Town Board Regular Meeting Agenda, Apr 27, 2026 — Agenda (full text)
Page 1
Agenda
Natalie E. Nitsche Town Clerk
Town Board of the Town of Hamburg
April 27, 2026
1. Roll Call
2. Pledge of Allegiance
3. Minutes of Previous Meeting
RESOLVED, that the Town Board does hereby approve the minutes of the previous meeting as
follows: April 13, 2026
4. Agenda Items
4.1. Proclamation Recognizing May as Amyotrophic Lateral Sclerosis (ALS) Awareness
Month
4.2. Public Hearing Proposed Local Law #6, 2026 Amend Chapter 65 of the Hamburg Town
Code
4.3. Non-CFA Zoning Code Site Plan Review Referral and Public Hearing Resolution
4.4. Town of Hamburg Plumbing Exam
4.5. Amendment to Chapter 65 - Avoidable Alarms
4.6. Approval of the 2026 Schedule of Fees for Avoidable Alarms
4.7. Schedule a public hearing for amending Chapter 75-4 A.
4.8. Out of Town Travel: 2026 OCFS/ANYSYB Director's Training
4.9. POLICE - Out of Town Travel Request
4.10. 2026 Highway School
4.11. Taylor Road Cabin Alcohol Waivers
4.12. RFP for New Speaker System at the Hamburg Town Arena
4.13. Youth, Recreation, and Senior Services Budget Adjustment
4.14. Youth, Recreation, & Senior Services Budget Adjustment
1
Page 2
4.15. Budget Adjustment
4.16. Youth, Recreation, & Senior Services Budget Adjustment - Youth Council
4.17. Budget Transfer
4.18. 2026 Home Grant
4.19. 2026 CDBG Grant
4.20. Purchase and Sale Agreement with Erie County
4.21. B&G Emergency Employment Request
4.22. B&G PAF
4.23. Youth, Recreation, & Senior Services P.A.F.
4.24. PAF - Justice Court
4.25. Lake Shore Volunteer Fire Company, Inc.-New Members Tessmer & Valera
4.26. Town Hall Brick Repair Contract 2026-01
4.27. Town Beach Jetty Repair Contract 2026-02
4.28. SW Blvd and Big Tree Road Traveler Center Rezoning SEQR Resolution
4.29. SW Blvd and Big Tree Road Traveler Center Rezoning Approval Resolution
5. Public Comment
6. Meeting is adjourned by Supervisor
2
Page 3
Town Board of the Town of Hamburg
April 27, 2026 Meeting
4.1. Proclamation Recognizing May as Amyotrophic Lateral Sclerosis (ALS) Awareness Month
WHEREAS, Amyotrophic Lateral Sclerosis (ALS), often referred to as Lou Gehrig’s Disease, is a
progressive neurodegenerative disease that affects nerve cells in the brain and spinal cord, leading to
loss of muscle control; and
WHEREAS, ALS causes individuals to lose the ability to speak, move, eat, and eventually breathe,
while their cognitive function is often preserved; and
WHEREAS, the disease currently has no known cure, and most people diagnosed with ALS live only
two to five years following diagnosis; and
WHEREAS, ALS impacts thousands of Americans each year, affecting individuals and their families
emotionally, physically, and financially; and
WHEREAS, organizations such as The ALS Association work tirelessly to provide patient support,
advance research, and advocate for improved care and policies; and
WHEREAS, increased public awareness and funding for research are critical to discovering treatments
and ultimately a cure for ALS; and
WHEREAS, recognizing ALS Awareness Month provides an opportunity to honor those living with
ALS, remember those who have lost their lives to the disease, and support ongoing efforts to improve
quality of life for patients and families.
NOW, THEREFORE, the Hamburg Town Board, does hereby proclaim May 2026 as Amyotrophic
Lateral Sclerosis Awareness Month, and encourage all residents to join in raising awareness, supporting
those affected, and promoting efforts to find a cure.
In Witness Whereof, we have caused the seal of the Town of Hamburg to be affixed this 20 th day of
April 27, 2026.
_________________________________________
3
Page 4
Elizabeth Farrell Lorentz, Supervisor
Dan Kozub, Deputy Supervisor
Frank Bogulski, Councilmember
Lynne Dixon, Councilmember
Nick Ortiz, Councilmember
4
Page 5
Town Board of the Town of Hamburg
April 27, 2026 Meeting
4.2. Public Hearing Proposed Local Law #6, 2026 Amend Chapter 65 of the Hamburg Town Code
Legal Notice Town of Hamburg
Notice of Hearing Proposed Local Law #6, 2026
PLEASE TAKE NOTICE that there has been presented to the Town Board of the Town of Hamburg on
March 23, 2026, pursuant to the Municipal Home Rule Law, a proposed local law to be known as
proposed local law #6, 2026; the proposed local law amends Chapter 65 of the Hamburg Town Code
entitled "Alarm Systems". An abstract of the proposed local law is described as follows:
The purpose of this local law is to amend the provisions of Chapter 65 of the Code of the Town of
Hamburg entitled "Alarm Systems", specifically §65-6. Avoidable Alarms. §65-7 Enforcement,§65-8
Penalties for offense and §65-9 Fines. A complete copy of the proposed amendments will be available
at:
HAMBURG TOWN HALL
Town Clerk’s Office/upper level
6100 South Park Avenue
Hamburg, New York 14075
And on the Town of Hamburg’s website:
www.townofhamburgny.com Click on Legal Notices & Bid
THEREFORE, pursuant to the statutes and the provisions of the Municipal Home Rule Law, the Town
Board of the Town of Hamburg will hold a public hearing on the aforesaid law, at the Hamburg Town
Hall, 6100 South Park Avenue, Hamburg, New York, at 7:00 p.m. on the 27th day of April, 2026, at
which time all persons interested may be heard.
Dated: March 23, 2026 Natalie E. Nitsche
Town of Hamburg
Town Clerk
5
Page 6
Town Board of the Town of Hamburg
April 27, 2026 Meeting
4.3. Non-CFA Zoning Code Site Plan Review Referral and Public Hearing Resolution
Whereas, the Hamburg Town Code contains and specifies the local laws and ordinances of the Town of
Hamburg; and
Whereas, the Town of Hamburg, over a three-year process, completed and adopted a new
Comprehensive Plan for the Town; and
Whereas, zoning must be in accordance with a Comprehensive Plan and the Town wants to continue the
process of bringing the Town’s Zoning Code and Zoning map into conformance with the Town’s new
2022 Comprehensive Plan; and
Whereas, the Town formed a Comprehensive Plan Implementation Committee (CPIC) who, in
accordance with the Comprehensive Plan and having completed other studies and reports on land use
issues in the Town, has recommended that the Town Board pursue numerous code amendments; and
Whereas, the Town of Hamburg directed the Town Planner to work with the CPIC and a special zoning
code committee to develop other priority zoning code updates that were not included in a CFA grant
that was received by the Town; and
Whereas, the Town CPIC, special zoning code committee, and the Town Planner have developed
specific Code amendments to improve, consolidate, and modernize the existing site plan review
regulations in the Town; and
Whereas, pursuant to Municipal Home Rule Law, the Town Board is proposing to enact a local law as
follows:
Be it enacted by the Town Board of the Town of Hamburg, New York, that the Hamburg Town Board
amends the Hamburg Town Code as follows (full copies attached):
Amend Chapter 280 (Zoning) “Article XLIV Site Plan Review” in its entirety; and
6
Page 7
Now, Therefore, Be It Resolved , pursuant to Part 617 6NYCRR, Article 8 of the Environmental
Conservation Law (SEQRA), it is the intent of the Town of Hamburg Town Board to establish itself as
SEQR Lead Agency and conduct a coordinated review of proposed revisions to Chapter 280 Zoning in
the Town Code.
Be It Further Resolved, that the Hamburg Town Board hereby authorizes the referral of this proposed
law amendment to Erie County.
Be It Finally Resolved, that the Hamburg Town Board sets a Public Hearing on these proposed
amendments at the Hamburg Town Hall, 6100 South Park Avenue, Hamburg, NY at 7:00 pm on May
18th, 2026.
ATTACHMENTS:
4-11-26 Town of Hamburg Site Plan Law Clean Final Version.pdf
7
Page 8
Town of Hamburg, NY
§ 280-307 § 280-309
ARTICLE XLIV
Site Plan Review
§ 280-307 Intent.
The intent of site plan review within the Town of Hamburg is to ensure the efficient use of land,
consideration of potential impacts on the community and the environment and their avoidance,
wherever possible, and the promotion of high standards in the design, layout, landscaping and
construction of development, to ensure development conforms to the Town of Hamburg
Comprehensive Plan and provisions of this chapter.
§ 280-307.1 Authority; Enforcement.
The Town Board of the Town of Hamburg, pursuant to the provisions of §274-a of Town Law, does
hereby grant the Hamburg Planning Board the power and authority to review and approve, approve
with conditions, or disapprove plans that require site plan approval under this chapter.
§ 280-307.2 Applicability.
Unless otherwise provided and as regulated by the Subdivision Regulations of the Town of
Hamburg, 1 site plan review and a site plan approval shall be required for all uses, buildings, and
structures that require a building permit or a certificate of occupancy under this chapter and for
which an application therefor has been made to the Town of Hamburg, except for a farm,
residential decks, signs, fences, one- family dwelling or a two-family dwelling and their permitted
accessory uses, buildings or structures, or similar uses as determined by the Supervising Code
Enforcement Officer prior to the issuance of a building permit or certificate of occupancy.
In general, this includes the following actions:
1. All new commercial, industrial, or institutional structures and uses.
2. All new multifamily housing.
3. Any exterior modification/or addition of existing commercial, industrial, institutional or
multifamily buildings.
4. Any conversion of an existing residential structure to a nonresidential structure.
5. Any conversion of an existing nonresidential structure into a residential structure
containing three or more dwelling units.
6. Any modification to an existing residential structure which increases the number of
dwelling units in the building to three or more dwelling units.
7. Any conversion of an existing nonresidential building from one type of use specified in
this chapter to another.
8. The removal of greenspace, significant revisions to landscaping, additions of impervious
surface, and/or modifications which affect parking for commercial, industrial, or
institutional structures and uses, or residential structures containing three or more dwelling
units.
Downloaded from https://ecode360.com/HA0055 on 2024-11-11
8
Page 9
Town of Hamburg, NY
§ 280-307 § 280-309
§ 280-308. Administrative review waiver.
A. An administrative review waiver may be issued if a proposed project is minor in nature to the
extent that a full site plan review before the Planning Board may not be necessary. An
administrative review waiver requires the site to have previously approved existing structure(s)
and use(s). If the modifications are deemed minor by the Administrative Review Waiver
Committee, consisting of a representative of the Building Department, the Town Engineer, a
representative of the Planning Department and the Planning Board Chair, an administrative
review waiver may be issued upon payment of the required fee (as set by the fee schedule that
is established by resolution of the Hamburg Town Board). A minimum of three (3) signatures
from the Administrative Review Waiver Committee must be secured on the administrative
review waiver application to approve an administrative review waiver. Should there be a tie
vote from the Administrative Review Waiver Committee, the project will be required to come
to the Planning Board for site plan review. Once the administrative review waiver is approved
or the Planning Board has issued site plan approval if the waiver was not granted, then the
applicant may apply for a building permit. Furthermore, the administrative review waiver may
include conditions that must be met for the issuance of the building permit.
B. In general, an administrative review waiver may be issued for a project that has met one or
more following criteria as determined by the Administrative Review Waiver Committee:
(1) Additions or detached accessory structures of less than 1,500 square feet or which
represent less than 10% of the existing structure, whichever is less, where no variances
are needed for construction.
(2) A minor change in use that does not require additional parking.
(3) Such other minor changes or similar uses as determined by the Administrative Review
Waiver Committee.
C. In certain cases, the preparation of a site plan application may be deemed necessary to meet
the requirements of an administrative review waiver process. It may also be determined that
the proposed project needs formal site plan approval from the Planning Board.
D. Determinations and approval conditions for an administrative review waiver may only be
appealed by the applicant by appearing before the Planning Board under a formal site plan
application. Approval of any administrative review waiver shall remain in effect for a period
of not more than one year, unless a successful application for a building permit has been
made within that period.
1. Editor's Note: See Ch. 230, Subdivision Regulations.
Downloaded from https://ecode360.com/HA0055 on 2024-11-11
9
Page 10
§ 280-309. Pre-application and Sketch Plan Submittal Process.
A. If desired, an applicant may submit an optional sketch plan application, including a form
(available from the Planning Department and on the Town website) and the appropriate
associated fee at least 14 calendar days prior to the next available Planning Board meeting.
Applicants are also encouraged to schedule a coordination meeting with the Planning
Department prior to submitting a sketch plan application.
B. Although there are no specific material requirements for a sketch plan submittal, the
applicant should supply as much information as possible to illustrate what they are
proposing. A survey of the property and a sketch of what is proposed would be very
important, and any other materials that could further outline the proposed project, including
but not limited to: conceptual site plan and renderings, elevation drawings, aerial maps, etc...
C. The purpose of sketch plan review is to assist the applicant with understanding any concerns
of the Planning Board, application requirements, and interpretation of the type of project.
D. The Planning Board will informally review the overall design and layout against the intent
and requirements of this chapter and provide feedback to the applicant on potential issues or
concerns that should be addressed or additional information that should be submitted, if the
applicant proceeds to full site plan application. The applicant can decide as to whether to
submit an amended sketch plan to the Planning Board for further review,make a formal site
plan application, or decide not to proceed.
§ 280-310. Procedure for review and approval of a site plan application.
A. Once it is determined that a full site plan process is needed (see previous sections), the
applicant must decide if they want to move forward with their application. If an applicant
wants to move forward, a complete site plan application, including any specific information
that the Planning Board requested during the sketch plan step (if the applicant received sketch
plan direction), must be submitted to the Planning Department at least 14 calendar days prior
to the next available Planning Board meeting. If the Planning Department determines that the
application meets the site plan requirements, the application will be placed on the next
available Planning Board agenda.
B. Prior to any formal approval of a site plan, and once the Planning Board determines that the
application is acceptable for further consideration and action, the Planning Board shall hold
a public hearing, which shall be advertised at least once in a newspaper of general circulation
in the Town at least five business days before such hearing. The Town shall also notify all
adjoining property owners by mail of the public hearing. As a part of the public hearing for
the site plan, a sign-in sheet shall be provided for the purpose of inclusion in Planning Board
meeting minutes.
C. Prior to moving forward with any decisions on the site plan application, the Planning Board
shall hold the required public hearing, complete SEQR, and meet the requirements of County
and adjoining community referral, if required, for the action.
D. The Planning Board shall review the application, site plan and supporting data and, at a
regular meeting of the Planning Board, after completing the public hearing, determining that
all requirements have been met, after completing any required referrals and the SEQR process
10
Page 11
(as needed), shall approve, approve with modification, or disapprove the site plan. The
Planning Board Chair will sign the site plan once the Town Engineer has determined that the
engineering plans are acceptable and authorize the chair to sign the plan. The signed site plan
shall be kept in the Planning and Engineering department files.
E. Approval of any site plan so deemed shall remain in effect for a period of not more than one
year unless a successful application for a building permit (or any other necessary required
permit for a site plan that does not require a building permit) has been made within that period.
If the applicant cannot meet this expiration period, they can apply in writing to the Planning
Department for a single six-month extension prior to expiration, that could be granted by the
Planning Board. When an extension is received, the Planning Department shall add the
request to the ‘Other Business’ portion of the next available Planning Board meeting for the
Planning Board to approve or deny.
F. Site plan applications that are tabled by the Planning Board for additional information, or at
the request of the applicant, will remain as tabled items for up to ninety calendar days (six
subsequent Planning Board meetings). If during this ninety-day period, no new information
is received, or unless an extension is requested and approved, the application will be
considered to be expired after this ninety-day period of inactivity. Prior to the expiration of
the application, the applicant can request in writing to the Planning Department that the
ninety-day period be extended for one additional ninety-day period. To begin the process
again, within one hundred eighty days of the expiration, the applicant will need to resubmit
the application with 50% of the required fee. After one hundred eighty days of the date of
expiration of the application, a new application will be required with the full application fee.
