Planning Board Regular Meeting, May 20, 2026 — Minutes (full text)
Page 1
Town of Hamburg Planning Board Minutes May 20, 2026
Town of Hamburg
Planning Board Meeting
May 20, 2026, Minutes
The Town of Hamburg Planning Board met for a Work Session at 6:30 PM, followed by
a Regular Meeting at 7:00 PM, on Wednesday, May 20, 2026, Room 7A/7B of Hamburg
Town Hall.
WORK SESSION
Jonathan Johnsen- Requesting Preliminary Plat Approval on a proposal for a 2-lot
subdivision to be located at 2342 Pleasant Ave (SBL#: 181.00-1.5.11)
Attorney Jonathan Johnsen appeared on behalf of the project and explained that the
owners of the property are looking to subdivide the property so that they can sell the
parcel that they are not using.
Mr. Rogers explained to the Board that the applicant is looking to split off 14 acres from
the original site. The property that the applicant is looking to subdivide is zoned R-1 with
the main use is single family housing and there would be access from Harbor Run Lane.
Chair Gronachan asked if there would be one or two access points.
Mr. Rogers stated there would be one access from Harbor Run Lane.
Member Ryan asked for clarification that there is no need for a zoning change.
Mr. Rogers confirmed that is correct.
Member Chmura would like it noted on the record that Harbor Run Lane is a Town road.
The project was tabled to the June 17th, 2026, Planning Board meeting, and the
Planning Board authorized a public hearing and for the Planning Department to produce
draft SEQR resolutions for consideration.
Chris Van Leaven- Requesting Preliminary Plat Approval on a proposal for a 4-lot
subdivision to be located at 4261 Lakeshore Road (SBL#: 159.17-1-16.1)
Attorney Sean Hopkins appeared on behalf of the project along with Christopher Van
Leaven.
Mr. Hopkins stated that the landowners are looking to divide an 8.53-acre parcel which
is zoned R-1 into four single family lots. The proposed layout will create four buildable
1
Page 2
Town of Hamburg Planning Board Minutes May 20, 2026
lots each with frontage and direct access to Lake Shore Road that will require adding
three (3) additional curb cuts on Lake Shore Road and one of the lots would have an
extra access point from Durham Road.
The configuration is in accordance with the zoning requirements as far as minimum lot
area, frontage and setbacks. The property is currently improved with a bed and
breakfast on the property with no immediate plans to change that proposed structure.
There are public utilities available to serve the four lots.
Mr. Rogers explained that Code Enforcement and the Planning Department did a
preliminary review of the minor subdivision request to make sure it met all zoning
requirements and at this point, it does not require a variance from the Zoning Board of
Appeals.
Mr. Rogers asked the Applicant about a small strip of land that is on the lakefront, and if
they can explain what parcel that strip of land will be paired with.
The Applicant replied there is a parcel of land that is located across the street from the
main property, that will go with sublot B however, everyone in the four (4) sublots would
have access to that land.
Mr. Rogers noted that because this is within the Waterfront Revitalization Area (WRA),
the project will need a Coastal Consistency Recommendation from the LWRP
Committee. The project is also located in the Route 5 Overlay which does not have any
specific requirements for minor subdivisions, so this is not against the intent of the
Route 5 Overlay.
In regard to all the structures currently located on the property, Mr. Rogers asked if
there is no plan for demolition.
The Applicant answered that all structures that are on the property will remain.
Mr. Rogers reiterated these parcels will be zoned R-1 and that zoning district does not
allow for commercial development, condos, apartments, or anything of that nature.
Should the Planning Board approve this, the Applicant would not be allowed to put an
apartment complex or shopping plaza there.
Chair Gronachan asked how are the buildings going to be divided up between the lots.
The Applicant responded that Lot C will include the main house and gazebo. Lot D will
include the carriage house and barn with the secondary access to Durham Road.
Chair Gronachan stated that when looking at the map, it looks as if there is a road that
goes through the property, and asked is that true?
2
Page 3
Town of Hamburg Planning Board Minutes May 20, 2026
The Applicant answered that there is a driveway that travels through the property.
Chair Gronachan also asked if there is only one parcel that will have access to Durham
Road.
The Applicant confirmed that is the case.
Member Ryan asked how would someone access the parcel across the road, and if it
will be by a tunnel that connects the property.
The Applicant responded that no, the tunnel is gone and the current owner does not
know the location of the tunnel. The property in question sits on a bluff and is not a
parcel that people would go out to it just exists with the property.
Member Clark stated that for the driveways that are located on Route 5, he feels that
there should be a condition of a turnaround so that no one is backing out onto Route 5.
The Planning Board asked Mr. Rogers to send this to the LWRP Committee to get their
recommendation.
The project was then tabled to the June 3rd, 2026, Planning Board meeting for a public
hearing.
Golf Carts Unlimited- Requesting Site Plan Approval of a proposal to construct a
4,700 sq-ft 1-story building with a 1,350 sq-ft covered patio to be located at 2330
Lakeview Road
Mark Passon appeared on behalf of the project.
