Southtowns Record

Town Board Regular Meeting Agenda, Jul 13, 2026 — Agenda

Government
Town of Hamburg
Board
Town Board
Meeting
Jul 13, 2026
Kind
Agenda
Topics
Zoning and land use, Water, sewer and drainage, Public safety, Budget and taxes, Parks and recreation, Roads and traffic, Energy and data center siting

Original document

Same meeting

Text · page 49 of 103

Read the whole document on one page (all 103 pages, each with its own heading)

l. Other impacts:  9  9

4. Impact on groundwater
  The proposed action may result in new or additional use of ground water, or  
  NO  
  YES
  may have the potential to introduce contaminants to ground water or an aquifer.
  (See Part 1. D.2.a, D.2.c, D.2.d, D.2.p, D.2.q, D.2.t)
  If “Yes”, answer questions a - h. If “No”, move on to Section 5.
  Relevant  No, or  Moderate
  Part I  small  to large
  Question(s)  impact  impact may
  may occur  occur
a. The proposed action may require new water supply wells, or create additional demand  D2c  9  9
  on supplies from existing water supply wells.
b. Water supply demand from the proposed action may exceed safe and sustainable  D2c  9  9
  withdrawal capacity rate of the local supply or aquifer.
  Cite Source:

c. The proposed action may allow or result in residential uses in areas without water and  D1a, D2c  9  9
  sewer services.

d. The proposed action may include or require wastewater discharged to groundwater.  D2d, E2l  9  9

e. The proposed action may result in the construction of water supply wells in locations  D2c, E1f,  9  9
  where groundwater is, or is suspected to be, contaminated.  E1g, E1h

f. The proposed action may require the bulk storage of petroleum or chemical products  D2p, E2l  9  9
  over ground water or an aquifer.
g. The proposed action may involve the commercial application of pesticides within 100  E2h, D2q,  9  9
  feet of potable drinking water or irrigation sources.  E2l, D2c

h. Other impacts:  9  9

5. Impact on Flooding
  The proposed action may result in development on lands subject to flooding.  
  ✔NO  YES
  
  (See Part 1. E.2)
  If “Yes”, answer questions a - g. If “No”, move on to Section 6.
  Relevant  No, or  Moderate
  Part I  small  to large
  Question(s)  impact  impact may
  may occur  occur
a. The proposed action may result in development in a designated floodway.  E2i
b. The proposed action may result in development within a 100-year or a 500-year  E2j, E5a,
floodplain.  E5b
c. The proposed action may result in development in an area potentially affected by sea  E2k, E5c
level rise.
d. The proposed action may result in, or require, modification of existing drainage  D2b, D2e
  patterns.
e. The proposed action may change flood water flows that contribute to flooding.  D2b, E2i,
  E2j, E2k
f. If there is a dam located on the site of the proposed action, is the dam in need of repair,  E1e
  or upgrade?

  Page 3 of 13  FEAF 2026
  49