G. If a site plan has been approved with conditions, pre-construction related conditions must be
met prior to issuing any permit to begin construction. Construction or post construction
conditions must be ensured through the Town’s inspection process and confirmed to be met
prior to any certificate of occupancy or operation permit is granted.
§ 280-310.1. Authority to require additional data.
In addition to the required site plan and supporting data indicated in this Article, the Planning
Board may request of an applicant or their agent additional supporting data or plans that the
Planning Board deems necessary and pertinent to carry out its responsibility for site plan review
as provided in this Article.
§ 280-311. Submission of site plan and supporting data.
A. The applicant or their agent shall submit five (5) hard copies of the site plan application form,
site plan, other required Town forms, a SEQR EAF (part 1), and an application fee (to be
determined by the Town). An electronic copy of these materials must also be submitted.
The copies of a site plan and supporting data are to be prepared by and bearing the official
seal and signature of a licensed architect, landscape architect, civil engineer or land
surveyor (permitted by law to do such). These materials will include the following
information, presented in drawn form at a scale approved by the Town and accompanied by
a written text:
(1) Survey of the property showing existing topographic features, including contours, large
trees, buildings, structures, streets, property lines, utility easements, rights-of-way and
11
Page 12
land use, and the zoning and ownership of surrounding property.
(2) A site plan showing proposed lots, blocks, building locations, all land use areas, including
any outdoor proposed uses, fire and emergency vehicle access (any communication with
emergency service providers), and lighting (lighting analysis, if requested).
(3) An aerial photograph of the site and surrounding properties, marked up to illustrate how the
proposed plan fits in with the surrounding properties.
(4) Traffic circulation, parking and loading spaces and pedestrian walks.
(5) Landscaping plans, including site grading, drainage existing and proposed landscape
materials, including trees and shrubs, and their locations, identification of those materials
to be removed, existing and proposed structures and all greenspace areas designed as
part of the site environment. Natural site features and vegetation shall be preserved and
integrated into the proposed site development wherever possible. These areas to be
preserved/protected shall include some form or means to accomplish their protection, including
the use of conservation easements. All new trees shall have a minimum of three inches of
caliper measured six inches above the ground and be in accordance with the Town’s
approved tree and vegetation list.
(6) If requested by the Planning Board, a visualization of the proposed project and how the
new development and proposed landscaping will help buffer or improve the character of
the area (a visual impact analysis may also be requested).
(7) Preliminary engineering plans, including street improvements, storm drainage system,
public utility extensions, water supply, sanitary sewer facilities, outdoor lighting and the
location of existing and proposed fire hydrants as approved by the Fire Chief or Town
Engineer.
(8) Preliminary architectural drawings/elevations for buildings to be constructed.
(9) Construction sequence and time schedule for completion of each phase for buildings,
parking spaces and landscaped areas.
(10) Other information as determined during sketch plan review and/or during site plan
application review.
B. Stormwater pollution prevention plan. When applicable, a stormwater pollution prevention
plan consistent with the requirements of the Town’s laws, shall be required for final
engineering approval and shall submitted to the engineering department following site plan
approval by the Planning Board. The SWPPP shall meet the performance and design criteria
and standards in the Town of Hamburg laws. The approved site plan shall be consistent with
the provisions of the Town’s codes and laws.
C. Access management. [Added 8-17-2015 by L.L. No. 11-2015]
(1) General. One of the most important objectives of access management is reducing the
potential for conflicts, particularly along the most heavily traveled roads. The best
methods for achieving a reduction in conflicts are reducing the number of conflict points
and separating through from local traffic. Land use development and transportation can
be brought into balance, and conflicts can be reduced, through appropriate limitations
on the number of driveways and the enforcement of driveway and corner clearance
12
Page 13
standards.
(a) Properties with frontage on two or more roads do not have the right to driveway
access to all such roads.
(b) Driveways may be required to be located so as to provide shared access and/or
cross-access with an abutting parcel or properties.
(c) Curb cuts and driveway spacing for new development or redevelopment will be
evaluated by the Planning Board on a case-by-case basis to reduce conflicts and
ensure traffic safety and efficiency. In certain cases, minimum spacing
requirements, as deemed appropriate by the Planning Board and that comply with
established State, County or Town standards, shall be applied.
(2) Corner clearance. Corner properties present special problems because they are extremely
attractive to high-volume peak-hour traffic businesses whose designs often create
conflict areas that overlap with the conflict area of the intersection.
(a) Corner clearance is to be measured along the road from the center line of the
driveway pavement to the closest edge of the road pavement. Where road widening
is planned or anticipated in the future, corner clearance should be increased to
provide for the width of the additional lane.
(b) Driveways for corner properties shall meet or exceed the minimum corner clearance
requirements as determined by the jurisdictional agency.
(c) Driveways should be located outside of the functional area of the intersection or, if
this is not possible, driveways should be placed as far as possible from the
intersection.
(d) Cross-access to adjoining properties should be encouraged to the greatest extent
possible.
(3) Driveway location.
(a) Driveway location will be based on a site plan that has been approved by the Town
Planning Board in consultation with the Town Engineer and, where appropriate, the
Town Highway Superintendent (Or County or NYSDOT officials for County and
NYS roadways).
(b) The Town Planning Board may allow the location of driveways (on Town roads) at
less than the minimum driveway spacing standards and corner clearances standards
if:
[1] A dual-driveway system, cross-access driveway system or shared driveway is
proposed and this improves the safe and efficient movement of traffic
between the parcel and the road;
[2] A driveway or driveways could be located so as to meet the minimum
driveway spacing standards and corner clearance standards, but the
characteristics of the parcel or the physical or operational characteristics of the
road are such that a change of location will improve the safe and efficient
13
Page 14
movement of traffic between the parcel and the road; or
[3] Conformance with the driveway spacing standards or corner clearance
standards imposes undue and exceptional hardship on the property owner.
[4] The spacing is approved by the Town Highway Department.
(4) For properties unable to meet the minimum driveway spacing standards or corner
clearance standards, a temporary driveway may be granted. The granting of a temporary
driveway will be conditioned on obtaining a shared driveway, cross-access driveway or
unified parking and circulation with an adjoining parcel, and closure of the temporary
driveway in the future.
D. Landscaping. [Added 8-17-2015 by L.L. No. 11-2015]
(1) A detailed landscaping plan shall be included with the site plan submission. This
landscape plan shall be prepared and certified by a New York State licensed landscape
architect.
(2) A minimum ground area of not less than 10% of the total site area to be developed shall
be landscaped area. Five percent of internal parking areas) shall be green space
(landscaped islands).
(3) For all areas, planted deciduous trees shall have a minimum of caliper of 3 inches,
measured six inches above grade. All planted coniferous trees shall have a minimum
height of five feet above finished grade.
(4) All existing trees larger than six inches in diameter, groups of trees and other natural
vegetation shall be incorporated into the landscape plan to the maximum extent
practicable to provide natural buffering from adjacent properties (especially residential
uses). Efforts shall be made to preserve these features, especially along lot lines. If these
trees along boundaries cannot be preserved, greater setbacks/buffers may be required.
Areas noted on the site plan for preservation must be protected by an instrument (like a
conservation easement) approved by the Town Attorney, delineated at the site and
approved by the Town prior to construction. A note indicating this requirement must
appear on the site plan to be approved.
(5) Selected vegetative plantings shall be compatible with soil conditions on the
development site as well as the regional climate.
(6) Plastic or other types of artificial plantings shall not be permitted.
(7) The landscaping design shall include the provision for pedestrian access to and from the
site.
(8) The landscape plan shall include trees and other design treatments that complement the
existing streetscape design.
(9) The arrangement and location of landscaped areas shall be dispersed throughout the
development site so as to prevent unsightliness and eliminate the monotony of parked
cars.
(10) At least one tree per 30 feet of frontage shall be planted in the required forty-foot setback
14
Page 15
area. Additional trees shall be planted throughout the developed area at a ratio of one
tree per 30 feet of side and rear yard dimension with the area to be developed. Trees may
be spaced evenly or clustered. Acceptable trees shall be limited to those trees listed on
the Town's planting list. This list is available from the Planning Department. Substitution
of planting material may be approved by the Planning Board.
(11) All required vegetative plantings shall be maintained in a healthy and productive
condition and shall be routinely examined. Plant materials shall be replaced, as necessary
or as directed by the Town. The Town Code Enforcement Officer shall enforce the
upkeep of landscaped areas through periodic inspections and in response to complaints
(five years after site plan development finalized or final Certificate of Occupancy).
(12) In areas of specific overlay districts, these districts may have additional or other specific
landscaping requirements.
E. Architectural standards. [Added 8-17-2015 by L.L. No. 11-2015]
(1) Blank walls and other dead or dull spaces at the street level shall be avoided. Visually
interesting activities at the sidewalk edge shall be maintained and/or established to
engage pedestrian interest.
(2) Building frontages should be active, with large nonreflective, minimally tinted window
openings at ground level.
(3) New building forms and elevations should be detailed and articulated to create
interesting rooflines and strong patterns of shade and shadow.
(4) Large structures should be designed to reduce their perceived height and bulk by
dividing the building mass into smaller-scale components.
(5) The rear of buildings (existing and proposed) shall be enhanced, where appropriate, to
improve public access from parking lots and to improve views to surrounding residential
properties.
(6) In some cases, the Planning Board may ask for alternative architectural plans to be
submitted.
(7) The visibility of rooftop equipment should be minimized by grouping this equipment
away from public view. If visible, it will also be necessary to screen these units.
(8) Building designs should incorporate traditional building materials such as masonry,
stone, brick and other natural appearing materials. Building colors should accent, blend
with or complement the surrounding environment.
(9) Dumpsters shall be placed on a concrete pad, and completely enclosed.
(10) In areas of specific overlay districts, these districts may have additional or other specific
architectural requirements.
§ 280-312. Criteria for review and approvals.
A. The Planning Board shall review the site plan and supporting data and take into consideration
15
Page 16
the following:
(1) Harmonious relationship between proposed uses and existing adjacent uses.
(2) Maximum safety of vehicular circulation between the site and street network.
(3) Pedestrian and bicycle accommodation.
(4) Adequacy of interior traffic circulation and parking and loading facilities, with
particular attention to vehicular and pedestrian safety.
(5) Adequacy of landscaping, areas to be protected, and setbacks in regard to achieving
maximum compatibility with and protection of adjacent property and land uses.
(6) The specific requirements of any overlay or other Town design requirements (wetlands,
floodplains, conservation areas, etc.).
(7) Aesthetic, landscaping and other design requirements.
(8) Infrastructure impacts.
(9) Public health and safety.
(10) Drainage, flooding, and grading impacts.
(11) Environmental impacts.
(12) For residential development, the adequacy of open space, playgrounds, and other
recreational amenities.
(13) Other applicable ordinances and laws of the Town of Hamburg.
B. Should changes or additional facilities be recommended by the Planning Board,
recommended approval of the site plan shall be conditional upon satisfactory compliance by
the applicant with the changes or additions.
C. In cases where any action of the Zoning Board of Appeals is required, the site plan shall be
the subject of a preliminary review by the Planning Board, in accordance with the review
procedure set forth above, before action is taken by the Zoning Board of Appeals. After such
action by the Zoning Board of Appeals, the Planning Board shall conduct a final review of
the site plan.
D. The Planning Board, in making its decision concerning the site plan, shall determine if a
sidewalk is warranted to be placed along the site's frontage along a town, county, or state
highway. The Planning Board shall state in its approval resolution the reasoning as to whether
the sidewalk is or is not required for the site's frontage (Reference to the Town of
Hamburg’s Sidewalk Plan shall be made – once adopted).
§ 280-313. Performance bond as condition of approval.
The Planning Board may require, as a condition of site plan approval, that the property owner file
a performance bond, in such amount as determined by the Town Engineer, to ensure that the
proposed development will be built in compliance with accepted plans.
16
Page 17
§ 280-313.1. Violations of approved plans. [Added 6-25-2012 by L.L. No. 2-2012]
In the event that, during construction, the property is not developed in accordance with the
approved site plan, the Building Inspector will utilize his enforcement responsibilities to bring the
site into conformance with the approved plan. In the case where the site cannot be brought into
conformance with the approved plan (for example, an area denoted on the plan for preservation of
trees is disturbed), the Building Inspector can issue a stop-work order and require the owner/
applicant to return to the Planning Board for potential approval of a revised plan. This approval of
a revised plan may require mitigation actions (for example, replacement of trees in a higher ratio
than those removed, screening, additional landscaping, improved aesthetics to the site, etc.) or
modifications to the plan, and bonding in accordance with § 280-313.
§ 280-313.2. Violations and penalties.
A violation of this Chapter and conviction thereof shall be punishable by a fine as set forth in the
Schedule of Fines and Penalties.
§ 280-313.3. Landscaping installation certification. [Added 4-13-2015 by L.L. No. 3-2015]
Where a landscape plan is specifically required by law, or where it is required by the Planning
Board, the applicant shall submit a certification from the Engineering Department that the required
landscaping has been installed in accordance with the approved landscape plan. This certification
shall be submitted to the Building Department along with other required information, prior to the
Building Department issuing a certificate of occupancy (CO) or a conditional CO.
§ 280-314. Site plan revisions.
A property owner wishing to make any changes to an approved site plan shall submit a revised
site plan to the Planning and Engineering Departments for review and approval. Any changes
deemed significant variation from the approved plan, as determined by these departments, shall
go before the Planning Board for approval.
§ 280-315. Other Requirements.
1. Requirement for EV charging stations for site plans (in accordance with Chapter LXII
Electric Vehicle Charging Stations).
17
Page 18
Town Board of the Town of Hamburg
April 27, 2026 Meeting
4.4. Town of Hamburg Plumbing Exam
BE IT RESOLVED that the Town Clerk is authorized to advertise for the Master Plumber, Journeyman
Plumber and Site Utility Contractor examination. The examination is scheduled for June 15, 2026.
ATTACHMENTS:
Plumbing exam legal notice.docx
18
Page 19
LEGAL NOTICE
TOWN OF HAMBURG
The Code Enforcement Department of the Town of Hamburg hereby gives notice of the
regular examination for the Master Plumber License, Site Utility Contractor License, and
Journeyman Plumber License to be held at the Hamburg Town Hall, 6100 South Park Avenue,
Room 7A, Hamburg, New York on Monday, June 15, 2026, at 6:00 p.m. local time.
Anyone wishing to take this examination and meeting the qualifications listed below,
should file an application in writing with the Town of Hamburg Code Enforcement Department
Office prior to June 4, 2025. A nonrefundable deposit of $100 per exam taken is due at the time
of application. Upon approval of the Town Plumbing Examiner, each applicant will be required
to pay on the night of the exam, to the Town Clerk, an additional fee of $200 for each exam to be
taken (Master Plumber Journeyman Plumber and Site Utility Contractor.)
Master Plumber, Journeyman Plumber, and Site Utility Contractors applicants must
have:
(A). Two years of vocational school, plus four years of practical experience under the
supervision of a master plumber for a master plumbing exam; Two years of vocational school,
plus two years of practical experience under the supervision of a master plumber for a
journeyman exam; Two years of vocational school, plus two years of practical experience under
a licensed site utility contractor for a site utility contractor exam; or
(B). Six years of practical plumbing experience for a master plumbing exam; Four years
of practical plumbing experience for a site utility contractor or journeyman plumber or
(C) An equivalent combination of training and experience indicated.
Certification must be attached or included with the application for the Master Plumber or
Site Utility Contractor Exam.
Jeffrey Skrzypek
Supervising Code Enforcement Officer
Town of Hamburg
Dated: April 27, 2026
19
Page 20
Town Board of the Town of Hamburg
April 27, 2026 Meeting
4.5. Amendment to Chapter 65 - Avoidable Alarms
WHEREAS, the Hamburg Town Code contains and specifies the local laws and ordinances of the
Town of Hamburg; and
WHEREAS, the Code Review Committee reviewed the provisions of Chapter 65 of the Code of the
Town of Hamburg entitled “Alarm Systems”, and suggested amendments for the Town Board to
consider; and
WHEREAS, pursuant to Municipal Home Rule Law, the Town Board is proposing to enact a local law
to amend the following sections of Chapter 65: §65-6. Avoidable Alarms; §65-7. Enforcement; §65-8.