Mr. Passon explained that in August 2025, there was a fire at the facility, and he needs
to reconstruct the building. The plans that were submitted were approved in a prior
Planning Board meeting as part of an expansion that had expired. It is the same
footprint that was approved, just a more updated building that is all one building with
more curb appeal and space.
Due to the fact that there are new members on the Planning Board, Mr. Rogers asked if
Mr. Passon could give a little history so they can be aware of what buildings were
previously on the site.
Mr. Passon replied the original building footprint was 40 ft. long by 30 ft. wide, then they
put in an addition off the back of an additional 20 ft. wide by 94 ft. long. Since the fire,
he would like to square it off and make it all one building instead of a series of additions
over the couple of years they have been in business.
3
Page 4
Town of Hamburg Planning Board Minutes May 20, 2026
Mr. Rogers explained to the Planning Board this parcel is currently zoned C-2 and there
are some proposed changes coming to Lakeview from a zoning standpoint. There are
talks of creating a new Lakeview Commercial District specifically for the C-2 properties
that have frontage onto Lakeview Road or Route 20, which to date have not happened.
Mr. Passon does have a special use permit for some minor auto-body work and as the
Lakeview Commercial District is currently written, this would be a permitted use.
Town Engineer Camie Jarrell noted that in the general sense, she will need to know
grading and other basic items. It appears that Mr. Passon will be doing some work on
the parking lot so the Engineering Department will need the basic drawings to be
reviewed accordingly.
Member Ryan asked if the building Mr. Passon is going to be constructing is the building
that had a fire and if he is going to be adding onto that building.
Mr. Passon replied the entire building is coming down and needs to be rebuilt.
Member Ryan further clarified if the other building that is on the lot is the auto shop and
asked if that is going to stay.
Mr. Passon replied that is correct.
Chair Gronachan stated after reviewing the original project, it states that there will be no
outdoor storage but there is a lot of objects outside. Due to that, in order for her to
support this project, there would need to be no outdoor storage, and the property would
need to be cleaned up. She asked Mr. Passon when he rebuilds, will all the stuff located
outside now be kept inside.
Mr. Passon responded that he will keep as much inside as he can since it is a large
building. He was unaware that he could not keep any carts outside because he has
always done that.
Chair Gronachan was also surprised but it is very clear in the resolution when this was
first passed. She would like to see the lot cleaned up when construction is done.
Chair Gronachan asked will the setback from the road be the same for the new
building?
Mr. Rogers clarified that it will, and will verify this.
Chair Gronachan then asked the following questions, and received the following
answers:
• What is the total square footage of the lot?
4
Page 5
Town of Hamburg Planning Board Minutes May 20, 2026
o 1.0048 acres.
• When this is completed, how many buildings will be on the lot?
o 2 buildings.
• What is the total square footage of the new building?
o 4,700 for the building with a covered patio that is attached which is
another 1,350 sq-ft, and the other building has 2,899 square footage.
• What is the potential number of golf carts that you could have on the property
during peak season?
o 30-40 carts.
• Do the carts not have Lithium batteries?
o They are a combination of both lead acid and lithium.
The project was then tabled until the June 3, 2026, Planning Board meeting for a public
hearing and to allow for Mr. Passon to provide a landscape plan.
REGULAR MEETING
CALL TO ORDER:
The meeting was called to order at 7:12 PM.
PLEDGE OF ALLEGIANCE
Cynthia Gronachan led the meeting attendees in the recitation of the Pledge of
Allegiance
ROLL CALL
Present: Chair Gronachan, Member Clark, Member Geraci, Member Ryan
Member Stewart, Member Chmura, Member Zajac, Member
Quandt (alternate)
Absent:
Staff: Josh Rogers, Planning Department; Planning Board Attorney
Joseph Gogan; Camie Jarrell, Engineering Department
Erie County Agricultural Society- Requesting a Site Plan Approval for a proposal
to demolish three (3) structures and construct a 32,850+/- sq-ft one-story building
within the existing Slade Park between the existing Fireman’s Building and
Grange Building to be located at 5600 McKinley Parkway
5
Page 6
Town of Hamburg Planning Board Minutes May 20, 2026
Doug Hutter of Zaxis Architectural appeared on behalf of the project and gave an
overview of the project.
The Town Conservation Advisory Board provided the Planning Board a memo with the
following comments:
• Save as many trees as possible and consider planning more trees than 32.
• Relocate as many trees as possible, especially the two red Japanese Maples.
• Plant mature trees, suggest 3” caliper.
• Support tree diversity. The importance of planting a variety of tree species is
significant to note considering the ash borer impact and likelihood of threat to
other species in the future. The architect reported that details of the replacement
species were still to be determined.
• Ensure tree survival with appropriate post planting care with an action plan for
replacement if needed.
• Architect, Doug Hutter mentioned that the long-term plan for the Fairgrounds is to
connect park-like space throughout the Fairgrounds. Since there will be an
increase in parking space and impermeable surface area, consider adding
islands of trees in the new parking and transportation areas for shade, native
species and a wide variety to best survive future climate change.
