Village Board agenda — April 6, 2026 (full text)
Page 1
AGENDA
Village Board of East Aurora
April 6, 2026 Regular Meeting at 7 pm
1. CALL MEETING TO ORDER
A. Pledge of Allegiance
B. Roll Call
C. Approval of Minutes of Village Board Meeting for March 16, 2026
D. Approval of Payment for April 6, 2026 Abstract 2025/2026 fiscal year for a total of $180,781.41.
2. SPEAKERS & COMMUNICATIONS (I)
3. PUBLIC HEARINGS
A. Consider an amendment to the Site Plan application from Brian Fisher of Fibbo Properties at 49 Knox Road to
change the façade and the location of the exterior patios and sliding glass doors for units 1 and 2 that affect
the south and west sides of the building.
B. Consider a local law amending the Village Code Chapter §112 Demolitions.
C. Consider approving the 2026-2027 Tentative Village Budget and Capital Plan.
4. OFFICIAL CONSIDERATIONS
A. Consider approving a Determination of Non-Significance pursuant to the State Environmental Quality Review Act in
the matter of an amended Site Plan Application from Brian Fisher of Fibbo Properties at 49 Knox Road to change
the façade and the location of the exterior patios and sliding glass doors for units 1 and 2 that affect the south and
west sides of the building.
B. Consider an amendment to the Site Plan application from Brian Fisher of Fibbo Properties at 49 Knox Road to
change the façade and the location of the exterior patios and sliding glass doors for units 1 and 2 that affect the
south and west sides of the building.
C. Consider approving the 2026-2027 Capital Plan as submitted by the Capital Committee
D. Consider adopting the 2026-27 Village Budget, including non-union wage rates.
E. Consider adopting the Water Budget and Water Rates for the 2026-27 budget year.
F. Consider approving a Moratorium on the development of any self-storage facilities.
G. Consider approving Chief of Police Patrick Welch to go to the IACP (International Association of Chiefs of Police)
conference, October 24-27th, the cost of the conference is $500 plus travel.
H. Consider approving a Temporary Use Hamlin Park Permit for ITAC, It Takes a Community, June 13th from 10 am to
6 pm for a drug and alcohol-free youth event, contingent on proper insurance being provided to the Clerk’s Office
one month before the event.
I. Consider setting a public hearing on May 4, 2026 to consider the Village’s Annual MS-4 Report.
J. Consider approving budget adjustments for the 2025/2026 fiscal year.
K. Consider approving budget modifications for the 2025/2026 fiscal year.
L. Accept the resignation of Shane Krieger, Village Administrator, for retirement to commence on April 3rd 2026.
M. Approve a resolution to assign out-of-title responsibilities temporarily to Maureen Jerackas as Village Administrator.
5. OLD BUSINESS
A. Reschedule the work session to review the Comprehensive Plan
6. NEW BUSINESS
7. SPEAKERS & COMMUNICATIONS (II)
8. DEPARTMENT HEAD REPORT
A. Building & Code Enforcement Annual Report
9. ADJOURNMENT
Page 2
VILLAGE OF EAST AURORA
VILLAGE BOARD MEETING
March 16, 2026 – 7:00 PM
Present:
Trustee Cameron
Trustee Flynn
Trustee Lazickas
Trustee Viger
Trustee Scheer
Trustee Rabey
Mayor Mercurio
Also Present:
Maureen Jerackas, Clerk-Treasurer
Shane Krieger, Village Administrator
Patrick Welch, Police Chief
Jeff Stoll, General Foreman
Joe Trapp, Deputy Village Attorney
Elizabeth Cassidy, Code Enforcement Officer
22 Members of the public
A Motion by Trustee Rabey to approve the Village Board minutes for March 2, 2026, seconded by Trustee
Flynn and carried by unanimous approval.
A Motion by Trustee Cameron to approve the payment of Abstract for March 16, 2026, with a total of
$61,343.39, seconded by Trustee Scheer and carried by unanimous approval.
SPEAKERS & COMMUNICATIONS (I)
• Tim Noon- 764 Oakwood- He said that the Village Tree Board is planning for the Arbor Day
celebration at the High School. He said that there will be a proclamation for the Mayor to sign and
invited all of the Trustees. Mayor Mercurio said that he loves going to the Arbor Day celebration.
• Nancy Smith- 195 Sycamore- She said that she respects and appreciates everything the Village Board
is doing and all the time they give. She said three cheers and thanked Trustee Flynn and Trustee Viger
for their service on the Village Board. She said that during a budget meeting that she attended,
Trustee Flynn said that a proposal from Bradley Tree needs to happen and Mrs. Smith appreciated
that. She also had a question about the tree management plan. General Foreman Stoll said that the
Village is going to get some training from Jarrod on a maintenance program for young trees. Mayor
Mercurio noted that General Foreman Stoll is going back to be an arborist himself and how beneficial
that will be for the Village.
• Jesse Griffis- Chairperson for Village Tree Board- He said that he would like Hamlin Park to get its
own dedicated line in the budget for tree maintenance. General Foreman Stoll said that his plan is to
maintain newly planted trees around April or May of every year. Mr. Griffis asked when the GIS
would be finished for the trees. General Foreman Stoll said that he is thinking it will be done by mid-
summer and that he is working with the website to try to make it a little easier to manage. Mr. Griffis
said that he would like a stamp of approval on the inventory by the Village Arborist so it would be
suitable for grants later.
Page 3
• Holly Maciejewski- 218 Center- She thanked Trustee Flynn and Trustee Viger for all they have done
with the Village Board. She wanted to verify if a meeting happened with NYSEG about the trees.
Village Administrator Krieger said that the Village has one scheduled. Mayor Mercurio noted that
there are agreements with NYSEG that are currently with the Village Attorney. She asked if NYSEG
was providing some sort of financial restitution to the Village, Village Administrator Krieger said that
they have not heard anything about that.
PUBLIC HEARINGS
• A Motion by Trustee Cameron to Open a Public Hearing at 7:15pm to Consider a Moratorium on the
development of any self-storage facilities, seconded by Trustee Rabey and carried with unanimous
approval.
o Code Enforcement Officer Cassidy said that this moratorium has been requested by members of
the Village Planning Commission. She said that they are concerned about the fact that in the
village, we're only allowed to place self-storage facilities in our manufacturing districts, which
are fairly limited. She said that when the last self-storage facility went in over on Commerce
Way, there were members who felt that this was not the best and highest use of a manufacturing
parcel, and they would like to put a moratorium in place in order to re-evaluate this type of use
within the village entirely.
A Motion by Trustee Lazickas to Close a Public Hearing at 7:16 pm to Consider a Moratorium on the
development of any self-storage facilities, seconded by Trustee Viger, and carried with unanimous
approval.
OFFICIAL CONSIDERATIONS
• A motion by Trustee Lazickas, to approve the Temporary Use Permit for Heart of Music Festival, June
13, 2026 starting as early as 1pm with the Aurora Ice Rink ending music at 10pm with the venue closing
at 11pm and everyone else ending music at 9pm and closing at 10pm, pending an approved Certificate
of Liability Insurance (To the clerk at least a month prior) and the approved Part 18 paperwork from
Erie County. (to the clerk by noon the Friday before), seconded by Trustee Rabey, and was unanimously
approved.
o Trustee Lazickas said that he spoke to the AIA and they did not want the later closing time of
midnight.
• A motion by Trustee Lazickas, to approve a Temporary Use Permit for Peggy Cooke, Aurora Ice
Association, Inc., for the East Aurora Classic Market, 115 Riley Street, from 7 am-1 pm Wednesdays
and Saturdays from May until November, with alcohol for tasting only and selling of bottled alcohol
without the intent to consume on site with all proper approvals from the State and Local authorities,
seconded by Trustee Flynn, and unanimously approved.
• A motion by Trustee Lazickas, to approve a Temporary Use Permit for Jamie Dingro, EA Famers
Market, 115 Riley Street, from 7 am-1 pm Wednesdays and Saturdays from May until November, with
alcohol for tasting only and selling of bottled alcohol without the intent to consume on site with all
proper approvals from the State and Local authorities, seconded by Trustee Cameron, and unanimously
approved.
• A motion by Trustee Rabey, to approve a Temporary Use Permit for Jerrica Hinman, Hometown Market
EA, 54 Elm Street & 644 Oakwood, monthly on Thursdays from 4pm-7pm & Sundays from 10am-2pm
from May to October, seconded by Trustee Scheer, and unanimously approved.
• A motion by Trustee Cameron, to approve a peddler solicitor permit for Michael Yohe to operate a
horse-drawn carriage, seconded by Trustee Lazickas, and unanimously approved.
Page 4
• A motion by Trustee Cameron, to refer to the Planning Commission on April 7, 2026 the Site Plan
application from Roger Andrews of Sestor Properties at 47 Elm Street to revitalize the existing lot into a
multi-use commercial retail, and office building, seconded by Trustee Viger, and unanimously approved.
• I, Mayor Mercurio, appoint Joshua Best to replace Ray Byrnes on the Historic Preservation Commission
for the term to expire April 5, 2027 pursuant to Village Code Chapter 156; and duly put to a roll call
vote which resulted in the following:
Trustee Lazickas - Aye
Trustee Flynn - Aye
Trustee Cameron - Aye
Trustee Scheer – Aye
Trustee Viger- Aye
Trustee Rabey- Aye
Mayor Mercurio – Aye
o Mayor Mercurio said that he appreciates all the time and effort Ray spent volunteering with the
HPC.
• A motion by Trustee Viger, to set a public hearing April 20, 2026 for Special Use Permit application
Erin Redding and Zachary Goodrich at 533 Prospect Ave. for a detached garage ADU, seconded by
Trustee Lazickas, and unanimously approved.
• A motion by Trustee Lazickas, to set a public hearing April 20, 2026 for Special Use Permit application
from James Boglioli of Benderson Development for Five Below at 123 Grey St. The proposal is for
staging merchandise outside of their storefront, seconded by Trustee Rabey, and unanimously approved.
• A motion by Trustee Cameron, to give permission for the mayor to sign an MOU with the PBA,
seconded by Trustee Rabey, and unanimously approved.
• MODIFY 2025/2026 BUDGET March 16, 2026
Trustee Flynn, offered the following resolution and moved for its adoption:
BE IT RESOLVED, the Clerk–Treasurer is hereby authorized to modify the 2025/2026 Budget in the
following manner:
Revenue – Appropriated Fund balance - $ 60,000
Expenditures –
Parks and Recreation Maintenance and Repairs 5.7140.0420 - $60,000
Arborist Hamlin Park trees
Revenue – Appropriated Fund balance - $ 196,000
Expenditures –
Street maintenance Equipment 5.5110.0200 - $196,000
Move DPW reserve money already approved to spend into the budget
The following resolution was seconded by Trustee Cameron and unanimously approved.
• A motion by Trustee Cameron, to Consideration to approve the use of the Village Arborist for tree care
in Hamlin Park. This work includes pruning and general care, seconded by Trustee Rabey, and
unanimously approved.
Page 5
• A motion by Trustee Cameron, to Approve Budget Adjustments for the 25/26 fiscal year, seconded by
Trustee Rabey, and unanimously approved.
Budget Transfers 2025-2026
FROM TO
A.5.3120.0126 Police Deferred Comp $ 900.00 A.5.3120.0125 Police Longevity $ 900.00
A.3420.0130 Dispatch Part time $15,000.00 A.5.3420.0140 Dispatch OT $ 15,000.00
• A motion by Trustee Lazickas, to give permission to advertise for the RFP for the feasibility study once
the documents are ready, seconded by Trustee Scheer, and unanimously approved.
• A motion by Trustee Rabey, to give permission for the Mayor to sign an agreement with AMR for
Emergency Medical Services, seconded by Trustee Lazickas, and unanimously approved
o Village Administrator Krieger reviewed the agreement with AMR and said that it’s a 3% steady
yearly increase versus a variable rate.
Speakers & Communications (II)
• Suzanne Mercurio- 129 Center Street- She thanked all of the department heads and the Village offices
for all they do to make East Aurora the best village. She gave her best wishes to Trustee Viger and
Trustee Flynn and said they would be missed. She thanked Mayor Mercurio for making East Aurora the
wonderful place it is to raise their family and that she is very proud of him.
Department Head and Trustee Reports
Police Chief– He said that the new officer started today and said that he is very happy with the progress that
the three new part-time dispatchers are making. He said that he has become a part of the Erie Crime Analysis
Board. He thanked the DPW for all their hard work at the police station. He said that his officers have been
attending trainings involving mental health and drug-involved death investigations. He said that the burn ban
starts today and ends May 14. He said that he visited both cannabis shops in town to check security footage, and
both are running well. He said that there have been questions about the camera on Main Street, which the police
department has utilized in the winter, and will be moving the camera back to Hamlin Park when the weather
allows.
General Foreman- He said that the DPW has been chipping brush early due to the storm damage, and let the
residents know to put their brush out. He said that they have been cold patching the road and that they opened
up yard waste on Fridays from 7 am-2 pm. He said that he met with Lucas from Parkitects to get going on the
playground grant coming up in May for New York Plays. He said that Lucas is going to give him some layouts
and designs, and also come to the next Hamlin Park Committee meeting as well.
Code Enforcement Officer- She said that every year she has to do a report for the Department of State on the
activities of her office. She said that she will bring the report to the next board meeting for the board to look at.
Village Administrator- none
Village Clerk-Treasurer- She said that the Village Budget is ready and that she has it down to 1.94% increase
in taxes. She said that the capital plan from the Capital Committee is also ready to be viewed and will be posted
on the website tomorrow. She said that the Village got back its fiscal stress monitoring scores and had no
designation. Mayor Mercurio thanked all of the department heads for keeping their budgets tight, the Trustees
for going through everything in detail, and Maureen for working hard to get the numbers down. Clerk-Treasurer
Jerackas said that she is also getting everything ready for the election on Wednesday.
Trustee Lazickas- He said that the Hamlin Park Committee met and currently has plans to hopefully revamp
the playground at Hamlin Park, and discussed a few ideas of grants and public fundraising. Trustee Scheer
noted that a playground is around $750,000, but the one mentioned online in Orchard Park costs two million
dollars. He thanked General Foreman Stoll for finding the parts and fixing up the playground that is currently at
Page 6
Hamlin Park. Mayor Mercurio said that the owners of Main and Hamlin are doing a partnership to get private
donations for the playground. Trustee Lazickas said to please come out and vote on Wednesday.
Trustee Cameron- She asked about data centers and asked if they could become a problem that the board needs
to address in the Village. Code Enforcement Officer Cassidy said that the code says that if it’s not stated, then
it’s not allowed. Trustee Cameron to come out to vote.
Trustee Scheer- He said that he has really enjoyed working with Trustee Flynn and Trustee Viger and will miss
having them on the Village Board. He said that Mayor Mercurio has become a good friend and that he is a
person who does great things for the community. He said Mayor Mercurio is always doing kind things that
nobody knows about and is very impressed with his character. Mayor Mercurio thanked Trustee Scheer for his
kind words.
Trustee Rabey- He thanked Trustee Flynn and Trustee Viger for serving on the Village Board and said that it
was a pleasure to work with both of them. He said that Mayor Mercurio is a very genuine and authentic person
and does good things for people. He said to come out and vote.
Mayor Mercurio- He said that he really appreciated working with Trustee Flynn and Trustee Viger. He said
that he appreciated Trustee Viger’s analytical precision and perspectives. He said that Trustee Flynn’s love for
the Village was evident in all of her decisions and that she is all heart. He thanked Ernie for everything that he
does for the Village.
Trustee Flynn- She said that it’s been an honor to serve on the board and enjoyed meeting all the new people.
She said that she knows the Village is in good hands with all the staff and elected officials.
Trustee Viger- She said that Mayor Mercurio was a joy to work with and that it’s been great to work with all of
the Trustees. She thanked the Village Tree Board for their dedication and passion for the trees and the Village.
ADJOURNMENT
A motion was made by Trustee Lazickas to adjourn the meeting at 7:51pm. Seconded by Trustee Viger and
unanimously carried.
Respectfully submitted,
Maureen Jerackas
Village Clerk-Treasurer
Page 7
Expense Approval Report 4.6.2026
Village of East Aurora, NY By Vendor Name
Payable Dates 4/6/2026 - 4/26/2026 Post Dates 3/31/2026 - 4/26/2026
Payable Number Vendor Name Payable Date Description (Item) Account Number Account Name Purchase Order Number Amount
Vendor: 10054 - Amazon
1NNN-LC49-9K3Q Amazon 04/06/2026 EAPD Computer A.5.3420.0200 POLICE & FIRE DISPATCH - E… 532.60
Vendor 10054 - Amazon Total: 532.60
Vendor: 10069 - Amherst Alarm Inc.
AA-36430 Amherst Alarm Inc. 04/06/2026 EAFD bldg interior door A.5.3410.0420 FIRE DEPT - DEPT SUPPLIES 412.50
inoperable- needed service
Vendor 10069 - Amherst Alarm Inc. Total: 412.50
Vendor: 10130 - BARTON & LOGUIDICE
2026000120 BARTON & LOGUIDICE 04/06/2026 DPW roof replacement MSA A.5.8140.0420 STORM SEWERS - MAINT & R…2026000120 1,800.00
Vendor 10130 - BARTON & LOGUIDICE Total: 1,800.00
Vendor: 10163 - Bobcat of Buffalo
04-303575 Bobcat of Buffalo 04/06/2026 DPW #552 parts and service A.5.1640.0460 CENTRAL GARAGE - VEHICLE… 76.14
Vendor 10163 - Bobcat of Buffalo Total: 76.14
Vendor: 10427 - Bradley Felton
Election Inspector 2 Bradley Felton 04/06/2026 Village Payment - Election A.5.1450.0410 BOARD OF ELECTIONS - ELEC… 175.00
March 2026
Vendor 10427 - Bradley Felton Total: 175.00
Vendor: 10170 - BRADLEY TREE & LANDSCAPE
inv 16206-2 BRADLEY TREE & LANDSCAPE 04/06/2026 132 Pine St consult A.5.8560.0420 SHADE TREES - MAINT & REP… 135.00
Vendor 10170 - BRADLEY TREE & LANDSCAPE Total: 135.00
Vendor: 10172 - BREATHING AIR RESOURCES
6934 BREATHING AIR RESOURCES 04/06/2026 EAFD hydrotest air cylinders A.5.3410.0420 FIRE DEPT - DEPT SUPPLIES 1,184.74
Vendor 10172 - BREATHING AIR RESOURCES Total: 1,184.74
Vendor: 10174 - BRENNTAG NORTH AMERICA INC.
inv BLN26-10331 BRENNTAG NORTH AMERICA 04/06/2026 DPW oil drum A.5.1640.0450 CENTRAL GARAGE - GASOLIN… 544.50
INC.
Vendor 10174 - BRENNTAG NORTH AMERICA INC. Total: 544.50
Vendor: 10229 - Charter Communications
115006201031426 Charter Communications 04/06/2026 EAPD Internet A.5.1480.0410 PUBINFO SVCS-PUB INFO SUP… 449.00
115006201031426 Charter Communications 04/06/2026 EAFD Internet A.5.1480.0410 PUBINFO SVCS-PUB INFO SUP… 160.00
115006201031426 Charter Communications 04/06/2026 EAFD Cable A.5.1480.0410 PUBINFO SVCS-PUB INFO SUP… 59.95
115006201031426 Charter Communications 04/06/2026 TAXES & FEES A.5.1480.0410 PUBINFO SVCS-PUB INFO SUP… 2.97
Vendor 10229 - Charter Communications Total: 671.92
Vendor: 10240 - CINTAS CORPORATION
2026000148 CINTAS CORPORATION 04/06/2026 building mats/uniforms A.5.1620.0420 BUILDINGS - MAINT & REPAI… 2026000148 319.50
4/2/2026 12:57:10 PM Page 1 of 11
Page 8
Expense Approval Report 4.6.2026 Payable Dates: 4/6/2026 - 4/26/2026 Post Dates: 3/31/2026 - 4/26/2026
Payable Number Vendor Name Payable Date Description (Item) Account Number Account Name Purchase Order Number Amount
2026000148 CINTAS CORPORATION 04/06/2026 building mats/uniforms A.5.1640.0420 CENTRAL GARAGE - MAINT &…2026000148 398.80
2026000148 CINTAS CORPORATION 04/06/2026 building mats/uniforms A.5.1640.0480 CENTRAL GARAGE - UNIFOR… 2026000148 444.52
5323194506 CINTAS CORPORATION 04/06/2026 Medicine supplies for first aid A.5.3120.0420 POLICE DEPT - MAINT. SERVI… 149.10
cabinet 3-12-26
5323194506 CINTAS CORPORATION 04/06/2026 Medicine supplies for first aid A.5.3420.0420 POLICE & FIRE DISPATCH - M… 149.10
cabinet 3-12-26
Vendor 10240 - CINTAS CORPORATION Total: 1,461.02
Vendor: 10275 - Conway Beam Truck Group
inv 153596B Conway Beam Truck Group 04/06/2026 DPW #525 oil/filter parts A.5.1640.0460 CENTRAL GARAGE - VEHICLE… 458.13
Vendor 10275 - Conway Beam Truck Group Total: 458.13
Vendor: 11383 - Corey Specht
032426 Corey Specht 04/06/2026 fuel for DRE Certification in A.5.3120.0440 POLICE DEPT - TRAINING, TR… 116.84
PA 3/24 & 3/25
Vendor 11383 - Corey Specht Total: 116.84
Vendor: 10282 - CORR DISTRIBUTORS INC.
inv 167240 CORR DISTRIBUTORS INC. 04/06/2026 janitorial supplies A.5.1620.0470 BUILDINGS - DEPARTMENTAL… 168.59
inv 167240 CORR DISTRIBUTORS INC. 04/06/2026 janitorial supplies A.5.1640.0470 CENTRAL GARAGE - DEPART… 118.95
inv 167240 CORR DISTRIBUTORS INC. 04/06/2026 janitorial supplies A.5.7140.0420 PLAYGROUNDS & REC CTRS. -… 253.38
Vendor 10282 - CORR DISTRIBUTORS INC. Total: 540.92
Vendor: 10286 - COUNTY LINE STONE
I288 & I515 COUNTY LINE STONE 04/06/2026 March - cold patch for Village A.5.5110.0420 STREET MAINT - ROAD MATE… 1,015.77
streets
Vendor 10286 - COUNTY LINE STONE Total: 1,015.77
Vendor: 11308 - Crossbar Athletics LLC
1812 Crossbar Athletics LLC 04/06/2026 Metal Plates A.5.1325.0403 VILLAGE ADMIN - OFFICE SU… 120.00
Vendor 11308 - Crossbar Athletics LLC Total: 120.00
Vendor: 10296 - CSEA EMPL BENEFIT FUND
12314052April2026 CSEA EMPL BENEFIT FUND 04/06/2026 Dental/ Vision A.5.9061.0807 DENTAL INS - DENTAL INS 6,303.32
12314052April2026 CSEA EMPL BENEFIT FUND 04/06/2026 Dental/ Vision A.5.9062.0808 OPTICAL - OPTICAL 1,011.95
12314052April2026 CSEA EMPL BENEFIT FUND 04/06/2026 Dental/ Vision F.5.9061.0807 DENTAL INS - DENTAL INS 511.08
12314052April2026 CSEA EMPL BENEFIT FUND 04/06/2026 Dental/ Vision F.5.9062.0808 OPTICAL - OPTICAL 82.05
Vendor 10296 - CSEA EMPL BENEFIT FUND Total: 7,908.40
Vendor: 10318 - DELACY FORD
517875/516781/511995/513… DELACY FORD 04/06/2026 EAPD vehicle repairs A.5.3120.0460 POLICE DEPT - VEHICLE MAI… 322.24
Vendor 10318 - DELACY FORD Total: 322.24
Vendor: 11380 - Donna Bodeker
Election Inspector 1 Donna Bodeker 04/06/2026 Village Payment - Election A.5.1450.0410 BOARD OF ELECTIONS - ELEC… 175.00
March 2025
Vendor 11380 - Donna Bodeker Total: 175.00
4/2/2026 12:57:10 PM Page 2 of 11
Page 9
Expense Approval Report 4.6.2026 Payable Dates: 4/6/2026 - 4/26/2026 Post Dates: 3/31/2026 - 4/26/2026
Payable Number Vendor Name Payable Date Description (Item) Account Number Account Name Purchase Order Number Amount
Vendor: 10376 - EIGHTY FOUR LUMBER
inv 0632-755174 EIGHTY FOUR LUMBER 04/06/2026 treated wood- DPW repairs A.5.5110.0420 STREET MAINT - ROAD MATE… 14.21
Vendor 10376 - EIGHTY FOUR LUMBER Total: 14.21
Vendor: 10403 - ERIE COUNTY COMPTROLLER
1800083477 ERIE COUNTY COMPTROLLER 04/06/2026 Tax Spreading A.5.1362.0410 TAX ADVER & EXPS - TAX ROL… 1,236.05
1800083533 ERIE COUNTY COMPTROLLER 04/06/2026 571 Main St Village Hall Acct A.5.1620.0431 BUILDINGS - ELECTRIC 1,610.81
7933856
1800083533 ERIE COUNTY COMPTROLLER 04/06/2026 Pine St DPW Offices and A.5.1640.0431 CENTRAL GARAGE - ELECTRIC 832.56
garage acct 256115
1800083533 ERIE COUNTY COMPTROLLER 04/06/2026 33 Center St A.5.3410.0431 FIRE DEPT - ELECTRIC 2,440.66
1800083533 ERIE COUNTY COMPTROLLER 04/06/2026 ST LIGHTING R2 ACCT 719336 A.5.5182.0431 STREET LIGHTING - ELECTRIC 641.09
1800083533 ERIE COUNTY COMPTROLLER 04/06/2026 Elmwood & Chestnut Hill A.5.5182.0431 STREET LIGHTING - ELECTRIC 966.07
Booster Pump Station Acct
1800083533 ERIE COUNTY COMPTROLLER 04/06/2026 Elm St Signal Acct 3514288 A.5.5182.0431 STREET LIGHTING - ELECTRIC 10.74
1800083533 ERIE COUNTY COMPTROLLER 04/06/2026 ST LIGHTING ACCT 4086039 A.5.5182.0431 STREET LIGHTING - ELECTRIC 948.82
1800083533 ERIE COUNTY COMPTROLLER 04/06/2026 Girard Ave Acct 893560 A.5.5182.0431 STREET LIGHTING - ELECTRIC 2.56
1800083533 ERIE COUNTY COMPTROLLER 04/06/2026 PINE ST WATER PLANT ACCT F.5.1620.0431 BUILDINGS - ELECTRIC 64.65
288597
inv 1800083347 ERIE COUNTY COMPTROLLER 04/06/2026 DPW- for street signs A.5.5110.0420 STREET MAINT - ROAD MATE… 97.74
Vendor 10403 - ERIE COUNTY COMPTROLLER Total: 8,851.75
Vendor: 10406 - ERIE COUNTY PUBLIC HEALTH LAB
2026000165 ERIE COUNTY PUBLIC HEALTH 04/06/2026 Water Samples- Sept F.5.8340.0490 TRANSFS & DIST - WATER TE… 2026000165 476.00
LAB
Vendor 10406 - ERIE COUNTY PUBLIC HEALTH LAB Total: 476.00
Vendor: 10430 - FERRY INC.
81648 FERRY INC. 04/06/2026 DPW vehicle hose assembly A.5.1640.0460 CENTRAL GARAGE - VEHICLE… 603.18
Vendor 10430 - FERRY INC. Total: 603.18
Vendor: 10448 - FIVE STAR EQUIPMENT INC.
inv P24263/P24305 FIVE STAR EQUIPMENT INC. 04/06/2026 DPW vehicle filters A.5.1640.0460 CENTRAL GARAGE - VEHICLE… 96.26
Vendor 10448 - FIVE STAR EQUIPMENT INC. Total: 96.26
Vendor: 10511 - GRAINGER
9854992154 GRAINGER 04/06/2026 Calleri- DPW workboots A.5.5110.0480 STREET MAINT - UNIFORMS 221.64
Vendor 10511 - GRAINGER Total: 221.64
Vendor: 10521 - GRECO TRAPP PLLC
February 2026 GRECO TRAPP PLLC 04/06/2026 Statement 33915 A.5.1420.0411 VILLAGE ATTORNEY - OTHER … 426.00
February 2026 GRECO TRAPP PLLC 04/06/2026 Statement 33914 A.5.1420.0411 VILLAGE ATTORNEY - OTHER … 1.76
February 2026 GRECO TRAPP PLLC 04/06/2026 Statement 33918 A.5.1420.0411 VILLAGE ATTORNEY - OTHER … 82.50
February 2026 GRECO TRAPP PLLC 04/06/2026 Statement 33919 A.5.1420.0411 VILLAGE ATTORNEY - OTHER … 842.50
Vendor 10521 - GRECO TRAPP PLLC Total: 1,352.76
Vendor: 10529 - HAMBURG OVERHEAD DOOR
2026000180 HAMBURG OVERHEAD DOOR 04/06/2026 EAFD door repairs A.5.3410.0420 FIRE DEPT - DEPT SUPPLIES 2026000180 1,874.00
Vendor 10529 - HAMBURG OVERHEAD DOOR Total: 1,874.00
4/2/2026 12:57:10 PM Page 3 of 11
Page 10
Expense Approval Report 4.6.2026 Payable Dates: 4/6/2026 - 4/26/2026 Post Dates: 3/31/2026 - 4/26/2026
Payable Number Vendor Name Payable Date Description (Item) Account Number Account Name Purchase Order Number Amount
Vendor: 10547 - Highmark Blue Cross & Blue Shield of Western New York
260320134128 Highmark Blue Cross & Blue 04/06/2026 Health Insurance A.5.9060.0805 HOSPITAL & MEDICAL INS - H… 46,236.80
Shield of Western New York
260320134128 Highmark Blue Cross & Blue 04/06/2026 Health Insurance A.5.9060.0806 HOSPITAL & MEDICAL INS - H… 20,178.64
Shield of Western New York
260320134128 Highmark Blue Cross & Blue 04/06/2026 Health Insurance F.5.9060.0805 HOSPITAL & MEDICAL INS - H… 4,811.89
Shield of Western New York
260320134128 Highmark Blue Cross & Blue 04/06/2026 Health Insurance F.5.9060.0806 HOSPITAL & MEDICAL INS - H… 950.51
Shield of Western New York
Vendor 10547 - Highmark Blue Cross & Blue Shield of Western New York Total: 72,177.84
Vendor: 10613 - JOHN SIXT & SON INC.
