provide those services within a reasonable me. In no event
shall Engineer be obligated to perform services on a schedule which, in the
Engineer’s professional judgement, does not provide Engineer sufficient me to
perform in accordance with the aforesaid standard of care.
D. If, through no fault of Engineer, the orderly and con nuous progress of Engineer’s
services is impaired, its services are delayed or suspended, or the Village authorizes
changes in the scope, extent, or character of the Project, then the me for
comple on of Engineer’s services, and the rates and amounts of Engineer’s
compensa on, shall be adjusted equitably.
E. The Village shall no fy the Engineer within seven (7) days from when the Village
becomes aware of any fault or defect in any of the services provided, including
errors, omissions, or inconsistencies on the Engineer’s Instruments of Service.
Page 1
V. E. Aurora-B&L MSA FY 2026-27 (ID 3593336).docx
Page 200
F. All design documents prepared or furnished by Engineer are instruments of service,
and Engineer retains an ownership and property interest (including the copyright
and the right of reuse) in such documents, whether or not the Project is completed.
Engineer grants Village a limited license to use the instruments of service exclusively
for: (1) performance of design or opera on, (2) Project construc on as is the
intended purpose of the documents, and (3) the purpose of maintenance and repair
of the Project, or (4) other documents, reports, details and plans as defined in the
project Scope of Work.
G. The Contract Documents for construc on contracts prepared as a service under this
Agreement are to be the Engineer’s template Contract Documents, including but not
limited to General Condi ons, General Requirements, Informa on for Bidders and
bidding documents, as may be amended by the Village.
H. Absent an agreement to the contrary, Engineer shall not at any me supervise,
direct, or have control over any contractor’s work, nor shall Engineer have authority
over or responsibility for the means, methods, techniques, sequences, or procedures
of construc on selected or used by any contractor, for safety precau ons and
programs incident to a contractor’s work progress, nor for any failure of any
contractor to comply with laws and regula ons applicable to contractor’s work.
I. Engineer neither guarantees the performance of any contractor nor assumes
responsibility for any contractor’s failure to furnish and perform its work in
accordance with the contract between Village and such contractor.
J. Engineer shall not be responsible for the acts or omissions of any contractor,
subcontractor, or supplier, or of any contractor’s agents or employees or any other
persons (except Engineer’s own employees) at the Project site or otherwise
furnishing or performing any construc on work; or for any decisions regarding, or
interpreta ons or clarifica ons of, the construc on contract or Instruments of
Service made by Village or any third party without the advice and consulta on of
Engineer.
K. Engineer shall be responsible only for those Construc on Phase services expressly
required of Engineer by the Task Authoriza on. With the excep on of such expressly
required services in each Task Authoriza on, Engineer shall have no design, Shop
Drawing review, or other obliga ons during construc on, and Village assumes all
responsibility for the applica on and interpreta on of the Construc on Contract
Documents, review and response to Contractor claims, Construc on Contract
administra on, processing of Change Orders and submi als, revisions to the
Construc on Contract Documents during construc on, construc on observa on and
review, review of Contractor’s payment applica ons, and all other necessary
Construc on Phase administra ve, engineering, and professional services, unless
otherwise added to the Task Authoriza on by supplemental agreement.
Page 2
V. E. Aurora-B&L MSA FY 2026-27 (ID 3593336).docx
Page 201
L. If the Construc on Contract Documents specifically require the Contractor to provide
professional design services or cer fica ons by a design professional related to
systems, materials, or equipment, the Engineer shall specify the appropriate
performance and design criteria that such services must sa sfy. The Engineer shall
review and take appropriate ac on on Shop Drawings and other submi als related
to the Work designed or cer fied by the Contractor’s design professional, provided
the submi als bear such professional’s seal and signature when submi ed to the
Engineer. The Engineer’s review shall be for the limited purpose of checking for
conformance with informa on given and the design concept expressed in the
Contract Documents. The Engineer shall be en tled to rely upon, and shall not be
responsible for, the adequacy and accuracy of the services, cer fica ons, and
approvals performed or provided by such design professionals.
M. Village shall bear full responsibility and liability for the genera on, existence, or
presence of any toxic, hazardous, radioac ve, infec ous, mutagenic, teratogenic,
carcinogenic, explosive, combus ble, or other dangerous substances (“hazardous
materials”) pre-exis ng at the site. Village affirms certain addi onal responsibili es
under the Agreement, including without limita on the following:
1. Village shall grant or cause to be granted a license of right-of-way to Engineer
to access all sites necessary for the performance of the Services under this
Agreement.
2. Village shall furnish or cause to be furnished to Engineer all documents and
informa on known to Village that relate to the iden ty, loca on, quan ty,
nature, or characteris cs of any hazardous materials at or near the site(s).
3. Unless otherwise required by law or set forth in this Agreement, Village shall be
responsible for accurately loca ng and prominently marking all buried,
concealed, or submerged pipes, tanks, cables, u li es or other man-made
obstruc ons (“underground facili es”) that may affect or be affected by
Engineer’s services.
N. Unless otherwise included under this Agreement, the par es acknowledge that
Engineer’s Task Authoriza on does not include any services related to a Hazardous
Environmental Condi on (the presence of asbestos, PCBs, petroleum, hazardous
substances or waste, and radioac ve materials). Village represents to Engineer that,
to the best of its knowledge, a Hazardous Environmental Condi on does not exist at
the Site, except as expressly disclosed to the Engineer in wri ng. If Engineer or any
other party encounters a Hazardous Environmental Condi on, Engineer may, at its
op on and without liability for consequen al or any other damages, suspend
performance of services on the por on of the Project affected thereby un l Village:
(i) retains appropriate specialist Engineers or contractors to iden fy and, as
appropriate, abate, remediate, or remove the Hazardous Environmental Condi on;
and (ii) warrants that the Site is in full compliance with applicable Laws and
Regula ons.
Page 3
V. E. Aurora-B&L MSA FY 2026-27 (ID 3593336).docx
Page 202
O. The services to be provided by Engineer under this Agreement DO NOT INCLUDE
advice or recommenda ons with respect to the issuance, structure, ming, terms or
any other aspect of municipal securi es, municipal deriva ves, guaranteed
investment contracts or investment strategies. Any opinions, advice, informa on or
recommenda ons provided by Engineer are understood by the par es to this
Agreement to be strictly engineering or other technical opinions, advice, informa on
or recommenda ons. Engineer is not a “municipal advisor” as defined by 15 U.S.C.
78o-4 or the related rules of the Securi es and Exchange Commission. The other
par es to this Agreement should determine independently whether they require the
services of a municipal advisor.
P. The Engineer shall not be required to execute cer ficates, guarantees, warran es, or
make representa ons that would, in its professional judgment, require knowledge,
services or responsibili es beyond the scope of this Agreement.
Q. Village and Engineer may transmit, and shall accept, Project-related correspondence,
Documents, text, data, drawings, informa on, and graphics, in electronic media or
digital format, either directly, or through access to a secure Project website, in
accordance with a mutually agreeable protocol. If the Scope of Services does not
establish protocols for electronic or digital transmi als, then Village and Engineer
shall jointly develop such protocols. When transmi ng items in electronic media or
digital format, the transmi ng party makes no representa ons as to long term
compa bility, usability, or readability of the items resul ng from the recipient’s use
of so ware applica on packages, opera ng systems, or computer hardware differing
from those used in the dra ing or transmi al of the items, or from those established
in applicable transmi al protocols. The Village may nevertheless require hard copies
of any correspondence, drawings, documents, and graphics for its use at no
addi onal cost.
R. The Village and Engineer may rely on the ini al informa on provided by both par es,
with both recognizing that such informa on may materially change which may result
in adjustments to the scope of any work or services.
S. Except with the Village’s knowledge and consent, the Engineer shall not engage in
any activity, or accept any employment, interest or contribution that would
reasonably appear to compromise the Engineer’s professional judgment with
respect to any work.
3. Engineering Services
Engineering Services may include, but not be limited to:
a. Review of contracts relating to the construction and/or reconstruction of new
buildings;
b. Review of matters referred to him/her to determine propriety of procedure;
c. Development and review of any plans proposed for the construction of any buildings
in the Village;
Page 4
V. E. Aurora-B&L MSA FY 2026-27 (ID 3593336).docx
Page 203
d. Attendance at any Regular meetings, including any meetings involving the local ZBA,
Planning Commission, and/or Village Board or other meetings as may be requested
from time to time;
e. The Engineer shall contact the governmental authorities required to approve any
Construction Documents and the entities providing utility services to the Project;
f. The Engineer shall assist the Village in connection with the Village’s responsibility for
filing documents required for the approval of governmental authorities having
jurisdiction over the Project.
g. The Engineer shall review any construction project within the Village and other
information, including, but not limited to any budget and/or cost estimates as well
as any laws, codes, and regulations applicable to the Engineer’s services;
h. During the development of any Construction Documents on any Village project, the
Engineer shall assist the Village in the review of: (1) selection and procurement
information that describes the time, place and conditions of selection, including
bidding or proposal forms; (2) the form of agreement between the Village and any
Contractor; and (3) the Conditions of the Contract for Construction (General,
Supplementary and other Conditions;
i. The Engineer shall review and respond to requests for information about any
construction projects;
j. The Engineer shall forward to the Village any of the following information received
from any party: (1) consent of surety or sureties, if any, to reduction in or partial
release of retainage or the making of final payment; (2) affidavits, receipts, releases
and waivers of liens or bonds; and (3) any other documentation required as part of
any development or construction project in the Village that must be reviewed by the
Village and/or any board associated with the Village; and,
k. Such other duties as may be assigned.
