d. The proposed action may result in light shining onto adjoining properties.  D2n  9  9

e. The proposed action may result in lighting creating sky-glow brighter than existing  D2n, E1a  9  9
  area conditions.

f. Other impacts:  9  9

16. Impact on Human Health
  The proposed action may have an impact on human health from exposure  
  ■ NO  
  YES
  to new or existing sources of contaminants. (See Part 1.D.2.q., E.1. d. f. g. and h.)
  If “Yes”, answer questions a - m. If “No”, go to Section 17.
  Relevant  No, or  Moderate
  Part I  small  to large
  Question(s)  impact  impact may
  may occur  occur
a. The proposed action is located within 1500 feet of a school, hospital, licensed day  E1d  9  9
  care center, group home, nursing home or retirement community.
b. The site of the proposed action is currently undergoing remediation.  E1g, E1h  9  9

c. There is a completed emergency spill remediation, or a completed environmental site  E1g, E1h  9  9
  remediation on, or adjacent to, the site of the proposed action.
d. The site of the action is subject to an institutional control limiting the use of the  E1g, E1h  9  9
  property (e.g., easement or deed restriction).
e. The proposed action may affect institutional control measures that were put in place  E1g, E1h  9  9
  to ensure that the site remains protective of the environment and human health.
f. The proposed action has adequate control measures in place to ensure that future  D2t  9  9
  generation, treatment and/or disposal of hazardous wastes will be protective of the
  environment and human health.
g. The proposed action involves construction or modification of a solid waste  D2q, E1f  9  9
  management facility.
h. The proposed action may result in the unearthing of solid or hazardous waste.  D2q, E1f  9  9

i. The proposed action may result in an increase in the rate of disposal, or processing, of  D2r, D2s  9  9
  solid waste.
j. The proposed action may result in excavation or other disturbance within 2000 feet of  E1f, E1g  9
  a site used for the disposal of solid or hazardous waste.  E1h

k. The proposed action may result in the migration of explosive gases from a landfill  E1f, E1g  9  9
  site to adjacent off-site structures.
l. The proposed action may result in the release of contaminated leachate from the  D2s, E1f,  9  9
  project site.  D2r

m. Other impacts:

  Page 10 of 13  FEAF 2026