IN2603-810843 JOHN SIXT & SON INC. 04/06/2026 rec bldg repairs A.5.7140.0420 PLAYGROUNDS & REC CTRS. -… 32.80
Vendor 10613 - JOHN SIXT & SON INC. Total: 32.80
Vendor: 11366 - Jonathan Becker
31126 Jonathan Becker 04/06/2026 Mileage for Grand Jury A.5.3120.0440 POLICE DEPT - TRAINING, TR… 29.85
Appearance
Vendor 11366 - Jonathan Becker Total: 29.85
Vendor: 10628 - Kieffer’s Fire Ext Svcs
765557 Kieffer’s Fire Ext Svcs 04/06/2026 Service call & recharge A.5.3120.0420 POLICE DEPT - MAINT. SERVI… 90.00
Vendor 10628 - Kieffer’s Fire Ext Svcs Total: 90.00
Vendor: 10661 - LAKESIDE SOD SUPPLY CO. INC
83620 LAKESIDE SOD SUPPLY CO… 04/06/2026 Marco Clay ball mix- HP field A.5.7140.0420 PLAYGROUNDS & REC CTRS. -… 440.74
Vendor 10661 - LAKESIDE SOD SUPPLY CO. INC Total: 440.74
Vendor: 10691 - LINSTAR INC.
129086 LINSTAR INC. 04/06/2026 PO ID for New Officer Pierce A.5.3120.0480 POLICE DEPT - UNIFORMS, B… 25.60
Vendor 10691 - LINSTAR INC. Total: 25.60
Vendor: 10697 - LOGICS
26-IN4685 LOGICS 04/06/2026 Monthly Hosting for May A.5.1480.0410 PUBINFO SVCS-PUB INFO SUP… 1,097.44
2026
Vendor 10697 - LOGICS Total: 1,097.44
Vendor: 10702 - LOWE'S
March 2026 LOWE'S 04/06/2026 Hamlin Park repairs A.5.7140.0420 PLAYGROUNDS & REC CTRS. -… 246.32
Vendor 10702 - LOWE'S Total: 246.32
Vendor: 10706 - M and T BANK
March 2026 Credit Card M and T BANK 04/06/2026 Buffalo News - March A.5.1325.0403 VILLAGE ADMIN - OFFICE SU… 36.99
March 2026 Credit Card M and T BANK 04/06/2026 BUFFALO NEWS - February A.5.1325.0403 VILLAGE ADMIN - OFFICE SU… 36.99
March 2026 Credit Card M and T BANK 04/06/2026 ADOBE - March A.5.1480.0410 PUBINFO SVCS-PUB INFO SUP… 21.74
March 2026 Credit Card M and T BANK 04/06/2026 ADOBE - February A.5.1480.0410 PUBINFO SVCS-PUB INFO SUP… 21.74
March 2026 Credit Card M and T BANK 04/06/2026 GODADDY A.5.1480.0410 PUBINFO SVCS-PUB INFO SUP… 71.88
March 2026 Credit Card M and T BANK 04/06/2026 Amazon A.5.3120.0403 POLICE DEPT - OFFICE SUPPLI… 8.99
March 2026 Credit Card M and T BANK 04/06/2026 WHEN TO WORK A.5.3120.0420 POLICE DEPT - MAINT. SERVI… 261.00
4/2/2026 12:57:10 PM Page 4 of 11
Page 11
Expense Approval Report 4.6.2026 Payable Dates: 4/6/2026 - 4/26/2026 Post Dates: 3/31/2026 - 4/26/2026
Payable Number Vendor Name Payable Date Description (Item) Account Number Account Name Purchase Order Number Amount
March 2026 Credit Card M and T BANK 04/06/2026 EAPD Stop Scams NY A.5.3120.0440 POLICE DEPT - TRAINING, TR… 225.00
Conference
March 2026 Credit Card M and T BANK 04/06/2026 NYS Assoc. of Chiefs of Police A.5.3120.0440 POLICE DEPT - TRAINING, TR… 336.05
Conference
March 2026 Credit Card M and T BANK 04/06/2026 WHEN TO WORK A.5.3420.0420 POLICE & FIRE DISPATCH - M… 261.00
Vendor 10706 - M and T BANK Total: 1,281.38
Vendor: 10720 - Manny's Ace Hardware
march receipts Manny's Ace Hardware 04/06/2026 Hamlin Park Project A.5.7140.0420 PLAYGROUNDS & REC CTRS. -… 195.63
Vendor 10720 - Manny's Ace Hardware Total: 195.63
Vendor: 10763 - MPH INDUSTRIES INC.
2026000184 MPH INDUSTRIES INC. 04/06/2026 Remote assy, wired PYTIII, A.5.3120.0470 POLICE DEPT - DEPTAL SUPPL…2026000184 225.95
Non-FS
2026000184 MPH INDUSTRIES INC. 04/06/2026 Cable Assy, Power,Bee/Pyt, A.5.3120.0470 POLICE DEPT - DEPTAL SUPPL…2026000184 46.35
10FT
Vendor 10763 - MPH INDUSTRIES INC. Total: 272.30
Vendor: 10864 - NYSEG
1001-1111-704 2/18-3/18/26 NYSEG 04/06/2026 400 Pine St 2/18-3/18/26 A.5.1640.0431 CENTRAL GARAGE - ELECTRIC 268.88
1001-1111-712 2/18-3/18/26 NYSEG 04/06/2026 Pine St 2/18-3/18/26 F.5.1620.0431 BUILDINGS - ELECTRIC 54.25
1001-3143-531 2/11-3/11/26 NYSEG 04/06/2026 NEAR 21 ELM SIGNAL 2/11- A.5.5182.0431 STREET LIGHTING - ELECTRIC 29.23
3/11/26
1001-7910-034 2/24-3/25/26 NYSEG 04/06/2026 GLENRIDGE RD 2/24-3/25/26 F.5.1620.0431 BUILDINGS - ELECTRIC 40.25
1003-3707-877 2/19-3/19/26 NYSEG 04/06/2026 Near 163 Main St 2/19- A.5.5182.0431 STREET LIGHTING - ELECTRIC 43.01
3/19/26
1003-3707-893 2/19-3/19/26 NYSEG 04/06/2026 Buffalo Rd @ Grey St 2/19- A.5.5182.0431 STREET LIGHTING - ELECTRIC 23.12
3/19/26
1004-1637-827 2/18-3/18/26 NYSEG 04/06/2026 33 Center St 2/18-3/18/26 A.5.3410.0431 FIRE DEPT - ELECTRIC 554.12
1004-8515-430 2/10-3/10/26 NYSEG 04/06/2026 400 Pine Street Salt Shed A.5.1640.0431 CENTRAL GARAGE - ELECTRIC 20.75
2/10-3/10/2026
1005-3329-701 1/10-3/10/26 NYSEG 04/06/2026 S GROVE ST 1/10-3/10/26 A.5.7140.0431 PLAYGROUNDS & REC CTRS. -… 266.29
Vendor 10864 - NYSEG Total: 1,299.90
Vendor: 10874 - OFFICE DEPOT
463360116001 OFFICE DEPOT 04/06/2026 office supplies A.5.1325.0403 VILLAGE ADMIN - OFFICE SU… 83.98
463360116001 OFFICE DEPOT 04/06/2026 office supplies A.5.1490.0403 PUBLIC WORKS ADMIN - OFF… 532.89
Vendor 10874 - OFFICE DEPOT Total: 616.87
Vendor: 10976 - RED WING BRANDS OF AMERICA INC.
in 3949270/4037818 RED WING BRANDS OF 04/06/2026 DPW- Williams and Jakubczak A.5.1640.0480 CENTRAL GARAGE - UNIFOR… 207.99
AMERICA INC. workboots
in 3949270/4037818 RED WING BRANDS OF 04/06/2026 DPW- Williams and Jakubczak A.5.5110.0480 STREET MAINT - UNIFORMS 171.99
AMERICA INC. workboots
Vendor 10976 - RED WING BRANDS OF AMERICA INC. Total: 379.98
Vendor: 10978 - REGIONAL INT. CORP.
2026000160 REGIONAL INT. CORP. 04/06/2026 DPW vehicle parts- Oct A.5.1640.0460 CENTRAL GARAGE - VEHICLE… 2026000160 1,054.86
Vendor 10978 - REGIONAL INT. CORP. Total: 1,054.86
4/2/2026 12:57:10 PM Page 5 of 11
Page 12
Expense Approval Report 4.6.2026 Payable Dates: 4/6/2026 - 4/26/2026 Post Dates: 3/31/2026 - 4/26/2026
Payable Number Vendor Name Payable Date Description (Item) Account Number Account Name Purchase Order Number Amount
Vendor: 10997 - Rodney Simone
Election Inspector 3 Rodney Simone 04/06/2026 Village Payment - Election A.5.1450.0410 BOARD OF ELECTIONS - ELEC… 175.00
March 2026
Vendor 10997 - Rodney Simone Total: 175.00
Vendor: 11362 - Rugged Books Inc.
2026000191 Rugged Books Inc. 04/26/2026 Dell Latitude 5430 Rugged A.5.3120.0210 POLICE DEPT - VEHICLES 2026000191 2,055.00
Vendor 11362 - Rugged Books Inc. Total: 2,055.00
Vendor: 11016 - SAF-GARD SAFETY SHOE CO.
IN-4593725 SAF-GARD SAFETY SHOE CO. 04/06/2026 DPW- Reichert workboots A.5.5110.0480 STREET MAINT - UNIFORMS 139.99
Vendor 11016 - SAF-GARD SAFETY SHOE CO. Total: 139.99
Vendor: 11020 - SAIA COMMUNICATIONS INC.
2026000186 SAIA COMMUNICATIONS INC. 04/06/2026 pager repairs and additional A.5.3410.0200 FIRE DEPT - EQUIP 2026000186 410.84
repair parts
Vendor 11020 - SAIA COMMUNICATIONS INC. Total: 410.84
Vendor: 11022 - SAMMY'S CAR WASH INC
2026000041 dec-mar SAMMY'S CAR WASH INC 04/26/2026 December 2025 car washes A.5.3120.0460 POLICE DEPT - VEHICLE MAI… 2026000041 175.00
2026000041 dec-mar SAMMY'S CAR WASH INC 04/26/2026 March 2026 car washes A.5.3120.0460 POLICE DEPT - VEHICLE MAI… 2026000041 175.00
2026000041 dec-mar SAMMY'S CAR WASH INC 04/26/2026 February 2026 car washes A.5.3120.0460 POLICE DEPT - VEHICLE MAI… 2026000041 175.00
2026000041 dec-mar SAMMY'S CAR WASH INC 04/26/2026 January 2026 car washes A.5.3120.0460 POLICE DEPT - VEHICLE MAI… 2026000041 175.00
Vendor 11022 - SAMMY'S CAR WASH INC Total: 700.00
Vendor: 10314 - SAXON DECK
Election Inspector 4 SAXON DECK 04/06/2026 Village Payment - Election A.5.1450.0410 BOARD OF ELECTIONS - ELEC… 175.00
March 2026
Vendor 10314 - SAXON DECK Total: 175.00
Vendor: 11033 - Schroder Joseph & Associates LLP
27281 Schroder Joseph & Associates 04/06/2026 SERVICES FOR FEBRUARY A.5.1420.0411 VILLAGE ATTORNEY - OTHER … 708.60
LLP 2026
Vendor 11033 - Schroder Joseph & Associates LLP Total: 708.60
Vendor: 11052 - SEWING TECHNOLOGY UNIFORM
51279 SEWING TECHNOLOGY 04/06/2026 2 pants, parka, cap, tie & bar, A.5.3120.0127 POLICE DEPT - UNIFORM ALL… 796.83
UNIFORM cuff case, OC pch
51279 SEWING TECHNOLOGY 04/06/2026 Duty & gar belt, belt keepers, A.5.3120.0127 POLICE DEPT - UNIFORM ALL… 413.90
UNIFORM 2 LS shirts & 2 SS
51300 SEWING TECHNOLOGY 04/06/2026 ASP, Mag pouch, glove & A.5.3120.0127 POLICE DEPT - UNIFORM ALL… 133.96
UNIFORM flashlight holder
51301 SEWING TECHNOLOGY 04/06/2026 ERT pants Lt OHara A.5.3120.0470 POLICE DEPT - DEPTAL SUPPL… 169.99
UNIFORM
51359 SEWING TECHNOLOGY 04/06/2026 SS Shirt and Polo A.5.3420.0480 POLICE & FIRE DISPATCH - UN… 176.98
UNIFORM
Vendor 11052 - SEWING TECHNOLOGY UNIFORM Total: 1,691.66
4/2/2026 12:57:10 PM Page 6 of 11
Page 13
Expense Approval Report 4.6.2026 Payable Dates: 4/6/2026 - 4/26/2026 Post Dates: 3/31/2026 - 4/26/2026
Payable Number Vendor Name Payable Date Description (Item) Account Number Account Name Purchase Order Number Amount
Vendor: 11059 - SHERWIN-WILLIAMS CO.
March receipts SHERWIN-WILLIAMS CO. 04/06/2026 HP rec bldg project A.5.7140.0420 PLAYGROUNDS & REC CTRS. -… 163.82
Vendor 11059 - SHERWIN-WILLIAMS CO. Total: 163.82
Vendor: 11375 - TH Automotive & Paint
1538 TH Automotive & Paint 04/06/2026 Repairs for Patrol car 25 A.5.3120.0465 POLICE DEPT - ACCIDENT RE… 7,657.55
accident
Vendor 11375 - TH Automotive & Paint Total: 7,657.55
Vendor: 11133 - THE HARTFORD
509154850337 THE HARTFORD 04/06/2026 Life Insurance A.5.9045.0803 LIFE INS - LIFE INS 858.00
509154850337 THE HARTFORD 04/06/2026 Life Insurance A.5.9045.0804 LIFE INS - LIFE INS-RETIREES 468.85
509154850337 THE HARTFORD 04/06/2026 Life Insurance F.5.9045.0803 LIFE INS - LIFE INS 88.00
509154850337 THE HARTFORD 04/06/2026 Life Insurance F.5.9045.0804 LIFE INS - LIFE INS-RETIREES 30.97
Vendor 11133 - THE HARTFORD Total: 1,445.82
Vendor: 11226 - Verizon-Local Svc.
MULTIPLE MARCH 2026 Verizon-Local Svc. 04/06/2026 716-652-0319 FIRE HALL A.5.3410.0434 FIRE DEPT - TELEPHONE 40.73
ELEVATOR
MULTIPLE MARCH 2026 Verizon-Local Svc. 04/06/2026 716-652-0893 ELEVATOR A.5.3410.0434 FIRE DEPT - TELEPHONE 81.46
Vendor 11226 - Verizon-Local Svc. Total: 122.19
Vendor: 11234 - VILLAGE OF EA WATER
QUARTERLY MARCH 2026 VILLAGE OF EA WATER 04/06/2026 25-00003-00 571 Main St A.5.1620.0433 BUILDINGS - WATER 135.92
QUARTERLY MARCH 2026 VILLAGE OF EA WATER 04/06/2026 25-00004-00 400-419 PINE ST A.5.1640.0433 CENTRAL GARAGE - WATER 293.19
- DPW GARAGE
QUARTERLY MARCH 2026 VILLAGE OF EA WATER 04/06/2026 25-00012-00 CIRCLE GARDEN A.5.1640.0433 CENTRAL GARAGE - WATER 71.33
CLUB
QUARTERLY MARCH 2026 VILLAGE OF EA WATER 04/06/2026 19-18370-00 33 Center St A.5.3410.0433 FIRE DEPT - WATER 186.85
QUARTERLY MARCH 2026 VILLAGE OF EA WATER 04/06/2026 25-00005-00 166 S GROVE A.5.7140.0433 PLAYGROUNDS & REC CTRS. -… 85.67
STREET
QUARTERLY MARCH 2026 VILLAGE OF EA WATER 04/06/2026 25-00008-00 400 PINE ST F.5.1620.0433 BUILDINGS - WATER 85.85
WATER PLANT
Vendor 11234 - VILLAGE OF EA WATER Total: 858.81
Vendor: 11248 - W.B. MASON CO. INC.
260811919, CM4557348, 26… W.B. MASON CO. INC. 04/06/2026 8 water ordered 3/19 & Feb A.5.3120.0420 POLICE DEPT - MAINT. SERVI… 24.99
rent
260811919, CM4557348, 26… W.B. MASON CO. INC. 04/06/2026 8 water ordered 3/19 & Feb A.5.3420.0420 POLICE & FIRE DISPATCH - M… 25.00
rent
Vendor 11248 - W.B. MASON CO. INC. Total: 49.99
Vendor: 11276 - WILLIAMSON LAW BOOK CO
210673 WILLIAMSON LAW BOOK CO 04/06/2026 Board Minutes book & sheets A.5.1325.0403 VILLAGE ADMIN - OFFICE SU… 525.12
Vendor 11276 - WILLIAMSON LAW BOOK CO Total: 525.12
Vendor: 11378 - Willow North LLC
2519 Willow North LLC 04/06/2026 backflow device annual A.5.1620.0420 BUILDINGS - MAINT & REPAI… 140.00
inspections
4/2/2026 12:57:10 PM Page 7 of 11
Page 14
Expense Approval Report 4.6.2026 Payable Dates: 4/6/2026 - 4/26/2026 Post Dates: 3/31/2026 - 4/26/2026
Payable Number Vendor Name Payable Date Description (Item) Account Number Account Name Purchase Order Number Amount
2519 Willow North LLC 04/06/2026 backflow device annual A.5.3410.0420 FIRE DEPT - DEPT SUPPLIES 490.00
inspections
Vendor 11378 - Willow North LLC Total: 630.00
Vendor: 11310 - Witmer Public Safety Group Inc.
2026000141 Witmer Public Safety Group 04/06/2026 additional helmet shields- A.5.3410.0200 FIRE DEPT - EQUIP 2026000141 305.98
Inc. EAFD
Vendor 11310 - Witmer Public Safety Group Inc. Total: 305.98
Vendor: 11357 - WM CORPORATE SERVICES INC.
5254388-1342-6 WM CORPORATE SERVICES 04/06/2026 Curb Service Curbside A.5.8160.0410 REFUSE & GARBAGE 48,726.51
INC. Collections
5254388-1342-6 WM CORPORATE SERVICES 04/06/2026 Hand Pickup Town Barrels A.5.8160.0410 REFUSE & GARBAGE 1,170.00
INC.
Vendor 11357 - WM CORPORATE SERVICES INC. Total: 49,896.51
Vendor: 11287 - WNYNETWORKS
00006479 WNYNETWORKS 04/06/2026 IT SERVICES FOR FEBRUARY A.5.1480.0410 PUBINFO SVCS-PUB INFO SUP… 1,812.50
2026 - VEA
00006479 WNYNETWORKS 04/06/2026 IT SERVICES FOR FEBRUARY A.5.1490.0420 PUBLIC WORKS ADMIN - MA… 375.00
2026 - DPW
00006479 WNYNETWORKS 04/06/2026 IT SERVICES FOR FEBRUARY A.5.3120.0420 POLICE DEPT - MAINT. SERVI… 500.00
2026 - EAPD
Vendor 11287 - WNYNETWORKS Total: 2,687.50
Grand Total: 180,781.41
4/2/2026 12:57:10 PM Page 8 of 11
Page 15
Expense Approval Report 4.6.2026 Payable Dates: 4/6/2026 - 4/26/2026 Post Dates: 3/31/2026 - 4/26/2026
Report Summary
Fund Summary
Fund Expense Amount
A - GENERAL FUND 173,585.91
F - ENTERPRISE WATER 7,195.50
Grand Total: 180,781.41
Account Summary
Account Number Account Name Expense Amount
A.5.1325.0403 VILLAGE ADMIN - OFFICE… 803.08
A.5.1362.0410 TAX ADVER & EXPS - TAX… 1,236.05
A.5.1420.0411 VILLAGE ATTORNEY - OT… 2,061.36
A.5.1450.0410 BOARD OF ELECTIONS - … 700.00
A.5.1480.0410 PUBINFO SVCS-PUB INFO… 3,697.22
A.5.1490.0403 PUBLIC WORKS ADMIN -… 532.89
A.5.1490.0420 PUBLIC WORKS ADMIN -… 375.00
A.5.1620.0420 BUILDINGS - MAINT & R… 459.50
A.5.1620.0431 BUILDINGS - ELECTRIC 1,610.81
A.5.1620.0433 BUILDINGS - WATER 135.92
A.5.1620.0470 BUILDINGS - DEPARTME… 168.59
A.5.1640.0420 CENTRAL GARAGE - MAI… 398.80
A.5.1640.0431 CENTRAL GARAGE - ELEC… 1,122.19
A.5.1640.0433 CENTRAL GARAGE - WA… 364.52
A.5.1640.0450 CENTRAL GARAGE - GAS… 544.50
A.5.1640.0460 CENTRAL GARAGE - VEH… 2,288.57
A.5.1640.0470 CENTRAL GARAGE - DEP… 118.95
A.5.1640.0480 CENTRAL GARAGE - UNI… 652.51
A.5.3120.0127 POLICE DEPT - UNIFORM… 1,344.69
A.5.3120.0210 POLICE DEPT - VEHICLES 2,055.00
A.5.3120.0403 POLICE DEPT - OFFICE S… 8.99
A.5.3120.0420 POLICE DEPT - MAINT. S… 1,025.09
A.5.3120.0440 POLICE DEPT - TRAINING,… 707.74
A.5.3120.0460 POLICE DEPT - VEHICLE … 1,022.24
A.5.3120.0465 POLICE DEPT - ACCIDENT… 7,657.55
A.5.3120.0470 POLICE DEPT - DEPTAL S… 442.29
A.5.3120.0480 POLICE DEPT - UNIFORM… 25.60
A.5.3410.0200 FIRE DEPT - EQUIP 716.82
A.5.3410.0420 FIRE DEPT - DEPT SUPPLI… 3,961.24
A.5.3410.0431 FIRE DEPT - ELECTRIC 2,994.78
A.5.3410.0433 FIRE DEPT - WATER 186.85
A.5.3410.0434 FIRE DEPT - TELEPHONE 122.19
A.5.3420.0200 POLICE & FIRE DISPATCH… 532.60
A.5.3420.0420 POLICE & FIRE DISPATCH… 435.10
4/2/2026 12:57:10 PM Page 9 of 11
Page 16
Expense Approval Report 4.6.2026 Payable Dates: 4/6/2026 - 4/26/2026 Post Dates: 3/31/2026 - 4/26/2026
Account Summary
Account Number Account Name Expense Amount
A.5.3420.0480 POLICE & FIRE DISPATCH… 176.98
A.5.5110.0420 STREET MAINT - ROAD … 1,127.72
A.5.5110.0480 STREET MAINT - UNIFO… 533.62
A.5.5182.0431 STREET LIGHTING - ELEC… 2,664.64
A.5.7140.0420 PLAYGROUNDS & REC C… 1,332.69
A.5.7140.0431 PLAYGROUNDS & REC C… 266.29
A.5.7140.0433 PLAYGROUNDS & REC C… 85.67
A.5.8140.0420 STORM SEWERS - MAINT… 1,800.00
A.5.8160.0410 REFUSE & GARBAGE 49,896.51
A.5.8560.0420 SHADE TREES - MAINT &… 135.00
A.5.9045.0803 LIFE INS - LIFE INS 858.00
A.5.9045.0804 LIFE INS - LIFE INS-RETIR… 468.85
A.5.9060.0805 HOSPITAL & MEDICAL IN… 46,236.80
A.5.9060.0806 HOSPITAL & MEDICAL IN… 20,178.64
A.5.9061.0807 DENTAL INS - DENTAL INS 6,303.32
A.5.9062.0808 OPTICAL - OPTICAL 1,011.95
F.5.1620.0431 BUILDINGS - ELECTRIC 159.15
F.5.1620.0433 BUILDINGS - WATER 85.85
F.5.8340.0490 TRANSFS & DIST - WATER… 476.00
F.5.9045.0803 LIFE INS - LIFE INS 88.00
F.5.9045.0804 LIFE INS - LIFE INS-RETIR… 30.97
F.5.9060.0805 HOSPITAL & MEDICAL IN… 4,811.89
F.5.9060.0806 HOSPITAL & MEDICAL IN… 950.51
F.5.9061.0807 DENTAL INS - DENTAL INS 511.08
F.5.9062.0808 OPTICAL - OPTICAL 82.05
Grand Total: 180,781.41
Project Account Summary
Project Account Key Expense Amount
**None** 180,781.41
Grand Total: 180,781.41
4/2/2026 12:57:10 PM Page 10 of 11
Page 17
Expense Approval Report 4.6.2026 Payable Dates: 4/6/2026 - 4/26/2026 Post Dates: 3/31/2026 - 4/26/2026
Authorization Signatures
***** Certificate of Financial Officer *****
I hereby certify that the attached Voucher Listing is complete and accurate to the best
of my knowledge, and payment is hereby approved.
Signed:________________________________________ Date:__________________
4/2/2026 12:57:10 PM Page 11 of 11
Page 18
Page 19
Page 20
Page 21
Page 22
Page 23
Page 24
Page 25
Page 26
Page 27
Page 28
Page 29
Page 30
Page 31
Page 32
Page 33
Draft 5 clean 2/25/2026
Chapter 112
BUILDINGS, DEMOLITION OF
§ 112-1. Definitions. § 112-6. Restoration of site; procedure
§ 112-2. Permit requirements; fees. upon owner neglecting to
§ 112-3. Certificate of insurance. restore.
§ 112-4. Procedures. § 112-7. Notification of completion.
§ 112-5. Time limit on permit validity. § 112-8. Penalties for offenses.
[HISTORY: Adopted by the Board of Trustees of the Village of East Aurora 9-27-1982 by L.L. No.
7-1982 (Chapter 50 of the 1972 Code). Amendments noted where applicable.]
GENERAL REFERENCES
Building construction — See Ch. 108. Property maintenance — See Ch. 192.
Fees — See Ch. 137, Art. II.
§ 112-1. Definitions.
As used in this chapter, the following terms shall have the meanings indicated:
APPLICATION FOR DEMOLITION — The application for a permit to demolish a building or structure or for
the substantial modification of a building or structure.
BASEMENT — That portion of a building that is partly below grade and which has more than half of its
height, measured from floor level to ceiling, above the average established curb level or finished grade of
the ground adjoining the building.
BUILDING — A combination of any materials, whether portable or fixed, as a structure wholly or partially
enclosed within exterior walls or within exterior or party walls and having a roof, affording shelter to persons,
animals or property. The word "building" shall be construed, when used herein, as though followed by the
words "or part or parts thereof."
CELLAR — That portion of a building that is partly or entirely below grade, which has more than half its
height, measured from floor to ceiling, below the average established curb level or finished grade of the
ground adjoining the building.
CODE ENFORCEMENT OFFICER — The Code Enforcement Officer for the Village of East Aurora or
its agent under contract with the Village to assist in the enforcement of this chapter.[Amended 3-14-2006
by L.L. No. 1-2006; 7-20-2009 by L.L. No. 5-2009]
CONTRACTOR — That person, firm or corporation employed by the owner of the property, empowered
by written consent of the owner to perform the specific duty of demolition as may be specified in authorizing
permits.
DEMOLITION or DEMOLISH — The dismantling, razing, or removal of a building or structure, or any
wall, roof, beam or other exterior constructed or essential element of any structure, where such element cannot
be easily reused in its same configuration without reconstruction, and/or a substantial modification of a
building or structure.
Page 34
DEMOLITION PERMIT — The permit for demolition of an existing building or structure or for the substantial
modification of a building or structure.
LOCATION — The actual confines of the demolition. The location as described in the application for
permit and as approved by the Code Enforcement Officer therein shall be the only area approved for the
demolition.[Amended 3-14-2006 by L.L. No. 1-2006]
OWNER and PROPERTY OWNER — The person who has the legal title to land together with ownership
of the building or structure located thereon, whose name appears on the most recent tax assessment rolls of
the Village of East Aurora.
PUBLIC WAY — A street, alley, sidewalk or other thoroughfare or easement permanently established for
passage of persons or vehicles. The term "public way" shall be construed, when used herein, as though
followed by the words "or part thereof."
SALVAGE — Component parts of a building or structure being demolished, removed or to be removed
from said building or structure for reuse or resale.
SALVAGE CONTRACTOR — A person, firm or corporation identified in the application for demolition,
authorized by the owner, in writing, to remove items of salvage from premises, which may or may not be
the same person, firm or corporation designated by the owner as the demolition contractor.
STRUCTURE — A combination of materials, other than a building, to form a construction that is safe and
stable, and includes, among other things, stadiums, platforms, radio towers, sheds and storage bins.
SUBSTANTIAL MODIFICATION – an alteration to a building or structure involving demolition or
alteration of forty (40%) percent or more of the roof area and/or any exterior walls, or an addition to an
existing building which increases the total floor area of the building by 40% or more, or a combination of
the two, or where smaller modifications to a structure over a period of 10 years meets this threshold.
§ 112-2. Permit requirements; fees.
A. No person shall demolish an existing building or structure having a gross floor area of 500 square feet
or more or propose a substantial modification without first obtaining a demolition permit, approved
by the Village Board of Trustees and signed by the Code Enforcement Officer, allowing such
demolition. Such permit shall be applied for and issued to the owner of the property. If such building
or structure is 50 or more years in age, the Village Board of Trustees shall refer the application to the
Village of East Aurora Historic Preservation Commission before making a decision. The Commission
shall promptly review the possible historic significance of such building or structure and shall make a
recommendation to the Village Board of Trustees with respect to the proposed demolition or
substantial modification. [Amended 3-14-2006 by L.L. No. 1-2006; 1-18-2011 by L.L. No. 1-2011]
B. Form; contents.
(1) Written application for a demolition permit shall be on the forms provided by the Code
Enforcement Officer. [Amended 3-14-2006 by L.L. No. 1-2006; 7-20-2009 by L.L. No.
5-2009]
(2) Said application for demolition or substantial modification shall require the name, address,
telephone number, and email address of the owner; the names, addresses and telephone numbers
of all contractors (general, special or salvage) authorized by the owner to perform work; and
contractor’s insurance certificates.
(3) A written description of the building or structure to be removed and/or a demolition plan prepared
by a registered design professional.
(4) Architectural plans for the addition/renovations, including a demolition plan prepared by a
Page 35
registered design professional.
(5) Starting and completion dates;
(6) Written list of materials to be salvaged;
(7) Provision for disposal of refuse;
(8) A statement as to security and/or barricades to safeguard premises from unauthorized entry
during the demolition work as well as the protection of the general public;
(9) A site plan application and documentation as required by Village Code Chapter 285.
C. An application and permit fee as set forth in Chapter 137, Article II, of this Code shall accompany all
demolition permit applications. Permits and fees are further established by § 285-62D of the Code of
the Village of East Aurora. [Amended 3-14-2006 by L.L. No. 1-2006; 7-20-2009 by L.L. No.
5-2009]
§ 112-3. Certificate of insurance.