• As conservationists it is important that we draw attention to the impact of
development and mature tree removal. Timing of mature tree removal is
significant to birds and animals who use these trees as their nesting grounds.
When nearly 30 mature trees are removed it impacts birds, insects, squirrels and
other animals. Consider timing tree removal with the least impact to the wildlife.
Mr. Rogers explained that the CAB met with Mr. Hutter on Saturday, May 16th and were
provided with a tour of the site along with an overview of the project. The CAB did
provide a memo for the Planning Board to consider before making their site plan
approval decision.
Town Engineer Camie Jarrell added that there has been a conversation between the
Engineering Department and the architect since the last meeting to discuss utilities and
grading and drainage. At this point, everything is going in a good direction.
Member Ryan asked a question directed for the CAB. In the report, it is suggested that
the Japanese Maple Trees be saved, how successful is it to save a tree and replant it if
it has to be moved?
Leona Rockwood, Chair of the CAB, stated that they do not have the information
regarding the success rate. However, due to the fact that the Japanese Maples are
6
Page 7
Town of Hamburg Planning Board Minutes May 20, 2026
thriving and are estimated at around $5,000.00 each, the CAB would like to see them
saved.
Mr. Hutter stated that he has already spoken with the Erie County Agricultural Society
and that they are willing to relocate the trees (which are between 12-15 ft tall and 4
inches in diameter) even though they are considered an invasive species. At this point,
they do not have a current relocation point, but it is something that will be shown on a
landscape plan
Member Clark would like to make it a condition for the site plan that the Japanese
Maple trees be relocated to satisfy the requests from the CAB memo.
Member Chmura made a motion to approve the following resolution:
Erie County Agricultural Society New Event Center
5600 McKinley Parkway
SEQR and Approval Resolution
May 20th, 2026
1. SEQR:
In accordance with the New York State SEQR Law, the Town of Hamburg Planning
Board has reviewed the Erie County Agricultural society even center project proposal, to
demolish three (3) structures and construct a 32,850+/- sq-ft one story building within
the existing Slade Park between the existing Fireman’s Building and Grange Building at
5600 McKinley Parkway (SBL: 183.10-1-8), held the required public hearing on May 6th,
2026, and completed the required 239-m referral to Erie County. Based on this review
for this Unlisted Action, and completion of Part 2 and Part 3 of the SEAF, the Planning
Board has determined that the project is not anticipated to result in any significant
adverse environmental impacts, and a Negative Declaration is hereby issued, and the
Planning Board Chair is authorized to sign the Part 3 which will act as the Negative
Declaration.
Original SEQR stated that the public hearing was held May 20th, 2026. Member
Chmura made an amendment to change the date to May 6th, 2026.
Motion made by Member Chmura, with a second from Member Clark.
Resolution passes with no opposition.
2. Site Plan Approval
7
Page 8
Town of Hamburg Planning Board Minutes May 20, 2026
Based on the review of the Erie County Agricultural Society event center project
materials and having completed the SEQR process, the Hamburg Planning Board
hereby approves the project with the following conditions and determinations:
1. Approval is contingent upon the Engineering Department comment letter
dated 05/15/2026.
2. The installation of sidewalks is not warranted, as the project is located within
the Erie County Fairgrounds property, and there will be pedestrian walking
paths within the site.
3. The landscaping plan shall be approved by the Planning Department.
4. All proposed lighting on the project shall be dark sky-complaint.
Motion to approve by Member Chmura, seconded by Member Ryan.
Resolution passes with no opposition.
Brandon Santa- Requesting Site Plan Approval for a proposal to construct six (6)
shop warehouse buildings along with other associated site improvements to be
located on a 7.46-acre parcel at 0 Lakeshore Road (SBL #: 150.00-1-6.2)
Attorney Sean Hopkins appeared on behalf of the project along with Brandon and
Brittany Santa.
Mr. Hopkins:
A brief overview of the project was given.
After reviewing the site plan resolutions, there are three conditions that they would like
to discuss.
1. Conditions 6 and 7 require that all vehicles do not use the State right-of-way
off Hawley Road to access the project site. They would like this to be subject
to heavy equipment and not to include passenger vehicles.
o Mr. Santa will make sure that his employees follow this stipulation and that
he has applicable language in the lease agreement to state this.
However, they want it to be made clear that they cannot ultimately ensure
or enforce that language against each and every instance where this may
occur.
Chair Gronachan stated that the reason that she felt it was necessary to add this as part
of the resolution in the lease is due to the fact that this is a contested project, and she
thought that by putting it in the lease it would make the tenants aware of the stipulation.
She is not in favor of making it only heavy equipment and she feels all vehicles should
be included.
8
Page 9
Town of Hamburg Planning Board Minutes May 20, 2026
Mr. Hopkins responded that they are ok with that, but they would like the stipulation to
apply to heavy equipment. However, if it must apply to all vehicles to make this pass,
they are willing to put it in the lease and ensure compliance.
