Agenda Natalie E. Nitsche Town Clerk Town Board of the Town of Hamburg August 10, 2026 1. Roll Call 2. Pledge of Allegiance 3. Minutes of Previous Meeting RESOLVED, that the Town Board does hereby approve the minutes of the previous meeting as follows: July 13, 2026 4. Agenda Items 4.1. Notice of Public Hearing Proposed Local Law #12, 2026 4.2. Schedule a public hearing for proposed local law 4.3. Lake View Commercial District Zoning Text Amendments Public Hearing Resolution 4.4. Additional Town Board Meeting 4.5. Amend Start Times of Town Board Work Sessions and Regular Town Board Meetings 4.6. Armor Pump Station Repair 4.7. Newton Abbott Fire Company, Inc. New Members 4.8. Big Tree Volunteer Firemen's Co, Inc- New Member O'Shaughnessy 4.9. Lake Shore Volunteer Fire Company, Inc. New Member-Golombek 4.10. Approval of local law to add a new chapter for Unmanned aircraft take-offs and landings 4.11. Unsafe structure at 6817 Boston State Road 4.12. Emergency Demolition Contractor 4.13. Police-Budget Amendment 4.14. Police – Disposal of Miscellaneous Car Equipment 4.15. Police – Disposal of Surplus Mini Lockers 4.16. Police – Disposal of Surplus Water Equipment 1

Page 2

4.17. Police – Disposal of Police Vehicles 4.18. Approval of Hamburg Police Department Tow Policy 4.19. Annual Conference Travel 4.20. Mileage Reimbursement Rate 4.21. Blasdell CDBG Bid Approval 4.22. Budget Amendment Transfer 4.23. Approve PO17 Creating additional position of Account Clerk 4.24. Youth, Recreation, & Senior Servies P.A.F. 4.25. Town Board PAF 4.26. B&G PAF 4.27. B&G 20' Utility Trailer Purchase 4.28. Highway Budget Amendment 4.29. Authorize additional Authorized signer to bank accounts 4.30. Plow Truck Purchase 4.31. Vending Machine Request for Proposals 4.32. Town Clerk - PAF 4.33. Buffalo Bills NFL Stadium Economic Impact Area & Town of Hamburg CFA Zoning Updates SEQR Negative Declaration Resolution 4.34. Buffalo Bills NFL Stadium Economic Impact Area & Town of Hamburg CFA Zoning Updates Adoption Resolution 4.35. Chapter 109 Amendments SEQR and Adoption Resolution 4.36. Mt. Vernon Manhole Repair and Joint Lining Project SEQR Resolution 4.37. Alumni Park SEQR Lead Agency Resolution 4.38. Concession Agreement 4.39. ECWA Water System Improvements Additional Fire Hydrant 4.40. Helps Program 4.41. Workday Reporting 4.42. Town of Hamburg Drainage and Stormwater Management District Public Hearing and 2

Page 3

Lead Agency 4.43. Amsdell Road Extension 4.44. Schoelkopf Road Town Property Ditch Cleaning 4.45. McKinley Parkway Sidewalk Extension 4.46. Town Hall Parking Lot Change Orders 5. Public Comment 6. Meeting is adjourned by Supervisor 3

Page 4

Town Board of the Town of Hamburg August 10, 2026 Meeting 4.1. Notice of Public Hearing Proposed Local Law #12, 2026 Legal Notice Town of Hamburg Notice of Hearing Proposed Local Law #12, 2026 PLEASE TAKE NOTICE that there has been presented to the Town Board of the Town of Hamburg on July 13, 2026, pursuant to the Municipal Home Rule Law, a proposed local law to be known as proposed local law #12, 2026. The purpose of the proposed local law is to amend various sections of Chapter 109 of the Hamburg Town Code, entitled "Fair Housing", in accordance with the recommendations of the Town of Hamburg Code Review Committee. A copy of the proposed amendments will be available, for public review, during regular business hours at the following locations: Hamburg Town Hall 6100 South Park Avenue Hamburg, New York 14075 (Town Clerk’s Office) And may also be found at the Town’s website www.townofhamburgny.gov click on “Legal Notices and Bids.” THEREFORE, pursuant to the statutes and the provisions of the Municipal Home Rule Law, the Town Board of the Town of Hamburg will hold a public hearing on the aforesaid law, at the Hamburg Town Hall, 6100 South Park Avenue, Hamburg, New York, at 6:00 p.m. on the 10th day of August, 2026, at which time all persons interested may be heard. Dated: July 13, 2026 Natalie Nitsche Town Clerk Town of Hamburg 4

Page 5

Town Board of the Town of Hamburg August 10, 2026 Meeting 4.2. Schedule a public hearing for proposed local law WHERAS, the Hamburg Town Code contains and specifies the local laws and ordinances of the Town of Hamburg; and WHEREAS, the Code Review Committee reviewed various regulations of the Town of Hamburg Code and has sent these suggested revisions to the Town Board to begin the adoption process; and BE IT RESOLVED that the Town Clerk is authorized to schedule a public hearing on a Proposed Local Law. The proposed local law would provide for amendments to the Hamburg Town Code in accordance with the recommendations of the Town of Hamburg Code Review Committee, specifically: The purpose of this local law is to amend the provisions of Chapter 76-4 L. Building permits, Chapter 280-11 Certain public uses excluded and 280-284 B. (2) Limitations on obstructions in required open space; and BE IT FURTHER RESOLVED that, in accordance with the State Environmental Quality Review Act (SEQRA), the Town Board will seek Lead Agency status for this proposed legislation and authorizes the Planning Department to perform the appropriate mailings and notifications; and BE IT FURTHER RESOLVED, that the Hamburg Town Board hereby authorizes the referral of these proposed Code amendments to Erie County; and BE IT FINALLY RESOLVED, that the Hamburg Town Board sets a Public Hearing on these proposed Code amendments at the Hamburg Town Hall, 6100 South Park Avenue, Hamburg, NY at 6:00 pm on September 14, 2026. ATTACHMENTS: 208-11 Code Changes.pdf Building Permit Renewal Code Change.pdf Town acc structure setback.pdf 5

Page 6

§ 280-11Certain public uses excluded. The regulations of this chapter shall not be construed to limit or interfere with the dedication, development or use of any land or building for public parks, other public recreation areas or public schools required for compulsory education; or with the use of land or buildings owned or leased by the State of New York, the County of Erie or the Town of Hamburg and used for governmental purposes including the installation of any type of signage, paid or unpaid parking of vehicles, any special events held by the municipality, or any use that provides monetary benefits to the municipality ; or with the construction, installation, operation and maintenance for public utility purposes of water or gas pipes, mains, standpipes, reservoirs or elevated water tanks, or conduits, electric light or electric power transmission or distribution lines, telephone or telegraph lines, oil pipelines, sewers, sewer mains or incidental appurtenances; or with any highway, railroad right-of-way or mass transit right-of-way existing or hereafter authorized by the State of New York, the County of Erie or the Town of Hamburg. These exceptions, however, shall not be interpreted to permit yards, garages or other buildings for service or storage by said public utilities which are otherwise permitted by this chapter in appropriate districts. Installation of standpipes, reservoirs or elevated water tanks shall be permitted only upon approval of the Town Planning Board as to location, type of structure, a effect upon adjacent properties and proximity to similar use areas. The Town Planning Board may prescribe conditions which it deems necessary or desirable and may require a site plan of the proposed installation. 6

Page 7

76-4 Building Permits L. Time limits. Building permits shall become invalid unless the authorized work is commenced within 180 calendar days following the date of issuance. Building permits shall expire 12 months after the date of issuance. For good cause shown, an application may be made for a 90 day extension period or a 180 day extension period of said permit upon payment of a renewal fee of ¼ the original building fee for a 90 day extension or 1/2 the original building fee for a 180 day extension. Permits can only be renewed one year beyond the original permit expiration date, and upon such expiration the work shall continue only if a new permit is granted at the discretion of the Code Enforcement Department. 7

Page 8

§ 280-284 Limitations on obstructions in required open space. B. In R Districts: (1) Accessory buildings and roofed projections shall not occupy more than 30% of a required rear yard of an interior lot nor more than 40% of a required rear yard of a corner lot. (2) No part of an accessory building shall be nearer than five feet to a rear or side lot line. (3) Detached accessory buildings shall be at least 10 feet from any dwelling and five feet from any other building. (4) No detached accessory buildings shall be permitted in required front yards, and the maximum size of all accessory buildings on a property shall be as follows: [Added 8-10-1987 by L.L. No. 12-1987; amended 6-12-1989 by L.L. No. 4-1989; 12-12-2005 by L.L. No. 5-2005; 11-28-2011 by L.L. No. 14-2011; 1-14-2013 by L.L. No. 1-2013] (a) For lots less than one acre in any residential zoning district: 850 square feet maximum area. (b) For lots greater than one acre in any residential zoning district: 1,000 square feet maximum area. (c) For lots greater than two acres in any residential zoning district: 1,500 square feet maximum area. 8

Page 9

Town Board of the Town of Hamburg August 10, 2026 Meeting 4.3. Lake View Commercial District Zoning Text Amendments Public Hearing Resolution Whereas, the Hamburg Town Code contains and specifies the local laws and ordinances of the Town of Hamburg; and Whereas, the Town of Hamburg, over a three-year process, completed and adopted a new Comprehensive Plan for the Town; and Whereas, zoning must be in accordance with a Comprehensive Plan and the Town wants to continue the process of bringing the Town’s zoning Code and Zoning map into conformance with the Town’s new 2022 Comprehensive Plan; and Whereas, the Town formed a Comprehensive Plan Implementation Committee (CPIC) who, in accordance with the Comprehensive Plan and having completed other studies and reports on land use issues in the Town, has recommended that the Town Board pursue numerous code amendments; and Whereas, the Town of Hamburg directed the Planning Department to work with the CPIC and a special Non-CFA Zoning Code Committee to develop other priority zoning code updates that were not included in a CFA grant that was received by the Town; and Whereas, the Town CPIC, Non-CFA Zoning Code Committee, and the Planning Department developed specific Code and zoning map revisions related to creating a new commercial district in the Lake View area in the Town; and Whereas, a public hearing was held on September 22nd, 2025, regarding zoning map and zoning text amendments for this Lake View Commercial District, and the Town received several comments from the public; and Whereas, a public hearing was then held on February 23rd, 2026, for further input on the zoning text amendments for the proposed Lake View Commercial District; and Whereas, the Planning Department and the Non-CFA Zoning Code Committee have made numerous revisions over the past six months to the Lake View Commercial District zoning text draft and would 9

Page 10

like to solicit further input from the public; and Whereas, pursuant to Municipal Home Rule Law, the Town Board is proposing to enact a local law as follows: Be it enacted by the Town Board of the Town of Hamburg, New York, that the Hamburg Town Board amends the Hamburg Town Code as follows (full copies attached): Amend Chapter 280 (Zoning), by adding a new Article, entitled “LC Lake View Commercial District”; and Be It Finally Resolved, that the Hamburg Town Board sets a Public Hearing on these proposed amendments at the Hamburg Town Hall, 6100 South Park Avenue, Hamburg, NY at 6:00 pm on September 14th, 2026. ATTACHMENTS: Lake View Commercial District Draft 8-10-26 for PH.pdf Lakeview_LCD Proposed Design Standards.docx 10

Page 11

Town of Hamburg, NY Amend Chapter 280. Zoning By adding a new Article LVIV LC Lake View Commercial District, as follows: Article LVIV LC Lake View Commercial District § 280-420. Intent. The Lake View Commercial District is intended to provide a controlled environment for light commercial uses adjacent to regional arterial highways in the Lake View area of the Town of Hamburg. These uses shall not be permitted to develop in such concentrations or in such a manner as to become a nuisance or hazard to public welfare and safety. This district is intended to help to protect adjoining residential areas and recognizes that certain parcels fronting Southwestern Boulevard, Lakeview Road, and Lakeshore Road and adjacent to Interstate 90 may not be suitable for residential development. Design will be important and will need to help blend any use into this nature of the Lake View area which has rural, residential, and important environmental features. § 280-421. Permitted Uses. A. Permitted uses shall be as follows: (1) Personal service establishments, such as but not limited to barbershops, beauty parlors, laundromats, dry cleaning, glass shops and small appliance repair. (2) Office buildings and offices. (3) Custom shops, including but not limited to printing, electrical, heating, plumbing or woodworking shops. (4) Landscaping sales or services. (5) Agricultural related and support businesses (No AG tourism). (6) Churches or other places of worship or religious education, parish houses, convents, rectories or parsonages. (7) Medical and other health services. (8) Banks. (9) Instructional facilities. (10) Minor retail sales serving the day-to-day convenient shopping needs of the surrounding neighborhood (less than 2,000 square feet). (11) Non-drive-thru restaurants (under 10,000 square feet). (12) Business rental units (see definition). (13) Existing homes, as of the date of the adoption of this local law. (14) Existing businesses (including those with a special use permit), as of the date of the adoption of this local law. (15) Prohibited uses. a) Car washes. b) Any use permitted in a Light Industrial or General Industrial district under the 11

Page 12

Town of Hamburg, NY Town of Hamburg Zoning Code. c) All uses not expressly or conditionally permitted are prohibited. (16) The following uses by special use permit authorized by the Planning Board (see Article XLVI): a) Drive-thru facilities permitted with an allowed use, except for non-drive thru restaurants. b) Allowed commercial uses with up to 2 residential units. c) Outdoor display. (17) Accessory uses and structures: a) Accessory uses and structures customarily incidental to permitted principal uses. § 280-422. Minimum lot size. Lot area. Lot area will be based on the size of the building, parking requirements, and landscaping. § 280-423. Maximum height of buildings. Maximum: 35 feet. § 280-424. Lot coverage. Maximum: 75%. § 280-425. Required yards. Unless otherwise provided, the minimum required yards and other open spaces in the LC District shall be as specified in this section. A. Front yard: 40 feet. B. Side yard: (1) Principal buildings: none required, except that: a) Where a side yard is provided, it shall be no less than five feet. b) Where a side yard abuts any R District boundary, it shall be not less than 20 feet or the height of the principal building, whichever is greater. c) Where a side yard is used for either vehicular ingress or egress, it shall be at least 12 feet. d) Where a side yard is used for vehicular ingress and egress, it shall not be less than 25 feet. C. Rear yard: (1) Minimum: 10 feet. (2) Abutting an R District boundary: same distance as required for a side yard along an R district boundary. 12

Page 13

Town of Hamburg, NY § 280-426. Supplemental regulations. For applicable supplemental regulations pertaining to use, height, area or open space, see Articles XXXVII through XXXIX. § 280-427. Landscaping requirements. Existing natural features and vegetation shall be preserved. Other landscaping treatments such as trees and shrubbery shall be located as directed by the Planning Board to achieve residential character and conformance with surrounding properties. § 280-428. Architectural requirements. Building elevation plans must be submitted to the Planning Board which reflect designs that accomplish the aesthetically enhanced look described in the intent section of this Code, and any applicable zoning overlay requirements. Buildings visible from Route 5 or Route 20 shall have a higher design image, including pitched roofs, higher quality materials, and windows facing Route 5 or Route 20, in accordance with the Intent Section. 13

Page 14

Lakeview Design Standards. A. The Lakeview Commercial (LC) District is established to provide for limited, neighborhood-scale commercial development compatible with the rural and residential character of the Lakeview area. B. These design standards are intended to: (1) Ensure high-quality site and architectural design consistent with community character; (2) Avoid strip commercial development patterns along major corridors; Applicability. A. The provisions of this article shall apply to all uses, structures, site plans, and redevelopment activities within the LC District. B. No building permit or site plan approval shall be issued except in compliance with this article. Site Design Standards. A. Building Orientation. (1) Principal buildings shall be oriented toward the public street. B. Setbacks. (1) Maximum front setback: 40 feet. C. Access Management. (1) Shared driveways and cross-access easements shall be required where feasible. (2) Curb cuts shall be minimized in accordance with Erie County access management practices. Building Design Standards. A. Massing and Scale. (1) Buildings shall be designed to reflect human-scale proportions. (2) Facades shall be articulated at intervals not exceeding 50 feet. (3) Blank walls greater than 100 feet in length are prohibited. B. Facade Articulation. (1) Each street-facing facade shall incorporate at least three (3) of the following: (a) Windows or transparent glazing; (b) Changes in materials; (c) Architectural projections or recesses; (d) Decorative cornices or trim elements. C. Building Materials. (1) Acceptable materials include brick, stone, wood, and fiber cement siding. 14

Page 15

(2) Prohibited materials include large expanses of corrugated metal or unfinished concrete block, except as minor accent elements not exceeding 25% of any facade. D. Roof Design. (1) Flat roofs shall include parapets with architectural detailing. (2) Sloped roofs shall utilize traditional forms such as gable or hip roofs. Parking and Circulation. A. Parking Layout. (1) Parking areas shall be divided into smaller sections through landscaped islands. (2) No parking row shall exceed 12 spaces without a landscaped break. B. Pedestrian Circulation. (1) Safe and clearly delineated pedestrian pathways shall connect parking areas to building entrances. (2) Walkways shall be distinguished through materials, striping, or grade separation. C. Internal Circulation. Site design shall promote safe vehicular circulation and minimize conflicts between vehicles and pedestrians. Landscaping and Buffering. A. General Requirements. Landscaping shall be provided to enhance visual quality and screen parking and service areas. B. Residential Buffers. A minimum 20-foot landscaped buffer shall be provided adjacent to residential uses. C. Parking Lot Landscaping. (1) One (1) tree shall be provided for every ten (10) parking spaces. (2) Interior landscaped islands shall be required every ten (10) parking spaces. Lighting Standards. A. All exterior lighting shall be fully shielded and directed downward. B. Maximum pole height shall be 20 feet. C. Lighting shall not produce glare or spill onto adjacent properties. D. Lighting design shall be consistent with dark-sky principles and suburban design standards utilized in Erie County. Signage Standards. A. Freestanding Signs. (1) Monument signs shall be required. (2) Pole signs are prohibited. 15

Page 16

(3) Maximum height: 8 feet. B. Wall Signs. (1) Wall signage shall not exceed 10% of the facade area. (2) Signs shall be integrated into the building architecture. C. Prohibited Signs. Internally illuminated box signs are prohibited. Service Areas. A. Loading areas, dumpsters, and mechanical equipment shall be located to the side or rear of buildings. B. Such areas shall be screened using materials consistent with the principal structure. C. Outdoor storage shall be prohibited unless fully screened. Environmental and Site Considerations. A. Development shall minimize impervious surface coverage where practicable. B. Stormwater management practices, including bioswales and rain gardens, shall be incorporated where feasible. C. Existing vegetation and natural features shall be preserved to the maximum extent practicable. Modifications and Waivers. The Planning Board may modify the requirements of this article where it finds that the proposed design meets or exceeds the intent of these standards and is consistent with the character of the Lakeview Area. 16

Page 17

Town Board of the Town of Hamburg August 10, 2026 Meeting 4.4. Additional Town Board Meeting BE IT RESOLVED, the Town Board approves an additional Town Board meeting August 24, 2026 starting at 5 pm. 17

Page 18

Town Board of the Town of Hamburg August 10, 2026 Meeting 4.5. Amend Start Times of Town Board Work Sessions and Regular Town Board Meetings WHEREAS, the Town Board of the Town of Hamburg has determined that modifying the start times of its Work Sessions and Regular Town Board Meetings will better accommodate the efficient conduct of Town business. NOW, THEREFORE, BE IT RESOLVED, that effective September 1, 2026, the Town of Hamburg Town Board hereby establishes the following meeting schedule: Town Board Work Sessions shall begin at 5:00 p.m.; and Regular Town Board Meetings shall begin at 6:00 p.m. BE IT FURTHER RESOLVED, that all future notices, agendas, legal notices, and publications pertaining to Town Board meetings shall reflect these revised meeting times. 18

Page 19

Town Board of the Town of Hamburg August 10, 2026 Meeting 4.6. Armor Pump Station Repair WHEREAS, the Hamburg Highway Department has an immediate need for emergency repair of the Armor Pump Station. Replacement of the pump system, force main piping and catch basin are necessary to prevent flooding. BE IT RESOLVED, that the Highway Dept. has received a project proposal from Kandey Co. with a price from NYS Bid #P26-040 of $129,171.00 for this emergency repair. BE IT FURTHER RESOLVED, that the Hamburg Town Board approves the use of $80,000 from B1490.0440.0001 Public Works -Independent Contractor services and a transfer of $49,171.00 from B Fund Fund balance (B.0000.0909) with the approval of the board. 19

Page 20

Town Board of the Town of Hamburg August 10, 2026 Meeting 4.7. Newton Abbott Fire Company, Inc. New Members BE IT RESOLVED, the Hamburg Town Board approves the recommendation of membership for following: Sejla Sabic Thaw Doc Htoo Catie Blake Erin Bendzula ATTACHMENTS: Sejla Sabic - New Member Letter.pdf Thaw Doc Htoo, Catie Blake, Erin Bendzula - New Members Letter.pdf 20

Page 21

Newton Abbott Fire Company, Inc. ABeorr FIRE CO INC. Town of Hamburg New York TOWN OF HAMBURG P.O Box 2001, Blasdell, NY 14219 Phone: (716) 825-3663 Fax: (716) 825-0844 Email: [email protected] Website: NewtonAbbottfire.com July 14, 2026 Hamburg Town Board Hamburg Town Hall 6100 South Park Ave Hamburg NY 14075 Dear Board Members, We respectfully request permission of the town board to accept the following applicant into the Newton Abbott Fire Company, Inc: Sejla Sabic 3200 Clearview Way Buffalo, NY 14219 Thank you for your continued cooperation and support. Sincerely Britt Munnell Recording Secretary Page 1 of 1 21

Page 22

FIRE CO INC. TOWN OF HAMBURG Newton Abbott Fire Company, Inc. Town of Hamburg, New York | P.O. Box 2001, Blasdell, NY 14219 Phone: 716-825-3663 Fax: 716-825-0844 | Email: [email protected] I Website: www.newtonabbottfire.com August 3, 2026 Hamburg Town Board Hamburg Town Hall 6100 South Park Ave Hamburg NY 14075 Dear Board Members, We respectfully request permission of the town board to accept the following applicants into the Newton Abbott Fire Company, Inc: Thaw Doc Htoo 5300 Lake Ave Orchard Park, NY 14127 Catie Blake 168 Shenandoah Rd Buffalo, NY 14220 Erin Bendzula 162 Charlescrest Ct West Seneca, NY 14224 Thank you for your continued cooperation and support. Sincerely, Britt Munnell Recording Secretary 22

Page 23

Town Board of the Town of Hamburg August 10, 2026 Meeting 4.8. Big Tree Volunteer Firemen's Co, Inc- New Member O'Shaughnessy BE IT RESOLVED, that the Hamburg Town Board approves that attached recommendations for the membership James O'Shaughnessy ATTACHMENTS: DOC072426-003.pdf 23

Page 24

24

Page 25

Town Board of the Town of Hamburg August 10, 2026 Meeting 4.9. Lake Shore Volunteer Fire Company, Inc. New Member-Golombek BE IT RESOLVED, that the Hamburg Town Board approves that attached recommendation for the membership of Ronald Golombek ATTACHMENTS: 2026 0717 - Town Board Approval - Ronald Golombek.docx 25

Page 26

Lake Shore Volunteer Fire Company, Inc. July 17, 2026 Hamburg Town Board S-6100 South Park Avenue Hamburg, New York 14075 Attn: Natalie Nitsche At the last regular company meeting of the Lake Shore Volunteer Fire Company Inc. held on Wednesday, July 15, 2026, the following applicant was approved for active membership: Ronald Golombek 4825 Clifton Parkway Hamburg, NY 14075 Please notify us upon the Town Board’s approval of their membership. Thank you for your consideration in this matter. Sincerely, Peggie Lipka Corresponding Secretary Lake Shore Volunteer Fire Co. Inc. 4591 LAKESHORE ROAD | HAMBURG, NY 14075 | STATION (716) 627-3522 | FAX (716) 627-7502 26

Page 27

Town Board of the Town of Hamburg August 10, 2026 Meeting 4.10. Approval of local law to add a new chapter for Unmanned aircraft take-offs and landings WHEREAS, the Hamburg Town Code contains and specifies the local laws and ordinances of the Town of Hamburg; and WHEREAS, the Code Review Committee reviewed the provisions for a new chapter to the Code of the Town of Hamburg entitled “Unmanned aircraft take-offs and landings”, and suggested the addition for the Town Board to consider; and WHEREAS, pursuant to Municipal Home Rule Law, the Town Board is proposing a local law to add a new chapter entitled “Unmanned aircraft take-offs and landings” WHEREAS, a public hearing was held on July 13, 2026, for discussion and public comment concerning adoption of this proposed local law; and WHEREAS, the Town of Hamburg has determined that this proposed local law amendment is a Type II action under SEQR, and no SEQR decision is necessary; and WHEREAS, these proposed local law amendments were referred to Erie County through the 239-m referral process and received no objections; and WHEREAS, the proposed amendments are in accordance with the recommendations of the Town of Hamburg Code Review Committee. NOW THEREFORE BE IT RESOLVED, the Hamburg Town Board approves Local Law and adds a new chapter entitled “Unmanned aircraft take-offs and landings” to the Code of the Town of Hamburg ATTACHMENTS: UAS code 5-9-26.docx 27

Page 28

Unmanned aircraft take-offs and landings Purpose and intent It is the intention of the Town of Hamburg to protect and enhance the public health, safety, security, privacy, and well-being of the residents of the community as well as of the guests and visitors thereto by the establishment of regulations and procedures governing the operation of unmanned aircraft (aka "drones") and/or unmanned aircraft systems (hereinafter "UAS"). Definitions As used in this chapter, the following terms shall have the meanings herein indicated BUFFALO BILLS COMPLEX All of the approximately 250 acre parcel of land situated in the Town of Orchard Park and in the Town of Hamburg, New York, locally known as "One Bills Drive," inclusive of the stadium, the Sports Training Performance Center, the Fieldhouse, parking lots, entrances, walkways and practice fields. PUBLIC AIRCRAFT OPERATIONS Government agencies, law enforcement, and public safety entities that qualify to fly UAS as a Public Aircraft under 49 U.S.C. § 40102(a)(41) and § 40125 UNMANNED AIRCRAFT [1] A device that is intended to navigate in the air without an onboard pilot; and [2] An aircraft that is operated without the possibility of human intervention from within or on the aircraft. Unmanned aircraft are also referred to as "drones." UNMANNED AIRCRAFT SYSTEM An unmanned aircraft and associated elements (including communications links and the components that control the unmanned aircraft) that are required for the pilot in command to operate safely and efficiently in the national airspace system. 28

Page 29

RESTRICTIONS ON USE A. It shall be unlawful for any person to take off or land in any zone within the Town of Hamburg an unmanned aircraft or unmanned aircraft system within one mile of and within two hours before or after an open air event and located within the Town of Hamburg, such events including, but not limited to, parades, concerts, street dances, festivals, art shows, sporting events and recreational events, unless permission is granted by the sponsor of the event. B. It shall be unlawful for any person to take off or land an unmanned aircraft or unmanned aircraft system within two miles of the Buffalo Bills Complex on the day of any event held at the Buffalo Bills Complex and four hours prior to or four hours after any event held at the Buffalo Bills Complex. C. All unmanned aircraft or unmanned aircraft systems shall be subject to all applicable Federal Aviation Administration (FAA) regulations. Exceptions A. Express written permission required. The takeoff or landing of an unmanned aircraft or unmanned aircraft system that is precluded by the Restrictions on Use stated above may be permitted pursuant to a permit issued by the Town of Hamburg Clerk after approval is granted by the Town of Hamburg Police Department. The permit fee shall be set by resolution by the Town Board B. Public Aircraft Operations Enforcement This chapter shall be enforced by the Town of Hamburg Police Department. Penalties for offenses. Any person who violates any provision of this chapter shall, upon conviction thereof, be punishable by a fine set forth in the Schedule of Fines and Penalties. 29

Page 30

When Effective This Local Law shall become effective immediately upon its enactment by the Town Board and after proper filing with the office of the NYS Secretary of State. 30

Page 31

Town Board of the Town of Hamburg August 10, 2026 Meeting 4.11. Unsafe structure at 6817 Boston State Road WHEREAS, the Town of Hamburg Code Chapter 80 references the procedure for unsafe buildings in the Town of Hamburg, and, WHEREAS, the Supervising Code Enforcement Officer of the Town of Hamburg made a formal inspection of the property located at 6817 Boston State Rd. Hamburg, NY (SBL 196.04-2-15) and deemed the structure unsafe, and, WHEREAS, the Supervising Code Enforcement officer provided the Town Board, in writing, a report of his findings and recommendations for demolition, and, WHEREAS, the Town Board has considered the report, and, BE IT RESOLVED, that the Town Board finds the structure located at 6817 Boston State Rd. Hamburg, NY unsafe and orders its removal, and, BE IT FURTHER RESOLVED, that the Town Board authorizes the Code Enforcement Department to advertise for demolition bids of said structure, and, BE IT FURTHER RESOLVED, that the Town Board designates the Supervising Code Enforcement Officer, an Assistant Code Enforcement Officer, the Town Attorney or Deputy Town Attorney, and the Code Enforcement liaison from the Town Board to schedule and hold a public hearing on the demolition of the structure, and, BE IT FINALLY RESOLVED, that once demolition bids are received, the Town Board shall make proper notification to the property owner stating the public hearing date, time, place, and estimated costs for the demolition. ATTACHMENTS: DOC072926-07292026134851.pdf 31

Page 32

32

Page 33

Town Board of the Town of Hamburg August 10, 2026 Meeting 4.12. Emergency Demolition Contractor WHEREAS, the Town of Hamburg Code Enforcement Department is responsible for the enforcement of Town of Hamburg Local Law No. 5-1972. (Chapter 80) Unsafe Buildings, Village of Hamburg Local Law No. 1-2014. (Chapter 127) Dangerous Buildings, and Village of Blasdell Local Law No. 5- 1997 (Chapter 100A) Unsafe Buildings and Structures, and such services to perform an emergency demolition of a structure that is in imminent danger of collapse are required BE IT RESOLVED, that the Town of Hamburg is looking to appoint two emergency demolition contractors for a duration of one year with the Town Board having the sole discretion to renew annually for another two years, to be on call for emergency demolitions, and, BE IT RESOLVED, that the Town Clerk is authorized to advertise for sealed bids entitled “Hamburg Emergency Demolition Contractor” Sealed bids must be received at Hamburg Town Hall, Town Clerk’s Office, 6100 South Park Avenue, Hamburg, New York 14075, and said bid will be publicly opened and read aloud on September 15, 2026 at 10:30 a.m. in Conference Room 7A Mailed bids should be sent to: Town of Hamburg, Attn: Town Clerk 6100 South Park Avenue Hamburg, New York 14075. Please mark clearly on the envelope: Bid Enclosed – “Hamburg Emergency Demolition Contractor” Charged to Clean up of properties A3620.469 ATTACHMENTS: 2027 Emergency Demo Contractor.pdf 33

Page 34

TOWN OF HAMBURG, NEW YORK REQUEST FOR EMERGENCY DEMOLITION SERVIES FOR THE CODE ENFOREMENT DEPARTMENT Your firm is hereby invited to submit a quotation to provide emergency demolition services as authorized by the Town of Hamburg Code Enforcement Department. The requested services and related work requirements are as described below. General The Town of Hamburg Code Enforcement Department is responsible for the enforcement of Town of Hamburg Local Law No. 5-1972. (Chapter 80) Unsafe Buildings, Village of Hamburg Local Law No. 1-2014. (Chapter 127) Dangerous Buildings, and Village of Blasdell Local Law No. 5-1997 (Chapter 100A) Unsafe Buildings and Structures. These local laws provide for the emergency demolition of such unsafe buildings as directed by the Town Code Enforcement Department when it has been determined that in the opinion of the Building Official, actual and immediate danger of the falling of a building or structure so as to endanger life or property, he may cause the necessary work to be done to render said building or structure, or part thereof, temporarily safe. This Department is seeking two reliable contactors to perform the emergency demolition of those designated unsafe buildings/structures in the Town of Hamburg, Village of Hamburg and Village of Blasdell. These services would be would be executed as an “as directed basis” under the supervision of the Town of Hamburg Code Enforcement Department. The contractors would be put on a call list that would be used from time to time when needed for an emergency demolition. These services would be executed under a lump sum contract under the supervision of the Town of Hamburg Code Enforcement Department. The cost of these services under such agreement will be funded through Town account A3620.469 (Clean up of Properties) This request for proposal neither commits the Town of Hamburg to select the contractor nor reimburse any costs associated with the preparation or submittal of proposals in this regard. The Town reserves the right to reject any and all proposals, should it be deemed to be in the best interest of the Town of Hamburg. 34

Page 35

Scope of Work Services The services to be provided by the contractor are to include, but not limited to the following A Complete Demolition of a Structurally Damaged Residential or Commercial Building Caused by an Emergency Situation. (1) After receiving notification from the Code Enforcement Department of the address for the emergency demolition, mobilize the required equipment and manpower within one hour of the notification and perform the initial demolition of the structure to remove the imminent danger of collapse. Clean any debris that ends up in the roadway, or in neighboring yards. Fence off the demolished structure to limit access by the public and reduce the hazard caused by the demolition. (2) Once the scene is released by the investigators the following work must be completed within 30 days; the disconnection of all utilities, clean up the demolition debris, foundations, and accessory structures. Backfill excavated area with clean fill and seeded with grass. The following is the detailed Scope of work that would be required; (a)The scope of work shall include all the labor, equipment and materials to complete the emergency demolition of the Building. (b)The demolition company must be ready and able to demolish and clean up a commercial or residential building (c) The demolition company must be available to mobilize at any given time or day. Once called the demolition company must be on the road with the machines and man power needed to accomplish the demolition within one hour. (d) All resulting debris shall be removed off the premises and be legally disposed of. (e) All associated excavated areas shall be backfilled with clean fill material, to meet existing grade and fine graded ready for seeding. (f) The demolition must be completed within 30 days from the scene being released from any investigators including but not limited to insurance, Town fire investigators, or County Fire investigators. 35

Page 36

(g) Maintenance and protection of traffic on Local streets shall be done in accordance with NYSDOT traffic safety regulations. (h) The contractor shall be responsible for the proper disconnection of all utilities. (i) All work shall be performed in accordance with New York State and Town of Hamburg, Village of Hamburg and Village of Blasdell Codes. (j) The demolition of the buildings shall be done as per NYCRR 56, Subpart 56- 11.5 ( controlled demolition).The Town of Hamburg will procure the necessary third party air monitoring services as required during the demolition. (k) The contractor shall provide adequate insurance coverage and obtain the necessary demolition permit. There will be no fee charged for the permit. Form of Proposal One copy of your quotation is to be submitted as follows: (1) The proposal is to represent the cost for all necessary work as deemed necessary to accomplish the demolition described in the scope of work. This cost should include the necessary costs (including but not limited to labor, equipment, tool, mobilization to the site and any other direct and indirect cost associated with the performance of the specified services). Bidders must provide an estimate of the cost involved with (a) The initial emergency demolition of a 2,000 square foot residential house that has been damaged by fire (b) The remaining demolition of the above structure to a seeded yard after the scene has been release by the investigators. (2) Provide a list of the equipment that is available to be mobilized and the time required to mobilize that the equipment. (3) Insurances (Liability and Workmen’s Compensation & Disability). Commercial Liability (Town of Hamburg must be named as additional insured) General Aggregate $1,000,000.00 Products and Comp/Op, Aggregate $2,000,000.00 Personal & Advertising Injury $1,000,000.00 Each Occurrence $1,000,000.00 36

Page 37

Fire Damage (any one fire) $ 50,000.00 Med. Expense (any one person) $ 5,000.00 Waiver of Subrogation: To the fullest extent permitted by applicable state law, a Waiver of Subrogation Clause shall be added to the General Liability, Automobile, Umbrella/Excess Liability, and Workers Compensation policies in favor of the Town. Automobile Liability Insurance Bodily injury and Property Damage, coverage for the Vendors as the owner or the lessee of automobiles, trucks, trailers, self-propelled Vendor’s equipment and all other owned, hired and non-owned vehicles registered for use on the public highway and/or used in operations relating to work under contract. The coverage limit applicable shall be the greater of the amounts below or the amount(s) carried by the Vendor. Combined Single Limit $1,000,000.00 Excess Liability and/or Umbrella Liability: Applicable to Commercial General and Automobile Liability policies. The Excess Liability and/or Umbrella Liability coverage limits applicable shall be the greater of the amounts indicated below or the amounts carried by the Town. Each Occurrence $1,000,000.00 Aggregate $1,000,000.00 Workers Compensation and Employer’s Liability Insurance Coverage as required by New York State statutory limits New York State Disability (NYDBL) Coverage as required by New York State statutory limits 37

Page 38

Proposal Due Date Sealed bid proposals must be labeled Hamburg Emergency Demolition Contractor and are to be received by Natalie Nitsche, Town Clerk, Hamburg Town Hall , 6100 South Park Avenue, Hamburg NY 14075 by 10:00 a.m. on TUESDAY SEPTEMBER 15, 2026 with the bid opening taking place at 10:30 a.m. in Hamburg Town Hall conference room 7A. Late submittals will not be accepted, and will be returned unopened. Requests for Further Information All questions and inquiries should be directed to: Jeffrey Skrzypek Supervising Code Enforcement Officer Town of Hamburg 6100 South Park Avenue Hamburg, NY 14075 (716) 649-6111 x 2214 Thank You in advance for your time and efforts in responding to this request for proposal. 38

Page 39

Town Board of the Town of Hamburg August 10, 2026 Meeting 4.13. Police-Budget Amendment WHEREAS, the Town of Hamburg Police Department receives distribution payments from a share of assets forfeited from defendants from time to time and, WHEREAS, these items are not included in the 2026 budget, NOW, THEREFORE BE IT RESOLVED, that the Town Board approves the receipt of the following monies and approves a budget amendment to the revenue account as follows: ATTACHMENTS: POLICE Budget Adjustment AF_2247.34.pdf 39