A. Certificates of insurance for liability, Worker’s Compensation, or the applicable waiver, and Disability
shall be delivered to the Code Enforcement Officer, as agent for the Village of East Aurora. The
minimum limits of said liability for the demolition of buildings and structures, whether in a
homeowner's insurance policy or separate liability policy, shall be in an amount as required by the
Village. [Amended 3-14-2006 by L.L. No. 1-2006; 7-20-2009 by L.L. No. 5-2009]
B. All insurance certificates shall include the Village of East Aurora as an additional named insured.
C. Insurance certificates or agreements in a form approved by the Village Attorney, holding the Village
of East Aurora, its officers and employees from liability resulting from work allowed by a demolition
permit, shall be delivered to the Code Enforcement Officer as agent for the Village of East Aurora.
[Amended 3-14-2006 by L.L. No. 1-2006]
§ 112-4. Procedures.
A. Upon the request of the Code Enforcement Officer, the person making the application for a permit to
demolish a building or structure or for a substantial modification of a building or structure, shall
submit to the Code Enforcement Officer a written report from a licensed exterminator regarding
extermination of the building or structure prior to the issuance of a demolition permit. [Amended 12-
1-1986 by L.L. No. 28-1986]
B. Prior to demolition, the contractor will erect a system of barricades around the construction site and
have the electric, gas and telephone services removed by the respective utility companies. The head
of the Department of Public Works of the Village of East Aurora or his designated representative shall
disconnect and cap the water service to the building or structure being demolished and plug the sewer
laterals to such building or structure. The owner shall pay to the Village Clerk a water disconnection
fee and a sewer disconnection fee as set forth in Chapter 137, Article II, of this Code for said
disconnecting, capping and plugging. [Amended 3-14-2006 by L.L. No. 1-2006]
C. The contractor shall obtain appropriate approval for the water use on the site from the head of the
Department of Public Works for dust control and have sufficient lengths of one-and-one-half-inch
and/or two-and-one-half-inch hose for this purpose. The contractor shall provide a flagman for traffic
control when necessary, and should a street have to be closed, he shall obtain permission from the
head of the Department of Public Works, the Chief of Police and the Fire Chief. [Amended 3-
14-2006 by L.L. No. 1-2006]
D. The contractor shall obtain all appropriate Erie County Highway or New York State Department of
Page 36
Transportation permits when necessary.
E. In the case of the demolition of an existing building which has a common or party wall with one or
more adjoining buildings, the owner of the building to be demolished shall be responsible for and bear
all costs in relation to the safeguarding of said adjacent wall.
F. Where beams, girders and joists are removed from party walls, the resulting pockets in said walls shall
be cleaned out and filled with solid masonry. Necessary repairs shall be made to put the party wall in
a safe condition. This work shall be done by the contractor at the expense of the property owner having
said demolition performed.
G. Where such demolition work is to be made and no immediate new construction is intended at the site,
the adjacent wall, whether of the party type or otherwise, shall be left in an acceptable condition so
far as appearance is concerned. In addition to the repair of all joists, pockets and similar openings, the
owner of the demolished building will be required to remove all old plaster, wallpaper and other
decorative material in addition to any loose wood, trim or other unrequired material, subject to the
approval of the Code Enforcement Officer. [Amended 3-14-2006 by L.L. No. 1-2006]
H. During the demolition work, debris must be systematically removed from the site and not allowed to
pile up or cause any obstruction.
I. When a building to be demolished contains a cellar or basement, the contractor shall remove all debris
and organic material from the cellar or basement and then break up and/or perforate the cellar floor.
The bearing or foundation wall shall be removed to a depth of at least 24 inches below the present
grade or at least 24 inches below any future grade to be established. The material resulting from the
cellar or foundation wall demolition may remain in the excavation, provided that the material is
crushed and compacted.
J. Where there is no cellar or basement, the bearing or foundation wall shall be removed to a depth of at
least 24 inches below any future grade to be established.
K. The Code Enforcement Officer of the Village of East Aurora shall inspect the demolition of any
building or structure in the Village regularly and shall be empowered to halt any such demolition that,
in the judgment of the Code Enforcement Officer, is not being performed in a safe and sanitary
manner. [Amended 3-14-2006 by L.L. No. 1-2006]
L. Demolition of any building or structure shall be carried on during daylight hours only on normal
Village workdays.
M. Salvage materials that are a structural part of the building or structure shall not be removed except as
part of the actual demolition of said building or structure. Removal of salvage shall be by the owner
or salvage contractor only.
N. In-ground storage tanks on the demolition site shall be removed from the demolition site in accordance
with all applicable regulations.
O. No explosives may be used in connection with demolition of buildings or structures in the Village of
East Aurora unless a special permit is first obtained from the Village Board of Trustees of the Village
of East Aurora, issued after a public hearing has been held by such Village Board of Trustees on the
application for such permit.
§ 112-5. Time limit on permit validity. [Amended 11-15-1982 by L.L. No. 9-1982; 3-14-2006 by L.L.
No. 1-2006]
A demolition permit shall be valid for a period of 30 days from the date of its issuance. One additional
extension of 10 working days may be granted by the Code Enforcement Officer in the event that unusual
circumstances prevent completion of the work. No work shall continue after the time limits stated above,
Page 37
except upon application and issuance of a new permit pursuant to §285-53.5 of the Code of the Village of
East Aurora.
§ 112-6. Restoration of site; procedure upon owner neglecting to restore.
A. All cellars and basements of demolished buildings or structures shall be filled in and made safe by
filling such basement or cellar with noncombustible materials and causing the surface of the location
to be on a level with the surrounding premises. No materials will be permitted as fill which may
corrode, rot, decay or collapse. All barricades, guardrails and temporary structures erected during
demolition shall be removed prior to completion approval by the Code Enforcement Officer.
[Amended 3-14-2006 by L.L. No. 1-2006]
B. In the event that the owner refuses or neglects to fill in and make safe such cellar or basement or
refuses or neglects to dismantle and remove any barricades, guardrails or temporary structures erected
during demolition, the Village of East Aurora may do the necessary work involved, either with Village
employees or outside contractors, and the cost of making the location safe shall be assessed against
such property and shall be a lien thereon.
§ 112-7. Notification of completion. [Amended 3-14-2006 by L.L. No. 1-2006]
Immediately after said demolition, the Code Enforcement Officer shall notify the property owner, in
writing, that said demolition for which a permit was issued has been completed.
§ 112-8. Penalties for offenses.
Any person committing an offense against any provisions of this chapter shall be guilty of a violation,
punishable as follows: by imprisonment for a term not exceeding 15 days or by a fine not exceeding $250,
or by both such fine and imprisonment. The continuation of an offense against the provisions of this chapter
shall constitute, for each day the offense is continued, a separate and distinct offense hereunder.
Page 38
3/16/2026
Village of East Aurora
Tentative Budget
June 1, 2026 - May 31, 2027
`
Page 39
Village of East Aurora
Fiscal Year June 1, 2026 to May 31, 2027
Budget Summary and Levy by Fund
Total Fund Anticipated Amount
Funds Expenditures Balance Revenue to Raise
General 10,069,582 450,000 4,657,273 4,962,309
Water 1,884,358 1,884,358 -
Total All Funds 11,953,940 450,000 6,541,631 4,962,309
Amount Taxable Value Tax Rate per 1,000
Funds to Raise
General 4,962,309 220,276,977 22.527588
Water
0 0
Total All Funds 4,962,309
`
Page 40
Village of East Aurora
Fiscal Year June 1, 2026 to May 31, 2027
Adopted Budget
General Water
Total Fund Fund
Appropriations 11,953,940 10,069,582 1,884,358
Less: Estimated Non Tax
Revenues 6,541,631 4,657,273 1,884,358
Appropriated GF Fund Bal 450,000 450,000 -
Total 6,991,631 5,107,273.00 1,884,358
Amount to be Raised by
Real Property Taxes 4,962,309 4,962,309 0
Taxable Full Valuation 220,276,977
2026-27 Tax Rate per $1,000 of $ 22.53
2025-26 Tax Rate per $1,000 of $ 22.10
Percent Increase/Decrease 1.94%
Tax Levy Rate 3.5%
Page 41
Village of East Aurora
Fiscal Year June 1, 2026 to May 31, 2027
General Fund - Budget Revenues
2025-2026 2026-2027 2026-2027
Final Proposed Final
Description Budget Budget Budget
REAL PROPERTY TAXES
1001 Real Property Taxes 4,793,030 4,962,309 4,962,309
1081 Payments in Lieu - - -
1089 Prior Year Exemption Removals 9,423 27,040 27,040
1090 Interest on Taxes 20,000 22,000 22,000
Total Real Property Taxes 29,423 49,040 49,040
NON-PROPERTY TAX ITEMS
1120 Sales Tax 1,100,000 1,200,000 1,200,000
1130 Utilities Receipts Tax 70,000 80,000 80,000
1170 Franchise Fee - Cable TV 99,000 95,000 95,000
Total Non-Property Tax
Items 1,269,000 1,375,000 1,375,000
DEPARTMENTAL INCOME
1255 Clerk Fees 4,000 4,500 4,500
1520 Police Fees 2,000 2,500 2,500
1521 STOP-DWI 15,000 5,000 5,000
1588 False Alarm Fees 1,000 1,000 1,000
1601 Death Certificates 6,000 6,000 6,000
1710 Public Works 8,000 8,000 8,000
2110 Zoning Fees 6,000 8,000 8,000
2260 Police Protection to Town of Aurora 1,800,000 1,920,000 1,920,000
2261 Public Safety - SRO 135,000 135,000 135,000
2262 Fire Protection to EAFPD (part Aurora) 390,000 390,000 390,000
2263 Fire Dispatch to other governments 220,000 220,000 220,000
2264 Ambulance Service to EAFPD 13,032 13,500 13,500
2389 Due from Erie County Sewer Mgmt. 0 0 0
2391 Due from Water Fund 0 0 0
2401 Interest Earnings 45,000 100,000 100,000
2410 Rental of Property (AMR) 7,200 7,200 7,200
2412 Rental of Property to other governments 0 0 0
2450 Insurance Dividends 4,000 4,000 4,000
2501 Solicitor's/Peddler's Permits 2,000 2,500 2,500
2530 Games of Chance 50 50 50
2550 Solid Waste Permits 300 300 300
2610 Court Fees & Fines 5,000 5,000 5,000
2651 Scrap Metal/Recycling 500 500 500
2655 Garbage Tags 1,000 1,000 1,000
2665 Sale of Excess Equipment 29,000 29,000 29,000
2680 Insurance Recoveries 0 0 0
2701 Refund of Prior Years Expenses 0 0 0
2706 Celebration Reimbursement 0 0 0
2770 Unclassified 3,000 3,000 3,000
Total Departmental
Income 2,697,082 2,866,050 2,866,050
Page 42
Village of East Aurora
Fiscal Year June 1, 2026 to May 31, 2027
General Fund - Budget Revenues
2025-2026 2026-2027 2026-2027
Final Proposed Final
Description Budget Budget Budget
STATE SOURCES
3001 State Aid, AIM (or equivalent) 50,569 50,569 50,569
3005 Mortgage Tax 80,000 80,000 80,000
3089 State Aid - Other 0 10,614 10,614
3405 St. Aid - Compassionate Care Act 20,000 20,000
3501 CHIPS 204,000 204,000 204,000
4510 Police/BUNY Step Grant 2,000 2,000 2,000
Total State Sources 336,569 367,183 367,183
Total Revenues 4,332,074 4,657,273 4,657,273
Page 43
Village of East Aurora
Fiscal Year June 1, 2026 to May 31, 2027
General Fund - Budget Expenses
2025-2026 2026-2027 2026-2027
Final Proposed Final
Description Budget Budget Budget
GENERAL GOVERNMENT SUPPORT
1010 Board of Trustees
110 Salaries 30,001 30,001 30,001
440 Training & Travel 1,000 1,000 1,000
Board of Trustees Total 31,001 31,001 31,001
1210 Mayor
Salaries 8,000 8,000 8,000
440 Training & Travel 1,000 1,000 1,000
Mayor Total 9,000 9,000 9,000
1320 Auditor `
410 Contractual Services 15,000 16,000 16,000
491 AUDITOR - GASB 4,500 4,500 4,500
Auditor Total 19,500 20,500 20,500
1325 Administration
110 Salaries & Wages 255,896 260,910 260,910
125 Longevity 900 900 900
126 Deferred Comp 7,500 7,500 7,500
140 Overtime 3,000 3,000 3,000
200 Equipment 6,000 6,000 6,000
403 Office Supplies 4,000 4,000 4,000
410 Legal Notices and Advertising 2,000 2,000 2,000
420 Maintenance Contracts 1,500 1,500 1,500
434 Telephone 1,300 1,300 1,300
440 Travel, Training & Dues 7,000 7,000 7,000
Administration Total 289,096 294,110 294,110
1362 Tax Collection
410 Contractual Services 1,400 1,400 1,400
Tax Collection Total 1,400 1,400 1,400
1380 Fiscal Agent Fees
410 Fiscal Agent Fees 12,000 11,000 11,000
411 EFC Administration Charge 0 0 0
Village Clerk Expenses 12,000 11,000 11,000
1420 Legal Expenses
110 Village Attorney Salaries 20,500 21,500 21,500
410 Village Attorney Contract 12,000 6,000 6,000
411 Outside Legal Counsel 27,000 36,000 36,000
420 Code Expense 8,000 8,000 8,000
Law Expenses 67,500 71,500 71,500
1440 Engineer
410 Professional Services 15,000 15,000 15,000
Engineer Expense 15,000 15,000 15,000
1450 Elections
410 Wages - Inspectors 700 700 700
440 Machines Supplies Training 300 300 300
Page 44
Village of East Aurora
Fiscal Year June 1, 2026 to May 31, 2027
General Fund - Budget Expenses
2025-2026 2026-2027 2026-2027
Final Proposed Final
Description Budget Budget Budget
Election Expense 1,000 1,000 1,000
1460 Records Management
403 Operating Expenses 1,000 1,000 1,000
Engineer Expense 1,000 1,000 1,000
1480 Information Technology
110 Webmaster Stipend 4,000 4,000 4,000
200 Equipment & Software 1,000 1,000 1,000
410 Suppl., Maint. Agmt., Internet, Server, GIS 80,000 80,000 80,000
Information Technology Total 85,000 85,000 85,000
1490 Public Works Administration
110 Salary & Wages 146,305 152,148 152,148
125 Longevity 2,100 2,400 2,400
126 Deferred Comp 3,959 5,500 5,500
200 Equipment 1,000 1,000 1,000
403 Office Supplies 5,500 3,500 3,500
420 Maintenance & Repair 4,700 4,700 4,700
434 Telephone 2,500 2,900 2,900
440 Travel & Training 2,145 2,230 2,230
480 Uniforms 400 400 400
Public Works Administration Total 168,609 174,778 174,778
1620 Buildings
110 Wages 69,597 72,100 72,100
125 Longevity 0 900 900
126 Deferred Comp 1,000 2,800 2,800
140 Overtime 3,000 3,000 3,000
200 Equipment 1,200 1,200 1,200
420 Maintenance & Repair 20,170 40,000 40,000
431 Electric 4,000 5,500 5,500
432 Gas 5,000 6,500 6,500
433 Water 700 700 700
470 Supplies 3,000 3,000 3,000
480 Uniforms 640 640 640
Buildings Total 108,307 136,340 136,340
1640 Central Garage
110 Wages 122,345 126,152 126,152
125 Longevity 2,100 2,400 2,400
126 Deferred Comp 4,500 4,500 4,500
140 Overtime 13,000 15,000 15,000
200 Equipment 6,000 6,000 6,000
420 Maintenance & Repair 28,025 28,060 28,060
431 Electric 3,500 4,500 4,500
432 Gas 9,000 9,000 9,000
433 Water 1,500 2,000 2,000
440 Travel & Training 2,000 2,000 2,000
Page 45
Village of East Aurora
Fiscal Year June 1, 2026 to May 31, 2027
General Fund - Budget Expenses
2025-2026 2026-2027 2026-2027
Final Proposed Final
Description Budget Budget Budget
450 Gas, Oil & Grease 65,000 65,000 65,000
460 Vehicle Maintenance & Parts 58,000 69,000 69,000
470 Supplies 2,500 2,500 2,500
480 Uniforms 4,120 4,120 4,120
490 Contract Services 960 1,000 1,000
Central Garage Total 322,550 341,232 341,232
1670 Central Printing & Mailing
403 Printing & Mailing 1,500 1,500 1,500
420 Maintenance & Repairs 3,000 2,000 2,000
470 Postage 9,000 10,000 10,000
Central Printing & Mailing Total 13,500 13,500 13,500
1910 Unallocated Insurance
410 P&L, Pub. Off., Pol. Prof., etc. 190,000 201,500 201,500
413 Judgments & Claims 5,000 5,000 5,000
Unallocated Insurance Total 195,000 206,500 206,500
Special Items
1920 Municipal Assoc. Dues 5,100 5,100 5,100
1940 Legal Advertising 0 0 0
1950 Special Assess. On Vill. Prop. 9,500 9,500 9,500
1990 Contingency 100,000 100,000 100,000
Special Item Expense 114,600 114,600 114,600
Total General Government
Support 1,454,063 1,527,461 1,527,461
Page 46
Village of East Aurora
Fiscal Year June 1, 2026 to May 31, 2027
General Fund - Budget Expenditures - Public Safety
2025-2026 2026-2027 2026-2027
Final Proposed Final
Description Budget Budget Budget
PUBLIC SAFETY
3120 Police
110 Salaries & Wages 196,800 204,670 204,670
120 Wages - Patrol Officers 1,710,116 1,779,600 1,779,600
124 DPW Mechanic Service 16,030 16,588 16,588
125 Longevity 14,000 18,600 18,600
126 Deferred Compensation 55,000 55,000 55,000
127 Uniform Allowance 27,900 27,900 27,900
140 Overtime 109,000 130,000 130,000
230 Equipment/Vehicles 106,000 104,000 104,000
231 STOP DWI Equipment 0 0 0
232 Public Safety Equipment 5,000 5,000 5,000
403 Office Supplies 3,200 3,200 3,200
405 K9 Supplies & Maintenance - - -
420 Maintenance & Service Contracts 28,100 32,000 32,000
434 Telephone 7,000 7,000 7,000
440 Travel & Training 7,000 7,500 7,500
450 Gas, Oil & Grease 48,000 48,000 48,000
460 Vehicle Maintenance 20,000 20,000 20,000
465 Accident Repais - Insurance 1,000 2,000 2,000
470 Supplies 15,000 15,000 15,000
480 Uniforms/Body Armor 6,000 8,000 8,000
495 D.A.R.E. Program - - -
Police Total 2,375,146 2,484,058 2,484,058
3310 Traffic Control
110 Wages 18,000 18,000 18,000
200 Equipment 0 0 0
470 Supplies 1,500 1,500 1,500
Traffic Control Total 19,500 19,500 19,500
3410 Fire Department
110 Salaries & Wages - DPW Mechanic 23,000 25,000 25,000
200 Equipment 60,820 61,713 61,713
420 Supplies 55,949 59,479 59,479
431 Electric 15,000 17,000 17,000
432 Gas 5,000 6,000 6,000
433 Water 800 800 800
434 Telephone 3,000 3,000 3,000
440 Travel & Training 9,900 9,900 9,900
450 Gas, Oil, Grease 15,000 15,000 15,000
460 Vehicle Maintenance 25,000 20,000 20,000
470 Janitorial Supplies 12,550 12,000 12,000
Page 47
Village of East Aurora
Fiscal Year June 1, 2026 to May 31, 2027
General Fund - Budget Expenditures - Public Safety
2025-2026 2026-2027 2026-2027
Final Proposed Final
Description Budget Budget Budget
480 Uniforms & Equipment 1,500 1,000 1,000
495 Fire Prevention 3,000 3,000 3,000
497 EMS 15,980 15,980 15,980
Fire Department Total 246,499 249,872 249,872
3420 Police & Fire Dispatch
110 Salaries & Wages 281,467 292,402 292,402
125 Longevity 900 2,100 2,100
126 Deferred Compensation 10,000 10,000 10,000
127 Uniform Allowance 2,600 2,600 2,600
130 Part-Time/Temporary 94,000 84,000 84,000
140 Overtime 45,000 45,000 45,000
200 Equipment 3,000 3,000 3,000
420 Maintenance & Service Contracts 9,000 11,000 11,000
440 Travel & Training 1,500 1,500 1,500
470 Supplies 2,000 2,000 2,000
480 Uniforms 1,500 2,000 2,000
Police & Fire Dispatch Total 450,967 455,602 455,602
3640 Disaster Prepardness
410 HAZMAT Contract 0 0 0
440 Training 0 0 0
Disaster Preparedness Total 0 0 0
4540 Ambulance
410 AMR Contract 26,600 27,400 27,400
Ambulance Total 26,600 27,400 27,400
Total Public Safety 3,118,712 3,236,432 3,236,432
Page 48
Village of East Aurora
Fiscal Year June 1, 2026 to May 31, 2027
General Fund - Budget Expenditures - Transportation
2025-2026 2026-2027 2026-2027
Final Proposed Final
Description Budget Budget Budget
TRANSPORTATION
5110 Street Maintenance
110 Wages 625,819 653,509 653,509
125 Longevity 8,125 7,925 7,925
126 Deferred Comp 12,000 14,000 14,000
140 Overtime 34,000 38,000 38,000
200 Equipment 103,727 67,000 67,000
420 Road Materials 79,835 81,485 81,485
431 Operation & Maintenance 4,000 15,000 15,000
480 Uniforms 7,800 8,340 8,340
Street Maintenance Total 875,306 885,259 885,259
`
5112 CHIPS
200 Perm Improve Highway, equip 204,000 204,000 204,000
Chips total 204,000 204,000 204,000
5142 Snow Removal
200 Equipment 0 12,000 12,000
470 Supplies 110,000 103,000 103,000
Snow Removal Expense 110,000 115,000 115,000
5182 Street Lighting
431 Electric 80,000 90,000 90,000
Snow Removal Expense 80,000 90,000 90,000
Total Transportation 1,269,306 1,294,259 1,294,259
Page 49
Village of East Aurora
Fiscal Year June 1, 2026 to May 31, 2027
General Fund - Budget Expenditures - Culture - Recreation
2025-2026 2026-2027 2026-2027
Final Proposed Final
Description Budget Budget Budget
CULTURE - RECREATION
7140 Parks and Recreation
420 General Maintenance & Repairs 27,500 22,500 22,500
420 Tree Maintenance 0 5,000 5,000
421 Cazenovia Creek 500 500 500
431 Electric 1,700 1,800 1,800
432 Gas 1,000 1,000 1,000
433 Water 850 750 750
Parks and Recreation Total 31,550 31,550 31,550
Museum
410 Contractual Services 5,000 5,000 5,000
Museum Total 5,000 5,000 5,000
7520 Historic Preservation
440 Travel, Training & Dues 1,000 1,000 1,000
Historic Preservation Total 1,000 1,000 1,000
7530 Economic Development
410 Contractual services 0 0 0
Economic Development Total 0 0 0
7550 Celebrations
470 Equipment
Maintenance Contract
Operating Expenses 9,000 10,000 10,000
Celebrations Total 9,000 10,000 10,000
Page 50
Village of East Aurora
Fiscal Year June 1, 2026 to May 31, 2027
General Fund - Budget Expenditures - Home & Community Service
2025-2026 2026-2027 2026-2027
Final Proposed Final
Description Budget Budget Budget
HOME AND COMMUNITY
SERVICES
8010 Zoning Board
110 Wages - Clerk 600 800 800
410 Supplies 50 50 50
440 Education, Travel, Training & Dues 350 150 150
Zoning Expense 1,000 1,000 1,000
8020 Planning Board
110 Wages - Clerk 500 1,000 1,000
410 Contract Services 1,000 500 500
420 Legal Notices 0 0 0
440 Training & NYPF Dues 425 425 425
Planning Board Expense 1,925 1,925 1,925
8140 Storm Sewers
200 Equipment
420 Maintenance & Repairs 9,750 9,750 9,750
430 MS4 Fees 2,000 2,000 2,000
Storm Sewer Expense 11,750 11,750 11,750
8160 Refuse & Garbage
140 Overtime 0 0 0
410 Contractual Services 550,000 680,000 680,000
480 Miscellaneous 1,000 1,500 1,500
Garbage Removal Total 551,000 681,500 681,500
8510 Community Beautification
411 Supplies 9,200 9,200 9,200
Community Beautification Total 9,200 9,200 9,200
8560 Shade Trees
200 Equipment 5,409 1,500 1,500
410 Contractual Services 10,000 10,000 10,000
430 Tree Purchase 6,250 6,250 6,250
470 Supplies 5,000 5,000 5,000
Shade Trees Total 26,659 22,750 22,750
Total Home and Community
Services 601,534 728,125 728,125
Page 51
Village of East Aurora
Fiscal Year June 1, 2026 to May 31, 2027
General Fund - Budget Expenditures - Employee Benefits
2025-2026 2026-2027 2026-2027
Final Proposed Final
Description Budget Budget Budget
EMPLOYEE BENEFITS
9010.800 State Retirement - Non-Police Employees $ 273,711 $ 277,887 $ 277,887
9010.801 State Retirement - Police $ 647,081 $ 685,580 $ 685,580
9025.800 EAFD Service Award Program $ 115,000 $ 108,000 $ 108,000
9030.801 Social Security/FICA/Medicare $ 318,727 $ 318,727 $ 318,727
9040.802 Worker's Compensation $ 100,000 $ 94,000 $ 94,000
9045.803 Life Insurance and disability $ 18,000 $ 17,000 $ 17,000
9045.804 Life Insurance - Retirees $ 5,425 $ 5,716 $ 5,716
9055.800 Unemployment Insurance $ 1,000 $ 1,000 $ 1,000
9060.805 Health Insurance $ 500,000 $ 550,000 $ 550,000
9060.806 Health Insurance - Retirees $ 225,000 $ 225,000 $ 225,000
9061.807 Dental $ 66,000 $ 66,000 $ 66,000
9062.808 Optical $ 13,000 $ 13,000 $ 13,000
Total Employee Benefits $ 2,282,944 $ 2,361,910 $ 2,361,910
Page 52
Village of East Aurora
Fiscal Year June 1, 2026 to May 31, 2027
General Fund - Budget Expenditures - Reserves
2025-2026 2026-2027 2026-2027
Final Proposed Final
Description Budget Budget Budget
RESERVES
9501.0500 TRANSFER TO RESERVES - ADMINISTRATOR EQUIPMENT $ - $ - $ -
9501.0600 TRANSFER TO RESERVES - POLICE AND FIRE DISPATCH E $ - $ - $ -
9501.0700 TRANSFER TO RESERVES - POLICE EQUIPMENT RESERVE $ - $ - $ -
9501.0800 TRANSFER TO RESERVES - FIRE EQUIPMENT RESERVE $ 30,000 $ 30,000 $ 30,000
9501.0900 TRANSFER TO RESERVES - HIGHWAY EQUIPMENT RESER $ -
Total Employee Benefits $ 30,000 $ 30,000 $ 30,000
Page 53
Village of East Aurora
Fiscal Year June 1, 2026 to May 31, 2027
General Fund - Budget Expenditures - Debt Service
2025-2026 2026-2027 2026-2027
Final Proposed Final
Description Budget Budget Budget
DEBT SERVICE
9710 Serial Bonds
607 2016 Principal (2043) 205,000 225,000 225,000
609 EFC Sewer Principal 0 0 0
612 2018 Ladder Truck Principal 45,000 45,000 45,000
613 2021 Principal 265,000 305,000 305,000
707 2016 Interest 123,675 119,975 119,975
709 EFC Sewer Interest 0 0 0
712 2018 Ladder Truck Interest 28,088 26,513 26,513
713 2021 Interest 104,732 122,357 122,357
Total Serial Bonds 771,495 843,845 843,845
9730 Bond Anticipation Note
9730.6 Principal 0 0 0
9730.7 Interest 0 0 0
Total BAN Expense 0 0 0
Total Debt Service 771,495 843,845 843,845
Page 54
Village of East Aurora `
Fiscal Year June 1, 2026 to May 31, 2027
General Fund - Budget Expenditures - Summary
2025-2026 2026-2027 2026-2027
Final Proposed Final
Description Budget Budget Budget
GENERAL GOVERNMENT SUPPORT 1,454,063 1,527,461 1,527,461
PUBLIC SAFETY 3,118,712 3,236,432 3,236,432
TRANSPORTATION 1,269,306 1,294,259 1,294,259
CULTURE - RECREATION 46,550 47,550 47,550
HOME AND COMMUNITY SERVICES 601,534 728,125 728,125
EMPLOYEE BENEFITS 2,282,944 2,361,910 2,361,910
RESERVES 30,000 30,000 30,000
DEBT SERVICE 771,495 843,845 843,845
TOTAL EXPENDITURES 9,574,604 10,069,582 10,069,582
Page 55
2026-2027 WATER RATES
2026-27 ECWA RATES
2025-26 RATE 2026-27 RATE INCREASE PERCENT
4.04 4.37 $ 0.33 8.17%
Inside Village RATE/1000 Gallons
Consumption Current Proposed Difference
0-5 $5.62 $5.95 $0.33
6-75 $7.09 $7.42 $0.33
OVER 75 $6.71 $7.04 $0.33
Outside Village
Consumption Current Proposed Difference
0-5 $8.43 $8.93 $0.50
6-75 $10.62 $11.12 $0.50 `
OVER 75 $10.01 $10.51 $0.50
Inside Village RATE/CUBIC FEET (748 Gallons)
Consumption Current Proposed Difference
0-6 $4.22 $4.46 $0.24
7-100 $5.32 $5.57 $0.24
OVER 100 $5.03 $5.28 $0.25
DEBT SERVICE COST
2024-25 2025-26
Current Proposed Difference
$30.75 $26.26 -$4.49
Operation and Maintenance
2024-25 2025-26
Current Proposed Difference
5/8" $40.58 $44.74 $4.16
1" $54.92 $60.41 $5.49
1.5" $78.44 $86.29 $7.85
2" $133.36 $146.70 $13.34
3" $156.89 $172.58 $15.69
4" $313.77 $345.15 $31.38
6" $549.10 $604.01 $54.91
8" $705.99 $776.59 $70.60
Page 56
Village of East Aurora
Fiscal Year June 1, 2026 to May 31, 2027
Water Fund - F Fund - Budget Revenues
2025-2026 2026-2027 2026-2027
Final Proposed Final
F Description Budget Budget Budget
2140 Water Sales $ 1,777,612 $ 1,842,858 $ 1,842,858
2144 Connection Charges 11,000 11,000 11,000
2148 Late Payments/Penalties 25,000 30,000 30,000
2401 Interest Earnings 500 500 500
2665 Sale of Excess Equip./Scrap 0 0 0
2770 Unclassified/Misc. 0 0 0
Water Debt Reserve Transfer 25,200 0 0
Total Revenues 1,839,312 1,884,358 1,884,358
`
Page 57
Village of East Aurora
Fiscal Year June 1, 2026 to May 31, 2027
Water Fund - Budget Expenditures
2025-2026 2026-2027 2026-2027
Final Proposed Final
F - Acct # Description Budget Budget Budget
1320 Auditor
410 Audit Contractual Services 7,000 7,000 7,000
Auditor Total 7,000 7,000 7,000
1380 Fiscal Agent Fees
410 Advertising & Legal Counsel 9,000 8,000 8,000
Fiscal Agent Fees Total 9,000 8,000 8,000
1620 Building
431 Electric 2,500 2,800 2,800
432 Gas 1,700 1,700 1,700
433 Water 750 750 750
Building Total 4,950 5,250 5,250
1910 Insurance
410 General Liability Insurance 25,000 27,000 27,000
Insurance Total 25,000 27,000 27,000
1950 Special Assessments
410 Sewer District No. 8 4,000 4,000 4,000
Special Assessments Total 4,000 4,000 4,000
1990 Contingency
400 Contingency 20,000 30,000 30,000
Contingency Total 20,000 30,000 30,000
8310 Water Administration
110 Wages 50,922 53,910 53,910
125 Longevity 0 0 0
126 Deferred Comp 500 0 0
140 Overtime 1,250 1,250 1,250
200 Equipment 0 0 0
403 Postage 7,500 8,700 8,700
410 Office Supplies 800 1,800 1,800
420 Software & Maint. Support 25,000 25,000 25,000
440 Training, Travel & Dues 1,000 1,000 1,000
Water Administration Total 86,972 91,660 91,660
8320 Source of Supply
470 Bulk Purchase 850,000 925,000 925,000
Source of Supply Total 850,000 925,000 925,000
Page 58
8340 Transmission & Distribution
110 Wages 194,266 201,087 201,087
125 Longevity 1,800 2,400 2,400
126 Deferred Comp 4,500 4,500 4,500
140 Overtime 12,000 12,000 12,000
200 Equipment 52,460 32,000 32,000
403 Office supplies 1,500 2,000 2,000
