Town of Hamburg
  1-1-27 PERMIT FEES
  PERMIT TYPE  FILING FEEEXAMINATION FEE  MISCELLANEOUS FEE

  RESIDENTIAL
  Single family residence  $10.00  $45.00  $0.53/sq ft habitable space

  Two Family Residence  $10.00  $45.00  $0.53/sq ft habitable space

  Town House, Condo  $10.00  $45.00  $0.53/sq ft habitable space

Multiple Dwellings/Hotel/Motel (3 or more units
  $10.00  $45.00  $1,050.00 per dwelling unit
  per buildng)

  Residential Additions  $10.00  $45.00  $0.53/sq ft habitable space

  Residential Alterations  $10.00  $40.00  1% construction cost *material cost*

  Residential Demolition House  $10.00  $150.00

  Residential Demolition Garage  $10.00  $45.00

  Moving a Structure  $10.00  $45.00  $0.53/sq ft

  Mobile Home Replacement  $10.00  $210.00  Requires electric permit
  Roof Replacement - Residential  $10.00  $65.00
  Residential Solar Panel  $10.00  $100.00  Requires electric permit
  1% construction cost *material cost*,
  Residential Wind Energy System  $0.00  $275.00
  requires electric permit
  COMMERCIAL
  Commercial or Industrial Building  $10.00  $100.00  $1.35/sq ft of gross floor area
  Commercial or Industrial Addition  $10.00  $100.00  $1.35/sq ft of gross floor area
  Commercial or Industrial Alteration  $10.00  $100.00  1.1% construction cost *material cost*
  Commercial Accessory Structure  $10.00  $45.00  $0.35/Sq ft
  Commercial Demolition  $10.00  $430.00
  Select Demolition  $10.00  $50.00
  Roof Replacement - Commercial  $10.00  $65.00  $0.06/Sq ft.
  Site Work: Non Residential Development  $10.00  $100.00  $0.045/sq ft net site area.
  *Phased site projects, term to be at the
  discretion of code enforcement official

  Site Work Renewal Fee  $1,050.00 Maximum  *6 month permit*
  Commercial HVAC Installation  $0.00  $55.00  $55.00 per unit
  Commercial Generator  $10.00  $265.00  Requires Electrical Permit
  Requires electric permit, 1.1% of Project
  Commercial Solar Panel  $10.00  $265.00
  Cost, requires electric permit
  2% construction cost *material cost*,
  Commercial Wind Energy System  $0.00  $275.00
  requires electric permit
  Cell Tower  $0.00  $550.00  2% Project cost, requires electric permit
  Cell Tower - Co Location  $0.00  $550.00  2% Project cost, requires electric permit
  Battery Storage  $0.00  $550.00  2% Project cost, requires electric permit

  21