Southtowns Record

October 19, 2026 Town Board Meeting, Oct 19, 2026 — Agenda

Government
Town of Hamburg
Board
Town Board
Meeting
Oct 19, 2026
Kind
Agenda
Topics
Short-term rentals, Zoning and land use, Water, sewer and drainage, Budget and taxes, Public safety, Parks and recreation, Energy and data center siting, Moratoriums

Original document

Text · page 54 of 201

Read the whole document on one page (all 201 pages, each with its own heading)

e. Will the proposed action be constructed in multiple phases?  Yes No
 i. If No, anticipated period of construction:  months
ii. If Yes:
   Total number of phases anticipated
   Anticipated commencement date of phase 1 (including demolition)  month  year
   Anticipated completion date of final phase  month  year
   Generally describe connections or relationships among phases, including any contingencies where progress of one phase
  maydetermine timing or duration of future phases: __________________________________________________________
  ___________________________________________________________________________________________________
  ___________________________________________________________________________________________________
f. Does the project include new residential uses?  Yes  No
If Yes, show numbers of units proposed.
  One Family  Two Family  Three Family  Multiple Family (four or more)
Initial Phase
At completion
  of all phases

g. Does the proposed action include new non-residential construction (including expansions)?  Yes  No
If Yes,
  i. Total number of structures
  ii. Dimensions (in feet) of largest proposed structure:  height;  width; and  length
 iii. Approximate extent of building space to be heated or cooled:  square feet
h. Does the proposed action include construction or other activities that will result in the impoundment of any  Yes  No
  liquids, such as creation of a water supply, reservoir, pond, lake, waste lagoon or other storage?
If Yes,
  i. Purpose of the impoundment:
 ii. If a water impoundment, the principal source of the water:  Ground water Surface water streams  Other specify:

iii. If other than water, identify the type of impounded/contained liquids and their source.

iv. Approximate size of the proposed impoundment.  Volume:  million gallons; surface area:  acres
 v. Dimensions of the proposed dam or impounding structure:  height;  length
vi. Construction method/materials for the proposed dam or impounding structure (e.g., earth fill, rock, wood, concrete):

D.2. Project Operations
a. Does the proposed action include any excavation, mining, or dredging, during construction, operations, or both?  Yes  No
  (Not including general site preparation, grading or installation of utilities or foundations where all excavated
  materials will remain onsite)
If Yes:
  i .What is the purpose of the excavation or dredging?
 ii. How much material (including rock, earth, sediments, etc.) is proposed to be removed from the site?
   Volume (specify tons or cubic yards):
   Over what duration of time?
iii. Describe nature and characteristics of materials to be excavated or dredged, and plans to use, manage or dispose of them.

 iv. Will there be onsite dewatering or processing of excavated materials?  Yes  No
  If yes, describe.

  v. What is the total area to be dredged or excavated?  acres
 vi. What is the maximum area to be worked at any one time?  acres
vii. What would be the maximum depth of excavation or dredging?  feet
viii. Will the excavation require blasting?  Yes  No
ix. Summarize site reclamation goals and plan:

  Page 4 of 15
  FEAF 2026
  54