Penalties for Offense and §65-9. Fines.
WHEREAS, a public hearing was held on April 27, 2026, for discussion and public comment
concerning adoption of this proposed local law; and
WHEREAS, the Town of Hamburg has determined that this proposed local law amendment is a Type II
action under SEQR, and no SEQR decision is necessary; and
WHEREAS, these proposed local law amendments were referred to Erie County through the 239-m
referral process and received no objections; and
WHEREAS, the proposed amendments are in accordance with the recommendations of the Town of
Hamburg Code Review Committee and the Town of Hamburg Planning Board.
NOW THEREFORE BE IT RESOLVED, the Hamburg Town Board amends Local Law #11 of the
year 1994 of the Code of the Town of Hamburg Chapter 65 entitled “Avoidable Alarms” to provide for
the revision of the Town Code as referenced above and attached.
ATTACHMENTS:
avoidable alarms code changes final draft.docx
20
Page 21
Proposed Code Changes
§ 65-1Purpose.
The purpose of this chapter is to protect and promote the health, safety and
general welfare of the residents of the Town of Hamburg by reducing the number
of avoidable alarms of fire, intrusion, holdup or other emergencies which
contribute to ineffective utilization of police and fire emergency agencies, require
emergency responses which are susceptible to high accident rates, interfere with
genuine emergencies (responses) and produce unnecessary alarm noise to the
surrounding community.
§ 65-2Definitions.
For the purpose of this chapter, the following words and phrases shall have the
meanings ascribed to them by this section:
ALARM SYSTEM
A device or an assembly of equipment which is designated to detect smoke,
abnormal rise in temperature, fire, medical emergency or an entry into or exit
from a building, structure or facility and by reason thereof emits an audible
response intended to alert persons outside of the premises and/or transmit a
signal or message to an emergency agency, either directly or through a private
answering point.
AUTOMATIC DIALER
A device that automatically dials and relays a prerecorded message to an
emergency agency.
EMERGENCY AGENCY
The Police Department or Fire District, central fire dispatch or other emergency
dispatch center.
§ 65-3Compliance required.
A. The owners and lessees of premises having alarm systems shall comply
with all of the provisions of this chapter.
21
Page 22
B. Schools with students in kindergarten through twelfth grade, located in
the Town of Hamburg, both public and private, shall be exempt from compliance
with this chapter.
C. Also exempt from this chapter will be, buildings owned or operated by
the Federal Government, State of New York, County of Erie, Town of Hamburg,
and fire stations within the Town of Hamburg.
§ 65-4Automatic cutoff system required.
A. No person shall install or maintain an external audible alarm device
which does not contain an operational automatic cutoff system which turns off
the external audible alarm after a period not to exceed 10 minutes. It is noted and
stressed that this subsection applies to any alarm devices installed after the
effective date of this chapter. That is to say, any alarm systems installed before
the date of this chapter need not comply with this section.
B. An automatic dialer connected directly to an emergency agency shall
automatically disconnect and/or terminate its message after the message has
been transmitted a maximum of two times. Notwithstanding the foregoing,
however, the total transmission time of all messages shall not exceed five
minutes.
§ 65-5Connection to 911 and emergency agencies restricted.
A. No alarm system shall have an automatic dialer feature or other type of
alarm alter which connects automatically to the enhanced 911 emergency
telephone system.
B. There shall be no automatic alarm system with direct communication of
any type to an emergency agency without prior written authorization from the
emergency agency where the alarms terminate.
22
Page 23
§ 65-6Avoidable alarms.
A. General provisions.
(1) For the purposes of this section, an “Avoidable Alarm” shall be
defined as the activation of an alarm system through mechanical failure,
malfunction, improper installation or the negligence of the owner, user,
custodian or lessee of an alarm system, or of his employees, requiring an
emergency response when, in fact, an emergency does not exist. An alarm
also includes intentional activation of an alarm system when the activator
knows an emergency situation does not exist.
(2) An Avoidable Alarm does not include alarms activated by violent
conditions of nature or similar cases beyond the control of the user, owner
or operator of the alarm system. The activation of an alarm system under
any circumstances in which the activator reasonably believes that an
emergency situation exists shall not be deemed to be an Avoidable Alarm.
B. Charges. An owner or lessee of real property to which an emergency
agency responds as a result of an Avoidable Alarm shall pay a fee for each such
response as set forth in the Schedule of Fees for Avoidable Alarms. The fees will
be assessed based on the previous calendar and payable upon receipt of written
notice.
C. Notice of excessive use. The owner or lessee of real property which
received an emergency response by reason of an Avoidable Alarm shall be
notified, in writing, by means of first class mail, of all Avoidable Alarms from the
previous calendar year. The letter shall inform the owner or lessee of the times
and types of emergency responses provided to the address location and shall also
contain a copy of this Alarm Code.
D. Administrative review. The Chief of Police and the Supervising Code
Enforcement officer shall establish a policy and procedure whereby an owner of
real property or lessee thereof on which an alarm system has been installed and
who has been notified of an Avoidable Alarm may present evidence as to why any
such alarm should not be classified as an Avoidable Alarm. The Chief of Police and
23
Page 24
the Supervising Code Enforcement Officer shall designate members of their
Departments, not to exceed five in total, to establish an appeal committee, to
receive such evidence and make recommendations and findings of fact
concerning such evidence. The Chief of Police and Supervising Code Enforcement
Officer shall make the final determination concerning an appeal, which
determination shall be final as to the administrative process. Any further review
shall only be taken pursuant to procedures under Article 78 of the Civil Practice
Law and Rules. To challenge the classification of an alarm as an Avoidable Alarm,
the real property owner or lessee thereof shall, in writing, notify the Supervising
Code Enforcement Officer within 20 days after receipt of notice of the Avoidable
Alarm. The failure to give timely notice shall be deemed a waiver of the right to
review the determination.
E. Payment of charges. Avoidable Alarm charges shall be paid to the Town
Clerk of the Town of Hamburg at S-6100 South Park Avenue, Hamburg, New York
14075.
F. Failure to remit fee. Failure of a real property owner or lessee of property
on which an alarm system is installed to pay the Avoidable Alarm charge within 30
days from notice of the amount due shall be assessed an additional fee of 20% to
cover the costs of additional administrative expenses related thereto, shall be
certified by the Building Inspector to the Town Receiver of Taxes and shall
thereupon become and be a lien upon the property on which said Avoidable
Alarms were located, and shall be added to and become and form a part of the
taxes next to be assessed and levied upon such lot or land and shall bear interest
at the same rate as taxes and shall be collected and enforced by the same officer
and in the same manner as taxes levied and assessed against such property.
§ 65-7Enforcement.
The Supervising Code Enforcement Officer or Chief of Police shall enforce this
chapter for alarm systems which detect medical emergencies, smoke, fire or
abnormal rise in temperature and entry or exit from a building, structure or
facility.
§ 65-8Penalties for offenses.
Any person, business, firm, corporation, partnership, association or other entity
that does not pay the fee as established in this code or that violates any other
24
Page 25
provisions of this code shall be subject to a fine or penalty as set forth in the
Schedule of Fines and Penalties for each offense. A separate offense shall be
deemed committed upon each day from notice of an Avoidable Alarm or
completion of administrative review of such notice until date of payment of all
charges due.
§ 65-9Fines and Fees.
Monies received for fines for shall go into the General Part of the Town Fund
§ 65-10Severability.
If any section, clause or provision of this chapter or the application thereof to any
person is adjudged invalid, such adjudication shall not affect other sections,
clauses or provisions or the application thereof which can be sustained or given
effect without the invalid section, clause or provision or application, and to this
end the various sections, clauses or provisions of this chapter are declared to be
severable.
§ 65-11When effective.
The chapter shall become effective immediately after proper filing, including with
the Secretary of State.
25
Page 26
New Code section added to the TOH Code
Schedule of Fees for Avoidable Alarms
The Town Board of the Town of Hamburg hereby establishes a unified
Schedule of fees for Avoidable Alarms for the Town of Hamburg, which said
Schedule may be adopted or amended from time to time, by resolution of the
Town Board; said Schedule of Fees for Avoidable Alarms hereinafter adopted
pursuant to this chapter and shall be entitled "Schedule of Fees for Avoidable
Alarms for the Town of Hamburg, New York." Same shall be filed at the time of
adoption, and upon any amendment thereof, in the office of the Town Clerk of
the Town of Hamburg.
26
Page 27
Town Board of the Town of Hamburg
April 27, 2026 Meeting
4.6. Approval of the 2026 Schedule of Fees for Avoidable Alarms
WHEREAS, the Town of Hamburg Code established a Schedule of Fees for Avoidable Alarms to be
imposed for Avoidable Alarms throughout the Town and
NOW, THEREFORE, BE IT RESOLVED, that the Hamburg Town Board adopt the 2026 Town of
Hamburg Schedule of Fees for Avoidable Alarms.
ATTACHMENTS:
2026 Avoidable alarms.pdf
27
Page 28
A B C D E
Number of Avoidable
Alarms throughout the Residential Fee Commercial Fee
1 past 12 Months
3 POLICE DEPARTMENT RESPONSES
4
5 First No Fee No Fee
6 Second and Third No Fee $100
7 Fourth and Fifth $50 $100
8 Sixth Through Eighth $100 $200
9 Ninth and Over $200 $500
10
11
12 FIRE DEPARTMENT RESPONSES
Number of Avoidable
Alarms throughout the Residential Fee Commercial Fee
13 past 12 Months
14
15 First No Fee No Fee
16 Second No Fee $100
17 Third Through Fifth $50 $200
18 Sixth Through Eighth $100 $500
19 Ninth and Over $200 $1,000
20
21
22
28
Page 29
Town Board of the Town of Hamburg
April 27, 2026 Meeting
4.7. Schedule a public hearing for amending Chapter 75-4 A.
WHEREAS, the Hamburg Town Code contains and specifies the local laws and ordinances of the
Town of Hamburg; and
WHEREAS, the Code Review Committee reviewed various regulations of the Town of Hamburg Code
and has sent these suggested revisions to the Town Board to begin the adoption process; and
BE IT RESOLVED that the Town Clerk is authorized to schedule a public hearing on a Proposed Local
Law. The proposed local law would provide for amendments to the Hamburg Town Code in accordance
with the recommendations of the Town of Hamburg Code Review Committee, specifically:
The purpose of this local law is to amend the provisions of Chapter 75-4 A. Brush, grass and weeds,
Inspection; removal by town.
BE IT FURTHER RESOLVED that, in accordance with the State Environmental Quality Review Act
(SEQRA), the Town Board will seek Lead Agency status for this proposed legislation and authorizes
the Planning Department to perform the appropriate mailings and notifications.
Be It Further Resolved, that the Hamburg Town Board hereby authorizes the referral of these proposed
Code amendments to Erie County; and
Be It Finally Resolved, that the Hamburg Town Board sets a Public Hearing on these proposed Code
amendments at the Hamburg Town Hall, 6100 South Park Avenue, Hamburg, NY at 7:00 pm on May
18, 2026.
ATTACHMENTS:
Chapter 75 Brush code change.docx
29
Page 30
75-2 Standards
It shall be unlawful for any person having control or ownership or any type of
tenancy in any lot for which at least one building permit has been issued, in the
Town of Hamburg, County of Erie and State of New York, to permit or maintain on
such land, or portion thereof, any growth of weeds, grass or other rank vegetation
to a greater height than 12 inches on the average, or any accumulation of dead
weeds, grass or brush.
Removed section above about being in a subdivision with a map cover filed.
When a minor subdivision is done the planning board can waive the map cover
filing and they do that sometimes. That would mean that those houses would not
need to cut their grass.
§ 75-4Inspection; removal by town.
A.
If an alleged violation has occurred, the Town Building Inspector shall send
written notice of the violation to the last known address of the property owner by
certified mail. The property owner shall then have ten (10) calendar days to cure
the violation. At the end of the ten day period, the Town Building Inspector shall
make an inspection, and if such inspection discloses that the owner or occupant
has not complied with said notice, then the Inspector shall cause weeds, grass and
other vegetation on such lands or portions thereof to be cut and removed. Once
the initial removal of the weeds, grass and other vegetation has been completed
by the Town of Hamburg, the Town shall continue to maintain the property with
cuts or clearings at least every two weeks until such time as the property owner
or occupant has provided written notice by certified and regular mail to the
Supervising Code Enforcement Officer acknowledging the condition and
confirming that the property will be maintained by the property owner or
occupant.
B. If the topography of said land is such as to make it impossible or impractical to
use machinery in the clearing and cutting, the Inspector shall first grade the land
in order that the cutting and removal may be done by machinery.
30
Page 31
C.
The actual cost of such cutting and removal, and grading, if necessary, plus a fee
of 20% for inspection and administrative overhead therewith, shall be certified by
the Building Inspector to the Town Receiver of Taxes and shall thereupon become
and be a lien upon the property on which said weeds, grass and other vegetation
were located, and shall be added to and become and form a part of the taxes next
to be assessed and levied upon such lot or land and shall bear interest at the
same rate as taxes and shall be collected and enforced by the same officer and in
the same manner as taxes levied and assessed against such property.
31
Page 32
Town Board of the Town of Hamburg
April 27, 2026 Meeting
4.8. Out of Town Travel: 2026 OCFS/ANYSYB Director's Training
BE IT RESOLVED; the Town Board authorizes Nicole Dayka (Youth at Risk Coordinator) to attend
the 2026 OCFS/ANYSYB Director’s Training in Saratoga Springs, NY. The event is scheduled for
May 6 & 7, 2026. Estimated costs for the conference are as follows:
Milage (.725 per mile x 584 Miles)= $423.40
Meals Per Diem (2 days x $65)= $130
Tolls and Incidentals= $41.62
Total= $595.02
Funds are available in A7020.0492.
32
Page 33
Town Board of the Town of Hamburg
April 27, 2026 Meeting
4.9. POLICE - Out of Town Travel Request
WHEREAS, the 2026 FBI-LEEDA Annual Executive Training Conference is being held Sunday, May
31, 2026 to Wednesday, June 3, 2026, at the Fort Lauderdale Marriott Harbor Beach Hotel in Fort
Lauderdale, FL, and;
WHEREAS, all accommodations as well as meals and transportation are provided, and;
NOW, THEREFORE, BE IT RESOLVED, the Town Board authorizes Captain Todd Ehret to attend the
2026 FBI-LEEDA Annual Executive Training Conference with no cost to the department.
33
Page 34
Town Board of the Town of Hamburg
April 27, 2026 Meeting
4.10. 2026 Highway School
RESOLVED, the Town Board Authorize Highway Superintendent Ed Hughes to attend the New York
State Association of Towns 2026 Highway School from June 1, 2026 through June 3, 2026 at Ithaca
College, Ithaca, New York.
REGISTRATION: $175.00
MEALS: (3 days EACH @ $50.00 per day) $150.00
LODGING: (3 nights at $200.00 per night) $600.00
TOTAL APPROXIMATE COST $925.00
Use of a town vehicle is requested.
Money is available in account A5010.492
34
Page 35
Town Board of the Town of Hamburg
April 27, 2026 Meeting
4.11. Taylor Road Cabin Alcohol Waivers
RESOLVED, that the Hamburg Town Board does hereby approve alcohol waivers for May 2026
Taylor Road Cabin rentals as follows:
5/1/26
5/2/26
5/3/26
5/8/26
5/9/26
5/10/26
5/15/26
5/16/26
5/17/26
5/23/26
5/24/26
5/29/26
5/30/26
5/31/26
35
Page 36
Town Board of the Town of Hamburg
April 27, 2026 Meeting
4.12. RFP for New Speaker System at the Hamburg Town Arena
WHEREAS, the current speaker system at the Hamburg Town Ice Arena no longer serves its purpose
due to age and disrepair;
BE IT RESOLVED; the Department of Youth, Recreation, and Senior Services be authorized to post
and distribute a Request for Proposal (RFP) in relation to acquiring a new speaker system to be
installed at the Hamburg Town Ice Arena.