Page 40

40

Page 41

Town Board of the Town of Hamburg August 10, 2026 Meeting 4.14. Police – Disposal of Miscellaneous Car Equipment WHEREAS, the Town Board recognizes the need to efficiently manage the assets owned by the Town and to ensure responsible utilization of public resources; and WHEREAS, it has been determined that certain Town assets are no longer required for public use, have become obsolete, or are in a state of disrepair beyond reasonable cost of restoration; and WHEREAS, the disposal of these assets will facilitate the efficient operation of the town and provide an opportunity for the generation of revenue or cost savings; NOW, THEREFORE, BE IT RESOLVED that the following assets shall be disposed of in accordance with the Town Sale of Surplus property policy: Miscellaneous Car Equipment that is obsolete and no longer of use to the Police Department; and WHEREAS, these items were sold via public auction through Auctions International, and; WHEREAS, the disposition of the Miscellaneous Car Equipment resulted in the receipt of $25.00 and, WHEREAS, these items are not included in the 2026 budget, NOW, THEREFORE BE IT RESOLVED, that the Town Board approves the receipt of these monies and approves the transfer of these funds to B3120.0202 be used for Police Department Motor Vehicles. 41

Page 42

Town Board of the Town of Hamburg August 10, 2026 Meeting 4.15. Police – Disposal of Surplus Mini Lockers WHEREAS, the Town Board recognizes the need to efficiently manage the assets owned by the Town and to ensure responsible utilization of public resources; and WHEREAS, it has been determined that certain Town assets are no longer required for public use, have become obsolete, or are in a state of disrepair beyond reasonable cost of restoration; and WHEREAS, the disposal of these assets will facilitate the efficient operation of the town and provide an opportunity for the generation of revenue or cost savings; NOW, THEREFORE, BE IT RESOLVED that the following assets shall be disposed of in accordance with the Town Sale of Surplus property policy: Tennsco Mini Lockers that are obsolete and no longer of use to the Police Department; and WHEREAS, these items were sold via public auction through Auctions International, and; WHEREAS, the disposition of Tennsco Mini Lockers resulted in the receipt of $210.00 and, WHEREAS, these items are not included in the 2026 budget, NOW, THEREFORE BE IT RESOLVED, that the Town Board approves the receipt of these monies and approves the transfer of these funds to B3120.0203 be used for Police Department equipment. 42

Page 43

Town Board of the Town of Hamburg August 10, 2026 Meeting 4.16. Police – Disposal of Surplus Water Equipment WHEREAS, the Town Board recognizes the need to efficiently manage the assets owned by the Town and to ensure responsible utilization of public resources; and WHEREAS, it has been determined that certain Town assets are no longer required for public use, have become obsolete, or are in a state of disrepair beyond reasonable cost of restoration; and WHEREAS, the disposal of these assets will facilitate the efficient operation of the town and provide an opportunity for the generation of revenue or cost savings; NOW, THEREFORE, BE IT RESOLVED that the following assets shall be disposed of in accordance with the Town Sale of Surplus property policy: Miscellaneous water equipment including SCBA breathing apparatus and spare tanks that are obsolete and no longer of use to the Police Department; and WHEREAS, these items were sold via public auction through Auctions International, and; WHEREAS, the disposition of Miscellaneous Water Equipment resulted in the receipt of $190.00 and, WHEREAS, these items are not included in the 2026 budget, NOW, THEREFORE BE IT RESOLVED, that the Town Board approves the receipt of these monies and approves the transfer of these funds to B3120.0203 be used for Police Department equipment. 43

Page 44

Town Board of the Town of Hamburg August 10, 2026 Meeting 4.17. Police – Disposal of Police Vehicles WHEREAS, the Town Board recognizes the need to efficiently manage the assets owned by the Town and to ensure responsible utilization of public resources; and WHEREAS, it has been determined that certain Town assets are no longer required for public use, have become obsolete, or are in a state of disrepair beyond reasonable cost of restoration; and WHEREAS, the disposal of these assets will facilitate the efficient operation of the town and provide an opportunity for the generation of revenue or cost savings; NOW, THEREFORE, BE IT RESOLVED that the following assets shall be disposed of in accordance with the Town Sale of Surplus property policy: 2023 Ford Explorer SUV Police Vehicle (VIN__7649) 2012 Ford Fusion Sedan (VIN__9751) 2023 Ford Explorer SUV/Police Vehicle (VIN__5929) WHEREAS, these items were sold via public auction through Auctions International, and; WHEREAS, the disposition of 2023 Ford Explorer SUV Police Vehicle (VIN__7649) resulted in the receipt of $4,500.00; and 2012 Ford Fusion Sedan (VIN__9751) resulted in the receipt of $2,425.00; and 2023 Ford Explorer SUV/Police Vehicle (VIN__5929) resulted in the receipt of $6,000.00 and, WHEREAS, these items are not included in the 2026 budget, NOW, THEREFORE BE IT RESOLVED, that the Town Board approves the receipt of these monies and approves the transfer of these funds to B3120.0202 to be used for Police Department Motor Vehicles. 44

Page 45

Town Board of the Town of Hamburg August 10, 2026 Meeting 4.18. Approval of Hamburg Police Department Tow Policy WHEREAS, the Town of Hamburg Police Department has established an orderly system for the safe and expeditious removal of motor vehicles form the streets of the Town of Hamburg when deemed necessary by the police department (“Tow Policy”); and WHEREAS, said Tow Policy acts also to supervise and control the operation of towing businesses that are granted permission to town vehicles for the Town of Hamburg Police Department; and WHEREAS, said Tow Policy includes qualifications for prospective tow operators and specific requirements that qualified town operators must comply with to be granted permission to tow vehicles for the Town of Hamburg Police Department; and WHEREAS, said Tow Policy does not prohibit owners or drivers of vehicles from contracting with any tow company of their choosing under appropriate circumstances; and WHEREAS, said Tow Policy includes maximum rates that may be charged by authorized tow companies for towing services; and WHEREAS, any tow operator that does not comply with said Tow Policy may have its permission to tow vehicles suspended; and NOW, THEREFORE, BE IT RESOLVED, that the Town Board of the Town of Hamburg approves and authorizes the Hamburg Police Department Tow Policy including the schedule of maximum towing rates. ATTACHMENTS: Tow Policy.pdf 45

Page 46

46

Page 47

47

Page 48

48

Page 49

49

Page 50

50

Page 51

51

Page 52

52

Page 53

53

Page 54

Town Board of the Town of Hamburg August 10, 2026 Meeting 4.19. Annual Conference Travel RESOLVED, that the Town Board approve the out- of -town travel for Highway Superintendent Ed Hughes to attend the 97th Annual Conference, Education Symposium & Expo on September 28, 2026 through October 2, 2026 in Saratoga Springs New York. Hotel accommodations: $804.00 Registration: 700.00 Meal allowance 5 days at $50.00 per day 250.00 Tolls: 30.00 (approximate) TOTAL: $1,784.00 Use of a town vehicle is requested. Funds are available in A5010.492 54

Page 55

Town Board of the Town of Hamburg August 10, 2026 Meeting 4.20. Mileage Reimbursement Rate RESOLVED, the Hamburg Town Board approves the increase in the 2026 Mileage Rate reimbursement for Town officials and employees from $.725 to $.76 to agree with the IRS increase retroactively effective as of July 1, 2026. 55

Page 56

Town Board of the Town of Hamburg August 10, 2026 Meeting 4.21. Blasdell CDBG Bid Approval WHEREAS, on June 22, 2026 the Hamburg Town Board authorized the Department of Community Development to release and advertise a bid for the 2026 Village of Blasdell CDBG infrastructure project on Labelle Avenue, and WHEREAS, the bids were opened on July 24, 2026 at 10:00 am with the following firms submitting bids: Firm Bid amount E&R General Construction $153,000.00 Milherst Construction $168,001.65 Thomann Asphalt Paving $173,386.68 American Paving & Excavating $209,260.50 D+H Paving, LLC $323,013.69 NOW THEREFORE BE IT RESOLVED that the Hamburg Town Board authorizes the Department of Community Development to enter into a contract with E & R General Construction to complete the 2026 CDBG funded Village of Blasdell Labelle Avenue project. CDBG funding in the amount of $100,000.00 is available in account CD 52 8662.354. The Village of Blasdell will utilize their funding for the remaining amount. 56

Page 57

Town Board of the Town of Hamburg August 10, 2026 Meeting 4.22. Budget Amendment Transfer RESOLVED, that the Town Board approves a budget amendment transferring $10,970.00 from Account A000.0000.2770.0000 Sponsorships and Naming Rights to Account A000.7020.0440.0000 Independent Contractor Services; and BE IT FURTHER RESOLVED, that the Town Supervisor and Finance Office are authorized and directed to make the necessary accounting and budgetary entries to carry out this amendment. 57

Page 58

Town Board of the Town of Hamburg August 10, 2026 Meeting 4.23. Approve PO17 Creating additional position of Account Clerk BE IT RESOLVED, that the Town Board authorize the Supervisor to sign the Civil Service approved PO17 creating an additional Account Clerk title in the Finance/Administration Department. ATTACHMENTS: PO 17 SIgned by CS.pdf 58

Page 59

59

Page 60

60

Page 61

61

Page 62

62

Page 63

Town Board of the Town of Hamburg August 10, 2026 Meeting 4.24. Youth, Recreation, & Senior Servies P.A.F. BE IT RESOLVED, that the Town Board approve the termination and hiring of personnel for the Youth, Recreation & Senior Services Department as attached. ATTACHMENTS: scan_2026_08_05_15_39_42_590.pdf 63

Page 64

64

Page 65

Town Board of the Town of Hamburg August 10, 2026 Meeting 4.25. Town Board PAF BE IT RESOLVED, that the Town Board approve the attached PAF. ATTACHMENTS: PAF Town Board Clerks.pdf 65

Page 66

66

Page 67

Town Board of the Town of Hamburg August 10, 2026 Meeting 4.26. B&G PAF BE IT RESOLVED, that the Town Board approves the termination and hiring of the following employees in Buildings & Grounds. ATTACHMENTS: Emergency PAF_8-10-26.pdf Signed BG PAF 08-10-26.pdf 67

Page 68

68

Page 69

69

Page 70

Town Board of the Town of Hamburg August 10, 2026 Meeting 4.27. B&G 20' Utility Trailer Purchase WHEREAS, the Buildings & Grounds Department has a need for a 20-foot utility trailer, and WHEREAS, the Buildings & Grounds Department has received two quotes: Trailer Sales of New York $5,263.85 PJ NFB Trailer and Auto Sales $5,716.93 BE IT RESOLVED, that the Town Board approves the purchase of a new 20-foot utility trailer from Trailer Sales of New York for $5,263.85. Funds available in Account # A.1640.202 and A.7140.413. 70

Page 71

Town Board of the Town of Hamburg August 10, 2026 Meeting 4.28. Highway Budget Amendment WHEREAS, The Highway Dept. has received funds from residents for installation of drainage pipe that has exceeded the amount budgeted for 2026 by $2,315.00. THEREFORE, BE IT RESOLVED, that the Town Board approve that the funds exceeding the budgeted amount will be deposited into Revenue Account DB.2770.7 and transferred to DB.5110.474. BE IT FURTHER RESOLVED, that the Expense Account DB.5110.474 be increased by $2,315.00. 71

Page 72

Town Board of the Town of Hamburg August 10, 2026 Meeting 4.29. Authorize additional Authorized signer to bank accounts BE IT RESOLVED, that the Town Board of the Town of Hamburg hereby designates Dan Kozub, Deputy Superintendent, as an authorized signer on the Town bank accounts identified by the Town Comptroller and approved by the Town Supervisor, subject to all applicable laws, Town policies, banking agreements, and internal control procedures; and BE IT FURTHER RESOLVED, that this authorization permits Mr. Kozub to sign checks and approve other banking transactions only when such payments or transactions have been properly authorized, audited, and approved in accordance with Town policies and applicable law; and BE IT FURTHER RESOLVED, that this authorization does not independently authorize Mr. Kozub to: Open or close a bank account; Borrow money or otherwise obligate the Town; Change account ownership or account terms; Execute investment transactions unless separately authorized; or Circumvent any dual-signature, dual-approval, claims-audit, or electronic-banking controls established by the Town; 72

Page 73

Town Board of the Town of Hamburg August 10, 2026 Meeting 4.30. Plow Truck Purchase NOW, THEREFORE, BE IT RESOLVED that the Town Board of the Town of Hamburg approves the purchase of (1) Western Star Plow Truck for the price of $307,515.00. Pricing is per Sourcewell Contract #032824-DAI purchased through Fleet Maintenance, Inc. and body additions at Valley Fab & Equipment. Funds available in Account H101.5130.201 73

Page 74

Town Board of the Town of Hamburg August 10, 2026 Meeting 4.31. Vending Machine Request for Proposals Be it resolved, the Town Board authorize the Department of Youth, Recreation & Senior Services to post and distribute a Request for Proposals (RFP) related to the operation of vending machines. The RFP will be for one year with an option for two separate one year extensions. Formal proposals are due to the Hamburg Town Clerk's office no later than August 31st 2026, by 11:00 AM. ATTACHMENTS: Final-Hamburg Vending Proposal Request.pdf 74

Page 75

COMPANY ____________________________________ ADDRESS ____________________________________ TOWN OF HAMBURG, NEW YORK REQUEST FOR PROPOSALS FOR HAMBURG ICE RINK VENDING MACHINE OPERATION FOR ONE YEAR (WITH POTENTIAL FOR TWO ONE YEAR ENTENSIONS) Town of Hamburg 6100 South Park Ave., Hamburg NY 14075 75

Page 76

TOWN OF HAMBURG REQUEST FOR PROPOSALS Sealed Proposals are hereby requested on the following: "Town of Hamburg Vending Machine Operation," all in accordance with specifications on file with the Hamburg Town Clerk, Natalie Nitsche, 6100 South Park Avenue, Hamburg, New York 14075. These specifications may be obtained in the Hamburg Town Clerk's office during regular business hours on weekdays (Monday-Friday) from 9:00 a.m. to 5:00 p.m. (local time). Sealed proposals on the above must be filed and submitted in writing to the Hamburg Town Clerk, 6100 South Park Avenue, Hamburg, New York 14075, no later than 11:00 a.m. (local time) on August 31st ,2026. Proposals must be marked "Town of Hamburg Vending Machine Operation." THE TOWN BOARD RESERVES THE RIGHT TO REJECT ALL PROPOSALS AND TO WAIVE ANY INFORMALITIES. Dated: 8/10/26 Natalie Nitsche Town Clerk Town of Hamburg 76

Page 77

Invitation Your firm is hereby invited to submit a proposal for operation of the Town of Hamburg Vending Machine Operations. This RFP neither commits the Town of Hamburg to select an operator nor reimburse any costs associated with the preparation or submittal of proposals in this regard. The Town reserves the right to reject any and all proposals, should it be deemed to be in the best interests of the Town of Hamburg. Introduction The Town of Hamburg currently utilizes a variety of Contractors and product lines for food and beverage machine vending. It is the Town's intent to streamline the purchasing process, promote continuity of product line across the varying facilities and in turn increase profit potential and reduce staff time dealing with multiple Contractors. Scope of Services It is the Town of Hamburg's intention to award a sales and vending service contract to one Contractor who will provide all of the following services: 1. Food and beverage vending machines at specified Town of Hamburg locations. A. Food Vending Machines The Town has identified the following locations as appropriate sites for placement of snack vending machine(s) unless another location(s) is otherwise specified by the Town: Hamburg Ice Rink 2 food vending machines(1 refrigerated food vending) 2980 Lakeview Rd 2 beverage vending machines Hamburg, NY 14075 Additional locations can be added to this contract by MOU document, signed by both parties, which must list the new location(s), date of installation and type and number of vending machines. In the event that a Contractor wishes to visit the specified location above prior to submitting a Proposal, it is the Contractor's responsibility to schedule a site visit independently. Contractors will be responsible for installation, removal, stocking, maintenance, and repair of the machines. Contractors will be responsible for all licenses required to market the stock within the machines. As part of their proposal, contractors are to disclose information regarding any subcontractors that will be involved with the delivery of vending services to the Town. This information should include subcontractor's adherence to the Town's insurance coverage requirements. B. Product Selection and Pricing The variety and brand names of the items to be sold shall be spelled out within the "Proposal Format- Attachments" section of the proposal. All contractors must identify as part of their proposal whether such brands are available as a result of related marketing, sale or concession agreements with distributors and or/producers. Pricing strategies are critical to ensure purchase. Contractor will work with the Town to ensure competitive pricing. C. Initial Installation Contractor shall provide transition plan for how long it will take from time of award to implementation of service plan including how machines will be added, moved, and removed from facilities. Vending machines and service should be operational no later than September 12th, 2026. 77

Page 78

D. Stocking and Equipment Requirements 1. Stocking: The Town of Hamburg will provide the selected contractor the exclusive right to supply all food and beverage vending machine products at the locations listed in section A. Food vending Machines. During the term of the Contract, the contractor shall keep food and beverage machines fully operational. During the term of the Contract, the contractor shall fully supply all products in a timely manner to keep all food and beverage vending machines operating and fully supplied with product, change, and all other necessary supplies to allow the Town of Hamburg and the contractor to maximize sales. The Town reserves the right to conduct periodic audits of the products stocked in the machines to ensure compliance. Contractor shall supply options with regard to how machines will be stocked with items for sale; how machines will be stocked with change; and how cash will be collected from the machines. 2. Equipment: a. Condition of Equipment: All equipment shall be up to date. This shall be interpreted as the latest models available at the execution of the signed contract. Initial equipment must include at a minimum: accept $1, $5, $10 bills; credit/debit card acceptors; cash recycling capabilities; and remote monitoring capabilities that allow Contractor to wirelessly track mechanical issues and detect need for machine refill. Additional specifications may include Energy Star certified machines, and other energy conservation methods such as LED lighting. Machine dimensions and a description of the appearance should be provided in the proposal. Replacement equipment shall be made available to each facility every 2 years for the duration of said contract if deemed necessary by the Town of Hamburg b. Maintenance and Repair: Contractor shall be responsible for handling equipment maintenance, repair, and replacement. Contractor shall provide information on how equipment problems and vandalism issues will be handled including anticipated response time and a repair/replace procedure and contact numbers. c. Equipment Malfunctions & Refunds: Contractor shall provide written policy regarding the handling of reimbursement to facility for lost money in vending machines. E. Ownership Vending machines located within Town of Hamburg facilities will be Contractor-owned. All machines of the Contractor that are placed in Town of Hamburg facilities are at the Contractor's sole risk. The Contractor releases the Town of Hamburg from any claims arising from the loss of or damage to the Contractor's property. F. Revenue and Reports Contractor shall supply proposed compensation rate to the Town of Hamburg for vending machine sales. Compensation to the Town of Hamburg for placement of the vending machines at the sites identified shall be based on a percent of gross sales as a part of the Contractor's agreement. During the contract, the Contractor shall provide a monthly gross receipt report of daily revenues, including an itemized report of sales of each item at each location. As part of their proposal, contractors are to supply options with regard to machine reports and how sales of specific items are tracked. G. References and Subcontractors Contractor must provide references for past-related work which includes contact person, agency, address, phone number, and dates of work for each reference. Be specific to the nature and volume of goods and/or services provided to each reference. 78

Page 79

Duration of Contract Contractors will supply a proposal based on a one-year agreement and the option for renewals for two future one year agreements (2026, 2027 & 2028). The Town may elect to renew the selected proposal for one additional period of three years for a total of five and a half years. For any renewal period authorized by the Town product and supply cost as well as the compensation rate will be subject to renegotiation and a mutual agreement of the parties. If a mutual agreement of the parties is not reached within a reasonable period as determined by the Town, the contract will not renew. Proposal Format PROPOSAL FORMAT Consultants should organize Proposals into the following Sections: A. Qualifications B. References C. Proposed Work Plan D. Authorized Negotiator E. Attachments F. Fee Proposal (include in a separate sealed envelope clearly marked "Fee Proposal") The following describes the elements that should be included in each of the proposal sections and the weighted point system that will be used for evaluation of the proposals. A. Qualifications/Quality of Work - 15 points 1. State the full name and address of your organization and, if applicable, the branch office or other subsidiary element that will perform, or assist in performing, the work hereunder. Indicate whether it operates as an individual, partnership, or corporation. If as a corporation, include whether it is licensed to operate in the State of New York. 2. Include the name of executive and personnel by skill and qualification that will be employed in the work. Show where these personnel will be physically located during the time they are engaged in the work. Indicate which of these individuals you consider key to the successful completion of the project. Identify only individuals who will do the work on this project by name and title. Resumes and qualifications are required for all proposed project personnel. 3. State history of the firm, in terms of length of existence, types of services provided, etc. Identify the technical details that make the firm uniquely qualified for this work. 4. Identify brand names and the quality of goods to be sold. B. References - 15 points Provide at least three references for past-related work. Include contact person, agency, address, phone and dates of work for each reference. Be specific as to the nature of goods and/or services provided to each reference. C. Proposed Work Plan - 30 points A detailed work plan is to be presented which lists all tasks determined to be necessary to accomplish the work detailed in the scope of services. The work plan shall define resources needed for each task. In addition, the work plan shall include a timeline schedule depicting the sequence and duration of tasks showing how the work will be organized and executed. The consultant may propose tasks and deliverables outside of those listed above if they believe they are necessary to support the Town's objectives. 79

Page 80

In the scoring for this section, consultants shall be evaluated on the clarity, thoroughness and content of their responses to the above items. D. Authorized Negotiator Include the name, phone number, and e-mail address of persons(s) in your organization authorized to negotiate the agreement with the Town. E. Attachments - 5 points Legal Status of Consultant, Conflict of Interest Form, the Non-Discrimination Form, a comprehensive list of the variety and brand names of the items to be sold must be completed and returned with the proposal. These elements should be included as attachments to the proposal submission. F. Fee Proposal - 35 points 1. Fee quotations shall be submitted in a separate, sealed, envelope as part of the proposal 2. Supply a compensation rate to the Town of Hamburg for vending machine sales. Compensation to the Town of Hamburg for placement of the vending machines at the sites identified shall be based on a percent of gross sales as a part of the Contractor's agreement. 3. Provide a detailed description regarding the annual amount of sponsorship payments paid to the Town of Hamburg. Insurance, Legal and Agreements: Specifications for license to operate the Town of Hamburg Vending Machine Operations. 1. The vendor is to file with the Town Clerk a performance bond issued by an incorporated surety company or other cash deposits in the amount of Five Hundred ($500) Dollars. 2. The vendor shall comply with all applicable Federal, State, County and all local statutes, laws, regulations, and licensing requirements as well as an up-to-date health permit and shall maintain the property in accordance with such laws and all the regulations. 3. The vendor shall charge reasonably competitive prices for any products sold. For purposes of this agreement, "reasonably competitive prices" shall be defined as prices that are competitive or reasonably aligned with the fair market pricing for the sale of similar products at local establishments in the Hamburg, NY area. 4. The vendor shall secure and maintain in force during the term of the contract Workers' Compensation and New York State Disability Benefits insurance as required by New York State Law. 5. The vendor shall also secure and maintain the following insurance: See insurance document attached. All coverages are to be written by a company licensed in New York and the company should have a Best's Key rating Guide rating of at least B+. 6. A certificate of the above required insurance providing a minimum of 30 days written notice of cancellation or non-renewal of such insurance shall be submitted to the Town Attorney's office, Town Hall, 6100 South Park Avenue, Hamburg, New York 14075, prior to execution of the lease (see accompanying Certificate of Insurance sample for reference). 7. Indemnification: Vendor agrees that it shall, to the fullest extent permitted by law, defend hold harmless and indemnify including the payment of attorney's fees and costs, the Town of Hamburg and any other facility owner, and their respective agents, officers, and employees, from and against all claims, suits, damages, defense, and other legal costs and expenses of any kind, arising out of, resulting from, caused by, or in any way related to the activities and operations of Vendor and/or use of Town owned or provided facilities. 8. If the vendor is a corporation or LLC, all corporate officers or managers, respectively, must execute an individual guarantee for all payments due and owing to the Town of Hamburg under the agreement. 80

Page 81

9. The town's insurance requirements are subject to change at the sole discretion of the Town and its insurance consultants. 10. The vendor shall abide by and enforce the following rules and regulations: a. No refreshments are to be dispensed in glass or metal containers. b. No additions or alterations may be made to the premises temporarily or other by the vendor. c. Vendor cannot sub-contract the sale or distribution of any vending to any other entities on the premises. 11. Acceptable bids are at the discretion of the vendor and will be reviewed when opened on August31st 2026, at 11:00 a.m. 12. The successful applicant shall enter into an agreement by September 4th, 2026, with the Town covering the foregoing terms herein set forth, prior to occupancy. 13. Award of RFP will be made only to the lowest responsible bidder whose proposals shall comply with all the provisions required to render it formal and provides the best value to the Town per the Town Code and the weighted point system defined above. The Town Board reserves the right to reject any or all proposals if, in its opinion, the best interests of the Town will, thereby, be promoted. 14. THE TOWN RESERVES THE RIGHT TO REJECT ALL PROPOSALS, to consider the reputation of the applicant in making its selection, and to waive any informalities or minor deviations from the specifications. 15. This sheet must be signed and returned with the proposal. ________________________________________ Signature of Applicant 81

Page 82

Insurance Requirements Instructions pertaining to the Town of Hamburg regarding: CONTRACTORS' OR VENDORS' INSURANCE COVERAGE AND CERTIFICATES 1. GENERAL PROVISIONS As to all required insurance: .1 The Vendor shall provide current Certificates of Insurance and accompanying documents and agrees to obtain a health permit prior to opening as described herein for the Town's approval prior to Town's signing of contract(s). .2 "Certificate Holder" shall be Town of Hamburg at the address of 6100 South Park Avenue Hamburg, NY 14075. .3 Coverage must comply with all specifications set forth herein. .4 All insurance documents must be executed with authorized signatures. .5 The Vendor's required liability policies must be endorsed to provide that any Notice of Cancellation or Notice of Non-Renewal given to the First Named Insured shall also be given to the Additional Insureds for this project. A copy of such endorsement(s) must be furnished to the Certificate Holder. .6 Failure of the Town to object to the Vendor's failure to furnish a Certificate or other evidence of the required insurance coverages, object to any defect in such Certificate or other evidence of coverage, or demand receipt of such Certificate or other evidence of coverage shall not be deemed a waiver of Vendor's obligation to furnish the required insurance coverages described herein. Nothing contained herein imposes on the Town a duty or obligation to review any evidence of insurance coverages or issue any formal approval or acceptance of such evidence. .7 The Vendor's liability and indemnification of the Town shall not be relieved or diminished by the Vendor securing insurance coverage in accordance with the Town's requirements. Any approval by the Town of such insurance coverage shall not be construed as accepting in any way the deficiencies in the Vendor's insurance coverage. .8 In addition to Certificates of Insurance and other documents, the Vendor shall provide to the Town and other Certificate Holders, on a timely basis, copies of any subsequently issued endorsement(s) that amend applicable coverages or limits. .9 When any required insurance shall expire, due to the attainment of a normal expiration or renewal date, the Vendor shall supply, no later than ten (10) days prior to such expiration, the Town with Certificates of Insurance and accompanying documents evidencing continuation of coverage in the same manner, limits of protection and scope as provided by the previous policy. .10 The Vendor will assure that any and all subcontractors retained by the Vendor carry and maintain insurance with reasonably prudent limits and coverage satisfactory to the Town in light of the work to be performed, written by companies meeting the same criteria as required in Section 2. LIABILITY INSURANCE, and that the Town is named additional insured on the subcontractor's liability policies according to the same requirements as described in Section 2.1(b). .11 The Vendor shall disclose to the Owner any deductible or self-insured retentions applicable to any of the coverages required herein of the Vendor. .12 The Town reserves the right to modify the requirements herein, including limits, based on circumstances involved, including but not limited to the nature of the risk involved, prior experience, insurer, or coverage. 82

Page 83

2. LIABILITY INSURANCE The Vendor agrees to secure and maintain, at the Vendor's own expense, all insurance coverage required herein from one or more insurance companies that are licensed to write such insurance in New York State or are eligible non-admitted insurers, per the current Excess Line Association of New York's (ELANY) official list. Insurers must carry an A.M. Best "Secure" rating of B+ or better. The vendor will secure health permit annually. The Vendor's insurance shall include the following, and shall be written with limits no less than hereinafter specified: .1 COMMERCIAL GENERAL LIABILITY (a) Occurrence based Commercial General Liability coverage to include bodily injury, personal injury, and property damage applicable to ongoing operations and contractual liability. The coverage limits applicable shall be the greater of the amounts indicated below or the amounts carried by the VENDOR: General Aggregate $2,000,000 Products & Comp/Op. Aggregate $2,000,000 Personal & Advertising Injury $1,000,000 Each Occurrence $1,000,000 Fire Damage (any one fire) $50,000 Med. Expense (any one person) $5,000 (b) Additional Insured: Coverage in Commercial General Liability and Excess Liability and/or Umbrella Liability policies or coverage sections shall be written or endorsed so as to apply to the following as additional insured on a primary and non-contributory basis: "Town of Hamburg and its employees, authorized volunteers and board members." The Certificate of Insurance must clearly state how Additional Insured coverage is achieved in the General Liability and Umbrella/Excess Liability policies. Certificates of Insurance must show the form numbers that are used to achieve all of the Additional Insured coverage. A copy of the actual policy language that affects this coverage in each policy must be provided to the Town with the Certificate of Insurance. (c) Waiver of Subrogation: To the fullest extent permitted by applicable state law, a Waiver of Subrogation Clause shall be added to the General Liability, Umbrella/Excess Liability, and Workers Compensation policies in favor of the Town. .2 AUTOMOBILE LIABILITY INSURANCE Bodily Injury and Property Damage, coverage for the Vendor as the owner or the lessee of automobiles, trucks, trailers, self-propelled Vendor's equipment and all other owned, hired and non-owned vehicles registered for use on the public highway and/or used in operations relating to work under contract. The coverage limit applicable shall be the greater of the amounts indicated below or the amount(s) carried by the Vendor: Combined Single Limit $1,000,000 (b) Additional Insured: Coverage in Auto Liability policy or coverage sections shall be written or endorsed so as to apply to the following as additional insured: "Town of Hamburg and its employees, authorized volunteers and board members." .3 EXCESS LIABILITY AND/OR UMBRELLA LIABILITY Applicable to Commercial General and Automobile Liability policies. The Excess Liability and/or Umbrella Liability coverage limits applicable shall be the greater of the amounts indicated below or the amounts carried by the Vendor: Each Occurrence $1,000,000 83

Page 84

Aggregate $1,000,000 See Section 2.1(b) above for additional insured requirements applicable to the Excess Liability and/or Umbrella Liability insurance. 3. WORKERS COMPENSATION AND EMPLOYER'S LIABILITY INSURANCE Coverage as required by New York State statutory limits. Coverage shall include a waiver of subrogation in favor of the Town of Hamburg. 4. NEW YORK DISABILITY (NYDBL) Coverage as required by New York State statutory limits. 84

Page 85

Town Board of the Town of Hamburg August 10, 2026 Meeting 4.32. Town Clerk - PAF BE IT RESOLVED, the Town Board approves the attached PAF for the Town Clerk's office. ATTACHMENTS: 8.10.26 PAF.pdf 85

Page 86

TOWN OF HAMBURG - PERSONNEL ACTION FORM Date of Request: 6/5/26 Department: Town Clerk Department Head Signature: Supervisor Signature: Date: TOWN BOARD MEETING OF 8/10/26 PAGE 1 of 1 I request that a Town Board Resolution be adopted approving the following personnel action(s): Full time PT/Sea/temp Termination Town Resident New(N) or Full Time Part Time hourly Separation # Emp # Employee Name Yes (Y) or Rehire (R) or Position/Status/Fund Start date No (N) Change (C) hourly rate rate Date 5045 Alice Magierski N C PT Clerk - Seasonal $20.00 2/19/2026 4948 Mary Hultquist N C PT Clerk - Seasonal $20.00 2/19/2026 86

Page 87

Town Board of the Town of Hamburg August 10, 2026 Meeting 4.33. Buffalo Bills NFL Stadium Economic Impact Area & Town of Hamburg CFA Zoning Updates SEQR Negative Declaration Resolution Whereas, the Hamburg Town Code contains and specifies the local laws and ordinances of the Town of Hamburg; and Whereas, in December 2023, the Town of Hamburg was awarded $126,000 on competitive basis from New York State Department of State (NYSDOS) for the development of the Buffalo Bills NFL Stadium Economic Impact Area & Town of Hamburg Zoning Update Project; and Whereas, after numerous Committee and stakeholder meetings, extensive public outreach, and agency coordination, the Town’s CFA Zoning Committee and Fisher Associates as the project consultant, have developed specific Code and zoning map revisions; and Whereas, pursuant to Municipal Home Rule Law, the Town Board is proposing to enact a local law as follows: Be it enacted by the Town Board of the Town of Hamburg, New York, that the Hamburg Town Board amends the Hamburg Town Code as follows (full copies attached): Amend Chapter 280 (Zoning) by adding a new Article, entitled “SIA - Stadium Impact Area District” Amend Article LVI McKinley Mall Area Incentives Append the “Bills Stadium Economic Impact Area Plan” to the Comprehensive Plan; and Whereas, pursuant to Municipal Home Rule Law, the Town Board is also proposing to enact a local law which proposes to amend the Town’s Zoning Map as follows: Be it enacted by the Town Board of the Town of Hamburg, New York, that the Hamburg Town Board amends the Town Zoning map as follows (as illustrated on the attached maps): Rezone SBL # 160.19-1-4.1 from R-3 to SIA Rezone SBL # 160.16-1-12 from R-3 to SIA Rezone SBL # 160.11-2-17 and 160.15-1-28 from HC to MU-1 Rezone SBL # 160.11-2-18 from NC to MU-1 Rezone the following SBL #s 160.11-2-19, 160.11-2-20, 160.11-2-21, 160.11-2-22, 160.11-2-23, 160.11-2-24, 160.11-2-25, 160.11-2-26, 160.11-2-27, 160.11-2-28, 160.11-2-29, 160.11-2-30, 160.11-2-31, 160.11-2-32, 160.15-1-20, 160.15-1-18, 160.15-1-16, 160.15-1-14, and 160.15-1- 12.2 from C-3 to MU-1 Rezone the following SBL #s: 160.15-1-24.1, 160.11-2-8.113, 160.11-2-8.12, and 160.11-2-9 from C-2 to MU-1 87

Page 88

Rezone the following SBL #s: 160.14-2-35, 160.14-2-37, 160.14-2-49, and 160.14-2-50 from R- 2 to MU-1; and Whereas, after receiving a letter of intent and interest from a property owner at 4511 East Highland Parkway to be included in the proposed rezonings, reviewing the zoning draft, and consulting with the Town Planning Department, the Town Board has determined the property has merit to be included in the proposed rezonings and will complement the transition of the Mckinley Parkway corridor, and has added SBL #: 160.11-2-16 to be rezoned from R-2 to MU-1; Whereas, a public hearing was held regarding these Code amendments on June 22nd, 2026, and comments were received and acknowledged from the public, and from Erie County, based on the 239-m referral. Now, Therefore, Be It Resolved, the Hamburg Town Board, in accordance with the State Environmental Quality Review Act (SEQRA) has determined that the proposed amendments to the Zoning Code of the Town of Hamburg Code of Ordinances and the Town of Hamburg Zoning Map will not adversely affect the natural resources of the State and/or the health, safety, and welfare of the public and is consistent with social and economic considerations and, therefore, issues the attached SEQRA Negative Declaration in accordance with Section 617.7 of the SEQRA regulations; and Be It Further Resolved That, the Supervisor is authorized to sign the Full Environmental Assessment Form (FEAF Parts 1, 2, and 3), which will act as the Negative Declaration. ATTACHMENTS: FEAF Part 1 Unsigned.pdf FEAF Part 2.pdf FEAF Part 3.pdf 88

Page 89

Full Environmental Assessment Form Part 1 - Project and Setting Instructions for Completing Part 1 Part 1 is to be completed by the applicant or project sponsor. Responses become part of the application for approval or funding, are subject to public review, and may be subject to further verification. Complete Part 1 based on information currently available. If additional research or investigation would be needed to fully respond to any item, please answer as thoroughly as possible based on current information; indicate whether missing information does not exist, or is not reasonably available to the sponsor; and, when possible, generally describe work or studies which would be necessary to update or fully develop that information. Applicants/sponsors must complete all items in Sections A & B. In Sections C, D & E, most items contain an initial question that must be answered either “Yes” or “No”. If the answer to the initial question is “Yes”, complete the sub-questions that follow. If the answer to the initial question is “No”, proceed to the next question. Section F allows the project sponsor to identify and attach any additional information. Section G requires the name and signature of the applicant or project sponsor to verify that the information contained in Part 1is accurate and complete. A. Project and Applicant/Sponsor Information. Name of Action or Project: Hamburg Stadium Impact Area Plan and Zoning Project Location (describe, and attach a general location map): Town of Hamburg, Stadium Impact Area (current Erie Community College campus and adjacent areas) Brief Description of Proposed Action (include purpose or need): See attachment Name of Applicant/Sponsor: Telephone: 716.649.6111 Town of Hamburg E-Mail: [email protected] Address: Hamburg Town Hall, 6100 S Park Avenue City/PO: Hamburg State: Zip Code: NY 14075 Project Contact (if not same as sponsor; give name and title/role): Telephone: 716.649.2023 Joshua Rogers, AICP, Town of Hamburg Planning Department E-Mail: [email protected] Address: same as above City/PO: State: Zip Code: Property Owner (if not same as sponsor): Telephone: Various including Erie County-owned ECC South Campus E-Mail: Address: City/PO: State: Zip Code: Page 1 of 13 FEAF 2019 89