4. Specific Task Authoriza on for Individual Ma ers
Engineer shall provide, or cause to be provided, the services set forth in each Task
Authoriza on, and Village shall pay Engineer for such services as set forth in such Task
Authoriza on. Once duly signed by Village and Engineer, each Task Authoriza on will be
deemed a part of and incorporated in this Agreement by reference. A template for Task
Authoriza ons is provided herein as Exhibit A. In the event of any inconsistency between
a par cular Task Authoriza on and the terms of this Agreement, the terms of this
Agreement shall control.
5. Engineer shall not provide any services to the Village without the prior direction of the
Village or any individual representative provided with such authority.
Page 5
V. E. Aurora-B&L MSA FY 2026-27 (ID 3593336).docx
Page 204
a. The Engineer shall perform its services consistent with the professional skill and care
ordinarily provided by Engineers practicing in the same or similar locality under the
same or similar circumstances. The Engineer shall perform its services as
expeditiously as is consistent with such professional skill and care and the orderly
progress of the Project.
b. In the event that the Engineer employs others to work on the Project on behalf of
the Village, the Engineer shall provide the Village with the requisite informa on to
iden fy such individuals and the Engineer shall remain responsible for the services
provided to the Village by such individuals.
6. Costs and Fees.
a. The Village shall be responsible for all costs and disbursements (e.g., filing fees,
permit fees, delivery charges, copies, long distance charges, etc.) necessarily
incurred on behalf of the Village by the Engineer. The charge for such services
would be without a retainer required.
b. Such charges shall not include the time of travel to and from the Engineer’s office.
All billings by Engineer for design and related services rendered to the Village shall
be submitted to the designated individual along with a description of the work
performed, the date such work was performed, the individual performing such
services, and the amount of time expended in the nearest quarter of an hour for
each such service provided. Invoices shall be submitted to the designated individual
on a monthly basis. Unless otherwise directed by Village, separate invoices shall be
submi ed for each Task Authoriza on, based on payment methods and amounts set
forth in each Task Authoriza on. Suppor ng informa on will be provided with each
invoice.
c. Payment of Invoices. Invoices are due and payable within thirty (30) days of the date
of the invoice. If Village fails to make a mely payment due Engineer, then Engineer
may, without liability, a er giving seven (7) days’ wri en no ce to Village, suspend
services under this Agreement un l Engineer has been paid in full all amounts due
for services, expenses, and other related charges.
d. Fees for Task Authoriza ons and hourly rates are hereto a ached as Exhibit B.
7. The parties agree that from time-to-time certain design, engineering, or construction
matters may arise requiring a certain specialization which Engineer would be compelled to
refer the matter to another individual possessing the necessary specialization. In such
event, Engineer agrees to submit to the Village a recommendation for such referral. The
intent of the parties herein is that all legal matters referred to any outside individual shall
be the responsibility of the outside individual for the proper resolution of such matters.
Page 6
V. E. Aurora-B&L MSA FY 2026-27 (ID 3593336).docx
Page 205
8. Insurance
The Engineer shall maintain the following insurance for the dura on of this Agreement. All
insurance required under this sec on shall be provided by a New York State licensed
insurer with an AM Best rating of “secure” or be er.
a. Comprehensive General Liability (CGL) coverage naming the Village as an addi onal
insured in the amount of $1,000,000.00 per occurrence/aggregate.
b. Worker’s Compensa on Insurance/New York State Disability Insurance/ Employer’s
Liability Insurance: Statutory
c. Professional Liability Insurance affording coverage for all professional services
rendered to the Village: $500,000.00
d. Proof of insurance shall be provided to the Village upon execu on of this Agreement
and the Village shall be no fied of any change in coverage within ten (10) calendar
days of such change.
9. Indemnifica on
For all ma ers arising out of the Engineer’s professional services, the Engineer agrees, to
the fullest extent permi ed by law, to indemnify and hold harmless the Village, its
officers, and employees against damages, liabili es, and costs, including reasonable
a orney’s fees, to the extent caused by the negligent performance of the Engineer, or third
par es under the direc on or control of the Engineer, in the performance of professional
services under this Agreement.
For all ma ers other than those arising out of the Engineer’s professional services (such
other ma ers commonly referred to as “General Liability Claims”), the Engineer shall
defend, indemnify, and hold harmless the Village, its Trustees, employees, and
representa ves from any and all claims, suits, causes of ac on, regardless of how
ins tuted, as a result of the negligent acts and/or omissions of the Engineer or its
employees, and resul ng from negligence, culpable conduct, misrepresenta on, or
recklessness, or any manner whatsoever, of the Engineer and/or its employees in the
negligent performance, in any way related to the services under this Agreement.
10. Dispute Resolu on
Village and Engineer agree to nego ate all disputes between them in good faith for a
period of thirty (30) days from the date of no ce by either party of the existence of the
dispute. If a dispute involves ma ers other than a claim by Engineer for payment of fees
and the par es fail to resolve the dispute through nego a on then Village and Engineer
agree that they shall first submit any and all such unse led claims, counterclaims, disputes,
and other ma ers in ques on between them arising out of or rela ng to this Agreement or
the breach thereof (“Disputes”) to media on by a mutually acceptable mediator. Village
Page 7
V. E. Aurora-B&L MSA FY 2026-27 (ID 3593336).docx
Page 206
and Engineer agree to par cipate in the media on process in good faith and to share the
cost of the media on equally. The process shall be conducted on a confiden al basis and
shall be completed within 150 days of the date of no ce by either party of the existence of
the dispute. If such media on is unsuccessful in resolving a Dispute, then (either party may
seek to have the Dispute resolved by a court of competent jurisdic on.
11. Jurisdic on and Venue
This agreement shall be construed pursuant to the laws of the State of New York with
venue in the County of Erie.
12. Assignment
Neither Village nor Engineer may assign, sublet, or transfer any rights under or interest
(including, but without limita on, moneys that are due or may become due) in this
Agreement without the wri en consent of the other, except to the extent that any
assignment, suble ng, or transfer is mandated or restricted by law. Unless specifically
stated to the contrary in any wri en consent to an assignment, no assignment will release
or discharge the assignor from any duty or responsibility under this Agreement. This
provision shall not preclude Engineer from retaining Subcontractors as it deems reasonably
necessary for the comple on of the services rendered hereunder.
13. Termination
This Agreement may be terminated by either party upon thirty (30) days written notice to
the other party.
14. Third Party Beneficiary
Nothing contained in this Agreement shall create a contractual rela onship with or a cause
of ac on in favor of any third party against the Engineer.
15. Waiver
Non-enforcement of any provisions by either party shall not cons tute a waiver of that
provision, nor shall it affect the enforceability of that provision or of the remainder of this
Agreement.
Page 8
V. E. Aurora-B&L MSA FY 2026-27 (ID 3593336).docx
Page 207
16. Confiden ality
A. Village and Engineer agree that:
1. neither party nor any of their employees or authorized representa ves will
disclose, sell, transfer or make available to third par es any Confiden al
Informa on (as defined below) of the other party except to employees, agents or
subconsultants who need to know such Confiden al Informa on in the
performance of their du es;
2. each party will use the Confiden al Informa on solely for the purposes of carrying
out their responsibili es and obliga ons under the terms of this Agreement or a
Task Authoriza on;
3. each party will take those precau ons reasonably necessary to maintain the
confiden ality of the other party’s Confiden al Informa on; and
4. upon request from the other party, each party shall return, or at the request of the
other party destroy, all copies of the other party’s Confiden al Informa on, once it
is no longer needed or permi ed for use.
B. For purposes of this Agreement, Confiden al Informa on shall mean all trade secrets,
proprietary informa on, know-how, processes, and other informa on and any tangible
evidence, record or representa on thereof, financial informa on, business informa on
and documents, the intellectual property of each party and other informa on, not
generally known to the public, which is confiden al or proprietary. Confiden al
Informa on shall not, however, include informa on which:
1. was published or was otherwise available to the public prior to its being disclosed
hereunder;
2. is published or otherwise becomes available to the public a er its receipt from the
disclosing party through no act or failure on the part of the receiving party;
3. was known to the receiving party prior to its receipt from the disclosing party as
established by the recipient's wri en records; or
4. was acquired by the receiving party from a third party under no obliga on to
maintain its confiden ality.
C. Village and Engineer agree that this confiden ality provision shall con nue in force for
a period of one year subsequent to the date of the last Project invoice sent by
Engineer to Village.