420 Maintenance & Repairs 23,220 43,020 43,020
440 Training, Travel & Dues 1,500 1,500 1,500
470 Supplies & Materials 15,000 15,000 15,000
480 Uniforms 1,740 1,920 1,920
490 Water Testing 3,700 3,700 3,700
Trans. & Dist. Total 311,686 319,127 319,127
9010 State Retirement 33,991 38,065 38,065
9030 Social Security 21,308 22,117 22,117
9040 Workers Comp 25,000 25,000 25,000
9045 Life Insurance 1,600 1,600 1,600
9060 Medical Insurance 73,435 80,879 80,879
9061 Dental Insurance 6,800 6,000 6,000
9062 Optical Insurance 1,100 1,100 1,100
Employee Ben.Exp. 163,234 174,761 174,761
9710 Serial Bonds & Bans
604 2010 Bond Principal 2020 180,000 180,000 180,000
605 2016 Principal Bond 55,000 15,000 15,000
606 2021 Principal Oakwood 35,000 35,000 35,000
704 2010 Bond Interest 2020 12,645 9,135 9,135
705 2016 Bond Interest 1,150 450 450
706 2021 Interest Oakwood 23,675 22,975 22,975
Total Debt Service 307,470 262,560 262,560
9900 Interfund Transfers
0901 Trans to Capital Fund 50,000 30,000 30,000
0903 Trans to General Fund (debt) 0 0 0
Total Interfund Transfers 50,000 30,000 30,000
Total Appropriations 1,839,312 1,884,358 1,884,358
Page 59
SALARY SCHEDULE 2026-2027
Number 2026/27 ANNUAL
ACCOUNT DEPARTMENT - TITLE Positions 2026/27 RATE SALARY TOTAL
BOARD OF TRUSTEES
A1010.110 TRUSTEE 6 $ 5,000.00 $ 5,000.00 $ 30,000.00
A1210.110 MAYOR 1 $ 8,000.00 $ 8,000.00 $ 8,000.00
ADMINSTRATION
A1325.110 ADMINISTRATOR 1 $ 34.51 $ 35,000.00 $ 35,000.00
A1325.110 CLERK-TREASURER 1 $ 44.81 $ 93,204.80 $ 93,204.80
A1325.110 DEPUTY CLERK-TREASURER 1 $ 28.41 $ 55,399.50 $ 55,399.50
A1325.110 PART-TIME DEPUTY CLERK (19 hrs/wk) 1 $ 23.80 $ 24,418.80 $ 24,418.80
A1325.110 ADA COORDINATOR 1 $ 1,300.00 $ 1,300.00 $ 1,300.00
A1325.110 GRANT MASTER 1 $ 6,000.00 $ 6,000.00 $ 6,000.00
A1420.110 VILLAGE ATTORNEY 1 $ 21,500.00 $ 21,500.00 $ 21,500.00
A1480.110 WEBMASTER 2 $ 4,000.00 $ 2,000.00 $ 4,000.00
A3410.110 FIRE DEPT CLERK 1 $ 2,000.00 $ 2,000.00 $ 2,000.00
A1325.110 OOT ADMIN STIPEND 1 $ 35,000.00 $ 35,000.00 $ 35,000.00
POLICE DEPARTMENT
A3120.110 POLICE CHIEF 1 $ 71.77 $ 149,281.60 $ 149,281.60
A3120.110 POLICE CLERK 1 $ 25.46 $ 49,647.00 $ 49,647.00
A3120.120 POLICE LIEUTENANT 4 $ 58.58 $ 121,846.40 $ 487,385.60
A3120.120 POLICE OFFICER 4 $ 50.94 $ 105,955.20 $ 423,820.80
A3120.120 POLICE OFFICER 2 $ 45.60 $ 94,848.00 $ 189,696.00
A3120.120 POLICE OFFICER 2 $ 43.20 $ 89,856.00 $ 179,712.00
A3120.120 POLICE OFFICER 1 $ 40.80 $ 84,864.00 $ 84,864.00
A3120.120 POLICE OFFICER 1 $ 38.41 $ 79,892.80 $ 79,892.80
A3120.120 POLICE OFFICER 1 $ 33.77 $ 70,241.60 $ 70,241.60
A3120.120 DETECTIVE 2 $ 53.97 $ 112,257.60 $ 224,515.20
A3120.120 POLICE OFFICER-PT 1 $ 33,000.00 $ 33,000.00 $ 33,000.00
A3120.120 DRUG RECOGNITION OFFICER 2 $ 500.00 $ 500.00 $ 1,000.00
A3120.120 RANGE OFFICER STIPEND 1 $ 500.00 $ 500.00 $ 500.00
A3120.120 ACCIDENT INVESTIGATOR 3 $ 500.00 $ 500.00 $ 1,500.00
A3310.110 CROSSING GUARDS/SPECIAL EVENTS 7 $19.00/$21.00
POLICE & FIRE DISPTACH
A3420.110 DISPATCHER 1 $ 35.42 $ 73,673.60 $ 73,673.60
A3420.110 DISPATCHER 1 $ 33.65 $ 69,992.00 $ 69,992.00
A3420.110 DISPATCHER 1 $ 35.42 $ 73,673.60 $ 73,673.60
A3420.110 DISPATCHER 1 $ 31.88 $ 66,310.40 $ 66,310.40
A3420.130 DISPATCHER P/T 4557 Hrs $ 22.50 $ 102,532.50 $ 102,532.50
A3420.110 STIPEND COMM SUPERVISOR 1 $ 5,000.00 $ 3,200.00 $ 3,200.00
DEPARTMENT OF PUBLIC WORKS
A1490.100 SUPERINTENDENT OF PUBLIC WORKS 1 $ 45.76 $ 95,180.80 $ 95,180.80
A1490.100 DPW ADMIN ASSISTANT 1 $ 25.46 $ 49,647.00 $ 49,647.00
A1620.100 METER REPAIR/CARETAKER 1 $ 34.64 $ 72,051.20 $ 72,051.20
A1640.100 MECHANIC 2 $ 36.25 $ 75,400.00 $ 150,800.00
A3410.110 MECHANIC PT 400 Hrs $ 25.09 $ 10,036.00 $ 10,036.00
A5110.100 WORKING CREW CHIEF 1 $ 39.07 $ 81,265.60 $ 81,265.60
A5110.100 MEO II 5 $ 34.64 $ 72,051.20 $ 360,256.00
A5110.100 LABORER 1 $ 20.13 $ 41,870.40 $ 41,870.40
A5110.100 LABORER (with CDL) 2 $ 22.13 $ 46,030.40 $ 92,060.80
A5110.100 DPW SUMMER HELP 2 $ 17.50 $ 8,400.00 $ 16,800.00
WATER DEPARTMENT - WATER FUND
F8310.100 DEPUTY CLERK 1 $ 25.46 $ 49,647.00 $ 49,647.00
F8340.100 WORKING CREW CHIEF 1 $ 39.07 $ 81,265.60 $ 81,265.60
F8340.100 MEO II 1 $ 34.64 $ 72,051.20 $ 72,051.20
F8340.100 LABORER 1 $ 20.13 $ 41,870.40 $ 41,870.40
* Crossing Guards receive a higher hourly wage for working special events Elected officals did not get a raise and salaried managers and
NOTE: Salaries are for informational purpose and do not necessarily reflect wages earned. clerks received 4%
Page 60
Pilot Payments - Adopted Budget
2026-2027
%
1 None
`
Page 61
3/13/2026
Fund Capital Full
Asset Type Desc Description or Model Footage Aprox. Cost Water Equipment Ways to fund
Code improv reconstruct
Vehicles and Equipment
Machinery & Equipment PRINOTH SW 4S SIDEWALK Plow A 200,000 in process from reserve
Machinery & Equipment Plow Truck large Dump A 330000 1 Save in reserve til can buy
Machinery & Equipment Fuel System, Underground Split (to make above ground) A 225,000 2 Save in reserve til can buy
Machinery & Equipment Caterpillar Compactor Tandem Vibratory 39" roller A 75,000 3 Save in reserve til can buy
Machinery & Equipment Plow Truck large Dump A 330000 4 Save in reserve til can buy
Machinery & Equipment Plow Truck large Dump F- Water 330000 5 Save in Water reserve til we can buy
Machinery & Equipment VAC Truck F 500,000 6 Save in Water reserve til we can buy
Machinery & Equipment INT'L CAB & CHASSIS, 80-100' AERIAL LIFT A 300,000 7 Save in reserve til can buy
Machinery & Equipment FREIGHTLINER PANEL VAN F- Water 220,000 8 Save in Water reserve til we can buy
Machinery & Equipment Pumper truck A 1,100,000 F-1 Save in reserve til can buy
Referb Pumper truck (2004 - Truck 1 or 3 The twins hopefully will get the trucks at least to the
Machinery & Equipment 200,000 F-2 Save in reserve til can pay for cash
30 year mark)
Machinery & Equipment FLY Car (current is 2016) A 100,000 F-3 Save in reserve til can buy
Machinery & Equipment Mini Pumper A 475,000 F-4 Save in reserve til can buy
Machinery & Equipment Radios - Fire A 285,000 F-5 Grant or Save
Machinery & Equipment Radios - Police (If County system) A 250,000-300,000 P-1 Grant or Save
Land and Building Improvements
Buildings Hamlin Park Plan items A Started
Buildings Bathroom at Recreation Building bump out A 260,000 In process
Walkways - only paving one A 300,000 P-1 Grant/ Budget or Excess FB or reserves
Lighting A 100,000-200,000 P-2 Excess FB or reserves
Playground A 200,000 P-3 Excess FB or reserves
Parking lot Long A 40,000 P-4 Excess FB or reserves
Buildings DPW roof A 450,000 1 In process
Buildings Police Station Renovations A
Buildings Police Windows A 200000+ may need more $ 2 In process
Buildings Police station Front steps 571 Main A TBD 3 Reserve, budget
Machinery & Equipment Police Surveillance system A 25,000 4 Reserve, budget
Buildings Dispatch Room update A TBD 5 Reserve, budget
Buildings Police Station roof (2006 20 or 30 year warrenty per Matt) A 250,000 6 Reserve, budget
Buildings Flooring in back officer entrance A TBD 7 Reserve, budget
Buildings Police - Evidence room A 70,000 8 Reserve, budget
Buildings Police Station Conference room in the old chief office A TBD 9 Reserve, budget
Locker room in the old red room A TBD 10 Reserve, budget
Water Projects
Infrastructure E Fillmore (full reconstruction - Plus 1.36 million for road portion) 2088' F- Water 700,700 1 Bond when appropriate or Reserve
Infrastructure Elmwood Ave from Chestnut Hill to Dead End (full reconstruction - plus 1.1 Million for for the road portion) 1725' F- Water 577,500 2 Bond when appropriate or Reserve
Infrastructure Hamlin Ave water main (Full reconstruction - plus 453,000 for the road portion) 2300' F- Water 759,000 3 Bond when appropriate or Reserve
Infrastructure Millard Fillmore Ave water main 625' F- Water 216,700 4 excess FB, reserves
Infrastructure Temple Pl water main 410' F- Water 146,124 4 excess FB, reserves
Infrastructure N Grove St water main 1475' F- Water 486,750 6 excess FB, reserves
Infrastructure Crescent Ave water main 825' F- Water 272,800 7 excess FB, reserves
Infrastructure Penn Ave water main 765' F- Water 265,100 7 excess FB, reserves
Infrastructure Park Place - Main to Oakwood F- Water 150000 9 Bond when appropriate
Infrastructure Church St water main 1750' F- Water 577,500 10
Full Road Reconstruction
Infrastructure E Fillmore (full reconstruction - Plus 637,000 for water portion) 2088' A 1,496,000 1 Bond when appropriate or Reserve
Infrastructure Elmwood Ave from Chestnut Hill to Dead End (full reconstruction - plus 525,000 for for the water portion) 1725' A 1,210,000 2 Bond when appropriate or Reserve
Infrastructure Hamlin Ave water main (Full reconstruction - plus 690,000 for the water portion) 2300' A 498,300 3 Bond when appropriate or Reserve
Projects for Future Ranking
Infrastructure Sidewalks South st. from S. Grove to ccenter A 100,000?
Page 62
Infrastructure Riley West Side (North to Girard - major tree issues) A ?
Infrastructure Center from South St. to American Legion A ?
Infrastructure Brooklea Sidewalks A ?
Green Letttering is in process, Purple writing are estimates, pink cell colors are water projects
and road reconstruction that go hand in hand.
Page 63
Village of East Aurora
Capital Plan 2026
6+ year plan
Budgeting: The Capital Committee believes that the Village should keep budgeting for the yearly cycled
capital purchases as has been the Village's practice for years. This includes the purchase of Police cars,
DPW skid steers, a mini excavator, and other vehicles and equipment on the ranking list that could be
added to the budget in a given year.
Reserves: The Capital Committee supports the efforts of the Village Board to build reserves to purchase
equipment without the need for bonding and paying out the interest. Specifically, to continue to add to
the reserve for Fire apparatus, Police building improvements, and DPW Equipment and Water fund
equipment. A reserve for water line replacement should be established as well, when possible.
General Fund Debt: In reviewing the Debt Schedule, we do not recommend taking on new debt in the
general fund unless an urgent project arises. We believe that if the funds cannot be otherwise saved or
obtained, the Village should work toward planning a road project in 2033 for Bond Anticipation Notes
(BANs) starting in 2034, followed by bonding in 2036. At this moment, the ranking spreadsheet has the
projects we believe will be needed in priority order.
Water Fund Debt: The Capital Committee believes that we should save for or plan projects in
2026/2027. The Village has a water improvement phased plan being developed by the Village engineers.
A Ban could be drawn up in 2027 for a project. The bonding can take place in 2029/2030 to help keep
the debt expense level and not have jumps in billing. The projects are numbered by priority on the
ranking spreadsheet. The Village will likely skip 1-3 until the road projects can be done at the same time
in 2034. The Engineers' plan may change priority depending on the outcome.
Project Ranking: All Projects and assets requested by the Department Heads and Village Board, which
were ready at the time this plan was put together, are listed and ranked. A conscious decision to have
more projects than can be accomplished in six years is on the list, so that this document can be easily
reviewed yearly and updated without possibly losing track of a project. Additionally, this list will be used
when looking into grants or if the Village ever needs to spend excess fund balance.
Fund Balance: The Village needs to follow the Fund Balance Policy if there is ever an excess fund
balance. The Capital Committee feels that the ranked projects should be considered for how these
funds are spent. The funds could also add to the reserves for these projects.. The Capital Committee is
aware that the Village may need to skip ranking for a project or asset that the Village can fund
completely in this event. The Capital Committee is happy to see that the process of using the capital
plan to spend down excess fund balance is working to help the village clearly reach planned goals.
Grants: The Capital Committee is aware that the Village is continually looking into grant opportunities.
This is one reason the Capital Committee’s ranking list includes projects that we do not expect will get
done in the next 6 years. The Capital Committee is also aware that the order in which the projects might
be completed could change because of grant funding, which may become available for a needed project
that may be lower on the list at that time.
Page 64
Safety:
Based on information from the department heads, police windows, and the DPW roof are the highest
priority because of safety concerns. We are happy to see that the Village board is treating them as a
high priority, as both are in process. The Capital Committee believes that the fire department radios are
needed for safety, but we need to see the outcome of the County Radio plan before purchasing new
radios that may not go with that system.
Hamlin Park: The Capital Committee is aware that the Village is already working on Hamlin Park. The
Village cannot take on added debt at this time to complete this project, but it has, however, been
working on completing small projects one at a time as funding becomes available. The Committee
believes that the Master plan should be updated once the current projects in process are completed.
This will allow for ranking of the remaining projects in next year’s plan. The Capital Committee is aware
that the Hamlin Park Committee is working on Master Plan updates and recommendations for park
improvements.
Future Projects: The Capital Committee believes the sidewalks should be evaluated to see where they
should be added and how the Village feels about adding sidewalks and setting area projects to keep a
walkable community and quality of life in the Village. That said, Equipment, buildings and water, and
road infrastructure are seen as a higher priority for our residents.
Page 65
Resolution of the Village of East Aurora of a Determination of Non-Significance pursuant
to the State Environmental Quality Review Act (SEQRA) in the matter of the Site Plan
Application for 49 Knox, to change the façade and the location of the exterior patios and
sliding glass doors for units 1 and 2 that affect the south and west sides of the building.
WHEREAS, the applicant has filed Part 1 of the Short Environmental Assessment Form (SEAF) with
this Board, a copy of which is included by reference and made a part hereof, relating to the proposed
project at 49 Knox Road, East Aurora, New York, wherein the applicant, Brian Fisher, as agent for
Fiboo Properties, LLC; and
WHEREAS, the Village Planning Commission, after carefully and fully reviewing the application,
including the Site Plan attached thereto, with any and all amendments and modifications, and
considering comments and documentation presented for and against the project, voted in the majority
recommending approval, with findings; and
WHEREAS, the Village SEQRA Intake Committee carefully and fully reviewed Part 1 of the SEAF
submitted by applicants, including the Site Plan attached thereto, and the above-referenced
amendments and modifications; and
WHEREAS, the Village SEQRA Intake Committee, after their review of the above, prepared Parts 2
and 3 of the SEAF with a recommendation of the issuance of the Negative Declaration of Environmental
Significance for submission to, and consideration by, the Village Board; and
WHEREAS, the Village Board of Trustees, upon taking an independent hard look and reasoned
evaluation of the above-referenced information, comments and written documentation, including, but
not limited to, Part 1 of the SEAF; comments, recommendations, findings and conditions of the Planning
Commission, the Site Plan and the recommendation of the SEQRA Intake Committee and that
Committee’s completed Parts 2 and 3 of the SEAF concerning the potential environmental impacts of
the project; all of which are incorporated by reference herein; and
WHEREAS, the Village Board, upon carefully and fully reviewing all the information, comments and
written documentation in regard to the project, made a finding that there are no significant
environmental impacts.
NOW, THEREFORE, BE IT RESOLVED, that the Village Board of East Aurora as Lead Agency has
determined that the proposed action described in the SEAF, submitted by the applicants, for the site
plan proposed to change the façade and the location of the exterior patios and sliding glass doors for
units 1 and 2 that affect the south and west sides of the building at 49 Knox Rd, as detailed in the Site
Plan Application dated February 24, 2026, is classified as an Type II Action and therefore issues a
Negative Declaration, that this development will not have a significant environmental impact and a Draft
Environmental Impact Statement will not be required nor prepared.
The foregoing resolution was duly made by Trustee ___________ and seconded by Trustee
__________________________ and carried on April 6, 2026.
Page 66
Resolution of the Village Board of East Aurora Approving the Site Plan for 49 Knox Road, applicant
Brian Fisher, of Fibbo Properties, to change the façade and the location of the exterior patios and
sliding glass doors for units 1 and 2 that affect the south and west sides of the building.
WHEREAS, an application has been submitted for Site Plan Approval at the above-referenced property by
applicant Brian Fisher, of Fibbo Properties:
WHEREAS, the Village’s SEQRA Intake Committee considered the application and reviewed Part 1 of the Short
Environmental Assessment Form submitted by the applicant and completed Part 2 and Part 3 thereof on behalf
of the Village, and it was the recommendation of the SEQRA Committee and approved by the Village Board as
a Negative Declaration, including that the proposed development plan is a Type II Action and would have no
significant environmental impact; and
WHEREAS, the Village Board at a public meeting reviewed and considered further the comments and all
written materials submitted by the applicant and all other information and recommendations before the Board,
including minutes of prior Village Board meetings and the recommendations from the SEQRA Intake
Committee and Planning Commission, and the referral and response from the Erie County Division of Planning
declaring: No Recommendation; proposed action has been reviewed and determined to be of local concern;
and
WHEREAS, the Village Board received and considered the Site Plan, the above-referenced upgrades, and any
and all amendments thereof; and
WHEREAS, the Village Board has separately considered the environmental impacts of the project, declared
itself Lead Agency and issued a Negative Declaration of Environmental Significance, with the proposal classified
as a Type II Action.
NOW, THEREFORE, BE IT RESOLVED, by the Village Board as follows:
1. The Findings of Fact of the SEQRA Intake Committee, the resolution with findings of the Planning
Commission, and the site plan application, all information included in the minutes taken in relation to the
above-mentioned Village Board meeting, are herein incorporated by reference.
2. The Resolution of the Village Board, considering the environmental impacts of the project and the
issuance of a Negative Declaration of Environmental Significance, is incorporated herein by reference.
3. The Site Plan relating to the proposed project at 49 Knox Road, East Aurora, New York, wherein the
applicant proposes to change the façade and the location of the exterior patios and sliding glass doors
for units 1 and 2 that affect the south and west sides of the building, as detailed on documents submitted
with the application, is hereby approved and is subject to the following additional conditions:
______________________________________________________________
______________________________________________________________
______________________________________________________________
4. The resolution is effective immediately, approving the issuance of a development, construction permit as
hereinbefore set forth, subject to compliance with all applicable federal, state, and local laws and codes.
The foregoing resolution was duly made by Trustee ___________ and seconded by Trustee
__________________________ and carried on April 6, 2026.
Page 67
RESOLUTION April 6, 2026
ADOPT 2026-2027 BUDGET
Trustee ______, offered the following resolution and moved for its adoption:
BE IT RESOLVED, the Budget for the Village of East Aurora for the fiscal year
2026/2027 is hereby ADOPTED with a tax rate of $ 22.528 per thousand.
BE IT FURTHER RESOLVED, the pay raises for the nonunion staff for the
2026/2027 fiscal year are included in the budget.
The following resolution was seconded by Trustee __________, and duly put to a
roll call vote which resulted in the following:
Trustee Lazickas
Trustee Cameron
Trustee Bojanowski
Trustee Kamp
Trustee Rabey
Trustee Root
Mayor Wochensky
Page 68
RESOLUTION April 6, 2026
ADOPT 2026-2027 WATER BUDGET AND RATE SCHEDULE
Trustee _______, offered the following resolution and moved for its adoption:
BE IT RESOLVED, the $1,884,358 Water Budget for the Village of East Aurora for the fiscal year 2026/2027 is
hereby ADOPTED with the following rate schedule:
2026-2027 PROPOSED WATER RATES
2025-26 RATE 2026-27 RATE INCREASE PERCENT
4.04 4.37 $ 0.33 8.17%
Inside Village RATE/1000 Gallons
Consumption Current Proposed Difference
0-5 $5.62 $5.95 $0.33
6-75 $7.09 $7.42 $0.33
OVER 75 $6.71 $7.04 $0.33
Outside Village
Consumption Current Proposed Difference
0-5 $8.43 $8.93 $0.50
6-75 $10.62 $11.12 $0.50
OVER 75 $10.01 $10.51 $0.50
Inside Village RATE/CUBIC FEET (748 Gallons)
Consumption Current Proposed Difference
0-6 $4.22 $4.46 $0.24
7-100 $5.32 $5.57 $0.24
OVER 100 $5.03 $5.28 $0.25
DEBT SERVICE COST
2024-25 2025-26
Current Proposed Difference
$30.75 $26.26 -$4.49
Operation and Maintenance
2024-25 2025-26
Current Proposed Difference
5/8" $40.58 $44.74 $4.16
1" $54.92 $60.41 $5.49
1.5" $78.44 $86.29 $7.85
2" $133.36 $146.70 $13.34
3" $156.89 $172.58 $15.69
4" $313.77 $345.15 $31.38
6" $549.10 $604.01 $54.91
8" $705.99 $776.59 $70.60
The following resolution was seconded by Trustee ________, and duly put to a roll call vote which resulted in the
following:
Trustee Lazickas –
Trustee Cameron -
Trustee Bojanowski-
Trustee Kamp -
Trustee Rabey -
Trustee Root -
Mayor Wochensky–
Page 69
WHEREAS, the Village of East Aurora has taken extensive steps to preserve the historic and small Village
feel throughout the Village, which only adds to the charm and building values in the Village, and
WHEREAS, the history of the area has long been recognized as an important aspect of any densely
populated municipality, and
WHEREAS, the Village has only limited space available for industrial and manufacturing endeavors that
would otherwise bring more people into the Village, which would benefit the other commercial
businesses in the Village, and
WHEREAS, the proliferation of self-storage facilities in the limited industrial and manufacturing zones
adds little to enhance the property values on the properties upon which they are located and provides
no other benefits in the community, nor brings additional permanent jobs to the Village, and
WHEREAS, questions exist with respect to the appropriateness of such self-storage facilities in the
Village, and
WHEREAS, provisions in the Village Code addressing the use of such facilities must be aligned with the
Comprehensive Plan, and
WHEREAS, the Planning Commission and Board of Trustees have requested that a local law be
developed to protect what little manufacturing land still exists,
NOW, BE IT THEREFORE RESOLVED, that the Village of East Aurora, acting in the best health, welfare,
and safety interests of the residents and property owners of the Village hereby suspends the further
development of any self-storage facilities within the jurisdictional limits of the Village by any entity, and
declares a one hundred eighty (180) day moratorium on any development of any self-storage facilities
as outlined herein, and
BE IT FURTHER RESOLVED, that the Village Attorney, in conjunction with the Building Department, after
consultation with the Planning Commission, shall develop a local law to deal with changes to the Zoning
Code and otherwise modify any current Village Code consistent with the objectives set forth herein, and
BE IT FURTHER RESOLVED, that the Village shall re-examine the continuation of the moratorium at
the completion of this initial period in order to fully and adequately protect the residents of the
Village.
Page 70
Page 71
Page 72
Page 73
Page 74
Page 75
Page 76
Page 77
Page 78
Page 79
Page 80
Page 81
Page 82
Page 83
Page 84
Page 85
Page 86
Page 87
Page 88
Page 89
Page 90
Page 91
Page 92
Page 93
Page 94
Page 95
Stormwater Management
Program Plan
(SWMP Plan)
Village of East Aurora
SPDES General Permit for Stormwater Discharges from Municipal
Separate Storm Sewer Systems (MS4s)
Permit No. GP-0-24-001
Effective Date: January 3, 2024
Expiration Date: January 2, 2029
Page 96
Table of Contents
Stormwater Management Program Contacts 2
Alternative Implementation Agreements 4
Minimum Control Measure 1: Public Education and Outreach Program 5
Minimum Control Measure 2: Public Involvement/Participation 11
Minimum Control Measure 3: Illicit Discharge Detection and Elimination 13
Minimum Control Measure 4: Construction Site Stormwater Runoff Control 20
Minimum Control Measure 5: Post-Construction Stormwater Management 30
Minimum Control Measure 6: Pollution Prevention and Good Housekeeping 34
List of Appendices
Appendix A: Map of Erie and Niagara County MS4 Regulated Area
Appendix B: SWMP Plan Compliance Documentation
Appendix C: Monitoring Locations Inspection and Sampling Field Sheet
Appendix D: Illicit Discharge Detection and Elimination Track Down Program
Appendix E: Construction Activities that Require SWPPP
Appendix F: SWPPP Review Checklist
Appendix G: Construction Site Inspection Report Form
Appendix H: No Exposure Certification
Appendix I: Storm Event Data Form; Visual Monitoring Form
Appendix J: Municipal Facility Assessment Form
Appendix K: Notice of Intent
Appendix L: Staffing Plan/Organizational Chart
Appendix M: WNY Stormwater Coalition Online Mapper/SOP
Appendix N: Resolution: Local Laws
Appendix O: Enforcement Response Plan
Appendix P: Part VIII: Enhanced Requirements for Impaired Waters
Page 97
Village of East Aurora
Stormwater Management Program Contacts
Stormwater Program Coordinator oversees the development, implementation, and enforcement of
the SWMP; coordinates all elements of the SWMP to ensure compliance with this SPDES general
permit; and develops and submits the Annual Report.
Name: Brian Halt
Title: Storm Water Management Officer
Phone: 716-652-6057
Email: [email protected]
Stormwater Management Officer for questions related to this Stormwater Management Program
(SWMP) Plan, or to obtain compliance-related documentation cited throughout this document.
Name: Brian Halt
Title: Storm Water Management Officer
Phone: 716-652-6057
Email: [email protected]
Local point of contact to receive and respond to public concerns/complaints regarding stormwater
management and compliance with permit requirements:
Name: Brian Halt
Title: SMO
Phone: 716-652-6057
Email: [email protected]
To report illicit discharges in the Village of East Aurora contact:
Name: Elizabeth Cassidy
Title: SMO, Code Enforcement Officer
Phone: 716-652-7591
Email: [email protected]
Page 98
To report stormwater complaints related to construction activity in the Village of East Aurora
contact:
Name: Elizabeth Cassidy
Title: SMO, Code Enforcement Officer
Phone: 716-652-7591
Email: [email protected]
Page 99
Alternative Implementation Agreements
Inventory of Other Entities Assisting with Implementation of SWMP Plan
List any entities assisting with any portion of the SWMP development, implementation, or
enforcement.
Name of Entity Permit Requirement
Town of Aurora MCM 3,4,5 Construction/post construction
inspections, IDDE
GHD MCM 6- SWPPP Review
WNY Stormwater MCM 1, 2, 3, 4, 5, 6 Education, Training, Development
Coalition
Although not included as an Appendix, Alternative Implementation Agreements are considered part
of this SWMP Plan, and are available by contacting the Stormwater Program Coordinator or
Stormwater Management listed Officer on page 2 of this document.