2. Condition 13 - the topic of hazardous waste has been discussed previously,
and they would like to make a couple of things clear:
o Mr. Santa already has two diesel tanks on the site with a capacity of 1,000
gallons and those would be moved to the back of the site to an
appropriate location.
o The type of tenants that they are envisioning do use materials that would
qualify under the State definition of hazardous materials. What they are
suggesting is to modify that condition to state that any material storage
would comply with the applicable standards of the DEC.
Member Chmura noted that she has an issue with the fact that the site plan does not
indicate that there are two (2) 1,000-gallon diesel tanks that are now going to be part of
the site. She understands that they are already there, but that they are now going to be
moved as part of this project and then be part of the site plan.
Mr. Hopkins explained that ultimately, the goal for the Applicant is to have his home on
one property and move his business to the back part of the property. This would require
him to relocate those two tanks.
Member Chmura clarified that the location of those tanks would eventually be a part of
the project site and because of that, the Applicant would have to indicate where those
tanks would be located.
Member Chmura asked how does 2,000 gallons of diesel fuel end up contemplating
what the DEC is calling a hot spot for any sort of engineering requirements with respect
to the SWPPP?
Town Engineer Camie Jarrell explained that it would not have impacts with respect to
the SWPPP, as tanks have very strict DEC requirements and any moving/relocation of
the tanks would have to comply with their DEC permit to have fuel tanks.
Mr. Hopkins noted that just to be clear, the tanks already have a secondary
containment, and they meet all safety requirements.
Chair Gronachan stated she has an issue with this because it is a change in the site
plan being done at the eleventh hour. For clarification, the tanks are currently on the
property with the house, so it is two separate pieces of property.
Mr. Hopkins confirmed that she is correct.
9
Page 10
Town of Hamburg Planning Board Minutes May 20, 2026
Chair Gronachan stated if the tanks are being moved, it is a change to the site plan, and
she is not in favor of that. If they would like to make a move like that, then they would
have to come back before the Planning Board.
Member Quandt explained that as part of his day job, he deals with tanks greater than
the 1,000 gallon capacity. He asked for clarification on the following:
• Are these double wall tanks?
o The Applicant responded yes.
• Are they steel or are they poly steel?
o Steel
• Around the tanks, are there any concrete pads or are they sitting on gravel?
o They are on gravel and owned by the fuel company.
Member Quandt explained with those types of tanks, as long as you are meeting all the
DEC requirements, there should be no necessary additional conditions.
Mr. Rogers asked if the Board would like to specify a condition that speaks specifically
about the fuel tanks and that they must meet the DEC applicable standards and have it
codified in the site plan conditions as well?
The entire Board noted they were in favor of that.
Chair Gronachan wants it stated that if they were to move forward with the movement of
the tanks, due to the fact that they are not on the site plan, the Applicant must return to
the Planning Bord with a new site plan.
Mr. Santa stated that ultimately if he has to leave them where they are currently located,
he is ok with that.
3. Condition 16 - in the red line- the Applicant would like to make clear that
business activities that could occur there in the future, in theory, could be a
little broader than the definition that is there. They would not want to be boxed
in where the tenants that usually utilize this type of facility would not be
permitted.
Mr. Rogers asked if the Board wanted to add a provision that states “related business
activities as determined by the Supervising Code Enforcement Officer”? He would be
the one that would interpret what a related business activity would be.
Mr. Hopkins would rather it states based on what M-3 zoning allows and excludes.
Chair Gronachan stated that the Code Enforcement Officer is the one that reviews
allowable uses and gives interpretations of the Code.
10
Page 11
Town of Hamburg Planning Board Minutes May 20, 2026
Mr. Rogers explained that it could be worded either way.
Mr. Rogers noted that the Planning Board previously issued a negative declaration at
the May 6th Planning Board meeting, and it was sent to the County for a 239-m referral.
A public hearing was also held on March 4th, 2026.
Member Chmura stated she would like for all the landscaping in regard to the berm
enhancement to be completed in phase one of the project. She would like the site plan
to state that there shall be no building mounted lighting on sides of the buildings that are
adjacent to residential properties.
There was some back and forth with the Woodlawn Sewer District, and she does not
believe that they have an access agreement between the Applicant and the sewer
district fort their property. Prior to the issuance of a building permit, she would like a
condition that the Applicant provides a written agreement with access and maintenance
with the Woodlawn Sewer District.
Town Engineer Camie Jarrell noted that in her engineering letter, it states that any third-
party approvals or permits will be received before she will grant final engineering
approval. She would consider that agreement with the Woodlawn Sewer District a third-
party approval.
Member Zajac asked how would the access road be constructed, meaning, what
materials are going to be used?
Mr. Santa stated that it is shown on the plan, he is not sure how it will be designed but
he assumes that it will either be paved or a stone roadway, whatever is required.
Member Zajac asked if that will connect to the 0 Lakeshore Road property?
Mr. Santa stated that it is going to connect the project site with Beam Road.
Chair Gronachan stated that this is what Woodlawn requested and the Planning Board
is unable to change that.
