Southtowns Record

Town Board Regular Meeting Agenda, Sep 28, 2026 — Agenda

Government
Town of Hamburg
Board
Town Board
Meeting
Sep 28, 2026
Kind
Agenda
Topics
Budget and taxes, Public safety, Water, sewer and drainage, Zoning and land use, Parks and recreation, Energy and data center siting, Roads and traffic, Moratoriums

Original document

Same meeting

Text · page 46 of 142

Read the whole document on one page (all 142 pages, each with its own heading)

d. Will the proposed action generate liquid wastes?  Yes No
If Yes:
 i. Total anticipated liquid waste generation per day:  gallons/day
 ii. Nature of liquid wastes to be generated (e.g., sanitary wastewater, industrial; if combination, describe all components and
  approximate volumes or proportions of each):

iii. Will the proposed action use any existing public wastewater treatment facilities?  Yes  No
  If Yes:
    Name of wastewater treatment plant to be used:
    Name of district:  9  9
    Does the existing wastewater treatment plant have capacity to serve the project?  Yes  No
    Is the project site in the existing district?  Yes  No
    Is expansion of the district needed?  Yes  No

    Do existing sewer lines serve the project site?  Yes  No
    Will a line extension within an existing district be necessary to serve the project?  Yes  No
  If Yes:
   Describe extensions or capacity expansions proposed to serve this project:

  9  9
iv. Will a new wastewater (sewage) treatment district be formed to serve the project site?  Yes No
  If Yes:
   Applicant/sponsor for new district:  9  9
    Date application submitted or anticipated:
    What is the receiving water for the wastewater discharge?
v. If public facilities will not be used, describe plans to provide wastewater treatment for the project, including specifying proposed
  receiving water (name and classification if surface discharge or describe subsurface disposal plans):

vi. Describe any plans or designs to capture, recycle or reuse liquid waste:
  9  9

e. Will the proposed action disturb more than one acre and create stormwater runoff, either from new point  Yes  No
  sources (i.e. ditches, pipes, swales, curbs, gutters or other concentrated flows of stormwater) or non-point
  source (i.e., sheet flow) during construction or post construction?
If Yes:  9
  i. How much impervious surface will the project create in relation to total size of project parcel?
  Square feet or  acres (impervious surface)
  Square feet or  acres (parcel size)
 ii. Describe types of new point sources.

iii. Where will the stormwater runoff be directed (i.e. on-site stormwater management facility/structures, adjacent properties,
  groundwater, on-site surface water, or off-site surface waters)?

  9  9
    If to surface waters, identify receiving water bodies or wetlands:

   Will stormwater runoff flow to adjacent properties?  Yes  No
iv. Does the proposed plan minimize impervious surfaces, use pervious materials or collect and re-use stormwater?  Yes  No

  9  9
  9  9
  9  9

  Page 6 of 15  FEAF 2026
  46