Page 100
SPDES General Permit for Stormwater Discharges from Municipal Separate
Storm Sewer Systems (MS4s) Permit No. GP-0-24-001
A. MCM1 – Public Education and Outreach Program
The MS4 Operator must develop and implement an education and outreach program to increase
public awareness of pollutant generating activities and behaviors. This MCM is designed to inform
the public about the impacts of stormwater on water quality, the general sources of stormwater
pollutants, and the steps the general public can take to reduce pollutants in stormwater runoff.
1. Development
Within three (3) years
a. Focus Areas
i. Surface waters classified as Class A-S, A or B
Listed below are surface waters classified as Class A-S, A or B according to New York State’s
Part 701 Classifications--Surface Waters and Groundwaters. Areas discharging to these
waters are focus areas for the education and outreach program. Because the Class A-S, Class
A and Class B surface waters have nearly identical best uses, and because all MS4 Operators
in Erie and Niagara County are in within the watershed of a Class A-S, Class A surface water
(i.e. Lake Erie, Niagara River or Lake Ontario), the focus area for education and outreach will
encompass the entire geographical area of GP-0-24-001 regulated MS4s as depicted in
Appendix A. All education and outreach materials will approach water quality protection
from the high standards inherent in Class A-S, A and B surface waters.
Class A-S and Class A fresh surface waters are a source of water supply for drinking, culinary
or food processing purposes; primary and secondary contact recreation; and fishing. The
waters are suitable for fish, shellfish and wildlife propagation and survival.
• Lake Erie Class A-S
• Niagara River Class A-S
• Lake Ontario Class A
• Eighteen Mile Creek, Middle, and tribs (0104-0017): Class A
• Eighteenmile Creek, Upper, and tribs (0104-0039): Class A
• Buffalo Creek, Lower, and tribs (0103-0004): Class A
• Buffalo Creek, Upper, and minor tribs (0103-0003): Class A
Class B fresh surface waters are primary and secondary contact recreation and fishing.
These waters are suitable for fish, shellfish and wildlife propagation and survival.
• Cayuga Creek, Middle, and minor tribs (0103-0017): Class B
• Eighteenmile Creek, Lower, minor tribs (0104-0030): Class B
• S. Branch Eighteenmile, Lower, and tribs (0104-0016): Class B
• Scajaquada Creek, Upper, and tribs (0101-0034): Class B
• Ellicott Creek, Lower, and tribs (0102-0018): Class B
• Grand Island, all tribs to Niagara R (0101-0011): Class B
• Hampton Brook and Tribs (0104-0041): Class B
Page 101
• Hyde Park Lake (0101-0030): Class B
• Tonawanda Creek, Middle, Main Stem (0101-0006): Class B
ii. Sewersheds for impaired waters
N/A: For the Village of East Aurora , there are no surface waters identified as impaired in
Appendix C of the MS4 General Permit (GP-0-24-001).
iii. TMDL watersheds:
N/A: there are no TMDL watersheds in Erie County or Niagara County.
iv. Areas with construction activities:
Education will be targeted to specific construction sites/operators that are identified during
Construction General Permit oversight and/or inspections as impacting water
quality/generating stormwater pollutants. In addition, construction-related activities are an
education and outreach topic for the following target audiences: contractors, developers,
design professionals, and Village of East Aurora municipal staff.
v. Areas with on-site wastewater systems:
Education will be targeted to specific sewersheds that are identified during illicit discharge
detection monitoring as discharging pathogens/fecal coliform. In addition, on-site
wastewater treatment systems (i.e. septic systems) are an education and outreach topic for
the residential target audience.
vi. Residential, commercial, and industrial areas
Education will take a variety of forms for these audiences. Residential/household education
will include tabling at community and regional events, stormwater displays in the main
municipal building, school-based programming such as the annual rain barrel painting
contest, and classroom presentations. Commercial audiences will be targeted for education
on topics most relevant to their primary operation (i.e. restaurants, landscaping and lawn
care, mobile washers); industrial areas will be targeted for education on outdoor materials
storage and other issues as they are discovered.
vii. Stormwater hotspots; and
Stormwater hotspots targeted for education: commercial container nurseries, vehicle fueling
stations, and vehicle service and maintenance facilities.
viii. Areas with illicit discharges.
Education will be targeted to specific sewersheds that are identified during illicit discharge
detection monitoring as discharging stormwater pollutants, specifically related to discharges
from activities such as landscaping and lawn care, dog waste; household hazardous waste
disposal, vehicle washing.
b. Target Audiences and Associated Pollutant Generating Activities
Within three (3) years
Page 102
i. Residents: landscaping and lawn care; dog waste; household hazardous waste disposal;
vehicle washing
ii. Commercial: Business owners and staff: landscaping and lawn care; vehicle fueling; vehicle
service and maintenance; uncovered materials exposure/storage
iii. Institutions: Managers, staff, and students: uncovered materials exposure/storage
(institutions not subject to SPDES MS4 Stormwater Permit)
iv. Construction: Developers, contractors, and design professionals: soil disturbance (erosion
and sediment control); uncontained construction waste
v. Industrial: Owners and staff: uncovered materials exposure/storage (ONLY industry not
subject to SPDES MSGP Stormwater Permit)
vi. MS4 Operator’s municipal staff: uncovered materials exposure; preventative
maintenance; spill prevention and response; erosion and sediment controls; managing
vegetated areas and open space; salt storage; waste, garbage and floatable debris.
c. Education and Outreach Topics
Within three (3) years
The table below summarizes the education and outreach topics, target audience(s), and how the
education and outreach topics reduce the potential for pollutants to be generated by the target
audience(s) for the focus area(s).
Topic Target Audience How Topic Reduces Potential for
Pollutants to be Generated by
Target Audience(s)
Household Guide Residents Addresses common household
activities that contaminate
stormwater and how to prevent
Rain Garden How-To-Guide Residents Reduces stormwater runoff and
potential to carry pollutants to the
MS4
Your Septic System Residents, MS4 staff Addresses proper use and
maintenance of septic systems to
ensure they are functioning as
designed
Pet Waste Residents, MS4 staff Addresses the importance of
cleaning up and proper disposal of
pet waste to ensure pathogens are
not exposed to runoff
Illicit Discharge Citizen's Guide Residents, MS4 staff Provides information on storm
sewers, illicit discharges, how to
Page 103
recognize them and where to
report the incident
Stormwater Ponds Residents, MS4 staff, Provides information on
Commercial sites, HOAs stormwater ponds, their purpose
and maintenance.
DIY Rain Barrel & Home Residents Reduces stormwater runoff, use of
Composting lawn care chemicals and potential
to carry pollutants to the MS4
Rain Barrel Use/Installation Residents Reduces stormwater runoff and
potential to carry pollutants to the
MS4
Litter in Waterways Residents, MS4 staff Addresses how litter pollutes and
impacts local waterways
Moving Dirt/Soil Disturbance/ Contractors, developers, MS4 Addresses soil disturbance, the
Construction General Permit staff CGP, and importance of erosion
and sediment control
d. Illicit Discharge Education
Within six (6) months
The brochure entitled: Illicit Discharge Detection and Elimination: A Citizen’s Guide to Identifying
and Preventing Stormwater Pollution will be made available to municipal
employees, businesses, and the public as follows:
i. Municipal employees: email announcement
ii. Businesses: municipal web page; public library
iii. Public: municipal web page; public library
2. Implementation and Frequency
a. Distribution Method of Educational Messages
A variety of the following methods of distribution will be utilized:
• Printed materials (e.g., mail inserts, brochures, and newsletters);
• Electronic materials (e.g., websites, email listservs);
• Mass media (e.g., newspapers, public service announcements on radio or cable);
• Workshops or focus groups;
• Displays in public areas (e.g., town halls, library, parks); or
• Social Media (e.g., Facebook, Twitter, blogs).
b. Frequency
Once every 5 years, the Village of East Aurora directs an educational message to each target
audience(s) for each focus area(s) based on the defined education and outreach topic(s) listed in
this Stormwater Management Program Plan; and, documents the date of completion and method of
distribution for each message.
Page 104
Compliance documentation is listed in Appendix B.
c. Updates to the Public Education and Outreach Program
Annually, by April 1: The Village of East Aurora reviews and updates, if necessary, the focus areas,
target audiences, and/or education and outreach topics.
Compliance documentation is listed in Appendix B.
Page 105
B. MCM 2 - Public Involvement/Participation
The MS4 Operator must provide opportunities to involve the public in the development, review, and
implementation of the SWMP. This MCM is designed to give the public the opportunity to include
their opinions in the implementation of this SPDES general permit.
1. Public Involvement/Participation
Public involvement/participation in the development and implementation of the Village of East
Aurora Stormwater Management Program includes opportunities to: review the SWMP Plan;
submit comments; ask questions; and, become involved in the SWMP.
The Village of East Aurora informs the public of the opportunity they have to review the SWMP
Plan; submit comments; ask questions; and, become involved in the SWMP via the following
avenues of communication:
• Public hearings or meetings
• Coordination with other pre-existing public involvement/participation opportunities
• Reporting concerns about activities or behaviors observed
• Stewardship activities
Methods of distribution used to inform public of opportunity:
• Printed materials (e.g., mail inserts, brochures, and newsletters);
• Electronic materials (e.g., websites, email listserves);
• Mass media (e.g., newspapers, public service announcements on radio or cable);
• Workshops or focus groups;
• Displays in public areas (e.g., town halls, library, parks); or
Compliance documentation is listed in Appendix B.
a. Local point of contact to receive and respond to public concerns regarding stormwater
management and compliance with permit requirements:
Name: Brian Halt
Title: Storm Water Management Officer
Phone: 716-652-6057
Email: [email protected]
The name or title of this individual, with contact information, will be published on public outreach
and public participation materials.
2. Public Notice and Input Requirements
a. Public Notice and Input Requirements for SWMP Plan
This requirement is included above in B.1 Public Involvement/Participation
Page 106
b. Public Notice and Input Requirements for Draft Annual Report
Annually, provide an opportunity for the public to review and comment on the draft Annual Report.
Document the opportunity below.
1. For public review and comment, the draft Annual Report will be presented at a regular
meeting of an existing board (e.g., administrative, planning, zoning) or a separate meeting
specifically for stormwater, as designated by the MS4 or if requested by the public. The
public must have the ability to ask questions about and make comments on the draft annual
report during that presentation; or
2. For public review and comment, the draft Annual Report will be posted on the Village of
East Aurora website: www.east-aurora.ny.us/government/public-works-department . The
website includes information on the timeframes and procedures to submit comments
and/or request a meeting. If a public meeting is requested by two or more persons, the MS4
Operator must hold such a meeting.
Compliance documentation is listed in Appendix B.
c. Consideration of Public Input
Annually, the Village of East Aurora documents a summary of comments received on the SWMP
Plan and draft Annual Report.
Compliance documentation is listed in Appendix B.
Page 107
C. MCM 3 - Illicit Discharge Detection and Elimination
The Village of East Aurora has a program to systematically detect illicit discharges to its municipal
separate storm sewer system (MS4), track down the source of the illicit discharge, and eliminate it.
This program is designed to manage the MS4 so it is not conveying pollutants associated with flows
other than those directly attributable to stormwater runoff. The Village of East Aurora Illicit
Discharge Detection and Elimination Program is supported by Local law 12-2007 Village of East
Aurora, NY Stormwater Management (ecode360.com)
1. Illicit Discharge Detection
a. Public Reporting of Illicit Discharges
i. To report illicit discharges in the Village of East Aurora contact:
Contact: Elizabeth Cassidy
Phone: 716-652-7591
Email: [email protected]
ii. Within thirty (30) days of an illicit discharge, each report of an illicit discharge is
documented in the Village of East Aurora SWMP Plan.
Compliance documentation is listed in Appendix B.
b. Monitoring Locations
The three types of monitoring locations used to detect illicit discharges are identified as follows:
i. MS4 outfalls: Any point of stormwater discharge from pipes, ditches, and swales, as well as
other points of concentrated flow, to surface waters of New York State from the Village of
East Aurora municipal separate storm sewer system (MS4).
ii. Interconnections: Any point of stormwater discharge from pipes, ditches, and swales, as
well as other points of concentrated flow, to another MS4 or private storm sewer system.
iii. Municipal facility intraconnections: Any point where stormwater is conveyed from a
municipal facility property to its own MS4. This is the most down-drainage end of the MS4
infrastructure located on the municipal facility prior to discharge to the MS4.
c. Monitoring Locations Inventory
The Village of East Aurora maintains an inventory of monitoring locations that are within the
boundaries of its MS4 Regulated area (see Appendix A). The inventory is available for public review
and comment as follows:
• Appendix B
• Upon request: contact the Stormwater Program Coordinator or Stormwater Management
Officer listed on page 2 of this document
Page 108
• On the Village of East Aurora webpage: www.east-aurora.ny.us/government/public-
works-department
• At the Village of East Aurora municipal building as follows:
o Hardcopy: DPW
o Electronically:
Public: Upon Request
• Internally: C:\Users\Water Foreman\Documents\Storm Water\Monitoring Locations
For each monitoring location, the following information is included:
a) Inventory information for MS4 outfalls
• ID;
• Prioritization (high or low);
• Type of monitoring location;
• Name of MS4 Operator’s municipal facility, if located at a municipal
facility;
• Receiving waterbody name and class;
• Receiving waterbody WI/PWL Segment ID;
• Land use in drainage area;
• Type of conveyance (open drainage or closed pipe);
• Material;
• Shape;
• Dimensions;
• Submerged in water; and
• Submerged in sediment.
b) Inventory information for interconnections
• ID;
• Prioritization (high or low);
• Type of monitoring location;
• Name of MS4 Operator receiving discharge or private storm system;
• Name of MS4 Operator’s municipal facility, if located at a municipal
facility; and
• Receiving waterbody name and class.
c) Inventory information for municipal facility intraconnections
• ID;
• Prioritization (high or low);
• Type of monitoring location;
• Name of MS4 Operator’s municipal facility; and
• Receiving waterbody name and class.
Page 109
ii. Annually, the Village of East Aurora updates the inventory if monitoring locations are
constructed or discovered; or if information for existing monitoring locations change.
Prioritization determinations and updates, as noted below, are also addressed in the update.
Compliance documentation pertaining to updating the monitoring locations inventory is listed in
Appendix B.
d. Monitoring Locations Prioritization
i. The Village of East Aurora prioritizes its monitoring locations which are included in the
monitoring locations inventory as follows:
a) High priority monitoring locations are as follows:
• At a high priority municipal facility, defined as a municipal facility that has one
or more of the following on site and exposed to stormwater:
o Storage of chemicals, salt, petroleum, pesticides, fertilizers, antifreeze,
lead-acid batteries, tires, waste/debris;
o Fueling stations; and/or
o Vehicle or equipment maintenance/repair.
• Discharging to impaired waters;
• Discharging within a TMDL watershed (Not applicable in the Village of East
Aurora);
• Directly discharging to waters with Class AA-S, A-S, AA, A, B, SA, or SB; and/or
• Confirmed citizen complaints on three or more separate occasions in the last
twelve (12) months.
b) All other monitoring locations are considered low priority.
ii. Monitoring locations that are newly constructed, or discovered, will be prioritized within
30 days; and
iii. Annually, the Village of East Aurora updates the monitoring location prioritization in the
inventory based on information gathered as part of the monitoring location inspection and
sampling program.
Compliance documentation pertaining to updating prioritization for monitoring locations in the
inventory is listed in Appendix B. The inventory is available for public review and comment as
indicated above.
e. Monitoring Locations Inspection and Sampling Program
The Village of East Aurora has a program to inspect monitoring locations and sample dry weather
flow discharging from the MS4.
i. The monitoring locations inspection and sampling procedures are as follows:
a) During dry weather, one (1) inspection of each monitoring location identified in the
inventory every five (5) years;
b) Inspections and sampling results (if flowing during dry weather) are documented
with a Monitoring Locations Inspection and Sampling Field Sheet (Appendix C).
Page 110
Although not included as an appendix, all completed forms for inspection and
sampling are considered part of this SWMP Plan and are available for public review
and comment as follows:
• Upon request: contact the Stormwater Program Coordinator or Stormwater
Management Officer listed on page 2 of this document
• At the Village of East Aurora municipal building as follows:
o Hardcopy: (DPW
o Electronically:
Public: Upon Request
c) Following a monitoring location inspection, all inspections which resulted in a
“suspect” or “obvious” illicit discharge characterization are subject to sampling unless
the source of the illicit discharge is clear and discernable (e.g., sewage), in which case
sampling is not necessary;
d) Sampling is conducted using field test strips and/or field instrumentation that are
sufficiently sensitive to detect the parameter below the sampling action level used.
As per the MS4 General Permit (Part VI.C.d), analytical methods are not subject to
New York State’s 40 CFR Part 136 requirements for approved methods and certified
laboratories;
e) Source track down is initiated for monitoring locations that are characterized as
“suspect” or “obvious” illicit discharge, or that exceed any sampling action level used;
f) All monitoring locations are re-inspected within thirty (30) days of the initial
inspection, if there is a physical indicator not related to flow, that is indicative of an
intermittent or transitory discharges. In layman’s terms, a monitoring location may
not be flowing at the time of the dry weather inspection, but there may be evidence
(i.e. physical indicators) of an illicit discharge such as oil stains or toilet paper. If those
same physical indicators persist, the Village of East Aurora will initiate illicit discharge
track down procedures.
ii. The Village of East Aurora, in partnership with the Western NY Stormwater Coalition, has
an employee training program addressing Illicit Discharge Detection and Elimination
procedures. This training engages employees in a classroom setting as well as in hands-on
monitoring location Inspection, sampling, results interpretation, and source track down and
elimination.
a) All new staff that are charged with performing monitoring location inspections and
sampling procedures will receive training on procedures prior to doing so;
Page 111
b) All existing staff, that are charged with performing monitoring location inspections
and sampling procedures will receive training on procedures prior to doing so, and,
once every five (5) years, thereafter; and
c) If the monitoring locations inspection and sampling procedures are updated, all
staff will receive training on the updates prior to conducting monitoring locations
inspections and sampling.
iii. The names, titles, and contact information for the individuals who have received
monitoring locations inspection and sampling procedures training is updated annually; and
iv. Annually, by April 1, the Village of East Aurora reviews and updates its monitoring
location inspection and sampling procedures based on results (e.g., trends, patterns, areas
with illicit discharges, and common problems).
Compliance documentation is listed in Appendix B for:
• Staff that have received monitoring location inspection and sampling procedures training;
and,
• Updates to the monitoring location inspection and sampling procedures.
2. Illicit Discharge Track Down Program
Within two (2) years
The Village of East Aurora has an illicit discharge track down program to identify the source of illicit
discharges and the responsible party.
a. The illicit discharge track down program includes the following:
i. The illicit discharge track down program is part of the Illicit Discharge Detection and
Elimination Track Down Program detailed in Appendix D. It includes procedures and steps to
take for illicit discharge track down;
ii. Timeframes to initiate illicit discharge track down are as follows:
a) Within twenty-four (24) hours of discovery, or 72 hours of dry weather
conditions, the Village of East Aurora will initiate track down procedures for
flowing MS4 monitoring locations with obvious illicit discharges;
b) Within two (2) hours of discovery, the Village of East Aurora will initiate track
down procedures for obvious illicit discharges of sanitary wastewater that would
affect bathing areas during bathing season, shell fishing areas or public water
intakes and report orally or electronically to the NYSDEC Regional Water Engineer
and local health department; and
c) Within five (5) days of discovery, or 72 hours of dry weather conditions, the
Village of East Aurora will initiate track down procedures for suspect illicit
discharges.
Page 112
b. As noted above, the Village of East Aurora, in partnership with the Western NY Stormwater
Coalition, has an employee training program addressing Illicit Discharge Detection and Elimination
procedures. This training includes source track down. Requirements pertaining to employee training
for existing staff, new staff and updates to the illicit discharge source track down procedures are
identical.
c. The names, titles, and contact information for the individuals who have received illicit discharge
track down procedures training is updated annually; and
d. Annually, by April 1, the Village of East Aurora reviews and updates its illicit discharge track down
procedures.
Compliance documentation is listed in Appendix B for:
• Staff that have received illicit discharge track down procedures training; and,
• Updates to the illicit discharge track down procedures.
3. Illicit Discharge Elimination Program
Within two (2) years
The Village of East Aurora has an illicit discharge elimination program. Once an illicit discharge is
track downed and a source identified, steps are taken to eliminate the source/discharge. As noted
previously, the Village of East Aurora Illicit Discharge Detection and Elimination Program is
supported by Local law 12-2007 Village of East Aurora, NY Stormwater Management
(ecode360.com)
• Although not included in this SWMP Plan, documentation of enforcement measures to
eliminate illicit discharges is available upon request by contacting the Stormwater Program
Coordinator or Stormwater Management Officer listed on page 2 of this document.
a. The illicit discharge elimination procedures including
i. Provisions for escalating enforcement and tracking enforcement actions are in the Village
of East Aurora Enforcement Response Plan detailed in Appendix O;
ii. To confirm the corrective actions have been taken, the monitoring location will be
inspected, and sampled if flowing, within 30 days of receiving notice that the source of
contamination has been eliminated;
iii. Steps taken for illicit discharge elimination procedures; and
iv. Timeframes for illicit discharge elimination are as follows:
• Within twenty-four (24) hours of identification of an illicit discharge that
has a reasonable likelihood of adversely affecting human health or the
environment, the Village of East Aurora will eliminate the illicit discharge;
• Within five (5) days of identification of an illicit discharge that does not
Page 113
have a reasonable likelihood of adversely affecting human health or the
environment, the Village of East Aurora will eliminate the illicit discharge; and
• Where elimination of an illicit discharge within the specified timeframes
above is not possible, the Village of East Aurora will notify the NYSDEC
Regional Water Engineer.
b. As noted above, the Village of East Aurora, in partnership with the Western NY Stormwater
Coalition, has an employee training program addressing Illicit Discharge Detection and Elimination
procedures. This training includes illicit discharge elimination procedures. General requirements
pertaining to employee training for existing staff, new staff and updates to the illicit discharge
elimination are identical.
c. The names, titles, and contact information for the individuals who have received illicit discharge
elimination procedures training is updated annually; and
d. Annually, by April 1, the Village of East Aurora reviews and updates the illicit discharge
elimination procedures.
Compliance documentation is listed in Appendix B for:
• Staff that have received illicit discharge elimination procedures training; and,
• Updates to the illicit discharge elimination procedures.
Page 114
D. MCM 4 - Construction Site Stormwater Runoff Control
The Village of East Aurora has a program to ensure construction sites subject to the NYSDEC
General Permit for Stormwater Discharges from Construction Activity (CGP) are effectively
controlled. This program is designed to prevent pollution from construction related activities, as well
as ensure for proper planning and installation of post-construction SMPs. The Village of East Aurora
Construction Site Stormwater Runoff Control Program is supported by Local law 11-2007 Village of
East Aurora, NY Stormwater Management (ecode360.com)
1. Applicable Construction Activities/Projects/Sites
a. The construction site stormwater runoff control program addresses stormwater runoff to the
MS4 from sites with construction activities that:
i. Result in a total land disturbance of greater than or equal to one acre; or
ii. Disturb less than one acre if part of a larger common plan of development or sale (even if
additional development/phase is years away).
b. For construction activities where the Village of East Aurora is listed as the owner/operator on
the Notice of Intent for coverage under the CGP. The Village of East Aurora will ensure its own
compliance with the CGP. The additional requirements for Section 3: Construction Oversight;
Section 6: SWPPP Review; Section 7: Pre-Construction Meeting; Section 8: Construction Site
Inspection; and Section 9: Construction Close-Out below are not required.
2. Public Reporting of Construction Site Complaints
a. To report stormwater complaints related to construction in the Village of East Aurora contact:
Contact: Elizabeth Cassidy
Phone: 716-652-7591
Email: [email protected]
b. The Village of East Aurora documents reports of construction site complaints with the following
information:
i. Date of the report;
ii. Location of the construction site;
iii. Nature of complaint;
iv. Follow up actions taken or needed; and
v. Inspection outcomes and any enforcement taken.
Page 115
Although not included as an appendix, this documentation is considered part of the Village of East
Aurora SWMP Plan. It is available for public review upon request; contact the Stormwater Program
Coordinator or Stormwater Management Officer listed on page 2 of this document www.east-
aurora.ny.us/government/public-works-department.
3. Construction Oversight Program
Within one (1) year of the EDC
The Village of East Aurora has a construction oversight program. It is important to note that the
program encompasses the entire municipality, within and beyond the MS4 regulated area.
a. Construction oversight procedures in the Village of East Aurora are as follows:
i. The construction site stormwater control program applies to all construction sites that are
subject to the NYSDEC General Permit for Stormwater Discharges from Construction Activity
(GP-0-20-001);
ii. As per the NYSDEC General Permit for Stormwater Discharges from Construction Activity
(GP-0-20-001), construction activities that require a Stormwater Pollution Prevention Plan
(SWPPP) are listed in Appendix E;
iii. Procedures for submitting SWPPPs to the Village of East Aurora are as follows:
a. For all land development activities subject to review and approval by the Planning
Commission or Village Board of the Village of East Aurora under floodplain
development permit or subdivision regulations, the applicant or developer shall be
required to submit an SWPPP that complies with the requirements of the Village
code chapter 220 to the Storm Water Management Officer. Village of East Aurora,
NY Stormwater Management (ecode360.com)
b. For all land development activities not subject to review by the Planning
Commission or Village Board of the Village of East Aurora, the applicant or
developer shall be required to submit an SWPPP prepared in accordance with the
standards contained in Village code chapter 220 to the Storm Water Management
Officer.
iv. The Village of East Aurora reviews Stormwater Pollution Prevention Plans (SWPPPs)
for all CGP-regulated constructed projects for conformance with NYS standards (Detailed below in
Part 6: SWPPP Review);
v. Prior to commencement of CGP-regulated construction activity, the Village of East Aurora
requires a pre-construction meeting (Detailed below in Part 7: Pre-Construction Meeting);
vi. The Village of East Aurora inspects CGP-regulated construction sites to ensure
compliance with the conditions of the CGP and is authorized to escalate enforcement actions
as is necessary by 11-2007 Village of East Aurora, NY Stormwater Management
(ecode360.com) . (Detailed below in Part 8: Construction Site Inspections);
vii. All CGP-regulated construction projects in the Village of East Aurora are subject to
construction site close-out requirements in conformance with the CGP (Detailed below in
Page 116
Part 9: Construction site close-out);
viii. The Village of East Aurora follows an enforcement process that includes expectations
for compliance for CGP-regulated construction sites that fail to comply with the conditions of
the CGP and their SWPPP. See Appendix O for the Enforcement Response Plan. For
information on enforcement actions pertaining to specific construction sites in the Village of
East Aurora contact:
Contact: Elizabeth Cassidy
Phone: 716-652-7591
Email: [email protected]
ix. Although not included in this SWMP Plan, documentation of enforcement measures
addressing non-compliance with the Construction General Permit (GP-0-20-001) is available
upon request by contacting the Stormwater Program Coordinator or Stormwater
Management Officer listed on page 2 of this document.
x. Other procedures associated with the control of stormwater runoff from applicable
construction activities.
Not Applicable
b. The Village of East Aurora, in partnership with the Western NY Stormwater Coalition, has an
employee training program addressing its Construction Site Stormwater Runoff Control Program.
This training engages employees in a classroom setting, and as appropriate, a SWPPP compliance
inspection at a construction site.
i) All new staff that are charged with conducting any construction oversight activities
will receive training on procedures prior to doing so;
ii) All existing staff, that are charged with conducting any construction oversight
activities will receive training on procedures prior to doing so, and, once every five (5)
years, thereafter; and
iii) If the construction oversight procedures are updated, all staff will receive training
on the updates prior to conducting construction oversight.
c. The names, titles, and contact information for the individuals who have received construction
oversight training are updated annually;
d. All individuals involved in construction activity in the Village of East Aurora (e.g., contractor,
subcontractor, qualified inspector, SWPPP reviewers) will be certified and maintain four (4) hours of
NYSDEC endorsed training in proper erosion and sediment control principles by attending the
NYSDEC 4-Hour Erosion and Sediment Control Training. This training is offered annually by Erie and
Niagara County Soil and Water Conservation Districts, as well as online by other Soil and Water
Conservation Districts across the state.
Page 117
i) Individuals responsible for reviewing SWPPPs on behalf of the Village of East
Aurora will maintain certification.
ii) In conformance with the NYS CGP, contractors, subcontractors and qualified
inspectors will maintain certification throughout the project. Contractors and and
subcontractors will include a current copy of their NYS certification in the on-site
SWPPP.
e. Annually, by April 1, the Village of East Aurora reviews and updates its construction oversight
procedures.
Compliance documentation is listed in Appendix B for:
• Staff that have received construction oversight training;
• Updates to the construction oversight procedures; and,
• NYSDEC 4-Hour Erosion and Sediment Control Training for individuals involved in
construction activity.
4. Construction Site Inventory & Inspection Tracking
Within six (6) months of the EDC
a. The Village of East Aurora maintains an inventory of CGP-regulated construction sites that
encompasses the entire municipality, within and beyond the MS4 regulated area. Although not
included as an appendix, the inventory is considered part of the Village of East Aurora SWMP Plan.
The inventory is available for public review and comment as follows:
• Upon request: contact Stormwater Program Coordinator or Stormwater Management
Officer listed on page 2 of this document
• At the Village of East Aurora municipal building as follows:
o Hardcopy: DPW
o Electronically:
Public: Upon Request
Internally: C:\Users\Water Foreman\Documents\Storm Water\Construction
Sites
The following information is included in the inventory:
• Location of the construction site;
• Owner/operator contact information, if other than the MS4 Operator;
• Receiving waterbody name and class;
• Receiving waterbody WI/PWL Segment ID;
• Prioritization (high or low);
• Construction project SPDES identification number;
• SWPPP approval date;
• Inspection history, including dates and ratings (satisfactory, marginal, or unsatisfactory,
when available); and
Page 118
• Current status of the construction site/project (i.e., active, temporarily shut down,
complete).
b. Annually, the Village of East Aurora updates the inventory if construction projects are approved
or completed.
5. Construction Site Prioritization
Within one (1) year
a. The Village of East Aurora prioritizes all CGP-regulated construction sites which are included in
the construction site inventory as follows:
i. High priority construction sites include construction sites:
a) With a direct conveyance (e.g., channel, ditch, storm sewer) to a surface water of
the State:
i) Classified as impaired by silt/sediment, phosphorus, or nitrogen as the
Pollutant of Concern;
ii) Classified as AA-S, AA, or A; or
b) With greater than five (5) acres of disturbed earth at any one time;
c) With earth disturbance within one hundred (100) feet of any lake or pond; and/or
d) Within fifty (50) feet of any rivers or streams.
ii. All other construction sites are considered low priority.
b. All CGP-regulated construction sites are prioritized within thirty (30) days of becoming active; and
c. Annually, after the initial prioritization, the Village of East Aurora updates the construction site
prioritization in the inventory based on information gathered as part of the construction oversight.
i. If the prioritization of the construction site changes priority based on
information gathered as part of the construction oversight program, the
MS4 Operator must comply with the requirements that apply to that
prioritization.