Member Zajac is uncomfortable with the fact that it is crossing over a parcel that is
unusable to get to a usable parcel. He feels that there has been quite a few
improvements on the other property that are benefiting this property. There have been
so many improvements to the 30-foot-wide property that is not being developed, and he
feels that some of them may not have occurred if this project was not being developed.
It is very hard to separate the two.
Chair Gronachan stopped this conversation as it has been discussed at length by
Member Zajac and other members of the Planning Board and Planning Department.
11
Page 12
Town of Hamburg Planning Board Minutes May 20, 2026
Chair Gronachan stated that on the first night that this project was presented, Mr.
Rogers ruled that the Board could not include that piece of property in this project.
Attorney Gogan added that he reviewed the GIS Map and Woodlawn Sewer does have
access that extends to the State Road, however, it is only 10-feet wide.
He stated that it was mentioned that the Applicant uses 3377 and 3379 Lakeshore Road
that goes to Hawley, and he asked was a survey ever done that shows where that
property line is? The GIS map shows that it is a trapezoid shape and that a person
would have to cross this property if they were coming in off of Hawley Road.
Due to the way the property is set forth, Attorney Gogan stated that he believes the
Applicant should get an agreement from the property owner.
The Applicant responded that he has already received an agreement.
Attorney Gogan asked if it is a recorded agreement?
Mr. Santa stated that he had the property staked by Nussbaumer and Clarke, to see
where the property line actually lays. It is only a few feet off the building.
The Applicant was asked to send the survey to the Planning Department so that it can
be reviewed.
Member Stewart made a motion:
Resolution – Site Plan Approval
0 Lakeshore Road Industrial Shops Project
5/20/2026
Whereas, the Town of Hamburg Planning Board received a site plan application from
Brandon Santa for the construction of six (6) single-story contractor shop/warehouse
buildings, totaling 75,220 sq-ft on a vacant lot along with associated parking, on-site
utility improvements, stormwater management, site lighting, and landscaping at 0 Lake
Shore Road located behind 3401 Lake Shore Road (SBL #: 150.00-1-6.2); and
Whereas, pursuant to Part 617 of the implementing regulations pertaining to Article 8
(State Environmental Quality Review Act - SEQR) of the Environmental Conservation
Law, the Hamburg Planning Board has established itself as SEQR Lead Agency and
conducted a coordinated environmental (SEQR) review for this project which has been
classified as an Unlisted action; and
Whereas, the Planning Department completed the required 239-m referral to Erie
County; and
12
Page 13
Town of Hamburg Planning Board Minutes May 20, 2026
Whereas, the Town of Hamburg Planning Board held the required public hearing on
March 4th, 2026; and
Whereas, in accordance with Part 617 of the implementing regulations pertaining to
Article 8 (State Environmental Quality Review Act - SEQRA) of the Environmental
Conservation Law, the Town of Hamburg Planning Board has issued a SEQR Negative
Declaration on May 6, 2026.
Now, Therefore Be It Resolved, the Town of Hamburg Planning Board issues
conditional site plan approval for this project with the following conditions:
1. Approval is contingent upon the Engineering Department comment letter dated
5/15/2026.
2. The landscaping plan (dated 4/30/2026) shall be approved by the Planning
Department.
3. Berms along Rush Creek that are extended the full length of the creek and pulled
back from the creek bank shall be installed and maintained by the Applicant in
phase 1 of the project.
4. The installation of sidewalks is not warranted as they already exist along the
frontage of Lakeshore Road.
5. All proposed lighting on the project shall be shielded and dark sky-compliant to
ensure there will not be any light spill onto adjacent properties. There will be no
building mounted lighting on elevations of buildings adjacent to residential
properties as shown on the site plan.
6. All vehicles shall be required to continue southbound and utilize the Woodlawn
exit off of Route 5 to circle around and come back up Route 5 going northbound
to make a right into the Project Site. The Applicant shall include language
regarding this traffic plan in the lease agreements with tenants.
7. The Applicant will direct his company drivers, and to the maximum extent
practicable his tenants, to not use the State right-of-way off of Hawley Road to
access the Project Site.
8. The Applicant shall comply with Erie County Division of Sewerage Management
(ECDSM) requirements to provide a 30-ft wide sanitary sewer easement,
centered on the pipe, that will be required for the existing sanitary sewer located
on the 10-ft wide parcel owned by the Woodlawn Sewer District (SBL #: 150.00-
1-15).
9. Given that Rush Creek is considered a 303(d) by the NYSDEC, it shall be a
requirement that there are two (2) SWPPP inspections per week to ensure that
necessary erosion and sediment control measures are in place.
10. Stormwater management facilities shall be designed to meet NYSDEC
requirements for water quality and quantity, including a 100-year storm event.
13
Page 14
Town of Hamburg Planning Board Minutes May 20, 2026
11. The Applicant shall comply with Chapter 243 Tree Management of Hamburg
Town Code for any proposed tree clearing, clear cutting, or tree removal.
12. The Applicant and subsequent tenants shall be required to comply with the
Chapter 175 Noise Ordinance of Hamburg Town Code.
