Text · page 6 of 13
Town of Hamburg Planning Board Minutes March 18, 2026 • Design complies with Town requirements for Tier 3 solar systems o Setbacks, fencing, panel height, access road, landscaping • No impact to jurisdictional wetlands, archeological or cultural resources, or critical species or habitat • Only minimal (spot) grading and stormwater treatment anticipated o Project will not increase peak stormwater runoff • Disturbed areas seeded with native, pollinator-friendly, flowering mix o Mowed (or grazed) 3-4 times a year o Land allowed to rest and regenerate (no water, fertilizer, pesticides) • Agricultural, open-know perimeter fence lets through small wildlife • Landscaping (343) plantings mitigates views from nearby homes • Coordination has begun with Hamburg Volunteer Fire and Erie County • All solar equipment qualifies as (USA-made) domestic content Local Benefits: • Lease allows land to stay in family, potential for future use (farming) • Possible agrivoltaics opportunities (sheep grazing, bee keeping) • Supports Town and County energy and sustainability goals o County Community Action Climate Plan: Transition to decarbonized electrical grid o Town Comprehensive Plan: Protect and enhance environmental assets, focus on re-use and revitalization, maintain solid mixed-use base, revitalize infrastructure • Financial benefits o Annual escalator PILOT payment to county IDA, e.g., $4,500MW (TBD) o Local construction labor (prevailing wage/union): $2.7m (est.) • Distributed Generation or DG projects generate electricity for the local grid, for local use o 3,900,000+kWh in year 1: annual power use of 575 NY homes o Community Solar: bill credits for low/moderate-income households via S-SFA Mr. Rogers explained to the Planning Board and the audience that this is the first time the Applicant has been before the Board so this meeting and a couple more meetings in the future are not open for public comment, meaning that no one will be able to come up to the microphone and speak. Mr. Rogers stated that he has provided his email address and members of the public are able to contact him with their comments which are shared with the Planning Board. When the project is going to be set for a public hearing, 6