As noted above, the CGP-regulated construction sites inventory is available for public review and
comment as follows:
• Upon request: contact Stormwater Program Coordinator or Stormwater Management
Officer listed on page 2 of this document
• At the Village of East Aurora municipal building as follows:
o Hardcopy: DPW
Page 119
o Electronically:
Public: Upon Request
Internally: C:\Users\Water Foreman\Documents\Storm
Water\Construction Sites
6. SWPPP Review
a. All individual(s) responsible for reviewing SWPPPs for acceptance will complete four (4) hours of
NYSDEC endorsed training in proper erosion and sediment control principles by attending the
NYSDEC 4-Hour Erosion and Sediment Control Training. This training is offered annually by Erie and
Niagara County Soil and Water Conservation Districts, as well as online by other Soil and Water
Conservation Districts across the state. This training will be completed within three (3) years of the
EDC and every three (3) years thereafter to maintain active certification.
b. SWPPP reviewers for the Village of East Aurora receive this training prior to
conducting SWPPP reviews for acceptance.
i. Individuals without these trainings cannot review SWPPPs for acceptance.
ii. Individuals who meet the definition of a qualified professional or qualified inspector are
exempt from this requirement.
c. To ensure individuals responsible for reviewing SWPPPs review all SWPPPs for applicable
construction activities and for conformance with the requirements of the CGP, the NYSDEC SWPPP
Review Checklist will be utilized (Appendix F). SWPPP reviews will include the following:
i. Erosion and sediment controls will be reviewed for conformance with the
NYS Standards and Specifications for Erosion and Sediment Control 2016, or equivalent;
ii. Individuals responsible for review of post-construction SMPs must be qualified
professionals or under the supervision of a qualified professional; and
iii. Post-construction SMPs must be reviewed for conformance with the NYS
Stormwater Management Design Manual (NYS SWMDM) 2015 or equivalent, including:
• All post-construction SMPs must meet the sizing criteria contained in the CGP and NYS
SWMDM 2015.
• Deviations from the performance criteria of the NYS SWMDM 2015 must demonstrate
that they are equivalent.
• The SWPPP must include an Operation & Maintenance Plan that includes inspection and
maintenance schedules and actions to ensure continuous and effective operation of each
post-construction SMP. The SWPPP must identify the entity that will be responsible for
the long-term operation and maintenance of each practice.
Compliance documentation is listed in Appendix B for:
• Staff involved in SWPPP reviews that have received NYSDEC 4-Hour Erosion and Sediment
Control Training
Page 120
d. Although not included as an appendix, SWPPP reviews, as documented by the NYSDEC SWPPP
Review Checklist, are considered part of the Village of East Aurora SWMP Plan. The SWPPP reviews
are available for public review and comment as follows:
• Upon request: contact Stormwater Program Coordinator or Stormwater Management
Officer listed on page 2 this document
• At the Village of East Aurora municipal building as follows:
o Hardcopy: DPW
o Electronically:
• Public: Upon Request
• Internally: C:\Users\Water Foreman\Documents\Storm Water\SWPP
e. As new construction activities are added to the construction site inventory, they will be prioritized
as noted previously; and
f. The Village of East Aurora will notify construction site owner/operators that their SWPPP has
been accepted using the MS4 SWPPP Acceptance Form created by the Department and required by
the CGP, signed in accordance with Part X.J: Signatories and Certifications (MS4 General Permit: GP-
0-24-001).
7. Pre-Construction Meeting
Prior to commencement of construction activities, the Village of East Aurora requires a pre-
construction meeting. The date and content of the preconstruction inspection/meeting is
documented in the construction site inventory of this SWMP Plan. The owner/operator listed on the
CGP NOI, the Village of East Aurora, contractor(s) responsible for implementing the SWPPP for the
construction activity, and the qualified inspector (if required for the construction activity) must
attend the meeting in order to:
a. Confirm the approved project has received, or will receive26, coverage under
the CGP or an individual SPDES permit;
b. Verify contractors and subcontractors selected by the owner/operator of the
construction activity have identified at least one individual that has received four (4)
hours of Department endorsed training in proper erosion and sediment control
principles from a Soil & Water Conservation District or other endorsed entity as
required by the CGP; and, a copy of the certification(s) for those individuals is added
to the on-site SWPPP.
c. Verify each of the contractors and subcontractors identified have signed a copy of
the following certification statement below before they commence any construction
activity:
"I hereby certify under penalty of law that I understand and agree to comply
with the terms and conditions of the SWPPP and agree to implement any
Page 121
corrective actions identified by the qualified inspector during a site inspection.
I also understand that the owner or operator must comply with the terms and
conditions of the most current version of the New York State Pollutant
Discharge Elimination System ("SPDES") general permit for stormwater
discharges from construction activities and that it is unlawful for any person
to cause or contribute to a violation of water quality standards. Furthermore,
I am aware that there are significant penalties for submitting false
information, that I do not believe to be true, including the possibility of fine
and imprisonment for knowing violations"
In addition to providing the certification statement above, the certification page must
also identify the following:
• Specific elements of the SWPPP that each contractor and subcontractor will
be responsible for, and include the name and title of the person providing the
signature;
• The name and title of the trained contractor responsible for SWPPP
implementation;
• The name, address and telephone number of the contracting firm;
• The address (or other identifying description) of the site; and
• The date the certification statement is signed.
The owner or operator of the Construction General Permit must attach the
certification statement(s) to the copy of the SWPPP that is maintained at the
construction site. If new or additional contractors are hired to implement measures
identified in the SWPPP after construction has commenced, they must also sign the
certification statement and provide the information listed above.
d. Review the construction oversight program and expectations for compliance.
8. Construction Site Inspections
The Village of East Aurora inspects CGP-regulated construction sites to ensure they are in
compliance with the SWPPP that pertains to the site.
a. All individual(s) responsible for construction site inspection will complete four (4) hours of
NYSDEC endorsed training in proper erosion and sediment control principles by attending
the NYSDEC 4-Hour Erosion and Sediment Control Training. This training is offered annually
by Erie and Niagara County Soil and Water Conservation Districts, as well as online by other
Soil and Water Conservation Districts across the state. This training will be completed every
three (3) years thereafter to maintain active certification.
b. All MS4 Construction Site Inspectors will receive this training prior to conducting
construction site inspections.
i. Individuals without these trainings cannot inspect construction sites.
ii. Individuals who meet the definition of a qualified professional or qualified inspector are
exempt from this requirement.
Page 122
c. All sites with construction activity identified in the inventory will be inspected annually
during active construction, after the pre-construction meeting, or sooner if deficiencies are
noted that require attention.
i. Follow up to construction site inspections must confirm corrective actions are
completed within timeframes established by the CGP and the MS4 Operator’s
Enforcement Response Plan.
d. The names, titles, and contact information for the individuals who have received the NYSDEC
4-Hour Erosion and Sediment Control Training are updated annually;
e. All construction inspections are documented using the NYSDEC Construction Site Inspection
Report Form (Appendix G) or an equivalent form containing the same information. The
completed Construction Site Inspection Reports are considered part of the Village of East
Aurora SWMP Plan and are available as follows:
• Upon request: contact Stormwater Program Coordinator or Stormwater
Management Officer listed on page 2 of this document
• At the Village of East Aurora municipal building as follows:
o Hardcopy: DPW
o Electronically:
• Public: Upon Request
• Internally: C:\Users\Water Foreman\Documents\Storm
Water\Construction Inspections
Compliance documentation is listed in Appendix B for:
• Staff conducting construction inspections that have received NYSDEC 4-Hour Erosion and
Sediment Control Training
9. Construction Site Close-out
a. To close out a CGP-regulated construction site, the Village of East Aurora conducts and
documents a final construction site inspection. The final construction site inspection is
documented using the Construction Site Inspection Report Form (Appendix G), or an
equivalent form containing the same information, or accept the construction site
owner/operator’s qualified inspector final inspection certification that is required by the
CGP. The completed (final) Construction Site Inspection Reports are considered part of the
Village of East Aurora SWMP Plan and are available as follows:
• Upon request: contact Stormwater Program Coordinator or Stormwater
Management Officer listed on page 2 of this document
• At the Village of East Aurora municipal building as follows:
o Hardcopy: DPW
o Electronically:
Page 123
• Public: Upon Request
• Internally: C:\Users\Water Foreman\Documents\Storm
Water\Construction Inspections
b. The Notice of Termination (NOT) is signed by the Village of East Aurora as required by the
CGP for projects determined to be complete. The NOT is signed in accordance with Part X.J:
Signatories and Certifications (MS4 General Permit: GP-0-24-001).
Page 124
E. MCM 5 – Post-Construction Stormwater Management
The Village of East Aurorahas a program to ensure proper operation and maintenance of post-
construction Stormwater Management Practices (SMPs) for new or redeveloped sites. This program
is designed to promote the long-term performance of post-construction SMPs in removing
pollutants from stormwater runoff. The Village of East Aurora Post-Construction Stormwater
Management Program is supported by Local law 11-2007 Village of East Aurora, NY Stormwater
Management (ecode360.com)
1. Applicable Post-Construction SMPs
The Village of East Aurora post-construction SMP program addresses stormwater runoff to the MS4
from publicly owned/operated and privately owned/operated post-construction SMPs that meet
the following:
a. Post-construction SMPs that have been installed as part of any CGP regulated construction site or
individual SPDES permit since March 10, 2003; and
b. All new post-construction SMPs constructed as part of the construction site stormwater runoff
control program.
2. Post-Construction SMP Inventory & Inspection Tracking
The Village of East Aurora maintains an inventory of post-construction SMPs that encompasses the
entire municipality, within and beyond the MS4 regulated area.
a. The Village of East Aurora under its continuing MS4 General Permit coverage:
i. Maintains the inventory from previous iterations of the MS4 General Permit requirement
for post-construction SMPs installed after March 10, 2003; and
ii. Will update the inventory for post-construction SMPs installed after March 10,
2003 as post-construction SMPs are approved or discovered; or after an owner/operator of
CGP-regulated construction activity has filed a NOT with the NYSDEC.
b. Annually, the Village of East Aurora updates the inventory of post-construction SMPs to include
the post-construction SMPs as noted above.
c. Within five (5) years
The following information will be included in the inventory either by using Village of East Aurora
maintenance records or by verification of maintenance records provided by the owner of the post-
construction SMP:
i. Street address or tax parcel;
ii. Type;
iii. Receiving waterbody name and class;
iv. Receiving waterbody WI/PWL Segment ID
v. Date of installation (if available) or discovery;
Page 125
vi. Ownership;
vii. Responsible party for maintenance;
viii. Contact information for party responsible for maintenance;
ix. Location of documentation depicting O&M requirements and legal agreements for post-
construction SMP;
x. Frequency for inspection of post-construction SMP, as specified in the New York State
Department of Environmental Conservation Maintenance Guidance: Stormwater
Management Practices, March 31, 2017 (NYS DEC Maintenance Guidance 2017) or as
specified in the O&M plan contained in the approved SWPPP;
xi. Reason for installation (e.g., new development, redevelopment, retrofit, flood control), if
known;
xii. Date of last inspection;
xiii. Inspection results; and
xiv. Any corrective actions identified and completed.
d. Although the Village of East Aurora inventory of post-construction SMPs is considered part of this
SWMP Plan and is available as follows:
• Upon request: contact Stormwater Program Coordinator or Stormwater Management
Officer listed on page 2 of this document
• At the Village of East Aurora municipal building as follows:
o Hardcopy: (Department Info)
o Electronically:
• Public: Upon Request
• Internally: C:\Users\Water Foreman\Documents\Storm Water\Post
Construction Inventory
3. SWPPP Review
As noted above, post-construction SMP SWPPP review requirements address the following:
a. Individuals responsible for review of post-construction SMPs must be qualified professionals or
under the supervision of a qualified professional; and
b. Post-construction SMPs must be reviewed for conformance with the NYS Stormwater
Management Design Manual (NYS SWMDM) 2015 or equivalent, including:
Page 126
i. All post-construction SMPs must meet the sizing criteria contained in the CGP and NYS
SWMDM 2015.
ii. Deviations from the performance criteria of the NYS SWMDM 2015 must demonstrate
that they are equivalent.
c. The SWPPP must include an O&M plan that includes inspection and maintenance schedules and
actions to ensure continuous and effective operation of each post-construction SMP. The SWPPP
must identify the entity that will be responsible for the long-term operation and maintenance of
each practice.
4. Post-Construction SMP Inspection & Maintenance Program
Within one (1) year
The Village of East Aurora has an inspection and maintenance program for publicly
owned/operated and privately owned/operated post-construction SMPs.
a. The post-construction SMP inspection and maintenance procedures are as follows:
i. All post-construction SMPs identified in the inventory are inspected at the frequency
specified in the NYSDEC Maintenance Guidance 2017 or as specified in the O&M plan
contained in the approved SWPPP, if available;
ii. The Post-Construction SMP Inspection Checklist in the NYSDEC Maintenance Guidance or
an equivalent form containing the same information must be used to document post-
construction SMP inspections. The Village of East Aurora will only accept Level 1
inspections (NYS DEC Maintenance Guidance 2017) by private owners inspecting post-
construction SMPs. Level 2 and Level 3 inspections must be performed by qualified
individuals as indicated in the checklist document.
The completed Post-Construction SMP Inspection Checklists are considered part of this
SWMP Plan and are available as follows:
• Upon request: contact Stormwater Program Coordinator or Stormwater
Management Officer listed on page 2 of this document
• At the Village of East Aurora municipal building as follows:
o Hardcopy: DPW
o Electronically:
• Public: Upon Request
• Internally: C:\Users\Water Foreman\Documents\Storm
Water\Post Construction Inspections
iii. Upon receipt of a completed inspection checklist, the Village of East Aurora will inform
the owner that follow-up actions indicated on the checklist (i.e. maintenance, repair, or
higher level inspection) must occur within thirty (30) days of the post-construction SMP
inspection; and
Page 127
iv. The Village of East Aurora will initiate enforcement within sixty (60) days of the
inspection if follow-up actions are not complete. See Appendix O Enforcement Response
Plan for course of action.
v. Although not included in this SWMP Plan, documentation of enforcement measures
pertaining to inspection and maintenance of post-construction stormwater management
practices is available upon request by contacting the Stormwater Program Coordinator or
Stormwater Management Officer listed on page 2 of this document.
b. The Village of East Aurora, in partnership with the Western NY Stormwater Coalition, has an
employee training program addressing its post-construction SMP inspection and maintenance
procedures. This training utilizes the NYSDEC Maintenance Guidance and includes a classroom
setting, followed by a post-construction SMP inspection.
i) All new staff that are charged with conducting post-construction SMP inspection and
maintenance activities will receive training on procedures prior to doing so;
ii) All existing staff, that are charged with conducting any post-construction SMP inspection
and maintenance activities will receive training on procedures prior to doing so, and, once
every five (5) years, thereafter; and
iii) If the post-construction SMP inspection and maintenance procedures are updated, all
staff will receive training on the updates prior to conducting post-construction SMP
inspection and maintenance.
iv) All inspectors will meet minimum qualifications for Level 1, 2, 3 inspections as per the
NYSDEC Maintenance Guidance document (2017).
c. The names, titles, and contact information for the individuals who have received post-
construction SMP inspection and maintenance procedures training are updated annually;
d. Annually, by April 1, the Village of East Aurora reviews and updates its post-construction SMP
inspection and maintenance procedures.
Compliance documentation is listed in Appendix B for:
• Staff that have received post-construction SMP inspection and maintenance procedures
training; and,
• Updates to the post-construction SMP inspection and maintenance procedures.
Page 128
F. MCM 6 – Pollution Prevention and Good Housekeeping
The Village of East Aurora has a pollution prevention and good housekeeping program for
municipal facilities and municipal operations to minimize pollutant discharges. This MCM is
designed to ensure the Village of East Aurora’s own activities do not contribute pollutants to
surface waters of the State.
1. Best Management Practices (BMPs) for Municipal Facilities & Operations
Within three (3) years
The Village of East Aurora has a municipal facility program and municipal operations program with
best management practices (BMPs) that will minimize the discharge of pollutants associated with
municipal facilities and municipal operations, respectively. The BMPs to be considered are as
follows and are documented in this SWMP Plan:
a. Minimize Exposure
i. Exposure of materials to rain, snow, snowmelt, and runoff must be minimized, unless not
technologically possible or not economically practicable and achievable in light of best
industry practices, including areas used for loading and unloading, storage, disposal,
cleaning, maintenance, and fueling operations, with the following BMPs:
a) Locate materials and activities inside or protect them with storm resistant
coverings;
b) Use grading, berming, or curbing to prevent runoff of contaminated flows and
divert run-on away from these areas;
c) Locate materials, equipment, and activities so leaks and spills are contained in
existing containment and diversion systems;
d) Clean up spills and leaks promptly using dry methods (e.g., absorbents) to prevent
the discharge of pollutants;
e) Store leaky vehicles and equipment indoors or, if stored outdoors, use drip pans
and absorbents;
f) Use spill/overflow protection equipment;
g) Perform all vehicle and/or equipment cleaning operations indoors, under cover, or
in bermed areas that prevent runoff and run-on and also captures any overspray;
h) Drain fluids, indoors or under cover, from equipment and vehicles that will be
decommissioned, and, for any equipment and vehicles that will remain unused for
extended periods of time, inspect at least monthly for leaks; and/or
i) Minimize exposure of chemicals by replacing with a less toxic alternative (e.g., use
non-hazardous cleaners).
Page 129
ii. No Exposure Certification for High Priority Municipal Facilities
a) Municipal facilities may qualify for No Exposure Certification (Appendix H) when all
activities and materials are completely sheltered from exposure to rain, snow,
snowmelt and/or runoff.
b) High priority municipal facilities with uncovered parking areas for vehicles awaiting
maintenance may be considered a low priority municipal facility if only routine
maintenance is performed inside and all other no exposure criteria are met. Details
on high/low priority municipal facilities are addressed later in this section.
c) Municipal facilities accepting or repairing disabled vehicles and/or vehicles that
have been involved in accidents are not eligible for the No Exposure Certification.
d) Municipal facilities must maintain the No Exposure Certification and document in
the SWMP Plan. The No Exposure Certification ceases to apply when activities or
materials become exposed.
b. Follow a Preventive Maintenance Program
i. The Village of East Aurora has a preventative maintenance program that includes routine
inspection, testing, maintenance, and repair of all fueling areas, vehicles and equipment and
systems to prevent leaks, spills and other releases.
This includes:
a) Performing inspections and preventive maintenance of stormwater drainage,
source controls, treatment systems, and plant equipment and systems;
b) Maintaining non-structural BMPs (e.g., keep spill response supplies available,
personnel appropriately trained, containment measures, covering fuel areas); and
c) Ensuring vehicle washwater is not discharged to the MS4 or to surface waters of
the State. Washing equipment/vehicles in a designated and/or covered area where
washwater is collected to be recycled or discharged to the sanitary sewer is required.
ii. Routine maintenance is performed to ensure BMPs are operating properly.
iii. When a BMP is not functioning to its designed effectiveness and needs repair or
replacement:
a) Maintenance is performed before the next anticipated storm event, or as
necessary to maintain the continued effectiveness of stormwater controls. If
maintenance prior to the next anticipated storm event is impracticable, maintenance
must be scheduled and accomplished as soon as practicable; and
b) Interim measures are taken to prevent or minimize the discharge of pollutants
until the final repair or replacement is implemented, including cleaning up any
contaminated surfaces so that the material will not be discharged during subsequent
Page 130
storm events.
c. Spill Prevention and Response Procedures
i. The Village of East Aurora follows Spill Prevention and Response Procedures designed to
minimize the potential for leaks, spills and other releases that may be exposed to
stormwater and provide for effective response to such spills if or when they occur. The Spill
Prevention and Response Procedures are as follows:
a) Store materials in appropriate containers;
b) Label containers (e.g., “Used Oil,” “Spent Solvents,” “Fertilizers and Pesticides”)
that could be susceptible to spillage or leakage to encourage proper handling and
facilitate rapid response if spills or leaks occur;
c) Implement procedures for material storage and handling, including the use of
secondary containment and barriers between material storage and traffic areas, or a
similarly effective means designed to prevent the discharge of pollutants from these
areas;
d) Develop procedures for stopping, containing, and cleaning up leaks, spills, and
other releases. As appropriate, execute such procedures as soon as possible;
e) Keep spill kits on-site, located near areas where spills may occur or where a rapid
response can be made;
f) Develop procedures for notification of the appropriate facility personnel,
emergency response agencies, and regulatory agencies when a leak, spill, or other
release occurs. If possible, one of these individuals should be a member of the
stormwater pollution prevention team. Any spills must be reported in accordance
with 6 NYCRR 750-2.7; and
g) Following any spill or release, the MS4 Operator must evaluate the adequacy of
the BMPs identified in the municipal facility specific SWPPP. If the BMPs are
inadequate, the SWPPP must be updated to identify new BMPs that will prevent
reoccurrence and improve the emergency response to such releases.
ii. Measures for cleaning up spills or leaks must be consistent with applicable petroleum bulk
storage, chemical bulk storage, or hazardous waste management regulations at 6 NYCRR
Parts 596-599, 613 and 370-373.
iii. This SPDES general permit does not relieve the Village of East Aurora of any reporting or
other requirements related to spills or other releases of petroleum or hazardous substances.
Any spill of a hazardous substance must be reported in accordance with 6 NYCRR 597.4. Any
spill of petroleum must be reported in accordance with 6 NYCRR 613.6 or 17 NYCRR 32.3.
Page 131
d. Erosion and Sediment Controls31
i. Stabilize exposed areas and control runoff using structural and/or nonstructural controls to
minimize onsite erosion and sedimentation.
ii. The Village of East Aurora will consider:
a) Structural and/or non-structural controls found in the NYS E&SC 2016;
b) Areas that, due to topography, land disturbance (e.g., construction), or other
factors, have potential for significant soil erosion;
c) Whether structural, vegetative, and/or stabilization BMPs are needed
to limit erosion;
d) Whether velocity dissipation devices (or equivalent measures) are needed at
discharge locations and along the length of any channel to provide a non-erosive flow
velocity from the structure to a water course; and
e) Address erosion or areas with poor vegetative cover, especially if the erosion is
within fifty (50) feet of a surface water of the State.
e. Manage Vegetated Areas and Open Space on Municipal Property
i. Maintain vegetated areas on Village of East Aurora owned/operated property and
right of ways:
a) Specify proper use, storage, and disposal of pesticides, herbicides, and fertilizers
including minimizing the use of these products and using only in accordance
manufacturer’s instruction;
b) Use lawn maintenance and landscaping practices that are protective of water
quality. Protective practices include: reduced mowing frequencies; proper disposal of
lawn clippings; and use of alternative landscaping materials (e.g., drought resistant
planting);
c) Place pet waste disposal containers and signage concerning the proper collection
and disposal of pet waste at all parks and open space where pets are permitted; and
d) Address waterfowl congregation areas where needed to reduce waterfowl
droppings from entering the MS4.
f. Salt Storage Piles or Pile Containing Salt
Enclose or cover storage piles of salt, or piles containing salt, used for deicing or maintenance of
paved surfaces, except during loading, unloading, and handling. Implement appropriate measures
(e.g., good housekeeping, routine sweeping, diversions, containment) to minimize exposure
resulting from adding to or removing materials from the pile.
g. Waste, Garbage, and Floatable Debris
Page 132
i. Keep all dumpster lids closed when not in use. For dumpsters and roll off boxes that do not
have lids and could leak, ensure that discharges have a control (e.g., secondary containment,
treatment); and
ii. Keep exposed areas free of waste, garbage, and debris or intercept them before they are
discharged:
a) Manage trash containers at parks and open space (scheduled cleanings; sufficient
number);
b) Pick up trash and debris on Village of East Aurora owned/operated property and
rights of way; and
c) Clean out catch basins within the appropriate timeframes as noted later in this
section.
h. Alternative Implementation Options
When alternative implementation options are utilized, require the parties performing municipal
operations as contracted services, including but not limited to street sweeping, snow removal, and
lawn/grounds care, to meet permit requirements as the requirements apply to the activity
performed.
2. Municipal Facilities33
a. Municipal Facility Program
Within three (3) years
The Village of East Aurora has a municipal facility program that includes BMPs to minimize
stormwater pollution from municipal operations, differentiation of BMPs applicable to high or low
priority facilities, and employee training. The municipal facility program is documented for this
SWMP Plan as follows:
i. Municipal facility procedures:
a) All BMPs incorporated into the municipal facility program;
b) High priority municipal facility requirements, that are specific to municipal
operations occurring at each high priority facility; and
c) Low priority municipal facility requirements that are specific to municipal
operations occurring at each low priority facility.
ii. The Village of East Aurora, in partnership with the Western NY Stormwater Coalition, has
an employee training program addressing its municipal facility procedures. This training
addresses on-site facility operations and is conducted concurrently with municipal
operations procedures.
a) All new staff that are charged with conducting municipal facility
procedures/BMPs will receive training on procedures prior to doing so;
Page 133
b) All existing staff, that are charged with conducting any municipal facility
procedures/BMPs will receive training on procedures prior to doing so, and, once
every five (5) years, thereafter; and
c) If the municipal facility procedures/BMPs are updated, all staff will receive
training on the updates prior to conducting municipal facility procedures.
iii. The names, titles, and contact information for the individuals who have received
municipal facility procedures training are updated annually;
iv. Annually, by April 1, the Village of East Aurora reviews and updates its municipal facility
procedures.
Compliance documentation is listed in Appendix B for:
• Staff that have received municipal facility procedures training; and,
• Updates to the municipal facility procedures.
b. Municipal Facility Inventory
i. Within two (2) years
The Village of East Aurora maintains an inventory of all municipal facilities in the SWMP
Plan. The following information is included in the inventory:
a) Name of municipal facility;
b) Street address;
c) Type of municipal facility;
d) Prioritization (high or low);
e) Receiving waterbody name and class;
f) Receiving waterbody WI/PWL Segment ID;
g) Contact information;
h) Responsible department;
i) Location of SWPPP (if high priority; when completed);
j) Type of activities present on site;
k) Size of facility (acres);
l) Date of last assessment;
Page 134
m) BMPs identified; and
n) Projected date of next comprehensive site assessment as per the municipal facility
prioritization.
ii. Annually, the Village of East Aurora updates the inventory if new municipal facilities are
added.
c. Municipal Facility Prioritization
i. Within three (3) years
The Village of East Aurora prioritizes all known municipal facilities as follows:
a) High priority municipal facilities include municipal facilities that have one or more of the
following on site and exposed to stormwater:
i) Storage of chemicals, salt, petroleum, pesticides, fertilizers, antifreeze, lead-acid
batteries, tires, waste/debris;
ii) Fueling stations; and/or
iii) Vehicle or equipment maintenance/repair.
b) Low priority municipal facilities include any municipal facilities that do not meet the
criteria for a high priority municipal facility.
c) High priority municipal facilities which qualify for a No Exposure Certification (Appendix H)
are low priority municipal facilities.
ii. Within thirty (30) days of when a municipal facility is added to the inventory, the Village of East
Aurora prioritizes it; and
iii. Annually, after the initial prioritization, the Village of East Aurora will update the municipal
facility prioritization in the inventory based on information gathered as part of the municipal facility
program, including cases where a No Exposure Certification ceases to apply. Although not included
as an appendix, the inventory and all required updates is considered part of the Village of East
Aurora SWMP Plan. The inventory is available for public review and comment as follows:
• Upon request: contact Stormwater Program Coordinator or Stormwater Management
Officer listed on page 2 of this document
• At the Village of East Aurora municipal building as follows:
o Hardcopy: DPW
o Electronically:
• Public: Upon Request
• Internally: C:\Users\Water Foreman\Documents\Storm
Water\Municipal Facilities
Page 135
d. High Priority Municipal Facility Requirements
i. Municipal Facility Specific SWPPP
Within five (5) years
The Village of East Aurora has a municipal facility specific SWPPP for each high priority municipal
facility. A copy of the municipal facility specific SWPPP is retained on site at the respective municipal
facility. The Village of East Aurora SWPPP contains the following:
a) Stormwater Pollution Prevention Team
The municipal facility specific SWPPP must identify the individuals (by name and/or title) and
their role/responsibilities in developing, implementing, maintaining, and revising the
municipal facility specific SWPPP. The activities and responsibilities of the team must address
all aspects of the municipal facility specific SWPPP.
b) General Site Description
A written description of the nature of the activities occurring at the municipal facility with a
potential to discharge pollutants, type of pollutants expected, and location of key features as
detailed in the site map.
c) Summary of potential pollutant sources
The municipal facility specific SWPPP must identify each area at the municipal facility where
materials or activities are exposed to stormwater or from which authorized non-stormwater
discharges originate, including any potential pollutant sources for which the municipal
facility has reporting requirements under the Emergency Planning and Community Right-To-
Know Act (EPCRA), Section 313.
i) Materials or activities include: machinery; raw materials; intermediate products;
byproducts; final products or waste products; and, material handling activities which
includes storage, loading and unloading, transportation or conveyance of any raw
material, intermediate product, final product or waste product.
ii) For each separate area identified, the description must include:
• Activities - A list of the activities occurring in the area (e.g., material
storage, equipment fueling and cleaning);
• Pollutants - A list of the associated pollutant(s) for each activity. The
pollutant(s) list must include all materials that are exposed to stormwater;
and
• Potential for presence in stormwater - For each area of the municipal
facility that generates stormwater discharges, a prediction of the direction
of flow, and the likelihood of the activity to contaminate the stormwater
discharge. Factors to consider include the toxicity of chemicals, quantity of
chemicals used, produced or discharged, the likelihood of contact with
stormwater; and history of leaks or spills of toxic or hazardous pollutants.
d) Spills and Releases
For areas that are exposed to precipitation or that otherwise drain to a stormwater
conveyance to be covered under this SPDES general permit, the municipal facility specific
Page 136
SWPPP must include a list of spills or releases of petroleum and hazardous substances or
other pollutants, including unauthorized non-stormwater discharges, that
may adversely affect water quality that occurred during the last three-year period. The list
must be updated when spills or releases occur.
e) Site Map
The municipal facility specific SWPPP must include a site map identifying the following, as
applicable:
i) Property boundaries and size in acres;
ii) Location and extent of significant structures (including materials shelters), and
impervious surfaces;
iii) Monitoring locations with its approximate sewershed. Each monitoring location
must be labeled with the monitoring location identification;
iv) Location of all post-construction SMPs and MS4 infrastructure (i.e. storm sewer
system);
v) Locations of discharges authorized under other SPDES permits;
vi) Locations where potential spills or releases can contribute to pollutants in
stormwater discharges and their accompanying drainage points;
vii) Locations of haul and access roads;
viii) Rail cars and tracks;
ix) Arrows showing direction of stormwater flow;
x) Location of all receiving waters in the immediate vicinity of the municipal facility,
indicating if any of the waters are impaired and, if so, whether the waters have
TMDLs established for them;
xi) Locations where stormwater flows have significant potential to cause erosion;
xii) Location and source of run-on from adjacent property containing significant
quantities of pollutants and/or volume of concern to the municipal facility; and
xiii) Locations of the following areas where such areas are exposed to precipitation or
stormwater:
(a) Fueling stations;
(b) Vehicle and equipment maintenance and/or cleaning areas;
Page 137
(c) Loading/unloading areas;
(d) Locations used for the treatment, storage or disposal of wastes;
(e) Liquid storage tanks;
(f) Processing and storage areas;
(g) Locations where significant materials, fuel or chemicals are stored and
transferred;
(h) Locations where vehicles and/or machinery are stored when not in use;
(i) Transfer areas for substances in bulk;
(j) Location and description of non-stormwater discharges (Part I.A.3.);
(k) Locations where spills35 or leaks have occurred; and
(l) Locations of all existing structural BMPs.
f) Stormwater Best Management Practices (BMPs)
The municipal facility specific SWPPP also documents the location and type of BMPs
implemented at the municipal facility. The municipal facility specific SWPPP must describe
how each BMP is being implemented for all the potential pollutant sources.
g) Municipal facility assessments
The municipal facility specific SWPPP includes a schedule for completing and recording
results of routine and comprehensive site assessments.
ii. Municipal Facility Assessments
a) Wet Weather Visual Monitoring (High Priority Municipal Facilities ONLY)
i) Once every five (5) years, the Village of East Aurora conducts wet weather visual
monitoring at all monitoring locations and other sites of stormwater leaving the site
that are discharging stormwater from fueling areas, storage areas, vehicle and
equipment maintenance/fueling areas, material handling areas and similar potential
pollutant generating areas.