ATTACHMENTS:
RFP for New Audio System at Ice Arena Updated 4-13-2026.pdf
36
Page 37
COMPANY___________________
ADDRESS____________________
REQUEST FOR PROPOSAL AND SPECIFICATIONS
FOR A NEW AUDIO SYSTEM AT
TOWN OF HAMBURG ICE ARENA
Town of Hamburg
6100 South Park Ave., Hamburg NY 14075
37
Page 38
TOWN OF HAMBURG
REQUEST FOR PROPOSALS
Sealed Proposals are hereby requested on the following:
"New Audio System at Town of Hamburg Ice Arena,” all in accordance with specifications on
file with the Hamburg Town Clerk, Natalie Nitsche, 6100 South Park Avenue, Hamburg, New
York. These specifications may be obtained in the Hamburg Town Clerk’s office during regular
business hours on weekdays (Monday-Friday) from 9:00 a.m. to 5:00 p.m. (local time).
Sealed proposals on the above must be filed and submitted in writing to the Hamburg Town
Clerk, 6100 South Park Avenue, Hamburg, New York 14075, no later than 11:00 a.m. (local
time) on Wednesday May 27th, 2026.
Proposals must be marked " New Audio System at Town of Hamburg Ice Arena".
THE TOWN BOARD RESERVES THE RIGHT TO REJECT ALL PROPOSALS AND TO
WAIVE ANY INFORMALITIES.
Dated: April 29th, 2026 Natalie Nitsche
Town Clerk
Town of Hamburg
38
Page 39
Introduction/Background
The Town of Hamburg Ice Arena is seeking proposals from qualified audio/AV
contractors to design, supply, install, and commission a brand-new facility wide audio system,
replacing the current aging equipment. The upgraded audio equipment must support sporting
events, skating sessions, announcements, emergency paging, music playback, private events, and
rentals. The Town of Hamburg Ice Arena is a year-round facility used in the winter for skating
and hockey and in warmer weather for summer camp and sport rentals. The main programs held
at the Ice Arena include Hamburg Hawks hockey, Hilbert College hockey, high school hockey,
Public Skate, Learn to Skate, Skate and Shoot, SABAH (organization for individuals with
disabilities), Summer Day Camp, organized sports rentals (lacrosse, etc.) and private rentals. The
Ice Arena needs a brand-new audio system in order to continue to service the community.
Project Objectives
• Removal and disposal of existing/outdated equipment and wiring.
• Install new audio system and necessary wiring which must
o Deliver clear, reliable, even, and high-quality sound coverage throughout rink and
lobby areas.
o Provide sound quality for fluctuating crowd sizes for programs and events.
o Include durable equipment suitable for cold, humid, and reverberant
environments.
Scope of Work
Vendors must tour the site prior to submitting a proposal and must provide a detailed
description of the scope of work they will complete. This description should include all required
equipment, labor, materials, programming, and time frame. The scope includes the following.
1. Design
• Create an audio system layout fair to the dimensions of the rink and lobby areas and
specify the location and size of the speakers on the provided diagram.
o Rink area dimensions: 240 feet by 221 feet
o Lobby area dimensions: 131 feet by 18 feet.
2. Removal and Disposal of Existing Audio Equipment
• Safe removal and disposal of all existing and outdated audio system components and
wiring.
• Patching and repairing small penetrations created by removal.
39
Page 40
3. Equipment Components
Must include all components listed below or components equivalent to what is listed:
• Speakers
o Custom indoor center clustered speaker system or equitable speaker
arrangement that provides the same quality sound throughout the entire
rink area (refer to Scope of Work section A).
o Four (4) ceiling mount lobby speakers capable of delivering quality sound
throughout the entire lobby area (refer to Scope of Work section A).
o Suitable for cold or moisture-prone zones (all weather speakers).
• Microphone
o Two (2) wired microphones or comparable wireless options and
accessories.
• Audio Equipment
o Amplifier, sequencer, on/off switch, CD/SD/USB player with Bluetooth
receiver and FM/AM radio tuner, wiring, and multimedia mixer.
4. Installation
• Installation of new speakers, wiring, equipment components stated above and all
other necessary components and accessories.
• Ensuring all mounting hardware and audio equipment is secure and suitable for an ice
arena environment.
5. Testing & Training
• Complete a full system testing and tuning to ensure in full working condition.
• Provide written instructions for the entire audio system.
Project Timeline
• Project start date must be 4-6 weeks after proposal is accepted by the Hamburg Town
Board.
• Project completion date must be 6-8 weeks after proposal is accepted by the Hamburg
Town Board.
• Vendor must coordinate a schedule with both the Town of Hamburg Building and
Grounds and Youth, Recreation, and Senior Services management staff prior to the
commencement of work on this project.
40
Page 41
Award of Contract and Evaluation Procedure
The Town of Hamburg has elected to award this contract on the basis of best value
pursuant to Town Code Chapter 48. The award of this contract will be made only to the
responsible bidder whose proposals shall comply with all the provisions required to render it
responsive and provides the best value to the Town. The Town Board reserves the right to reject
any or all proposals if, in its opinion, the best interests of the Town will, thereby, be promoted.
The bidder must present evidence of:
• Prior municipal experience and performance, both with the Town of Hamburg or
other municipalities.
• Ability to perform the project demonstrated by completion of prior projects of a
similar nature and size and within required time horizons.
• Financial wherewithal to complete project within required time horizons.
• Prior experience with operation of specific plant and machinery necessary to
complete the project, confirm current ownership of plant and machinery, or if not
currently owned, availability and lead time for acquisition.
• The “Project Timeline” is provided above. Bidder may propose a modified
timeline for consideration but must meet the provided milestones.
The above categories shall be weighed with the overall bid price as follows:
• 45% – Price
• 25% – Experience
• 10% – Ability to Perform
• 10% – Plant and Machinery
• 5% – Financial Wherewithal
• 5% – Timeline
Further categories for assessing proposal include:
• Geographic locality of business.
• Compatibility of system components to allow for future expansion, revision, or
relocation.
• Overall design and plan to meet scope of work described.
• Meeting all conditions detailed in the RFP.
Insurance, Legal and Agreements
• The vendor must secure any applicable permits and make sure the project is in
compliance with any town codes and regulations.
41
Page 42
• The vendor shall also secure and maintain the following insurance: See insurance
document attached. All coverages are to be written in a company licensed in New
York and the company should have a Best’s Key rating Guide rating of at least B+.
• A certificate of the above required insurance providing a minimum of 30 days written
notice of cancellation or non-renewal of such insurance shall be submitted to the
Town Attorney's office, Town Hall, 6100 South Park Avenue, Hamburg, New York
14075, prior to execution of the installation (see accompanying Certificate of
Insurance sample for reference).
• Indemnification: Vendor agrees that it shall, to the fullest extent permitted by law,
defend, hold harmless and indemnify including the payment of attorney’s fees and
costs, the Town of Hamburg and any other facility owner, and their respective agents,
officers, and employees, from and against all claims, suits, damages, defense, and
other legal costs and expenses of any kind, arising out of, resulting from, caused by,
or in any way related to the activities and operations of Vendor and/ or use of Town
owned or provided facilities.
• The town's insurance requirements are subject to change at the sole discretion of the
Town and its insurance consultants.
• The Town will NOT provide any use of Town owned equipment for any portion of
the project.
• THE TOWN RESERVES THE RIGHT TO REJECT ALL PROPOSALS, to consider
the reputation of the applicant in making its selection, and to waive any informalities
or minor deviations from the specifications.
• This sheet must be signed and returned with the proposal.
___________________________________
Signature of Applicant
42
Page 43
Insurance Requirements
Instructions pertaining to the Town of Hamburg regarding:
CONTRACTORS’ OR VENDORS’
INSURANCE COVERAGE AND CERTIFICATES
1. GENERAL PROVISIONS
As to all required insurance:
.1 The Vendor shall provide current Certificates of Insurance and accompanying
documents as described herein for the Town’s approval prior to Town’s signing of
contract(s).
.2 “Certificate Holder” shall be Town of Hamburg at the address of
6100 South Park Avenue Hamburg, NY 14075.
.3 Coverage must comply with all specifications set forth herein.
.4 All insurance documents must be executed with authorized signatures.
.5 The Vendor’s required liability policies must be endorsed to provide that any Notice
of Cancellation or Notice of Non-Renewal given to the First Named Insured shall
also be given to the Additional Insureds for this project. A copy of such
endorsement(s) must be furnished to the Certificate Holder.
.6 Failure of the Town to object to the Vendor’s failure to furnish a Certificate or other
evidence of the required insurance coverages, object to any defect in such
Certificate or other evidence of coverage, or demand receipt of such Certificate or
other evidence of coverage shall not be deemed a waiver of Vendor’s obligation to
furnish the required insurance coverages described herein. Nothing contained
herein imposes on the Town a duty or obligation to review any evidence of insurance
coverages or issue any formal approval or acceptance of such evidence.
.7 The Vendor’s liability and indemnification of the Town shall not be relieved or
diminished by the Vendor securing insurance coverage in accordance with the
Town’s requirements. Any approval by the Town of such insurance coverage shall not
43
Page 44
be construed as accepting in any way the deficiencies in the Vendor’s insurance
coverage.
.8 In addition to Certificates of Insurance and other documents, the Vendor shall
provide to the Town and other Certificate Holders, on a timely basis, copies of any
subsequently issued endorsement(s) that amend applicable coverages or limits.
.9 When any required insurance shall expire, due to the attainment of a normal
expiration or renewal date, the Vendor shall supply, no later than ten (10) days prior
to such expiration, the Town with Certificates of Insurance and accompanying
documents evidencing continuation of coverage in the same manner, limits of
protection and scope as provided by the previous policy.
.10 The Vendor will assure that any and all subcontractors retained by the Vendor carry
and maintain insurance with reasonably prudent limits and coverage satisfactory to
the Town in light of the work to be performed, written by companies meeting the
same criteria as required in Section 2. LIABILITY INSURANCE, and that the Town is
named additional insured on the subcontractor’s liability policies according to the
same requirements as described in Section 2.1(b).
.11 The Vendor shall disclose to the Owner any deductible or self-insured retentions
applicable to any of the coverages required herein of the Vendor.
.12 The Town reserves the right to modify the requirements herein, including limits,
based on circumstances involved, including but not limited to the nature of the risk
involved, prior experience, insurer, or coverage
44
Page 45
2. LIABILITY INSURANCE
The Vendor agrees to secure and maintain, at the Vendor’s own expense, all insurance
coverage required herein from one or more insurance companies that are licensed to
write such insurance in New York State or are eligible non-admitted insurers, per the
current Excess Line Association of New York’s (ELANY) official list. Insurers must carry
an A.M. Best “Secure” rating of B+ or better. The Vendor’s insurance shall include the
following, and shall be written with limits no less than hereinafter specified:
.1 COMMERCIAL GENERAL LIABILITY
(a) Occurrence based Commercial General Liability coverage to include bodily
injury, personal injury, and property damage applicable to ongoing operations
and contractual liability. The coverage limits applicable shall be the greater of
the amounts indicated below or the amounts carried by the VENDOR:
General Aggregate $2,000,000
Products & Comp/Op. Aggregate $2,000,000
Personal & Advertising Injury $1,000,000
Each Occurrence $1,000,000
Fire Damage (any one fire) $50,000
Med. Expense (any one person) $5,000
(b) Additional Insured: Coverage in Commercial General Liability and Excess
Liability and/or Umbrella Liability policies or coverage sections shall be written
or endorsed so as to apply to the following as additional insured on a primary
and non-contributory basis:
"Town of Hamburg and its employees, authorized volunteers and board
members.”
The Certificate of Insurance must clearly state how Additional Insured coverage
is achieved in the General Liability and Umbrella/Excess Liability policies.
45
Page 46
Certificates of Insurance must show the form numbers that are used to achieve
all of the Additional Insured coverage. A copy of the actual policy language that
effects this coverage in each policy must be provided to the Town with the
Certificate of Insurance.
(c) Waiver of Subrogation: To the fullest extent permitted by applicable state law, a
Waiver of Subrogation Clause shall be added to the General Liability,
Umbrella/Excess Liability, and Workers Compensation policies in favor of the
Town.
.2 EXCESS LIABILITY AND/OR UMBRELLA LIABILITY applicable to Commercial
General and Automobile Liability policies. The Excess Liability and/or Umbrella
Liability coverage limits applicable shall be the greater of the amounts indicated
below or the amounts carried by the Vendor:
Each Occurrence $1,000,000
Aggregate $1,000,000
See Section 2.1(b) above for additional insured requirements applicable to the
Excess Liability and/or Umbrella Liability insurance.
3. WORKERS COMPENSATION AND EMPLOYER’S LIABILITY INSURANCE
Coverage as required by New York State statutory limits. Coverage shall include a
waiver of subrogation in favor of the Town of Hamburg.
4. NEW YORK DISABILITY (NYDBL)
Coverage as required by New York State statutory limits.
46
Page 47
Town Board of the Town of Hamburg
April 27, 2026 Meeting
4.13. Youth, Recreation, and Senior Services Budget Adjustment
WHEREAS, a check for $5,000.00 was received from the Donny Thiry Foundation as a donation for the
Adaptive Recreation Programing.
NOW THEREFORE BE IT RESOLVED, that the Town Board does hereby authorize a budget
amendment in 2026 to increase the appropriate revenue and expenditure lines for the receipt of the
donation.
Increase: A000.0000.2705.0000 (Gifts and Donations)
Increase: A000.7310.0440.0000 (Recreation Program Custodial and Contractual)
47
Page 48
Town Board of the Town of Hamburg
April 27, 2026 Meeting
4.14. Youth, Recreation, & Senior Services Budget Adjustment
WHEREAS, a check for $300.00 was received from the Schenkler Family as a donation for the
Adaptive Recreation Programing.
NOW THEREFORE BE IT RESOLVED, that the Town Board does hereby authorize a budget
amendment in 2026 to increase the appropriate revenue and expenditure lines for the receipt of the
donation.
Increase: A000.0000.2705.0000 (Gifts and Donations)
Increase: A000.7310.0412.0000 (Recreation Supplies)
48
Page 49
Town Board of the Town of Hamburg
April 27, 2026 Meeting
4.15. Budget Adjustment
RESOLVED, that the Town Board hereby approves a budget transfer of $5,000 from Account
A.1220.0102 (Supervisor Personal Services-Part-Time) to Account 1340.0102 (Budget Personal
Services-Part-Time); and
BE IT FURTHER RESOLVED, that the Town Supervisor and Finance Office are authorized and
directed to make the necessary accounting and budgetary entries to carry out this amendment.
49
Page 50
Town Board of the Town of Hamburg
April 27, 2026 Meeting
4.16. Youth, Recreation, & Senior Services Budget Adjustment - Youth Council
WHEREAS, a check for $6000.00 was received from the Associate of NYS Youth Bureaus to help
provide support for the coordination of the regional youth council members including virtual meetings
and help in the development of recommendations on policy topics for submission/virtual presentation to
statewide advisory council.
NOW THEREFORE BE IT RESOLVED, that the Town Board does hereby authorize a budget
amendment in 2026 to increase the appropriate revenue and expenditure lines for the receipt of the
donation.