13. There shall be no storage of hazardous waste materials as defined by the NYS
Department of Environmental Conservation in the shop buildings or the outdoor
storage areas that is not in compliance with applicable standards.
14. In the event above ground petroleum storage tanks, of any capacity, are to be
located within the project site, the tanks shall comply with all standards of the
NYSDEC, and the location and the installation details shall return to the Planning
Board for amended site plan approval.
15. Outdoor storage shall be limited to the areas denoted on the approved site plan
dated 4/30/26.
16. Use of the shop buildings is limited to storage of tenant equipment, machinery,
materials, tenant workshop space and related business activities per the M-3
zoning district.
17. The Declaration of Easements for the parcels at 0 and 3401 Lake Shore Road
shall be recorded at the Erie County Clerk’s Office and a recorded copy shall be
provided to the Planning Department.
18. Deviations from the approved site plan or approved landscaping plan determined
to be significant by the Planning, Engineering, and Code Enforcement
Departments will require amended site plan approval from the Planning Board.
19. There shall be no open burning on the project site.
There was a motion to approve by Member Stewart, seconded by Member Geraci.
Resolution passes with six (6) ayes and one (1) nay from Member Zajac, the motion
carried.
716 Storage, LLC- Requesting Re-Approval for an as-built site plan for a 71,400
sq-ft self-storage facility on vacant land located at the southwest corner of South
Park Avenue and Southwestern Boulevard
Darryl Martin, project architect, appeared on behalf of the project and gave a history of
the project.
The applicant did not construct the two buildings, 6000 and 3000 square foot storage
buildings, that were originally going to be located on the west property line.
Currently the building that is there is a climate-controlled storage building that is doing
quite well. The other changes that was made are removal of lighting in the middle of the
14
Page 15
Town of Hamburg Planning Board Minutes May 20, 2026
parking area and the removal of landscaping with regard to the curb and grass area on
the south side, closest to the car wash.
Mr. Rogers stated that the original site plan was approved in 2023 and had two
buildings on the west property line as well as some striping for parking, and lighting. For
the amended site plan, the two buildings are gone, and they are looking for an as-built
site plan, meaning the Applicant is looking for approval of a site plan of what has been
built to date with some other improvements.
Town Engineer Camie Jarrell noted that the removal of the buildings is of no concern.
She agrees that eliminating the island by the gate is safer due to the way the road
bends. By moving the lighting, there is no spillover to the neighboring property, but it
does make the lighting less in the center of parking area. The removal of the striped
island in the middle does mean that it is a little wide there and with no drive lanes there,
cars coming in and out are left to their own device to make sure they stay to the right.
From an engineering perspective, these are not a big concern at this time, but
something for the Planning Board to consider.
The Planning Board is in agreement with not reopening SEQR.
The project was tabled to the June 3, 2026, Planning Board for a public hearing, and the
Planning Department was authorized to draft approval resolutions for Planning Board
consideration.
Hamburg II East Ess, LLC and Hamburg II West ESS, LLC- Requesting Planning
Board Approval of a Use Variance and Planning Board Approval for a Change of
Use and Site Plan Approval for a Tier 3 battery energy storage system (BESS) to
be located on a 2.7 – acre site at 6433 Railroad Avenue
Attorney Sean Hopkins appeared on behalf of the project along with Andrew Welch, the
Director of Development, and Jeremy Kaufman the Project Manager.
The Applicant understands that this project will require a use variance from the Zoning
Board of Appeals so with the exception of potentially seeking Lead Agency status
pursuant to SEQR, they are not asking for any other formal determination at this time.
The site itself is located at 6433 Railroad Avenue and owned by Donald Spittler who has
entered into an agreement, which a copy has been provided with the variance
application.
They are proposing a Tier 3 battery storage project which is defined in the Town Code.
15
Page 16
Town of Hamburg Planning Board Minutes May 20, 2026
The site was previously zoned industrial until recently when the Town Board changed
the zoning classification and it became neighborhood commercial, hence the need for a
use variance. If you look at the wide range of allowable uses for this zoning district,
none of them would be allowed on the property due to the lack of frontage and the close
proximity to the railroad tracks.
The Applicant has also already entered into an agreement with National Grid.
Mr. Joshua Rogers noted for full disclosure as well as being the Town Planner for the
Town of Hamburg, he is employed by Wendel. Wendel was approached by RIC Energy
to draw up site plan drawings for this project and declined to do so because of the
conflict of interest. He does know the applicants through his work at Wendel, however,
Wendel does not have anything to do with this specific project
Member Chmura noted due to the fact that she works at Wendel as well, she will be
recusing herself from the review of this project, even though her company does not
have any direct involvement in the project
Member Quandt was appointed as an active member.
Jeremy Kaufman gave a history of the company.