(a) All samples must be collected from discharges resulting from a qualifying
storm event. The storm event must be documented using the Storm Event
Data Form (Appendix I) and kept with the municipal facility specific SWPPP.
The sample must be taken during the first thirty (30) minutes (or as soon as
practical, but not to exceed one hour) of the discharge at the monitoring
location.
(b) No analytical tests are required to be performed on the samples
Page 138
for the purpose of meeting the visual monitoring requirements.
(c) The visual examination must document observations of color, odor, clarity,
floating solids, settled solids, suspended solids, foam, oil sheen, and any other
obvious indicators of stormwater pollution.
(d) The visual examination of the sample must be conducted in a well-lit area.
(e) Where practicable, the same individual should carry out the collection and
examination of discharges for the entire permit term for consistency.
(f) The MS4 Operator must document the visual examination using the Visual
Monitoring Form (Appendix I) and keep it with the municipal facility specific
SWPPP to record:
(i) Monitoring location ID;
(ii) Examination date and time;
(iii) Personnel conducting the examination;
(iv) Nature of the discharge (runoff or snowmelt);
(v) Visual quality of the stormwater discharge including observations
of color, odor, clarity, floating solids, settled solids, suspended solids,
foam, oil sheen, and other obvious indicators of stormwater pollution;
and
(vi) Probable sources of any observed stormwater contamination.
(vii) Corrective and follow up actions – If the visual examination
indicates the presence of color, odor, floating solids, settled solids,
suspended solids, foam, oil sheen, or other indicators of stormwater
pollution, at minimum, the Village of East Aurora will complete and
document the following actions:
(1) Evaluate the facility for potential sources;
(2) Remedy the problems identified;
(3) Revise the municipal facility specific SWPPP; and
(4) Perform an additional visual inspection during the first
qualifying storm event following implementation of the
corrective action. If the first qualifying storm event does
not occur until the next visual monitoring period, this
follow up action may be used as the next visual
inspection.
Page 139
b) The monitoring locations inspection and sampling program (MCM 3: Illicit Discharge
Detection and Elimination) includes all Village of East Aurora municipal facilities.
c) Comprehensive Site Assessments
i) Once every five (5) years following the most recent assessment, the Village of East
Aurora will complete a comprehensive site assessment for each high priority
municipal facility as identified in the inventory using the Municipal Facility
Assessment Form (Appendix J) or an equivalent form containing the same
information, and document it in the municipal facility specific SWPPP and SWMP Plan
that:
(a) The municipal facility is in compliance with the terms and conditions of the
NYSDEC SPDES General Permit for Stormwater Discharges from Municipal
Separate Storm Sewer Systems (GP-0-24-001;
(b) Deficiencies were identified and all reasonable steps taken to minimize
any discharge in violation of the permit, which has a reasonable likelihood of
adversely affecting human health or the environment;
(i) Within twenty-four (24) hours, the MS4 Operator must prepare a
schedule that includes corrective actions and specific interim
milestones to be implemented until the corrective action is
implemented; or
(c) Deficiencies were identified and all reasonable steps taken to minimize any
discharge in violation of the permit, which does not have a reasonable
likelihood of adversely affecting human health or the environment;
(i) Within seven (7) days, the MS4 Operator must prepare a
schedule that includes corrective actions and specific interim
milestones to be implemented until the corrective action is
implemented.
e. Low Priority Municipal Facility Requirements
i. The MS4 Operator must identify procedures outlining BMPs for the types of activities that occur at
the low priority municipal facilities. A municipal facility specific SWPPP is not required.
ii. Municipal Facility Assessments
a) Low priority municipal facilities are not required to conduct wet weather visual
monitoring.
b) The monitoring locations inspection and sampling program is conducted at the municipal
facility.
c) Comprehensive Site Assessments
i) Once every five (5) years following the most recent assessment, the Village of East
Aurora will complete a comprehensive site assessment for each low priority
municipal facility as identified in the inventory using the Municipal Facility
Page 140
Assessment Form (Appendix J) or an equivalent form containing the same
information, and document in the SWMP Plan that:
(a) The municipal facility is in compliance with the terms and conditions of the
NYSDEC SPDES General Permit for Stormwater Discharges from Municipal
Separate Storm Sewer Systems (GP-0-24-001);
(b) Deficiencies were identified and all reasonable steps taken to minimize
any discharge in violation of the permit, which has a reasonable likelihood of
adversely affecting human health or the environment;
• Within twenty-four (24) hours, the Village of East Aurora must
prepare a schedule that includes corrective actions and specific
interim milestones to be implemented until the corrective action is
implemented; or
(c) Deficiencies were identified and all reasonable steps taken to minimize any
discharge in violation of the permit, which does not have a reasonable
likelihood of adversely affecting human health or the environment;
• Within seven (7) days, the MS4 Operator must prepare a
schedule that includes corrective actions and specific interim
milestones to be implemented until the corrective action is
implemented.
3. Municipal Operations & Maintenance
a. Municipal Operations Program
Municipal operations in the Village of East Aurora are: street and bridge maintenance; winter road
maintenance; MS4 maintenance; open space maintenance; solid waste management; new
construction and land disturbances; right-of-way maintenance.
Within three (3) years
The Village of East Aurora has a municipal operations program. The municipal operations program
is documented in the SWMP Plan specifying:
i. The municipal operations procedures as follows:
a) The BMPs incorporated into the municipal operations program;
b) The municipal operations corrective actions requirements;
d) Roads, bridges, parking lots, and right of way maintenance requirements; and
e) All other municipal operations maintenance requirements.
ii. The Village of East Aurora, in partnership with the Western NY Stormwater Coalition, has
an employee training program addressing its municipal operations procedures. This training
addresses municipal operations procedures and is conducted concurrently with municipal
facility procedures.
Page 141
a) All new staff that are charged with conducting municipal operations procedures
will receive training prior to conducting municipal operations procedures;
b) All existing staff, that are charged with conducting any municipal operations
procedures will receive training prior to conducting municipal operations
procedures and, once every five (5) years, thereafter; and
c) If the municipal operations procedures are updated, all staff will receive training
on the updates prior to conducting municipal operations procedures.
iii. The names, titles, and contact information for the individuals who have received
municipal operations procedures training is updated annually;
iv. Annually, by April 1, the Village of East Aurora reviews and updates its municipal
operations procedures.
Compliance documentation is listed in Appendix B for:
• Staff that have received municipal operations procedures training; and,
• Updates to the municipal operations procedures.
b. Municipal Operations Corrective Actions
i. For municipal operations, Village of East Aurora must either:
a) Ensure compliance with the terms and conditions of the NYSDEC SPDES General Permit for
Stormwater Discharges from Municipal Separate Storm Sewer Systems (GP-0-24-001; or
b) Implement corrective actions according to the following schedule and, after
implementation, ensure the operations are in compliance with the terms and conditions of
the NYSDEC SPDES General Permit for Stormwater Discharges from Municipal Separate
Storm Sewer Systems (GP-0-24-001):
i) Within twenty-four (24) hours of discovery for situations that have a
reasonable likelihood of adversely affecting human health or the
environment;
ii) Initiated within seven (7) days of inspection and completed within
thirty (30) days of inspection for situations that do not have a
reasonable likelihood of adversely affecting human health or the
environment; and
iii) For corrective actions that require special funding or construction
that will take longer than thirty (30) days to complete, a schedule
will be prepared that specifies interim milestones to ensure
compliance in the shortest reasonable time.
c. Catch Basin Inspection and Maintenance
Page 142
Within three (3) years of the EDC,
The Village of East Aurora has a catch basin inspection and maintenance program that targets its
MS4 Regulated area (see map Appendix A). The program entails the following:
i. Identifies when catch basin inspection is needed with consideration for:
a) Areas with construction activities;
b) Residential, commercial, and industrial areas;
c) Recurring or history of issues; or
d) Confirmed citizen complaints on three or more separate occasions in the last
twelve (12) months.
ii. An inventory of catch basin inspection information is maintained and includes the
following information
a) Date of inspection;
b) Approximate level of trash, sediment, and/or debris captured at time of clean-out
• no trash, sediment, and/or debris;
• <50% of the depth of the sump;
• >50% of the depth of the sump);
c) Depth of structure;
d) Depth of sump; and
e) Date of clean out, if applicable.
iii. Based on inspection results, catch basins will be cleaned out within the following
timeframes:
a) Within six (6) months after the catch basin inspection, catch basins which had
trash, sediment, and/or debris exceeding 50% of the depth of the sump must be
cleaned out;
b) Within one (1) year after the catch basin inspection, catch basins which had trash,
sediment, and/or debris at less than 50% of the depth of the sump must be cleaned
out; and
c) MS4 Operators are not required to clean out catch basins if the catch basins are
operating properly and:
i. There is no trash, sediment, and/or debris in the catch basin; or
ii. The sump depth of the catch basin is less than or equal to two (2) feet.
Page 143
iv. The Village of East Aurora catch basin inspection and maintenance program includes the
following practices for properly managing materials removed from catch basins during clean
out operations (handling and disposal) so that:
a) Water removed during the catch basin cleaning process will not reenter the MS4 or
surface waters of the State;
b) Material removed from catch basins is disposed of in accordance with any applicable
environmental laws and regulations; and
c) Material removed during the catch basin cleaning process will not
reenter the MS4 or surface waters of the State.
v. The catch basin inspection and maintenance operations process can be used to determine
if there are signs/evidence of illicit discharges and procedures for referral/follow-up if illicit
discharges are encountered.
d. Roads, Bridges, Parking Lots, & Right of Way Maintenance
i. Sweeping
Within six (6) months
The Village of East Aurora has procedures for sweeping and/or cleaning municipal streets, bridges,
parking lots, and right of ways owned/operated by the Village of East Aurora.
a) All roads, bridges, parking lots, and right of ways must be swept and/or cleaned once
every five (5) years in the spring (following winter activities such as sanding). This
requirement is not applicable to:
i) Uncurbed roads with no catch basins;
ii) High-speed limited access highways; or
iii) Roads defined as interstates, freeways and expressways, or arterials by the United
States Department of Transportation, Federal Highway Administration, Highway
Functional Classification Concepts, Criteria and Procedures, 2013.
b) Annually, from April 1 through October 31, roads in business and commercial areas must
be swept. This requirement is not applicable to:
i) Uncurbed roads with no catch basins;
ii) High-speed limited access highways; or
iii) Roads defined as interstates, freeways and expressways, or arterials by the USDOT
2013.
ii. Maintenance
Within five (5) years
In addition to the BMPs, the Village of East Aurora adheres to the following provisions:
Page 144
a) Pave, mark, and seal in dry conditions;
b) Stage road operations and maintenance activity (e.g., patching, potholes) to reduce the
potential discharge of pollutants to the MS4 or surface waters of the State;
c) Restrict the use of herbicides/pesticide application to roadside vegetation; and
d) Contain pollutants associated with bridge maintenance activities (e.g., paint chips, dust,
cleaning products, other debris).
iii. Winter Road Maintenance
Within five (5) years
In addition to the BMPs, the Village of East Aurora adheres to the following provisions:
a) Routinely calibrate equipment to control salt/sand application rates; and
b) Ensure that routine snow disposal activities comply with the Division of Water Technical
and Operation Guidance Series 5.1.11, Snow Disposal.
Although not included as an appendix in the SWMP Plan, documentation of the procedures and
completion of permit requirements pertaining to Pollution Prevention and Good Housekeeping for
Municipal Operations are available as follows:
• Upon request: contact Stormwater Program Coordinator or Stormwater Management
Officer listed on page 2 of this document
• At the Village of East Aurora municipal building as follows:
o Hardcopy: DPW
o Electronically:
• Public: Upon Request
• Internally: C:\Users\Water Foreman\Documents\Storm
Water\Good Housekeeping for Municipal Operations
Page 145
Map of Erie and Niagara County MS4 Regulated Area Appendix A
Page 146
SWMP Plan Compliance Documentation Appendix B
A. MCM1 – Public Education and Outreach Program
Compliance Documentation
Once every 5 years, the Village of East Aurora directs an educational message to target audience(s)
for each focus area(s) based on the defined education and outreach topic(s) listed in this
Stormwater Management Program Plan. Listed below are the date(s) of completion and method of
distribution for each message.
i. Residents:
Landscaping and lawn care:
Date of completion: January 2, 2024 - present
Method used: Brochure Household Guide to Preventing Stormwater Pollution
posted online: www.erie.gov/stormwater; www.east-
aurora.ny.us/government/public-works-department; brochure handout at public
education tabling events (2024: 14; 2025: 18); brochure available at municipal
building
Dog waste:
Date of completion: January 2, 2024 - present
Method used: Brochure Pick Up Your Pet Waste: It’s Your Doody posted online:
www.erie.gov/stormwater; www.east-aurora.ny.us/government/public-works-
department; brochure handout Pick Up Your Pet Waste: It’s Your Doodie at public
education tabling events (2024: 14; 2025: 18); brochure available at municipal
building
Household hazardous waste disposal:
Date of completion: Annually
Method used: : Brochure Household Guide to Preventing Stormwater Pollution at
public education tabling events (2024: 14; 2025: 18); brochure available at municipal
building
• Erie County: County website, multiple press releases, County newsletters;
multiple social media posts
Page 147
• Niagara County: Direct mailing throughout each host community and adjacent
municipalities; County website, Email list-serve; multiple County press
releases
Vehicle washing:
Date of completion: January 2, 2024 - present
Method used: Brochure Household Guide to Preventing Stormwater Pollution
posted online: www.erie.gov/stormwater; www.east-
aurora.ny.us/government/public-works-department; brochure handout at public
education tabling events (2024: 14; 2025: 18); brochure available at municipal
building
Illicit Discharge:
Date of completion: June 15, 2024 (libraries); January 2, 2024 – present
Method used: Distributed Illicit Discharge Detection and Elimination: A Citizen’s
Guide to Identifying and Preventing Stormwater Pollution brochure to Erie and
Niagara Public Libraries; posted online: www.erie.gov/stormwater; ; www.east-
aurora.ny.us/government/public-works-department ; brochure at public education
events (2024: 14; 2025: 18); brochure available at municipal building
Ii. Commercial: Business Owners and Staff:
Landscaping and lawn care:
Date of completion:
Method used: Stormwater pollution prevention information provided at time of
municipal fire inspections (1x/3 year)
Vehicle fueling:
Date of completion:
Method used: Stormwater pollution prevention information provided at time of
municipal fire inspections (1x/3 year)
Page 148
Vehicle maintenance:
Date of completion:
Method used: Stormwater pollution prevention information provided at time of
municipal fire inspections (1x/3 year)
Uncovered materials exposure/storage:
Date of completion:
Method used: Stormwater pollution prevention information provided at time of
municipal fire inspections (1x/3 year)
Illicit Discharge:
Date of completion:
Method used: Stormwater pollution prevention information provided at time of
municipal fire inspections (1x/3 year)
Iii. Institutions: Managers, Staff, and Students (Institutions Not Subject to SPDES
MS4/MSGP Stormwater Permitting)
Uncovered materials exposure/storage:
Date of completion:
Method used: Stormwater pollution prevention information provided at time of
municipal fire inspections (1x/3 year)
Iv. Construction: Developers, Contractors, And Design Professionals:
Soil disturbance:
Date of completion: 1/1/2025; 2/19/2025; 1/14/2026; 2/10/2026
Method used: NYSDEC 4 Hour Erosion & Sediment Control Training
Uncontained construction waste:
Date of completion: 1/1/2025; 2/19/2025; 1/14/2026; 2/10/2026
Method used: NYSDEC 4 Hour Erosion & Sediment Control Training
Page 149
V. Industrial: Owners and Staff: (Industry Not Subject to SPDES MSGP Stormwater Permit)
Uncovered materials exposure/storage:
Date of completion:
Method used: Stormwater pollution prevention information provided at time of
municipal fire inspections (1x/3 year)
Vi. MS4 Operator’s Municipal Staff:
Uncovered materials exposure/storage
Date of completion: 10/14/25
Method used: Pollution Prevention - Good Housekeeping Training
Preventative maintenance:
Date of completion: 10/14/25
Method used: Pollution Prevention - Good Housekeeping Training
Spill prevention and response:
Date of completion: 10/14/25
Method used: Pollution Prevention - Good Housekeeping Training
Erosion and Sediment Controls:
Date of completion: 10/14/25
Method used: Pollution Prevention - Good Housekeeping Training
Vegetated areas and open space:
Date of completion: 10/14/25
Method used: Pollution Prevention - Good Housekeeping Training
Salt storage:
Date of completion: 10/14/25
Method used: Pollution Prevention - Good Housekeeping Training
Waste, garbage and floatable debris:
Page 150
Date of completion: 10/14/25
Method used: Pollution Prevention - Good Housekeeping Training
Illicit Discharge:
Date of completion: 10/7/25
Method used: Illicit Discharge Detection & Elimination Training
Updates to the Public Education and Outreach Program
Annually, by April 1: The Village of East Aurora reviews and updates, if necessary, the focus areas,
target audiences, and/or education and outreach topics. Listed below are the date(s) of review and
description of update.
Date of Review Description of Update (including “No Update”)
3/23/26 No Update
Page 151
SWMP Plan Compliance Documentation Appendix B (continued)
B. MCM 2 - Public Involvement/Participation
Public involvement/participation in the development and implementation of the Village of East
Aurora SWMP includes opportunities to: review the SWMP Plan; submit comments; ask questions;
and, become involved in the SWMP.
To document (annually), enter date(s) of completion:
Public hearings or meetings
Description:
Method used:
Dates of completion:
Coordination with other pre-existing public involvement/participation opportunities
Description:
Method used:
Dates of completion:
Reporting concerns about activities or behaviors observed
Description:
Method used:
Dates of completion:
Public Notice and Input Requirements for Draft Annual Report
Annually, the Village of East Aurora provides an opportunity for the public to review and comment
on the draft Annual Report. Listed below are the date(s) of review and description of the
opportunity provided.
Date of Review Description of Opportunity
3/23/26 No Update
Page 152
Consideration of Public Input
Annually, the Village of East Aurora documents a summary of comments received on the SWMP
Plan and draft Annual Report. Listed below are the comments and date received (if no comments
were received, date and note in description).
Date Received Description of SWMP Plan Comments
Date Received Description of Draft Annual Report Comments
Within thirty (30) days of when public input is received, the MS4 Operator must update the SWMP
Plan, where appropriate, based on the public input received. Listed below are the updates and
effective date (if no updates are made, note in description).
Date of Update Description of SWMP Plan Update or “No Update” if applicable
Page 153
SWMP Plan Compliance Documentation Appendix B (continued)
C. MCM 3 - Illicit Discharge Detection and Elimination
1. Illicit Discharge Detection
Public Reporting of Illicit Discharges
Within thirty (30) days of an illicit discharge, each report of an illicit discharge is documented below.
Date of the report:
Location of the illicit discharge:
Nature of the illicit discharge:
Follow up actions taken or needed (including response times):
Inspection outcomes and any enforcement taken:
Date of the report:
Location of the illicit discharge:
Nature of the illicit discharge:
Follow up actions taken or needed (including response times):
Inspection outcomes and any enforcement taken:
Date of the report:
Location of the illicit discharge:
Nature of the illicit discharge:
Follow up actions taken or needed (including response times):
Inspection outcomes and any enforcement taken:
Page 154
Annually, the Village of East Aurora updates the inventory for new monitoring locations that are
constructed or discovered; or if information for existing monitoring locations change. Prioritization
determinations and updates are also addressed below.
Date of Update Description Inventory Update(s); or “No Update” if applicable
3/23/26 No Update
Annually, the Village of East Aurora reviews and updates the names, titles, and contact information
for the individuals who have received illicit discharge training on the following:
• Monitoring locations inspection;
• Sampling procedures;
• Results interpretation;
• Source track down; and,
• Source elimination.
The Illicit Discharge Detection and Elimination training provided by the Western New York
Stormwater Coalition is comprehensive and addresses all training requirements applicable to the
IDDE Program.
Date of Update Name, title & email of individual trained Training Date
3/23/26 Brian Halt, SMO, [email protected] 10/7/25
Annually, by April 1, the Village of East Aurora reviews and updates its monitoring location
inspection and sampling procedures based on results (e.g., trends, patterns, areas with illicit
discharges, and common problems).
Date of Update Description Inspection and Sampling Procedures Update(s); or “No Update” if
applicable
6/9/25 Updated Inspection Forms
SWMP Plan Compliance Documentation Appendix B (continued)
D. MCM 3 – Construction Site Stormwater Runoff Control
Page 155
Annually, the Village of East Aurora reviews and updates the names, titles, and contact information
for the individuals who have received Construction Oversight Training.
Date of Update Name, Title & Email of Individual Trained Training Date
3/23/26 Elizabeth Cassidy, SMO, Code Enforcement Officer 1/15/2021
Annually, by April 1, the Village of East Aurora reviews and updates its construction oversight
procedures.
Date of Update Description Construction Oversight Procedures Update(s); or “No Update”
if applicable
3/23/26 No Update
Annually, the Village of East Aurora updates it CGP-regulated construction sites inventory.
Date of Update Description Inventory Update(s); or “No Update” if applicable
3/23/26 No Update
Individuals involved in construction activity, SWPPP review, construction site inspections in the
Village of East Aurora have received four (4) hours of Department endorsed training in proper
erosion and sediment control principles from a Soil & Water Conservation District, or other
Department endorsed entity. Individuals who meet the definition of a qualified professional or
qualified inspector are exempt from this requirement.
Date of Training Name, Title & Email of Individual Trained Task : Oversight;
SWPPP Review;
Inspection
Page 156
6/30/24 Elizabeth Cassidy, SMO, Code Enforcement Officer All
6/30/24 Camie Jarell, PE GHD SWPPP Review
Page 157
SWMP Plan Compliance Documentation Appendix B (continued)
E. MCM 5 – Post-Construction Stormwater Management
Annually, the Village of East Aurora reviews and updates the names, titles, and contact information
for the individuals who have received Post-Construction SMP Inspection And Maintenance
Training.
Date of Update Name, Title & Email of Individual Trained Training Date
3/23/26 Elizabeth Cassidy 1/15/21
Annually, the Village of East Aurora updates its inventory of post-construction SMPs.
Date of Update Description Inventory Update(s); or “No Update” if applicable
3/23/26 No Update
Annually, by April 1, the Village of East Aurora reviews and updates its post-construction SMP
inspection and maintenance procedures.
Date of Update Description Post-construction SMP Inspection and Maintenance Procedures
Update(s); or “No Update” if applicable
3/23/26 No Update
Page 158
SWMP PLAN COMPLIANCE Appendix B (continued)
F. MCM 6 – Pollution Prevention and Good Housekeeping
Annually, the Village of East Aurora reviews and updates the names, titles, and contact information
for the individuals who have received Municipal Facility Procedures Training And Municipal
Operations Procedures Training.
Date of Update Name, Title & Email of Individual Trained Training Date
6/30/24 Brian Halt, SMO 10/14/25
Annually, by April 1, the Village of East Aurora reviews and updates its municipal facility procedures
and its municipal operations procedures.
Date of Update Description Municipal Facility Procedures Update(s)
August 2026 Updated existing municipal facility BMPs to conform to new MS4 Permit.
Date of Update Description Municipal Operations Procedures Update(s)
August 2026 Updated existing municipal operations BMPs to conform to new MS4 Permit.
Annually, the Village of East Aurora updates its inventory of all municipal facilities.
Date of Update Description Inventory Update(s); or “No Update” if applicable
3/23/26 Municipal Facilities Mapped
Page 159
Monitoring Locations Inspection and Sampling Field Sheet Appendix C
Monitoring Locations Inspection and Sampling Field Sheet Appendix C (continued)
Page 160
Page 161
Illicit Discharge Detection and Elimination Track Down Program Appendix D
OUTFALL AND MONITORING LOCATIONS GUIDANCE
Procedures for Dry Weather Inspection, Sampling, Track Down and Elimination
Dry weather: No precipitation/snow melt for at least 48 hours (minimum; consider longer during
periods of prolonged wet weather).
I. Choose Monitoring Locations (outfalls, interconnections, intraconnections)
a. Review previous outfall inspections; identify monitoring locations/outfalls requiring
inspection or any that may require re-inspection.
b. Prepare for dry weather inspection: Monitoring Locations Inspection and Sampling
Field Sheet, outfall report/current data for all to be inspected, storm system
maps/route, clip board, pen.
c. Each outfall has a detailed report listing dimensions/composition of the pipe or ditch
and also visual observations of the flow, if it was flowing at the time data were
collected.
d. The outfall report should be updated to reflect any changes, especially the “Outfall
Discharging” answer.
i. Submit an Outfall Map Update Request form.
OR
ii. The Outfall Editor App can be used in the field to make real time changes to
your outfall report, including a new picture. Do not change ownership or
Outfall IDs.
II. Inspect/Sample Monitoring Locations/Outfalls
Dry weather inspections and sampling can be done at the same time.
a. Inspection
i. Inspect each monitoring location scheduled for the year.
ii. If you cannot find the end of the pipe or ditch, or it is inaccessible or unsafe to
reach, locate the first upstream catch basin/access point to determine
whether there is flow. Note the inspection point on the form if it deviates
from the mapped monitoring location. Make a note in your files for future
inspections.
iii. If no flow is present, complete Sections 1, 2 and 5 on the Monitoring
Locations Inspection and Sampling Field Sheet. If flow is present, complete
Sections 4 and 6 too.
b. Sampling
i. Schedule (or proceed with) sampling for monitoring locations discharging flow
during dry weather based on completion of Sections 2, 4, 5 and 6 of the
Monitoring Locations Inspection and Sampling Field Sheet. Complete Sections
Page 162
3 and 7 if sampling. If the source of the illicit discharge is clear and discernable
(e.g. sewage), sampling is not necessary.
ii. Suggested sampling equipment and supplies
Note: The equipment listed below, including the black light, was provided to
all WNY Stormwater Coalition members in 2011.
The WNY Stormwater Coalition has test strips and equipment available to
borrow. Purchasing information can be provided upon request.
Contact for both: Mary Rossi at [email protected].
• Equipment
o Hanna pH/Temp/Conductivity/TDS Meter
o 6' Dipper Sample Collector
o Nalgene Wash Bottle
o Safety Glasses
o 600 mL plastic beakers (2)
o Glass jar/bottle with tight lid
o Disposable Gloves
o Tape Measure
o Distilled Water
o Paper Towels
o Trash Bag
o Hand Sanitizer
o Black Light Fixture and Cotton Pads
• Test Strips
o Ammonia (Hach # 4315-70)
o pH (LaMotte # 5049-36)
o Total Chlorine (LaMotte # 5049-36)
o Nitrite (LaMotte # 5049-39)
o Nitrate (LaMotte # 5049-39)
o Phosphate (Hach # 4315-75)
iii. Use the Outfall and Monitoring Location Sampling Guide (follows) to conduct on-
site sampling using field meter and test strips; if detergent contamination is
suspected (bubbles/suds/etc.), a sample will need to be brought back for exposure to
black light. Record results in Section 3 on the Monitoring Locations Inspection and
Sampling Field Sheet.
c. Retain forms as documentation of inspection/sampling for 5 years.
III. Illicit Discharge Track Down
For all flows characterized as “suspect” or “obvious” in Section 6 of the Monitoring Locations
Inspection and Sampling Field Sheet, source track down must be conducted according to the
following timeframe:
Page 163
a. Following inspection and sampling, within twenty-four (24) hours of discovery, the
MS4 Operator must initiate track down procedures for flowing MS4 monitoring
locations with obvious illicit discharges.
b. Within two (2) hours of discovery, the MS4 Operator must initiate track
down procedures for obvious illicit discharges of sanitary wastewater
that would affect bathing areas during bathing season, shell fishing
areas or public water intakes and report orally or electronically to the
NYSDEC Regional Water Engineer and local health department; and
c. Within five (5) days of discovery, the MS4 Operator must initiate track
down procedures for suspect illicit discharges.
d. Consult sewer and land use maps to evaluate potential contributing area and
characteristics of the area.
e. Visually inspect catch basins/manholes/ditches progressively upstream from the
outfall/monitoring location to identify contributing areas with no flow that can be
eliminated from further consideration.
f. It is possible that the visual inspections indicate the source of flow/contamination is
from another MS4 entering your system at an interconnection. Contact their
stormwater coordinator, in writing, and describe your findings along with a precise
location for the point where flow from their system enters your system. Keep this
documentation for 5 years. Add a note in your files or on the outfall report itself to
save time and trouble for the next inspection.
g. See Track Down Techniques table for additional track down options.