Page 90

B. Government Approvals B. Government Approvals, Funding, or Sponsorship. (“Funding” includes grants, loans, tax relief, and any other forms of financial assistance.) Government Entity If Yes: Identify Agency and Approval(s) Application Date Required (Actual or projected) a. City Council, Town Board, 9 ✔ Yes 9 No Town Board [Plan and zoning adoption] June 2026 or Village Board of Trustees b. City, Town or Village 9 Yes 9 No ✔ Planning Board [Recommendation for Approval] June 2026 Planning Board or Commission c. City, Town or 9 Yes 9 No Village Zoning Board of Appeals d. Other local agencies 9 Yes 9 No e. County agencies 9 Yes 9 No ✔ Erie County Dept of Environment and Planning [GMU 239-L Review and Recommendation] f. Regional agencies 9 Yes 9 No g. State agencies 9 Yes 9 No h. Federal agencies 9 Yes 9 No i. Coastal Resources. i. Is the project site within a Coastal Area, or the waterfront area of a Designated Inland Waterway? 9 No 9 Yes ✔ ii. Is the project site located in a community with an approved Local Waterfront Revitalization Program? ✔ 9 Yes 9 No iii. Is the project site within a Coastal Erosion Hazard Area? 9 Yes ✔ 9 No C. Planning and Zoning C.1. Planning and zoning actions. Will administrative or legislative adoption, or amendment of a plan, local law, ordinance, rule or regulation be the 9 Yes 9 No ✔ only approval(s) which must be granted to enable the proposed action to proceed? • If Yes, complete sections C, F and G. • If No, proceed to question C.2 and complete all remaining sections and questions in Part 1 C.2. Adopted land use plans. a. Do any municipally- adopted (city, town, village or county) comprehensive land use plan(s) include the site ✔ 9 Yes 9 No where the proposed action would be located? If Yes, does the comprehensive plan include specific recommendations for the site where the proposed action 9 Yes ✔ 9 No would be located? b. Is the site of the proposed action within any local or regional special planning district (for example: Greenway; 9 Yes 9 No ✔ Brownfield Opportunity Area (BOA); designated State or Federal heritage area; watershed management plan; or other?) If Yes, identify the plan(s): _______________________________________________________________________________________________________ NYS Heritage Areas: West Erie Canal Corridor ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ c. Is the proposed action located wholly or partially within an area listed in an adopted municipal open space plan, 9 Yes ✔ 9 No or an adopted municipal farmland protection plan? If Yes, identify the plan(s): ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ Page 2 of 13 90

Page 91

C.3. Zoning a. Is the site of the proposed action located in a municipality with an adopted zoning law or ordinance. 9 Yes 9 No ✔ If Yes, what is the zoning classification(s) including any applicable overlay district? ECC_________________________________________________________________________________________________________ South Campus is currently zoned R3 (Multifamily), McKinley Mall is zoned C1 (Local Retail Business) with an overlay district (McKinley Mall Incentive Zone), and the other affected parcels are zoned C3 (Office). Other parcels in corridor are C2. _________________________________________________________________________________________________________ b. Is the use permitted or allowed by a special or conditional use permit? 9 Yes 9 No c. Is a zoning change requested as part of the proposed action? 9 Yes 9 No If Yes, i. What is the proposed new zoning for the site? New ___________________________________________________________________ SIA District, rezoning corridor to MU-1, modifications to McKinley Mall Incentive Zone C.4. Existing community services. a. In what school district is the project site located? Frontier ________________________________________________________________ Central School District b. What police or other public protection forces serve the project site? Town_________________________________________________________________________________________________________ of Hamburg Police Department; Erie County Sherriff; New York State Police c. Which fire protection and emergency medical services serve the project site? __________________________________________________________________________________________________________ Scranton Volunteer Fire Company; Mercy Hospital; Big Tree EMS d. What parks serve the project site? __________________________________________________________________________________________________________ Orchard Acres Park near the existing McKinley Malld. The Stadium Economic Impact Area plan envisions significant public open spaces. __________________________________________________________________________________________________________ D. Project Details D.1. Proposed and Potential Development a. What is the general nature of the proposed action (e.g., residential, industrial, commercial, recreational; if mixed, include all components)? _________________________________________________________________________________________________________ b. a. Total acreage of the site of the proposed action? _____________ acres b. Total acreage to be physically disturbed? _____________ acres c. Total acreage (project site and any contiguous properties) owned or controlled by the applicant or project sponsor? _____________ acres c. Is the proposed action an expansion of an existing project or use? 9 Yes 9 No i. If Yes, what is the approximate percentage of the proposed expansion and identify the units (e.g., acres, miles, housing units, square feet)? % ____________________ Units: ____________________ d. Is the proposed action a subdivision, or does it include a subdivision? 9 Yes 9 No If Yes, i. Purpose or type of subdivision? (e.g., residential, industrial, commercial; if mixed, specify types) ________________________________________________________________________________________________________ ii. Is a cluster/conservation layout proposed? 9 Yes 9 No iii. Number of lots proposed? ________ iv. Minimum and maximum proposed lot sizes? Minimum __________ Maximum __________ e. Will the proposed action be constructed in multiple phases? 9 Yes 9 No i. If No, anticipated period of construction: _____ months ii. If Yes: • Total number of phases anticipated _____ • Anticipated commencement date of phase 1 (including demolition) _____ month _____ year • Anticipated completion date of final phase _____ month _____year • Generally describe connections or relationships among phases, including any contingencies where progress of one phase may determine timing or duration of future phases: _______________________________________________________________ ____________________________________________________________________________________________________ ____________________________________________________________________________________________________ Page 3 of 13 91

Page 92

f. Does the project include new residential uses? 9 Yes 9 No If Yes, show numbers of units proposed. One Family Two Family Three Family Multiple Family (four or more) Initial Phase ___________ ___________ ____________ ________________________ At completion of all phases ___________ ___________ ____________ ________________________ g. Does the proposed action include new non-residential construction (including expansions)? 9 Yes 9 No If Yes, i. Total number of structures ___________ ii. Dimensions (in feet) of largest proposed structure: ________height; ________width; and _______ length iii. Approximate extent of building space to be heated or cooled: ______________________ square feet h. Does the proposed action include construction or other activities that will result in the impoundment of any 9 Yes 9 No liquids, such as creation of a water supply, reservoir, pond, lake, waste lagoon or other storage? If Yes, i. Purpose of the impoundment: ________________________________________________________________________________ ii. If a water impoundment, the principal source of the water: 9 Ground water 9 Surface water streams 9 Other specify: _________________________________________________________________________________________________________ iii. If other than water, identify the type of impounded/contained liquids and their source. _________________________________________________________________________________________________________ iv. Approximate size of the proposed impoundment. Volume: ____________ million gallons; surface area: ____________ acres v. Dimensions of the proposed dam or impounding structure: ________ height; _______ length vi. Construction method/materials for the proposed dam or impounding structure (e.g., earth fill, rock, wood, concrete): ________________________________________________________________________________________________________ D.2. Project Operations a. Does the proposed action include any excavation, mining, or dredging, during construction, operations, or both? 9 Yes 9 No (Not including general site preparation, grading or installation of utilities or foundations where all excavated materials will remain onsite) If Yes: i .What is the purpose of the excavation or dredging? _______________________________________________________________ ii. How much material (including rock, earth, sediments, etc.) is proposed to be removed from the site? • Volume (specify tons or cubic yards): ____________________________________________ • Over what duration of time? ____________________________________________________ iii. Describe nature and characteristics of materials to be excavated or dredged, and plans to use, manage or dispose of them. ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ iv. Will there be onsite dewatering or processing of excavated materials? 9 Yes 9 No If yes, describe. ___________________________________________________________________________________________ ________________________________________________________________________________________________________ v. What is the total area to be dredged or excavated? _____________________________________acres vi. What is the maximum area to be worked at any one time? _______________________________ acres vii. What would be the maximum depth of excavation or dredging? __________________________ feet viii. Will the excavation require blasting? 9 Yes 9 No ix. Summarize site reclamation goals and plan: _____________________________________________________________________ ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ b. Would the proposed action cause or result in alteration of, increase or decrease in size of, or encroachment 9 Yes 9 No into any existing wetland, waterbody, shoreline, beach or adjacent area? If Yes: i. Identify the wetland or waterbody which would be affected (by name, water index number, wetland map number or geographic description): ______________________________________________________________________________________________ _________________________________________________________________________________________________________ Page 4 of 13 92

Page 93

ii. Describe how the proposed action would affect that waterbody or wetland, e.g. excavation, fill, placement of structures, or alteration of channels, banks and shorelines. Indicate extent of activities, alterations and additions in square feet or acres: _________________________________________________________________________________________________________ _________________________________________________________________________________________________________ _________________________________________________________________________________________________________ _________________________________________________________________________________________________________ iii. Will the proposed action cause or result in disturbance to bottom sediments? Yes 9 No If Yes, describe: __________________________________________________________________________________________ iv. Will the proposed action cause or result in the destruction or removal of aquatic vegetation? 9 Yes 9 No If Yes: • acres of aquatic vegetation proposed to be removed: ___________________________________________________________ • expected acreage of aquatic vegetation remaining after project completion:________________________________________ • purpose of proposed removal (e.g. beach clearing, invasive species control, boat access): ____________________________ ____________________________________________________________________________________________________ • proposed method of plant removal: ________________________________________________________________________ • if chemical/herbicide treatment will be used, specify product(s): _________________________________________________ v. Describe any proposed reclamation/mitigation following disturbance: _________________________________________________ _________________________________________________________________________________________________________ c. Will the proposed action use, or create a new demand for water? 9 Yes 9 No If Yes: i. Total anticipated water usage/demand per day: __________________________ gallons/day ii. Will the proposed action obtain water from an existing public water supply? 9 Yes 9 No If Yes: • Name of district or service area: _________________________________________________________________________ • Does the existing public water supply have capacity to serve the proposal? 9 Yes 9 No • Is the project site in the existing district? 9 Yes 9 No • Is expansion of the district needed? 9 Yes 9 No • Do existing lines serve the project site? 9 Yes 9 No iii. Will line extension within an existing district be necessary to supply the project? 9 Yes 9 No If Yes: • Describe extensions or capacity expansions proposed to serve this project: ________________________________________ ____________________________________________________________________________________________________ • Source(s) of supply for the district: ________________________________________________________________________ iv. Is a new water supply district or service area proposed to be formed to serve the project site? 9 Yes 9 No If, Yes: • Applicant/sponsor for new district: ________________________________________________________________________ • Date application submitted or anticipated: __________________________________________________________________ • Proposed source(s) of supply for new district: _______________________________________________________________ v. If a public water supply will not be used, describe plans to provide water supply for the project: ___________________________ _________________________________________________________________________________________________________ vi. If water supply will be from wells (public or private), what is the maximum pumping capacity: _______ gallons/minute. d. Will the proposed action generate liquid wastes? 9 Yes 9 No If Yes: i. Total anticipated liquid waste generation per day: _______________ gallons/day ii. Nature of liquid wastes to be generated (e.g., sanitary wastewater, industrial; if combination, describe all components and approximate volumes or proportions of each): __________________________________________________________________ _________________________________________________________________________________________________________ _________________________________________________________________________________________________________ iii. Will the proposed action use any existing public wastewater treatment facilities? 9 Yes 9 No If Yes: • Name of wastewater treatment plant to be used: _____________________________________________________________ • Name of district: ______________________________________________________________________________________ • Does the existing wastewater treatment plant have capacity to serve the project? 9 Yes 9 No • Is the project site in the existing district? 9 Yes 9 No • Is expansion of the district needed? 9 Yes 9 No Page 5 of 13 93

Page 94

• Do existing sewer lines serve the project site? 9 Yes 9 No • Will a line extension within an existing district be necessary to serve the project? 9 Yes 9 No If Yes: • Describe extensions or capacity expansions proposed to serve this project: ____________________________________ ____________________________________________________________________________________________________ ____________________________________________________________________________________________________ iv. Will a new wastewater (sewage) treatment district be formed to serve the project site? 9 Yes 9 No If Yes: • Applicant/sponsor for new district: ____________________________________________________________________ • Date application submitted or anticipated: _______________________________________________________________ • What is the receiving water for the wastewater discharge? __________________________________________________ v. If public facilities will not be used, describe plans to provide wastewater treatment for the project, including specifying proposed receiving water (name and classification if surface discharge or describe subsurface disposal plans): ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ vi. Describe any plans or designs to capture, recycle or reuse liquid waste: _______________________________________________ ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ e. Will the proposed action disturb more than one acre and create stormwater runoff, either from new point 9 Yes 9 No sources (i.e. ditches, pipes, swales, curbs, gutters or other concentrated flows of stormwater) or non-point source (i.e. sheet flow) during construction or post construction? If Yes: i. How much impervious surface will the project create in relation to total size of project parcel? _____ Square feet or _____ acres (impervious surface) _____ Square feet or _____ acres (parcel size) ii. Describe types of new point sources. __________________________________________________________________________ _________________________________________________________________________________________________________ iii. Where will the stormwater runoff be directed (i.e. on-site stormwater management facility/structures, adjacent properties, groundwater, on-site surface water or off-site surface waters)? ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ • If to surface waters, identify receiving water bodies or wetlands: ________________________________________________ ____________________________________________________________________________________________________ ____________________________________________________________________________________________________ • Will stormwater runoff flow to adjacent properties? 9 Yes 9 No iv. Does the proposed plan minimize impervious surfaces, use pervious materials or collect and re-use stormwater? 9 Yes 9 No f. Does the proposed action include, or will it use on-site, one or more sources of air emissions, including fuel 9 Yes 9 No combustion, waste incineration, or other processes or operations? If Yes, identify: i. Mobile sources during project operations (e.g., heavy equipment, fleet or delivery vehicles) _________________________________________________________________________________________________________ ii. Stationary sources during construction (e.g., power generation, structural heating, batch plant, crushers) ________________________________________________________________________________________________________ iii. Stationary sources during operations (e.g., process emissions, large boilers, electric generation) ________________________________________________________________________________________________________ g. Will any air emission sources named in D.2.f (above), require a NY State Air Registration, Air Facility Permit, 9 Yes 9 No or Federal Clean Air Act Title IV or Title V Permit? If Yes: i. Is the project site located in an Air quality non-attainment area? (Area routinely or periodically fails to meet 9 Yes 9 No ambient air quality standards for all or some parts of the year) ii. In addition to emissions as calculated in the application, the project will generate: • ___________Tons/year (short tons) of Carbon Dioxide (CO2) • ___________Tons/year (short tons) of Nitrous Oxide (N2O) • ___________Tons/year (short tons) of Perfluorocarbons (PFCs) • ___________Tons/year (short tons) of Sulfur Hexafluoride (SF6) • ___________Tons/year (short tons) of Carbon Dioxide equivalent of Hydroflourocarbons (HFCs) • ___________Tons/year (short tons) of Hazardous Air Pollutants (HAPs) Page 6 of 13 94

Page 95

h. Will the proposed action generate or emit methane (including, but not limited to, sewage treatment plants, 9 Yes 9 No landfills, composting facilities)? If Yes: i. Estimate methane generation in tons/year (metric): ________________________________________________________________ ii. Describe any methane capture, control or elimination measures included in project design (e.g., combustion to generate heat or electricity, flaring): ________________________________________________________________________________________ _________________________________________________________________________________________________________ i. Will the proposed action result in the release of air pollutants from open-air operations or processes, such as 9 Yes 9 No quarry or landfill operations? If Yes: Describe operations and nature of emissions (e.g., diesel exhaust, rock particulates/dust): _________________________________________________________________________________________________________ _________________________________________________________________________________________________________ j. Will the proposed action result in a substantial increase in traffic above present levels or generate substantial 9 Yes 9 No new demand for transportation facilities or services? If Yes: i. When is the peak traffic expected (Check all that apply): † Morning † Evening †Weekend † Randomly between hours of __________ to ________. ii. For commercial activities only, projected number of truck trips/day and type (e.g., semi trailers and dump trucks): _____________ ________________________________________________________________________________________________________ iii. Parking spaces: Existing ___________________ Proposed ___________ Net increase/decrease _____________________ iv. Does the proposed action include any shared use parking? Yes No v. If the proposed action includes any modification of existing roads, creation of new roads or change in existing access, describe: ________________________________________________________________________________________________________ vi. Are public/private transportation service(s) or facilities available within ½ mile of the proposed site? 9 Yes 9 No vii Will the proposed action include access to public transportation or accommodations for use of hybrid, electric 9 Yes 9 No or other alternative fueled vehicles? viii. Will the proposed action include plans for pedestrian or bicycle accommodations for connections to existing 9 Yes 9 No pedestrian or bicycle routes? k. Will the proposed action (for commercial or industrial projects only) generate new or additional demand 9 Yes 9 No for energy? If Yes: i. Estimate annual electricity demand during operation of the proposed action: ____________________________________________ _________________________________________________________________________________________________________ ii. Anticipated sources/suppliers of electricity for the project (e.g., on-site combustion, on-site renewable, via grid/local utility, or other): ________________________________________________________________________________________________________ iii. Will the proposed action require a new, or an upgrade, to an existing substation? 9 Yes 9 No l. Hours of operation. Answer all items which apply. i. During Construction: ii. During Operations: • Monday - Friday: _________________________ • Monday - Friday: ____________________________ • Saturday: ________________________________ • Saturday: ___________________________________ • Sunday: _________________________________ • Sunday: ____________________________________ • Holidays: ________________________________ • Holidays: ___________________________________ Page 7 of 13 95

Page 96

m. Will the proposed action produce noise that will exceed existing ambient noise levels during construction, 9 Yes 9 No operation, or both? If yes: i. Provide details including sources, time of day and duration: _______________________________________________________________________________________________________ _______________________________________________________________________________________________________ ii. Will the proposed action remove existing natural barriers that could act as a noise barrier or screen? 9 Yes 9 No Describe: _________________________________________________________________________________________________ _________________________________________________________________________________________________________ n. Will the proposed action have outdoor lighting? 9 Yes 9 No If yes: i. Describe source(s), location(s), height of fixture(s), direction/aim, and proximity to nearest occupied structures: _________________________________________________________________________________________________________ _________________________________________________________________________________________________________ ii. Will proposed action remove existing natural barriers that could act as a light barrier or screen? 9 Yes 9 No Describe: _________________________________________________________________________________________________ _________________________________________________________________________________________________________ o. Does the proposed action have the potential to produce odors for more than one hour per day? 9 Yes 9 No If Yes, describe possible sources, potential frequency and duration of odor emissions, and proximity to nearest occupied structures: ______________________________________________________________________________________ ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ p. Will the proposed action include any bulk storage of petroleum (combined capacity of over 1,100 gallons) 9 Yes 9 No or chemical products 185 gallons in above ground storage or any amount in underground storage? If Yes: i. Product(s) to be stored ______________________________________________________________________________________ ii. Volume(s) ______ per unit time ___________ (e.g., month, year) iii. Generally, describe the proposed storage facilities:________________________________________________________________ ________________________________________________________________________________________________________ q. Will the proposed action (commercial, industrial and recreational projects only) use pesticides (i.e., herbicides, 9 Yes 9 No insecticides) during construction or operation? If Yes: i. Describe proposed treatment(s): ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ ii. Will the proposed action use Integrated Pest Management Practices? 9 Yes 9 No r. Will the proposed action (commercial or industrial projects only) involve or require the management or disposal 9 Yes 9 No of solid waste (excluding hazardous materials)? If Yes: i. Describe any solid waste(s) to be generated during construction or operation of the facility: • Construction: ____________________ tons per ________________ (unit of time) • Operation : ____________________ tons per ________________ (unit of time) ii. Describe any proposals for on-site minimization, recycling or reuse of materials to avoid disposal as solid waste: • Construction: ________________________________________________________________________________________ ____________________________________________________________________________________________________ • Operation: __________________________________________________________________________________________ ____________________________________________________________________________________________________ iii. Proposed disposal methods/facilities for solid waste generated on-site: • Construction: ________________________________________________________________________________________ ____________________________________________________________________________________________________ • Operation: __________________________________________________________________________________________ ____________________________________________________________________________________________________ Page 8 of 13 96

Page 97

s. Does the proposed action include construction or modification of a solid waste management facility? 9 Yes 9 No If Yes: i. Type of management or handling of waste proposed for the site (e.g., recycling or transfer station, composting, landfill, or other disposal activities): ___________________________________________________________________________________ ii. Anticipated rate of disposal/processing: • ________ Tons/month, if transfer or other non-combustion/thermal treatment, or • ________ Tons/hour, if combustion or thermal treatment iii. If landfill, anticipated site life: ________________________________ years t. Will the proposed action at the site involve the commercial generation, treatment, storage, or disposal of hazardous 9 Yes 9 No waste? If Yes: i. Name(s) of all hazardous wastes or constituents to be generated, handled or managed at facility: ___________________________ _________________________________________________________________________________________________________ _________________________________________________________________________________________________________ ii. Generally describe processes or activities involving hazardous wastes or constituents: ___________________________________ _________________________________________________________________________________________________________ ________________________________________________________________________________________________________ iii. Specify amount to be handled or generated _____ tons/month iv. Describe any proposals for on-site minimization, recycling or reuse of hazardous constituents: ____________________________ ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ v. Will any hazardous wastes be disposed at an existing offsite hazardous waste facility? 9 Yes 9 No If Yes: provide name and location of facility: _______________________________________________________________________ ________________________________________________________________________________________________________ If No: describe proposed management of any hazardous wastes which will not be sent to a hazardous waste facility: ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ E. Site and Setting of Proposed Action E.1. Land uses on and surrounding the project site a. Existing land uses. i. Check all uses that occur on, adjoining and near the project site. 9 Urban 9 Industrial 9 Commercial 9 Residential (suburban) 9 Rural (non-farm) 9 Forest 9 Agriculture 9 Aquatic 9 Other (specify): ____________________________________ ii. If mix of uses, generally describe: __________________________________________________________________________________________________________ __________________________________________________________________________________________________________ b. Land uses and covertypes on the project site. Land use or Current Acreage After Change Covertype Acreage Project Completion (Acres +/-) • Roads, buildings, and other paved or impervious surfaces • Forested • Meadows, grasslands or brushlands (non- agricultural, including abandoned agricultural) • Agricultural (includes active orchards, field, greenhouse etc.) • Surface water features (lakes, ponds, streams, rivers, etc.) • Wetlands (freshwater or tidal) • Non-vegetated (bare rock, earth or fill) • Other Describe: _______________________________ ________________________________________ Page 9 of 13 97

Page 98

c. Is the project site presently used by members of the community for public recreation? 9 Yes 9 No i. If Yes: explain: __________________________________________________________________________________________ d. Are there any facilities serving children, the elderly, people with disabilities (e.g., schools, hospitals, licensed 9 Yes 9 No day care centers, or group homes) within 1500 feet of the project site? If Yes, i. Identify Facilities: ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ e. Does the project site contain an existing dam? 9 Yes 9 No If Yes: i. Dimensions of the dam and impoundment: • Dam height: _________________________________ feet • Dam length: _________________________________ feet • Surface area: _________________________________ acres • Volume impounded: _______________________________ gallons OR acre-feet ii. Dam=s existing hazard classification: _________________________________________________________________________ iii. Provide date and summarize results of last inspection: _______________________________________________________________________________________________________ _______________________________________________________________________________________________________ f. Has the project site ever been used as a municipal, commercial or industrial solid waste management facility, 9 Yes 9 No or does the project site adjoin property which is now, or was at one time, used as a solid waste management facility? If Yes: i. Has the facility been formally closed? 9 Yes 9 No • If yes, cite sources/documentation: _______________________________________________________________________ ii. Describe the location of the project site relative to the boundaries of the solid waste management facility: _______________________________________________________________________________________________________ _______________________________________________________________________________________________________ iii. Describe any development constraints due to the prior solid waste activities: __________________________________________ _______________________________________________________________________________________________________ g. Have hazardous wastes been generated, treated and/or disposed of at the site, or does the project site adjoin 9 Yes 9 No property which is now or was at one time used to commercially treat, store and/or dispose of hazardous waste? If Yes: i. Describe waste(s) handled and waste management activities, including approximate time when activities occurred: _______________________________________________________________________________________________________ _______________________________________________________________________________________________________ h. Potential contamination history. Has there been a reported spill at the proposed project site, or have any 9 Yes 9 No remedial actions been conducted at or adjacent to the proposed site? If Yes: i. Is any portion of the site listed on the NYSDEC Spills Incidents database or Environmental Site 9 Yes 9 No Remediation database? Check all that apply: 9 Yes – Spills Incidents database Provide DEC ID number(s): ________________________________ 9 Yes – Environmental Site Remediation database Provide DEC ID number(s): ________________________________ 9 Neither database ii. If site has been subject of RCRA corrective activities, describe control measures:_______________________________________ ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ iii. Is the project within 2000 feet of any site in the NYSDEC Environmental Site Remediation database? 9 Yes 9 No If yes, provide DEC ID number(s): ______________________________________________________________________________ iv. If yes to (i), (ii) or (iii) above, describe current status of site(s): _______________________________________________________________________________________________________ _______________________________________________________________________________________________________ Page 10 of 13 98

Page 99

v. Is the project site subject to an institutional control limiting property uses? 9 Yes 9 No • If yes, DEC site ID number: ____________________________________________________________________________ • Describe the type of institutional control (e.g., deed restriction or easement): ____________________________________ • Describe any use limitations: ___________________________________________________________________________ • Describe any engineering controls: _______________________________________________________________________ • Will the project affect the institutional or engineering controls in place? 9 Yes 9 No • Explain: ____________________________________________________________________________________________ ___________________________________________________________________________________________________ ___________________________________________________________________________________________________ E.2. Natural Resources On or Near Project Site a. What is the average depth to bedrock on the project site? ________________ feet b. Are there bedrock outcroppings on the project site? 9 Yes 9 No If Yes, what proportion of the site is comprised of bedrock outcroppings? __________________% c. Predominant soil type(s) present on project site: ___________________________ __________% ___________________________ __________% ____________________________ __________% d. What is the average depth to the water table on the project site? Average: _________ feet e. Drainage status of project site soils: 9 Well Drained: _____% of site 9 Moderately Well Drained: _____% of site 9 Poorly Drained _____% of site f. Approximate proportion of proposed action site with slopes: 9 0-10%: _____% of site 9 10-15%: _____% of site 9 15% or greater: _____% of site g. Are there any unique geologic features on the project site? 9 Yes 9 No If Yes, describe: _____________________________________________________________________________________________ ________________________________________________________________________________________________________ h. Surface water features. i. Does any portion of the project site contain wetlands or other waterbodies (including streams, rivers, 9 Yes 9 No ponds or lakes)? ii. Do any wetlands or other waterbodies adjoin the project site? 9 Yes 9 No If Yes to either i or ii, continue. If No, skip to E.2.i. iii. Are any of the wetlands or waterbodies within or adjoining the project site regulated by any federal, 9 Yes 9 No state or local agency? iv. For each identified regulated wetland and waterbody on the project site, provide the following information: • Streams: Name ____________________________________________ Classification _______________________ • Lakes or Ponds: Name ____________________________________________ Classification _______________________ • Wetlands: Name ____________________________________________ Approximate Size ___________________ • Wetland No. (if regulated by DEC) _____________________________ v. Are any of the above water bodies listed in the most recent compilation of NYS water quality-impaired 9 Yes 9 No waterbodies? If yes, name of impaired water body/bodies and basis for listing as impaired: _____________________________________________ ___________________________________________________________________________________________________________ i. Is the project site in a designated Floodway? 9 Yes 9 No j. Is the project site in the 100-year Floodplain? 9 Yes 9 No k. Is the project site in the 500-year Floodplain? 9 Yes 9 No l. Is the project site located over, or immediately adjoining, a primary, principal or sole source aquifer? 9 Yes 9 No If Yes: i. Name of aquifer: _________________________________________________________________________________________ Page 11 of 13 99

Page 100

m. Identify the predominant wildlife species that occupy or use the project site: ______________________________ ______________________________ _______________________________ ______________________________ ______________________________ _______________________________ ______________________________ n. Does the project site contain a designated significant natural community? 9 Yes 9 No If Yes: i. Describe the habitat/community (composition, function, and basis for designation): _____________________________________ ________________________________________________________________________________________________________ ii. Source(s) of description or evaluation: ________________________________________________________________________ iii. Extent of community/habitat: • Currently: ______________________ acres • Following completion of project as proposed: _____________________ acres • Gain or loss (indicate + or -): ______________________ acres o. Does project site contain any species of plant or animal that is listed by the federal government or NYS as 9 Yes 9 No endangered or threatened, or does it contain any areas identified as habitat for an endangered or threatened species? If Yes: i. Species and listing (endangered or threatened):______________________________________________________________________________ ________________________________________________________________________________________________________________________ ________________________________________________________________________________________________________________________ p. Does the project site contain any species of plant or animal that is listed by NYS as rare, or as a species of 9 Yes 9 No special concern? If Yes: i. Species and listing:____________________________________________________________________________________________________ _______________________________________________________________________________________________________________________ q. Is the project site or adjoining area currently used for hunting, trapping, fishing or shell fishing? 9 Yes 9 No If yes, give a brief description of how the proposed action may affect that use: ___________________________________________ ________________________________________________________________________________________________________ E.3. Designated Public Resources On or Near Project Site a. Is the project site, or any portion of it, located in a designated agricultural district certified pursuant to 9 Yes 9 No Agriculture and Markets Law, Article 25-AA, Section 303 and 304? If Yes, provide county plus district name/number: _________________________________________________________________ b. Are agricultural lands consisting of highly productive soils present? 9 Yes 9 No i. If Yes: acreage(s) on project site? ___________________________________________________________________________ ii. Source(s) of soil rating(s): _________________________________________________________________________________ c. Does the project site contain all or part of, or is it substantially contiguous to, a registered National 9 Yes 9 No Natural Landmark? If Yes: i. Nature of the natural landmark: 9 Biological Community 9 Geological Feature ii. Provide brief description of landmark, including values behind designation and approximate size/extent: ___________________ ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ d. Is the project site located in or does it adjoin a state listed Critical Environmental Area? 9 Yes 9 No If Yes: i. CEA name: _____________________________________________________________________________________________ ii. Basis for designation: _____________________________________________________________________________________ iii. Designating agency and date: ______________________________________________________________________________ Page 12 of 13 100

Page 101

e. Does the project site contain, or is it substantially contiguous to, a building, archaeological site, or district 9 Yes 9 No which is listed on the National or State Register of Historic Places, or that has been determined by the Commissioner of the NYS Office of Parks, Recreation and Historic Preservation to be eligible for listing on the State Register of Historic Places? If Yes: i. Nature of historic/archaeological resource: 9 Archaeological Site 9 Historic Building or District ii. Name: _________________________________________________________________________________________________ iii. Brief description of attributes on which listing is based: _______________________________________________________________________________________________________ f. Is the project site, or any portion of it, located in or adjacent to an area designated as sensitive for 9 Yes 9 No archaeological sites on the NY State Historic Preservation Office (SHPO) archaeological site inventory? g. Have additional archaeological or historic site(s) or resources been identified on the project site? 9 Yes 9 No If Yes: i. Describe possible resource(s): _______________________________________________________________________________ ii. Basis for identification: ___________________________________________________________________________________ h. Is the project site within fives miles of any officially designated and publicly accessible federal, state, or local 9 Yes 9 No scenic or aesthetic resource? If Yes: i. Identify resource: _________________________________________________________________________________________ ii. Nature of, or basis for, designation (e.g., established highway overlook, state or local park, state historic trail or scenic byway, etc.): ___________________________________________________________________________________________________ iii. Distance between project and resource: _____________________ miles. i. Is the project site located within a designated river corridor under the Wild, Scenic and Recreational Rivers 9 Yes 9 No Program 6 NYCRR 666? If Yes: i. Identify the name of the river and its designation: ________________________________________________________________ ii. Is the activity consistent with development restrictions contained in 6NYCRR Part 666? 9 Yes 9 No F. Additional Information Attach any additional information which may be needed to clarify your project. If you have identified any adverse impacts which could be associated with your proposal, please describe those impacts plus any measures which you propose to avoid or minimize them. G. Verification I certify that the information provided is true to the best of my knowledge. Applicant/Sponsor Name ___________________________________ Date_______________________________________ Signature________________________________________________ Title_______________________________________ PRINT FORM Page 13 of 13 101

Page 102

Brief Description of Proposed Action (include purpose or need): The proposed action involves the adoption of the Town of Hamburg's "Bills Stadium Economic Impact Area Plan" and associated zoning for creation of a new zoning district called the "Stadium Impact Area (SIA) zone.” The action also involves complementary modifications to existing zoning districts in areas adjacent to the SIA. The Area Plan, which will be appended to the Town's existing comprehensive plan, sets forth a vision for the current Erie Community College (ECC), an approximately 100-acre site adjacent to the new Buffalo Bills Stadium. ECC has plans to vacate the property in coming years. The plan sets forth a vision for an innovative, walkable, mixed-use neighborhood. The plan includes a set of programmatic, urban design, mobility, and building guidelines for future developer(s) to implement the vision. The SIA zoning district facilitates creation of new development that aligns with the Plan vision. It sets forth a process for adoption that requires a district-wide conceptual plan to ensure a cohesive development. The district includes allowable uses focused on a midscale, walkable mixed-use environment, as well as transportation network standards that emphasize multimodal travel. North of the SIA, the action includes modest changes to the zoning. A collection of parcels along McKinley Parkway rezoned as MU-1. Further north, at the existing McKinley Mall, the McKinley Mall Incentive Zone would be modified to increase the types of amenities available as part of the incentives intended to spur redevelopment and be more complementary to the SIA. 102

Page 103

Agency Use Only [If applicable] Full Environmental Assessment Form Project : Buffalo Bills NFL Stadium Economic Impact Area & Town of Hamburg CFA Part 2 - Identification of Potential Project Impacts Date : 8/10/26 Part 2 is to be completed by the lead agency. Part 2 is designed to help the lead agency inventory all potential resources that could be affected by a proposed project or action. We recognize that the lead agency=s reviewer(s) will not necessarily be environmental professionals. So, the questions are designed to walk a reviewer through the assessment process by providing a series of questions that can be answered using the information found in Part 1. To further assist the lead agency in completing Part 2, the form identifies the most relevant questions in Part 1 that will provide the information needed to answer the Part 2 question. When Part 2 is completed, the lead agency will have identified the relevant environmental areas that may be impacted by the proposed activity. If the lead agency is a state agency and the action is in any Coastal Area, complete the Coastal Assessment Form before proceeding with this assessment. Tips for completing Part 2:  Review all of the information provided in Part 1.  Review any application, maps, supporting materials and the Full EAF Workbook.  Answer each of the 18 questions in Part 2.  If you answer “Yes” to a numbered question, please complete all the questions that follow in that section.  If you answer “No” to a numbered question, move on to the next numbered question.  Check appropriate column to indicate the anticipated size of the impact.  Proposed projects that would exceed a numeric threshold contained in a question should result in the reviewing agency checking the box “Moderate to large impact may occur.”  The reviewer is not expected to be an expert in environmental analysis.  If you are not sure or undecided about the size of an impact, it may help to review the sub-questions for the general question and consult the workbook.  When answering a question consider all components of the proposed activity, that is, the whole action.  Consider the possibility for long-term and cumulative impacts as well as direct impacts.  Answer the question in a reasonable manner considering the scale and context of the project. 1. Impact on Land Proposed action may involve construction on, or physical alteration of, ■NO  YES  the land surface of the proposed site. (See Part 1. D.1) If “Yes”, answer questions a - j. If “No”, move on to Section 2. Relevant No, or Moderate Part I small to large Question(s) impact impact may may occur occur a. The proposed action may involve construction on land where depth to water table is E2d less than 3 feet. b. The proposed action may involve construction on slopes of 15% or greater. E2f c. The proposed action may involve construction on land where bedrock is exposed, or E2a generally within 5 feet of existing ground surface. d. The proposed action may involve the excavation and removal of more than 1,000 tons D2a of natural material. e. The proposed action may involve construction that continues for more than one year D1e or in multiple phases. f. The proposed action may result in increased erosion, whether from physical D2e, D2q disturbance or vegetation removal (including from treatment by herbicides). g. The proposed action is, or may be, located within a Coastal Erosion hazard area. B1i h. Other impacts: Page 1 of 13 FEAF 2026 103

Page 104

2. Impact on Geological Features The proposed action may result in the modification or destruction of, or inhibit access to, any unique or unusual land forms on the site (e.g., cliffs, dunes,  ✔NO  YES minerals, fossils, caves). (See Part 1. E.2.g) If “Yes”, answer questions a - c. If “No”, move on to Section 3. Relevant No, or Moderate Part I small to large Question(s) impact impact may may occur occur a. Identify the specific land form(s) attached: E2g 9 9 b. The proposed action may affect or is adjacent to a geological feature listed as a E3c 9 9 registered National Natural Landmark. Specific feature: c. Other impacts: 9 9 3. Impacts on Surface Water The proposed action may affect one or more wetlands or other surface water  ✔NO  YES bodies (e.g., streams, rivers, ponds or lakes). (See Part 1. D.2, E.2.h) If “Yes”, answer questions a - l. If “No”, move on to Section 4. Relevant No, or Moderate Part I small to large Question(s) impact impact may may occur occur a. The proposed action may create a new water body. D2b, D1h 9 9 b. The proposed action may result in an increase or decrease of over 10% or more than a D2b 9 9 10 acre increase or decrease in the surface area of any body of water. c. The proposed action may involve dredging more than 100 cubic yards of material D2a 9 9 from a wetland or water body. d. The proposed action may involve construction within or adjoining a freshwater or E2h 9 9 tidal wetland, or in the bed or banks of any other water body. e. The proposed action may create turbidity in a waterbody, either from upland erosion, D2a, D2h 9 9 runoff or by disturbing bottom sediments. f. The proposed action may include construction of one or more intake(s) for withdrawal D2c 9 9 of water from surface water. g. The proposed action may include construction of one or more outfall(s) for discharge D2d 9 9 of wastewater to surface water(s). h. The proposed action may cause soil erosion, or otherwise create a source of D2e 9 9 stormwater discharge that may lead to siltation or other degradation of receiving water bodies. i. The proposed action may affect the water quality of any water bodies within or E2h 9 9 downstream of the site of the proposed action. j. The proposed action may involve the application of pesticides or herbicides in or D2q, E2h 9 9 around any water body. k. The proposed action may require the construction of new, or expansion of existing, D1a, D2d 9 9 wastewater treatment facilities. Page 2 of 13 FEAF 2026 104