Increase: A000.0000.2705.0000 (Gifts and Donations)
Increase: A000.7310.0440.0000 (Independent Contractor Services)
50
Page 51
Town Board of the Town of Hamburg
April 27, 2026 Meeting
4.17. Budget Transfer
BE IT RESOLVED, that the Town Board hereby approves a budget transfer of $10,000 from Account
A000.0000.2770.0000 (Sponsorships and Naming Rights) to Account A000.7020.0440.0000
(Independent Contractor Services); and
BE IT FURTHER RESOLVED, that the Town Supervisor and Finance Office are authorized and
directed to make the necessary accounting and budgetary entries to carry out this amendment
51
Page 52
Town Board of the Town of Hamburg
April 27, 2026 Meeting
4.18. 2026 Home Grant
BE IT RESOLVED that the Hamburg Town Board authorize the Department of Community
Development to proceed with the following 2026 HOME projects based upon the 2026 HUD HOME
grant allocation:
2026 HOME Grant via Erie County/Town of Hamburg Consortium: $146,200.00
Hamburg Renovation Grants: $114,058.00
Administration (Consortium): $ 10,212.00
CHDO set-aside (Consortium): $ 21,930.00
52
Page 53
Town Board of the Town of Hamburg
April 27, 2026 Meeting
4.19. 2026 CDBG Grant
BE IT RESOLVED that the Hamburg Town Board authorize the Department of Community
Development to proceed with the following 2026 CDBG projects based upon the 2026 HUD CDBG
grant allocation:
Town of Hamburg 2026 Community Development Block Grant Funding: $420,082.00
Housing Renovation Conditional Grants $100,000.00
Town of Hamburg Highway - Infrastructure Reconstruction $100,000.00
Village of Blasdell Infrastructure Reconstruction $100,000.00
Planning /Administration $40,082.00
First Time Homebuyer Conditional Grants $40,000.00
ADA $20,000.00
Housing Counseling $10,000.00
Legal/Eviction Services $10,000.00
53
Page 54
Town Board of the Town of Hamburg
April 27, 2026 Meeting
4.20. Purchase and Sale Agreement with Erie County
WHEREAS, the Hamburg Town Board desires to enter into a Purchase and Sale Agreement with Erie
County to acquire approximately 102 parcels of real property listed on the attached “Schedule A”, and
WHEREAS, the acquisition of the parcels is for the benefit of the residents of the Town of Hamburg,
NOW THEREFORE BE IT RESOLVED, that the Hamburg Town Board approves the purchase and
transfer of approximately 102 parcels of real property from Erie County to the Town of Hamburg, and
the Supervisor is authorized to sign the Purchase and Sale Agreement.
ATTACHMENTS:
Schedule A.pdf
54
Page 55
55
Page 56
56
Page 57
57
Page 58
Town Board of the Town of Hamburg
April 27, 2026 Meeting
4.21. B&G Emergency Employment Request
BE IT RESOLVED that the Town Board approves the attached PAF.
ATTACHMENTS:
B&G Emergency Employment Request.pdf
58
Page 59
59
Page 60
Town Board of the Town of Hamburg
April 27, 2026 Meeting
4.22. B&G PAF
BE IT RESOLVED, that the Town Board approves the termination and hiring of the following
employees in Buildings & Grounds.
ATTACHMENTS:
Signed BG PAF 04-27-26.pdf
60
Page 61
61
Page 62
Town Board of the Town of Hamburg
April 27, 2026 Meeting
4.23. Youth, Recreation, & Senior Services P.A.F.
BE IT RESOLVED, that the Town Board approve the termination and hiring of personnel for the
Youth, Recreation & Senior Services Department as follows:
ATTACHMENTS:
Signed Rec PAF 04-23-26.pdf
62
Page 63
63
Page 64
Town Board of the Town of Hamburg
April 27, 2026 Meeting
4.24. PAF - Justice Court
BE IT RESOLVED, that the Town Board approves the attached PAF.
ATTACHMENTS:
PAF-Zdon.pdf
64
Page 65
-E --l
IlIlt
:t 0
N (D
o 00 ! Ol (,I NJ O (o co ! O) N o >o
6)< c o
E
o)
m
-o
c rn> .D o) o
o
3 o
! tp 3 7
o o o o
=) ts>v
o I
f l)
c
C m o,)^o
9,3 oa
)o -o o
--t o)
OJ 3 o m o- o
N T'
o z
o- {f +9 tr
o 6'
5
ll)
= 3
(! z6) a
o)
N
N
o o
o)
o c NJ
o
o- n o NJ
vo ol
ll
T'
o
s=N
c
a. l-.
l 19
cr o
NJ
o cl) (
ID
o-
llilillllllllllllll o
f
o'
2
o
,
o
o-
oJ
!
E
o
s.
l
oa
o
OJ
o
e\
\
I'
Bd
!=
o Hz
I\lrr 30
d-
lt>
o
o
=3
;@
--{
-p
o
9_
.D
9_
8e
.)
!. *.
o
6-
Sr
a f ;,t
=.
@ !
!
o o
zz
m
f F
o
; 6
o,)
i
o- a. 6
OJ
: z
o n
o
,
3
J 'Tt
c
= n.
o,,
N) 3
ul o o
1.,l
!
--t
J
o
oJ
q)
o
o 3
-c'
--{
.D o
o 3
o-
ln o)
o
o
NJ
Cll
65
Page 66
Town Board of the Town of Hamburg
April 27, 2026 Meeting
4.25. Lake Shore Volunteer Fire Company, Inc.-New Members Tessmer & Valera
RESOLVED, that the Hamburg Town Board does hereby approve the request of the Lake Shore
Volunteer Fire Company, Inc. to add to the ranks of their membership of the following individuals:
Benjamin Tessmer & Paul Valera
ATTACHMENTS:
2026 0416 - Town Board Approval - Ben Tessmer - Paul Valera.docx
66
Page 67
Lake Shore Volunteer Fire Company, Inc.
April 16, 2026
Hamburg Town Board
S-6100 South Park Avenue
Hamburg, New York 14075
Attn: Natalie Nitsche
At the last regular company meeting of the Lake Shore Volunteer Fire Company Inc. held on
Wednesday, April 15, 2026, the following applicants were approved for active membership:
Benjamin Allen Tessmer
3264 Lake Heights Drive Apt. C
Hamburg, NY 14075
Paul R. P. Valera
41 Woodcreek Lane
Grand Island, NY 14072
Please notify us upon the Town Board’s approval of their membership.
Thank you for your consideration in this matter.
Sincerely,
Peggie Lipka
Corresponding Secretary
Lake Shore Volunteer Fire Co. Inc.
4591 LAKESHORE ROAD | HAMBURG, NY 14075 | STATION (716) 627-3522 | FAX (716) 627-7502
67
Page 68
Town Board of the Town of Hamburg
April 27, 2026 Meeting
4.26. Town Hall Brick Repair Contract 2026-01
WHEREAS, the Town Buildings & Grounds Department has identified significant concerns with the
deterioration of the brick around Town Hall which is in need of repair; and
WHEREAS, the project was bid on April 23, but no bids were received.
BE IT RESOLVED that the Town Clerk is authorized to readvertise for sealed bids entitled “Hamburg
Town Hall Brick Repair, Contract 2026-01”
Project bid documents will be available for viewing and download on April 28, 2026, on the Town
website, and the notice will be published as soon as possible in an official Town paper;
Sealed separate bids will be received at Hamburg Town Hall, Town Clerk’s Office, 6100 South Park
Ave, Hamburg, New York, 14075, and said bid will be publicly opened and read aloud on Thursday,
May 14, 2026 in Conference Room 7 A/B (downstairs) at 10:00 AM. Mailed bids should be sent to:
Town of Hamburg, (clearly marked) Attn: TOWN CLERK, Bid Enclosed – Hamburg Town Hall Brick
Repair, Contract 2026-01, 6100 South Park Ave, Hamburg, NY 14075
68
Page 69
Town Board of the Town of Hamburg
April 27, 2026 Meeting
4.27. Town Beach Jetty Repair Contract 2026-02
WHEREAS, the Town is eligible for reimbursement from FEMA for storm damage for the repair of the
Town Beach Jetty
BE IT RESOLVED that the Town Clerk is authorized to advertise for sealed bids entitled “Hamburg
Town Beach Jetty Repair, Contract 2026-02”
Project bid documents will be available for viewing and download on April 28, 2026, on the Town
website, and the notice will be published as soon as possible in an official Town paper and on the NYS
Contract Reporter;
Sealed separate bids will be received at Hamburg Town Hall, Town Clerk’s Office, 6100 South Park
Ave, Hamburg, New York, 14075, and said bid will be publicly opened and read aloud on Monday,
June 1, 2026 in Conference Room 7 A/B (downstairs) at 11:00 AM. Mailed bids should be sent to:
Town of Hamburg, (clearly marked) Attn: TOWN CLERK, Bid Enclosed – Hamburg Town Beach
Jetty Repair, Contract 2026-02, 6100 South Park Ave, Hamburg, NY 14075
69
Page 70
Town Board of the Town of Hamburg
April 27, 2026 Meeting
4.28. SW Blvd and Big Tree Road Traveler Center Rezoning SEQR Resolution
WHEREAS, the Town of Hamburg received a request from Briad Development, LLC to rezone 4.14
acres of land (SBL # 160.18-1-9.1) located at the intersection of Southwestern Boulevard and Big Tree
Road from C-1 (Local Retail Business District District) to C-2 (General Commercial District) for the
development of a small-scale travel center, to be anchored by an 8,700 sq-ft building with gasoline
service, accompanied by several quick-service restaurant (QSR) establishments, and other site
improvements; and
WHEREAS, pursuant to Part 617 of the implementing regulations pertaining to Article 8 (State
Environmental Quality Review Act - SEQR) of the Environmental Conservation Law, the Hamburg
Town Board has established itself as SEQR Lead Agency and conducted a coordinated environmental
(SEQR) review for this Unlisted action; and
WHEREAS, the Town Board has reviewed the FEAF (Parts 1, 2, and 3) and solicited input from the
public and from other Involved and Interested agencies, and has taken a hard look at the social,
economic, and environmental impacts of the adoption of the proposed zoning map amendment and
subsequent project; and
WHEREAS, the findings of this review indicate that the proposed zoning map amendment and
construction of the small-scale travel center with accompanying gasoline service (with the conditions
proposed by the Planning Board and accepted by the Town) will not adversely affect the natural
resources of the State and/or the health, safety and welfare of the public; and
WHEREAS, the Town of Hamburg Town Board held the required public hearing on March 9 th, 2026.
NOW, THEREFORE BE IT RESOLVED, the Hamburg Town Board, as SEQR Lead Agency for this
action, has determined that the adoption of the Town of Hamburg zoning change and construction of
the small-scale travel center with accompanying gasoline service at this location will not result in any
significant adverse impacts on the environment, and a Negative Declaration is hereby issued, based on
the reasons as set forth in the full Environmental Assessment Form and Part 3 analysis attachment; and
BE IT FINALLY RESOLVED, the Town Board authorizes the Town Supervisor to sign the
Environmental Assessment Form, which will act as the SEQR Negative Declaration, and authorizes that
the appropriate notices and filings be made.
70
Page 71
ATTACHMENTS:
04_SEQR - Circle K Hamburg.pdf
FEAF Part 2 - SW Blvd and Big Tree Road Traveler Center.pdf
FEAF Part 3.pdf
SW Blvd and Big Tree Road Rezoning Part 3 Analysis.pdf
71
Page 72
72
Page 73
73
Page 74
74
Page 75
75
Page 76
76
Page 77
77
Page 78
78
Page 79
79
Page 80
80
Page 81
81
Page 82
82
Page 83
83
Page 84
84
Page 85
85
Page 86
86
Page 87
Agency Use Only [If applicable]
Full Environmental Assessment Form Project : Briad Development Southwestern and Big Tree Re
Part 2 - Identification of Potential Project Impacts Date : 4/13/2026
Part 2 is to be completed by the lead agency. Part 2 is designed to help the lead agency inventory all potential resources that could
be affected by a proposed project or action. We recognize that the lead agency=s reviewer(s) will not necessarily be environmental
professionals. So, the questions are designed to walk a reviewer through the assessment process by providing a series of questions that
can be answered using the information found in Part 1. To further assist the lead agency in completing Part 2, the form identifies the
most relevant questions in Part 1 that will provide the information needed to answer the Part 2 question. When Part 2 is completed, the
lead agency will have identified the relevant environmental areas that may be impacted by the proposed activity.
If the lead agency is a state agency and the action is in any Coastal Area, complete the Coastal Assessment Form before proceeding
with this assessment.
Tips for completing Part 2:
• Review all of the information provided in Part 1.
• Review any application, maps, supporting materials and the Full EAF Workbook.
• Answer each of the 18 questions in Part 2.
• If you answer “Yes” to a numbered question, please complete all the questions that follow in that section.
• If you answer “No” to a numbered question, move on to the next numbered question.
• Check appropriate column to indicate the anticipated size of the impact.
• Proposed projects that would exceed a numeric threshold contained in a question should result in the reviewing agency
checking the box “Moderate to large impact may occur.”
• The reviewer is not expected to be an expert in environmental analysis.
• If you are not sure or undecided about the size of an impact, it may help to review the sub-questions for the general
question and consult the workbook.
• When answering a question consider all components of the proposed activity, that is, the Awhole action@.
• Consider the possibility for long-term and cumulative impacts as well as direct impacts.
• Answer the question in a reasonable manner considering the scale and context of the project.
1. Impact on Land
Proposed action may involve construction on, or physical alteration of, NO YES
✔
the land surface of the proposed site. (See Part 1. D.1)
If “Yes”, answer questions a - j. If “No”, move on to Section 2.
Relevant No, or Moderate
Part I small to large
Question(s) impact impact may
may occur occur
a. The proposed action may involve construction on land where depth to water table is E2d 9
✔ 9
less than 3 feet.
b. The proposed action may involve construction on slopes of 15% or greater. E2f 9
✔ 9
c. The proposed action may involve construction on land where bedrock is exposed, or E2a 9
✔ 9
generally within 5 feet of existing ground surface.
d. The proposed action may involve the excavation and removal of more than 1,000 tons D2a 9
✔ 9
of natural material.
e. The proposed action may involve construction that continues for more than one year D1e 9
✔ 9
or in multiple phases.
f. The proposed action may result in increased erosion, whether from physical D2e, D2q 9
✔ 9
disturbance or vegetation removal (including from treatment by herbicides).
g. The proposed action is, or may be, located within a Coastal Erosion hazard area. B1i 9
✔ 9
h. Other impacts: _______________________________________________________ 9 9
___________________________________________________________________
Page 1 of 10
FEAF 2019
87
Page 88
2. Impact on Geological Features
The proposed action may result in the modification or destruction of, or inhibit
access to, any unique or unusual land forms on the site (e.g., cliffs, dunes, NO
✔ YES
minerals, fossils, caves). (See Part 1. E.2.g)
If “Yes”, answer questions a - c. If “No”, move on to Section 3.
Relevant No, or Moderate
Part I small to large
Question(s) impact impact may
may occur occur
a. Identify the specific land form(s) attached: ________________________________ E2g 9 9
___________________________________________________________________
b. The proposed action may affect or is adjacent to a geological feature listed as a E3c 9 9
registered National Natural Landmark.
Specific feature: _____________________________________________________
c. Other impacts: ______________________________________________________ 9 9
___________________________________________________________________
3. Impacts on Surface Water
The proposed action may affect one or more wetlands or other surface water ✔
NO YES
bodies (e.g., streams, rivers, ponds or lakes). (See Part 1. D.2, E.2.h)
If “Yes”, answer questions a - l. If “No”, move on to Section 4.
Relevant No, or Moderate
Part I small to large
Question(s) impact impact may
may occur occur
a. The proposed action may create a new water body. D2b, D1h 9 9
b. The proposed action may result in an increase or decrease of over 10% or more than a D2b 9 9
10 acre increase or decrease in the surface area of any body of water.
c. The proposed action may involve dredging more than 100 cubic yards of material D2a 9 9
from a wetland or water body.
d. The proposed action may involve construction within or adjoining a freshwater or E2h 9 9
tidal wetland, or in the bed or banks of any other water body.
e. The proposed action may create turbidity in a waterbody, either from upland erosion, D2a, D2h 9 9
runoff or by disturbing bottom sediments.
f. The proposed action may include construction of one or more intake(s) for withdrawal D2c 9 9
of water from surface water.
g. The proposed action may include construction of one or more outfall(s) for discharge D2d 9 9
of wastewater to surface water(s).
h. The proposed action may cause soil erosion, or otherwise create a source of D2e 9 9
stormwater discharge that may lead to siltation or other degradation of receiving
water bodies.
i. The proposed action may affect the water quality of any water bodies within or E2h 9 9
downstream of the site of the proposed action.
j. The proposed action may involve the application of pesticides or herbicides in or D2q, E2h 9 9
around any water body.
k. The proposed action may require the construction of new, or expansion of existing, D1a, D2d 9 9
wastewater treatment facilities.