Page 9
V. E. Aurora-B&L MSA FY 2026-27 (ID 3593336).docx
Page 208
17. En re Agreement
This Agreement, including any expressly incorporated Exhibits, cons tutes the en re
Agreement between Village and Engineer and supersedes all prior wri en or oral
understandings. This Agreement may only be amended, supplemented, modified, or
canceled by a duly executed wri en instrument. If any term or condi on of this Agreement
shall, to any extent, be found invalid, void or unenforceable, the remaining provisions shall
remain in full force and effect to the extent allowed by applicable law.
VILLAGE: Village of East Aurora ENGINEER: Barton & Loguidice, D.P.C.
By: By:
Kenneth M. Knutsen, P.E.
Title: _______________________ Title: Senior Vice President
Date Date
Signed: Signed: 4/28/2026
Address for giving no ces: Address for giving no ces:
Village of East Aurora Barton & Loguidice, A n: President
585 Oakwood Avenue 443 Electronics Parkway
East Aurora, NY 14052 Liverpool, New York 13088
Page 10
V. E. Aurora-B&L MSA FY 2026-27 (ID 3593336).docx
Page 209
Exhibit A – Template for Task Authoriza ons
Village of East Aurora Professional Services
Barton & Loguidice, D.P.C. Master Services Agreement
Task Authorization 26-__
[INSERT PROJECT NAME]
Village of East Aurora (“Village”) entered in to a Master Services Agreement with Barton &
Loguidice, D.P.C. (“Engineer” or “B&L”) with an effec ve date of [INSERT DATE]. In accordance
with that Master Services Agreement, the following Task Authoriza on is hereby approved and
Engineer is authorized by Village to proceed with the services as delineated below. This is
Engineer’s [e.g., 1st, 2nd] Task Authoriza on for the term April 1, 2026 through March 31, 2027.
Effec ve Date of this Task Authoriza on:
B&L Project Number/Name:
B&L Phase Number/Name:
B&L Project Manager:
Owner’s Project Manager:
Fee Limit for this Task Authoriza on, if any:
Payment Method: [e.g., Time & Expense per hourly billing rates; lump sum]
Engineer’s Scope of Services:
[insert descrip on of services, deliverables, schedule, services not included, etc.]
Approved for Village By:
[insert signature and date of signature]
Type Name and Title of Owner’s Approver:
Approved for B&L By:
[insert signature and date of signature]
Type Name and Title of B&L Approver:
Page 11
V. E. Aurora-B&L MSA FY 2026-27 (ID 3593336).docx
Page 210
Exhibit B – Consultant’s Hourly Billing Rates Schedule
Note: The billing rates schedule shown below will be in effect for the en re calendar year
indicated on the rates schedule, and will be replaced with Consultant’s new billing rates
schedule effec ve on January 1st of each and every subsequent year of this Agreement.
Page 12
V. E. Aurora-B&L MSA FY 2026-27 (ID 3593336).docx
Page 211
Barton & Loguidice
Billing Rates for Calendar Year 2026
Travel by passenger vehicle IRS standard mileage rate (exclusive of operator time)
Overnight travel & subsistence At cost
Telephone, postage, delivery, etc. At cost
In-house printing Unit rate schedule for printed material
Field equipment & expendables Unit rate schedule
Unmanned Aircraft Systems (UAS) equipment $300/day (exclusive of operator time)
Outside services including lab services & printing Cost plus 15%
Individual staff at the following hourly rates:
Billing
Promotional Title Rate
Principal 320.00
Senior Vice President 320.00
Vice President 282.00
Senior Associate 252.00
Associate 237.00
Senior Managing Engineer 227.00
Senior Managing Hydrogeologist 225.00
Senior Managing Industrial Hygienist 215.00
Senior Managing Landscape Architect 200.00
Chief Asset Management Specialist 260.00
Chief Engineer 227.00
Senior Project Manager 227.00
Senior Construction Manager 200.00
Managing Architect 180.00
Managing Asset Management Specialist 225.00
Managing Community Planner 162.00
Managing Engineer 200.00
Managing Environmental Scientist 160.00
Managing Hydrogeologist 200.00
Managing Industrial Hygienist 162.00
Managing Landscape Architect 177.00
Consultant 216.00
Lead Architect 180.00
Lead Asset Management Specialist 245.00
Lead Engineer 200.00
Lead Environmental Scientist 195.00
Lead Hydrogeologist 200.00
Lead Landscape Architect 165.00
Project Manager 190.00
Senior Land Surveyor 150.00
Construction Manager 180.00
Senior Staff Sustainability Specialist 150.00
Senior Project Community Planner 140.00
Senior Project Engineer 180.00
Senior Project Environmental Scientist 152.00
Senior Project Hydrogeologist 135.00
Senior Project Landscape Architect 152.00
3.0
Page 212
Barton & Loguidice
Billing Rates for Calendar Year 2026
Travel by passenger vehicle IRS standard mileage rate (exclusive of operator time)
Overnight travel & subsistence At cost
Telephone, postage, delivery, etc. At cost
In-house printing Unit rate schedule for printed material
Field equipment & expendables Unit rate schedule
Unmanned Aircraft Systems (UAS) equipment $300/day (exclusive of operator time)
Outside services including lab services & printing Cost plus 15%
Individual staff at the following hourly rates:
Billing
Promotional Title Rate
Construction Management Technician II 151.00
Senior Staff Engineer 180.00
Senior Staff Environmental Scientist 152.00
Senior Staff Hydrogeologist 135.00
Land Surveyor 137.00
Construction Management Technician I 120.00
Senior Staff Water Quality Scientist 150.00
Project Architect 165.00
Project Community Planner 132.00
Project Engineer 163.00
Project Environmental Scientist 120.00
Staff Architectural Designer 150.00
Staff Asset Management Specialist 215.00
Staff Engineer 163.00
Staff Environmental Scientist 128.00
Staff Field Scientist 135.00
Staff Hydrogeologist 130.00
Staff Industrial Hygienist 135.00
Staff Landscape Architect 150.00
Crew Chief 135.00
Asset Management Specialist II 160.00
Assistant Landscape Architect II 135.00
Community Planner II 116.00
Engineer II 150.00
Environmental Scientist II 115.00
Hydrogeologist II 116.00
Industrial Hygienist II 111.00
Assistant Landscape Architect I 133.00
Engineer I 135.00
Environmental Scientist I 105.00
Field Scientist I 95.00
Industrial Hygienist I 110.00
Architectural Designer II 135.00
Engineering Designer II 168.00
Architectural Designer I 123.00
Engineering Designer I 137.00
Senior Engineering Technician 150.00
3.0
Page 213
Barton & Loguidice
Billing Rates for Calendar Year 2026
Travel by passenger vehicle IRS standard mileage rate (exclusive of operator time)
Overnight travel & subsistence At cost
Telephone, postage, delivery, etc. At cost
In-house printing Unit rate schedule for printed material
Field equipment & expendables Unit rate schedule
Unmanned Aircraft Systems (UAS) equipment $300/day (exclusive of operator time)
Outside services including lab services & printing Cost plus 15%
Individual staff at the following hourly rates:
Billing
Promotional Title Rate
Engineering Technician 124.00
Environmental Technician 102.00
Resident Engineer 152.00
Inspector 128.00
Construction Monitor 126.00
Instrument Operator 91.00
Director of Risk Management 164.00
Senior Project Accountant 105.00
Project Accountant 90.00
Senior Marketing Specialist 105.00
Senior Communications Specialist 123.00
UAS Operator 123.00
Marketing Specialist 90.00
Communications Specialist 123.00
Receptionist 90.00
Engineering Aide 124.00
Office Administrator 90.00
Senior Group Technical Assistant 105.00
Project Administrator 105.00
Group Technical Assistant 90.00
Intern - Technical 92.00
3.0
Page 214
MODIFY 2025/2026 BUDGET May 4, 2026
Trustee _______, offered the following resolution and moved for its adoption:
BE IT RESOLVED, the Clerk–Treasurer is hereby authorized to modify the 2025/2026
Budget in the following manner:
Revenue – 4.2770 Unclassified - $ 100.00
Expenditures – 5.8560.0430 Shade Trees-Tree Purchase - $ 100.00
Donation for trees, Arbor Day
The following resolution was seconded by Trustee ________ and unanimously
approved
Page 215
RESOLUTION May 04, 2026
DECLARE SURPLUS PROPERTY
Trustee , offered the following resolution and moved for its adoption:
BE IT RESOLVED, the Department of Public Works has a 2016 Chevy
2500 (#502) VIN 1GC1KUEG0GF106998 and 1988 Sidewalk Plow SW-
48 Chassis-001881059 for surplus property and is due to be auctioned
within the next 90 days.
The foregoing resolution was seconded by Trustee and
unanimously approved.