Page 105

l. Other impacts: 9 9 4. Impact on groundwater The proposed action may result in new or additional use of ground water, or  ✔NO  YES may have the potential to introduce contaminants to ground water or an aquifer. (See Part 1. D.2.a, D.2.c, D.2.d, D.2.p, D.2.q, D.2.t) If “Yes”, answer questions a - h. If “No”, move on to Section 5. Relevant No, or Moderate Part I small to large Question(s) impact impact may may occur occur a. The proposed action may require new water supply wells, or create additional demand D2c 9 9 on supplies from existing water supply wells. b. Water supply demand from the proposed action may exceed safe and sustainable D2c 9 9 withdrawal capacity rate of the local supply or aquifer. Cite Source: c. The proposed action may allow or result in residential uses in areas without water and D1a, D2c 9 9 sewer services. d. The proposed action may include or require wastewater discharged to groundwater. D2d, E2l 9 9 e. The proposed action may result in the construction of water supply wells in locations D2c, E1f, 9 9 where groundwater is, or is suspected to be, contaminated. E1g, E1h f. The proposed action may require the bulk storage of petroleum or chemical products D2p, E2l 9 9 over ground water or an aquifer. g. The proposed action may involve the commercial application of pesticides within 100 E2h, D2q, 9 9 feet of potable drinking water or irrigation sources. E2l, D2c h. Other impacts: 9 9 5. Impact on Flooding The proposed action may result in development on lands subject to flooding.  ✔NO YES  (See Part 1. E.2) If “Yes”, answer questions a - g. If “No”, move on to Section 6. Relevant No, or Moderate Part I small to large Question(s) impact impact may may occur occur a. The proposed action may result in development in a designated floodway. E2i b. The proposed action may result in development within a 100-year or a 500-year E2j, E5a, floodplain. E5b c. The proposed action may result in development in an area potentially affected by sea E2k, E5c level rise. d. The proposed action may result in, or require, modification of existing drainage D2b, D2e patterns. e. The proposed action may change flood water flows that contribute to flooding. D2b, E2i, E2j, E2k f. If there is a dam located on the site of the proposed action, is the dam in need of repair, E1e or upgrade? Page 3 of 13 FEAF 2026 105

Page 106

g. Other impacts: 9 9 6. Impacts on Air and Climate The proposed action may include a state regulated air emission source. ✔ NO  YES (See Part 1. D.2.f., D.2.h, D.2.g) or generate greenhouse gas emissions over 10,000 metric tons of carbon dioxide equivalents (See Part 1. D.2.h) If “Yes”, answer questions a - i. If “No”, move on to Section 7. Relevant No, or Moderate Part I small to large Question(s) impact impact may may occur occur a. If the proposed action requires federal or state air emission permits, the action may also have the potential to emit one or more regulated air contaminants at or above the following levels: D2g i. More than 100 short tons/year of carbon monoxide (CO) D2g ii. More than 100 short tons/year of oxides of nitrogen (NOx) outside the NYC Metropolitan Area or Long Island OR 25 short tons/year within the NYC Metropolitan Area or Long Island D2g iii. More than 100 short tons/year of particulate matter (PM-10, PM-2.5) D2g iv. More than 50 short tons/year of volatile organic compounds (VOC) outside the NYC Metropolitan Area or Long Island OR 25 short tons/year within the NYC Metropolitan Area or Long Island D2g v. More than 100 short tons/year of sulfur dioxide (SO2) b. The proposed action has the potential to emit 10 short tons/year or more of any one D2g designated hazardous air pollutant, or 25 short tons/year or more of any combination of such hazardous air pollutants. c. The proposed action may include a heat source capable of producing more than 20 D2f, D2g million BTUs per hour. d. The proposed action may exceed 50% of any of the thresholds in “a” or “b”, D2g above. e. The proposed action may result in the combustion or thermal treatment of solid, D2f, D2s hazardous, or hospital/medical/infectious waste.   f. The proposed action is subject to the Nonattainment New Source Review or Prevention D2g of Significant Deterioration requirements discussed in 6 NYCRR Part 231. g. The proposed action will emit more than 10,000 metric tons of CO2 equivalents per D2h year. h. A municipality adopted comprehensive or individual plan addressing climate change C2d applies to the proposed action and the proposed action would materially conflict with the achievement of one or more goals of the plan related to climate change. i. Other impacts: Page 4 of 13 FEAF 2026 106

Page 107

7. Impact on Plants and Animals The proposed action may result in a loss of flora or fauna. (See Part 1. E.2. m.-q.) ✔ NO YES If “Yes”, answer questions a - j. If “No”, move on to Section 8. Relevant No, or Moderate Part I small to large Question(s) impact impact may may occur occur a. The proposed action may cause reduction in population or loss of individuals of any E2o threatened or endangered species, as listed by New York State or the Federal government, that use the site, or are found on, over, or near the site. b. The proposed action may result in a reduction or degradation of any habitat used by E2o any rare, threatened or endangered species, as listed by New York State or the federal government. c. The proposed action may cause reduction in population, or loss of individuals, of any E2p species of special concern or conservation need, as listed by New York State or the Federal government, that use the site, or are found on, over, or near the site. d. The proposed action may result in a reduction or degradation of any habitat used by E2p any species of special concern and conservation need, as listed by New York State or the Federal government. Page 5 of 13 FEAF 2026 107

Page 108

e. The proposed action may diminish the capacity of a registered National Natural E3c 9 9 Landmark to support the biological community it was established to protect. f. The proposed action may result in the removal of, or ground disturbance in, any E2n 9 9 portion of a designated significant natural community. Source: g. The proposed action may substantially interfere with nesting/breeding, foraging, or E2m 9 9 over-wintering habitat for the predominant species that occupy or use the project site. h. The proposed action requires the conversion of more than 10 acres of forest, 9 9 E1b grassland or any other regionally or locally important habitat. Habitat type & information source: i. Proposed action (commercial, industrial or recreational projects, only) involves use of D2q 9 9 herbicides or pesticides. j. Other impacts: 9 9 8. Impact on Agricultural Resources The proposed action may impact agricultural resources. (See Part 1. E.3.a. and b.)  ✔NO  YES If “Yes”, answer questions a - h. If “No”, move on to Section 9. Relevant No, or Moderate Part I small to large Question(s) impact impact may may occur occur a. The proposed action may impact soil classified within soil group 1 through 4 of the E2c, E3b 9 9 NYS Land Classification System. b. The proposed action may sever, cross or otherwise limit access to agricultural land E1a, Elb 9 9 (includes cropland, hayfields, pasture, vineyard, orchard, etc). c. The proposed action may result in the excavation or compaction of the soil profile of E3b 9 9 active agricultural land. d. The proposed action may irreversibly convert agricultural land to non-agricultural E1b, E3a 9 9 uses, either more than 2.5 acres if located in an Agricultural District, or more than 10 acres if not within an Agricultural District. e. The proposed action may disrupt or prevent installation of an agricultural land El a, E1b 9 9 management system. f. The proposed action may result, directly or indirectly, in increased development C2c, C3, 9 9 potential or pressure on farmland. D2c, D2d g. The proposed project is not consistent with the adopted municipal Farmland C2c 9 9 Protection Plan. h. Other impacts: 9 9 Page 6 of 13 FEAF 2026 108

Page 109

9. Impact on Aesthetic Resources The land use of the proposed action is obviously different from, or are in  ✔NO  YES sharp contrast to, current land use patterns between the proposed project and a scenic or aesthetic resource. (Part 1. E.1.a, E.1.b, E.3.h.) If “Yes”, answer questions a - g. If “No”, go to Section 10. Relevant No, or Moderate Part I small to large Question(s) impact impact may may occur occur a. Proposed action may be visible from any officially designated federal, state, or local E3h 9 9 scenic or aesthetic resource. b. The proposed action may result in the obstruction, elimination or significant E3h, C2b 9 9 screening of one or more officially designated scenic views. c. The proposed action may be visible from publicly accessible vantage points: E3h i. Seasonally (e.g., screened by summer foliage, but visible during other seasons) 9 9 ii. Year round 9 9 d. The situation or activity in which viewers are engaged while viewing the proposed E3h action is: E2q, i. Routine travel by residents, including travel to and from work 9 9 ii. Recreational or tourism-based activities E1c 9 9 e. The proposed action may cause a diminishment of the public enjoyment and E3h 9 9 appreciation of the designated aesthetic resource. f. There are similar projects visible within the following distance of the proposed D1a, E1a, 9 9 project: D1f, D1g 0-1/2 mile ½ -3 mile 3-5 mile 5+ mile g. Other impacts: 9 9 10. Impact on Historic and Archeological Resources The proposed action may occur in or adjacent to a historic or archaeological  ✔ NO YES  resource. (Part 1. E.3.e, f. and g.) If “Yes”, answer questions a - e. If “No”, go to Section 11. Relevant No, or Moderate Part I small to large Question(s) impact impact may may occur occur a. The proposed action may occur wholly or partially within, or substantially contiguous to, any buildings, archaeological site or district which is listed on the National or E3e 9 9 State Register of Historical Places, or that has been determined by the Commissioner of the NYS Office of Parks, Recreation and Historic Preservation to be eligible for listing on the State Register of Historic Places. b. The proposed action may occur wholly or partially within, or substantially contiguous E3f 9 9 to, an area designated as sensitive for archaeological sites on the NY State Historic Preservation Office (SHPO) archaeological site inventory. c. The proposed action may occur wholly or partially within, or substantially contiguous E3g 9 9 to, an archaeological site not included on the NY SHPO inventory. Source: Page 7 of 13 FEAF 2026 109

Page 110

d. Other impacts: 9 9 If any of the above (a-d) are answered “Moderate to large impact may e. occur”, continue with the following questions to help support conclusions in Part 3: i. The proposed action may result in the destruction or alteration of all or part E3e, E3g, 9 9 of the site or property. E3f ii. The proposed action may result in the alteration of the property’s setting or E3e, E3f, 9 9 integrity. E3g, E1a, E1b iii. The proposed action may result in the introduction of visual elements which E3e, E3f, 9 9 are out of character with the site or property, or that may alter its setting. E3g, E3h, C2, C3 11. Impact on Open Space and Recreation The proposed action may result in a loss of recreational opportunities or a  ✔ NO  YES reduction of an open space resource as designated in any adopted municipal open space plan. (See Part 1. C.2.c, E.1.c., E.2.q.) If “Yes”, answer questions a - e. If “No”, go to Section 12. Relevant No, or Moderate Part I small to large Question(s) impact impact may may occur occur a. The proposed action may result in an impairment of natural functions, or “ecosystem D2e, E1b 9 9 services”, provided by an undeveloped area, including but not limited to stormwater E2h, storage, nutrient cycling, wildlife habitat. E2m, E2o, E2n, E2p b. The proposed action may result in the loss of a current or future recreational resource. C2a, E1c, 9 9 C2c, E2q c. The proposed action may eliminate open space or recreational resource in an area C2a, C2c 9 9 with few such resources. E1c, E2q d. The proposed action may result in loss of an area now used informally by the C2c, E1c 9 9 community as an open space resource. e. Other impacts: 9 9 12. Impact on Critical Environmental Areas The proposed action may be located within or adjacent to a critical NO ■  YES  environmental area (CEA). (See Part 1. E.3.d) If “Yes”, answer questions a - c. If “No”, go to Section 13. Relevant No, or Moderate Part I small to large Question(s) impact impact may may occur occur a. The proposed action may result in a reduction in the quantity of the resource or E3d 9 9 characteristic which was the basis for designation of the CEA. b. The proposed action may result in a reduction in the quality of the resource or E3d 9 9 characteristic which was the basis for designation of the CEA. c. Other impacts: 9 9 Page 8 of 13 FEAF 2026 110

Page 111

13. Impact on Transportation The proposed action may result in a change to existing transportation systems.  ■ NO  YES (See Part 1. D.2.j) If “Yes”, answer questions a - f. If “No”, go to Section 14. Relevant No, or Moderate Part I small to large Question(s) impact impact may may occur occur a. Projected traffic increase may exceed capacity of existing road network. D2j b. The proposed action may result in the construction of paved parking area for 500 or D2j 9 9 more vehicles. c. The proposed action will degrade existing transit access. D2j 9 9 d. The proposed action will degrade existing pedestrian or bicycle accommodations. D2j 9 9 e. The proposed action may alter the present pattern of movement of people or goods. D2j 9 9 f. Other impacts: 9 9 14. Impact on Energy The proposed action may cause an increase in the use of any form of energy.  ■ NO  YES (See Part 1. D.2.k) If “Yes”, answer questions a - e. If “No”, go to Section 15. Relevant No, or Moderate Part I small to large Question(s) impact impact may may occur occur a. The proposed action will require a new, or an upgrade to an existing, substation. D2k 9 9 b. The proposed action will require the creation or extension of an energy transmission D1f, 9 9 or supply system to serve more than 50 single or two-family residences or to serve a D1q, D2k commercial or industrial use. c. The proposed action may utilize more than 2,500 MWhrs per year of electricity. D2k 9 9 d. The proposed action may involve heating and/or cooling of more than 100,000 square D1g 9 9 feet of building area when completed. e. Other Impacts: 15. Impact on Noise, Odor, and Light The proposed action may result in an increase in noise, odors, or outdoor lighting.  ■ NO  YES (See Part 1. D.2.m., n., and o.) If “Yes”, answer questions a - f. If “No”, go to Section 16. Relevant No, or Moderate Part I small to large Question(s) impact impact may may occur occur a. The proposed action may produce sound above noise levels established by local D2m 9 9 regulation. b. The proposed action may result in blasting within 1,500 feet of any residence, D2m, E1d 9 9 hospital, school, licensed day care center, or nursing home. c. The proposed action may result in routine odors for more than one hour per day. D2o 9 9 Page 9 of 13 FEAF 2026 111

Page 112

d. The proposed action may result in light shining onto adjoining properties. D2n 9 9 e. The proposed action may result in lighting creating sky-glow brighter than existing D2n, E1a 9 9 area conditions. f. Other impacts: 9 9 16. Impact on Human Health The proposed action may have an impact on human health from exposure  ■ NO  YES to new or existing sources of contaminants. (See Part 1.D.2.q., E.1. d. f. g. and h.) If “Yes”, answer questions a - m. If “No”, go to Section 17. Relevant No, or Moderate Part I small to large Question(s) impact impact may may occur occur a. The proposed action is located within 1500 feet of a school, hospital, licensed day E1d 9 9 care center, group home, nursing home or retirement community. b. The site of the proposed action is currently undergoing remediation. E1g, E1h 9 9 c. There is a completed emergency spill remediation, or a completed environmental site E1g, E1h 9 9 remediation on, or adjacent to, the site of the proposed action. d. The site of the action is subject to an institutional control limiting the use of the E1g, E1h 9 9 property (e.g., easement or deed restriction). e. The proposed action may affect institutional control measures that were put in place E1g, E1h 9 9 to ensure that the site remains protective of the environment and human health. f. The proposed action has adequate control measures in place to ensure that future D2t 9 9 generation, treatment and/or disposal of hazardous wastes will be protective of the environment and human health. g. The proposed action involves construction or modification of a solid waste D2q, E1f 9 9 management facility. h. The proposed action may result in the unearthing of solid or hazardous waste. D2q, E1f 9 9 i. The proposed action may result in an increase in the rate of disposal, or processing, of D2r, D2s 9 9 solid waste. j. The proposed action may result in excavation or other disturbance within 2000 feet of E1f, E1g 9 a site used for the disposal of solid or hazardous waste. E1h k. The proposed action may result in the migration of explosive gases from a landfill E1f, E1g 9 9 site to adjacent off-site structures. l. The proposed action may result in the release of contaminated leachate from the D2s, E1f, 9 9 project site. D2r m. Other impacts: Page 10 of 13 FEAF 2026 112

Page 113

17. Consistency with Community Plans The proposed action is not consistent with adopted land use plans. NO   ✔ YES (See Part 1. C.1, C.2. and C.3.) If “Yes”, answer questions a - h. If “No”, go to Section 18. Relevant No, or Moderate Part I small to large Question(s) impact impact may may occur occur a. The proposed action’s land use components may be different from, or in sharp C2, C3, D1a 9 ✔ 9 contrast to, current surrounding land use pattern(s). E1a, E1b b. The proposed action will cause the permanent population of the city, town or village C2 9 ✔ 9 in which the project is located to grow by more than 5%. c. The proposed action is inconsistent with local land use plans or zoning regulations. C2, C2, C3 ✔ 9 d. The proposed action is inconsistent with any County plans, or other regional land use C2, C2 9✔ 9 plans. e. The proposed action may cause a change in the density of development that is not C3, D1c, 9✔ 9 supported by existing infrastructure or is distant from existing infrastructure. D1d, D1f, D1d, Elb f. The proposed action is in an area characterized by low density developmentthat C4, D2c, D2d 9 ✔ 9 will require new or expanded public infrastructure. D2j g. The proposed action may induce secondary development impacts (e.g., residential or C2a 9✔ commercial development not included in the proposed action) h. Other: 9 9 18. Consistency with Community Character The proposed project is inconsistent with the existing community character.  ✔ NO YES  (See Part 1. C.2, C.3, D.2, E.3) If “Yes”, answer questions a - g. If “No”, proceed to Part 3. Relevant No, or Moderate Part I small to large Question(s) impact impact may may occur occur a. The proposed action may replace or eliminate existing facilities, structures, or areas E3e, E3f, E3g 9 9 of historic importance to the community. b. The proposed action may create a demand for additional community services (e.g. C4 9 9 schools, police and fire) c. The proposed action may displace affordable or low-income housing in an area where C2, C3, D1f 9 9 there is a shortage of such housing. D1g, E1a d. The proposed action may interfere with the use or enjoyment of officially recognized C2, E3 9 9 or designated public resources. e. The proposed action is inconsistent with the predominant architectural scale and C2, C3 9 character. f. Proposed action is inconsistent with the character of the existing natural landscape. C2, C3 E1a, E1b E2g, E2h g. Other impacts: Page 11 of 13 FEAF 2026 113

Page 114

19. Impact on Disadvantaged Communities The proposed project may impact a disadvantaged community. ✔ NO YES (See Part 1. E.4) If “Yes”, answer questions a - g . If “No”, proceed to Part 3. Relevant No, or Moderate Part I small to large Question(s) impact impact may may occur occur a. Is the potentially affected disadvantaged community identified as having E.4.c comparatively higher burdens or vulnerabilities by the Disadvantaged Community Assessment Tool? b. The proposed action may create new air emissions or increase existing air emissions D.2.f-i, E.4 within a disadvantaged community. c. The proposed action may create new wastewater treatment or discharges, or expand D.2.d existing wastewater treatment or discharges, within a disadvantaged community. d. The proposed action creates or expands a solid or hazardous waste management D.2.r, D.2.s, facility, or involves the generation of solid or hazardous waste, within or near a D.2.t, E.1.f, disadvantaged community. E.1.g e. The proposed action may increase traffic within a disadvantaged community. D.2.j f. The proposed action affects or involves one or more of the following facility C.3.c, D.1.a, types: D.1.g, D.2.a, i. landfill; D.2.d, D.2.f, E.1.a, E.1.b. ii. other industrial, manufacturing, or mining land uses; E.1.h, E.1.v, iii. major oil or chemical bulk storage facility; E.4 iv. municipal waste combustor; v. power generation facility; vi. risk management plan site; vii. remediation site; or viii. scrap metal processor. g. Other impacts: Page 12 of 13 FEAF 2026 114

Page 115

20. Future Physical Climate Risks The proposed project may be vulnerable to future physical climate risks or increase the vulnerability of human or ecological communities to future physical climate risks. ✔ NO YES (See Part 1. E.5) If “Yes”, answer questions a - e. If “No”, proceed to Part 3. Relevant No, or Moderate Part I small to large Question(s) impact impact may may occur occur a. The proposed action is vulnerable to damage from a projected 100-year flood. E2j, E5a b. The proposed action is vulnerable to damage from a 500-year flood. E2k, E5b c. The proposed action is in an area potentially affected by sea level rise. E5c d. The proposed action may increase the vulnerability of human or ecological E5d communities to the following: i. drought ii. temperature extremes (hot or cold) iii. extreme storms, including high winds iv. landslides v. coastal erosion vi. stormwater flooding vii. other climate or weather hazards? If yes, describe: _______________________ e. Other impacts: Page 13 of 13 FEAF 2026 115

Page 116

Agency Use Only [IfApplicable] Project : Buffalo Bills NFL Stadium Economic Impact Date : Area & Town of Hamburg CFA Zoning Updates 8/10/26 Full Environmental Assessment Form Part 3 - Evaluation of the Magnitude and Importance of Project Impacts and Determination of Significance Part 3 provides the reasons in support of the determination of significance. The lead agency must complete Part 3 for every question in Part 2 where the impact has been identified as potentially moderate to large or where there is a need to explain why a particular element of the proposed action will not, or may, result in a significant adverse environmental impact. Based on the analysis in Part 3, the lead agency must decide whether to require an environmental impact statement to further assess the proposed action or whether available information is sufficient for the lead agency to conclude the proposed action will not have a significant adverse environmental impact. By completing the certification on the next page, the lead agency can complete its determination of significance. Reasons Supporting This Determination: To complete this section: • Identify the impact based on the Part 2 responses and describe its magnitude. Magnitude considers factors such as severity, size, or extent of an impact. • Assess the importance of the impact. Importance relates to the geographic scope, duration, probability of the impact occurring, number of people affected by the impact, and any additional environmental consequences if the impact were to occur. • The assessment should take into consideration any design element or project changes. • Repeat this process for each Part 2 question where the impact has been identified as potentially moderate to large or where there is a need to explain why a particular element of the proposed action will not, or may, result in a significant adverse environmental impact. • Provide the reason(s) why the impact may, or will not, result in a significant adverse environmental impact. • For Conditional Negative Declarations identify the specific condition(s) imposed that will modify the proposed action so that no significant adverse environmental impacts will result. • Attach additional sheets, as needed. The proposed action involves the amendment of Chapter 280 (Zoning) by adding a new Article, entitled “SIA - Stadium Impact Area District”, amending Article LVI McKinley Mall Area Incentives, appending the “Bills Stadium Economic Impact Area Plan” to the Comprehensive Plan, and subsequent rezonings of parcels along McKinley Parkway to the MU-1 zoning district, and ECC South Campus from R-3 to SIA (Stadium Impact Area District). These rezonings aim to create a cohesive transition area of development along the currently commercial-zoned McKinley Parkway corridor. This area also aims to blend with the SIA District that has been created for ECC's South Campus, which will include a process for development of those parcels that meets the goals of the Stadium Impact Area Plan. The Town has been coordinating with Erie County, NYSDOT, and other agencies, and none of these agencies have highlighted any environmental concerns. No construction is associated with these actions, as they only involve the adoption of documents, zoning ordinances, and zoning map changes. No significant adverse environmental impacts are anticipated as a result of the adoption of the Area Plan, zoning ordinance, or rezonings. Determination of Significance - Type 1 and Unlisted Actions SEQR Status: † Type 1 ✔ † Unlisted Identify portions of EAF completed for this Project: † Part 1 ✔ † Part 2 ✔ † Part 3 ✔ 116 FEAF 2026

Page 117

Upon review of the information recorded on this EAF, as noted, plus this additional support information and considering both the magnitude and importance of each identified potential impact, it is the conclusion of the Hamburg Town Board as lead agency that: ✔ A. This project will result in no significant adverse impacts on the environment, and, therefore, an environmental impact statement need not be prepared. Accordingly, this negative declaration is issued. B. Although this project could have a significant adverse impact on the environment, that impact will be avoided or substantially mitigated because of the following conditions that will be required by the lead agency: There will, therefore, be no significant adverse impacts from the project as conditioned, and, therefore, this conditioned negative declaration is issued. A conditioned negative declaration may be used only for UNLISTED actions (see 6 NYCRR 617.7(d)). C. This Project may result in one or more significant adverse impacts on the environment and an environmental impact statement must be prepared to further assess the impact(s) and possible mitigation and to explore alternatives to avoid or reduce those impacts. Accordingly, this positive declaration is issued. Name of Action: Buffalo Bills NFL Stadium Economic Impact Area & Town of Hamburg CFA Zoning Updates Name of Lead Agency: Hamburg Town Board Name of Responsible Officer in Lead Agency: Elizabeth Farrell-Lorentz Title of Responsible Officer: Supervisor Signature of Responsible Officer in Lead Agency: Date: Signature of Preparer (if different from Responsible Officer) Date: For Further Information: Contact Person: Joshua Rogers Address: 6100 South Park Avenue, Hamburg, NY 14075 Telephone Number: 716-649-2023 E-mail: [email protected] For Type 1 Actions and Conditioned Negative Declarations, a copy of this Notice is sent to: Chief Executive Officer of the political subdivision in which the action will be principally located (e.g., Town / City / Village of) Other involved agencies (if any) Applicant (if any) Environmental Notice Bulletin: http://www.dec.ny.gov/enb/enb.html Page 2 of 2 FEAF 2026 117

Page 118

Town Board of the Town of Hamburg August 10, 2026 Meeting 4.34. Buffalo Bills NFL Stadium Economic Impact Area & Town of Hamburg CFA Zoning Updates Adoption Resolution Whereas, the Hamburg Town Code contains and specifies the local laws and ordinances of the Town of Hamburg; and Whereas, in December 2023, the Town of Hamburg was awarded $126,000 on competitive basis from New York State Department of State (NYSDOS) for the development of the Buffalo Bills NFL Stadium Economic Impact Area & Town of Hamburg Zoning Update Project, and Whereas, after numerous Committee and stakeholder meetings, extensive public outreach, and agency coordination, the Town’s CFA Zoning Committee and Fisher Associates as the project consultant, have developed specific Code and zoning map revisions; and Whereas, pursuant to Municipal Home Rule Law, the Town Board is proposing to enact a local law as follows: Be it enacted by the Town Board of the Town of Hamburg, New York, that the Hamburg Town Board amends the Hamburg Town Code as follows (full copies attached): Amend Chapter 280 (Zoning) by adding a new Article, entitled “SIA - Stadium Impact Area District” Amend Article LVI McKinley Mall Area Incentives Append the “Bills Stadium Economic Impact Area Plan” to the Comprehensive Plan; and Whereas, pursuant to Municipal Home Rule Law, the Town Board is also proposing to enact a local law which proposes to amend the Town’s Zoning Map as follows: Be it enacted by the Town Board of the Town of Hamburg, New York, that the Hamburg Town Board amends the Town Zoning map as follows (as illustrated on the attached maps): Rezone SBL # 160.19-1-4.1 from R-3 to SIA Rezone SBL # 160.16-1-12 from R-3 to SIA Rezone SBL # 160.11-2-17 and 160.15-1-28 from HC to MU-1 Rezone SBL # 160.11-2-18 from NC to MU-1 Rezone the following SBL #s 160.11-2-19, 160.11-2-20, 160.11-2-21, 160.11-2-22, 160.11-2-23, 160.11-2-24, 160.11-2-25, 160.11-2-26, 160.11-2-27, 160.11-2-28, 160.11-2-29, 160.11-2-30, 160.11-2-31, 160.11-2-32, 160.15-1-20, 160.15-1-18, 160.15-1-16, 160.15-1-14, and 160.15-1- 12.2 from C-3 to MU-1 Rezone the following SBL #s: 160.15-1-24.1, 160.11-2-8.113, 160.11-2-8.12, and 160.11-2-9 from C-2 to MU-1 118

Page 119

Rezone the following SBL #s: 160.14-2-35, 160.14-2-37, 160.14-2-49, and 160.14-2-50 from R- 2 to MU-1; Rezone the following SBL # 160.11-2-16 from R-2 to MU-1; and Whereas, a public hearing was held regarding these Code amendments on June 22nd, 2026, and comments were received and acknowledged from the public and Erie County, based on the 239-m referral. Whereas, the Hamburg Town Board, in accordance with Part 617 of the implementing regulations pertaining to Article 8 (State Environmental Quality Review Act - SEQRA) of the Environmental Conservation Law, has issued a SEQR Negative Declaration. Now Therefore Be It Resolved, the Hamburg Town Board amends Local Law #10 of the year 1986 of the Code of the Town of Hamburg Chapter 280 entitled “Zoning” to provide for the revisions of the Town Code, and to provide for changes in the boundary of the Zoning Map whereby the Zoning is changed from NC (Neighborhood Commercial General Residence District), R-2 (Single-Family Residence, Attached District), R-3 (Multifamily District), C-2 (General Commercial District), C-3 (Office District) and HC (Hamburg Commercial District) to MU-1 (Mixed-Use District 1) and SIA (Stadium Impact Area District) for the properties indicated above – see attached amended map as referenced above and attached. ATTACHMENTS: Hamburg Stadium Impact Area Zoning_8.7.26_v3.pdf 119

Page 120

Hamburg Stadium Impact Area (SIA) District Zoning Ordinance Town of Hamburg, New York August 2026 120

Page 121

HAMBURG SIA DISTRICT ZONING 2 Notes • This will create a new zoning district • On zoning map, change the site from existing Multifamily to SIA • Location: Current code has Articles for each district. Numbering will need to be updated • Add definition: a) Hotel, luxury/boutique. A lodging facility, primarily for transient guests for compensation, that provides access to or offers ancillary amenities and accommodations which may include but is not limited to a minimum of two or more of a restaurant and/or lounge or bar area, swimming pool, fitness center or similar amenities that would be consistent with industry standards as additional benefits for the patrons of such lodging facilities. Such hotel shall be officially designated as a four- or five-star hotel as determined by an independent third- party ratings system. 121

Page 122

HAMBURG SIA DISTRICT ZONING 3 ARTICLE XYZ 280-XYZ PURPOSE A. The Stadium Impact Area (SIA) District is established to guide development of the area adjacent to the Buffalo Bills Highmark Stadium. The intent of this district is to: 1. Implement the vision, goals, and development guidelines of the Bills Stadium Economic Impact Area Plan (2025). 2. Facilitate the creation of a vibrant, mixed-use neighborhood that complements the stadium while serving as a year-round destination for residents, visitors, and businesses. 3. Encourage a diverse mix of uses including entertainment, commercial, cultural, complimentary housing typologies, and recreational that generate activity throughout the year and contribute to a strong local identity. 4. Promote walkable development patterns that support safe and attractive pedestrian circulation, reduce reliance on automobiles, and integrate multiple modes of transportation though construction aligned with complete streets principles. 5. Develop world-class public open spaces, plazas, and civic amenities as integral components of redevelopment. 6. Ensure sensitive transitions between new development and surrounding single-family neighborhoods by requiring landscaped buffers and other appropriate measures. 7. Establish high-quality design standards for buildings, streetscapes, and public spaces that imbue vibrant community character and foster a wholesome environment for both game- day visitors and everyday users. 8. Coordinate new development with transportation, utility, and infrastructure improvements to ensure accessibility, efficiency, and long-term viability. 9. Provide flexibility in site planning and building placement to allow innovation while ensuring consistency with the Town’s Comprehensive Plan and the adopted Bills Stadium Economic Impact Area Plan. 280-XYZ Relationship To Other Regulations 1. Unless otherwise provided herein, all development within the Stadium District shall comply with the standards, procedures, and requirements of the Town of Hamburg Zoning Code. 2. Where a standard in this article conflicts with the Town of Hamburg Zoning Code, the provisions of this article shall govern. 3. Where a standard is not identified in this article, the applicable provisions of the Town of Hamburg Zoning Code shall apply. 122

Page 123

HAMBURG SIA DISTRICT ZONING 4 Section 280-XZY Required Process A. Objective. The objective of this process is to ensure that the SIA is developed as part of a cohesive master plan approved by the Town Board. An applicant may not subdivide land within the SIA for the purposes of avoiding the objectives of this process. B. Approval for an application shall be through the Town’s Special Use Permit process in accordance with Article XLVI of this Chapter and any provisions of this Article XYZ. Where a conflict exists between the provisions of Article XLVI and this Article XYZ, the provisions of this Article shall prevail. C. For purposes of this Article XYZ, the Town Board shall authorize Special Use Permits. If the Town Board finds the application in accordance with the intent of this district and Bills Stadium Economic Impact Area Plan, the Town Board will refer the application to the Planning Board in accordance with Article XLVIII of the Town Zoning Code. The final approved Plan will represent the approved uses for the site. D. As part of the application process, the applicant shall submit a conceptual plan of development for the district and appropriate State Environmental Quality Review Act (SEQRA) information. As part of approval for the Special Use Permit, the Town Board must find the application in accordance with the intent of this district, the Buffalo Bills Stadium Economic Impact Area Plan, and the Comprehensive Plan. The final approved Plan will represent the approved uses for the site. E. A Special Use Permit shall only be granted for a single plan that covers the entirety of the SIA district, or multiple plans, where each plan complies with all design requirements of this district, the Buffalo Bills Stadium Economic Impact Area Plan, and the Comprehensive Plan and all plans in total meet all requirements of and cover the entirety of the entire SIA district. Any subdivision of land within the SIA must occur after a Special Use Permit approval is granted. Any land that has been subdivided is subject to the obligations and requirements associated with the conceptual plan. F. Once a Special Use Permit is received for the uses and overall layout of the site, the owner of the site may need to come before the Planning Board for subdivision approval and to receive full site plan approval for proposed phases of the project. This approval will follow the requirements of site plan approval under Article XLIV but will only involve the Planning Board as a recommending board, with the Town Board responsible for subdivision and/or site plan approval. G. Once the Special Use Permit is granted, if the owner wishes to change the plan or change or add additional uses, a new application would need to be submitted, following the same procedure noted in Subsection A above. H. Alternative Approval Process 1. For the SIA Zoning District, the Hamburg Pre-permitted Site Incentive Law can be utilized to establish this site as a “Pre-Permitted” site in the Town of Hamburg. This process (described in the Pre-Permitted section of the zoning law), of obtaining a “Pre- Permitted” site designation, can allow the Town and future owners/developers of the site to set more parameters for development that relate to the impacts of the development of this site, and allow the development to take place without an extended process. The required 123

Page 124

HAMBURG SIA DISTRICT ZONING 5 GEIS for Pre-Permitted designation will also set thresholds and conditions and further evaluate layouts of the site. 2. As stated in the Pre-Permitted law, if this designation is received, proposed development phases and projects would not be subject to further Town Board/Planning Board reviews. Engineering plans/site plans/subdivision plans will be submitted to a SIA District Committee, to be created by the Hamburg Town Board. The format of these plans shall be in accordance with the Town requirements for site plan/subdivision review. If this Committee finds the project to be in conformance with the SEQR findings and Town standards, and other regulatory permits and approvals have been issued, the applicant can proceed with applications to the Town Building Inspection Department for site-clearing and building permits. I. Timeframe for Construction 1. Time frames will be set at the time of approvals. 2. If the time frames set for commencement of construction are exceeded, the applicant shall return to the Town Board to receive an updated approval. Section 280-XYZ Objectives In reviewing proposals within the SIA, the Town Board shall consider whether the following objectives are achieved. To demonstrate that these objectives are achieved the applicant shall develop a plan that complies with the principles and physical character described in the Buffalo Bills Stadium Economic Impact Area Plan (2025). A. Economic Vitality. Creation of a unique destination that supports attracts private investment and expands the Town’s tax base. B. Integrated Land Uses. Promotion of a cohesive land use mix, including retail, dining, entertainment, residential (townhomes and other smaller scale residential building types), office, and community facilities, arranged in a compact and walkable pattern. C. Public Realm Excellence. Provision of usable and well-located open spaces, plazas, and pedestrian-oriented streets that create a vibrant public life. Public art is an important component of the public real experience. D. Neighborhood Compatibility. Preservation and enhancement of surrounding residential character through transitional design, green buffers, and context-sensitive building massing. E. Transportation and Access. Advancement of multimodal circulation systems—including pedestrian, bicycle, shuttle, and vehicular access—that mitigate traffic impacts and improve safety, particularly on event days. F. Design Quality. Coordination of architectural styles, building forms, and site design to achieve compatibility, visual interest, and climate-appropriate construction. Inclusive Design principles ensure accommodation for persons of all ages and abilities. G. Environmental and Cultural Stewardship. Preservation and integration of natural features, sustainable practices, and opportunities for cultural or recreational facilities that reflect Hamburg’s community identity. 124

Page 125

HAMBURG SIA DISTRICT ZONING 6 Section 280-XYZ Dimensional and Development Standards A. This section provides dimensional standards for various roadway types and building types in the SIA. Applicants should reference the Bills Stadium Economic Impact Area Plan (2025) for additional guidance. B. Streets and Roadways 1) General. The applicant shall create a network of roadways throughout the site. These roadways within the SIA shall be developed according to a hierarchy of streets based upon their intended use and adjacent land use. The roadways shall be designed to accommodate all users of the road in accordance with complete streets principles. Street Type Tier 1 – Access Streets Description Tier 1 roadways connect the site to external roadways and distribute traffic throughout the district. They are designed to handle the traffic associated with development throughout the year, including during events at the stadium. A. Setbacks 1 15 feet minimum, 30 feet maximum B. Sidewalks 6 feet minimum width sidewalk plus 6 feet minimum width for tree lawn. At its discretion, the Town Board may approve alternative pedestrian infrastructure such as a multiuse path. C. Trees 50-foot spacing D. Height / Hotel, maximum six stories, 70 feet Other uses, maximum four stories, 55 feet E. Step-back 15-foot upper floor step-back required for buildings greater than three stories Additional 1) Travel lanes shall not exceed 11 feet in width per lane standards 2) Two-way bicycle facilities shall be minimum 10 feet in width 1 For purposes of the SIA, setbacks refer to the front façade of the building to the roadway, whether a public right-of-way or internal to the private development 125