Page 2 of 10
88
Page 89
l. Other impacts: _______________________________________________________ 9 9
___________________________________________________________________
4. Impact on groundwater
The proposed action may result in new or additional use of ground water, or ✔
NO YES
may have the potential to introduce contaminants to ground water or an aquifer.
(See Part 1. D.2.a, D.2.c, D.2.d, D.2.p, D.2.q, D.2.t)
If “Yes”, answer questions a - h. If “No”, move on to Section 5.
Relevant No, or Moderate
Part I small to large
Question(s) impact impact may
may occur occur
a. The proposed action may require new water supply wells, or create additional demand D2c 9 9
on supplies from existing water supply wells.
b. Water supply demand from the proposed action may exceed safe and sustainable D2c 9 9
withdrawal capacity rate of the local supply or aquifer.
Cite Source: ________________________________________________________
c. The proposed action may allow or result in residential uses in areas without water and D1a, D2c 9 9
sewer services.
d. The proposed action may include or require wastewater discharged to groundwater. D2d, E2l 9 9
e. The proposed action may result in the construction of water supply wells in locations D2c, E1f, 9 9
where groundwater is, or is suspected to be, contaminated. E1g, E1h
f. The proposed action may require the bulk storage of petroleum or chemical products D2p, E2l 9 9
over ground water or an aquifer.
g. The proposed action may involve the commercial application of pesticides within 100 E2h, D2q, 9 9
feet of potable drinking water or irrigation sources. E2l, D2c
h. Other impacts: ______________________________________________________ 9 9
__________________________________________________________________
5. Impact on Flooding
The proposed action may result in development on lands subject to flooding. NO
✔ YES
(See Part 1. E.2)
If “Yes”, answer questions a - g. If “No”, move on to Section 6.
Relevant No, or Moderate
Part I small to large
Question(s) impact impact may
may occur occur
a. The proposed action may result in development in a designated floodway. E2i 9 9
b. The proposed action may result in development within a 100 year floodplain. E2j 9 9
c. The proposed action may result in development within a 500 year floodplain. E2k 9 9
d. The proposed action may result in, or require, modification of existing drainage D2b, D2e 9 9
patterns.
e. The proposed action may change flood water flows that contribute to flooding. D2b, E2i, 9 9
E2j, E2k
f. If there is a dam located on the site of the proposed action, is the dam in need of repair, E1e 9 9
or upgrade?
Page 3 of 10
89
Page 90
g. Other impacts: ______________________________________________________
9 9
___________________________________________________________________
6. Impacts on Air
The proposed action may include a state regulated air emission source.
✔ NO YES
(See Part 1. D.2.f., D.2.h, D.2.g)
If “Yes”, answer questions a - f. If “No”, move on to Section 7.
Relevant No, or Moderate
Part I small to large
Question(s) impact impact may
may occur occur
a. If the proposed action requires federal or state air emission permits, the action may
also emit one or more greenhouse gases at or above the following levels:
i. More than 1000 tons/year of carbon dioxide (CO2) D2g 9 9
ii. More than 3.5 tons/year of nitrous oxide (N2O) D2g 9 9
iii. More than 1000 tons/year of carbon equivalent of perfluorocarbons (PFCs) D2g 9 9
iv. More than .045 tons/year of sulfur hexafluoride (SF6) D2g 9 9
D2g 9 9
v. More than 1000 tons/year of carbon dioxide equivalent of
hydrochloroflourocarbons (HFCs) emissions
vi. 43 tons/year or more of methane D2h 9 9
b. The proposed action may generate 10 tons/year or more of any one designated D2g 9 9
hazardous air pollutant, or 25 tons/year or more of any combination of such hazardous
air pollutants.
c. The proposed action may require a state air registration, or may produce an emissions D2f, D2g 9 9
rate of total contaminants that may exceed 5 lbs. per hour, or may include a heat
source capable of producing more than 10 million BTU=s per hour.
d. The proposed action may reach 50% of any of the thresholds in “a” through “c”, D2g 9 9
above.
e. The proposed action may result in the combustion or thermal treatment of more than 1 D2s 9 9
ton of refuse per hour.
f. Other impacts: ______________________________________________________ 9 9
__________________________________________________________________
7. Impact on Plants and Animals
The proposed action may result in a loss of flora or fauna. (See Part 1. E.2. m.-q.) NO
✔ YES
If “Yes”, answer questions a - j. If “No”, move on to Section 8.
Relevant No, or Moderate
Part I small to large
Question(s) impact impact may
may occur occur
a. The proposed action may cause reduction in population or loss of individuals of any E2o 9 9
threatened or endangered species, as listed by New York State or the Federal
government, that use the site, or are found on, over, or near the site.
b. The proposed action may result in a reduction or degradation of any habitat used by E2o 9 9
any rare, threatened or endangered species, as listed by New York State or the federal
government.
c. The proposed action may cause reduction in population, or loss of individuals, of any E2p 9 9
species of special concern or conservation need, as listed by New York State or the
Federal government, that use the site, or are found on, over, or near the site.
d. The proposed action may result in a reduction or degradation of any habitat used by E2p 9 9
any species of special concern and conservation need, as listed by New York State or
the Federal government.
Page 4 of 10
90
Page 91
e. The proposed action may diminish the capacity of a registered National Natural E3c 9 9
Landmark to support the biological community it was established to protect.
f. The proposed action may result in the removal of, or ground disturbance in, any E2n 9 9
portion of a designated significant natural community.
Source: ____________________________________________________________
g. The proposed action may substantially interfere with nesting/breeding, foraging, or
E2m 9 9
over-wintering habitat for the predominant species that occupy or use the project site.
h. The proposed action requires the conversion of more than 10 acres of forest, 9 9
E1b
grassland or any other regionally or locally important habitat.
Habitat type & information source: ______________________________________
__________________________________________________________________
i. Proposed action (commercial, industrial or recreational projects, only) involves use of D2q 9 9
herbicides or pesticides.
j. Other impacts: ______________________________________________________ 9 9
__________________________________________________________________
8. Impact on Agricultural Resources
The proposed action may impact agricultural resources. (See Part 1. E.3.a. and b.) ✔
NO YES
If “Yes”, answer questions a - h. If “No”, move on to Section 9.
Relevant No, or Moderate
Part I small to large
Question(s) impact impact may
may occur occur
a. The proposed action may impact soil classified within soil group 1 through 4 of the E2c, E3b 9 9
NYS Land Classification System.
b. The proposed action may sever, cross or otherwise limit access to agricultural land E1a, Elb 9 9
(includes cropland, hayfields, pasture, vineyard, orchard, etc).
c. The proposed action may result in the excavation or compaction of the soil profile of E3b 9 9
active agricultural land.
d. The proposed action may irreversibly convert agricultural land to non-agricultural E1b, E3a 9 9
uses, either more than 2.5 acres if located in an Agricultural District, or more than 10
acres if not within an Agricultural District.
e. The proposed action may disrupt or prevent installation of an agricultural land El a, E1b 9 9
management system.
f. The proposed action may result, directly or indirectly, in increased development C2c, C3, 9 9
potential or pressure on farmland. D2c, D2d
g. The proposed project is not consistent with the adopted municipal Farmland C2c 9 9
Protection Plan.
h. Other impacts: ________________________________________________________ 9 9
Page 5 of 10
91
Page 92
9. Impact on Aesthetic Resources
The land use of the proposed action are obviously different from, or are in ✔
NO YES
sharp contrast to, current land use patterns between the proposed project and
a scenic or aesthetic resource. (Part 1. E.1.a, E.1.b, E.3.h.)
If “Yes”, answer questions a - g. If “No”, go to Section 10.
Relevant No, or Moderate
Part I small to large
Question(s) impact impact may
may occur occur
a. Proposed action may be visible from any officially designated federal, state, or local E3h 9 9
scenic or aesthetic resource.
b. The proposed action may result in the obstruction, elimination or significant E3h, C2b 9 9
screening of one or more officially designated scenic views.
c. The proposed action may be visible from publicly accessible vantage points: E3h
i. Seasonally (e.g., screened by summer foliage, but visible during other seasons) 9 9
ii. Year round 9 9
d. The situation or activity in which viewers are engaged while viewing the proposed E3h
action is:
E2q,
i. Routine travel by residents, including travel to and from work 9 9
ii. Recreational or tourism based activities E1c 9 9
e. The proposed action may cause a diminishment of the public enjoyment and E3h 9 9
appreciation of the designated aesthetic resource.
f. There are similar projects visible within the following distance of the proposed D1a, E1a, 9 9
project: D1f, D1g
0-1/2 mile
½ -3 mile
3-5 mile
5+ mile
g. Other impacts: ______________________________________________________ 9 9
__________________________________________________________________
10. Impact on Historic and Archeological Resources
The proposed action may occur in or adjacent to a historic or archaeological NO
✔ YES
resource. (Part 1. E.3.e, f. and g.)
If “Yes”, answer questions a - e. If “No”, go to Section 11.
Relevant No, or Moderate
Part I small to large
Question(s) impact impact may
may occur occur
a. The proposed action may occur wholly or partially within, or substantially contiguous
to, any buildings, archaeological site or district which is listed on the National or E3e 9 9
State Register of Historical Places, or that has been determined by the Commissioner
of the NYS Office of Parks, Recreation and Historic Preservation to be eligible for
listing on the State Register of Historic Places.
b. The proposed action may occur wholly or partially within, or substantially contiguous E3f 9 9
to, an area designated as sensitive for archaeological sites on the NY State Historic
Preservation Office (SHPO) archaeological site inventory.
c. The proposed action may occur wholly or partially within, or substantially contiguous E3g 9 9
to, an archaeological site not included on the NY SHPO inventory.
Source: ____________________________________________________________
Page 6 of 10
92
Page 93
d. Other impacts: ______________________________________________________ 9 9
__________________________________________________________________
If any of the above (a-d) are answered “Moderate to large impact may
e. occur”, continue with the following questions to help support conclusions in Part 3:
i. The proposed action may result in the destruction or alteration of all or part E3e, E3g, 9 9
of the site or property. E3f
ii. The proposed action may result in the alteration of the property’s setting or E3e, E3f, 9 9
integrity. E3g, E1a,
E1b
iii. The proposed action may result in the introduction of visual elements which E3e, E3f, 9 9
are out of character with the site or property, or may alter its setting. E3g, E3h,
C2, C3
11. Impact on Open Space and Recreation
The proposed action may result in a loss of recreational opportunities or a NO
✔ YES
reduction of an open space resource as designated in any adopted
municipal open space plan.
(See Part 1. C.2.c, E.1.c., E.2.q.)
If “Yes”, answer questions a - e. If “No”, go to Section 12.
Relevant No, or Moderate
Part I small to large
Question(s) impact impact may
may occur occur
a. The proposed action may result in an impairment of natural functions, or “ecosystem D2e, E1b 9 9
services”, provided by an undeveloped area, including but not limited to stormwater E2h,
storage, nutrient cycling, wildlife habitat. E2m, E2o,
E2n, E2p
b. The proposed action may result in the loss of a current or future recreational resource. C2a, E1c, 9 9
C2c, E2q
c. The proposed action may eliminate open space or recreational resource in an area C2a, C2c 9 9
with few such resources. E1c, E2q
d. The proposed action may result in loss of an area now used informally by the C2c, E1c 9 9
community as an open space resource.
e. Other impacts: _____________________________________________________ 9 9
_________________________________________________________________
12. Impact on Critical Environmental Areas
The proposed action may be located within or adjacent to a critical NO
✔ YES
environmental area (CEA). (See Part 1. E.3.d)
If “Yes”, answer questions a - c. If “No”, go to Section 13.
Relevant No, or Moderate
Part I small to large
Question(s) impact impact may
may occur occur
a. The proposed action may result in a reduction in the quantity of the resource or E3d 9 9
characteristic which was the basis for designation of the CEA.
b. The proposed action may result in a reduction in the quality of the resource or E3d 9 9
characteristic which was the basis for designation of the CEA.
c. Other impacts: ______________________________________________________ 9 9
__________________________________________________________________
Page 7 of 10
93
Page 94
13. Impact on Transportation
The proposed action may result in a change to existing transportation systems. NO YES
✔
(See Part 1. D.2.j)
If “Yes”, answer questions a - f. If “No”, go to Section 14.
Relevant No, or Moderate
Part I small to large
Question(s) impact impact may
may occur occur
a. Projected traffic increase may exceed capacity of existing road network. D2j 9 9
✔
b. The proposed action may result in the construction of paved parking area for 500 or D2j 9
✔ 9
more vehicles.
c. The proposed action will degrade existing transit access. D2j 9
✔ 9
d. The proposed action will degrade existing pedestrian or bicycle accommodations. D2j 9
✔ 9
e. The proposed action may alter the present pattern of movement of people or goods. D2j 9 9
✔
f. Other impacts: ______________________________________________________ 9 9
__________________________________________________________________
14. Impact on Energy
The proposed action may cause an increase in the use of any form of energy. NO
✔ YES
(See Part 1. D.2.k)
If “Yes”, answer questions a - e. If “No”, go to Section 15.
Relevant No, or Moderate
Part I small to large
Question(s) impact impact may
may occur occur
a. The proposed action will require a new, or an upgrade to an existing, substation. D2k 9 9
b. The proposed action will require the creation or extension of an energy transmission D1f, 9 9
or supply system to serve more than 50 single or two-family residences or to serve a D1q, D2k
commercial or industrial use.
c. The proposed action may utilize more than 2,500 MWhrs per year of electricity. D2k 9 9
d. The proposed action may involve heating and/or cooling of more than 100,000 square D1g 9 9
feet of building area when completed.
e. Other Impacts: ________________________________________________________
____________________________________________________________________
15. Impact on Noise, Odor, and Light
The proposed action may result in an increase in noise, odors, or outdoor lighting. NO ✔
YES
(See Part 1. D.2.m., n., and o.)
If “Yes”, answer questions a - f. If “No”, go to Section 16.
Relevant No, or Moderate
Part I small to large
Question(s) impact impact may
may occur occur
a. The proposed action may produce sound above noise levels established by local D2m ✔9 9
regulation.
b. The proposed action may result in blasting within 1,500 feet of any residence, D2m, E1d 9
✔ 9
hospital, school, licensed day care center, or nursing home.
c. The proposed action may result in routine odors for more than one hour per day. D2o 9
✔ 9
Page 8 of 10
94
Page 95
d. The proposed action may result in light shining onto adjoining properties. D2n 9 9
✔
e. The proposed action may result in lighting creating sky-glow brighter than existing D2n, E1a 9
✔ 9
area conditions.
f. Other impacts: ______________________________________________________ 9 9
__________________________________________________________________
16. Impact on Human Health
The proposed action may have an impact on human health from exposure NO ✔
YES
to new or existing sources of contaminants. (See Part 1.D.2.q., E.1. d. f. g. and h.)
If “Yes”, answer questions a - m. If “No”, go to Section 17.