Page 216
RESOLUTION 20260504
A motion by Trustee ______to Appoint fire department clerk
WHEREAS, the Village of East Aurora Fire Department needs additional support for administrative
tasks, and
WHEREAS, the fire department needs tasks like required trainings tracked properly, purchasing
policies documents need to be properly recorded, and required reporting reviewed to ensure that
they are submitted by the department in a timely manner, and
WHEREAS, Christine Cappola, Sr. Administrative Assistant of the DPW, has agreed to assist with
these clerical tasks for the Fire Department Chief and Clerk-Treasurer; and
WHEREAS, the positions shall be paid a stipend for this work; and
NOW, THEREFORE, BE IT RESOLVED that Christine Cappola is appointed as the Fire Department
clerk starting June 1, 2026, with a stipend of $2,000 per year. The stipend will be paid out biweekly
as long as this task is assigned to the employee. Seconded by Trustee ________,
Page 217
Chapter 112
BUILDINGS, DEMOLITION OF
AND/OR SUBSTANTIAL MODIFICATION TO
§ 112-1. Purpose; intent.
A. It is the purpose of this chapter to protect the public health, safety, and welfare with respect to the
demolition of and/or substantial modification to structures within the Village of East Aurora; to
protect structures of special value to the community; and to enhance the visual environment of the
Village by regulating total and partial demolition and substantial modifications to structures in the
Village of East Aurora.
B. This chapter is intended to:
1. Protect people and properties from unsafe demolition practices and exposure to hazardous
substances or unsafe situations occurring before, during, or after demolition.
2. Protect and preserve those structures of special historic, aesthetic, cultural, or economic value.
3. Ensure that after demolition, sites are developed and maintained.
4. Ensure that development proposals that include demolition of and/or substantial modification, or
a combination of the two, are consistent with Village policies regarding land use, visual character,
health, and safety.
5. Allow for careful consideration of development proposals which include demolition of and/or
substantial modification, or a combination of the two, with respect to the architectural design,
style, appearance, scale, and character of the existing structure and the surrounding neighborhood.
§ 112-2. Title.
This chapter shall be known and may be cited as the “Demolition of and/or Substantial Modification to
Buildings.”
§ 112-3. Applicability.
A. No demolition activities and/or proposed substantial modification to an existing building or structure
shall be performed before first obtaining a demolition/substantial modification permit, approved by
the Village Board of Trustees and signed by the Code Enforcement Officer, allowing such demolition
of and/or substantial modification based on the following conditions:
(1) Demolition of and/or substantial modification of buildings/structures with an aggregate area up
to and including 1,200 square feet, where 50 % or more of the roof area and/or any exterior walls
or an addition that increases the total floor area of the building by 50% or more, or a combination
of the two; or
(2) Demolition of and/or substantial modification of buildings/structures 1,201 square feet to 2,500
square feet in aggregate area where 40% or more of the roof area and/or any exterior walls or an
addition that increases the total floor area of the building by 40% or more, or a combination of
the two; or
(3) Demolition of and/or substantial modification of buildings/structures 2,501 square feet or greater
in aggregate area where 30% or more of the roof area and/or any exterior walls or an addition
that increases the total floor area of the building by 30% or more, or a combination of the two.
B. Any demolition activities and/or substantial modification to a structure that requires a permit pursuant to
§285-53.5, or any other provision of the Village Code, shall be in conformance with the provisions set
forth herein. However, any building or structure that is damaged or destroyed by fire, flood, wind, other
Page 218
calamity, act of God, or act of the public enemy, or any building or structure subject to Chapter 113,
Buildings, Unsafe, is not subject to this chapter.
§ 112-4. Definitions.
As used in this chapter, the following terms shall have the meanings indicated:
APPLICATION FOR DEMOLITION/SUBSTANTIAL MODIFICATION — The application for a permit to
demolish a building or structure or for the substantial modification of a building or structure.
BASEMENT — That portion of a building that is partly below grade and which has more than half of its
height, measured from floor level to ceiling, above the average established curb level or finished grade of
the ground adjoining the building.
BUILDING — A combination of any materials, whether portable or fixed, as a structure wholly or partially
enclosed within exterior walls or within exterior or party walls and having a roof, affording shelter to persons,
animals or property. The word "building" shall be construed, when used herein, as though followed by the
words "or part or parts thereof."
CELLAR — That portion of a building that is partly or entirely below grade, which has more than half its
height, measured from floor to ceiling, below the average established curb level or finished grade of the
ground adjoining the building.
CODE ENFORCEMENT OFFICER — The Code Enforcement Officer for the Village of East Aurora or
its agent under contract with the Village to assist in the enforcement of this chapter.
CONTRACTOR — That person, firm or corporation employed by the owner of the property, empowered
by written consent of the owner to perform the specific duty of demolition or substantial modification as
may be specified in authorizing permits.
DEMOLITION or DEMOLISH — The dismantling, razing, or removal of a building or structure, or any
wall, roof, beam, or other exterior constructed or essential element of any structure, where such element cannot
be easily reused in its same configuration without reconstruction
DEMOLITION/SUBSTANTIAL MODIFICATION PERMIT — The permit for demolition of an existing
building or structure or for the substantial modification of a building or structure.
LOCATION — The actual confines of the demolition or substantial modification. The location as described
in the application for permit and as approved by the Code Enforcement Officer therein shall be the only
area approved for the demolition or substantial modification.
OWNER and PROPERTY OWNER — The person who has the legal title to land together with ownership
of the building or structure located thereon, whose name appears on the most recent tax assessment rolls of
the Village of East Aurora.
PUBLIC WAY — A street, alley, sidewalk or other thoroughfare or easement permanently established for
passage of persons or vehicles. The term "public way" shall be construed, when used herein, as though
followed by the words "or part thereof."
SALVAGE — Component parts of a building or structure being demolished, removed or to be removed
from said building or structure for reuse or resale.
SALVAGE CONTRACTOR — A person, firm or corporation identified in the application for demolition,
authorized by the owner, in writing, to remove items of salvage from premises, which may or may not be
the same person, firm or corporation designated by the owner as the demolition contractor.
STRUCTURE — A combination of materials, other than a building, to form a construction that is safe and
stable, and includes, among other things, stadiums, platforms, radio towers, sheds and storage bins.
SUBSTANTIAL MODIFICATION – an alteration to a building or structure involving demolition and/or
an addition.
Page 219
§ 112-5. Permit requirements; fees. Permit procedures.
A. No person shall demolish an existing building or structure having a gross floor area of 500 square feet
or more or propose a substantial modification without first obtaining a demolition permit, approved
by the Village Board of Trustees and signed by the Code Enforcement Officer, allowing such
demolition. Such permit shall be applied for and issued to the owner of the property. If such building
or structure is 50 or more years in age, the Village Board of Trustees shall refer the application to the
Village of East Aurora Historic Preservation Commission before making a decision. The Commission
shall promptly review the possible historic significance of such building or structure and shall make a
recommendation to the Village Board of Trustees with respect to the proposed demolition or
substantial modification.
A. Before any demolition of and/or substantial modification activity commences, a
demolition/substantial modification permit application shall be applied for by the property owner(s)
or the property owner(s) agent with the Code Enforcement Officer.
B. An application and permit fee as set forth in Chapter 137, Article II, of this Code shall accompany all
demolition/substantial modification permit applications. Permits and fees are further established by §
285-62D of the Code of the Village of East Aurora.
C. Prior to Village Board review, the permit application shall be referred to the Village of East Aurora
Historic Preservation Commission at the next available meeting.
(1) The Commission shall promptly review the proposed demolition of and/or substantial
modification for the exterior architectural design and scale, and the impact on the character of
the existing structure and the surrounding neighborhood.
(2) The Commission shall promptly review the possible historic significance of such buildings or
structures that are 50 or more years in age.
(3) The Commission shall make a written recommendation to the Village Board of Trustees with
respect to the proposed demolition of and/or substantial modification for the Village Board of
Trustees to review at the next available Village Board meeting.
D. Upon review, the Village Board shall provide a written statement to the applicant stating whether or
not the application is approved, conditionally approved, or disapproved. A copy of the appropriate
Village Board minutes shall be a sufficient report.
E. Upon approval, the Code Enforcement Official shall issue a demolition/substantial modification
permit pursuant to §108-4 and §285-53.5 of the Code of the Village of East Aurora.
F. Any decision rendered shall be subject to §285-55.8 of the Code of the Village of East Aurora.
§ 112-6. Permit requirements.
A. Form; contents.
(1) Written application for a demolition permit shall be on the forms provided by the Code
Enforcement Officer.
(2) Said application for demolition of and/or substantial modification shall require the name,
address, telephone number, and email address of the owner; the names, addresses and telephone
numbers of all contractors (general, special or salvage) authorized by the owner to perform work;
and contractor’s insurance certificates.
(3) A written description of the building or structure to be removed and/or a demolition plan prepared
Page 220
by a registered design professional.
(4) Architectural plans for substantial modification, including a demolition plan prepared by a
registered design professional.
(5) An asbestos survey pursuant to New York State Industrial Code Rule 56 (12 NYCRR 56).
(6) Starting and completion dates;
(7) Written list of materials to be salvaged;
(8) Provision for disposal of refuse;
(9) A statement as to security and/or barricades to safeguard premises from unauthorized entry
during the demolition work as well as the protection of the general public;
(10) A site plan application and documentation as required by Village Code Chapter 285-51.