Page 126

HAMBURG SIA DISTRICT ZONING 7 Street Type Tier 1 – Access Streets 3) Block length: Not applicable, however, crosswalks are required at all crossings. Street Type Tier 2 – Pedestrian-Focused Streets Description Tier 2 roadways serve as the main commercial and pedestrian corridors of the district. They are designed for slower speeds and to enhance the pedestrian realm. They are generally located within commercial and mixed-use areas of the SIA. A. Setbacks 2 0 foot minimum, 20 feet maximum B. Sidewalks 12 feet minimum width. Sidewalks along Tier 2 streets shall be multi-functional. Three distinct zones shall be articulated to provide adequate space for circulation with a minimum clear width of 5’, adequate space for streetscape and amenities, and adequate space for activity in front of buildings. C. Trees 40-foot spacing D. Height Hotel, maximum six stories, 70 feet Other uses, maximum four stories, 55 feet Ground floor minimum height, 12 feet E. Step-back 15 foot upper floor step-back required for buildings greater than three stories Additional 1) Travel lanes shall not exceed 10.5 feet in width per lane. Standards 2) On-street parking (i.e., parallel parking) is encouraged and shall be 8 feet wide inclusive of gutter pan. 3) Blocks shall not exceed 400 feet in length between intersections. Crosswalks are required at all intersections. 2 For purposes of the SIA, setbacks refer to the front façade of the building to the roadway, whether a public right-of-way or internal to the private development 126

Page 127

HAMBURG SIA DISTRICT ZONING 8 Street Type Tier 2 – Pedestrian-Focused Streets 4) Front porches, stoops, or balconies shall have a minimum of 6 feet depth for usability; exceptions may be granted. Street Type Tier 3 – Neighborhood Streets Description Tier 3 roads serve areas of the district that are primarily residential. A. Setbacks 3 10 foot minimum, 30 feet maximum B. Sidewalks 6 feet minimum width sidewalk plus 6 feet minimum width for tree lawn C. Trees 35-foot spacing D. Height Maximum three stories Additional 1) Travel lanes shall not exceed 10 feet per lane standards 2) Garages must be located on the side or rear of buildings 3) Blocks shall not exceed 300 feet in length between intersections. Crosswalks are required at all intersections. C. Building and Site Standards 1) Façade length: Maximum 200’ along front façade. 2) Ground floor transparency: Minimum 70% of the first floor of the front of a principal building shall be clear glass. This 70% requirement can be modified during the 3 For purposes of the SIA, setbacks refer to the front façade of the building to the roadway, whether a public right-of-way or internal to the private development 127

Page 128

HAMBURG SIA DISTRICT ZONING 9 application process if Town Board determines the project contains other aesthetic features that enhance the visual impact of the District. Residential-only buildings are exempt from this requirement. 3) Orientation: Buildings must be oriented toward streets and open spaces, including placement of front entrances. 4) Avoiding blank walls: Blank wall surfaces greater than 20’ are prohibited if visible from streets or other public areas. Any side of the building that has frontage on a sidewalk or street shall include windows, doors, murals or other architectural articulations. 5) Concealing unappealing functions. Site layout shall be designed to minimize impact, visibility, and public view of service areas, loading docks, dumpsters, utilities, and other utilitarian functions of the property. The site layout should place these components on the side of the building with the fewest number of expected pedestrians to the degree practicable and utilities shall be buried. In areas likely to be seen by pedestrians, these functions should be buffered with site landscaping, architectural screening, and fencing. Chain link fencing is not acceptable for screening purposes. 6) Mechanical equipment: Mechanical equipment, including metal chimneys and elevator penthouses at grade, attached to, or on the roof of a building, shall be screened from the view of the most adjacent street or driveway or they should be integrated into the overall design of the building through use of materials, placement, roof shape or form, or other means. D. Site standards for dwellings 1) Applicability. The following is applicable to single-family and two-family dwellings. 2) Purpose. Single- and two-family dwellings shall be developed in such a way that contributes to the walkable, mixed-use nature of the SIA District. Single- and two-family dwellings shall be constructed in a manner colloquially known as “skinny houses,” which are a building typology similar to vertical orientation and small-footprint of townhomes but are fully detached. 3) Single- and two-family dwellings shall be sited on lots 3,000 SF or less. 4) Single- and two-family dwellings are suitable only for Tier 3 streets as described in Section C above. 5) Single- and two-family dwellings are not permitted within 2,000 square feet of the nearest face of the Buffalo Bills Stadium. E. Building Materials 1) Buildings must use high quality materials that contribute to a vibrant neighborhood and resist deterioration. 2) Building facade materials permitted within the SIA include, but are not limited to, brick, concrete masonry, wood, cementitious fiber board, manufactured limestone, cast stone, masonry, stone, glass, terra cotta, cellular PVC trim, tile, and sustainable materials. 3) Primary façade materials shall wrap building corners a minimum of 20’ on building sides. 128

Page 129

HAMBURG SIA DISTRICT ZONING 10 4) The following building materials are prohibited on any façade visible to the general public: a) Plain concrete block b) Glass block c) Exposed aggregate (rough finish) concrete wall panels, d) Exterior insulating finish systems (EIFS) e) T-111 plywood or oriented strand board (OSB) siding. f) Plastic g) Vinyl, except cellular vinyl trim may be used as decorative or detail elements for up to 25% of the facade. h) Metal, except as decorative or detail elements for up to 30% of the facade. i) Metal panels with a depth of less than one inch or a thickness less than U.S. Standard 26 gauge. j) Mirrored glass with a reflectance greater than 40%. F. Lighting 1) Placement of lighting fixtures shall be designed to provide adequate ambient light levels for safety and usefulness, and shall be configured to highlight pedestrian paths and building entrances. 2) Along Tier 2 and Tier 3 streets, site lighting shall use shielded and full cut-off fixtures that avoid spilling light onto neighboring streets, properties, structures, and into the night sky. Site lighting shall use low height fixtures, between 14 and 17’, which shall reinforce the pedestrian scale. G. Open Space Requirements. 1) District-Wide Standard. A minimum of 10% of gross site area within the development shall be preserved as usable open space. 2) Public Plazas. A publicly accessible plaza, depicted in the guidelines of the Bills Stadium Economic Impact Area Plan must be included in the approximate location identified on the Plan. Said plaza must be a minimum 5,000 square feet, designed with seating, shade, and active frontages. 3) Green Buffers. Landscaped buffers of 200 feet minimum are required along edges adjacent to existing R1 and R2 residential districts at the time of adoption of the SIA district. Applicants must demonstrate how said buffers provide adequate mitigation of impacts associated with development in the district, including impacts associated with but not limited to visual, traffic, and noise. 4) Trees. Minimum 2.5” caliper canopy tree required along street edges. Sufficient soil volume for street canopy trees is required where hardscaping occurs to ensure adequate soil for viability, longevity, and growth. 129

Page 130

HAMBURG SIA DISTRICT ZONING 11 H. Parking and Access. 5) Off-Street Parking Requirements. a) Applicants shall develop a parking plan to demonstrate how it will adequately accommodate parking demand associated with development. Applicants are encouraged to include multiple means to reduce parking demand and associated traffic impacts via Transportation Demand Strategies. These means include but are not limited to shared parking arrangements and shuttle service options to off- site locations. b) Based upon an analysis of this plan, the Planning Board shall make a recommendation to the Town Board as part of the Specia Permit approval process. 6) Location a) Along a Tier 1 Street: Surface parking areas must be lined with landscaped buffers to minimize the visual impacts of parking areas. Landscaped buffers shall be a minimum 5-foot width and include decorative shrubs (maximum 36 inches in height) and/or decorative grasses and a minimum of one tree for every 30 feet. b) Along a Tier 2 or Tier 3 Street: a. Surface parking. Parking areas for mixed-use and non-residential buildings must be located to the rear or side of buildings and public spaces. When located on the side of a building the parking areas must contain a landscape buffer consistent with the requirements for a Tier 1 Street to minimize the visual impacts of the parking area. b. Structured parking. Structured parking facilities must be visually and structurally integrated with buildings of other uses along Tier 2 and Tier 3 streets. At a minimum, the façade facing a Tier 2 or Tier 3 street must be lined with commercial or residential uses along the building length. Vehicular and pedestrian access points are exempted from this requirement. 7) Pedestrian Access. All parking areas must be connected via sidewalks or paths to adjacent streets and buildings 8) Bicycle parking. For commercial uses, one bicycle parking space per 3,000 feet of gross floor area must be provided. Bicycle parking shall be located and clearly designated in safe and convenient locations. I. Signs 1) For applicable Sign regulations, see Article XXXVI. Section 280-XYZ Uses A. General Provisions. 1) Multiple uses are permitted on each lot. All uses are subject to the Special Use Permit process. 2) Where a use is not expressly listed, the Town Board shall determine whether it is: a) Substantially similar to a permitted use 130

Page 131

HAMBURG SIA DISTRICT ZONING 12 b) Permitted subject to conditions c) Prohibited 3) Location and mix of uses. The Buffalo Bills Stadium Economic Impact Area Plan (2025) shall serve as a guiding document governing the appropriate location and mix of uses within the SIA. Applicants are shall demonstrate how proposed uses align with the goals and vision articulated in the plan. Alternatives to the mix of uses envisioned in the Buffalo Bills Stadium Economic Impact Area Plan may be permitted at the discretion of the Town Board if the applicant demonstrates that the proposed plan meets the spirit and helps achieve the vision of said plan. 4) Mixed-use buildings are encouraged, but individual buildings may contain single uses, provided that the district contains a balanced mix in accordance with the Buffalo Bills Stadium Economic Impact Area Plan. B. Permitted Uses 1) Residential a) Dwelling, single-family (See Section 280-XYZ.E for applicable standards) b) Dwelling, two-family (See Section 280-XYZ.E for applicable standards) c) Townhouse d) Residential units as part of a mixed-use building, provided that the ground floor of any side facing a street or open space is occupied by non-residential uses. 2) Commercial and Retail b) Eateries, including restaurants, breweries, cafes, and bars. c) Financial Institution d) Retail e) Entertainment venues (indoor/outdoor performance spaces). f) Health clubs, wellness centers, fitness studios g) Hotel, luxury/boutique h) Office i) Personal service establishments, including but not limited to salons and therapeutic massage 3) Community and Civic a) Athletic facilities (indoor and outdoor) b) Community centers, cultural or recreational facilities c) Museums or cultural exhibits d) Public parks, plazas, and open spaces e) School f) Day care centers 131

Page 132

HAMBURG SIA DISTRICT ZONING 13 g) Educational facilities 4) Accessory Uses a) Parking facilities, including structured parking and surface lots, subject to the parking requirements of this section. b) ATM c) Temporary events and installations C. Prohibited Uses. The following uses are prohibited within the SIA and not permitted under any circumstances: a) Adult entertainment establishments b) Automotive repair c) Cannabis dispensary d) Car wash e) Distribution center f) Drive-through g) Filling station h) Industrial uses i) Mobile Home j) Motel k) Multifamily building, excluding mixed-use building l) Parking garage or parking lot as a principal use m) Smoke shop n) Storage facility o) Warehousing Section 280-XYZ Development Standards A. Infrastructure. All development shall be services by public water and sewer. The applicant must provide documentation of sufficient capacity to handle the needs of the proposed development. B. Transportation Impacts 1) Overview. Applicants must conduct a detailed traffic study and plan to take appropriate measures to mitigate the negative traffic impacts associated with new development. 2) Traffic Study: A study is required documenting existing traffic conditions in the vicinity of the proposed project, accurately describe the volume and effect of the projected traffic generated by the proposed project, and identify measures necessary and sufficient to mitigate any adverse impacts on existing traffic conditions. The Traffic Study shall contain the following: a) Existing traffic conditions: Measurement and assessment of average and daily peak hour vehicular, pedestrian and bicycle traffic volumes, average and peak speeds, sight 132

Page 133

HAMBURG SIA DISTRICT ZONING 14 distances, accident data and Levels of Service (LOS) of all intersections and streets within the project impact area and including any intersection projected to be adversely affected by the project over the No Build condition. b) Projected traffic conditions: Projected traffic conditions for the design year of occupancy, including a statement of the design year of occupancy, estimated background traffic growth on an annual average basis, and impacts of other proposed developments that have been approved in whole or in part by the Town of Hamburg or an abutting municipality which will affect future traffic conditions. c) Projected impact of proposed project: Projected peak hour and daily traffic generated by the project on the roads and ways in the project impact area, sight lines at the intersections of the proposed driveways and streets, existing and proposed traffic controls in the vicinity of the proposed Development Project, and projected post- development traffic volumes and Levels of Service (LOS) of intersections and roads likely to be affected by the proposed project. d) Traffic circulation plan: Development in the SIA is expected to create a number of new roadways (which may be public rights-of-way or privately owned roads that function in a similar manner). The circulation plan must provide designs for both circulation within the SIA, as well as how and where these roadways will connect to existing right-of-way. As such, the plan shall also discuss means for coordination with relevant stakeholder agencies, such as NY Department of Transportation. e) Traffic mitigation measures: Specific measures to be undertaken by the Applicant in order to mitigate the impacts of the proposed project. Mitigation measures may include both on-site and off-site measures. Measures may include but are not limited to intersection improvements, shuttle options, bicycle and pedestrian infrastructure, and other means to both accommodate vehicular traffic and promote multiple transportation options. The proposed mitigation measures, if approved, shall be required to be completed prior to the issuance of a final certificate of occupancy for the project component. f) Gameday and special events: The transportation study must include an analysis of traffic impacts related to events at the Buffalo Bills Stadium, including but not limited to Buffalo Bills games. C. Project Phasing. 1) At the request of the Applicant phasing of the project shall be permitted with Town Board approval, provided that the submission shows the full build-out of the Project and all associated impacts as of the completion of the final phase. Any off-site mitigation requirements shall be structured in phases to coordinate with the project buildout and must be completed prior to construction of that phase of work. 2) Phased projects will have time frames set at the time of approvals. If the time frames set for the construction of these phases are exceed, the applicant must return to the Town Board to update the plan. 133

Page 134

HAMBURG SIA DISTRICT ZONING 15 D. Interim Property Maintenance and Development Obligations 1) Applicability. The requirements of this subsection shall apply to all land, buildings, structures, and development parcels within the SIA District, including land that has been subdivided following approval of the master development plan. 2) Continuing Responsibility. The owner of record of each parcel shall be responsible for compliance with the requirements of this subsection including any new and/or additional owners resulting from any subdivision of a parcel. 3) Maintenance of Undeveloped Property. Any portion of the SIA District not actively under construction shall be maintained in a safe, orderly, and attractive condition. Such areas shall be kept free of debris, refuse, abandoned equipment, disabled vehicles, construction waste, hazardous conditions, and excessive overgrowth. 4) Maintenance of Vacant Development Parcels. Vacant parcels intended for future development shall be graded, stabilized, and maintained to prevent erosion, nuisance conditions, and deterioration of the appearance of the District. Temporary seeding, landscaping, fencing, stormwater facilities, and other site improvements shall be maintained in good condition until development occurs. 5) Demolition and Site Restoration. Following demolition of any principal structure, the property owner shall restore the site within six months of completion of demolition unless redevelopment construction has commenced. Site restoration shall include, at a minimum: a) Removal of foundations, debris, and construction materials, unless specifically approved to remain as part of a future development phase; b) Grading and stabilization of disturbed areas; c) Seeding, landscaping, or other ground treatment sufficient to prevent erosion and maintain an orderly appearance; d) Installation and maintenance of any fencing or screening required by the Town Board. 6) Vacant Buildings. Any building that becomes vacant shall be maintained in a weather-tight, secure, and code-compliant condition. Broken windows, damaged doors, deteriorated exterior materials, graffiti, and similar conditions shall be repaired in a timely manner. 7) Interim Site Management Plan. As part of the Special Use Permit approval, the applicant shall submit an Interim Site Management Plan identifying the party responsible for maintenance of undeveloped lands, vacant development parcels, stormwater facilities, landscaping, temporary improvements, and common areas. The Plan may be amended from time to time as parcels are subdivided or ownership changes. 134

Page 135

Town Board of the Town of Hamburg August 10, 2026 Meeting 4.35. Chapter 109 Amendments SEQR and Adoption Resolution WHEREAS, the Hamburg Town Code contains and specifies the local laws and ordinances of the Town of Hamburg; and WHEREAS, the Code Review Committee reviewed various regulations of Chapter 109 and sent these suggested revisions to the Town Board to begin the adoption process; and WHEREAS, pursuant to Municipal Home Rule Law, the Town Board is proposing to enact a local law as follows: Be it enacted by the Town Board of the Town of Hamburg, New York, that the Hamburg Town Board amends the Hamburg Town Code as follows (full copies attached): Amend Chapter 109 (Fair Housing), by amending § 109-6, entitled “Enforcement”; § 109-10 “Education and promotion of housing goals”; and 109-11 “Affirmatively furthering fair housing”; and WHEREAS, a public hearing was held on August 10th, 2026, for discussion and public comment concerning adoption of this proposed local law; and WHEREAS, the Town of Hamburg has determined that this proposed local law amendment is a Type II action under SEQR, and no further SEQR review is necessary; and WHEREAS, this proposed local law amendment was referred to Erie County through the 239-m referral process and received no objections; and WHEREAS, the proposed local law amendment is in accordance with the recommendation of the Town of Hamburg Code Review Committee. NOW THEREFORE BE IT RESOLVED, the Hamburg Town Board amends Local Law #2 of the year 2005 of the Code of the Town of Hamburg Chapter 109 entitled “Fair Housing” to provide for the 135

Page 136

revisions of the Town Code as referenced above and attached. ATTACHMENTS: FEAF Part 1.pdf Fair Housing Amendments Clean Version 8-10-26.pdf 136

Page 137

Full Environmental Assessment Form Part 1 - Project and Setting Instructions for Completing Part 1 Part 1 is to be completed by the applicant or project sponsor. Responses become part of the application for approval or funding, are subject to public review, and may be subject to further verification. Complete Part 1 based on information currently available. If additional research or investigation would be needed to fully respond to any item, please answer as thoroughly as possible based on current information; indicate whether missing information does not exist, or is not reasonably available to the sponsor; and, when possible, generally describe work or studies that would be necessary to update or fully develop that information. Applicants/sponsors must complete all items in Sections A & B. In Sections C, D & E, most items contain an initial question that must be answered either “Yes” or “No.” If the answer to the initial question is “Yes,” complete the following sub-questions. If the answer to the initial question is “No,” proceed to the next question. Section F allows the project sponsor to identify and attach additional information. Section G requires the name and signature of the applicant or project sponsor to verify the information in Part 1 is accurate and complete. A. Project and Applicant/Sponsor Information. Name of Action or Project: Proposed code changes for Chapter 109 Fair Housing Project Location (describe and attach a general location map): N/A (Involves local law amendment) Brief Description of Proposed Action (include purpose or need): The proposed local law involves amendments to the Fair Housing regulations of Chapter 109 based on input from the Town's Community Development Department and the Town's Code Review Committee. The action includes amendments to § 109-6, entitled “Enforcement”; § 109-10 “Education and promotion of housing goals”; and 109-11 “Affirmatively furthering fair housing” (see attached draft for revisions). Name of Applicant/Sponsor: Telephone: 716-649-6111 Town of Hamburg E-Mail: Address: 6100 South Park Avenue City/PO: State: Zip Code: Hamburg NY 14075 Project Contact (if not same as sponsor; give name and title/role): Telephone: E-Mail: Address: City/PO: State: Zip Code: Property Owner (if not same as sponsor): Telephone: E-Mail: Address: City/PO: State: Zip Code: Page 1 of 15 FEAF 2026 137

Page 138

B. Government Approvals B. Government Approvals, Funding, or Sponsorship. (“Funding” includes grants, loans, tax relief, and any other forms of financial assistance.) Government Entity If Yes: Identify Agency and Approval(s) Application Date Required (Actual or projected) a. City Council, Town Board, 9✔ Yes 9 No Town Board Approval August 2026 or Village Board of Trustees b. City, Town or Village 9 Yes 9 No Planning Board or Commission c. City, Town or 9 Yes 9 No Village Zoning Board of Appeals d. Other local agencies 9 Yes 9 No e. County agencies 9✔ Yes 9 No County 239 referral 7/27/26 f. Regional agencies 9 Yes 9 No g. State agencies 9 Yes 9 No h. Federal agencies 9 Yes 9 No i. Coastal Resources. i. Is the project site within a Coastal Area or the waterfront area of a Designated Inland Waterway? 9 Yes 9 No ii. Is the project site located in a community with an approved Local Waterfront Revitalization Program? 9 Yes No iii. Is the project site within a Coastal Erosion Hazard Area? 9 Yes 9 No C. Planning and Zoning C.1. Planning and zoning actions. Will administrative or legislative adoption, or amendment of a plan, local law, ordinance, rule, or regulation be the 9 ✔ Yes 9 No only approval(s) that must be granted to enable the proposed action to proceed?  If Yes, complete sections C, F and G.  If No, proceed to question C.2 and complete all remaining sections and questions in Part 1 C.2. Adopted land use plans. a. Do any municipally adopted (city, town, village, or county) comprehensive land use plan(s) include the site 9 ✔ Yes 9 No where the proposed action would be located? If Yes, does the comprehensive plan include specific recommendations for the site where the proposed action ✔ Yes No would be located? 9 b. Is the site of the proposed action within any local or regional special planning district (for example: Greenway; ✔ Yes No Brownfield Opportunity Area (BOA); designated State or Federal heritage area; watershed management plan; 9 9 or other)? If Yes, identify the plan(s): NYS Heritage Area: West Erie Canal Corridor c. Is the proposed action located wholly or partially within an area listed in an adopted municipal open space plan ✔ Yes No or an adopted municipal farmland protection plan? 9 9 If Yes, identify the plan(s): Open Space and Greenspace Plan Page 2 of 15 FEAF 2026 138

Page 139

d. Is the proposed action in a municipality with an adopted comprehensive or individual plan that addresses climate Yes ✔ No change? 9 9 If Yes , identify the elements of the plan that are relevant to the action: 9 9 C.3. Zoning 9 9 a. Is the site of the proposed action located in a municipality with an adopted zoning law or ordinance? ✔ Yes No If Yes, what is the zoning classification(s) including any applicable overlay district? All b. Is the use permitted or allowed by a special or conditional use permit? Yes ✔ No c. Is a zoning change requested as part of the proposed action? Yes ✔ No If Yes, what is the proposed new zoning for the site? C.4. Existing community services. a. In what school district is the project site located? Frontier CSD and Hamburg CSD b. What police or other public protection forces serve the project site? Hamburg Police and Erie County Sheriff's c. Which fire protection and emergency medical services serve the project site? All Fire Districts d. What parks serve the project site? All Parks D. Project Details D.1. Proposed and Potential Development a. What is the general nature of the proposed action (e.g., residential, industrial, commercial, recreational; if mixed, include all components)? 9 9 b. a. Total acreage of the site of the proposed action? acres b. Total acreage to be physically disturbed? acres 9 9 c. Total acreage (project site and any contiguous properties) owned or controlled by the applicant or project sponsor? acres c. Is the proposed action an expansion of an existing project or use? 9 Yes9 No If Yes, what is the approximate percentage of the proposed expansion and identify the units (e.g., acres, miles, housing units, square feet)? % Units: d. Is the proposed action a subdivision, or does it include a subdivision? 9 Yes9 No If Yes, i. Purpose or type of subdivision? (e.g., residential, industrial, commercial; if mixed, specify types) ii. Is a cluster/conservation layout proposed? Yes No iii. Number of lots proposed? iv. Minimum and maximum proposed lot sizes? Minimum Maximum Page 3 of 15 FEAF 2026 139

Page 140

e. Will the proposed action be constructed in multiple phases? 9 Yes 9 No i. If No, anticipated period of construction: months ii. If Yes:  Total number of phases anticipated  Anticipated commencement date of phase 1 (including demolition) month year  Anticipated completion date of final phase month year  Generally describe connections or relationships among phases, including any contingencies where progress of one phase may determine timing or duration of future phases: 9 9 f. Does the project include new residential uses? Yes No If Yes, show numbers of units proposed. One Family Two Family Three Family Multiple Family (four or more) 9 9 Initial Phase At completion of all phases 9 9 9 g. Does the proposed action include new non-residential construction (including expansions)? Yes No If Yes, i. Total number of structures ii. Dimensions (in feet) of largest proposed structure: height; width; and length iii. Approximate extent of building space to be heated or cooled: square feet h. Does the proposed action include construction or other activities that will result in the impoundment of any Yes No liquids, such as creation of a water supply, reservoir, pond, lake, waste lagoon or other storage? If Yes, i. Purpose of the impoundment: ii. If a water impoundment, the principal source of the water: Ground water Surface water streams 9 Other 9 specify: iii. If other than water, identify the type of impounded/contained liquids and their source. iv. Approximate size of the proposed impoundment. Volume: million gallons; surface area: acres v. Dimensions of the proposed dam or impounding structure: height; length vi. Construction method/materials for the proposed dam or impounding structure (e.g., earth fill, rock, wood, concrete): D.2. Project Operations a. Does the proposed action include any excavation, mining, or dredging, during construction, operations, or both? Yes No (Not including general site preparation, grading or installation of utilities or foundations where all excavated materials will remain onsite) If Yes: i .What is the purpose of the excavation or dredging? ii. How much material (including rock, earth, sediments, etc.) is proposed to be removed from the site?  Volume (specify tons or cubic yards): 9 9  Over what duration of time? iii. Describe nature and characteristics of materials to be excavated or dredged, and plans to use, manage or dispose of them. iv. Will there be onsite dewatering or processing of excavated materials? Yes No If yes, describe. 9 9 v. What is the total area to be dredged or excavated? acres vi. What is the maximum area to be worked at any one time? acres vii. What would be the maximum depth of excavation or dredging? feet viii. Will the excavation require blasting? Yes No ix. Summarize site reclamation goals and plan: Page 4 of 15 FEAF 2026 140

Page 141

b. Would the proposed action cause or result in alteration of, increase or decrease in size of, or encroachment Yes No into any existing wetland, waterbody, shoreline, beach or adjacent area? If Yes: i. Identify the wetland or waterbody which would be affected (by name, water index number, wetland map number or geographic description): ii. Describe how the proposed action would affect that waterbody or wetland, e.g., excavation, fill, placement of structures, or alteration of channels, banks, and shorelines. Indicate extent of activities, alterations and additions in square feet or acres: iii. Will the proposed action cause or result in disturbance to bottom sediments? Yes No If Yes, describe: iv. Will the proposed action cause or result in the destruction or removal of aquatic vegetation? Yes No If Yes:  acres of aquatic vegetation proposed to be removed:___________________________  expected acreage of aquatic vegetation remaining after project completion:  purpose of proposed removal (e.g. beach clearing, invasive species control, boat access):  proposed method of plant removal:  if chemical/herbicide treatment will be used, specify product(s): v. Describe any proposed reclamation/mitigation following disturbance: c. Will the proposed action use, or create a new demand for water? Yes No If Yes: i. Total anticipated water usage/demand per day: gallons/day ii. Will the proposed action obtain water from an existing public water supply? Yes No If Yes:  Name of district or service area:  Does the existing public water supply have capacity to serve the proposal? Yes No  Is the project site in the existing district? Yes No  Is expansion of the district needed? Yes No  Do existing lines serve the project site? Yes No iii. Will line extension within an existing district be necessary to supply the project? Yes No If Yes:  Describe extensions or capacity expansions proposed to serve this project:  Source(s) of supply for the district: iv. Is a new water supply district or service area proposed to be formed to serve the project site? Yes No If, Yes:  Applicant/sponsor for new district:  Date application submitted or anticipated:  Proposed source(s) of supply for new district: v. If a public water supply will not be used, describe plans to provide water supply for the project: vi. If water supply will be from wells (public or private), what is the maximum pumping capacity: gallons/minute. Page 5 of 15 FEAF 2026 141

Page 142

d. Will the proposed action generate liquid wastes? Yes No If Yes: i. Total anticipated liquid waste generation per day: gallons/day ii. Nature of liquid wastes to be generated (e.g., sanitary wastewater, industrial; if combination, describe all components and approximate volumes or proportions of each): iii. Will the proposed action use any existing public wastewater treatment facilities? Yes No If Yes:  Name of wastewater treatment plant to be used:  Name of district: 9 9  Does the existing wastewater treatment plant have capacity to serve the project? Yes No  Is the project site in the existing district? Yes No  Is expansion of the district needed? Yes No  Do existing sewer lines serve the project site? Yes No  Will a line extension within an existing district be necessary to serve the project? Yes No If Yes:  Describe extensions or capacity expansions proposed to serve this project: 9 9 iv. Will a new wastewater (sewage) treatment district be formed to serve the project site? Yes No If Yes:  Applicant/sponsor for new district: 9 9  Date application submitted or anticipated:  What is the receiving water for the wastewater discharge? v. If public facilities will not be used, describe plans to provide wastewater treatment for the project, including specifying proposed receiving water (name and classification if surface discharge or describe subsurface disposal plans): vi. Describe any plans or designs to capture, recycle or reuse liquid waste: 9 9 e. Will the proposed action disturb more than one acre and create stormwater runoff, either from new point Yes No sources (i.e. ditches, pipes, swales, curbs, gutters or other concentrated flows of stormwater) or non-point source (i.e., sheet flow) during construction or post construction? If Yes: 9 i. How much impervious surface will the project create in relation to total size of project parcel? Square feet or acres (impervious surface) Square feet or acres (parcel size) ii. Describe types of new point sources. iii. Where will the stormwater runoff be directed (i.e. on-site stormwater management facility/structures, adjacent properties, groundwater, on-site surface water, or off-site surface waters)? 9 9  If to surface waters, identify receiving water bodies or wetlands:  Will stormwater runoff flow to adjacent properties? Yes No iv. Does the proposed plan minimize impervious surfaces, use pervious materials or collect and re-use stormwater? Yes No 9 9 9 9 9 9 Page 6 of 15 FEAF 2026 142

Page 143

f. Does the proposed action include, or will it use on-site, one or more sources of air emissions, including fuel Yes No combustion, waste incineration, or other processes or operations? If Yes, identify: i. Mobile sources during project operations (e.g., heavy equipment, fleet or delivery vehicles) ______________________________________________________________________________________________________ ii. Stationary sources during construction (e.g., power generation, structural heating, batch plant, crushers) ______________________________________________________________________________________________________ iii. Stationary sources during operations (e.g., process emissions, boilers, electric generation, surface coating) ______________________________________________________________________________________________________ g. Will any air emission sources named in D.2.f (above), require an Air Facility Registration, Air State Facility Yes No Permit, Title IV Permit or Title V Permit? If Yes: i. Is the proposed action subject to the Nonattainment New Source Review or Prevention of Significant Deterioration Yes No requirements discussed in 6 NYCRR Part 231? ii. As calculated in the air permit application, the proposed action has the potential to emit:  Tons/year (short tons) of carbon monoxide (CO)  Tons/year (short tons) of oxides of nitrogen (NOx)  Tons/year (short tons) of particulate matter (PM-10, PM-2.5)  Tons/year (short tons) of volatile organic compounds (VOC)  Tons/year (short tons) of sulfur dioxide (SO2) iii. Will emissions of air contaminants from the proposed action described above exceed the corresponding major Yes No source thresholds? iv.Does the proposed action have the potential to emit 10 tons/year or more of any one designated hazardous air Yes No pollutant or 25 tons/year or more of any combination of such hazardous air pollutants (6NYCRR 200.1(ag))? If Yes, provide the total potential to emit hazardous air pollutants in short tons/year: _____________________________ h. Will the proposed action generate or emit annual direct and indirect greenhouse gas emissions, such as carbon dioxide, methane, nitrous oxide, sulfur hexafluoride, hydrofluorocarbons, or perfluorocarbons in excess of 10,000 metric tons of total carbon dioxide equivalents per year at any point in the lifetime of the proposed action (estimated using the carbon dioxide equivalent definition and global warming potentials provided in 6 NYCRR Part 496)? Yes No If Yes: i. Estimate the proposed action’s metric tons of carbon dioxide equivalents in tons/year (metric): ii. Describe any greenhouse gas capture, control, or elimination measures included in project design: i. Will the proposed action result in the release of air pollutants from open-air operations or processes, such as Yes No quarry or landfill operations? If Yes: Describe operations and nature of emissions (e.g., diesel exhaust, rock particulates/dust): j. Will the proposed action result in a substantial increase in traffic above present levels or generate substantial Yes No new demand for transportation facilities or services? If Yes: i. When is the peak traffic expected (Check all that apply): Morning Evening Weekend Randomly between hours of to . ii. For commercial activities only, projected number of truck trips/day and type (e.g., semi trailers and dump trucks): iii. Parking spaces: Existing Proposed Net increase/decrease iv. Does the proposed action include any shared use parking? Yes No v. If the proposed action includes any modification of existing roads, creation of new roads or change in existing access, describe: ______________________________________________________________________________________________________________ vi. Are public/private transportation service(s) or facilities available within ½ mile of the proposed site? Yes No vii Will the proposed action include access to public transportation or accommodations for use of hybrid, electric Yes No or other alternative fueled vehicles? viii. Will the proposed action include plans for pedestrian or bicycle accommodations for connections to existing Yes No pedestrian or bicycle routes? Page 7 of 15 FEAF 2026 143

Page 144

k. Will the proposed action (for commercial or industrial projects only) generate new or additional energy demand? Yes No If Yes: i. Estimate annual electricity demand during operation of the proposed action: ii. Anticipated sources/suppliers of electricity for the project (e.g., on-site combustion, on-site renewable, via grid/local utility, or other):________________________________________________________________________________________________ iii. Will the proposed action require a new, or an upgrade, to an existing substation? Yes No l. Hours of operation. Answer all items which apply. i. During Construction: ii. During Operations:  Monday - Friday:  Monday - Friday:  Saturday:  Saturday:  Sunday:  Sunday:  Holidays:  Holidays: m. Will the proposed action produce noise that will exceed existing ambient noise levels during construction, Yes No operation, or both? If yes: i. Provide details including sources, time of day and duration: ii. Will the proposed action remove existing natural barriers that could act as a noise barrier or screen? Yes No Describe: n. Will the proposed action have outdoor lighting? Yes No If yes: i. Describe source(s), location(s), height of fixture(s), direction/aim, and proximity to nearest occupied structures: ii. Will proposed action remove existing natural barriers that could act as a light barrier or screen? Yes No Describe: o. Does the proposed action have the potential to produce odors for more than one hour per day? Yes No If Yes, describe possible sources, potential frequency and duration of odor emissions, and proximity to nearest occupied structures: p. Will the proposed action include any bulk storage of petroleum (combined capacity of over 1,100 gallons) Yes No or chemical products 185 gallons in above ground storage or any amount in underground storage? If Yes: i. Product(s) to be stored ii. Volume(s) per unit time (e.g., month, year) iii. Generally, describe the proposed storage facilities: q. Will the proposed action (commercial, industrial and recreational projects only) use pesticides Yes No (i.e., herbicides, insecticide) during construction or operation? If Yes: i. Describe proposed treatment(s): ii. Will the proposed action use Integrated Pest Management Practices? Yes No Page 8 of 15 FEAF 2026 144

Page 145

r. Will the proposed action (commercial or industrial projects only) involve or require the management or disposal Yes No of solid waste (excluding hazardous materials)? If Yes: i. Describe any solid waste(s) to be generated during construction or operation of the facility:  Construction: tons per (unit of time)  Operation : tons per (unit of time) ii. Describe any proposals for on-site minimization, recycling or reuse of materials to avoid disposal as solid waste:  Construction:  Operation: iii. Proposed disposal methods/facilities for solid waste generated on-site:  Construction:  Operation: s. Does the proposed action include construction or modification of a solid waste management facility? Yes No If Yes: i. Type of management or handling of waste proposed for the site (e.g., recycling or transfer station, composting, landfill, or9 9 other disposal activities): ii. Anticipated rate of disposal/processing:  Tons/month, if transfer or other non-combustion/thermal treatment, or  Tons/hour, if combustion or thermal treatment iii. If landfill, anticipated site life: years t. Will the proposed action at the site involve the commercial generation, treatment, storage, or disposal of hazardous Yes No waste? If Yes: 9 9 i. Name(s) of all hazardous wastes or constituents to be generated, handled, or managed at facility: ii. Generally describe processes or activities involving hazardous wastes or constituents: iii. Specify amount to be handled or generated tons/month iv. Describe any proposals for on-site minimization, recycling, or reuse of hazardous constituents: 9 v. Will any hazardous wastes be disposed at an existing offsite hazardous waste facility? Yes No If Yes: provide name and location of facility:________________________________________________________________________ If No: describe proposed management of any hazardous wastes which will not be sent to a hazardous waste facility: 9 9 9 Page 9 of 15 FEAF 2026 145

Page 146

9 99 E. Site and Setting of Proposed Action E.1. Land uses on and surrounding the project site a. Existing land uses. i. Check all uses that occur on, adjoining and near the project site. 9Urban 9Industrial 9Commercial 9Residential (suburban) 9Rural (non-farm) 9Forest 9Agriculture 9Aquatic 9Other (specify): 9 9 ii. If mix of uses, generally describe: 9 b. Land uses and cover types on the project site. Land use or Current Acreage After 9 Change 9 Cover type Acreage Project Completion (Acres +/-)  Roads, buildings, and other paved or impervious surfaces (total)  • Industrial or manufacturing • Commercial • Residential  Forested  Meadows, grasslands or brushlands (non- agricultural, including abandoned agricultural)  Agricultural (includes active orchards, field, greenhouse, etc.)  Surface water features (lakes, ponds, streams, rivers, etc.) 9 9  Wetlands (freshwater or tidal)  Non-vegetated (bare rock, earth, or fill)  Other, Describe: 9 9 Page 10 of 15 FEAF 2026 146