(Illicit Discharge Detection and Elimination: A Guidance Manual for Program Development and Technical
Assistance, Center for Watershed Protection October 2004)
Page 164
IV. Illicit Discharge Elimination
a. Eliminate source of contamination or if nature of the source prohibits elimination,
utilize targeted education to inform/minimize the source
(e.g. pet waste or pool/spa water disposed in storm sewers: distribute information
on proper disposal throughout neighborhood).
b. The following timeframes are required for illicit discharge elimination:
i. Within twenty-four (24) hours of identification of an illicit discharge that
has a reasonable likelihood of adversely affecting human health or the
environment, the MS4 Operator must eliminate the illicit discharge;
ii. Within five (5) days of identification of an illicit discharge that does not
have a reasonable likelihood of adversely affecting human health or
the environment, the MS4 Operator must eliminate the illicit discharge;
iii. Where elimination of an illicit discharge within the specified timeframes
is not possible, the MS4 Operator must notify the Regional Water Engineer.
c. Refer to your Stormwater Management Plan (Appendix O) for detailed provisions for
escalating enforcement and tracking. Your municipality has a local law specific to
illicit discharges to assist with enforcement as needed.
V. Documentation
The Monitoring Locations Inspection and Sampling Field Sheet completed in the field is to be
filed and retained as compliance documentation for inspection and sampling. You may also
scan the completed forms. If you opt to scan, create a new folder for each year or indicate
year of inspection in the file name (this will be helpful for planning inspections to meet your
compliance goal and for state/federal compliance audits). Retain all documentation for 5
years.
a. Inspection Frequency (20%/year)
i. Completed Monitoring Locations Inspection and Sampling Field Sheets.
ii. Record monitoring locations inspected on spreadsheet or whatever you use
to track inspections. It doesn’t have to be elaborate, just a tool to identify
outfalls inspected and those in need of inspection.
e.g. Outfall ID and date inspected are adequate. Additional information such
as whether it was flowing and a “Notes” column are also useful.
b. Sampling
The Monitoring Locations Inspection and Sampling Field Sheet documents both
inspection and sampling.
c. Track Down and Elimination
All steps and actions utilized to track down and eliminate illicit discharges should be
carefully documented. There is no “one size fit” as each instance will be unique.
Documentation should include all efforts taken to identify and eliminate the source
of contamination: how track down was done, results of track down, actions to
eliminate source of contamination, additional details, and any enforcement
measures utilized.
Page 165
Outfall and Monitoring Location Sampling Guide
This document was prepared to serve as quick reference for sampling flowing outfalls using your Hanna
meter for pH, temperature, Total Dissolved Solids (TDS) and Conductivity, test strips for Ammonia, pH,
Total Chlorine, Nitrite/Nitrate and Phosphate, and black light/cotton pad for detergents. Depending on
the results and visual observations at the outfall, source identification and elimination of that source
may be necessary as well as additional sampling.
Sample collection
1. When possible, sample flow directly in a clean, wide mouth beaker (rinse dipper and beakers 2x
with flow for conditioning). Dump the contents downstream from sample collection point.
2. Collect two samples: one for the field meter analyses and one for the test strips.
Note: I use the beaker for one sample and the dipper for the second.
pH, Temperature, Total Dissolved Solids (TDS) and Conductivity (Hanna Meter)
This meter should be calibrated periodically as per the instruction manual. If you cannot find your
meter, there is a test strip for pH (below) and a basic thermometer will work.
1. Turn on the Hanna Instruments pH /Temperature/Conductivity meter.
2. Remove cap on probe and rinse the probe end with distilled water.
3. In the field, place the probe in the sample collected for on-site analyses.
4. Record the results on the Monitoring Locations Inspection and Sampling Field Sheet.
5. Rinse the probe with distilled water and replace the cap. For extended time of storage,
probe cap must be filled with pH Electrode Storage Solution or pH 4 Buffer solution.
Detailed instructions in folder see Care and Storage of pH Electrode.
Test Strips
When using test strips, keep wet fingers out of the container. Close cap tightly after use.
Store in a cool, dry place.
Ammonia (HACH # 4315-70)
Ammonia levels are tested to indicate presence of sanitary sewage in stormwater. Should high levels be
detected, further investigation and source track down are required. If the illicit discharge is clearly and
discernably sewage, sampling is not necessary.
1. Dip strip into water sample.
2. Vigorously move it up and down in water sample for 30 seconds, making sure
both pads are always submerged.
3. Remove test strip and shake off excess water.
4. Hold the strip level, with pad side up, for 30 seconds.
Page 166
5. To read the result, turn the test strip over so that both pads face away from
you.
6. Compare the color of the small pad to the color chart on the container.
7. Read the result through the clear plastic of the test strip.
8. Record the result on the Monitoring Locations Inspection and Sampling Field
Sheet.
pH and Total Chlorine (LaMotte # 5049-36)
pH is measured to indicate potential industrial discharges.
Total chlorine is measured to indicate a tap water leak into the storm sewer system or possibly
discharge of chlorinated pool/spa water.
1. Immerse test strip and remove with pads face up.
2. Do not shake off excess water.
3. Wait 15 seconds and immediately hold up vertically
against the color chart on container.
4. Record the pH result on the Monitoring Locations
Inspection and Sampling Field Sheet.
5. Using the same strip, record the results for Total Chlorine
Nitrite and Nitrate (LaMotte # 5049-39)
Sources of nitrite (NO2) and nitrate (NO3) in urban stormwater runoff include lawn and garden
fertilizers, pet waste and failing septic tanks.
1. Using at least a cup-size sample, immerse test strip for 2 seconds and remove
with pads face up.
2. Do not shake off excess water.
3. Wait 60 seconds and immediately hold up vertically against the color chart on
container.
4. Record the Nitrite result on the Monitoring Locations Inspection and Sampling
Field Sheet.
5. Using the same strip, record the results for Nitrate.
Phosphate (HACH # 4315-75)
Sources of phosphate/phosphorus in urban runoff include plant and leaf litter, soil
particles, pet waste, road salt and lawn fertilizer. Lawns and roads account for the greatest loading.
1. Dip a strip into water for 5 seconds and remove.
2. Hold the strip level, with pad side up, for 45 seconds.
3. Do not shake excess water from the strip.
4. Compare the color of the small pad to the color chart on the container.
5. Record the result on the Monitoring Locations Inspection and Sampling Field
Sheet.
Additional Testing
1
Page 167
Detergents – Black Light/Cotton Pad
Indicates presence of optical brighteners, used in detergents to whiten fabrics, which fluoresce under
ultraviolet light. Sources of detergents include failing septic systems, improperly connected laundry
discharges and industrial sources.
1. Soak cotton pad with sample.
2. Place under black light. If it fluoresces, detergents are present.
3. Under bright light conditions, you may have to move to a dark area
or devise a box to block light.
4. Record the detection or absence of detergents on the Monitoring
Locations Inspection and Sampling Field Sheet.
Note: If an intermittent discharge is suspected, the cotton pad can be
secured at the outfall or an upstream point (such as suspended in a storm
DI) for a given length of time during dry weather before black light exposure. A suet feeder cage works
well.
Construction Activities that Require SWPPP Appendix E
(from NYS Construction General Permit (GP-0-20-001)
Appendix B-Table 1 and Table 2
2
Page 168
Construction Activities that Require SWPPP Appendix E (continued)
3
Page 169
4
Page 170
Construction Activities that Require SWPPP Appendix E (continued)
5
Page 171
Construction Activities that Require SWPPP Appendix E (continued)
6
Page 172
SWPPP Review Checklist Appendix F
7
Page 173
SWPPP Review Checklist Appendix F (continued)
8
Page 174
SWPPP Review Checklist Appendix F (continued)
9
Page 175
Construction Site Inspection Report Form Appendix G
10
Page 176
Construction Site Inspection Report Form Appendix G (continued)
11
Page 177
Construction Site Inspection Report Form Appendix G (continued)
12
Page 178
No Exposure Certification Appendix H
13
Page 179
Storm Event Data Form Appendix I
Visual Monitoring Form
m
14
Page 180
Storm Event Data Form Appendix I (continued)
Visual Monitoring Form
15
Page 181
Storm Event Data Form Appendix I (continued)
Visual Monitoring Form
16
Page 182
Municipal Facility Assessment Form Appendix J
17
Page 183
Municipal Facility Assessment Form Appendix J (continued)
18
Page 184
Municipal Facility Assessment Form Appendix J (continued)
19
Page 185
Municipal Facility Assessment Form Appendix J (continued)
20
Page 186
Municipal Facility Assessment Form Appendix J (continued)
21
Page 187
Notice of Intent: Village of East Aurora Appendix K
22
Page 188
Staffing Plan/Organizational Chart Appendix L
23
Page 189
Village of East Aurora
Departments at the Village Responsible for Implementation of the
Six Minimum Control Measures (MCM)
MS4 Coordinator - Stormwater Management Officer - Brian Halt
MCM 1 MCM 2 MCM 3 MCM 4 MCM 5 MCM 6
ILLICIT DISCHARGE
POST CONSTRUCTION
PUBLIC EDUCATION PUBLIC INVOLVEMENT DETECTION AND CONSTRUCTION SITES GOOD HOUSEKEEPING
MANAGEMENT
ELIMINATION
WNYSC WNYSC DPW Building Department Building Department DPW
The Coalition creates WNYSC schedules 2 (B.Halt) - Inspects outfalls, Once the SWPPP is approved and All long term post construction Implements best management
graphics and designs public meetings a year and field reconnaissance before any clearing activities can measures are inspected by the practices for operational and
presentations. Prepares to educate key associated with regular take place a kick-off meeting is Building Deparment before capital improvements. Staff is
postcards and mailers. individuals and groups. inspections and potential held on site to be attended by the construction is completed and trained annually.
Creates K-12 Education illicit discharge. Project Manager, Site NOT signed by E. Cassidy or
Packages. Organizes a Conducts staff training, Superintendent and Owner's Village Supervisor.
stormwater conference performs inspections, and SWPPP Inspector. Construction
once in 2 years, Invites issues notices of violation. sites are monitored by the Building
Guest speakers, Department.
Engineering Consultants,
Landscape Architects and
MS4 communities.
Makes presentations to TOA presents the draft (B.Halt) - Recieves calls from E. Cassidy closely monitors the The owner signs a maintenance DPW maintains facilities
educate MS4 Annual Report at a residents, Code Enforcement construction sites by reviewing the agreement and files it at including buildings, salt storage,
Communities and Town public meeting to Officers, Highway weekly inspection reports and County Clerk's office to ensure fueling station, Village roadways,
Boards when needed. educate key individuals employees, regarding illicit issuing notice of voilations (NOV) if that the post-construction drainage infrastructures, and
Maintains a website and for public input. discharges into storm system. necessary. Fourth NOV maybe measures will not be altered village facilities.
related to stormwater The complaints are accompained with an admintrative without notification and will be
management. investigated and necessary fine. A stop work order may also be maintained in the future. Also
violations issued. issued with the help of the Code the owner file an easement
Enforcement Officer. agreement the County Clerk's
office to allow for period
inspections by TOA.
TOA posts the draft TOA participates in After the NOV is issued the site is DPW - Maintains
SWMP Plan on the different Environmental inspected again in 14 days as a Village maintenance facilities
website, has a groups that have follow up on the voilations including buildings, salt
Stormwater Management interest in the storage, fueling station, Village
webpage, reviews the stormwater roadways, drainage
SWMP Plan at a public management program. infrastructures.
meeting, and has a These local groups assist
brochure display in the with public education
Municipal Center. and involvement.
24
Page 190
WNY Stormwater Coalition Online Mapper/SOP Appendix M
Guide to Utilizing the Online Stormwater Mapper
WNY Stormwater Coalition
PURPOSE:
This web application was created using ArcGIS enterprise to provide the WNY Stormwater Coalition
members with a method for viewing all of their stormwater conveyance data in an online interactive
map.
Online mapper Link:
https://erieny.maps.arcgis.com/apps/webappviewer/index.html?id=717984bd03e74f23b0
296461e3ea9957
After clicking the above link, you are prompt for an ArcGIS Login to sign into Erie County.
Login Credentials:
Username: WNY_Storm
Password: $tormW@ter20
Recommended Web Browsers:
• Google Chrome
• Internet Explorer
• iOS Safari
LEGEND:
Upon opening the mapper, layers automatically turn on. As you zoom in more layers become
visible. To view the legend click the icon above, located in the upper left corner of the mapper.
25
Page 191
The Legend is dynamic and will change to show you which layers are
active as you zoom in and out of the map. At the default scale you see
MS4 boundaries (2000,2010), Municipalities and Areas Without
Municipal Sewer are the active layers.
LAYER LIST:
26
Page 192
The layer list is located to the right of the legend in the upper left
portion of the mapper. The layer list is also dynamic, similar to the
legend. Data layers that are not visible at certain scales appear
greyed out. The image on the left shows that Stormwater Point
Features, Flow and Ditch layers appearing grey. These layers will only
turn on at a larger scale as they are not clearly visible at smaller
scales. You can also turn on/off any layers you choose by simply
checking the blue box. Notice the three little dots next to each layer.
When you click the three little dots a menu appears:
Zoom to: Zooms to the scale of the entire layer
Transparency: Allows you to adjust the transparency of the layer
Visibility Range: Lets you turn on/off layers at range of scales
Enable Pop-up: Lets you turn on/off pop capability on a layer
Move Up/Down: Will move a layer up or down in ranking in the TOC
View in Attribute Table: Pulls up attribute table for the feature
Show Item Details: Takes you to the item detail page on ArcGIS online
27
Page 193
SEARCH BY OUTFALL ID:
The search widget is in the upper-left hand portion of the mapper next to the layer list icon. Once
clicked the widget panel drop downs on the left side and a small search box appears next to the
search symbol.
The search box gives you results as you begin to type the outfall ID.
MUNICIPAL FILTER:
This widget allows you to apply a filter to all of
the stormwater conveyance and outfall data based
on municipality.
Once you select a municipality, click Apply.
It will zoom to that municipality and the only data
showing on the map will be for that particular
municipality.
Depending on the size of the municipality,
you may need to zoom in further to see the
stormwater data.
Notice in the attribute table pull up, the only
data available is the selected municipality
28
Page 194
OTHER WIDGETS:
Notice a few other remaining widgets on
the inside portion of the mapper.
Basic Zoom Function: You can use
these buttons to zoom. You can also
use your mouse capability to scroll
in/out to zoom throughout the mapper.
Double-clicking any area on the map will
also do a partial zoom-in.
Home Button:
The home button takes you to the default extent of the map.
My Location:
The button uses your device’s location when you have it enabled. This is particularly helpful if using
the mapper in the field.
Measurement:
29
Page 195
Allows you to measure Area, Distance and
can give you a precise location.
To measure distance, select the middle icon
and then single click you starting point and as
many points in between your last point. To
end your segment, double-click on the last
point in your measurement. You can change
your measure type from feet to miles etc. in
the drop down list.
To measure area use the icon on the far left.
Single click to begin drawing your polygon, and
double-click to finish it. Use the measurement
type drop-down to change your area
measurement unit.
To capture the precise location of a point select
the third icon to the right. It will take the location
of you mouse at all times, and then also allow
you to click a point on the map to give you
precise location in longitude/latitude base on
either Decimal Degrees, or Degree, Minutes,
Seconds. (use drop-down)
*For all three measurements, you can use
CTRL (on your keyboard) to enable snapping to
features in the map such as manholes, pipes,
ditches, outfalls etc. This makes tracing
polygons very easy.
Printing Widget:
30
Page 196
The print widget lets you export the map to various
file types to be saved or printed. The current view of
the map generates when you click print. The default
layout is “A3 Landscape” and default format is JPG.
You have the option to select different types in the
drop down. You can title your map.
A file is generated after clicking print. To view the file click
on the file name. It will open the map in another tab in your
browser.
Below is an example of a JPG map generated from the
widget
Notice that all of the active layers in your current map view are included in the legend at the bottom
of the map. Also included are map data references, a scale, and the title of the map.
To start over the print process, select Clear Prints button.
31
Page 197
The Advanced print button lets the user:
-Adjust the map scale/extent
-Edit the spatial reference
-Add an author and copyright to the map
-Option to include the legend
-Change the unit used for the scale bar
-Edit the size of the map portion of the print
-Change the DPI of the file output
-Option to include attributes in the map
Basemap Gallery:
This lets the user change active basemap used in
the mapper. The default basemap is called
‘Topographic’
Depending on how you’re using the mapper, other
basemaps might be more useful than others.
Full Screen:
This button will set the mapper to fill your
entire screen rather than just within your
browser.
32
Page 198
The Attribute Table:
The attribute table can be pulled up from the bottom of the map screen at any time. All
layers that contain attributes can be found in the is table. Each layer has its own tab. By
default ‘Filter by map extent’ is checked. This means that you can only see attributes for
features that are currently displayed in the map. Feel free to uncheck this setting, but it
may slow down you mapper due to the large amounts data stored in each layer.
1
1
33
Page 199
Resolution: Local Laws Appendix N
34
Page 200
35
Page 201
36
Page 202
37
Page 203
38
Page 204
39
Page 205
40
Page 206
41
Page 207
42
Page 208
43
Page 209
44
Page 210
45
Page 211
46
Page 212
47
Page 213
48
Page 214
49
Page 215
50
Page 216
51
Page 217
52
Page 218
53
Page 219
54
Page 220
55
Page 221
56
Page 222
57
Page 223
58
Page 224
59
Page 225
60
Page 226
61
Page 227
62
Page 228
63
Page 229
Enforcement Response Plan Appendix O
The Enforcement Response Plan (ERP) describes the action(s) to be taken for violations
pertaining to MCM 3: Illicit Discharge Detection and Elimination, MCM 4: Construction Site
Stormwater Runoff Control, and MCM 5: Post-Construction Stormwater. The ERP provides a
protocol to address repeat and continuing violations through progressively stricter responses
(i.e., escalation of enforcement) as needed to achieve compliance with the terms and
conditions of the MS4 General Permit (GP-0-24-001) and/or Construction General Permit (GP-
0-20-001). Enforcement responses are based on the type, magnitude, and duration of the
violation, effect of the violation on the receiving water, compliance history of the violator(s),
and good faith of the violator(s) in compliance efforts. See subsequent pages for specific illicit
discharge, construction, and post-construction stormwater management practice enforcement
responses.
Efforts to obtain a voluntary correction of deficiencies through informal enforcement, such as
verbal warnings or written notices, must not exceed sixty (60) days in duration from the time of
initial determination of the violation(s) until a return to compliance.
The Village of East Aurora will use the following types of enforcement responses or
combination of responses for illicit discharge, construction, and post-construction
stormwater management practice violations per Village of East Aurora Code Chapter 220-12:
Village of East Aurora, NY Stormwater Management (ecode360.com)
Customize: you must describe/explain process for all listed below and include the title and
department of the person(s) responsible for each enforcement response listed below.
i. Verbal warnings; given directly to contractor/job foreman on site,
property owner, or operator with description of violation and instructions
on remedy, timeframe in which it is to be completed
ii. Written notices; When the SMO determines that a land development
activity is not being carried out in accordance with the requirements , it
may issue a written notice of violation to the landowner.
iii. Citations (and associated fines);
iv. Stop work orders; The SMO may issue a stop-work order for
violations. Persons receiving a stop-work order shall be required to
halt all land development activities, except those activities that
address the violations leading to the stop-work order. The stop-work
order shall be in effect until the SMO confirms that the land
development activity is in compliance and the violation has been
satisfactorily addressed. Failure to address a stop-work order in a
timely manner may result in civil, criminal, or monetary penalties in
accordance with the enforcement measures
v. Withholding of plan approvals or other authorizations affecting the
ability to discharge to the MS4; If any building or land development
64
Page 230
activity is installed or conducted in violation of this chapter, the SMO
may prevent the occupancy of said building or land.
vi. Additional measures, supported in local legal authorities, such as
collecting against the project’s bond or directly billing the responsible
party to pay for work and materials to correct violations.
Enforcement Tracking
The Village of East Aurora documents instances of non-compliance in this SWMP Plan. The
enforcement case documentation includes, at a minimum, the following:
a. Name of the owner/operator of the facility or site of the violation (can be
redacted from the publicly available SWMP Plan);
b. Location of the stormwater source (e.g., construction project);
c. Description of the violation;
d. Schedule for returning to compliance;
e. Description of enforcement response used, including escalated responses if
repeat violations occur or violations are not resolved in a timely manner;
f. Accompanying documentation of enforcement response (e.g., notices of
noncompliance, notices of violations);
g. Any referrals to different departments or agencies; and
h. Date violation was resolved.
All documentation pertaining to Enforcement Response is considered part of tis SWMP Plan
and is available upon request: contact Stormwater Program Coordinator or Stormwater
Management Officer listed on page 2 of this document (Internally: C:\Users\Water
Foreman\Documents\Storm Water\Enforcement Response
65
Page 231
Enforcement Response Plan: Illicit Discharge Detection and Elimination
Violation Issue Minimum Response
Unauthorized discharge to MS4 i) Any direct or indirect non-stormwater discharge to i) Warning letter with schedule for
the MS4 correction/imlementation of BMPs (NOV Optional)
Enforcement Response Plan:
ii) Failure to eliminate discharge/cease practice or ii) NOV
implement BMPs in accordance with schedule:
violation continued for 30 or more days after notice
iii) Failure to eliminate discharge/cease practoice or iii) Formal Enforcement/Fines
implement BMPs in accordance with schedule:
Illicit Discharge Detection and Elimination
violation continued for 60 or more days after notice
Unauthorized/Illicit Connection to MS4 i) Any drain or conveyance, whether on the surface or i) Warning letter with schedule for
subsurface, which allows an illegal discharge to enter correction/imlementation of BMPs (NOV Optional)
the MS4
ii) Failure to eliminate illicit connection to the MS4 in ii) NOV
accordance with schedule: violation continued for 30
or more days after notice
iii) Failure to eliminate illicit connection to the MS4 in iii) Formal Enforcement/Fines
accordance with schedule: violation continued for 60
or more days after notice
Appendix O (continued)
66
Page 232
Enforcement Response Plan: Appendix O (continued)
Construction General Permit
Enforcement Response Plan: Construction General Permit
Violation Issue Minimum Response
Failure to obtain coverage under the i) One or more acres of disturbed area i) Notice of Violation
Construction General Permit WITH appropriate
erosion & sediment control practices ii) One or more acres of disturbed area - violation ii) Cease and Desist
continued for 30 or more days after discovery
iii) One or more acres of disturbed area - violation iii) Formal Enforcement/Fines
continued for 60 or more days after discovery
Failure to obtain coverage under the i) One up to five acres of disturbed area i) Notice of Violation
Construction General Permit and WITHOUT or
MINIMAL erosion & sediment control practices ii) One up to five acres of disturbed area - violation ii) Cease and Desist
continued for 15 or more days, after discovery
iii) One up to five acres of disturbed area - iii) Formal Enforcement/Fines
violation continued for 30 or more days after
discovery
iv) Five or more acres iv) Cease and Desist
v) Five or more acres - violation continued for 30 or v) Formal Enforcement/Fines
more days after discovery
Has coverage under the Construction General i) One up to five acres of disturbed area i) Warning letter with schedule for
Permit and has significant violations of permit correctve action(s) (NOV Optional)
ii) Failure to correct deficiencies in accordance ii) NOV and/or Stop Work Order
with schedule: One up to five acres of disturbed
area
iii) Five or more acres iii) NOV and/or Stop Work Order
Failure to meet significant permit requirements. i) Unsatisfactory compliance inspection i) Warning letter with Inspection report
Including, but not limited to: listing deficiencies and schedule for
correctve action(s)
- lack of or a substantially inadequate SWPPP; ii) Failure to correct deficiencies in accordance
with schedule ii) NOV and/or Stop Work Order
- failure to implement or maintain BMPs;
iii) Duration of noncompliance is longer than 60
- failure to perform required inspections days. iii) Formal Enforcement/Fines
67
Page 233
Enforcement Response Plan: Post-Construction Stormwater Management Practice Inspection & Maintenance
Violation Issue Minimum Response
Failure to perform required inspections and/or i) No SMP inspection report submitted i) Warning letter with schedule for correction (NOV
Maintenance
submit inspection report. Optional)
NYS DEC Stormwater Management Practices ii) No inspection report submitted - violation ii) NOV
Inspection Checklists 2017: continued for 30 or more days after notice
https://www.dec.ny.gov/docs/water_pdf/smpin
spchklist.pdf iii) No inspection report submitted - violation iii) Formal Enforcement/Fines
continued for 60 or more days after notice
Enforcement Response Plan:
Failure to perform required maintenance as i) SMP maintenance not performed i) Warning letter with schedule for correction (NOV
called for in the Maintenance Agreement Optional)
associated with the post-construction
stormwater management practice(s); or, in the ii) Maintenance not performed - violation ii) NOV
absence of a formal Maintenance Agreement, continued for 30 or more days after notice
NYS DEC Maintenance Guidance for
Stormwater Management Practices 2017: iii) Maintenance not performed - violation iii) Formal Enforcement/Fines
https://extapps.dec.ny.gov/docs/water_pdf/sm continued for 60 or more days after notice
pmaintguidance.pdf
Failure to address deficiencies, corrective i) Failure to correct SMP deficiencies i) Warning letter with schedule for correction (NOV
actions, or further investigation (if Optional)
recommended in inspection report)
ii) Failure to correct deficiencies in accordance ii) NOV
with schedule: violation continued for 30 or more
days after notice
Post-Construction Stormwater Management Practice Inspection &
iii) Failure to correct deficiencies in accordance iii) Formal Enforcement/Fines
with schedule: violation continued for 60 or more
days after notice
Appendix O (continued)
68
Page 234
Budget Transfers 2025-2026
FROM TO
A.5.1490.0403 Public Works- Office Supplies $ 600.00 A.5.1490.0434 Public Works Admin- Telephone $ 600.00
A.5.1620.0470 Buildings- Dept Supplies $ 1,500.00 A.5.1620.0431 Buildings- Electric $ 1,500.00
A.5.1640.0420 Central Garage- Maint & Rep $ 1,200.00 A.5.1640.0431 Central Garage- Electric $ 1,200.00
A.5.7550.0470 Celebrations- Operating $ 770.00 A.5.4540.0410 Ambulance Serv- American $ 770.00
A.5.5110.0125 Street Maint- Longevity $ 1,700.00 A.5.5110.0140 Street Maint- Overtime $ 1,700.00
A.5.3120.0460 Police Dept- Vehicle Maint $ 1,000.00 A.5.3120.0465 Police Dept- Accident Repairs $ 1,000.00
F.5.8340.0110 Transfs & Dist- Salaries & Wa $ 5,500.00 F.5.8340.0140 Transfs & Dist- Overtime $ 5,500.00
F.5.8340.0470 Transfs & Dist- Supplies & M $ 5,000.00 F.5.8340.0420 Transfs & Dist- Maint & Repairs $ 5,000.00
Page 235
MODIFY 2025/2026 BUDGET April 6, 2026
Trustee _______, offered the following resolution and moved for its adoption:
BE IT RESOLVED, the Clerk–Treasurer is hereby authorized to modify the 2025/2026
Budget in the following manner:
Revenue – 4.2770 Unclassified - $ 2,761.63
Expenditures – 5.3120.0140 Police Overtime - $2,761.63
DEA OT Reimbursement
Revenue – 4.2770 Unclassified - $ 1,464.35
Expenditures – 5.3120.0140 Police Overtime - $ 1,464.35
DEA OT Reimbursement
Revenue – 4.2770 Unclassified - $ 5,139.25
Expenditures – 5.3120.0140 Police Overtime - $ 5,139.25
DEA OT Reimbursement
The following resolution was seconded by Trustee ________ and unanimously
approved
Page 236
To the Village Board,
On Feb 3rd, the EA Village Planning Commission (EAPC) discussed the updated
proposal of Young Development to Subdivide and Rezone approx. 15 acres to allow for
110 units of Senior Housing at 270 Quaker Road. The parcel in question is currently
zoned for General Manufacturing and has been identified as light
industrial/manufacturing uses dating back to before the 2001 Comp Plan was
prepared. The Village’s adopted Comprehensive Plan (2001) and the Update to the
Zoning Code in 2019 has been clear that these parcels are to be developed for light
industrial uses, similar to the LSI’s development in Commerce Green. In fact, this
desire led to denying an application by Walmart many years ago for commercial/retail
development.
The Planning Commission (EAPC) would like to request a meeting with the Village
Board to discuss whether the Village Board wants to continue to promote light
industrial/manufacturing uses in the Village or whether there is a desire to more actively
promote senior housing. Our intent is NOT to discuss this specific project proposal, but
to get a better sense of the Policy direction and preferences of the Village Board with
respect to the Comp Plan.
The EAPC realizes that the proposed site has not been actively marketed for light
industrial uses, and that Village Policy may have changed in terms of land use/zoning
priorities. The EPAC acknowledges that Senior Housing is also a significant need for
the Village. Our dilemma is that the EPAC is trying to balance the Village’s long time
desire to promote light industrial/manufacturing at the site to create jobs, against the
need to provide more senior housing for residents that want to downsize/age-in-place
yet remain in the Village. As part of the EAPC’s deliberations, we would like to request
a meeting with the Village Board to discuss whether the Village Board wants to continue
to promote light industrial/manufacturing uses in the Village or whether there is a desire
to more actively promote senior housing. To reiterate, our intent is not to discuss this
specific project proposal, but to get a better sense of the Policy direction and
preferences of the Village Board with respect to the Comp Plan.
Representatives of the EAPC would request to be included on the Agenda for
the February 17th Village Board meeting to discuss this further. Planning Commission
members Castle, Morris, and Simeone will be available to attend the Village Board
meeting.
Please let me know if you have any questions regarding this.
- Dale Morris, EAPC Vice Chairman
Page 237
Page 238
Page 239
Page 240
Page 241
Page 242
Page 243
Page 244
Page 245
Page 246
Page 247
Page 248
Page 249
Page 250
Page 251
Page 252
Page 253
Page 254
RESOLUTION 20260406
WHEREAS, the Village Administrator has resigned, and
WHEREAS, the Village advertised the position on March 24, 2026, and
WHEREAS, the Village has yet to interview and fill the position, and
WHEREAS, the Clerk-Treasurer could continue to perform duties of the Village Administrator
on an out-of-title basis, and
WHEREAS, Maureen Jerackas, Village Clerk-Treasurer, has agreed to continue to cover the
duties working out of title as Village Administrator for a period not to exceed Six (6) months, and a
training period that doesn’t exceed One (1) year, until the right candidate can be found; and
WHEREAS, the positions shall be paid a stipend during this period of time for this work, and
while training the new Village Administrator; and
NOW, BE IT THEREFORE RESOLVED that Maureen Jerackas is assigned to continue to do out-
of-title work as the Village Administrator, with a stipend of $673 per week. The stipend will start on
April 6, 2026, and will continue until the new Administrator’s training is completed, as verified and
approved by the Mayor.
BE IT FURTHER RESOLVED that the term of coverage shall be no longer than 6 months under
this agreement, plus no more than one year for training.
BE IT FURTHER RESOLVED that, if Vacations, personal time, or Holidays cannot be taken due
to these assignments, with approval from the Administrator or Mayor, the unused days will be paid
out or carried over into the new year.