§ 112-7. Certificate of insurance.
A. Certificates of insurance for liability, Worker’s Compensation, or the applicable waiver, and Disability
shall be delivered to the Code Enforcement Officer, as agent for the Village of East Aurora. The
minimum limits of said liability for the demolition of buildings and structures, whether in a
homeowner's insurance policy or separate liability policy, shall be in an amount as required by the
Village.
B. All insurance certificates shall include the Village of East Aurora as an additional named insured.
C. Insurance certificates or agreements in a form approved by the Village Attorney, holding the Village
of East Aurora, its officers and employees from liability resulting from work allowed by a demolition
permit, shall be delivered to the Code Enforcement Officer as agent for the Village of East Aurora.
§ 112-8. Procedures.
A. Upon the request of the Code Enforcement Officer, the person making the application for a permit to
demolish a building or structure or for a substantial modification to a building or structure shall submit
to the Code Enforcement Officer a written report from a licensed exterminator regarding
extermination of the building or structure prior to the issuance of a demolition permit.
B. Prior to demolition, the contractor will erect a system of barricades around the construction site and
have the electric, gas and telephone services removed by the respective utility companies. The head
of the Department of Public Works of the Village of East Aurora or his designated representative shall
disconnect and cap the water service to the building or structure being demolished and plug the sewer
laterals to such building or structure. The owner shall pay to the Village Clerk a water disconnection
fee and a sewer disconnection fee as set forth in Chapter 137, Article II, of this Code for said
disconnecting, capping and plugging.
C. The contractor shall obtain appropriate approval for the water use on the site from the head of the
Department of Public Works for dust control and have sufficient lengths of one-and-one-half-inch
and/or two-and-one-half-inch hose for this purpose. The contractor shall provide a flagman for traffic
control when necessary, and should a street have to be closed, he shall obtain permission from the
head of the Department of Public Works, the Chief of Police and the Fire Chief.
D. The contractor shall obtain all appropriate Erie County Highway or New York State Department of
Transportation permits when necessary.
E. In the case of the demolition of an existing building which has a common or party wall with one or
more adjoining buildings, the owner of the building to be demolished shall be responsible for and bear
Page 221
all costs in relation to the safeguarding of said adjacent wall.
F. Where beams, girders and joists are removed from party walls, the resulting pockets in said walls shall
be cleaned out and filled with solid masonry. Necessary repairs shall be made to put the party wall in
a safe condition. This work shall be done by the contractor at the expense of the property owner having
said demolition performed.
G. Where such demolition work is to be made and no immediate new construction is intended at the site,
the adjacent wall, whether of the party type or otherwise, shall be left in an acceptable condition so
far as appearance is concerned. In addition to the repair of all joists, pockets and similar openings, the
owner of the demolished building will be required to remove all old plaster, wallpaper and other
decorative material in addition to any loose wood, trim or other unrequired material, subject to the
approval of the Code Enforcement Officer. During the demolition work, debris must be systematically
removed from the site and not allowed to pile up or cause any obstruction.
H. When a building to be demolished contains a cellar or basement, the contractor shall remove all debris
and organic material from the cellar or basement and then break up and/or perforate the cellar floor.
The bearing or foundation wall shall be removed to a depth of at least 24 inches below the present
grade or at least 24 inches below any future grade to be established. The material resulting from the
cellar or foundation wall demolition may remain in the excavation, provided that the material is
crushed and compacted.
I. Where there is no cellar or basement, the bearing or foundation wall shall be removed to a depth of at
least 24 inches below any future grade to be established.
J. The Code Enforcement Officer of the Village of East Aurora shall inspect the demolition of any
building or structure in the Village regularly and shall be empowered to halt any such demolition that,
in the judgment of the Code Enforcement Officer, is not being performed in a safe and sanitary
manner.
K. Demolition of any building or structure shall be carried on during daylight hours only on normal
Village workdays.
L. Salvage materials that are a structural part of the building or structure shall not be removed except as
part of the actual demolition of said building or structure. Removal of salvage shall be by the owner
or salvage contractor only.
M. In-ground storage tanks on the demolition site shall be removed from the demolition site in accordance
with all applicable regulations.
N. No explosives may be used in connection with demolition of buildings or structures in the Village of
East Aurora unless a special permit is first obtained from the Village Board of Trustees of the Village
of East Aurora, issued after a public hearing has been held by such Village Board of Trustees on the
application for such permit.
§ 112-9. Time limit on permit validity.
A. A permit for demolition only shall be valid for a period of 30 days from the date of its issuance. One
additional extension of 10 working days may be granted by the Code Enforcement Officer in the event
that unusual circumstances prevent completion of the work. No work shall continue after the time limits
stated above, except upon application and issuance of a new permit pursuant to §285-53.5 of the Code
of the Village of East Aurora.
B. A demolition/substantial modification permit shall be pursuant to §108-4 and §285-53.5 of the Code of
the Village of East Aurora.
Page 222
§ 112-10. Restoration of site; procedure upon owner neglecting to restore.
A. All cellars and basements of demolished buildings or structures shall be filled in and made safe by
filling such basement or cellar with noncombustible materials and causing the surface of the location
to be on a level with the surrounding premises. No materials will be permitted as fill which may
corrode, rot, decay or collapse. All barricades, guardrails and temporary structures erected during
demolition shall be removed prior to completion approval by the Code Enforcement Officer.
B. In the event that the owner refuses or neglects to fill in and make safe such cellar or basement or
refuses or neglects to dismantle and remove any barricades, guardrails or temporary structures erected
during demolition, the Village of East Aurora may do the necessary work involved, either with Village
employees or outside contractors, and the cost of making the location safe shall be assessed against
such property and shall be a lien thereon.
§ 112-11. Notification of completion.
Immediately after said demolition, the Code Enforcement Officer shall notify the property owner, in
writing, that said demolition for which a permit was issued has been completed.
§ 112-12. Penalties for offenses.
Any person committing an offense against any provisions of this chapter shall be guilty of a violation,
punishable as follows: by imprisonment for a term not exceeding 15 days or by a fine not exceeding $250,
or by both such fine and imprisonment. The continuation of an offense against the provisions of this chapter
shall constitute, for each day the offense is continued, a separate and distinct offense hereunder.
Added:
§ 285-53.5 Demolition/substantial modification and building permits.
A. No person or persons shall commence to erect, construct, alter, or change the nature or the type of
occupancy of any land, building or structure within the Village of East Aurora until the owner of the
land upon which it is proposed to so erect, construct, alter, demolish or change the nature or the type of
occupancy of any such land, building or structure has applied for and obtained a building permit for the
same from the CEO.
B. (Reserved)
C. Demolition of and/or substantial modification of an existing building or structure greater than 500
square feet and more than 50 years old must obtain a demolition permit in accordance with Chapter 112
of the East Aurora Village Code.
D. No building permit may be issued without first obtaining site plan approval for a new development plan
as provided for in Article 51 of this chapter.
E. A building permit issued by the CEO pursuant to this section shall be valid for a period of one year
from the date of issue. Building permits for pools issued by the CEO shall be valid for a period of three
months from the date of issue.
Page 223
CASE NO. - - -
) ~ f- - - - 5~
DATE OF HEARING !£( 2,,\ I'1..-}o
Town of Aurora Zoning Board of Appeals
575 Oakwood Avenue, East Aurora, New York 14052
Zoning Board of Appeals Application Form
I. TYPE OF REQUEST
~ AREA VARIANCE _ SPECIAL USE PERMIT USE VARIANCE INTERPRETATION
11. APPLICANT/PETITIONER
Applicant's Nam,e.......--1--:=¥-~~.......:.,,,.....,......::........s::.~L..U.....u....i.=--~=::.....:;.==\-L..L.E::=-+---------
Address --~'-1----...p...,D~.__._..........' - ' - - - - - - - - - - - - - . - - - r r - - . - - - - - - - . - - . - . " " 7 " , . . . . - : : - - - - - -
City fa6b &2f:Qf"Gb-
Phone7}( ,- ~ b b - 7035 Fax ..__ Email --->--1~~"'\.L.u.M!ld...L..l~:,q..11-,.L.U......._L..:.....:_--1,.1...l,_ _
Interest in the property (ex: owner/purchaser/developer)____ b-LO-Y't-e-C:_ _ _ _ _ _ _ _ _ _ _ __
Ill. PROPERTY OWNER INFORMATION (If different from applicant information.)
Property Owner(s) Name(s) _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Address
--------------------------------
City _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ State _ _ _ _ _ ZIP_ _ _ _ __
Phone _ _ _ _ _ __ Fax _ _ _ _ _ Email _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Ill. PROPERTY INFORMATION
Property Address 5Ci~ S~ ~ r
SBL# _ \ 7q.1
b__- __.l_- ___.lf..____ _ _ __
Property size in acres , 3,.C,.,. Property Frontage in feet 1D I
Zoning District t/d Surrounding Zoning _ __.~""'-'-'- - - -
Current Use of Property -~~ ~S...... \J_~
~ ~~- - - - - - - - - - - - - -
IV. REQUEST DETAIL
(check all that apply)
'I-. Variance from Ordinance Section(s) #---'-~-"-H=---
i =
9::;_;•c...;_ f:. .....(1.