Page 147

c. Is the project site presently used by members of the community for public recreation? 9 Yes 9 No i. If Yes: explain: d. Are there any facilities serving children, the elderly, people with disabilities (e.g., schools, hospitals, licensed 9 Yes 9 No day care centers, or group homes) within 1500 feet of the project site? If Yes, i. Identify facilities: e. Does the project site contain an existing dam? 9 Yes 9 No If Yes: i. Dimensions of the dam and impoundment:  Dam height: feet  Dam length: feet  Surface area: acres  Volume impounded: gallons OR acre-feet ii. Dam’s existing hazard classification: iii. Provide date and summarize results of last inspection: f. Has the project site ever been used as a municipal, commercial or industrial solid waste management facility, 9 Yes 9 No or does the project site adjoin property that is now, or was at one time, used as a solid waste management facility? If Yes: i. Has the facility been formally closed? 9 Yes 9 No  If Yes, cite sources/documentation: ii. Describe the location of the project site relative to the boundaries of the solid waste management facility: iii. Describe any development constraints due to the prior solid waste activities: g. Have hazardous wastes been generated, treated and/or disposed of at the site, or does the project site adjoin 9 Yes 9 No property which is now or was at one time used to commercially treat, store and/or dispose of hazardous waste? If Yes: i. Describe waste(s) handled and waste management activities, including approximate time when activities occurred: h. Potential contamination history. Has there been a reported spill at the proposed project site, or have any 9 Yes 9 No remedial actions been conducted at or adjacent to the proposed site? If Yes: i. Is any portion of the site listed on the NYSDEC Spills Incidents database or Environmental Site 9 Yes 9 No Remediation database? Check all that apply: 9 Yes – Spills Incidents database Provide DEC ID number(s): 9 Yes – Environmental Site Remediation database Provide DEC ID number(s): 9 Neither database ii. If site has been subject of RCRA corrective activities, describe control measures: iii. Is the project within 2000 feet of any site in the NYSDEC Environmental Site Remediation database? 9 Yes 9 No If Yes, provide DEC ID number(s): iv. If Yes to (i), (ii) or (iii) above, describe current status of site(s): Page 11 of 15 FEAF 2026 147

Page 148

v. Is the project site subject to an institutional control limiting property uses? 9 Yes9 No  If Yes, DEC site ID number:  Describe the type of institutional control (e.g., deed restriction or easement):  Describe any use limitations:  Describe any engineering controls:  Will the project affect the institutional or engineering controls in place? 9 Yes9 No  Explain: E.2. Natural Resources On or Near Project Site a. What is the average depth to bedrock on the project site? feet b. Are there bedrock outcroppings on the project site? 9 Yes9 No If Yes, what proportion of the site is comprised of bedrock outcroppings? % c. Predominant soil type(s) present on project site: % ________________________ _________% ________________________ _________% d. What is the average depth to the water table on the project site? Average: feet e. Drainage status of project site soils: 9 Well Drained: % of site 9 Moderately Well Drained: % of site 9 Poorly Drained % of site f. Approximate proportion of proposed action site with slopes: 9 0-10%: % of site 9 10-15%: % of site 9 15% or greater: % of site g. Are there any unique geologic features on the project site? 9 9 Yes No If Yes, describe: h. Surface water features. i. Does any portion of the project site contain wetlands or other waterbodies (including streams, rivers, 9 Yes 9 No ponds, or lakes)? ii. Do any wetlands or other waterbodies adjoin the project site? 9 Yes No If Yes to either i or ii, continue. If No, skip to E.2.i. iii. Are any of the wetlands or waterbodies within or adjoining the project site regulated by any federal, 9 Yes No state or local agency? iv. For each identified regulated wetland and waterbody on the project site, provide the following information:  Streams: Name Classification • Lakes or Ponds: Name Classification • Wetlands: Name Approximate Size • Wetland No. (if regulated by DEC) v. Are any of the above water bodies listed in the most recent compilation of NYS water quality-impaired 9 Yes9 No waterbodies? If Yes, name of impaired water body/bodies and basis for listing as impaired: i. Is the project site in a designated Floodway? 9 9 Yes No j. Is the project site in the 100-year Floodplain? 9 9 Yes No 9 9 k. Is the project site in the 500-year Floodplain? Yes No 9 9 l. Is the project site located over, or immediately adjoining, a primary, principal or sole source aquifer? Yes No If Yes: i. Name of aquifer: Page 12 of 15 FEAF 2026 148

Page 149

m. Identify the predominant wildlife species that occupy or use the project site: n. Does the project site contain a designated significant natural community? 9 Yes 9 No If Yes: i. Describe the habitat/community (composition, function, and basis for designation): ii. Source(s) of description or evaluation: iii. Extent of community/habitat:  Currently: acres  Following completion of project as proposed: acres  Gain or loss (indicate + or -): acres o. Does project site contain any species of plant or animal that is listed by the federal government or NYS as 9 Yes 9 No endangered or threatened, or does it contain any areas identified as habitat for an endangered or threatened species? If Yes: i. Species and listing (endangered or threatened): p. Does the project site contain any species of plant or animal that is listed by NYS as rare, or as a species of 9 Yes 9 No special concern? If Yes: i. Species and listing: q. Is the project site or adjoining area currently used for hunting, trapping, fishing or shell fishing? 9 Yes 9 No If Yes, give a brief description of how the proposed action may affect that use: E.3. Designated Public Resources On or Near Project Site a. Is the project site, or any portion of it, located in a designated agricultural district certified pursuant to 9 Yes 9 No Agriculture and Markets Law, Article 25-AA, Section 303 and 304? If Yes, provide county plus district name/number: b. Are agricultural lands consisting of highly productive soils present? 9 Yes 9 No i. If Yes: acreage(s) on project site? ii. Source(s) of soil rating(s): c. Does the project site contain all or part of, or is it substantially contiguous to, a registered National 9 Yes 9 No Natural Landmark? If Yes: i. Nature of the natural landmark: 9 Biological Community 9 Geological Feature ii. Provide brief description of landmark, including values behind designation and approximate size/extent: d. Is the project site located in or does it adjoin a state listed Critical Environmental Area? 9 Yes 9 No If Yes: i. CEA name: ii. Basis for designation: iii. Designating agency and date: Page 13 of 15 FEAF 2026 149

Page 150

e. Does the project site contain, or is it substantially contiguous to, a building, archaeological site, or district Yes No listed on the National or State Register of Historic Places, or that has been determined by the Commissioner of the NYSOffice of Parks, Recreation and Historic Preservation to be eligible for listing on the State Register of Historic Places? If Yes: i. Nature of historic/archaeological resource: Archaeological Site Historic Building or District ii. Name: iii. Brief description of attributes on which listing is based: f. Is the project site, or any portion of it, located in or adjacent to an area designated as sensitive for Yes No archaeological sites on the New York State Historic Preservation Office (SHPO) archaeological site inventory? g. Have additional archaeological or historic site(s) or resources been identified on the project site? Yes No If Yes: i. Describe possible resource(s): ii. Basis for identification: h. Is the project site within five miles of any officially designated and publicly accessible federal, state, or local Yes No scenic, or aesthetic resource? If Yes: i. Identify resource: ii. Nature of, or basis for, designation (e.g., established highway overlook, state or local park, state historic trail, or scenic byway, etc.): iii. Distance between project and resource: miles. i. Is the project site located within a designated river corridor under the Wild, Scenic and Recreational Rivers Yes No Program 6 NYCRR 666? If Yes: i. Identify the name of the river and its designation: ii. Is the activity consistent with development restrictions contained in 6NYCRR Part 666? Yes No E.4. Disadvantaged Communities Designated Pursuant to ECL Article 75 a. Is the project located within, or within ½ mile of, a disadvantaged community? Yes No If No, could impacts(see examples below in E.4.b) from the project affect a disadvantaged community? Yes No If Yes to either question in E.4.a, answer the remaining questions in this section. b. Will there be direct or indirect impacts that may affect a disadvantaged community, such as those listed below? Yes No i. new noise sources or expansions/modification of existing noise sources; - noise from operational sources - noise from construction activities ii. emissions of air pollutants including, mobile emissions; iii. wastewater discharges; iv. generation of odors; v. light pollution; vi. new or modified radiation sources; vii. new or modified sources of solid waste generation, management, or disposal. If Yes, describe the impacts: c. Do any of the State agency approvals identified in question B.g include any of the following DEC permits? State Pollutant Discharge Elimination System (SPDES) Yes No Solid Waste Management Facility Yes No Hazardous Waste Management Facility Yes No Air Pollution Control (Title V or Air State Facility) Yes No Water Withdrawal over 20 MGD for Cooling Water Yes No Waste Transporter Yes No Page 14 of 15 FEAF 2026 150

Page 151

E.5 Future Physical Climate Risks Will the proposed action be vulnerable to the following future physical climate risks under current or projected future conditions: a. Is the proposed action vulnerable to damage from a projected 100-year flood? Yes No b. Is the proposed action vulnerable to damage from a projected 500-year flood? Yes No c. Is the proposed action in an area potentially affected by sea level rise? Yes No d. Will the proposed action increase the vulnerability of human or ecological communities to the following: i. drought? Yes No ii. temperature extremes (hot or cold)? Yes No iii. extreme storms, including high winds? Yes No iv. landslides? Yes No v. coastal erosion? Yes No vi. stormwater flooding? Yes No vii. other climate or weather hazards? Yes No If Yes, describe: _____________________________________ F. Additional Information Attach any additional information which may be needed to clarify your project. If you have identified any adverse impacts which could be associated with your proposal, please describe those impacts plus any measures which you propose to avoid or minimize them. G. Verification I certify that the information provided is true to the best of my knowledge. Applicant/Sponsor Name Joshua Rogers Date 7/7/26 Town Planner Signature Title Page 15 of 15 FEAF 2026 151

Page 152

Town of Hamburg, NY Chapter 109 FAIR HOUSING § 109-1. Policy. § 109-9. Other remedies. § 109-2. Definitions. § 109-10. Education and promotion of § 109-3. Unlawful acts. housing goals. § 109-4. Applicability. § 109-11. Affirmatively furthering fair § 109-5. Exemptions. housing. § 109-6. Enforcement. § 109-12. Expedition of proceedings. § 109-7. Penalties for offenses. § 109-13. Construal of provisions. § 109-8. Court action. [HISTORY: Adopted by the Town Board of the Town of Hamburg 8-4-196 by L.L. No. 8-1986; amended in its entirety 3-14-2005 by L.L. No. 2-2005. Subsequent amendments noted where applicable.] GENERAL REFERENCES Zoning — See Ch. 280. § 109-1. Policy. It is the policy of the Town of Hamburg to provide for fair housing throughout the Town. § 109-2. Definitions. As used in this chapter, the following words shall have the meanings indicated: ADVERTISING — Printing, circulating, placing or publishing or causing to be placed or published any written statement with respect to the availability of a dwelling for sale or rental. DISABILITY — A physical or mental impairment which substantially limits one or more major life activities; a record of such an impairment or a condition regarded by others as such an impairment. HOUSING UNIT — Any building, structure, or portion thereof which is used or occupied, or is intended, arranged or designed to be used or occupied, as the home or residence of one or more persons maintaining a common household. MARITAL STATUS — Single, married, divorced, separated or widowed. MILITARY STATUS — A person's participation in the military service of the United States or the military service of the state including, but not limited to, the Army National Guard, the Air National Guard, the New York Naval Militia, the New York Guard, and such additional forces as may be created by the federal or state government as authorized by law.[Added 5-23-2016 by L.L. No. 5-2016] SEXUAL ORIENTATION — Heterosexuality, homosexuality, bisexuality, asexuality, whether actual or perceived, as well as a person's gender identity, self-image, appearance or expression.[Amended 5-23-2016 by L.L. No. 5-2016] Downloaded from https://ecode360.com/HA0055 on 2026-07-10 152

Page 153

Town of Hamburg, NY § 109-2 HAMBURG CODE § 109-5 SOURCE OF INCOME — Payments from any lawful occupation or employment, as well as other payments, including, but not limited to, public assistance, public assistance security agreements, supplemental security income, pensions, annuities, unemployment benefits, government subsidies such as Section 8, or other housing subsidies.[Amended 5-23-2016 by L.L. No. 5-2016] § 109-3. Unlawful acts. A. It shall be unlawful: [Amended 5-23-2016 by L.L. No. 5-2016] (1) To refuse to sell or rent or refuse to negotiate for the sale or rental or to deny any dwelling to any person because of race, color, religion, sex, age, marital status, disability, national origin, source of income, sexual orientation, military status or because the person has a child or children. (2) To discriminate against any person in the terms, conditions or provision of services or facilities in connection with the sale or rental of a dwelling because of race, color, religion, sex, age, marital status, disability, national origin, source of income, sexual orientation, military status or because the person has a child or children. (3) To induce or attempt to induce any person to sell or rent any dwelling by representations regarding the entry into the neighborhood of a person or persons of a particular race, color, religion, sex, age, marital status, disability, national origin, source of income, sexual orientation, military status or because the person has a child or children. (4) For a person offering residential property for sale or rent or anyone acting on behalf of such a person to print or circulate or cause to be printed or circulated any statement, advertisement or publication or to use any form of application for the sale or rental of a dwelling or to make any record or inquiry in connection with the sale or rental of a dwelling which expresses, directly or indirectly, any limitation, specification or discrimination as to race, color, religion, sex, age, marital status, disability, national origin, source of income, sexual orientation, military status or because the person has a child or children. B. For purposes of this chapter, discrimination shall include: (1) A refusal to permit, at the expense of a disabled person, reasonable modifications of existing premises occupied or to be occupied by such person if such modifications may be necessary to afford such person full enjoyment of the premises (except that, in the case of rental, the landlord may, where it is reasonable to do so, condition permission for a modification on the renter agreeing to restore the interior of the premises to the condition that existed before the modification, reasonable wear and tear excepted); and (2) A refusal to make reasonable accommodations in the rules, policies, practices or services when such accommodation may be necessary to afford such person equal opportunity to use and enjoy a dwelling. § 109-4. Applicability. This chapter shall apply to all residential structures located within the Town, as well as land zoned for residential uses. § 109-5. Exemptions. Downloaded from https://ecode360.com/HA0055 on 2026-07-10 153

Page 154

Town of Hamburg, NY § 109-5 FAIR HOUSING § 109-6 A. The prohibitions of this chapter shall not apply to a religious institution or organization limiting the sale, rental or occupancy of dwellings which it owns or operates to persons of the same religion or giving preference to such persons, unless membership in such religion is restricted on account of race, color, religion, sex, age, marital status, disability, national origin, source of income, sexual orientation, military status or because the person has a child or children. [Amended 5-23-2016 by L.L. No. 5-2016] B. The prohibitions of this chapter against discrimination because of sex shall not apply to a residential building owned by a public body or by a private institution or organization and maintained, in whole or part, for the exclusive use of one sex. C. The provisions of this chapter shall not apply to: (1) The rental of a housing accommodation in a building which contains housing accommodations for not more than two families living independently of each other, if the owner or members of his family reside in one of such housing accommodations and the rental has occurred without advertising. [Amended 5-23-2016 by L.L. No. 5-2016] (2) The restriction of the rental of all rooms in a housing accommodation to individuals of the same sex. (3) The rental of rooms in a housing accommodation, if such rental is by the occupant of the housing accommodation or by the owner of the housing accommodation and he or members of his family reside in such housing accommodations. (4) Solely with respect to age to the restriction of the sale, rental or lease of housing accommodations exclusively to persons 55 years of age or older. § 109-6. Enforcement. A. Filing of complaints. (1) The Town shall receive and investigate complaints under this chapter. The Supervisor shall designate the Community Development Department Head of the Town or designee to perform the function contained in this section and may also designate a not-for-profit fair housing organization to either assist the Community Development Department Head in conducting investigations or to perform such functions and investigation. (2) Any person or organization, whether or not an aggrieved party, may file with the Supervisor's designee a complaint of a violation of this chapter. (3) The Supervisor's designee may investigate individual instances and patterns of conduct prohibited by this chapter, even without a complaint from another person or organization, and may initiate complaints in connection therewith. B. Investigation. The Supervisor's designee shall notify the accused party, in writing, within 30 days of the filing of any complaint. The designee shall make a prompt investigation in connection with the complaint and, within 100 days after a complaint is filed, determine whether the Town has jurisdiction and, if so, whether there is probable cause to believe that the person named in the complaint (hereinafter referred to as the "respondent"), has engaged or is engaging in an unlawful discriminatory practice. If, during or after the investigation, the designee believes that appropriate action to preserve the status quo or to prevent irreparable harm is advisable, the designee shall advise the Town Attorney, in writing, to bring immediately, in the name of the Town, any action necessary Downloaded from https://ecode360.com/HA0055 on 2026-07-10 154

Page 155

Town of Hamburg, NY § 109-6 HAMBURG CODE § 109-8 to preserve such status quo or to prevent such harm, including the seeking of temporary restraining orders and preliminary injunctions. C. Action. If, at the conclusion of the investigation, the Supervisor's designee determines that there is probable cause to credit the allegation of the complaint, the designee shall certify the matter to the Town Attorney, who shall institute proceedings in the name of the Town. In the event of a conflict of interest between Town personnel and the respondent(s), the Supervisor's designee may refer the matter to outside counsel, providing notice to interested parties within 30 days of the date upon which the conflict was determined. [Amended 5-23-2016 by L.L. No. 5-2016] D. Conciliation. If, in the judgment of the Supervisor's designee, a conciliation agreement would satisfactorily resolve the complaint, he/she shall seek to facilitate such an agreement, which may include provisions requiring the respondent to refrain from unlawful discriminatory practices and pay such compensation and/or perform affirmative relief as is agreed upon by the parties. Conciliation agreements shall not be subject to confidentiality. [Added 5-23-2016 by L.L. No. 5-2016] § 109-7. Penalties for offenses. A. Any person found to have violated any provision of this chapter shall be subject to the following: (1) A fine or penalty as set forth in the Schedule of Fines and Penalties. The Town may choose to designate a portion of any recovery to further the purposes of this chapter. (2) Revocation or suspension of any license or permit necessary for the operation of the dwelling unit in question. (3) Costs, expenses and disbursements incurred by the Town, necessary to obtain complete compliance by the respondent with the chapter; and/or restraining orders and temporary or permanent injunctions necessary to obtain complete compliance with this chapter. B. Each day a violation continues shall constitute a separate violation of this chapter. C. The Town Attorney may institute criminal action to punish a violation of this chapter by imprisonment for a term not exceeding 30 days if the above proceeding does not result in compliance with this chapter. D. The Town may choose to designate a portion of any penalties recovered to further the purposes of this chapter, including further public information; the engagement of a fair housing agency or agencies to further promote fair housing activities within the Town; the participation by the Town in/ with any other organization whose principal goal is to provide fair housing and/or housing counseling activities; the offset of any fees and/or expenses originated with the pursuit of this chapter. § 109-8. Court action. [Amended 5-23-2016 by L.L. No. 5-2016] Any person claiming to be aggrieved by an unlawful discriminatory practice as defined by § 109-3A of this chapter shall have a cause of action in any court of competent jurisdiction within one year from the date of the occurrence for damages and such other remedies as may be appropriate. The court may: A. Award actual damages, including but not limited to mental anguish, embarrassment and humiliation; B. Award punitive damages; Downloaded from https://ecode360.com/HA0055 on 2026-07-10 155

Page 156

C. Award reasonable attorney's fees in the case of a prevailing plaintiff; and/or D. Grant as relief as it deems appropriate, any permanent or temporary injunction, temporary restraining order or other order. No bond shall be required prior to the issuance of injunctive relief. § 109-9. Other remedies. Nothing in this chapter shall be construed to limit the rights of the complainant to pursue, at any time prior to or after the filing of a complaint, any other remedies which the complainant may have under the law of any state, the United States or any jurisdiction. Pursuit of one or more remedies available under this chapter shall not preclude the pursuit of any other remedy available under this chapter. § 109-10. Education and promotion of housing goals. A. Immediately after the enactment of this chapter, the Town shall commence educational activities which will explain the law and help to promote the Town's fair housing goals. Such activities shall continue while this chapter remains in force. B. Housing providers or real estate brokers selling or renting 20 or more dwelling units within a calendar year shall formulate an affirmative fair housing marketing plan, which must be filed with the Community Development Department Head or their designee. At minimum, such affirmative fair housing marketing plans shall include a statement of nondiscrimination and a marketing plan designed to attract a diverse pool of applicants. The Town may require annual reports of housing providers' compliance with their plans. C. Housing providers or real estate brokers selling or renting 20 or more dwelling units within a calendar year shall be required to use the equal opportunity logotype on applications and marketing materials and to display, in rental or real estate offices, a public notice of equal opportunity housing. § 109-11. Affirmatively furthering fair housing. [Added 5-23-2016 by L.L. No. 5-2016]1 A. In order to assure integration within a multifamily development, if affordable units are offered, affordable units shall not be clustered, but mixed with market-rate units. Additionally, the exterior appearance of affordable units shall be made to be the same as market-rate units by the provision of exterior finishes and materials of the same type and quality. 1. Editor’s Note: This local law also renumbered former §§ 109-11 and 109-12 as §§ 109-12 and 109-13, respectively. § 109-12. Expedition of proceedings. Any court in which a proceeding under this chapter is instituted shall assign the case for hearing at the earliest practicable date and cause the case to be expedited in every way. § 109-13. Construal of provisions. Nothing in this chapter shall be construed to invalidate or limit any law of the state, the United States or any other jurisdiction that grants, guarantees or protects the same rights granted, guaranteed or protected by this chapter. Downloaded from https://ecode360.com/HA0055 on 2026-07-10 156

Page 157

Town Board of the Town of Hamburg August 10, 2026 Meeting 4.36. Mt. Vernon Manhole Repair and Joint Lining Project SEQR Resolution WHEREAS, the Town of Hamburg has identified the need for manhole repairs and joint lining for the Mount Vernon Sewer District, which consists of a sanitary sewer system that is currently owned, operated, and maintained by the Town of Hamburg, but discharging to the Erie County Sewer District No. 1; and WHEREAS, this infrastructure work constitutes an eligible project pursuant to the Water Infrastructure Improvement (WIIA) program and is therefore eligible for loan and grant assistance to help finance the total project cost; and WHEREAS, the Town of Hamburg intends to pursue grant assistance through the Environmental Facilities Corporation (EFC) to undertake these improvements; and WHEREAS, the application to EFC for grant assistance requires that the Town comply with the State Environmental Quality Review Act (SEQRA) if applicable; and WHEREAS, the project is considered to be “replacement, rehabilitation or reconstruction of a structure or facility, in kind, on the same site” and is therefore a Type II action under Section 617.5c (2) of the SEQR regulations; and WHEREAS, the Town Board has reviewed the Project in accordance with the Town’s Local Waterfront Revitalization Program and has completed a Waterfront Assessment Form (WAF) for a Coastal Consistency determination and referred the Project to the LWRP committee, who recommended consistency. NOW, THEREFORE BE IT RESOLVED, the Hamburg Town Board has determined that funding and implementing the project at the proposed location in the Mt. Vernon Sewer District is consistent with the Town’s Local Waterfront Revitalization Program (“LWRP”), and will not result in any significant adverse impacts on the environment. BE IT FINALLY RESOLVED, the Hamburg Town Board herby determines that the manhole repairs and joint lining improvements project is a Type II action under SEQR, and therefore the project is not an action subject to further review under 6 NYCRR Part 617 of the SEQR regulations. 157

Page 158

ATTACHMENTS: LWRP Recommendation 7-21-26.pdf Mt Vernon Manhole Repair SEAF Part 1 Signed.pdf Mt Vernon Manhole Repair SEAF Part 2 and 3.pdf 158

Page 159

Outlook Re: LWRP Coastal Consistency Review From Henry Kleinfelder <[email protected]> Date Tue 7/21/2026 8:42 AM To Mark Melewski <[email protected]>; Joshua Rogers <[email protected]> Cc Elizabeth Farrell <[email protected]>; Sherri Best <[email protected]>; Carrie Meyer <[email protected]>; Kim Finley <[email protected]>; Laura Hahn <[email protected]>; Lynn Rudnicki <[email protected]>; David Woelfling <[email protected]>; William Clark <[email protected]>; [email protected] <[email protected]>; Donna M. Gonser <[email protected]> Town of Hamburg Warning: Exercise caution with email messages from external sources such as this message. Always verify the sender and avoid clicking on links, attachments or QR codes unless certain of their authenticity. Mark & Joshua The LWRP committee has reached a majority that approves the Mt Vernon project application. Respectfully, Hank Kleinfelder Chair On Jul 21, 2026, at 8:25 AM, [email protected] wrote: I approve. From: Henry Kleinfelder <[email protected]> Sent: Monday, July 20, 2026 10:00 AM To: Elizabeth Farrell <[email protected]>; Sherri Best <[email protected]>; Carrie Meyer <[email protected]>; Donna M. Gonser <[email protected]>; Kim Finley <[email protected]>; Laura Hahn <[email protected]>; Lynn Rudnicki <[email protected]>; David Woelfling <[email protected]>; William Clark <[email protected]>; [email protected] Cc: Mark Melewski <[email protected]>; Joshua Rogers <[email protected]> Subject: LWRP Coastal Consistency Review 159

Page 160

Short Environmental Assessment Form Part 1 - Project Information Instructions for Completing Part 1 – Project Information. The applicant or project sponsor is responsible for the completion of Part 1. Responses become part of the application for approval or funding, are subject to public review, and may be subject to further verification. Complete Part 1 based on information currently available. If additional research or investigation would be needed to fully respond to any item, please answer as thoroughly as possible based on current information. Complete all items in Part 1. You may also provide any additional information you believe will be needed by or useful to the lead agency; attach additional pages as necessary to supplement any item. Part 1 – Project and Sponsor Information Name of Action or Project: Mt. Vernon Manhole Repair and Joint Lining Project Project Location (describe, and attach a location map): Mt. Vernon Sewer District Hamburg, NY 14075 Brief Description of Proposed Action: The proposed project involves manhole repairs and joint lining for the Mount Vernon Sewer District, which consists of a sanitary sewer system that is currently owned, operated, and maintained by the Town of Hamburg, but discharging to the Erie County Sewer District No. 1. Manhole rehabilitation and joint lining will involve trench-less rehabilitation, including lining the inside of the manhole, patching leaks, and installation of water barriers and/or chimney seals. Name of Applicant or Sponsor: Telephone: Town of Hamburg E-Mail: Address: 6100 South Park Avenue City/PO: State: Zip Code: Hamburg NY 14075 1. Does the proposed action only involve the legislative adoption of a plan, local law, ordinance, NO YES administrative rule, or regulation? If Yes, attach a narrative description of the intent of the proposed action and the environmental resources that may be affected in the municipality and proceed to Part 2. If No, continue to question 2. ✔ 2. Does the proposed action require a permit, approval or funding from any other government Agency? NO YES If Yes, list agency(s) name and permit or approval: Environmental Facilities Corporation (EFC) funding ✔ 3. a. Total acreage of the site of the proposed action? N/A acres b. Total acreage to be physically disturbed? N/A acres c. Total acreage (project site and any contiguous properties) owned or controlled by the applicant or project sponsor? acres 4. Check all land uses that occur on, are adjoining or near the proposed action: □ Urban Rural (non-agriculture) Industrial Commercial ■ Residential (suburban) □ Forest Agriculture ■ Aquatic Other(Specify): Parkland Page 1 of 3 SEAF 2026 160

Page 161

5. Is the proposed action, NO YES N/A a. A permitted use under the zoning regulations? ✔ b. Consistent with the adopted comprehensive plan? ✔ NO YES 6. Is the proposed action consistent with the predominant character of the existing built or natural landscape? ✔ 7. Is the site of the proposed action located in, or does it adjoin, a state listed Critical Environmental Area? NO YES If Yes, identify: ✔ NO YES 8. a. Will the proposed action result in a substantial increase in traffic above present levels? ✔ b. Are public transportation services available at or near the site of the proposed action? ✔ c. Are any pedestrian accommodations or bicycle routes available on or near the site of the proposed action? ✔ 9. Does the proposed action meet or exceed the state energy code requirements? NO YES If the proposed action will exceed requirements, describe design features and technologies: ✔ 10. Will the proposed action connect to an existing public/private water supply? NO YES If No, describe method for providing potable water: ✔ 11. Will the proposed action connect to existing wastewater utilities? NO YES If No, describe method for providing wastewater treatment: ✔ 12. a. Does the project site contain, or is it substantially contiguous to, a building, archaeological site, or district NO YES which is listed on the National or State Register of Historic Places, or that has been determined by the Commissioner of the NYS Office of Parks, Recreation and Historic Preservation to be eligible for listing on the ✔ State Register of Historic Places? b. Is the project site, or any portion of it, located in or adjacent to an area designated as sensitive for ✔ archaeological sites on the NY State Historic Preservation Office (SHPO) archaeological site inventory? 13. a. Does any portion of the site of the proposed action, or lands adjoining the proposed action, contain NO YES wetlands or other waterbodies regulated by a federal, state or local agency? ✔ b. Would the proposed action physically alter, or encroach into, any existing wetland or waterbody? ✔ If Yes, identify the wetland or waterbody and extent of alterations in square feet or acres: Page 2 of 3 SEAF 2026 161

Page 162

14. Identify the typical habitat types that occur on, or are likely to be found on the project site. Check all that apply: □ ■ Shoreline □ Forest Agricultural/grasslands Early mid-successional Wetland □ Urban ■ Suburban 15. Does the site of the proposed action contain any species of animal, or associated habitats, listed by the State or NO YES Federal government as threatened or endangered? ✔ 16. Is the project site located in the 100-year or 500-year flood plain? NO YES ✔ NO YES 17. Will the proposed action create storm water discharge, either from point or non-point sources?If Yes, ✔ a. Will storm water discharges flow to adjacent properties? b. Will storm water discharges be directed to established conveyance systems (runoff and storm drains)? If Yes, briefly describe: 18. Does the proposed action include construction or other activities that would result in the impoundment of water NO YES or other liquids (e.g., retention pond, waste lagoon, dam)? If Yes, explain the purpose and size of the impoundment: ✔ 19. Has the site of the proposed action or an adjoining property been the location of an active or closed solid waste NO YES management facility? If Yes, describe: ✔ 20.Has the site of the proposed action or an adjoining property been the subject of remediation (ongoing or NO YES completed) for hazardous waste? If Yes, describe: ✔ NO YES 21. Is the project located within, or within ½ mile of, a disadvantaged community? ✔ If No, could impacts from the project affect a disadvantaged community? If Yes to either question in 21, answer the following question. a. Identify the potential pollution impacts of the project, either direct or indirect, that may occur within the disadvantaged community (e.g., wastewater discharges, air emissions, noise, odors, solid or hazardous waste generation or management): I CERTIFY THAT THE INFORMATION PROVIDED ABOVE IS TRUE AND ACCURATE TO THE BEST OF MY KNOWLEDGE Applicant/sponsor/name: Joshua Rogers Date: 7/15/26 Signature: Title: Town Planner Page 3 of 3 SEAF 2026 162

Page 163

EAF Mapper Summary Report Thursday, July 16, 2026 11:28 AM Disclaimer: The EAF Mapper is a screening tool intended to assist project sponsors and reviewing agencies in preparing an environmental assessment form (EAF). Not all questions asked in the EAF are answered by the EAF Mapper. Additional information on any EAF question can be obtained by consulting the EAF Workbooks. Although the EAF Mapper provides the most up-to-date digital data available to DEC, you may also need to contact local or other data sources to confirm data provided by the Mapper or to obtain data not provided by the Mapper. Part 1 / Question 7 [Critical Environmental No Area] Part 1 / Question 12a [National or State Yes Register of Historic Places or State Eligible Sites] Part 1 / Question 12b [Archeological Sites] Yes Part 1 / Question 13a [Wetlands or Other Yes - Digital mapping information on local, New York State, and federal Regulated Waterbodies] wetlands and waterbodies is known to be incomplete. Refer to the EAF Workbook. Part 1 / Question 15 [Threatened or No Endangered Animal] Part 1 / Question 16 [100 or 500 Year Yes Floodplain] Part 1 / Question 20 [Remediation Site] No Part 1 / Question 21 [Disadvantaged No Community] Short Environmental Assessment Form - EAF Mapper Summary Report 163 1

Page 164

Agency Use Only [If applicable] Project: Mt. Vernon Manhole Repair Project Date: 7/16/26 Short Environmental Assessment Form Part 2 - Impact Assessment Part 2 is to be completed by the Lead Agency. Answer all of the following questions in Part 2 using the information contained in Part 1 and other materials submitted by the project sponsor or otherwise available to the reviewer. When answering the questions the reviewer should be guided by the concept “Have my responses been reasonable considering the scale and context of the proposed action?” No, or Moderate small to large impact impact may may occur occur 1. Will the proposed action create a material conflict with an adopted land use plan or zoning regulations? ✔ 2. Will the proposed action result in a change in the use or intensity of use of land? ✔ 3. Will the proposed action impair the character or quality of the existing community? ✔ 4. Will the proposed action have an impact on the environmental characteristics that caused the establishment of a Critical Environmental Area (CEA)? ✔ 5. Will the proposed action result in an adverse change in the existing level of traffic or affect existing infrastructure for mass transit, biking or walkway? ✔ 6. Will the proposed action cause an increase in the use of energy and it fails to incorporate reasonably available energy conservation or renewable energy opportunities? ✔ 7. Will the proposed action impact existing: a. public / private water supplies? ✔ b. public / private wastewater treatment utilities? ✔ 8. Will the proposed action impair the character or quality of important historic, archaeological, architectural or aesthetic resources? ✔ 9. Will the proposed action result in an adverse change to natural resources (e.g., wetlands, waterbodies, groundwater, air quality, flora and fauna)? ✔ 10. Will the proposed action result in an increase in the potential for erosion, flooding or drainage problems? ✔ 11. Will the proposed action create a hazard to environmental resources or human health? ✔ 12. Is the potentially affected disadvantaged community identified as having comparatively higher burdens or vulnerabilities by the Disadvantaged Community Assessment Tool? ✔ 13. Will the proposed action cause or increase a pollution burden within a disadvantaged community? ✔ Page 1 of 2 SEAF 2026 164

Page 165

Agency Use Only [If applicable] Project: Mt. Vernon Manhole Repair Project Date: 7/16/26 Short Environmental Assessment FormPart 3 Determination of Significance For every question in Part 2 that was answered “moderate to large impact may occur,” or if there is a need to explain why a particular element of the proposed action may or will not result in a significant adverse environmental impact, please complete Part 3. Part 3 should, in sufficient detail, identify the impact, including any measures or design elements that have been included by the project sponsor to avoid or reduce impacts. Part 3 should also explain how the lead agency determined that the impact may or will not be significant. Each potential impact should be assessed considering its setting, probability of occurring, duration, irreversibility, geographic scope and magnitude. Also consider the potential for short- term, long-term and cumulative impacts. The proposed project involves manhole repairs and joint lining for the Mount Vernon Sewer District, which consists of a sanitary sewer system that is currently owned, operated, and maintained by the Town of Hamburg, but discharging to the Erie County Sewer District No. 1. The manhole rehabilitation and joint lining will involve trench-less rehabilitation, including lining the inside of the manhole, patching leaks, and installation of water barriers and/or chimney seals. All appropriate permitting and approvals will be received prior to construction. The proposed project is located in the Local Waterfront Revitalization Area of the Town's LWRP and has been shown to be consistent with this plan. The project has received a Letter of No Effect from the State Historic Preservation Office (SHPO), signifying no significant environmental impacts to historic, cultural, or archaeological resources are expected. Check this box if you have determined, based on the information and analysis above, and any supporting documentation,that the proposed action may result in one or more potentially large or significant adverse impacts and an environmental impact statement is required. Check this box if you have determined, based on the information and analysis above, and any supporting ✔ documentation,that the proposed action will not result in any significant adverse environmental impacts. Town of Hamburg 7/16/26 Name of Lead Agency Date Elizabeth Farrell-Lorentz Supervisor Print or Type Name of Responsible Officer in Lead Agency Title of Responsible Officer in Lead Agency Signature of Responsible Officer in Lead Agency Signature of Preparer (if different from Responsible Officer) Page 2 of 2 SEAF 2026 165

Page 166

Town Board of the Town of Hamburg August 10, 2026 Meeting 4.37. Alumni Park SEQR Lead Agency Resolution WHEREAS, the Town of Hamburg has long been recognized as a community dedicated to parks, recreation, families, and civic pride; and WHEREAS, the opening of the new National Football League stadium at the border of the Town of Hamburg presents a unique opportunity to celebrate the Town’s special connection to sports while creating lasting opportunities and amenities for Hamburg residents; and WHEREAS, over the past two years, the Town Board, Town staff, and community partners have worked to identify ways in which the residents of Hamburg can highlight and benefit from this opportunity, and WHEREAS, the Town of Hamburg Town Board proposes various upgrades and improvements to the Town-owned property at Parker Road and Big Tree Rd/Route 20-A, now known as Alumni Park (SBL #: 160.20-2-3.12); and WHEREAS, the Project is exempt from regulations of the Town Zoning Code as prescribed in §280-11, does not require Site Plan approval from the Planning Board, and is not subject to the 239-m referral to Erie County; and WHEREAS, pursuant to the State Environmental Quality Review Act (SEQRA) a Full Environmental Assessment Form (FEAF) has been prepared for the Project dated August 6, 2026, which describes the Project in considerable detail; and WHEREAS, the FEAF, having been reviewed by the Hamburg Town Board, was deemed complete and accurate relative to the Project; and WHEREAS, the Hamburg Town Board has determined that the Project constitutes an Unlisted Action as defined by the SEQR regulations §617.2 (al) and thereafter chose uncoordinated SEQR review pursuant to 6 NYCRR §617.6(b)(4). NOW THEREFORE BE IT RESOLVED, the Hamburg Town Board now desires to establish itself as 166

Page 167

Lead Agency with respect to the Project in accordance with the SEQR regulations of 6 NYCRR 617.6 and authorizes the Planning Department to conduct the proper notices and filing requirements as necessary. ATTACHMENTS: FEAF Part 1.pdf Updated Site Map.pdf 167

