Text · page 25 of 73
Read the whole document on one page (all 73 pages, each with its own heading)
Town Board of the Town of Hamburg October 5, 2026 Meeting 4.5. Demolition Public Hearing Findings for 5036 Lakeshore Rd. WHEREAS, the Hamburg Town Code Chapter 80-3 C. requires a public hearing to be held prior to the demolition of a structure deemed unsafe by the Town Board; and WHEREAS, the Town Boards designees conducted a public hearing held on September 17, 2026 at 4:00 PM about the demolition of 5036 Lakeshore Rd; and WHEREAS, the property owners representative presented information pertaining to the reparability of the structure, including a structural analysis signed by a registered design professional, and a detailed scope of work with a time line to repair the structure; and WHEREAS, the Town Boards designees review the information provided by the owners representative and made a recommendation that the demolition of the structure located at 5036 Lakeshore Rd. be postponed with conditions; and BE IT RESOLVED that the Town Board postpone the demolition of 5036 Lakeshore Rd. with the following conditions: 1. Work will continue for the remediation and repair of the unsafe condition per the timeline supplied on September 23, 2026 in the scope of work. 2. A new roof covering will be installed by June 30, 2027. 3. Prior to any further demolition or material removal an asbestos survey will be provided to the Town of Hamburg. 4. All drawing and plans must be submitted to the Town of Hamburg Building Department showing the exact method the structural repairs will be performed. 5. All necessary Building Permits need to be obtained before work is started. 6. The house must be tested for mold and if mold is present it needs to be cleaned by a certified mold abatement contractor and retested. 7. All exterior elements of the house must be free from cracks, peeling or chipped paint and must be put back in an as new condition. 8. The Town of Hamburg needs to be listed as additionally insured on the owner and contractor’s insurance policy until work has been completed and a Certificate of Compliance has been issued. 9. The property will remain in the new purchasers name (DeMarco) until work is completed and a Certificate of Compliance has been issued. BE IT FURTHER RESOLVED that if any of the above conditions are not met or not met by the timeline provided by the owners representative, the Town of Hamburg will proceed with the demolition of the structure located at 5036 Lakeshore. 25