'p =)' - - - - - - - - - - - - -
- Special Use Permit for: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Use Variance for:
-----------------------
_Interpretation of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
2
Page 224
V. SIGNATURES (This application must be signed by the applicant/petitioner. If the applicant is not
the owner of the property, a separate owner authorization form must be submitted - see pg. 5)
Print name of ApplicanUPetitioner
State of New York; County of Erie
On the/~ day ofjf-/1'7 C" in the yearZO:z.t;,, before me, the
above individual appeared, personally known to me on the
basis of satisfactory evidence to be the individual whose
name is subscribed to the within instrument and
acknowledged to me that he/she/they executed the same
for the purposes therein stated.
~-f-c.. ..
,,,'f>' -•·•- ,
E H ~,,,,,, ..
N o t ~ l'?,S'l'ATB··.~~~\
. ~"' ··••••••· z ,,,.
~
:
f ..: OF NBW Yon'-.. \
: NOTARYPUBUC \
~~
(Notary stamp) i 1::.: Qualified in : °' i
\ ~ •• Erie County / {:;:
\ C).:•. 01Vl004o.!29 :' ~ !
~~~·-.. * ..··~'
~ ""-' .
<:) ,,,,..:-
:v,:
..,,,,,,,,,,,.....
",, 7,s,,S'j ••• .,,. •• 'GC;)
ON EXPI~\
,,, •••··
Office Use Only: Date received: Receipt#:
----------- ----------
Application reviewed by: ______________
ECDP ZR-1 form sent to EC: _ _ _ _ _ _ __ Hearing publication date: __________
PREVIOUS APPEAL(S):
A previous appeal to the Zoning Board of Appeals ( ) has ( ) has not been made with respect to this property.
Previous appeals:
- - - - - - - - Type of Appeal: _ _ _ _ _ _ _ _ _ __
Date: Granted Denied
Date: - - - - - - - - Type of Appeal :_ _ _ _ _ _ _ _ _ __ Granted Denied
3
Page 225
PETITIONER'S LETTER OF INTENT
Please describe in detail the proposed project, reason the variance and/or special use permit is being
requested and any additional information that may be helpful to the Zoning Board of Appeals in deciding this
appeal:
TO BE COMPLETED ONLY WHEN A USE VARIANCE IS BEING REQUESTED:
A Use Variance is requested because the applicable regulations and restrictions in the Zoning Code of the
Town of Aurora have caused unnecessary hardship as demonstrated by the following:
1) I cannot realize a reasonable return on my property for each and every permitted use allowed in the
current zoning classification as demonstrated by the accompanying financial evidence (provide financial
evidence to support your argument).
Financial Evidence Provided Yes No ___ (financial evidence is required per NYS Town Law)
2) Describe why your alleged hardship relating to the subject property is unique and does not apply
to other properties in the zoning district or neighborhood: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
3) Describe why you believe that the essential character of the neighborhood/community will not
change if the Zoning Board of Appeals grants you a use variance: _ _ _ _ _ _ _ _ _ _ _ __
4) Is your need for a use variance a result of you own actions (is your difficulty self-created)? Please
explain:-------------------------------------
(Attach additional pages if needed)
4
Page 226
SUPERVISOR TOWN CLERK
Charles D. Snyder Martha L. Librock
(716) 652-7590 (716) 652-3280
[email protected] townclerk@townofaurora .com
TOWN OF AURORA
Aurora Municipal Center
575 Oakwood Avenue, East Aurora, NY 14052
www.townofaurora.com
TOWN COUNCIL MEMBERS Robert and Jennifer Brayman
559 South St
Luke Wochensky
[email protected]
East Aurora, NY 14052
Joseph M. McCann April 16, 2026
[email protected]
Mr. & Mrs. Brayman,
Raymond M . Wrazen
[email protected]
The Building Department has reviewed your request to construct a deck at the front of
your residence at 559 South St. The request has been denied because it fails to meet the
SUPT. OF HIGHWAYS requirement for the front yard setback in the Residence-I (Rl) Zoning District in which it
David M. Gunner
(716) 652-4050
is located. There is an existing neighborhood front yard setback average of 57 .21 '.
[email protected]
Section 1 l 6-8.1E(2)
CODE ENFORCEMENT Requirement: Where 20% or more of the lots in the same block on the same side of the
OFFICER
street and within 1,000' of a proposed building are improved with buildings, the average
Elizabeth Cassidy
(716) 652-7591 setback of such existing buildings shall establish the minimum setback or building line.
[email protected] This provision shall not be interpreted to permit a front yard depth of less than 45 ' .
Requested: Front yard setback of 26 .5'
ASSESSOR Variance: 30.71'
Stephen R. Pigeon
[email protected]
(716) 652-0011 This letter serves as notice that we have received the application and fee for the Zoning
Board of Appeals. You will receive notification from the Town Clerk with the date and
DIR. OF RECREATION time of the next available hearing. If you have any questions, please contact our office at
Christopher Musshafen
652-7591.
(716) 652-8866
[email protected]
TOWN ATTORNEY
Brigid M. Maloney
TOWN JUSTICE
y
Jeffrey P. Markello Code Enforcement Officer
Anthony Difilippo [V
HISTORIAN
Robert L. Goller
(716) 652-7944
[email protected]
FAX: (716) 652-3507
This institution is an equal
opportunity provider and employer.
Page 227
Erie County On-Line Mapping Application Toronto
0
H.l 1nillot1
che:.te
ur - • - - 211 - 1•· · don
~J 278 480 486 166 ;, 522 277 (
~ 274
280
""':
_ 279
273 Elullillo
•
I ;;=;;.;;:::: """'Y.!.
- "' _
503
_ ___0 i
• ,
2a6 285
1§ 461 491 515 293 ' ·~ 295
1ig1, 473 a 485 497 509 521 r 292
ri d
300
I i
i
299 I
~99
r •t r- -1- ~ - 299
d 298
r 305 J I 11
•
300 I 0
{'QI/A "-fJ' - ,i·
G'• :·
306 306
Legend
460
472 478 484
492
49~
502
512
522
528 53,51 312 564
309
56-8 574
578, J, -·- -- -"
~-•
r~- _
'I ( l
;I
--,I
636 •
"- :-.~. □ Parcels 'J ~1,
552 I ' , 11 - _., 1
1
I • I 332
....... _,_
r
~ l -T 1 • r ; 1 r• 1 1 1 ~~~Sr
333
459 465 473 481 485 491
I336 511 517 531 537 r-· 336
569 577 585 0 0 633 0
~i( 1 -11 1 W\
525
ji - 342
ifb'1j ·30 1 w
347
3~
~$~
342
358
t 353
357
1( I
t 354
358
T
.
353
, 359
347 I
l
. • ! ..:.,
t~ 350
356
360
y- -- r
581
~-_ , 626 o
q;s ~01-1 e,S t ¢
366 362 522 .I i
365
371 376
478
484 371 . 516 528 371
366
562
574 590 600 612
620
632
6
44 ~ ~t(\,~J
~.g-• W\
4£6 472 I 370 510 370
%l 3 3 ·. 1 '«,&\-
Total. 207.51 ft 7,51
qloJ, ~-73 .02-' est-
475 507
- :I
555
Total: 804 26 ft
q1p tS- ~ s;- '1 I ~
~r~ ,t.f:. z.-1 • \I\A tt6
• I
45 1 625 I 645 653
ls2s 563
~I M
573 I 589
499
96 q-1 ( -1
465 607
100 ......... (c; D1 iS 1 yV\
·/ 483 '•
~ (/
I
11 5 ,0-,.~1, ~
I \ 24S 2S5 265
275 0 425 (o -vr ~,02' VK
450 125
205
285
~ ZS' l.f R,D\t s\--'
130 135
240 PSO 441
0 0.07 0.1 Miles This map is a user generated static output from
ERIE COUNTY
WGS_ 1984_Web_ Mercator_Auxiliary_Sphere
THIS MAP IS NOT TO BE USED FOR NAVIGATION
DEPARTMENT OF ENVIRONMENT & PLANNING
OFFICE OF GIS
an Internet mapping site and is for reference only.
Data layers that appear on this map may or may
not be accurate, current, or otherwise reliable.
1: 4,514 0
Page 228
Case# llf 1/
Exhibit# k z
Date qrtl~l,~11J
:ir-r.-- - -
d)
"><
N
--"
""'
~
- (}
C
0
.....
ll,.. 'jl..
t-
t €
:;,
4\..
r
3----'
•
' \
•
'
•
I>
•
"
\µ
,J\
:,
~
-:r II
:..
~ •
<::.
~-- •
"'
'- 'II
""'- i'
\J.)
~
'.
6
'
'll
.
-75'
J., ..
c;
~ .
~
•'rt)
-'.)
-J
-1.. ,,
.