Relevant No,or Moderate
Part I small to large
Question(s) impact impact may
may cccur occur
a. The proposed action is located within 1500 feet of a school, hospital, licensed day E1d 9
✔ 9
care center, group home, nursing home or retirement community.
b. The site of the proposed action is currently undergoing remediation. E1g, E1h 9
✔ 9
c. There is a completed emergency spill remediation, or a completed environmental site E1g, E1h 9
✔ 9
remediation on, or adjacent to, the site of the proposed action.
d. The site of the action is subject to an institutional control limiting the use of the E1g, E1h 9
✔ 9
property (e.g., easement or deed restriction).
e. The proposed action may affect institutional control measures that were put in place E1g, E1h 9
✔ 9
to ensure that the site remains protective of the environment and human health.
f. The proposed action has adequate control measures in place to ensure that future D2t 9
✔ 9
generation, treatment and/or disposal of hazardous wastes will be protective of the
environment and human health.
g. The proposed action involves construction or modification of a solid waste D2q, E1f 9
✔ 9
management facility.
h. The proposed action may result in the unearthing of solid or hazardous waste. D2q, E1f ✔
9 9
i. The proposed action may result in an increase in the rate of disposal, or processing, of D2r, D2s 9
✔ 9
solid waste.
j. The proposed action may result in excavation or other disturbance within 2000 feet of E1f, E1g ✔
9 9
a site used for the disposal of solid or hazardous waste. E1h
k. The proposed action may result in the migration of explosive gases from a landfill E1f, E1g 9
✔ 9
site to adjacent off site structures.
l. The proposed action may result in the release of contaminated leachate from the D2s, E1f, 9
✔ 9
project site. D2r
m. Other impacts: ______________________________________________________
__________________________________________________________________
Page 9 of 10
95
Page 96
17. Consistency with Community Plans
The proposed action is not consistent with adopted land use plans. NO YES
✔
(See Part 1. C.1, C.2. and C.3.)
If “Yes”, answer questions a - h. If “No”, go to Section 18.
Relevant No, or Moderate
Part I small to large
Question(s) impact impact may
may occur occur
a. The proposed action’s land use components may be different from, or in sharp C2, C3, D1a 9 9
✔
contrast to, current surrounding land use pattern(s). E1a, E1b
b. The proposed action will cause the permanent population of the city, town or village C2 9
✔ 9
in which the project is located to grow by more than 5%.
c. The proposed action is inconsistent with local land use plans or zoning regulations. C2, C2, C3 9 9
✔
d. The proposed action is inconsistent with any County plans, or other regional land use C2, C2 9
✔ 9
plans.
e. The proposed action may cause a change in the density of development that is not C3, D1c, 9
✔ 9
supported by existing infrastructure or is distant from existing infrastructure. D1d, D1f,
D1d, Elb
f. The proposed action is located in an area characterized by low density development C4, D2c, D2d 9
✔ 9
that will require new or expanded public infrastructure. D2j
g. The proposed action may induce secondary development impacts (e.g., residential or C2a 9
✔ 9
commercial development not included in the proposed action)
h. Other: _____________________________________________________________ 9 9
__________________________________________________________________
18. Consistency with Community Character
The proposed project is inconsistent with the existing community character. NO
✔ YES
(See Part 1. C.2, C.3, D.2, E.3)
If “Yes”, answer questions a - g. If “No”, proceed to Part 3.
Relevant No, or Moderate
Part I small to large
Question(s) impact impact may
may occur occur
a. The proposed action may replace or eliminate existing facilities, structures, or areas E3e, E3f, E3g 9 9
of historic importance to the community.
b. The proposed action may create a demand for additional community services (e.g. C4 9 9
schools, police and fire)
c. The proposed action may displace affordable or low-income housing in an area where C2, C3, D1f 9 9
there is a shortage of such housing. D1g, E1a
d. The proposed action may interfere with the use or enjoyment of officially recognized C2, E3 9 9
or designated public resources.
e. The proposed action is inconsistent with the predominant architectural scale and C2, C3 9 9
character.
f. Proposed action is inconsistent with the character of the existing natural landscape. C2, C3 9 9
E1a, E1b
E2g, E2h
g. Other impacts: ______________________________________________________ 9 9
__________________________________________________________________
PRINT FULL FORM Page 10 of 10
96
Page 97
Agency Use Only [IfApplicable]
Project : Briad Development Southwestern and Big Tree Traveler Ce
Date : 4/13/2026
Full Environmental Assessment Form
Part 3 - Evaluation of the Magnitude and Importance of Project Impacts
and
Determination of Significance
Part 3 provides the reasons in support of the determination of significance. The lead agency must complete Part 3 for every question
in Part 2 where the impact has been identified as potentially moderate to large or where there is a need to explain why a particular
element of the proposed action will not, or may, result in a significant adverse environmental impact.
Based on the analysis in Part 3, the lead agency must decide whether to require an environmental impact statement to further assess
the proposed action or whether available information is sufficient for the lead agency to conclude that the proposed action will not
have a significant adverse environmental impact. By completing the certification on the next page, the lead agency can complete its
determination of significance.
Reasons Supporting This Determination:
To complete this section:
• Identify the impact based on the Part 2 responses and describe its magnitude. Magnitude considers factors such as severity,
size or extent of an impact.
• Assess the importance of the impact. Importance relates to the geographic scope, duration, probability of the impact
occurring, number of people affected by the impact and any additional environmental consequences if the impact were to
occur.
• The assessment should take into consideration any design element or project changes.
• Repeat this process for each Part 2 question where the impact has been identified as potentially moderate to large or where
there is a need to explain why a particular element of the proposed action will not, or may, result in a significant adverse
environmental impact.
• Provide the reason(s) why the impact may, or will not, result in a significant adverse environmental impact
• For Conditional Negative Declarations identify the specific condition(s) imposed that will modify the proposed action so that
no significant adverse environmental impacts will result.
• Attach additional sheets, as needed.
The analysis completed for Part 2 included use of the following studies or analyses provided by the Applicant:
-Planning Board Rezoning Report
-Site Survey
-Proposed Site Plan
-Circulation Plan
-FEMA Flood Map
-Wetland Delineation Plan
-Safety Systems and Regulatory Controls at Modern Fueling Facilities Memo
-Official Agency Comments from Coordinated Review
-SHPO Letter of No Concern
-ITE Trip Generation Analysis
Please find the attached Part 3 analysis as the basis for why this project should be issued a Negative Declaration.
Determination of Significance - Type 1 and Unlisted Actions
SEQR Status: Type 1
✔ Unlisted
Identify portions of EAF completed for this Project:
✔ Part 1
✔ Part 2
✔ Part 3 97
FEAF 2019
Page 98
Upon review of the information recorded on this EAF, as noted, plus this additional support information
and considering both the magnitude and importance of each identified potential impact, it is the conclusion of the
Hamburg Town Board as lead agency that:
✔ A. This project will result in no significant adverse impacts on the environment, and, therefore, an environmental impact
statement need not be prepared. Accordingly, this negative declaration is issued.
B. Although this project could have a significant adverse impact on the environment, that impact will be avoided or
substantially mitigated because of the following conditions which will be required by the lead agency:
There will, therefore, be no significant adverse impacts from the project as conditioned, and, therefore, this conditioned negative
declaration is issued. A conditioned negative declaration may be used only for UNLISTED actions (see 6 NYCRR 617.7(d)).
C. This Project may result in one or more significant adverse impacts on the environment, and an environmental impact
statement must be prepared to further assess the impact(s) and possible mitigation and to explore alternatives to avoid or reduce those
impacts. Accordingly, this positive declaration is issued.
Name of Action: Briad Development Southwestern and Big Tree Traveler Center Rezoning
Name of Lead Agency: Hamburg Town Board
Name of Responsible Officer in Lead Agency: Elizabeth Farrell-Lorentz
Title of Responsible Officer: Supervisor
Signature of Responsible Officer in Lead Agency: Date:
Signature of Preparer (if different from Responsible Officer) Date:
For Further Information:
Contact Person: Joshua Rogers
Address: 6100 South Park Ave
Telephone Number: 716-649-6111 ext. 2384
E-mail: [email protected]
For Type 1 Actions and Conditioned Negative Declarations, a copy of this Notice is sent to:
Chief Executive Officer of the political subdivision in which the action will be principally located (e.g., Town / City / Village of)
Other involved agencies (if any)
Applicant (if any)
Environmental Notice Bulletin: http://www.dec.ny.gov/enb/enb.html
PRINT FULL FORM Page 2 of 2
98
Page 99
Hamburg Town Board
Part 3 Analysis
Briad Development Southwestern and Big Tree Rezoning
0 Big Tree Road and Southwestern Boulevard, Hamburg, NY 14219 (SBL#: 160.18-1-9.1)
4/13/2026
Based on Part 1 and Part 2 of the FEAF, information submitted by the Applicant, correspondence
received, and discussions of the Planning Board and Town Board, the following potentially moderate
to large impacts were identified, and have been analyzed:
Project Description and Action
See FEAF.
1. Impact on Land
The project will disturb approximately 2.2 acres of land out of a 4.08-acre site, with conversion to
a convenience store building, a gas station facility, with drive-thru space, 43 parking spaces, and
other impervious areas. Approximately 1.5 acres of land will consist of impervious surface. Final
engineered plans will be reviewed and approved by the Town Engineer, including a Stormwater
Pollution Prevention Plan (SWPPP). Appropriate erosion and sediment control measures will be
required during construction, with inspections occurring by a qualified person. A condition of the
rezoning approval will be to maintain existing natural features, and vegetative buffers on the site,
especially to keep a 0.66-acre lawned area on the site and to buffer the nearest adjoining
neighbors at Big Tree Road and Burke Parkway, to be addressed during site plan review.
A landscaping plan will need to be prepared that focuses on highlighting the existing natural
areas to be maintained in addition to the substantial tree planting that will take place around the
Project Site and especially in screening areas easily meeting § 280-209’s requirement for a
single tree to be planted every 30 feet. This landscape plan can also be a rezoning condition that
is subject to Planning Board review/approval during the site plan stage.
Information submitted and Analysis: Proposed Site Plan, FEAF Part 1, Planning Board Rezoning
Report.
Conclusion: The project is not anticipated to have a significant impact on land.
13. Impact on Transportation
The site is bounded by Big Tree Road to the north, Interstate 90 to the west, Southwestern
Boulevard to the south, and where the Seven Corners intersection was removed to the east. The
project site is currently vacant land. Land uses within the vicinity of the project site are generally
commercial. The proposed development consists of a multi-tenant commercial site designed to
99
Page 100
function as a small-scale travel center serving both the local community and motorists traveling
along the Interstate I-90 corridor.
The Applicant has submitted a circulation plan, showing a driveway onto Southwestern Boulevard
located as far as possible from the intersection of Southwestern Boulevard and Big Tree Road,
based on input from NYSDOT.
The project and it’s uses generate what is known as pass-by taffic, meaning that vehicles are
already traveling on a road adjacent to a business, and will stop as part of their existing journey,
rather than generating new, separate trips. These customers, commonly seen at gas stations or
convenience stores, do not create new traffic, but simply make a turn-in maneuver. The table
below shows the estimated daily visits for the development, as well as the AM and PM peak trips.
These visits were determined using the 8th Edition ITE Trip Generation Rates.
The Applicant has also been in communication with the NYSDOT regarding driveway access. The
Applicant has proposed driveways from Southwestern Blvd and Big Tree Road into the project
site. Correspondence from the NYSDOT has highlighted that they are open to considering the two
entrances but noted that since the project is a major commercial development, review and
comment from several of their teams will be required.
Information submitted and Analysis
Circulation Plan, Planning Board Rezoning Report, ITE Trip Generation Analysis, FEAF Part 1
Conclusion: Based on the information provided above, the project is not anticipated to have a
significant impact on transportation.
15. Impact on Noise, Odor, and Light
The project will temporarily produce excess sound during construction, primarily between 7 am
and 4 pm on weekdays (the project will need to follow Town noise ordinances). There will be
outdoor lighting on the project site, and conditions of site plan approval will require the lighting to
meet dark sky residential lighting standards as set forth by the Town of Hamburg. Parking lot
lighting will be shielded and regulated by conditions of site plan approval. The fuel canopy
component of the project will not produce adverse odors, and will have double‑wall tanks, leak
detection technology, spill containment systems.
100
Page 101
Information submitted: FEAF Part 1, Safety Systems and Regulatory Controls at Modern Fueling
Facilities Memo
Conclusion: The project is not anticipated to have a significant impact on the noise, odor, or light
on the site.
16. Impact on Human Health
Given that part of the project involves a fuel station component, there have been some questions
in regard to applicable safety standards for fueling facilities. The Applicant presented at the 3/9
Town Board public hearing and produced a memo detailing the applicable EPA and NYSDEC
standards. Fueling facilities in New York State operate under strict environmental regulations
requiring advanced engineering systems and operational safeguards. These protections—
including double‑wall tanks, leak detection technology, spill containment systems, operator
training, and regular inspections—greatly reduce the risk of fuel releases compared to older filling
station designs.
Information submitted: FEAF Part 1, Safety Systems and Regulatory Controls at Modern Fueling
Facilities Memo
Conclusion: The project is not anticipated to have a significant impact on human health.
17. Impact on Community Plans
Due to the project needing a rezoning, the question of whether “the proposed action is
inconsistent with local land use plans or zoning regulations” was checked as a moderate to large
impact.
During Code Review and Planning Board review of the project, it was determined that a rezoning
from C-1 to C-2 would not result in spot zoning, nor would it be inconsistent with zoning in the
area, given that there are C-2 uses across the street, and to the immediate east of the property.
The project is within a commercial corridor of the Town, and the rezoning report that was
produced by the Planning Board highlights that Comprehensive Plan denotes that the north side
of Southwestern Boulevard is a commercial area but suggests that it needs uses and restrictions
that protect the surrounding residential areas.
There also is adequate fire protection and other community services in this area.
Information submitted and Analysis: Hamburg Planning Board Rezoning Report, Southwestern
Blvd Excerpt from Hamburg Comp Plan
Conclusion: The project is not anticipated to have a significant impact on community plans.
Attachments:
• -Planning Board Rezoning Report
• -Site Survey
101
Page 102
• -Proposed Site Plan
• -Circulation Plan
• -FEMA Flood Map
• -Wetland Delineation Plan
• -Safety Systems and Regulatory Controls at Modern Fueling Facilities Memo
• -Official Agency Comments from Coordinated Review
• -SHPO Letter of No Concern
• -ITE Trip Generation Analysis
102
Page 103
Town Board of the Town of Hamburg
April 27, 2026 Meeting
4.29. SW Blvd and Big Tree Road Traveler Center Rezoning Approval Resolution
Whereas, the Town of Hamburg received a request from Briad Development, LLC to rezone 4.14 acres
of land (SBL # 160.18-1-9.1) located at the intersection of Southwestern Boulevard and Big Tree Road
from C-1 (Local Retail Business District District) to C-2 (General Commercial District) for the
development of a small-scale travel center, to be anchored by an 8,700 sq-ft building with gasoline
service, accompanied by several quick-service restaurant (QSR) establishments, and other site
improvements; and
Whereas, the Hamburg Planning Board reviewed the rezoning request and recommended on February
4th, 2026, that this rezoning request be approved with conditions; and
Whereas, a public hearing was held regarding the zoning map revision and subsequent project on March
9th, 2026 and comments were received from the public, and the Town completed the required Erie
County 239 m referral; and
Whereas, the Hamburg Town Board has determined that the proposed rezoning and project will not
result in any significant negative effect on the environment and has issued a Negative Declaration and
determined that the rezoning is in accordance with the Town's Comprehensive Plan.
Now, Therefore, Be It Resolved, the Town of Hamburg Town Board hereby rezones the property
identified above from C-1 to C-2 with the following conditions:
1. The following uses shall not be permitted:
Laundry or dry-cleaning plants;
Facilities for the manufacture, compounding, and assembly of products from previously
prepared materials;
Retail cannabis dispensaries;
New or used motor vehicles sales (servicing of vehicles is allowed at these facilities);
Terminals for local trucking and delivery service, but not including any tractor, trailer or
tractor-trailer combination, or automobile conveyor, provided that all vehicle loading,
unloading and parking is on the premises;
Commercial car washes;
Automotive repair services (including oil change, muffler and brake shops, collision shops
and tire shops); and
Towing and recovery impoundment areas, but not including auto wrecking or the storage of
motor vehicles not eligible for New York State motor vehicle inspection stickers.
2. The fueling facility component of the project will comply with EPA and NYSDEC standards and
shall require advanced engineering systems and operational safeguards. These protections will
include double-wall tanks, leak detection technology, spill containment systems, operator
training, alarm systems and regular inspections.
3. An adequate landscape buffer shall consist of a landscaped area, adjacent to Big Tree Road. The
width and the landscaping to be provided in the landscaped area shall be determined by the
Planning Board during the site plan review process.