• Project:
o The current conditions of this parcel, located between two railroad tracks
on both sides, in terms of other developments, are very constrained by
how narrow the land is.
o A large perk for this project is that there is dense screening on all sides so
it would be very challenging for anyone outside of the parcel to see the
battery storage project.
o It is mostly flat topography and is roughly 2.6 acres.
o They are saying it is one project, but it is comprised of two co-located five
(5) megawatt battery storage projects.
o They use Tesla megapack 2XL, which has 24-hour remote monitoring
o Project area is about 14,108 square feet or 0.32 acres including the
access road it is about 0.6 acres.
o No need for the utility to add additional infrastructure for the project, the
point of interconnection is at the edge of the parcel.
o A key perk of battery storage for the local community is that it serves to
stabilize the grid. Meaning that it balances supply and demand at all times.
Andy Welch, Director of Development, gave an overview of the technology
• Technology of Tesla Megapack 2XL:
16
Page 17
Town of Hamburg Planning Board Minutes May 20, 2026
o Chemistry is an Iron Phosphate battery
o It is the newest model and is much less volatile than earlier classes of
batteries.
o As mentioned, it is a 24-hour remote monitoring project with additional
thermal imaging cameras.
o Over 20,000 units deployed without a single incident
• Cabinets
o About 8-9 feet tall, 6 feet wide and 30 ft. long.
o Not a giant battery but it is made up of lots of cells that are 6X6.5X2 that
are in trays which are stored in 24 modules that slide into the cabinets.
This ensures a level of isolation and helps to keep the top of the cabinet
which has the cooling equipment open
o The center of the cabinet is the battery management system and is
monitored at all times. The monitoring is looking for any abnormalities in
behavior such as charging wrong or heating up so that it can be shut down
immediately.
• Operation
o Charge at night when the power is more readily available between 10pm-
8am
o Discharge between peak hours of 2pm-8pm
• Safety
o Committed to full compliance with State guidelines and NFPA 855 safety
standards
o Equipment and design compliant with national and local safety codes
o Peer review during permitting
o Manufacturer design for hazard control
o Dispatchable personnel are available 24 hours a day
o Signage at facility and near property entrance
o Security monitoring of facility
o Emergency response plan before commissioning
o Central station monitoring
o Physical Structure Safety:
▪ Battery modules with active and passive fuses-externally
serviceable
▪ Touch-safe Customer Interface Bay
▪ Non-walk-in IP66 enclosure and deflagration mitigation
▪ Thermal roof with overpressure vents
Mr. Rogers stated that this is a unique project for the Town of Hamburg. There is a
battery energy storage project in the Village of Blasdell, that was not done by this
17
Page 18
Town of Hamburg Planning Board Minutes May 20, 2026
company. This is unique because they are looking for a use variance from the Zoning
Board. They are before the Planning Board first because they are going to be the lead
agency and responsible for making a SEQR decision.
Mr. Rogers explained that after the Applicant gets a decision from the Zoning Board,
they would return to the Planning Board for a change of use and ultimately Site Plan
Approval. The Town Code states that if there is a decision between the Zoning Board
and the Planning Board, the Planning Board takes lead agency.
Mr. Rogers recommended the Planning Board conduct a coordinated review with the
DEC, if available, the owners of the railroads, and of course the Board may send it to
any other agencies they deem appropriate.
Mr. Rogers asked the Applicant to submit a Full Environmental Assessment Form, not
just the short form which had been submitted.
Town Engineer Camie Jarrell added for clarification to the Board, it looks as if the
property does not have road frontage, however, there is a public right-of-way. Currently,
the existing driveway that is shared zig zags throughout the public right-of-way to
service both buildings on this property. The applicant is going to redo the driveway and
bring it up to the new project. This would be within a public right-of-way. For
consideration, the Board would be allowing a private driveway to be upgraded and used
in a public right-of-way. As stated, there is already a driveway there so she can see
how that would be permitted.
Member Ryan asked if the Applicant would provide a HMA (Hazard Mitigation Analysis)?
The Applicant responded yes, it is their intent to do that as part of the site plan approval.
Member Ryan asked if the Applicant works with fire protection engineers on these types
of projects.
The Applicant responded yes, they typically work with a firm called ESRG, who are the
leaders in the field.
Member Ryan mentioned that the Applicant previously stated that once the fire has
started, it is a four hour burn out. She asked for clarification, is that four hours per cell
or four hours if a bunch go up in flames? How long could one expect a fire to last?
The Applicant answered that the most recent fire was in Warwick, and it was a total of
six hours before it went down. It is not that the batteries cannot be put out it is that they
are stored in cabinets that are watertight and you cannot get water onto them. The only
way to get water onto the batteries is to open the door and pull the trays out which
would be putting personnel in more danger.
18
Page 19
Town of Hamburg Planning Board Minutes May 20, 2026
Member Stewart asked what is the lifespan of the battery packs and what happens to
the batteries after their life use?
The Applicant answered that the lifespan is 20 years for the battery pack. Once the
battery is at its end there is a full decommissioning plan where the cabinets themselves
are removed, with the batteries still in them and taken back to Tesla. Tesla then recycles
all of the components and disposes them at their designated facility. Once the cabinets
have been removed, the applicant would continue the decommissioning of the land by
digging up the concrete foundations and restoring the land.
Mr. Rogers also wanted the Planning Board to know that similar to the Solar Law, if the
project were not to be in operation for more than a year, the Town has the right to enact
the decommissioning plan and use the bond that will be on file to then remove the
infrastructure.
