Text · page 49 of 103
Read the whole document on one page (all 103 pages, each with its own heading)
l. Other impacts: 9 9 4. Impact on groundwater The proposed action may result in new or additional use of ground water, or NO YES may have the potential to introduce contaminants to ground water or an aquifer. (See Part 1. D.2.a, D.2.c, D.2.d, D.2.p, D.2.q, D.2.t) If “Yes”, answer questions a - h. If “No”, move on to Section 5. Relevant No, or Moderate Part I small to large Question(s) impact impact may may occur occur a. The proposed action may require new water supply wells, or create additional demand D2c 9 9 on supplies from existing water supply wells. b. Water supply demand from the proposed action may exceed safe and sustainable D2c 9 9 withdrawal capacity rate of the local supply or aquifer. Cite Source: c. The proposed action may allow or result in residential uses in areas without water and D1a, D2c 9 9 sewer services. d. The proposed action may include or require wastewater discharged to groundwater. D2d, E2l 9 9 e. The proposed action may result in the construction of water supply wells in locations D2c, E1f, 9 9 where groundwater is, or is suspected to be, contaminated. E1g, E1h f. The proposed action may require the bulk storage of petroleum or chemical products D2p, E2l 9 9 over ground water or an aquifer. g. The proposed action may involve the commercial application of pesticides within 100 E2h, D2q, 9 9 feet of potable drinking water or irrigation sources. E2l, D2c h. Other impacts: 9 9 5. Impact on Flooding The proposed action may result in development on lands subject to flooding. ✔NO YES (See Part 1. E.2) If “Yes”, answer questions a - g. If “No”, move on to Section 6. Relevant No, or Moderate Part I small to large Question(s) impact impact may may occur occur a. The proposed action may result in development in a designated floodway. E2i b. The proposed action may result in development within a 100-year or a 500-year E2j, E5a, floodplain. E5b c. The proposed action may result in development in an area potentially affected by sea E2k, E5c level rise. d. The proposed action may result in, or require, modification of existing drainage D2b, D2e patterns. e. The proposed action may change flood water flows that contribute to flooding. D2b, E2i, E2j, E2k f. If there is a dam located on the site of the proposed action, is the dam in need of repair, E1e or upgrade? Page 3 of 13 FEAF 2026 49