Page 229
CHARLES J. RO5tN & \'UIFE
LIBER 1808 PAGE 500 (' 0 LI
CENTERUNEOF SOUTH' STREET Case #_-..:.,:7J_,__,_ _ _ __
f?.xhibit #r ~
:11-11-...,.,,. - - - - -
SOUTHSTREET\ '(49.5' WIDE)
iJate 'i I [. 7,Jt;
fHERLY CORPORATION LINE ~ •\ 1722.62' D&M 1·,a9..;,-1-1,,:
1E~ ==
IE VILLAGE OF EAST AURORA '------ CENTER LINE OF OLEAN ST
·-•-•-• -•-• ----.-:::=_ ____\,2.~:E~'.Y.~----·-
d'ol,
,..,,,
•
\
\
\ ,,
SOUT H LINE OF
SOU TH STREET
_;-,0-~
c-> _; . I,
7.1s· r , r ---,2::-.:0-.1""•- J
2 STORY
FRAME H01.Hr FMl.1f
NO. 55!• HOU S£
DiliVt
2,c;·[Mf
BLOCK
J.T GllitAGE
18.4'
l,Z.,.c.~i)
:;p~~~
1 7 6,(ST
:::;
in
(J)
st'
N
N
~WEITLINEOF
ROSEN L 1808 P. 500
:::;
.$
0
0
0
FENCE POST ' ; , in
2.57'WEST "a N
N .
MANGUSO LAND SL
FREDERICK M. r
PROF LAND SUR
572 TUSCAROf
0.94' □
·3' _ FRAME ANGOLA.NY 1
9 SHED PHONE & FAX 716
1.32' ~
I.IC NO 0497
EMAIL Rick@Mangusolar
~UCCl:SSOR TO THF. iHC
\'!'/lll\/1..M (.. OUC:Kt/\
NOitM/,N G. JOl-\N~•
\>:::::::::::::---77~1.scsoj;"•CD~&MM_\_---=:=:i~~ WILSON /\\. t-iUN'ff
\ PARALLEL \V/ITH THE
CENTER LINE OF
FENCE POST
3.29' \'UEH
1.17' SOUTH
LEGEN
SOUTH STREET
These standard sym
be found in the dra-
~••• iiSJa~::iq UJ0Jd asetpmd ue::i noA aJo,aq a(A0O ·sJVIJ Aq paA1a::iaJ aq 1snw w.10, S!4.L ••••• EXISTING If.
0 SET IRON P
-o- UTILITY PO
BOUNDAR)
Page 230
Case# 19-f/
F.xhibit # ~
Short Environmental Assessment Form Date t:£ f 7iUi
Part 1 - Project Information
Instructions for Completing
Part 1 - Project Information. The applicant or project sponsor is responsible for the completion of Part 1. Responses become part of the
application for approval or funding, are subject to public review, and may be subject to further verification. Complete Part 1 based on
information currently available. If additional research or investigation would be needed to fully respond to any item, please answer as
thoroughly as possible based on current information.
Complete all items in Part 1. You may also provide any additional information which you believe will be needed by or useful to the
lead agency; attach additional pages as necessary to supplement any item.
Part 1 - Project and Sponsor Information
r 0 ~ Cl.r'\d ,Q1\.1) 1
Name of Applicant or Sponsor: Telephone: 7 ll.Q - 8CO- 103,5
~t> ~ ~ U"\'f\l
Address:
6':f1 5 D ~ 8'
City!PO: k;- ~\) 'O'fO..., State: f...)l.{ ZipCl4l)
1. Does the proposed action only involve the legislative adoption of a plan, local law, ordinance, NO YES
administrative rule, or regulation?
If Yes, attach a narrative description of the intent of the proposed action and the environmental resources that
may be affected in the municipality and proceed to Part 2. If no, continue to question 2. □
2. Does the proposed action require a permit, approval or funding from any other government Agency? NO YES
If Yes, list agency(s) name and permit or approval:
11)
3. a. Total acreage of the site of the proposed action?
b. Total acreage to be physically disturbed?
c. Total acreage (project site and any contiguous properties) owned
or controlled by the applicant or project sponsor? ,. ~ b acres
4. Check all land uses that occur on, are adjoining or near the proposed action:
D Urban ~ Rural (non-agriculture) D Industrial D Commercial ~ Residential (suburban)
D Forest O Agriculture 0 Aquatic D Other(Specify):
□ Parkland
Page 1 of 3 SEAF 2019
Page 231
5. Is the proposed action, NO YES NIA
A permitted use under the zoning regulations?
□ .@ □
a.
□ ~ □
b. Consistent with the adopted comprehensive plan?
NO YES
6. Is the proposed action consistent with the predominant character of the existing built or natural landscape?
□ ~
7. Is the site of the proposed action located in, or does it adjoin, a state listed Critical Environmental Area? NO YES
If Yes, identify:
[El □
NO YES
8. a. Will the proposed action result in a substantial increase in traffic above present levels?
Ix] □
b. Are public transportation services available at or near the site of the proposed action?
~ □
Are any pedestrian accommodations or bicycle routes available on or near the site of the proposed
~ □
C.
action?
9. Does the proposed action meet or exceed the state energy code requirements? NO YES
If the proposed action will exceed requirements, describe design features and technologies:
Eill □
10. Will the proposed action connect to an existing public/private water supply? NO YES
IfNo, describe method for providing potable water:
~ □
11. Will the proposed action connect to existing wastewater utilities? NO YES
If No, describe method for providing wastewater treatment:
fi] □
12. a. Does the project site contain, or is it substantially contiguous to, a building, archaeological site, or district NO YES
which is listed on the National or State Register of Historic Places, or that has been determined by the
Commissioner of the NYS Office of Parks, Recreation and Historic Preservation to be eligible for listing on the ~ □
State Register of Historic Places?
b. Is the project site, or any portion of it, located in or adjacent to an area designated as sensitive for
B] □
archaeological sites on the NY State Historic Preservation Office (SHPO) archaeological site inventory?
13. a. Does any portion of the site of the proposed action, or lands adjoining the proposed action, contain NO YES
wetlands or other waterbodies regulated by a federal, state or local agency?
~ □
b. Would the proposed action physically alter, or encroach into, any existing wetland or waterbody?
@ □
If Yes, identify the wetland or waterbody and extent of alterations in square feet or acres:
Page 2 of 3
Page 232
14. Identify the typical habitat types that occur on, or are likely to be found on the project site. Check all that apply:
□ Shoreline 0 Forest D Agricultural/grasslands D Early mid-successional
□ Wetland D Urban D Suburban
15 . Does the site of the proposed action contain any species of animal, or associated habitats, listed by the State or NO YES
Federal government as threatened or endangered?
fa] □
16. Is the project site located in the 100-year flood plan? NO YES
~ □
17. Will the proposed action create storm water discharge, either from point or non-point sources?
NO YES
If Yes, @ □
a. Will storm water discharges flow to adjacent properties? @ □
b. Will storm water discharges be directed to established conveyance systems (runoff and storm drains)?
If Yes, briefly describe:
ID □
18. Does the proposed action include construction or other activities that would result in the impoundment of water NO YES
or other liquids (e.g., retention pond, waste lagoon, dam)?
If Yes, explain the purpose and size of the impoundment:
fil □
19. Has the site of the proposed action or an adjoining property been the location of an active or closed solid waste NO YES
management facility?
If Yes, describe:
[] □
20.Has the site of the proposed action or an adjoining property been the subject of remediation (ongoing or NO YES
completed) for hazardous waste?
If Yes, describe:
~ □
I CERTIFY THAT THE INFORMATION PROVIDED ABOVE IS TRUE AND ACCURATE TO THE BEST OF
MY KNOWLEDGE
Applicant/sponsor/name: • ~ ~ 'f)y'ttlA ..... vv1t'L4'------ Date: ~Ju~l 'Lh
Signature: £~ d..... ~ ~ ()
Title: ()u1 ·~ .I
PRINT FORM Page 3 of 3
Page 233
INSTRUCTIONS(RP-t-217-PC'.!'-INS): www.orps.state.ny.us
FOR COUNTY USE ONLY
'L • ~
C1. SWIS Code I, Y 4 1'.) tjI V 1 1 1
New York State Depa
Taxation and Finance
C2. Date Deed Recorded I• :l
VI
Z, ;, I / 7I" Olfice of Real Property Tax Serv,ces
I I 1 0 "'"" O•y )!:>'- RP- 5217-PDF
I-C~3_._eo_o_k_;I::,;;;;!:';;;;;;;::;:;t,,;:';,;;;;:;!:';;;/=-.Ic_•_
· P_•:,ge_,:;;;;;!;;;;;;~±:::;;;:;;:;:;::......L_ _ _ _ _ _ _.:,:R:,:•a:;_I;.:P•::o:::pe::.;rty:!..::Tr::•:::"•:.:,:f•:;_•.:,:R:::•P::o:.:.rt.!:(8::.:/1::o):._:A..:.::U.:.:ftO:=RAA!S!890R9 OPPfCI
PROPERTY INFORMATION
1. Property 559 South Street
OCT 3 0 2015
Location
RECEIVED
• STREET Nu.18ER • STREET NAME
Aurora 14052
'CITY OR TOWN ~UAGE
2. Buyer Brayman f/k/a Lewis Jennifer A.
- IL},/)
Name
_B_r_~_:_•_:_:_e,c_o_•_,_,
_______________
LAST NAMEICOM,...V
:_:_:~~_;_:~L_.____________________v
,.. . . " ' " ' Ir
A
1., J<.J
~~ill!