Page 168

Full Environmental Assessment Form Part 1 - Project and Setting Instructions for Completing Part 1 Part 1 is to be completed by the applicant or project sponsor. Responses become part of the application for approval or funding, are subject to public review, and may be subject to further verification. Complete Part 1 based on information currently available. If additional research or investigation would be needed to fully respond to any item, please answer as thoroughly as possible based on current information; indicate whether missing information does not exist, or is not reasonably available to the sponsor; and, when possible, generally describe work or studies that would be necessary to update or fully develop that information. Applicants/sponsors must complete all items in Sections A & B. In Sections C, D & E, most items contain an initial question that must be answered either “Yes” or “No.” If the answer to the initial question is “Yes,” complete the following sub-questions. If the answer to the initial question is “No,” proceed to the next question. Section F allows the project sponsor to identify and attach additional information. Section G requires the name and signature of the applicant or project sponsor to verify the information in Part 1 is accurate and complete. A. Project and Applicant/Sponsor Information. Name of Action or Project: Alumni Park Improvements Project Location (describe and attach a general location map): 4899 Big Tree Road, Hamburg, NY 14075 Brief Description of Proposed Action (include purpose or need): The proposed action involves the installation of a 4-foot split rail fence that will be placed along 20A, as well as an 8-foot fence, ten feet away from Rush Creek. There will also be a 5-foot-wide brick walkway called Legacy Trail, video boards, new picnic tables, camera installation, artwork along with an observation point/statue, improved playground equipment, the re-purposing of the permanent existing shelter and other associated temporary structures, a 70 ' x 210' turf flag football field and associated temporary seating and lighting. Name of Applicant/Sponsor: Telephone: 716-649-6111 ext. 2380 Town of Hamburg E-Mail: Address: 6100 South Park Ave City/PO: State: Zip Code: Hamburg NY 14075 Project Contact (if not same as sponsor; give name and title/role): Telephone: E-Mail: Address: City/PO: State: Zip Code: Property Owner (if not same as sponsor): Telephone: E-Mail: Address: City/PO: State: Zip Code: Page 1 of 15 FEAF 2026 168

Page 169

B. Government Approvals B. Government Approvals, Funding, or Sponsorship. (“Funding” includes grants, loans, tax relief, and any other forms of financial assistance.) Government Entity If Yes: Identify Agency and Approval(s) Application Date Required (Actual or projected) a. City Council, Town Board, 9 Yes 9 No or Village Board of Trustees b. City, Town or Village 9 Yes 9 No Planning Board or Commission c. City, Town or 9 Yes 9 No Village Zoning Board of Appeals d. Other local agencies 9 Yes 9 No e. County agencies 9 Yes 9 No f. Regional agencies 9 Yes 9 No g. State agencies 9 Yes 9 No h. Federal agencies 9 Yes 9 No i. Coastal Resources. i. Is the project site within a Coastal Area or the waterfront area of a Designated Inland Waterway? 9 Yes 9✔ No ii. Is the project site located in a community with an approved Local Waterfront Revitalization Program? 9 Yes No ✔ iii. Is the project site within a Coastal Erosion Hazard Area? 9 Yes 9✔ No C. Planning and Zoning C.1. Planning and zoning actions. Will administrative or legislative adoption, or amendment of a plan, local law, ordinance, rule, or regulation be the 9 Yes 9✔ No only approval(s) that must be granted to enable the proposed action to proceed?  If Yes, complete sections C, F and G.  If No, proceed to question C.2 and complete all remaining sections and questions in Part 1 C.2. Adopted land use plans. a. Do any municipally adopted (city, town, village, or county) comprehensive land use plan(s) include the site 9 ✔ Yes 9 No where the proposed action would be located? If Yes, does the comprehensive plan include specific recommendations for the site where the proposed action Yes No would be located? 9 b. Is the site of the proposed action within any local or regional special planning district (for example: Greenway; ✔ Yes No Brownfield Opportunity Area (BOA); designated State or Federal heritage area; watershed management plan; 9 9 or other)? If Yes, identify the plan(s): NYS Heritage Areas:West Erie Canal Corridor c. Is the proposed action located wholly or partially within an area listed in an adopted municipal open space plan Yes ✔ No or an adopted municipal farmland protection plan? 9 9 If Yes, identify the plan(s): Open Space Plan Page 2 of 15 FEAF 2026 169

Page 170

d. Is the proposed action in a municipality with an adopted comprehensive or individual plan that addresses climate Yes ✔ No change? 9 9 If Yes , identify the elements of the plan that are relevant to the action: 9 9 C.3. Zoning 9 9 a. Is the site of the proposed action located in a municipality with an adopted zoning law or ordinance? ✔ Yes No If Yes, what is the zoning classification(s) including any applicable overlay district? R-2 (Town projects are exempt from Zoning Code according to 280-11) b. Is the use permitted or allowed by a special or conditional use permit? Yes ✔ No c. Is a zoning change requested as part of the proposed action? Yes ✔ No If Yes, what is the proposed new zoning for the site? C.4. Existing community services. a. In what school district is the project site located? Frontier Central b. What police or other public protection forces serve the project site? Town of Hamburg Police Department c. Which fire protection and emergency medical services serve the project site? Armor Fire District d. What parks serve the project site? Alumni Park, Park at Parker Road D. Project Details D.1. Proposed and Potential Development a. What is the general nature of the proposed action (e.g., residential, industrial, commercial, recreational; if mixed, include all components)? 9 9 Recreational b. a. Total acreage of the site of the proposed action? 3.2 acres b. Total acreage to be physically disturbed? <2 acres 9 9 c. Total acreage (project site and any contiguous properties) owned or controlled by the applicant or project sponsor? 3.2 acres c. Is the proposed action an expansion of an existing project or use? 9 Yes9✔ No If Yes, what is the approximate percentage of the proposed expansion and identify the units (e.g., acres, miles, housing units, square feet)? % Units: d. Is the proposed action a subdivision, or does it include a subdivision? 9 Yes9✔ No If Yes, i. Purpose or type of subdivision? (e.g., residential, industrial, commercial; if mixed, specify types) ii. Is a cluster/conservation layout proposed? Yes No iii. Number of lots proposed? iv. Minimum and maximum proposed lot sizes? Minimum Maximum Page 3 of 15 FEAF 2026 170

Page 171

e. Will the proposed action be constructed in multiple phases? 9✔ Yes 9 No i. If No, anticipated period of construction: months ii. If Yes:  Total number of phases anticipated 2  Anticipated commencement date of phase 1 (including demolition) Aug month 2026 year  Anticipated completion date of final phase Sep month 2026 year  Generally describe connections or relationships among phases, including any contingencies where progress of one phase may determine timing or duration of future phases: 9 9 Phase 1 includes placing of the turf football field, lighting, and the fence, and some of the temporary structures. Phase 2 will consist of completion of all other elements. f. Does the project include new residential uses? Yes ✔ No If Yes, show numbers of units proposed. One Family Two Family Three Family Multiple Family (four or more) 9 9 Initial Phase At completion of all phases 9 9 9 g. Does the proposed action include new non-residential construction (including expansions)? Yes ✔ No If Yes, i. Total number of structures ii. Dimensions (in feet) of largest proposed structure: height; width; and length iii. Approximate extent of building space to be heated or cooled: square feet h. Does the proposed action include construction or other activities that will result in the impoundment of any Yes ✔ No liquids, such as creation of a water supply, reservoir, pond, lake, waste lagoon or other storage? If Yes, i. Purpose of the impoundment: ii. If a water impoundment, the principal source of the water: Ground water Surface water streams 9 Other 9 specify: iii. If other than water, identify the type of impounded/contained liquids and their source. iv. Approximate size of the proposed impoundment. Volume: million gallons; surface area: acres v. Dimensions of the proposed dam or impounding structure: height; length vi. Construction method/materials for the proposed dam or impounding structure (e.g., earth fill, rock, wood, concrete): D.2. Project Operations a. Does the proposed action include any excavation, mining, or dredging, during construction, operations, or both? Yes ✔ No (Not including general site preparation, grading or installation of utilities or foundations where all excavated materials will remain onsite) If Yes: i .What is the purpose of the excavation or dredging? ii. How much material (including rock, earth, sediments, etc.) is proposed to be removed from the site?  Volume (specify tons or cubic yards): 9 9  Over what duration of time? iii. Describe nature and characteristics of materials to be excavated or dredged, and plans to use, manage or dispose of them. iv. Will there be onsite dewatering or processing of excavated materials? Yes No If yes, describe. 9 9 v. What is the total area to be dredged or excavated? acres vi. What is the maximum area to be worked at any one time? acres vii. What would be the maximum depth of excavation or dredging? feet viii. Will the excavation require blasting? Yes No ix. Summarize site reclamation goals and plan: Page 4 of 15 FEAF 2026 171

Page 172

b. Would the proposed action cause or result in alteration of, increase or decrease in size of, or encroachment Yes ✔ No into any existing wetland, waterbody, shoreline, beach or adjacent area? If Yes: i. Identify the wetland or waterbody which would be affected (by name, water index number, wetland map number or geographic description): ii. Describe how the proposed action would affect that waterbody or wetland, e.g., excavation, fill, placement of structures, or alteration of channels, banks, and shorelines. Indicate extent of activities, alterations and additions in square feet or acres: iii. Will the proposed action cause or result in disturbance to bottom sediments? Yes No If Yes, describe: iv. Will the proposed action cause or result in the destruction or removal of aquatic vegetation? Yes No If Yes:  acres of aquatic vegetation proposed to be removed:___________________________  expected acreage of aquatic vegetation remaining after project completion:  purpose of proposed removal (e.g. beach clearing, invasive species control, boat access):  proposed method of plant removal:  if chemical/herbicide treatment will be used, specify product(s): v. Describe any proposed reclamation/mitigation following disturbance: c. Will the proposed action use, or create a new demand for water? Yes ✔ No If Yes: i. Total anticipated water usage/demand per day: gallons/day ii. Will the proposed action obtain water from an existing public water supply? Yes No If Yes:  Name of district or service area:  Does the existing public water supply have capacity to serve the proposal? Yes No  Is the project site in the existing district? Yes No  Is expansion of the district needed? Yes No  Do existing lines serve the project site? Yes No iii. Will line extension within an existing district be necessary to supply the project? Yes No If Yes:  Describe extensions or capacity expansions proposed to serve this project:  Source(s) of supply for the district: iv. Is a new water supply district or service area proposed to be formed to serve the project site? Yes No If, Yes:  Applicant/sponsor for new district:  Date application submitted or anticipated:  Proposed source(s) of supply for new district: v. If a public water supply will not be used, describe plans to provide water supply for the project: vi. If water supply will be from wells (public or private), what is the maximum pumping capacity: gallons/minute. Page 5 of 15 FEAF 2026 172

Page 173

d. Will the proposed action generate liquid wastes? Yes ✔ No If Yes: i. Total anticipated liquid waste generation per day: gallons/day ii. Nature of liquid wastes to be generated (e.g., sanitary wastewater, industrial; if combination, describe all components and approximate volumes or proportions of each): iii. Will the proposed action use any existing public wastewater treatment facilities? Yes No If Yes:  Name of wastewater treatment plant to be used:  Name of district: 9 9  Does the existing wastewater treatment plant have capacity to serve the project? Yes No  Is the project site in the existing district? Yes No  Is expansion of the district needed? Yes No  Do existing sewer lines serve the project site? Yes No  Will a line extension within an existing district be necessary to serve the project? Yes No If Yes:  Describe extensions or capacity expansions proposed to serve this project: 9 9 iv. Will a new wastewater (sewage) treatment district be formed to serve the project site? Yes No If Yes:  Applicant/sponsor for new district: 9 9  Date application submitted or anticipated:  What is the receiving water for the wastewater discharge? v. If public facilities will not be used, describe plans to provide wastewater treatment for the project, including specifying proposed receiving water (name and classification if surface discharge or describe subsurface disposal plans): vi. Describe any plans or designs to capture, recycle or reuse liquid waste: 9 9 e. Will the proposed action disturb more than one acre and create stormwater runoff, either from new point Yes ✔ No sources (i.e. ditches, pipes, swales, curbs, gutters or other concentrated flows of stormwater) or non-point source (i.e., sheet flow) during construction or post construction? If Yes: 9 i. How much impervious surface will the project create in relation to total size of project parcel? Square feet or acres (impervious surface) Square feet or acres (parcel size) ii. Describe types of new point sources. iii. Where will the stormwater runoff be directed (i.e. on-site stormwater management facility/structures, adjacent properties, groundwater, on-site surface water, or off-site surface waters)? 9 9  If to surface waters, identify receiving water bodies or wetlands:  Will stormwater runoff flow to adjacent properties? Yes No iv. Does the proposed plan minimize impervious surfaces, use pervious materials or collect and re-use stormwater? Yes No 9 9 9 9 9 9 Page 6 of 15 FEAF 2026 173

Page 174

f. Does the proposed action include, or will it use on-site, one or more sources of air emissions, including fuel Yes ✔ No combustion, waste incineration, or other processes or operations? If Yes, identify: i. Mobile sources during project operations (e.g., heavy equipment, fleet or delivery vehicles) ______________________________________________________________________________________________________ ii. Stationary sources during construction (e.g., power generation, structural heating, batch plant, crushers) ______________________________________________________________________________________________________ iii. Stationary sources during operations (e.g., process emissions, boilers, electric generation, surface coating) ______________________________________________________________________________________________________ g. Will any air emission sources named in D.2.f (above), require an Air Facility Registration, Air State Facility Yes ✔ No Permit, Title IV Permit or Title V Permit? If Yes: i. Is the proposed action subject to the Nonattainment New Source Review or Prevention of Significant Deterioration Yes No requirements discussed in 6 NYCRR Part 231? ii. As calculated in the air permit application, the proposed action has the potential to emit:  Tons/year (short tons) of carbon monoxide (CO)  Tons/year (short tons) of oxides of nitrogen (NOx)  Tons/year (short tons) of particulate matter (PM-10, PM-2.5)  Tons/year (short tons) of volatile organic compounds (VOC)  Tons/year (short tons) of sulfur dioxide (SO2) iii. Will emissions of air contaminants from the proposed action described above exceed the corresponding major Yes No source thresholds? iv.Does the proposed action have the potential to emit 10 tons/year or more of any one designated hazardous air Yes No pollutant or 25 tons/year or more of any combination of such hazardous air pollutants (6NYCRR 200.1(ag))? If Yes, provide the total potential to emit hazardous air pollutants in short tons/year: _____________________________ h. Will the proposed action generate or emit annual direct and indirect greenhouse gas emissions, such as carbon dioxide, methane, nitrous oxide, sulfur hexafluoride, hydrofluorocarbons, or perfluorocarbons in excess of 10,000 metric tons of total carbon dioxide equivalents per year at any point in the lifetime of the proposed action (estimated using the carbon dioxide equivalent definition and global warming potentials provided in 6 NYCRR Part 496)? Yes ✔ No If Yes: i. Estimate the proposed action’s metric tons of carbon dioxide equivalents in tons/year (metric): ii. Describe any greenhouse gas capture, control, or elimination measures included in project design: i. Will the proposed action result in the release of air pollutants from open-air operations or processes, such as Yes ✔ No quarry or landfill operations? If Yes: Describe operations and nature of emissions (e.g., diesel exhaust, rock particulates/dust): j. Will the proposed action result in a substantial increase in traffic above present levels or generate substantial ✔ Yes No new demand for transportation facilities or services? If Yes: i. When is the peak traffic expected (Check all that apply): Morning ✔ Evening ✔ Weekend Randomly between hours of to . ii. For commercial activities only, projected number of truck trips/day and type (e.g., semi trailers and dump trucks): iii. Parking spaces: Existing Proposed Net increase/decrease iv. Does the proposed action include any shared use parking? ✔ Yes No v. If the proposed action includes any modification of existing roads, creation of new roads or change in existing access, describe: ______________________________________________________________________________________________________________ vi. Are public/private transportation service(s) or facilities available within ½ mile of the proposed site? ✔ Yes No vii Will the proposed action include access to public transportation or accommodations for use of hybrid, electric ✔ Yes No or other alternative fueled vehicles? viii. Will the proposed action include plans for pedestrian or bicycle accommodations for connections to existing Yes ✔ No pedestrian or bicycle routes? Page 7 of 15 FEAF 2026 174

Page 175

k. Will the proposed action (for commercial or industrial projects only) generate new or additional energy demand? ✔ Yes No If Yes: i. Estimate annual electricity demand during operation of the proposed action: ii. Anticipated sources/suppliers of electricity for the project (e.g., on-site combustion, on-site renewable, via grid/local utility, or other):________________________________________________________________________________________________ National Grid connection for lighting/power iii. Will the proposed action require a new, or an upgrade, to an existing substation? Yes ✔ No l. Hours of operation. Answer all items which apply. i. During Construction: ii. During Operations:  Monday - Friday: 7 am to 7 pm  Monday - Friday: Dawn to Dusk  Saturday: 7 am to 7 pm  Saturday: Dawn to Dusk  Sunday:  Sunday: Dawn to Dusk  Holidays:  Holidays: Dawn to Dusk m. Will the proposed action produce noise that will exceed existing ambient noise levels during construction, ✔ Yes No operation, or both? If yes: i. Provide details including sources, time of day and duration: Temporary noise from construction, associated event noise during event days and weekends ii. Will the proposed action remove existing natural barriers that could act as a noise barrier or screen? Yes ✔ No Describe: n. Will the proposed action have outdoor lighting? ✔ Yes No If yes: i. Describe source(s), location(s), height of fixture(s), direction/aim, and proximity to nearest occupied structures: 8 foot dark sky compliant lamps sprawled around the Park ii. Will proposed action remove existing natural barriers that could act as a light barrier or screen? Yes ✔ No Describe: o. Does the proposed action have the potential to produce odors for more than one hour per day? Yes ✔ No If Yes, describe possible sources, potential frequency and duration of odor emissions, and proximity to nearest occupied structures: p. Will the proposed action include any bulk storage of petroleum (combined capacity of over 1,100 gallons) Yes ✔ No or chemical products 185 gallons in above ground storage or any amount in underground storage? If Yes: i. Product(s) to be stored ii. Volume(s) per unit time (e.g., month, year) iii. Generally, describe the proposed storage facilities: q. Will the proposed action (commercial, industrial and recreational projects only) use pesticides Yes ✔ No (i.e., herbicides, insecticide) during construction or operation? If Yes: i. Describe proposed treatment(s): ii. Will the proposed action use Integrated Pest Management Practices? Yes No Page 8 of 15 FEAF 2026 175

Page 176

r. Will the proposed action (commercial or industrial projects only) involve or require the management or disposal Yes ✔ No of solid waste (excluding hazardous materials)? If Yes: i. Describe any solid waste(s) to be generated during construction or operation of the facility:  Construction: tons per (unit of time)  Operation : tons per (unit of time) ii. Describe any proposals for on-site minimization, recycling or reuse of materials to avoid disposal as solid waste:  Construction:  Operation: iii. Proposed disposal methods/facilities for solid waste generated on-site:  Construction:  Operation: s. Does the proposed action include construction or modification of a solid waste management facility? Yes ✔ No If Yes: i. Type of management or handling of waste proposed for the site (e.g., recycling or transfer station, composting, landfill, or9 9 other disposal activities): ii. Anticipated rate of disposal/processing:  Tons/month, if transfer or other non-combustion/thermal treatment, or  Tons/hour, if combustion or thermal treatment iii. If landfill, anticipated site life: years t. Will the proposed action at the site involve the commercial generation, treatment, storage, or disposal of hazardous Yes ✔ No waste? If Yes: 9 9 i. Name(s) of all hazardous wastes or constituents to be generated, handled, or managed at facility: ii. Generally describe processes or activities involving hazardous wastes or constituents: iii. Specify amount to be handled or generated tons/month iv. Describe any proposals for on-site minimization, recycling, or reuse of hazardous constituents: 9 v. Will any hazardous wastes be disposed at an existing offsite hazardous waste facility? Yes No If Yes: provide name and location of facility:________________________________________________________________________ If No: describe proposed management of any hazardous wastes which will not be sent to a hazardous waste facility: 9 9 9 Page 9 of 15 FEAF 2026 176

Page 177

9 99 E. Site and Setting of Proposed Action E.1. Land uses on and surrounding the project site a. Existing land uses. i. Check all uses that occur on, adjoining and near the project site. 9Urban 9Industrial 9Commercial ■9Residential (suburban) 9Rural (non-farm) ■ 9Forest 9Agriculture 9Aquatic ■9Other (specify): Parkland 9 9 ii. If mix of uses, generally describe: 9 b. Land uses and cover types on the project site. Land use or Current Acreage After 9 Change 9 Cover type Acreage Project Completion (Acres +/-)  Roads, buildings, and other paved or impervious surfaces (total)  • Industrial or manufacturing • Commercial • Residential  Forested  Meadows, grasslands or brushlands (non- agricultural, including abandoned agricultural)  Agricultural (includes active orchards, field, greenhouse, etc.)  Surface water features (lakes, ponds, streams, rivers, etc.) 9 9  Wetlands (freshwater or tidal)  Non-vegetated (bare rock, earth, or fill)  Other, Describe: Parkland 3.2 3.2 0 9 9 Page 10 of 15 FEAF 2026 177

Page 178

c. Is the project site presently used by members of the community for public recreation? 9 ■ Yes 9 No i. If Yes: explain: The park is currently used by Town residents, and will continue to be a recreational resource that is open to the public. d. Are there any facilities serving children, the elderly, people with disabilities (e.g., schools, hospitals, licensed 9 ■ Yes 9 No day care centers, or group homes) within 1500 feet of the project site? If Yes, i. Identify facilities: ECC South Campus e. Does the project site contain an existing dam? 9 Yes 9■ No If Yes: i. Dimensions of the dam and impoundment:  Dam height: feet  Dam length: feet  Surface area: acres  Volume impounded: gallons OR acre-feet ii. Dam’s existing hazard classification: iii. Provide date and summarize results of last inspection: f. Has the project site ever been used as a municipal, commercial or industrial solid waste management facility, 9 Yes 9■ No or does the project site adjoin property that is now, or was at one time, used as a solid waste management facility? If Yes: i. Has the facility been formally closed? 9 Yes 9 No  If Yes, cite sources/documentation: ii. Describe the location of the project site relative to the boundaries of the solid waste management facility: iii. Describe any development constraints due to the prior solid waste activities: g. Have hazardous wastes been generated, treated and/or disposed of at the site, or does the project site adjoin 9 Yes 9■ No property which is now or was at one time used to commercially treat, store and/or dispose of hazardous waste? If Yes: i. Describe waste(s) handled and waste management activities, including approximate time when activities occurred: h. Potential contamination history. Has there been a reported spill at the proposed project site, or have any 9 Yes 9■ No remedial actions been conducted at or adjacent to the proposed site? If Yes: i. Is any portion of the site listed on the NYSDEC Spills Incidents database or Environmental Site 9 Yes 9 No Remediation database? Check all that apply: 9 Yes – Spills Incidents database Provide DEC ID number(s): 9 Yes – Environmental Site Remediation database Provide DEC ID number(s): 9 Neither database ii. If site has been subject of RCRA corrective activities, describe control measures: iii. Is the project within 2000 feet of any site in the NYSDEC Environmental Site Remediation database? 9 Yes 9■ No If Yes, provide DEC ID number(s): iv. If Yes to (i), (ii) or (iii) above, describe current status of site(s): Page 11 of 15 FEAF 2026 178

Page 179

v. Is the project site subject to an institutional control limiting property uses? 9 Yes9 No  If Yes, DEC site ID number:  Describe the type of institutional control (e.g., deed restriction or easement):  Describe any use limitations:  Describe any engineering controls:  Will the project affect the institutional or engineering controls in place? 9 Yes9 No  Explain: E.2. Natural Resources On or Near Project Site a. What is the average depth to bedrock on the project site? >5 feet b. Are there bedrock outcroppings on the project site? 9 Yes9 ■ No If Yes, what proportion of the site is comprised of bedrock outcroppings? % c. Predominant soil type(s) present on project site: Wd Wayland Soils Complex 55.5 % ________________________ AoB Angola silt loam _________% 35.1 ________________________ DbA Darien silt loam _________% 2.9 d. What is the average depth to the water table on the project site? Average: >5 feet e. Drainage status of project site soils: 9 Well Drained: % of site 9 Moderately Well Drained: % of site 9✔ Poorly Drained 100 % of site f. Approximate proportion of proposed action site with slopes: 9✔ 0-10%: 100 % of site 9 10-15%: % of site 9 15% or greater: % of site g. Are there any unique geologic features on the project site? 9 9 Yes ■ No If Yes, describe: h. Surface water features. i. Does any portion of the project site contain wetlands or other waterbodies (including streams, rivers, 9■ Yes 9 No ponds, or lakes)? ii. Do any wetlands or other waterbodies adjoin the project site? 9■ Yes No If Yes to either i or ii, continue. If No, skip to E.2.i. iii. Are any of the wetlands or waterbodies within or adjoining the project site regulated by any federal, 9■ Yes No state or local agency? iv. For each identified regulated wetland and waterbody on the project site, provide the following information:  Streams: Name 837-235 Classification • Lakes or Ponds: Name Classification • Wetlands: Name Federal Waters, Federal Waters, Federal Waters,... Approximate Size • Wetland No. (if regulated by DEC) v. Are any of the above water bodies listed in the most recent compilation of NYS water quality-impaired 9 ■ Yes9 No waterbodies? If Yes, name of impaired water body/bodies and basis for listing as impaired: Name - Pollutants - Uses:Rush Creek and tribs - Fecal Coliforms;Total Phosphorus i. Is the project site in a designated Floodway? 9 9 ■ No Yes j. Is the project site in the 100-year Floodplain? 9 9 Yes ■ No 9 9 k. Is the project site in the 500-year Floodplain? Yes ■ No 9 9 l. Is the project site located over, or immediately adjoining, a primary, principal or sole source aquifer? Yes ■ No If Yes: i. Name of aquifer: Page 12 of 15 FEAF 2026 179

Page 180

m. Identify the predominant wildlife species that occupy or use the project site: n. Does the project site contain a designated significant natural community? 9 Yes 9■ No If Yes: i. Describe the habitat/community (composition, function, and basis for designation): ii. Source(s) of description or evaluation: iii. Extent of community/habitat:  Currently: acres  Following completion of project as proposed: acres  Gain or loss (indicate + or -): acres o. Does project site contain any species of plant or animal that is listed by the federal government or NYS as 9 Yes 9■ No endangered or threatened, or does it contain any areas identified as habitat for an endangered or threatened species? If Yes: i. Species and listing (endangered or threatened): p. Does the project site contain any species of plant or animal that is listed by NYS as rare, or as a species of 9 Yes 9■ No special concern? If Yes: i. Species and listing: q. Is the project site or adjoining area currently used for hunting, trapping, fishing or shell fishing? 9 Yes 9■ No If Yes, give a brief description of how the proposed action may affect that use: E.3. Designated Public Resources On or Near Project Site a. Is the project site, or any portion of it, located in a designated agricultural district certified pursuant to 9 Yes 9■ No Agriculture and Markets Law, Article 25-AA, Section 303 and 304? If Yes, provide county plus district name/number: b. Are agricultural lands consisting of highly productive soils present? 9 Yes 9■ No i. If Yes: acreage(s) on project site? ii. Source(s) of soil rating(s): c. Does the project site contain all or part of, or is it substantially contiguous to, a registered National 9 Yes 9■ No Natural Landmark? If Yes: i. Nature of the natural landmark: 9 Biological Community 9 Geological Feature ii. Provide brief description of landmark, including values behind designation and approximate size/extent: d. Is the project site located in or does it adjoin a state listed Critical Environmental Area? 9 Yes 9■ No If Yes: i. CEA name: ii. Basis for designation: iii. Designating agency and date: Page 13 of 15 FEAF 2026 180

Page 181

e. Does the project site contain, or is it substantially contiguous to, a building, archaeological site, or district Yes ■ No listed on the National or State Register of Historic Places, or that has been determined by the Commissioner of the NYSOffice of Parks, Recreation and Historic Preservation to be eligible for listing on the State Register of Historic Places? If Yes: i. Nature of historic/archaeological resource: Archaeological Site Historic Building or District ii. Name: iii. Brief description of attributes on which listing is based: f. Is the project site, or any portion of it, located in or adjacent to an area designated as sensitive for ■ Yes No archaeological sites on the New York State Historic Preservation Office (SHPO) archaeological site inventory? g. Have additional archaeological or historic site(s) or resources been identified on the project site? Yes ■ No If Yes: i. Describe possible resource(s): ii. Basis for identification: h. Is the project site within five miles of any officially designated and publicly accessible federal, state, or local ■ Yes No scenic, or aesthetic resource? If Yes: i. Identify resource: The project involves the current park at Parker Road and 20A. ii. Nature of, or basis for, designation (e.g., established highway overlook, state or local park, state historic trail, or scenic byway, etc.): Local Park iii. Distance between project and resource: miles. i. Is the project site located within a designated river corridor under the Wild, Scenic and Recreational Rivers Yes ■ No Program 6 NYCRR 666? If Yes: i. Identify the name of the river and its designation: ii. Is the activity consistent with development restrictions contained in 6NYCRR Part 666? Yes No E.4. Disadvantaged Communities Designated Pursuant to ECL Article 75 a. Is the project located within, or within ½ mile of, a disadvantaged community? Yes ■ No If No, could impacts(see examples below in E.4.b) from the project affect a disadvantaged community? Yes No If Yes to either question in E.4.a, answer the remaining questions in this section. b. Will there be direct or indirect impacts that may affect a disadvantaged community, such as those listed below? Yes ■ No i. new noise sources or expansions/modification of existing noise sources; - noise from operational sources - noise from construction activities ii. emissions of air pollutants including, mobile emissions; iii. wastewater discharges; iv. generation of odors; v. light pollution; vi. new or modified radiation sources; vii. new or modified sources of solid waste generation, management, or disposal. If Yes, describe the impacts: c. Do any of the State agency approvals identified in question B.g include any of the following DEC permits? State Pollutant Discharge Elimination System (SPDES) Yes No Solid Waste Management Facility Yes No Hazardous Waste Management Facility Yes No Air Pollution Control (Title V or Air State Facility) Yes No Water Withdrawal over 20 MGD for Cooling Water Yes No Waste Transporter Yes No Page 14 of 15 FEAF 2026 181

Page 182

E.5 Future Physical Climate Risks Will the proposed action be vulnerable to the following future physical climate risks under current or projected future conditions: a. Is the proposed action vulnerable to damage from a projected 100-year flood? Yes ■ No b. Is the proposed action vulnerable to damage from a projected 500-year flood? Yes ■ No c. Is the proposed action in an area potentially affected by sea level rise? ■ Yes ■ No d. Will the proposed action increase the vulnerability of human or ecological communities to the following: i. drought? Yes ■ No ii. temperature extremes (hot or cold)? Yes ■ No iii. extreme storms, including high winds? Yes ■ No iv. landslides? Yes ■ No v. coastal erosion? Yes ■ No vi. stormwater flooding? Yes ■ No vii. other climate or weather hazards? Yes ■ No If Yes, describe: _____________________________________ F. Additional Information Attach any additional information which may be needed to clarify your project. If you have identified any adverse impacts which could be associated with your proposal, please describe those impacts plus any measures which you propose to avoid or minimize them. G. Verification I certify that the information provided is true to the best of my knowledge. Applicant/Sponsor Name Joshua Rogers Date 8/6/26 Signature Title Town Planner Page 15 of 15 FEAF 2026 182

Page 183

EAF Mapper Summary Report Monday, July 27, 2026 8:58 AM Disclaimer: The EAF Mapper is a screening tool intended to assist project sponsors and reviewing agencies in preparing an environmental assessment form (EAF). Not all questions asked in the EAF are answered by the EAF Mapper. Additional information on any EAF question can be obtained by consulting the EAF Workbooks. Although the EAF Mapper provides the most up-to-date digital data available to DEC, you may also need to contact local or other data sources to confirm data provided by the Mapper or to obtain data not provided by the Mapper. B.i.i [Coastal or Waterfront Area] No B.i.ii [Local Waterfront Revitalization Area] Yes C.2.b. [Special Planning District] Yes - Digital mapping data are not available for all Special Planning Districts. Refer to EAF Workbook. C.2.b. [Special Planning District - Name] NYS Heritage Areas:West Erie Canal Corridor E.1.h [DEC Spills or Remediation Site - Digital mapping data are not available or are incomplete. Refer to EAF Potential Contamination History] Workbook. E.1.h.i [DEC Spills or Remediation Site - Digital mapping data are not available or are incomplete. Refer to EAF Listed] Workbook. E.1.h.i [DEC Spills or Remediation Site - Digital mapping data are not available or are incomplete. Refer to EAF Environmental Site Remediation Database] Workbook. E.1.h.iii [Within 2,000' of DEC Remediation No Site] E.2.g [Unique Geologic Features] No E.2.h.i [Surface Water Features] Yes - Digital mapping information on local, New York State, and federal wetlands and waterbodies is known to be incomplete. Refer to the EAF Workbook. E.2.h.ii [Surface Water Features] Yes - Digital mapping information on local, New York State, and federal wetlands and waterbodies is known to be incomplete. Refer to the EAF Workbook. E.2.h.iii [Surface Water Features] Yes - Digital mapping information on local, New York State, and federal wetlands and waterbodies is known to be incomplete. Refer to the EAF Workbook. E.2.h.iv [Surface Water Features - Stream 837-235 Name] E.2.h.iv [Surface Water Features - Stream C Classification] E.2.h.iv [Surface Water Features - Wetlands Federal Waters Name] E.2.h.v [Impaired Water Bodies] Yes E.2.h.v [Impaired Water Bodies - Name and Name - Pollutants - Uses:Rush Creek and tribs - Fecal Coliforms;Total Basis for Listing] Phosphorus E.2.i. [Floodway] No E.2.j. [100 Year Floodplain] No E.2.k. [500 Year Floodplain] No E.2.l. [Aquifers] No E.2.n. [Natural Communities] No Full Environmental Assessment Form - EAF Mapper Summary Report 183 1

Page 184

E.2.o. [Endangered or Threatened Species] No E.2.p. [Rare Plants or Animals] No E.3.a. [Agricultural District] No E.3.c. [National Natural Landmark] No E.3.d [Critical Environmental Area] No E.3.e. [National or State Register of Historic Digital mapping data are not available or are incomplete. Refer to EAF Places or State Eligible Sites] Workbook. E.3.f. [Archeological Sites] Yes E.3.i. [Designated River Corridor] No E.4.a [Disadvantaged Community] No Full Environmental Assessment Form - EAF Mapper Summary Report 184 2

Page 185

630’ - 4’ SPLIT RAIL 5’ (W) Brick Walkway N STADIUM FEDERAL WETLANDS Observation Point of Stadium FOOTBALL FIELD Artwork E 8’ SOLID FENCE MAIN ENTRANC NEW TE G EL TIN R SH XIS EXISTING E FENCE GATE FENCE G G T IN TIN SE SW XIS 3-5 Existing E Playground PLAYG A r ti ROUN Flag F ficial Turf D ootba 200’ 70’ x 2 ll Field 10’ 178’ 8’ 247’ Conceptual Master Plan - Subject to Final Engineering & Permitting Master Plan185

Page 186

Town Board of the Town of Hamburg August 10, 2026 Meeting 4.38. Concession Agreement WHEREAS, the Town of Hamburg desires to enter into an agreement with Donald Bond d/b/a Bonds Bussin Bites, to operate a refreshment concession at the Hamburg Town Park for a period commencing as soon as all required permits issued by the Erie County Health Department, and insurance certificates are submitted and approved until on or about Labor Day 2026. The vendor will pay the Town $200.00. NOW THEREFORE BE IT RESOLVED that the Town of Hamburg enter into an agreement with Donald Bond d/b/a Bonds Bussin Bites and, BE IT FURTHER RESOLVED that Supervisor Elizabeth Farrell Lorentz is authorized to sign the agreement on behalf of the Town of Hamburg, upon review by the Legal Department. ATTACHMENTS: Addendum to agreement between Bonds Bussin Bites & Town of Hamburg.pdf 186

Page 187

187

Page 188

Town Board of the Town of Hamburg August 10, 2026 Meeting 4.39. ECWA Water System Improvements Additional Fire Hydrant WHEREAS, the Town of Hamburg has been notified by Erie County Water Authority of a Water System Improvement Project planned within the Town and; WHEREAS, as part of the project, ECWA is planning to install a new section of watermain between 5310 Southwestern Blvd. and 5278 Southwestern Blvd. and are planning to install one (1) Hydrant and; THEREFORE BE IT RESOLVED, that the Town Board authorizes the ECWA to install the one (1) additional fire hydrant as shown on the project plans and reviewed by the Town Engineering Department and that the Town of Hamburg agrees to pay the ECWA the annual direct service hydrant maintenance fee for this hydrant, and BE IT FURTHER RESOLVED, that the Town Clerk is requested to provide two certified copies of this resolution to the Engineering Department for transmittal to the ECWA. 188

Page 189

Town Board of the Town of Hamburg August 10, 2026 Meeting 4.40. Helps Program WHEREAS, The Town Board has the authority to manage the Town of Hamburg Personnel efficiently and effectively in accordance with applicable laws, rules, regulations, and collective bargaining agreements, including New York State Civil Service Laws and the Erie County Rules for the Classified Service;  and WHEREAS, New York State Civil Service Commission  has developed and the Erie County Personnel Department has adopted the NYS HELPS (Hiring for Emergency Limited Placement Statewide) program, which allows for the inclusion of titles where qualified individuals may be appointed to a non-competitive version of a competitive title in order to gain permanent status without competitive examination and upon completion of a necessary probationary term be placed in the competitive class without further exam; and WHEREAS, Erie County has recommended that the below resolve clause regarding the appointment process be approved to allow the Town of Hamburg to appropriately utilize the NYS Helps program in its most efficient form so as not to delay the ability of employees hired through the program to gain permanent status; NOW THEREFORE BE IT RESOLVED, that any individual appointed through the NYS Helps program, as approved and administered by The County of Erie, and upon completion of the minimum probationary term of the position and the requirements as outlined/approved by Erie County Civil Service, shall be afforded the rights of that of a competitive class appointment without further exam or approval by the Erie County Civil Service Commission. The Town Board of the Town of Hamburg retains all rights and authority as it relates to hiring and employment procedures. 189

