Southtowns Record

Town Board Regular Meeting Agenda, Jun 22, 2026 — Agenda

Government
Town of Hamburg
Board
Town Board
Meeting
Jun 22, 2026
Kind
Agenda
Topics
Public safety, Budget and taxes, Zoning and land use, Water, sewer and drainage, Parks and recreation, Roads and traffic

Original document

Same meeting

Text · page 50 of 62

Read the whole document on one page (all 62 pages, each with its own heading)

This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.

2517 Long
  Grand Island, NY 14072

  CHANGE ORDER REQUEST RECAP

  Job Name:  Hamburg Senior Community Center  Date:  4/2/2026
  Contract No.: 2025-03E  Change Order Regest No.:  3  CIR Job No.:  2502019
Description:
CIR to provide a credit for the difference in price between a new 300K VA padmount transformer with a stainless steel base per specification
section 261219, and the proposed re-conditioned 300K VA padmount transformer with 10X transarmor coating from Maddox.

Material Description  Material  _| Labor Description  Hours  Rate  Labor Cost
Cooper Electric Quote #332241  $  (47,860.00)|  Foreman ST  -  -  $  -
Maddox Quote #Q212510-5  $  43,208.41 | Journeyman ST  =  -  $  -
  Foreman PT  -  $  -
  Journeyman PT  -  $  -
  $  =

  $  s
  $  -

  $  -
  $  -

 Material Cost Subtotal:  $  (4,651.59)  $  -
  Job Expenses:  Supervision (12.5%)  0.000  -  $  -
Document Control  Tool Usage (4% of Labor)  $  -
Travel Time Costs  Total Labor Costs:  $  -
Telephone  SUBTOTAL(L+M+JE)  $  (4,651.59)
Transportation  Research & Layout  0%  $  -
Storage / Warehouse  Material Handling  0%  $  -
Safety (3% of Labor Cost)  $  -  Clean Up Costs:  0%  $  -
Inspections & Permits

Record Drawings

Fuel Surcharges (4% of Material Cost)  $  -  SUBTOTAL:  $  (4,651.59)
'26 -'27 Wage Rate Increase  $  -  Overhead  0%  $  -
Total Job Expenses  $  S  Profit  0%  $  -
Qualifications & Clarifications:  Subcontractor  $  -
1.) Sales Tax is NOT included  Subcontractor Mark-up  15%  $  -
2.)  Straight Time only-NO overtime included  TOTAL:  $  (4,651.59)
3.) No cutting and patching included  Tax on Total  -  $  =
4.) Schedule Impact  Bond Cost  0%  $  -

  Change Order Request Total  $  (4,651.59)
  We reserve the right to correct any and all errors and omissions  50