Southtowns Record

Town Board Regular Meeting Agenda, Jul 13, 2026 — Agenda

Government
Town of Hamburg
Board
Town Board
Meeting
Jul 13, 2026
Kind
Agenda
Topics
Zoning and land use, Water, sewer and drainage, Public safety, Budget and taxes, Parks and recreation, Roads and traffic, Energy and data center siting

Original document

Same meeting

Text · page 47 of 103

Read the whole document on one page (all 103 pages, each with its own heading)

Agency Use Only [If applicable]
  Full Environmental Assessment Form  Article XLIV Site Plan Review
  Project :
  Part 2 - Identification of Potential Project Impacts  Date : 7/13/26

Part 2 is to be completed by the lead agency. Part 2 is designed to help the lead agency inventory all potential resources that could
be affected by a proposed project or action. We recognize that the lead agency=s reviewer(s) will not necessarily be environmental
professionals. So, the questions are designed to walk a reviewer through the assessment process by providing a series of questions that
can be answered using the information found in Part 1. To further assist the lead agency in completing Part 2, the form identifies the
most relevant questions in Part 1 that will provide the information needed to answer the Part 2 question. When Part 2 is completed, the
lead agency will have identified the relevant environmental areas that may be impacted by the proposed activity.

If the lead agency is a state agency and the action is in any Coastal Area, complete the Coastal Assessment Form before proceeding
with this assessment.
Tips for completing Part 2:
   Review all of the information provided in Part 1.
   Review any application, maps, supporting materials and the Full EAF Workbook.
   Answer each of the 18 questions in Part 2.
   If you answer “Yes” to a numbered question, please complete all the questions that follow in that section.
   If you answer “No” to a numbered question, move on to the next numbered question.
   Check appropriate column to indicate the anticipated size of the impact.
   Proposed projects that would exceed a numeric threshold contained in a question should result in the reviewing agency
  checking the box “Moderate to large impact may occur.”
   The reviewer is not expected to be an expert in environmental analysis.
    If you are not sure or undecided about the size of an impact, it may help to review the sub-questions for the general
  question and consult the workbook.
   When answering a question consider all components of the proposed activity, that is, the whole action.
   Consider the possibility for long-term and cumulative impacts as well as direct impacts.
   Answer the question in a reasonable manner considering the scale and context of the project.
1. Impact on Land
  Proposed action may involve construction on, or physical alteration of,  ■NO
    YES
  
  the land surface of the proposed site. (See Part 1. D.1)
  If “Yes”, answer questions a - j. If “No”, move on to Section 2.
  Relevant  No, or  Moderate
  Part I  small  to large
  Question(s)  impact  impact may
  may occur  occur
a. The proposed action may involve construction on land where depth to water table is  E2d
  less than 3 feet.

b. The proposed action may involve construction on slopes of 15% or greater.  E2f

c. The proposed action may involve construction on land where bedrock is exposed, or  E2a
  generally within 5 feet of existing ground surface.
d. The proposed action may involve the excavation and removal of more than 1,000 tons  D2a
  of natural material.
e. The proposed action may involve construction that continues for more than one year  D1e
  or in multiple phases.
f. The proposed action may result in increased erosion, whether from physical  D2e, D2q
  disturbance or vegetation removal (including from treatment by herbicides).
g. The proposed action is, or may be, located within a Coastal Erosion hazard area.  B1i

h. Other impacts:

  Page 1 of 13  FEAF 2026
  47