3. Tex
BIiiing
Address
STREET NUMBER ANO NAME CITY OR TOWN
OR
O Part of a Parcel (Only If Part of a Parcel) Check as they apply:
4A. Plannino eoard wi'lh Subdivision Authority Exists
5. Deed 225 OR 0.00
Property
_1.,..,0==--- X .cB. Subdivision Approval was Required for Transfer
'FRONT~EET ~ 'ACRES
Slzo 4C. Parcel Approved for Subdivision wtth Map Provided
□
Brayman f/k/a Lewis Jennifer A.
e. Seller • LAST NAME/COMPANY FIRST NAME
Name
LAST NAME>COMPANY
Chock the boxes below•• they apply:
•7. Select the description which moat accurately descrlbn the
uu of the property at the time of 11'8: 8. Ownership Type is Condominium 0
A. One Family Residential 9. New Construction on a Vacant Land D
10A, Property Located within an Agricultural District 0
108. !~~~~1=i~t~:isc/osure notice indicating that the property is in an D
SALE INFORMATION 15. Check one or more ofthne conditions H appllcable to transfer:
A. Sale Between Relatives or Former Relatives
B. Sale between Related Companies or Partners In Business.
11. Sale Contract Date
C. One of the Buyers Is a\10 a Seller
o. Buyer or Setter la Government Agency or Lending Institution
• 12, Date of Sale/Transfer E. Deed Type not Warranty or Bargain and Sale (Specify Below)
F. Sale of Fractional or Less than Fee Interest (Specify Below)
*13. Full Sale Price G. Significant Change in Property Between Taxable Status and Sale Oates
H. Sale of Business is lnduded in Sale Price
( Full Sale Price is the total aroount paid for the property including personal property. I. Other Unusual Factors Affecting Sele F'ric.e {Specify Below)
This payment may be In the form of cash, other property or goods, or the assumption of J. None
mortgages or other obligations.) Please round to the n&arest whole dollar amount.
•comment(I} on Condition:
14. lnd~ata the value of personal
property Included In the sale .00
ASSESSMENT INFORMATION - Data should reflect the latest Final Assessment Roll and Tax Bill
16. YHr of A•H11ment Roll from which Information taken(YY) 14 •17. Total Assessed Value 94,600
•,a. Property Cl••• 210 *19. School District Name East Aurora
•20. Tax Map ldentlfier(s)/Roll ldentlfler(1) (If more th,n four, attach sheet with additional ldentlfler(a))
175.16-1-11
CERTIFICATION
I Certtfy that all of the Items of lnfonnatlon ente,.d on this form are true and correct (to the bfft of my knowledge and ~fief) and I understand that the making of any willful
false statement of material fact herein subject me to the PtPYltlon1 of tht penal Jaw relattve to the making and filing of false Instruments.
SELLER SIGNATURE BUYER CONTACT INFORMATION
(Enter lnfonnation for the buyer. Note: If buy&< is LLC.1ociety, association. c:«pof&Uon. Joint stoek company, estale o,
entity that is not an Individual agent or lk:ludary. then e name and eoc,taci infOf'ITlation of an lndivlduallre1poneible
perty who c,n answer questions regarding the transfer mu.st be entered. T)'PI o, pr1rtt clearly.)
Jennifer & Robert
FIRST NAME
South Street
' STREET NUMSER ' STREET NAME
NY 14052
"ZIPCOOE
BUYER'S ATTORNEY
Carol A.
FIRST NAME
(716) 652-9600
AREA CODE TELEPHONE NUMBER (Ell: 9999999)
Book11287/Page496 Extra Page 1 Page 4 of 4
Page 234
QUIT CLAIM DEED
THIS INDENTURE, made the ~ay of October, 2015, between Jennifer A. Brayman, f/k/a Jennifer
A. Lewis, residing at 559 South Street, East Aurora, New York 14052, party of the first part, and
Jennifer A. Brayman and Robert L. Brayman, husband and wife, residing at 559 South Street, East
Aurora, New York 14052, party of the second part,
WITNESSETH, that the party of the first part, in consideration of One and No More Dollars, lawful
money of the United States, paid by the party of the second part, does hereby remise, release and quitclaim unto
the party of the second part, the heirs or successors and assigns of the party of the second part forever,
ALL THAT TRACT OR PARCEL OF LAND ... see attached Schedule A
THIS deed is made not to defraud creditors, nor does it render the Grantor herein insolvent.
TOGETHER with all right, title and interest, if any, of the party of the first part in and to any streets and
roads abutting the above described premises to the center lines thereof,
TOGETHER with the appurtenances and all the estate and rights of the party of the first part in and to
said premises,
TO HA VE AND TO HOLD the premises herein granted unto the party of the second part, the heirs or
successors and assigns of the party of the second part forever.
AND the party of the first part, in compliance with Section 13 of the Lien Law, covenants that the party of
the first part will receive the consideration for this conveyance and will hold the right to receive such
consideration as a trust fund to be applied first for the purpose of paying the costs of the improvement and will
apply the same first to the payment of the cost of the improvement before using any part of the total of the same
for any other purpose.
The word "party" shall be construed as ifit read "parties" whenever the sense of this indenture so
requires.
IN WITNESS WHEREOF, the party of the first part has duly executed this deed the day and year first
above written.
IN PRESENCE OF:
STATE OF NEW YORK )
COUNTY OF ERIE ) ss.:
On the sft\ay of October, in the year 2015 before me, the undersigned, personally appeared Jennifer A.
Brayman f/k/a Jennifer A. Lewis personally known to me or proved to me on the basis of satisfactory evidence to
be the individual whose name is subscribed to the within/attached instrument and acknowledged to me that she
executed the same in her capacity, and that by her signature on the instrument, the individual, or the person on
behalf of which the individual acted, executed the instrument.
Signature and Office o ndividual
Taking Acknowledgment (affix stamp)
CAROL A. FlAHER1Y
Notary Public, State of New York
Qualified in Erie County 1--::Y-
My Commission Expires December 28, 20-+- I
Book11287/Page495 Page 2 of 4
Page 235
-------
Schedule 11 A11
ALL THAT TRACT OR PARCEL OF LAND, situate in the Town of Aurora,
County of Erie and state of New York, being part of Lot No. 22, Township 9,
Range 6 of the Holland Land Company's Survey, bounded and described as
follows:
BEGINNING at a point in the center line of south Street which is the
southerly Corporation line of the Village of East Aurora, 1722.62 feet west
from its intersection with the center line of Olean Street which is also the
northwest corner of lands conveyed to Charles J. Rosen and wife by deed
recorded in Erie County Clerk's Office in Liber 1808 of Deeds at page 500;
thence southerly along the westerly line of said Rosen's land and a
continuation thereof to a point 225 feet southerly from the center line of
South Street; thence westerly parallel with the center line of South Street
about 71.5 feet to a point in a line drawn southerly at an angle of 88° 14'
from a point in the center line of said street 70 feet westerly from the
point of beginning; thence northerly along said line about 225 feet to the
center line of South Street; thence easterly along said center line 70 feet
to the place of beginning.
Book11287/Page496 Page 3 of 4
Page 236
ERIE COUNTY CLERK'S OFFICE
II I II II II II Ill III II Illlll 111111111111111
County Clerk's Recording Page
Return to: Book Type: D Book: 11287 Page: 494
BOX131 Page Count: 3
Doc Type: DEED
Rec Date: 10/23/2015
Rec Time: 12:30:55 PM
Party 1: Control#: 2015217946
BRAYMAN JENNIFER A FKA UserID: Nancy
Trans#: 15172981
Party 2: Document Sequence Number
BRAYMAN JENNIFER A TT2015006417
Recording Fees: Consideration Amount: 1.00
RECORDING $35.00 BASIC MT $0.00
COECO$1 RET $1.00 SONYMAMT $0.00
COE STATE $14.25 GEN $14.25 ADDL MT/NFTA $0.00
COE STATE $4.75 RM $4.75 SP MT/M-RAIL $0.00
RP5217 CNTY $9 $9.00 NY STATE TT $0.00
RP5217 ST-RES $116 $116.00 ROAD FUND TT $0.00
TP584 $10.00
Total: $190.00
STATE OF NEW YORK
ERIE COUNTY CLERK'S OFFICE
WARNING - THIS SHEET CONSTITUTES THE CLERK'S ENDORSEMENT REQUIRED
BY SECTION 319&316-a (5) OF THE REAL PROPERTY LAW OF THE STATE OF NEW
YORK. DO NOT DETACH. THIS IS NOT A BILL.
Christopher L. Jacobs
County Clerk
------------------ - - - - - - --
Book11287/Page494 Page 1 of 4