4. All dumpsters to be located on the Project Site shall be enclosed by a six-foot-tall fence in
accordance with Town requirements.
103
Page 104
5. Fully engineered plans will be prepared and submitted with a SWPPP & Engineer's Report during
the Site Plan Application review process, subject to Town Engineering review.
6. Dark sky compliant lighting will be provided for the entire project site and there will not be any
lighting spillover onto the residential properties to the rear of the project site.
7. The Project will require a Special Use Permit from the Planning Board and shall meet the
requirements per § 280-330 of the Zoning Code.
8. Site plan approval by the Planning Board is required to ensure that the above requirements are
met, and other site plan issues are addressed (including landscaping, lighting, parking lot design,
building aesthetics, and other site improvements).
9. A performance bond in accordance with § 280-313 of Hamburg Town Code shall be required as
a condition of site plan approval. The scope of the performance bond shall not include the
building or the fueling facility improvements and the scope of the site improvements to be subject
to the performance bond such as landscaping, stormwater management, etc. shall be determined
based on input from the Town Engineer.
10. The Applicant shall be required to obtain a Highway Work Permit from the NYS Department of
Transportation for the driveway connection onto Big Tree Road and if a Highway Work Permit
for the driveway connection onto Big Tree Road cannot be obtained, the Town Board expressly
reserves the right to re-evaluate the appropriateness of the C-2 zoning of the property.
11. In the event construction of the project has not commenced within three years, the Town Board
expressly reserves the right to re-evaluate the appropriateness of the C-2 zoning of the property.
12. Conditions No. 1 to 11 as set forth herein shall be subject to a Declaration of Restrictions at the
Erie County Clerk’s Office to be recorded when the Applicant closes on the purchase of the
property. A recorded copy of the Declaration of Restrictions shall be provided to the Planning
Department upon recording at the Erie County Clerk’s Office.
Be It Further Resolved, that the Zoning Code of the Town of Hamburg be amended as follows:
To amend Local Law #10 of the year 1986 of the Code of the Town of Hamburg Chapter 280 entitled
"Zoning" to provide for a change in the boundary of the Zoning Map whereby the Zoning is changed
from C-1 to C-2 for the property identified by SBL # 160.18-1-9.1.
ATTACHMENTS:
Site 2025 - 094-C101 SITE DEVELOPMENT PLAN (2).pdf
104
Page 105
105
PLOT TIME: 1/13/2026 12:35:53 PM
GENERAL SURVEY NOTES:
PLANNING DATA
ZONING CLASSIFICATION: LOCAL RETAIL BUSINESS DISTRICT (C-1) 1. EXISTING CONDITIONS ARE BASED ON A FIELD SURVEY PREPARED BY
PARCEL #: 160.18 -1 - 9.1 BOWMAN CONSULTING TITLED ALTA/NSPS LAND TITLE SURVEY FOR BRIAD
SEWER DISTRICT: ERIE COUNTY SEWER DISTRICT NO.3 DEVELOPMENT, LLC, DATED OCTOBER 10, 2025.
WATER DISTRICT: ERIE COUNTY WATER AUTHORITY
2. THE SURVEY IS TIED HORIZONTALLY INTO THE NORTH AMERICAN DATUM OF
Architecture
ITEM REQUIRED / ALLOWED PROPOSED 1983 (NAD 83). Eng ine er ing
MAX BUILDING HEIGHT 35 FT. 25 FT. Land Surveying
3. THE SURVEY IS TIED VERTICALLY INTO THE NORTH AMERICAN VERTICAL
MAX LOT COVERAGE 75% 35.2% DATUM OF 1988 (NAVD 88). WWW.GYMODPC.COM
MAXIMUM PRINCIPAL USE AND
15,000 SF. 8,702 SF.
18969 US Route 11
STRUCTURE SIZE Watertown,NY13601
MINIMUM LOT WIDTH 100 FT. > 100 FT. 315.788.3900
MINIMUM FRONT YARD SETBACK 40 FT. 56 FT.
©
MINIMUM SIDE YARD SETBACK 5 FT. / 25 FT. 107 FT. / 54 FT.
MINIMUM REAR YARD SETBACK 10 FT. 210 FT.
IT IS A VIOLATION OF SECTION
NUMBER OF PARKING SPACES IS 7209, SUBDIVISION 2, OF THE
43 PARKING SPACES NEW YORK STATE EDUCATION
PARKING SPACES DETERMINED BY THE TOWN OF LAW FOR ANY PERSON, UNLESS
14 GAS CANOPY SPACES
HAMBURG NY PLANNING BOARD. ACTING UNDER THE DIRECTION
OF A LICENSED PROFESSIONAL
12" H
ENGINEER OR LAND SURVEYOR
N 33° 53' 38" W 0.8' TO ALTER THIS DOCUMENT IN
21.92'
DPE
ANY WAY. IF ALTERED, SUCH
) 2'
EED
109.7
(21.92' DEED ) LICENSEE SHALL AFFIX HIS OR
.72' D S OF
3
T
EN D " (109 AND
70 EXISTING LEGEND HER SEAL AND THE NOTATION
07" W
701
M N 6' G T HE L "ALTERED BY" FOLLOWED BY
U U T °2 ON
S 41 TERLY A5L, PG. 397
701.8
BC 7
N FO DO .1' '
701.9
EXISTING WETLAND HIS OR HER SIGNATURE, DATE
703.3
699.6
O Y 2 .9 E S 87 AND A SPECIFIC DESCRIPTION
702.5
M THW LIBER 5
TC 7701.57
03.60
"N
BC
0
SOU OF ALTERATION.
3
701.5
701.3
01.89
CONCRETE SIDEWALK
2
3
10' M YARD
69 SEAL:
REA ACK
693.3 693.4
4
SETB
694.4 70 20' PERMANENT EASEMENT
INIM
R
5 INLET
69
(B)
MONUMENT GR. 702.72
UM
20
FOUND INV. 698.72 (A) PROPERTY LINE
'
692.4
"NYDOT" INV. 698.67 (B)
1.2'
(A)
693
MINOR CONTOUR LINE
5
N 39° 18' 50
0.5'
70
(N 39° 26' 33
APPROX. LOC.
695.9
20' WIDE PERMANENT
EASEMENT MAJOR CONTOUR LINE
BC 70
693.4
PER REF. #2
705.32
TC 703.66
BC 703.34
6
703.86
69
(NOT REFERENCED IN TITLE REPORT)
703.5
703.4
5
702.6
701.6
.54
691.4 STORM SEWER LINE
" 293' +/- RE
"W
EXISTING OVERHEAD PROJECT NO: 2025-094
PROPOSED 4" DIP MONUMENT
12" HDPE
WATER SERVICE UTILITY LINE SCALE: 1" = 30'
FOUND
293.76'
6
"NYDOT"
70
692.5 EXISTING ELECTRICAL BOX DRAWN BY: CC
F #3)
693.7 695.4
DESIGNED BY: PS
BC 704.59
1
TC 704.89
69 EXISTING TRANSMISSION
697
E
690.8 POLE
ER ONT
LIN
PS
BC 706.95
10 697.3 CHECKED BY:
706.73
705.58
7' M
704.7
' MINIMU
704.1
703.1
YA FR 69825
TY
R
689.3
E YA R D EXISTING UTILITY POLE DATE ISSUED: N/A
RD OM SID
PR OM F
PR W SETBACK
OP
691 EXISTING ELECTRICAL
LI OP EST
YA 10' FR
NE E S 692.3 694.5 697.4 MANHOLE
RT ID
6
R5
70
705 R15
BC 705.34
TC 705.65
Y E INLET
RD
0'
707.04
2
689.5
GR. 706.50 EXISTING GAS MARKER
89
'
6 INV. 702.15 (A)
30'
1
69
INV. 701.95 (B)
707
INLET EXISTING CATCH BASIN
0'
GR. 708.03
R2
691.7
BC 706.32
TC 706.61
R2 INV. 704.33 (A)
707.95
707.41
692 9 0 ' INV. 702.63 (B) SANITARY MANHOLE
69
(B)
15 " HD P E
692.6
15" HDPE
703.9
705.2
(B)
5' AR
(B)
706.0
706.4
689.4
69
3 (B) NYSDOT MONUMNET
M D
(A)
696.4
Y
IN S
APPROX. LOC.
(A)
PROPOSED ASPHALT 9
IM ET
SAN MH. 699.2
U BA
3 PAVEMENT WETLAND MARKER
M
689.0 PER REF. #2 69 N.Y.D.O.T.
6" HDPE
0
8
SI CK
70
70
BC
MAP NO. 288 PROPOSED
D
694
708.17
E
708.55
70
PARCEL 324VENDOR SIGN TRAFFIC SIGN
8.
R2
R2
695.1
35
12'
706
(REF. #3)
0'
5
7'
707
69
7 7
69
690
696
68 BC 708.32
TC 707.81
BC 707.55
688.7
698
688
APPROX. LOC.
708.92
705.2
704.9
708.52
706.6
707.5
708.98
20' WIDE PERMANENT 4 ' 702.1
694.7 R5
PROPOSED LEGEND
699
702
EASEMENT 69
SOUTHWESTERN BLVD (NYS ROUTE 20) AND BIG TREE ROAD
5 '
20' PER REF. #2 R6912
(NOT REFERENCED IN TITLE REPORT) 2-113 BUILDING
689.2
12" HDPE
691.0
TOWN OF HAMBURG, ERIE COUNTY, STATE OF NEW YORK
687.6
PROPOSED CONCRETE 697.4 2 '
70
703 10 3 7 08.
56
CONCRETE
DUMPSTER PAD R 70 BC
70
' 6 96 MONUMENT
9
79 FOUND ASPHALT PAVEMENT
9
. 693.1 INLET
70
7 6 77 GR. 708.54 "NYDOT"
68 INV. 704.09 (A)
JIMMY JOHN'S/
INLET PAVEMENT PAINT
CONCEPT SITE DEVELOPMENT PLAN
705.2
708.5
INV. 703.99 (B)
PROPOSED
+/- 1,799 SF
PROPOSED
+/- 1,387 SF
"W
696.1 702.4
GR. 709.33
PROPOSED
699.4
+/- 4,625 SF
698
DUNKIN
(A)
+/- 891 SF
BWW2GO
CIRCLE K
4 4 INV. 705.88 (A)
QSR
STORMWATER
706.8
'
708 707.6
1 704.1
(B) 12" HDPE INV. 705.13 (B) MANAGEMENT AREA
°0
688.3
(B)
BC 708.55
(A) TC 708.86
709.84
709.70
(A)
692.9 694.3
11
704
12' 30' SETBACK LINE
PROJECT LOCATION: C:\Users\cchawgo\GYMO DPC\2025-094 Circle K Wendy's Jimmy John's Hamburg NY - Documents\04_Engineering\01_Drawings\Site 2025 - 094.dwg
6" HDPE
S
8 MONUMENT
68 690.3 696.5 701.8
703
FOUND WATER SERVICE LINE
PROPOSED STORMWATER "NYDOT"
CIRCLE K/ JIMMY JOHN'S/DUNKIN/BWW2GO
687.1
9
68 MANAGEMENT AREA 1
70
6' FULL HEIGHT CURB
5
709
689.5
70
701.4
BC 709.63
684.3 686.4 2
70 PROPOSED CONCRETE
BC 709.11
TC 709.40
690
168.38'
710.17
710
709.95
18 PAVEMENT SIGN
709.1
709.4
16
707.7
692.2
14' 12'
18'
BIG TREE
694.5 702
R1 DRIVE THROUGH INTERCOM
0'
(N 33° 43' 35" REF #3)
702.4
690.7 9'
R5
ROAD
(VARIABLE WIDTH)
688.1
5'
684.6 R5
'
N 33° 42' 54" W
63' FROM
R
701.0 BOLLARD
697.1 '
698.3 705.4
685 702.4 EAST SIDE
686.4
PROPERTY LINE
37'
692.2 703.5
9 43 PARKING COUNT
PROPOSED FUEL 70
6
BC 709.36
TC 709.72
CANOPY
700.8
BC 709.90
6
68
710.30
709.5
709.5
708.6
689.6
685.5
6
8 698.3
69
69 706.3
710.36
694.1
703.2
0
35' 35'
70
690
687 691.1
710
1 7
687.2 69 70
697.0 CANOPY DRIP LINE
688.4
7 7 01 702.7
INLET
9
69
69
2
701.0 GR. 709.58
709
69 693.1 703.7 INV. 705.38 (A)
R
8 691.0
703
68
BC 710.08
687.7
INV. 705.28 (B)
702
2'
696.2
3 2-103
-6
69 PROPOSED INLET
"
706.3
GR. 710.05
(B)
698
AIR PORT
708.7
699.4
45'
709.3
4 INV. 705.85 (A)
709.6
69 705.3
MONUMENT INV. 705.65 (B)
689 689.3
9 698.8
709.85 709.8
708.1
687.9 700.1 FOUND (A) 10" HDPE
710.61
710.62
5 701.6 "NYDOT" (B)
709.93
6
MONUMENT
706
N.Y.D.O.T. 69
705
MONUMENT
69
(A
688.2
MAP NO. 288 695.3
INLET FOUND TC 709.84 FOUND
) 1
708.8 BC 709.56 "NYDOT"
PARCEL 324 692.4
GR. 704.25 703.5 0.1'
0"
(REF. #3) INLET 697 MONUMENT 0.5' (N 56° 52' 18" REF #3)
SAN MH. INV. 701.05 (A) )
HD
GR. 598.00 699.0 FOUND (N 53° 15 ' 47" RE
PROPOSED F #3 2-108 708.1 TC 709.36
.70
RIM 700.30 INV. 700.25 (B)
PROPOSED N 56° 52' 59" E 95.20' 709.4
P
8'
709
688.8 690.5 INV. 594.60 (A) 0.3' E 186.9
' 28" TANKS 707.9
709
N 53° 16FUEL
E
688 (N 56° 00' 36" 346' +/- REF #3) (SEALED) VENDOR SIGN
688.0 INV. 594.10 (B) 0.1' 30' 709.0
N 56° 01' 17" E 346.17' 707.6 09
FRONT YARD
FRONT YARD
705.5 706.4 9. BC
40' MINIMUM
688.2 702.2
PROPERTY
704.1 705 708.7 70 71
56' FROM
708
SETBACK
699.1 706.37 707.25 0.7
695.6 697.8 700 701.0 708.68
687.9 692.6 698 699 701 R2 ' 705.03 8.98 70 MONUMENT 4
LINE
686.6 9
689.7
694 696 697 701.70 0' R15
703.40 706.32 707.20 708.04 708.65 70 9.0
8 691.2 692 693 695 698.40 700.08 8
68 68 690 1077
691.00
694.06 696.38 703.38 705.00
707.97 7 08 FOUND
UGEL
701.59 .92
687.42 689.68 691.80
696.29 698.38 700.08
TC 704.89 6" HDPE
TC 706.14 TC 707.17 TC 708.49
"NYDOT"
691.78 693.99
TC 699.95 TC 701.48 TC 703.29
BC 702.96
(A) BC 704.58
BC 705.89 BC 706.89 BC 708.18 (A) 6" HDPE 0.2'
687.32 689.59 BC 701.27
TC 696.21 BC 699.64
(B)
(B) 0.5'
(B)
TC 691.65 12" HDPE TC 693.91 BC 695.93
TC 687.24 TC 689.50 (A) BC 693.61 INLET
(A)6" HDPE
BC 689.24 BC 691.32
BC 686.96
GR. 708.50 LAST REVISED: N/A
(B)
INLET INV. 705.40 (A)
GR. 690.01 INV. 704.50 (B) PROGRESS PRINTS ONLY
E
INV. 685.51 (A)
12" HDPE
JANUARY 13, 2026
DP
INV. 685.41 (B)
12" HDPE
SOUTHWESTERN BOULEVARD
"H
DRAWING NO.
12
(S.H. 9269)
GRAPHIC SCALE
INLET
(WIDTH VARIES)
NORTH
BY DATUM
1 inch = 30 ft.
15 0 7.5 15 30 60
C101