Southtowns Record

Planning Board Regular Meeting, Jan 21, 2026 — Minutes

Government
Town of Hamburg
Board
Planning Board
Meeting
Jan 21, 2026
Kind
Minutes
Topics
Zoning and land use, Roads and traffic, Water, sewer and drainage, Public safety, Budget and taxes, Housing

Original document

Same meeting

Text · page 1 of 18

Town of Hamburg Planning Board Minutes  January 21, 2026

  Town of Hamburg
  Planning Board Meeting
  January 21, 2026, Minutes

The Town of Hamburg Planning Board met for a Work Session at 6:30 PM, followed by
a Regular Meeting at 7:00 PM, on Wednesday, January 21, 2026, in Room 7B of
Hamburg Town Hall.

WORK SESSION

Carl DiNezza- Requesting Preliminary Plat Approval of a 2-lot subdivision at 58
North Shore Drive

Mr. Carl Dinezza appeared on behalf of the project.

Mr. DiNezza explained that the request is being made because he is looking to build a
home for his daughter who is moving back to the area. He would like to have the
property split and he did go to the Hoover Beach Community Association and got their
approval as well as having the property surveyed. After he gets done with the Planning
Board, he will be going before the Zoning Board, get an address for the property from
Engineering, then he can work with an architect to find out exactly what can be built
properly and within code. It was suggested by Code Enforcement that he utilize a
framed garage that is on the parcel to keep costs down.

Mr. Rogers explained that Mr. DiNezza came before the Planning Board in 2023 with a
similar request to subdivide property over on North Shore Drive, which is in the Hoover
Beach area. Mr. DiNezza was going to go before the Zoning Board but did not move
forward at that point in time. He is back before the Planning Board to subdivide the
property so he may build a house for his daughter and her family. Mr. Rogers brought to
the Boards attention that parcel is located in Hoover Beach and that area has its own
set of rules. Though technically in the Town of Hamburg, the residents do not own their
parcels and lease. As such, they are required to get authorization from the Hoover
Beach Community Association, which Mr. DiNezza did and the letter of approval is on
file with the Planning Department. The reason Mr. DiNezza has to go before the Zoning
Board is because his proposed subdivision request and the lots that would be created
do not meet the minimum lot size in R-2. When served by public sewer you are required
to have 10,000 sq-ft., which obviously by subdividing this property the second lot would
not meet that requirement. One of the variances for lot size that Code Enforcement
mentioned was that there would be rear and side yard setback variances that would be
requested. What Mr. DiNezza is looking for is any comments that this Board has that will
be passed on to the Zoning Board as they take a look at this request for all the
variances for the subdivision.

  1