Page 190

Town Board of the Town of Hamburg August 10, 2026 Meeting 4.41. Workday Reporting BE IT RESOLVED that the Hamburg Town Board does hereby approve the 2026 Workday Reporting resolution as required by the NYS Comptroller. (Attached) ATTACHMENTS: 20260807083728.pdf 190

Page 191

191

Page 192

192

Page 193

Town Board of the Town of Hamburg August 10, 2026 Meeting 4.42. Town of Hamburg Drainage and Stormwater Management District Public Hearing and Lead Agency WHEREAS, the Town of Hamburg (the “Town”) manages a drainage system which provides collection of the rainfall and snow melt runoff for Town properties and controls the quantity and quality of runoff into local, state, and federal waterways; and WHEREAS, the Town has determined it will need a dedicated sole source of funding to continue to construct, operate, and maintain sufficient stormwater infrastructure to comply with increasingly stringent permit requirements, provide sufficient capital to repair/replace aging infrastructure, and to address the effects of increasing precipitation as a result of climate change; and WHEREAS, the Town proposes to create a new Town-wide Drainage and Stormwater Management District (the "District") to manage and fund the entire stormwater system. WHEREAS, for the Town of Hamburg to form a Town-wide Drainage and Stormwater Management District the Town of Hamburg must adopt the Order and schedule a public hearing. The public hearing will provide involved and concerned parties an opportunity to comment on the Map, Plan, & Report as well as voice any potential comments or issues; and WHEREAS, the Town Engineer has submitted a proposed Order that includes a notice of the public hearing and announces that the Map, Plan, & Report are available for public review; and WHEREAS, the formation of the District will require the Town to comply with the New York State Environmental Quality Review Act (Article 8 of the Environmental Conservation Law and its implementing regulations at 6 NYCRR Part 617; “SEQRA”) and the Town’s Local Waterfront Revitalization Program; and WHEREAS, pursuant to Part 617 of the implementing regulations pertaining to Article 8 (State Environmental Quality Review Act - SEQR) of the Environmental Conservation Law, the Town Board has determined that developing and implementing the proposed District is an Unlisted Action; and WHEREAS, the Town Board, in compliance with Section 209-d of the Town Law, now desires to conduct a public hearing concerning the proposed District; 193

Page 194

NOW, THEREFORE BE IT RESOLVED, the Town Board does hereby accept the Map, Plan and Report and Order in accordance with the Town Law for the creation of a Town-wide Drainage and Stormwater Management District; and BE IT FURTHER RESOLVED, by the Town Board, as follows: Section 1: The Town Board will hold a public hearing pursuant to Article 12-A, Section 209-d of the N.Y. Town Law on the 24th of August 2026 starting at 5 p.m. at the Hamburg Town Hall, to consider the establishment of the proposed District, and at which all interested persons may be heard (the "Public Hearing"). Section 2: The Town Clerk is hereby authorized and directed to cause a copy of this Order to be published once in the official newspaper of the Town, the first publication thereof to be not less than ten nor more than twenty days before the day set herein for the Public Hearing, and said Town Clerk shall also cause a copy thereof to be posted on the sign-board of the Town maintained pursuant to the subdivision 6 of Section 30 of the N.Y. Town Law not less than ten nor more than twenty days before the day set for the Public Hearing. The Town Clerk shall also cause a copy of this Order to be posted on the Town's official website not less than ten nor more than twenty days before the day set for the Public Hearing. Section 3: The Town Clerk shall file a certified copy of this Order with the Office of the State Comptroller, on or about the date of publication of this Order. Section 4: This Order shall take effect immediately. ATTACHMENTS: FEAF Part 1.pdf 194

Page 195

Full Environmental Assessment Form Part 1 - Project and Setting Instructions for Completing Part 1 Part 1 is to be completed by the applicant or project sponsor. Responses become part of the application for approval or funding, are subject to public review, and may be subject to further verification. Complete Part 1 based on information currently available. If additional research or investigation would be needed to fully respond to any item, please answer as thoroughly as possible based on current information; indicate whether missing information does not exist, or is not reasonably available to the sponsor; and, when possible, generally describe work or studies that would be necessary to update or fully develop that information. Applicants/sponsors must complete all items in Sections A & B. In Sections C, D & E, most items contain an initial question that must be answered either “Yes” or “No.” If the answer to the initial question is “Yes,” complete the following sub-questions. If the answer to the initial question is “No,” proceed to the next question. Section F allows the project sponsor to identify and attach additional information. Section G requires the name and signature of the applicant or project sponsor to verify the information in Part 1 is accurate and complete. A. Project and Applicant/Sponsor Information. Name of Action or Project: Town of Hamburg Drainage and Stormwater Management District Formation Project Location (describe and attach a general location map): Town of Hamburg Brief Description of Proposed Action (include purpose or need): The Town of Hamburg (Town) manages a drainage system which provides collection of the rainfall and snow melt runoff for Town properties and controls the quantity and quality of runoff into local, state, and federal waterways. The Town has to meet maintenance and operation needs, as well as complete capital work, to keep the system running while complying with regulations governing stormwater and operates under the NYSDEC general stormwater SPDES permit for Municipal Separate Storm Sewer System (MS4). The Town has determined it will need a dedicated sole source of funding to continue to construct, operate, and maintain sufficient stormwater infrastructure to comply with increasingly stringent permit requirements, provide sufficient capital to repair/replace aging infrastructure, and to address the effects of increasing precipitation as a result of climate change. Accordingly, the Town proposes to create a new Town-wide Drainage and Stormwater Management District (DSMD) to manage and fund the entire stormwater Name of Applicant/Sponsor: system. (See attached Map, Plan and Telephone: Report) 716-649-6111 Town of Hamburg Town Board E-Mail: Address: 6100 South Park Avenue City/PO: State: Zip Code: Hamburg NY 14075 Project Contact (if not same as sponsor; give name and title/role): Telephone: Same E-Mail: Address: City/PO: State: Zip Code: Property Owner (if not same as sponsor): Telephone: N/A E-Mail: Address: City/PO: State: Zip Code: Page 1 of 15 FEAF 2026 195

Page 196

B. Government Approvals B. Government Approvals, Funding, or Sponsorship. (“Funding” includes grants, loans, tax relief, and any other forms of financial assistance.) Government Entity If Yes: Identify Agency and Approval(s) Application Date Required (Actual or projected) a. City Council, Town Board, 9✔ Yes 9 No Formation of District Fall 2026 or Village Board of Trustees b. City, Town or Village 9 Yes 9 No Planning Board or Commission c. City, Town or 9 Yes 9 No Village Zoning Board of Appeals d. Other local agencies 9 Yes 9 No e. County agencies 9 Yes 9 No f. Regional agencies 9 Yes 9 No g. State agencies 9 Yes 9 No h. Federal agencies 9 Yes 9 No i. Coastal Resources. i. Is the project site within a Coastal Area or the waterfront area of a Designated Inland Waterway? 9 ✔ Yes 9 No ii. Is the project site located in a community with an approved Local Waterfront Revitalization Program? 9 Yes No ✔ iii. Is the project site within a Coastal Erosion Hazard Area? 9 Yes 9✔ No C. Planning and Zoning C.1. Planning and zoning actions. Will administrative or legislative adoption, or amendment of a plan, local law, ordinance, rule, or regulation be the 9 ✔ Yes 9 No only approval(s) that must be granted to enable the proposed action to proceed?  If Yes, complete sections C, F and G.  If No, proceed to question C.2 and complete all remaining sections and questions in Part 1 C.2. Adopted land use plans. a. Do any municipally adopted (city, town, village, or county) comprehensive land use plan(s) include the site 9 ✔ Yes 9 No where the proposed action would be located? If Yes, does the comprehensive plan include specific recommendations for the site where the proposed action Yes ✔ No would be located? 9 b. Is the site of the proposed action within any local or regional special planning district (for example: Greenway; ✔ Yes No Brownfield Opportunity Area (BOA); designated State or Federal heritage area; watershed management plan; 9 9 or other)? If Yes, identify the plan(s): The Town of Hamburg includes a BOA, Greenway and other Planning districts c. Is the proposed action located wholly or partially within an area listed in an adopted municipal open space plan ✔ Yes No or an adopted municipal farmland protection plan? 9 9 If Yes, identify the plan(s): The Town has an Open Space and Greenspace Plan (outdated) Page 2 of 15 FEAF 2026 196

Page 197

d. Is the proposed action in a municipality with an adopted comprehensive or individual plan that addresses climate Yes ✔ No change? 9 9 If Yes , identify the elements of the plan that are relevant to the action: 9 9 C.3. Zoning 9 9 a. Is the site of the proposed action located in a municipality with an adopted zoning law or ordinance? ✔ Yes No If Yes, what is the zoning classification(s) including any applicable overlay district? Entire Town - all zoning districts b. Is the use permitted or allowed by a special or conditional use permit? Yes ✔ No c. Is a zoning change requested as part of the proposed action? Yes ✔ No If Yes, what is the proposed new zoning for the site? C.4. Existing community services. a. In what school district is the project site located? All Town School Districts b. What police or other public protection forces serve the project site? Town of Hamburg Police, Erie County and NYS c. Which fire protection and emergency medical services serve the project site? All Town fire and emergency service providers d. What parks serve the project site? All Town, County and NYS parks within the Town D. Project Details D.1. Proposed and Potential Development a. What is the general nature of the proposed action (e.g., residential, industrial, commercial, recreational; if mixed, include all components)? 9 9 b. a. Total acreage of the site of the proposed action? acres b. Total acreage to be physically disturbed? acres 9 9 c. Total acreage (project site and any contiguous properties) owned or controlled by the applicant or project sponsor? acres c. Is the proposed action an expansion of an existing project or use? 9 Yes9 No If Yes, what is the approximate percentage of the proposed expansion and identify the units (e.g., acres, miles, housing units, square feet)? % Units: d. Is the proposed action a subdivision, or does it include a subdivision? 9 Yes9 No If Yes, i. Purpose or type of subdivision? (e.g., residential, industrial, commercial; if mixed, specify types) ii. Is a cluster/conservation layout proposed? Yes No iii. Number of lots proposed? iv. Minimum and maximum proposed lot sizes? Minimum Maximum Page 3 of 15 FEAF 2026 197

Page 198

e. Will the proposed action be constructed in multiple phases? 9 Yes 9 No i. If No, anticipated period of construction: months ii. If Yes:  Total number of phases anticipated  Anticipated commencement date of phase 1 (including demolition) month year  Anticipated completion date of final phase month year  Generally describe connections or relationships among phases, including any contingencies where progress of one phase may determine timing or duration of future phases: 9 9 f. Does the project include new residential uses? Yes No If Yes, show numbers of units proposed. One Family Two Family Three Family Multiple Family (four or more) 9 9 Initial Phase At completion of all phases 9 9 9 g. Does the proposed action include new non-residential construction (including expansions)? Yes No If Yes, i. Total number of structures ii. Dimensions (in feet) of largest proposed structure: height; width; and length iii. Approximate extent of building space to be heated or cooled: square feet h. Does the proposed action include construction or other activities that will result in the impoundment of any Yes No liquids, such as creation of a water supply, reservoir, pond, lake, waste lagoon or other storage? If Yes, i. Purpose of the impoundment: ii. If a water impoundment, the principal source of the water: Ground water Surface water streams 9 Other 9 specify: iii. If other than water, identify the type of impounded/contained liquids and their source. iv. Approximate size of the proposed impoundment. Volume: million gallons; surface area: acres v. Dimensions of the proposed dam or impounding structure: height; length vi. Construction method/materials for the proposed dam or impounding structure (e.g., earth fill, rock, wood, concrete): D.2. Project Operations a. Does the proposed action include any excavation, mining, or dredging, during construction, operations, or both? Yes No (Not including general site preparation, grading or installation of utilities or foundations where all excavated materials will remain onsite) If Yes: i .What is the purpose of the excavation or dredging? ii. How much material (including rock, earth, sediments, etc.) is proposed to be removed from the site?  Volume (specify tons or cubic yards): 9 9  Over what duration of time? iii. Describe nature and characteristics of materials to be excavated or dredged, and plans to use, manage or dispose of them. iv. Will there be onsite dewatering or processing of excavated materials? Yes No If yes, describe. 9 9 v. What is the total area to be dredged or excavated? acres vi. What is the maximum area to be worked at any one time? acres vii. What would be the maximum depth of excavation or dredging? feet viii. Will the excavation require blasting? Yes No ix. Summarize site reclamation goals and plan: Page 4 of 15 FEAF 2026 198

Page 199

b. Would the proposed action cause or result in alteration of, increase or decrease in size of, or encroachment Yes No into any existing wetland, waterbody, shoreline, beach or adjacent area? If Yes: i. Identify the wetland or waterbody which would be affected (by name, water index number, wetland map number or geographic description): ii. Describe how the proposed action would affect that waterbody or wetland, e.g., excavation, fill, placement of structures, or alteration of channels, banks, and shorelines. Indicate extent of activities, alterations and additions in square feet or acres: iii. Will the proposed action cause or result in disturbance to bottom sediments? Yes No If Yes, describe: iv. Will the proposed action cause or result in the destruction or removal of aquatic vegetation? Yes No If Yes:  acres of aquatic vegetation proposed to be removed:___________________________  expected acreage of aquatic vegetation remaining after project completion:  purpose of proposed removal (e.g. beach clearing, invasive species control, boat access):  proposed method of plant removal:  if chemical/herbicide treatment will be used, specify product(s): v. Describe any proposed reclamation/mitigation following disturbance: c. Will the proposed action use, or create a new demand for water? Yes No If Yes: i. Total anticipated water usage/demand per day: gallons/day ii. Will the proposed action obtain water from an existing public water supply? Yes No If Yes:  Name of district or service area:  Does the existing public water supply have capacity to serve the proposal? Yes No  Is the project site in the existing district? Yes No  Is expansion of the district needed? Yes No  Do existing lines serve the project site? Yes No iii. Will line extension within an existing district be necessary to supply the project? Yes No If Yes:  Describe extensions or capacity expansions proposed to serve this project:  Source(s) of supply for the district: iv. Is a new water supply district or service area proposed to be formed to serve the project site? Yes No If, Yes:  Applicant/sponsor for new district:  Date application submitted or anticipated:  Proposed source(s) of supply for new district: v. If a public water supply will not be used, describe plans to provide water supply for the project: vi. If water supply will be from wells (public or private), what is the maximum pumping capacity: gallons/minute. Page 5 of 15 FEAF 2026 199

Page 200

d. Will the proposed action generate liquid wastes? Yes No If Yes: i. Total anticipated liquid waste generation per day: gallons/day ii. Nature of liquid wastes to be generated (e.g., sanitary wastewater, industrial; if combination, describe all components and approximate volumes or proportions of each): iii. Will the proposed action use any existing public wastewater treatment facilities? Yes No If Yes:  Name of wastewater treatment plant to be used:  Name of district: 9 9  Does the existing wastewater treatment plant have capacity to serve the project? Yes No  Is the project site in the existing district? Yes No  Is expansion of the district needed? Yes No  Do existing sewer lines serve the project site? Yes No  Will a line extension within an existing district be necessary to serve the project? Yes No If Yes:  Describe extensions or capacity expansions proposed to serve this project: 9 9 iv. Will a new wastewater (sewage) treatment district be formed to serve the project site? Yes No If Yes:  Applicant/sponsor for new district: 9 9  Date application submitted or anticipated:  What is the receiving water for the wastewater discharge? v. If public facilities will not be used, describe plans to provide wastewater treatment for the project, including specifying proposed receiving water (name and classification if surface discharge or describe subsurface disposal plans): vi. Describe any plans or designs to capture, recycle or reuse liquid waste: 9 9 e. Will the proposed action disturb more than one acre and create stormwater runoff, either from new point Yes No sources (i.e. ditches, pipes, swales, curbs, gutters or other concentrated flows of stormwater) or non-point source (i.e., sheet flow) during construction or post construction? If Yes: 9 i. How much impervious surface will the project create in relation to total size of project parcel? Square feet or acres (impervious surface) Square feet or acres (parcel size) ii. Describe types of new point sources. iii. Where will the stormwater runoff be directed (i.e. on-site stormwater management facility/structures, adjacent properties, groundwater, on-site surface water, or off-site surface waters)? 9 9  If to surface waters, identify receiving water bodies or wetlands:  Will stormwater runoff flow to adjacent properties? Yes No iv. Does the proposed plan minimize impervious surfaces, use pervious materials or collect and re-use stormwater? Yes No 9 9 9 9 9 9 Page 6 of 15 FEAF 2026 200

Page 201

f. Does the proposed action include, or will it use on-site, one or more sources of air emissions, including fuel Yes No combustion, waste incineration, or other processes or operations? If Yes, identify: i. Mobile sources during project operations (e.g., heavy equipment, fleet or delivery vehicles) ______________________________________________________________________________________________________ ii. Stationary sources during construction (e.g., power generation, structural heating, batch plant, crushers) ______________________________________________________________________________________________________ iii. Stationary sources during operations (e.g., process emissions, boilers, electric generation, surface coating) ______________________________________________________________________________________________________ g. Will any air emission sources named in D.2.f (above), require an Air Facility Registration, Air State Facility Yes No Permit, Title IV Permit or Title V Permit? If Yes: i. Is the proposed action subject to the Nonattainment New Source Review or Prevention of Significant Deterioration Yes No requirements discussed in 6 NYCRR Part 231? ii. As calculated in the air permit application, the proposed action has the potential to emit:  Tons/year (short tons) of carbon monoxide (CO)  Tons/year (short tons) of oxides of nitrogen (NOx)  Tons/year (short tons) of particulate matter (PM-10, PM-2.5)  Tons/year (short tons) of volatile organic compounds (VOC)  Tons/year (short tons) of sulfur dioxide (SO2) iii. Will emissions of air contaminants from the proposed action described above exceed the corresponding major Yes No source thresholds? iv.Does the proposed action have the potential to emit 10 tons/year or more of any one designated hazardous air Yes No pollutant or 25 tons/year or more of any combination of such hazardous air pollutants (6NYCRR 200.1(ag))? If Yes, provide the total potential to emit hazardous air pollutants in short tons/year: _____________________________ h. Will the proposed action generate or emit annual direct and indirect greenhouse gas emissions, such as carbon dioxide, methane, nitrous oxide, sulfur hexafluoride, hydrofluorocarbons, or perfluorocarbons in excess of 10,000 metric tons of total carbon dioxide equivalents per year at any point in the lifetime of the proposed action (estimated using the carbon dioxide equivalent definition and global warming potentials provided in 6 NYCRR Part 496)? Yes No If Yes: i. Estimate the proposed action’s metric tons of carbon dioxide equivalents in tons/year (metric): ii. Describe any greenhouse gas capture, control, or elimination measures included in project design: i. Will the proposed action result in the release of air pollutants from open-air operations or processes, such as Yes No quarry or landfill operations? If Yes: Describe operations and nature of emissions (e.g., diesel exhaust, rock particulates/dust): j. Will the proposed action result in a substantial increase in traffic above present levels or generate substantial Yes No new demand for transportation facilities or services? If Yes: i. When is the peak traffic expected (Check all that apply): Morning Evening Weekend Randomly between hours of to . ii. For commercial activities only, projected number of truck trips/day and type (e.g., semi trailers and dump trucks): iii. Parking spaces: Existing Proposed Net increase/decrease iv. Does the proposed action include any shared use parking? Yes No v. If the proposed action includes any modification of existing roads, creation of new roads or change in existing access, describe: ______________________________________________________________________________________________________________ vi. Are public/private transportation service(s) or facilities available within ½ mile of the proposed site? Yes No vii Will the proposed action include access to public transportation or accommodations for use of hybrid, electric Yes No or other alternative fueled vehicles? viii. Will the proposed action include plans for pedestrian or bicycle accommodations for connections to existing Yes No pedestrian or bicycle routes? Page 7 of 15 FEAF 2026 201

Page 202

k. Will the proposed action (for commercial or industrial projects only) generate new or additional energy demand? Yes No If Yes: i. Estimate annual electricity demand during operation of the proposed action: ii. Anticipated sources/suppliers of electricity for the project (e.g., on-site combustion, on-site renewable, via grid/local utility, or other):________________________________________________________________________________________________ iii. Will the proposed action require a new, or an upgrade, to an existing substation? Yes No l. Hours of operation. Answer all items which apply. i. During Construction: ii. During Operations:  Monday - Friday:  Monday - Friday:  Saturday:  Saturday:  Sunday:  Sunday:  Holidays:  Holidays: m. Will the proposed action produce noise that will exceed existing ambient noise levels during construction, Yes No operation, or both? If yes: i. Provide details including sources, time of day and duration: ii. Will the proposed action remove existing natural barriers that could act as a noise barrier or screen? Yes No Describe: n. Will the proposed action have outdoor lighting? Yes No If yes: i. Describe source(s), location(s), height of fixture(s), direction/aim, and proximity to nearest occupied structures: ii. Will proposed action remove existing natural barriers that could act as a light barrier or screen? Yes No Describe: o. Does the proposed action have the potential to produce odors for more than one hour per day? Yes No If Yes, describe possible sources, potential frequency and duration of odor emissions, and proximity to nearest occupied structures: p. Will the proposed action include any bulk storage of petroleum (combined capacity of over 1,100 gallons) Yes No or chemical products 185 gallons in above ground storage or any amount in underground storage? If Yes: i. Product(s) to be stored ii. Volume(s) per unit time (e.g., month, year) iii. Generally, describe the proposed storage facilities: q. Will the proposed action (commercial, industrial and recreational projects only) use pesticides Yes No (i.e., herbicides, insecticide) during construction or operation? If Yes: i. Describe proposed treatment(s): ii. Will the proposed action use Integrated Pest Management Practices? Yes No Page 8 of 15 FEAF 2026 202

Page 203

r. Will the proposed action (commercial or industrial projects only) involve or require the management or disposal Yes No of solid waste (excluding hazardous materials)? If Yes: i. Describe any solid waste(s) to be generated during construction or operation of the facility:  Construction: tons per (unit of time)  Operation : tons per (unit of time) ii. Describe any proposals for on-site minimization, recycling or reuse of materials to avoid disposal as solid waste:  Construction:  Operation: iii. Proposed disposal methods/facilities for solid waste generated on-site:  Construction:  Operation: s. Does the proposed action include construction or modification of a solid waste management facility? Yes No If Yes: i. Type of management or handling of waste proposed for the site (e.g., recycling or transfer station, composting, landfill, or9 9 other disposal activities): ii. Anticipated rate of disposal/processing:  Tons/month, if transfer or other non-combustion/thermal treatment, or  Tons/hour, if combustion or thermal treatment iii. If landfill, anticipated site life: years t. Will the proposed action at the site involve the commercial generation, treatment, storage, or disposal of hazardous Yes No waste? If Yes: 9 9 i. Name(s) of all hazardous wastes or constituents to be generated, handled, or managed at facility: ii. Generally describe processes or activities involving hazardous wastes or constituents: iii. Specify amount to be handled or generated tons/month iv. Describe any proposals for on-site minimization, recycling, or reuse of hazardous constituents: 9 v. Will any hazardous wastes be disposed at an existing offsite hazardous waste facility? Yes No If Yes: provide name and location of facility:________________________________________________________________________ If No: describe proposed management of any hazardous wastes which will not be sent to a hazardous waste facility: 9 9 9 Page 9 of 15 FEAF 2026 203

Page 204

9 99 E. Site and Setting of Proposed Action E.1. Land uses on and surrounding the project site a. Existing land uses. i. Check all uses that occur on, adjoining and near the project site. 9Urban 9Industrial 9Commercial 9Residential (suburban) 9Rural (non-farm) 9Forest 9Agriculture 9Aquatic 9Other (specify): 9 9 ii. If mix of uses, generally describe: 9 b. Land uses and cover types on the project site. Land use or Current Acreage After 9 Change 9 Cover type Acreage Project Completion (Acres +/-)  Roads, buildings, and other paved or impervious surfaces (total)  • Industrial or manufacturing • Commercial • Residential  Forested  Meadows, grasslands or brushlands (non- agricultural, including abandoned agricultural)  Agricultural (includes active orchards, field, greenhouse, etc.)  Surface water features (lakes, ponds, streams, rivers, etc.) 9 9  Wetlands (freshwater or tidal)  Non-vegetated (bare rock, earth, or fill)  Other, Describe: 9 9 Page 10 of 15 FEAF 2026 204

Page 205

c. Is the project site presently used by members of the community for public recreation? 9 Yes 9 No i. If Yes: explain: d. Are there any facilities serving children, the elderly, people with disabilities (e.g., schools, hospitals, licensed 9 Yes 9 No day care centers, or group homes) within 1500 feet of the project site? If Yes, i. Identify facilities: e. Does the project site contain an existing dam? 9 Yes 9 No If Yes: i. Dimensions of the dam and impoundment:  Dam height: feet  Dam length: feet  Surface area: acres  Volume impounded: gallons OR acre-feet ii. Dam’s existing hazard classification: iii. Provide date and summarize results of last inspection: f. Has the project site ever been used as a municipal, commercial or industrial solid waste management facility, 9 Yes 9 No or does the project site adjoin property that is now, or was at one time, used as a solid waste management facility? If Yes: i. Has the facility been formally closed? 9 Yes 9 No  If Yes, cite sources/documentation: ii. Describe the location of the project site relative to the boundaries of the solid waste management facility: iii. Describe any development constraints due to the prior solid waste activities: g. Have hazardous wastes been generated, treated and/or disposed of at the site, or does the project site adjoin 9 Yes 9 No property which is now or was at one time used to commercially treat, store and/or dispose of hazardous waste? If Yes: i. Describe waste(s) handled and waste management activities, including approximate time when activities occurred: h. Potential contamination history. Has there been a reported spill at the proposed project site, or have any 9 Yes 9 No remedial actions been conducted at or adjacent to the proposed site? If Yes: i. Is any portion of the site listed on the NYSDEC Spills Incidents database or Environmental Site 9 Yes 9 No Remediation database? Check all that apply: 9 Yes – Spills Incidents database Provide DEC ID number(s): 9 Yes – Environmental Site Remediation database Provide DEC ID number(s): 9 Neither database ii. If site has been subject of RCRA corrective activities, describe control measures: iii. Is the project within 2000 feet of any site in the NYSDEC Environmental Site Remediation database? 9 Yes 9 No If Yes, provide DEC ID number(s): iv. If Yes to (i), (ii) or (iii) above, describe current status of site(s): Page 11 of 15 FEAF 2026 205

Page 206

v. Is the project site subject to an institutional control limiting property uses? 9 Yes9 No  If Yes, DEC site ID number:  Describe the type of institutional control (e.g., deed restriction or easement):  Describe any use limitations:  Describe any engineering controls:  Will the project affect the institutional or engineering controls in place? 9 Yes9 No  Explain: E.2. Natural Resources On or Near Project Site a. What is the average depth to bedrock on the project site? feet b. Are there bedrock outcroppings on the project site? 9 Yes9 No If Yes, what proportion of the site is comprised of bedrock outcroppings? % c. Predominant soil type(s) present on project site: % ________________________ _________% ________________________ _________% d. What is the average depth to the water table on the project site? Average: feet e. Drainage status of project site soils: 9 Well Drained: % of site 9 Moderately Well Drained: % of site 9 Poorly Drained % of site f. Approximate proportion of proposed action site with slopes: 9 0-10%: % of site 9 10-15%: % of site 9 15% or greater: % of site g. Are there any unique geologic features on the project site? 9 9 Yes No If Yes, describe: h. Surface water features. i. Does any portion of the project site contain wetlands or other waterbodies (including streams, rivers, 9 Yes 9 No ponds, or lakes)? ii. Do any wetlands or other waterbodies adjoin the project site? 9 Yes No If Yes to either i or ii, continue. If No, skip to E.2.i. iii. Are any of the wetlands or waterbodies within or adjoining the project site regulated by any federal, 9 Yes No state or local agency? iv. For each identified regulated wetland and waterbody on the project site, provide the following information:  Streams: Name Classification • Lakes or Ponds: Name Classification • Wetlands: Name Approximate Size • Wetland No. (if regulated by DEC) v. Are any of the above water bodies listed in the most recent compilation of NYS water quality-impaired 9 Yes9 No waterbodies? If Yes, name of impaired water body/bodies and basis for listing as impaired: i. Is the project site in a designated Floodway? 9 9 Yes No j. Is the project site in the 100-year Floodplain? 9 9 Yes No 9 9 k. Is the project site in the 500-year Floodplain? Yes No 9 9 l. Is the project site located over, or immediately adjoining, a primary, principal or sole source aquifer? Yes No If Yes: i. Name of aquifer: Page 12 of 15 FEAF 2026 206

Page 207

m. Identify the predominant wildlife species that occupy or use the project site: n. Does the project site contain a designated significant natural community? 9 Yes 9 No If Yes: i. Describe the habitat/community (composition, function, and basis for designation): ii. Source(s) of description or evaluation: iii. Extent of community/habitat:  Currently: acres  Following completion of project as proposed: acres  Gain or loss (indicate + or -): acres o. Does project site contain any species of plant or animal that is listed by the federal government or NYS as 9 Yes 9 No endangered or threatened, or does it contain any areas identified as habitat for an endangered or threatened species? If Yes: i. Species and listing (endangered or threatened): p. Does the project site contain any species of plant or animal that is listed by NYS as rare, or as a species of 9 Yes 9 No special concern? If Yes: i. Species and listing: q. Is the project site or adjoining area currently used for hunting, trapping, fishing or shell fishing? 9 Yes 9 No If Yes, give a brief description of how the proposed action may affect that use: E.3. Designated Public Resources On or Near Project Site a. Is the project site, or any portion of it, located in a designated agricultural district certified pursuant to 9 Yes 9 No Agriculture and Markets Law, Article 25-AA, Section 303 and 304? If Yes, provide county plus district name/number: b. Are agricultural lands consisting of highly productive soils present? 9 Yes 9 No i. If Yes: acreage(s) on project site? ii. Source(s) of soil rating(s): c. Does the project site contain all or part of, or is it substantially contiguous to, a registered National 9 Yes 9 No Natural Landmark? If Yes: i. Nature of the natural landmark: 9 Biological Community 9 Geological Feature ii. Provide brief description of landmark, including values behind designation and approximate size/extent: d. Is the project site located in or does it adjoin a state listed Critical Environmental Area? 9 Yes 9 No If Yes: i. CEA name: ii. Basis for designation: iii. Designating agency and date: Page 13 of 15 FEAF 2026 207

Page 208

e. Does the project site contain, or is it substantially contiguous to, a building, archaeological site, or district Yes No listed on the National or State Register of Historic Places, or that has been determined by the Commissioner of the NYSOffice of Parks, Recreation and Historic Preservation to be eligible for listing on the State Register of Historic Places? If Yes: i. Nature of historic/archaeological resource: Archaeological Site Historic Building or District ii. Name: iii. Brief description of attributes on which listing is based: f. Is the project site, or any portion of it, located in or adjacent to an area designated as sensitive for Yes No archaeological sites on the New York State Historic Preservation Office (SHPO) archaeological site inventory? g. Have additional archaeological or historic site(s) or resources been identified on the project site? Yes No If Yes: i. Describe possible resource(s): ii. Basis for identification: h. Is the project site within five miles of any officially designated and publicly accessible federal, state, or local Yes No scenic, or aesthetic resource? If Yes: i. Identify resource: ii. Nature of, or basis for, designation (e.g., established highway overlook, state or local park, state historic trail, or scenic byway, etc.): iii. Distance between project and resource: miles. i. Is the project site located within a designated river corridor under the Wild, Scenic and Recreational Rivers Yes No Program 6 NYCRR 666? If Yes: i. Identify the name of the river and its designation: ii. Is the activity consistent with development restrictions contained in 6NYCRR Part 666? Yes No E.4. Disadvantaged Communities Designated Pursuant to ECL Article 75 a. Is the project located within, or within ½ mile of, a disadvantaged community? Yes No If No, could impacts(see examples below in E.4.b) from the project affect a disadvantaged community? Yes No If Yes to either question in E.4.a, answer the remaining questions in this section. b. Will there be direct or indirect impacts that may affect a disadvantaged community, such as those listed below? Yes No i. new noise sources or expansions/modification of existing noise sources; - noise from operational sources - noise from construction activities ii. emissions of air pollutants including, mobile emissions; iii. wastewater discharges; iv. generation of odors; v. light pollution; vi. new or modified radiation sources; vii. new or modified sources of solid waste generation, management, or disposal. If Yes, describe the impacts: c. Do any of the State agency approvals identified in question B.g include any of the following DEC permits? State Pollutant Discharge Elimination System (SPDES) Yes No Solid Waste Management Facility Yes No Hazardous Waste Management Facility Yes No Air Pollution Control (Title V or Air State Facility) Yes No Water Withdrawal over 20 MGD for Cooling Water Yes No Waste Transporter Yes No Page 14 of 15 FEAF 2026 208

Page 209

E.5 Future Physical Climate Risks Will the proposed action be vulnerable to the following future physical climate risks under current or projected future conditions: a. Is the proposed action vulnerable to damage from a projected 100-year flood? Yes No b. Is the proposed action vulnerable to damage from a projected 500-year flood? Yes No c. Is the proposed action in an area potentially affected by sea level rise? Yes No d. Will the proposed action increase the vulnerability of human or ecological communities to the following: i. drought? Yes No ii. temperature extremes (hot or cold)? Yes No iii. extreme storms, including high winds? Yes No iv. landslides? Yes No v. coastal erosion? Yes No vi. stormwater flooding? Yes No vii. other climate or weather hazards? Yes No If Yes, describe: _____________________________________ F. Additional Information Attach any additional information which may be needed to clarify your project. If you have identified any adverse impacts which could be associated with your proposal, please describe those impacts plus any measures which you propose to avoid or minimize them. G. Verification I certify that the information provided is true to the best of my knowledge. Applicant/Sponsor Name Joshua Rogers Date 8/7/26 Town Planner Signature Title Page 15 of 15 FEAF 2026 209

Page 210

Town Board of the Town of Hamburg August 10, 2026 Meeting 4.43. Amsdell Road Extension WHEREAS, the Town of Hamburg is committed to providing sidewalks for the safe travel of pedestrians throughout the Town; and WHEREAS, the Town completed a portion of Amsdell Road, but per the funding requirements, must utilize MWBE and/or SDVOB firms as part of the project; and WHEREAS, the Town Engineer released a Request for Quotes to those firms on the State list for these certifications and received one MBE and one SDVOB; and WHEREAS, the Town Engineer recommends the Town enter into an agreement with one or both firms for the extension of sidewalks and one new crossing on Amsdell Road for a not-to-exceed price of $150,000. NOW THEREFORE BE IT RESOLVED, that the Town Board authorizes the Supervisor to enter into an agreement with one or both firms for work at a cost not-to-exceed $150,000 and the Town Engineer and EECG Consulting to coordinate the scope of work starting as soon as possible. Funds are available in General Fund 210

Page 211

Town Board of the Town of Hamburg August 10, 2026 Meeting 4.44. Schoelkopf Road Town Property Ditch Cleaning WHEREAS, the Town of Hamburg owned vacant property on Schoelkopf Road, SBL #190.09-4-19.11 includes a large drainage channel that receives runoff from the Town roads and local properties; and WHEREAS, the Engineering Department has inspected the condition of the channel and found it is in need of significant maintenance; and WHEREAS, following discussion with Highway, it was determined that an independent contractor will be required to complete the work and the Engineering Department obtained 3 quotes; and WHEREAS, the Town Engineer recommends the Town award the Schoelkopf Road Ditch Cleaning to Ground Breaking Solutions Inc. for $23,000.00. NOW THEREFORE BE IT RESOLVED, that the Town Board authorizes the Supervisor to sign a letter of authorization to Ground Breaking Solutions Inc. for work. Funds are available in B.1490.0440.1 211

Page 212

Town Board of the Town of Hamburg August 10, 2026 Meeting 4.45. McKinley Parkway Sidewalk Extension WHEREAS, the Town of Hamburg would like to extend the sidewalk on McKinley Parkway from Clark St to the first driveway of the Fairgrounds; and WHEREAS, the Engineering Department requested quotes for the work, but all quotes received were above the public bid requirement and funding available. However, the Town would like to complete as much as of the work as possible; and WHEREAS, the Town Engineer recommends the Town award the McKinley Parkway Sidewalk Extension to Surianello Concrete for a not-to-exceed price of $34,000.00. NOW THEREFORE BE IT RESOLVED, that the Town Board authorizes the Supervisor to enter into an agreement with Surianello Concrete for work. Funds are available in H106.1440.440 212

Page 213

Town Board of the Town of Hamburg August 10, 2026 Meeting 4.46. Town Hall Parking Lot Change Orders WHEREAS, the Town Board awarded the original contract for the Town Hall Parking Lot to Louie Del Prince; and WHEREAS, the Town requested revisions of the plans by Wendel Engineering and the associated cost changes by the contractor Louie Del Prince; and WHEREAS, Town Engineer has reviewed the proposed change orders and recommends the Town Board approve the work; and THEREFORE BE IT RESOLVED, that the Town Board authorize the Supervisor to sign the attached change orders. BE IT FURTHER RESOLVED, that the Town Board hereby approves a budget amendment increasing the following accounts by $233,072, as follows: Transfer $14,344.21 from General Fund to Project H108.1440.456.403 Transfer $18,622 from Police budget to Project H108.1440.456.403 Remaining funds available in Project H108.1440.456.403 BE IT FURTHER RESOLVED, that the Town Supervisor and Finance Office are authorized and directed to make the necessary accounting and budgetary entries and to take all actions necessary to carry out this resolution. ATTACHMENTS: DOC080726-002.pdf 213