Mr. Rogers stated that there has been a lot of questions regarding noise, and asked the
Applicant if they could speak to the fact of whether or not this project produces more
noise than a typical kind of facility.
The Applicant answered that the only noise associated with this project is the fans for
the cooling system. They are not particularly robust and are variable speed fans, so
their operating level is going to depend upon things such as ambient conditions. The
noise does not propagate that far and there is virtually no impact on the surrounding
areas.
Mr. Rogers noted that going back to the coordinated review, as stated before, there are
no other agency approvals but as Mr. Hopkins noted earlier, this property had been
rezoned about two years ago from M-2 to Neighborhood Commercial. At that time, the
Town did get a number of comments from Erie County about the industrial rezoning that
had been done. While the County does not have any approval power per se for this
project, he suggested that the Board send the project to the County to get their
comments from a regional standpoint.
Chair Gronachan stated that last month, she attended a Planning/Zoning training
session, and this was a topic of discussion. These are the issues that she has:
▪ It was not just one fire in the State of New York; there was a total of 5. What was
explained to her was the reason the fire code got changed in January was
because there were not any fire stations that could handle the fires that took
place in these towns, so the fires had to burn for day. Why is it that you think
there was only one fire when she was told there were five.
▪ How many of these sites or operations are throughout the State of New York?
And how many instances have there been in the last five years?
19
Page 20
Town of Hamburg Planning Board Minutes May 20, 2026
The Applicant responded that at this point, they do not have any of their projects
operational. The first one is in its final approval stage. However, there are tens of
thousands of the Megapack 2XL’s in operation across the country. At this point in time,
there have been zero instances of a fire with this battery, which is why they chose to go
with this technology.
John Macon, Leader of the Southtowns Hazmat Team, was in attendance and available
to answer questions the Planning Board may have.
Chair Gronachan asked if she was correct with what was stated in regard to the fires in
the other cities? Are those fires similar to this kind of project?
Mr. Macon did not have knowledge of all the fires but could speak on 1 or 2 of them.
This is a different project than what was involved in those other areas and to his
knowledge a different company. Every company uses a different technology, and the
chemistry of the batteries are different as well as different safety precautions. The fire
that was near Watertown had older technology older systems and was very different
from what is being proposed here.
Chair Gronachan asked Mr. Macon if he can address the concerns and rumors
regarding whether if there is a fire, you cannot have water used on it and it has to burn
for days?
Mr. Macon answered that every locality is different. Lithium-Ion Batteries are not a new
technology, but it is a new problem. There is new technology coming out every day
including new extinguishing agents that are being proposed to put out the batteries.
However, you are correct that water is not a great extinguishing agent for these
batteries.
Chair Gronachan asked what does the fire department have to do to meet the standards
of the New York State Fire Code?
Mr. Macon said that he cannot speak to the fire code as he is not an expert on that. The
Southtowns Hazmat Team has people that they call when they have questions.
Chair Gronachan would like to have someone look at the new State Fire Code because
it has just changed due to what happened with these older fires.
She asked with respect to the Blasdell facility, do the fire departments in that area have
to have different training required versus the typical training?
Mr. Macon said the training that was mentioned this evening is very similar to the
training that was received for the facility in Blasdell. The Applicant is an expert in that
20
Page 21
Town of Hamburg Planning Board Minutes May 20, 2026
technology, and most fire departments will probably defer to them when it comes to an
emergency situation.
Chair Gronachan noted she would like to see if the fire departments are trained for this.
Member Geraci asked, not being familiar with battery storage, do they produce their
own electricity that is supplied to the area or sold to NYSEG?
The Applicant responded these are batteries, they do not generate electricity they store
electricity. They charge at night and discharge during the day.
Member Geraci asked what is the purpose of storing electricity?
The Applicant responded there are several reasons. First, without effective battery
storage, electricity needs to be generated at the same time as it is being used so the
load has to match the supply. Secondly, batteries allow for cheaper power in the power
industry and lastly all the power that is put out is used within Hamburg.
The Planning Board authorized the Planning Department to file the appropriate notices
and conduct a coordinated review.
The project was tabled to the June 17th, 2026 PB meeting.
OTHER BUSINESS
Member Stewart made a motion, seconded by Member Ryan, to approve the following
minutes:
o September 17, 2025
o November 19, 2025
As the vote on the motion was six (6) ayes, and two (2) abstention from Member Zajac
and Member Quandt the motion carried.
Member Ryan made a motion, seconded by Member Stewart, to approve the following
minutes:
o March 18, 2026
o April 1, 2026
o April 15, 2026
o May 6, 2026
As the vote on the motion was seven (7) ayes and one (1) abstention from Member
Quandt the motion carried.
21
Page 22
Town of Hamburg Planning Board Minutes May 20, 2026
Member Chmura made a motion, seconded by Member Ryan, to adjourn the meeting.
Carried.
The meeting was adjourned at 9:20 PM.
Respectfully submitted,
August Geraci, Secretary
22