Town Board Regular Meeting Agenda, Apr 13, 2026 — Agenda (full text)
Page 1
Agenda
Natalie E. Nitsche Town Clerk
Town Board of the Town of Hamburg
April 13, 2026
1. Roll Call
2. Pledge of Allegiance
3. Minutes of Previous Meeting
RESOLVED, that the Town Board does hereby approve the minutes of the previous meeting as
follows: March 23,2026
4. Agenda Items
4.1. Blasdell Volunteer Fire Department
4.2. Zoning Board of Appeals Alternate Member Appointment
4.3. Approve Buffalo Niagara Waterkeeper annual spring sweep
4.4. Town of Hamburg EBO
4.5. Out of Town Travel Request - Police / Dog Control Officer
4.6. Police - Out of Town Travel Request
4.7. Authorize Out of Town travel for Emergency Manager utilizing Town Vehicle
4.8. Annual Grass Cutting Bid
4.9. POLICE –Budget Amendment
4.10. B&G PAF
4.11. Youth, Recreation, & Senior Services P.A.F.
4.12. Town Clerk's Office PAF
4.13. Engineering Department PAF
4.14. Budget Amendment - JCAP Grant
4.15. New Audio System at Town of Hamburg Arena Bids
1
Page 2
4.16. Dog Shelter Lease Agreement Addendum
4.17. Article LX Smoke Shops and Vape Shops SEQR Resolution
4.18. Article LX Smoke Shops and Vape Shops Adoption Resolution
4.19. Nike Concession and Bathroom National Grid Service
4.20. McKinley Sidewalk Extension Engineering Design
4.21. West Arnold Archeological Phase 1B Study
4.22. SW Blvd and Big Tree Road Traveler Center Rezoning SEQR Resolution
4.23. SW Blvd and Big Tree Road Traveler Center Rezoning Approval Resolution
4.24. Budget Amendment
4.25. Ice Arena Pro-Shop and Concession Stand RFP
5. Public Comment
6. Meeting is adjourned by Supervisor
2
Page 3
Town Board of the Town of Hamburg
April 13, 2026 Meeting
4.1. Blasdell Volunteer Fire Department
WHEREAS, the Village Board of Trustees of the Village of Blasdell conducted a public hearing with
respect to the issue of whether the Village of Blasdell shall be permitted to merge its Volunteer Fire
Department into the adjacent Fire Protection District maintained by the Big Tree Volunteer Fire
Company, Inc.; and
WHEREAS, the Board of Trustees considered input from the public and duly considered ramifications
of a contemplated merger, as above referenced; and
WHEREAS, the Village of Blasdell acknowledges that the declining enrollment of active volunteer
firefighters renders it impossible for the Village to maintain its own independent volunteer fire
department and meet basic fire protection needs throughout the Village pertaining to Village residential,
commercial and industrial properties, along with protection for the life, safety and general wellbeing of
its citizens; and
WHEREAS, the Village Board of Trustees of the Village of Blasdell respectfully requested that State
Senator Gallivan of the New York Senate and Assemblyman Rivera of the New York State Assembly
Co-Sponsor Enabling Legislation, which upon its adoption shall be forwarded to the Governor for her
review and consideration; and
WHEREAS, the Village Board of Trustees humbly requested that if such Enabling Legislation is duly
adopted that the Governor of the State of New York shall expediently sign said legislation to enable the
merger and to continue the outstanding fire protection and emergency services that the Village of
Blasdell has received in the last three years and throughout its history.
NOW THEREFORE BE IT RESOLVED, the Hamburg Town Board also respectfully requests the same
aforementioned actions to authorize the Village of Blasdell to merge its Volunteer Fire Department into
the adjacent Fire Protection District maintained by the Big Tree Volunteer Fire Company Inc., and
BE IT FURTHER RESOLVED, the Town Supervisor is authorized to sign any affiliated required
documentation.
3
Page 4
Town Board of the Town of Hamburg
April 13, 2026 Meeting
4.2. Zoning Board of Appeals Alternate Member Appointment
RESOLVED, pursuant to Town Code §34-12, the Hamburg Town Board appoints Catherine Mika as an
Alternate to the Zoning Board of Appeals for a two (2) year term ending December 31, 2027.
4
Page 5
Town Board of the Town of Hamburg
April 13, 2026 Meeting
4.3. Approve Buffalo Niagara Waterkeeper annual spring sweep
WHEREAS, Buffalo Niagara Waterkeeper desires to enter into an agreement with the Town of
Hamburg, to provide access for volunteer beach and waterfront cleanup events, at Hamburg Town Park
and local beaches to conduct the annual spring sweep, to be held on Saturday, April 25, 2026, and
WHEREAS, the Town Board of the Town of Hamburg supports this project, and purpose of the
event, and
WHEREAS, the Hamburg Town Board approves the Application for Special Event
NOW THEREFORE BE IT RESOLVED that the Town of Hamburg enter into an agreement
with Buffalo Niagara Waterkeeper, and
BE IT FURTHER RESOLVED THAT the Supervisor is authorized to sign the agreement on
behalf of the Town of Hamburg.
ATTACHMENTS:
Special Event Permit & Insurance.pdf
5
Page 6
6
Page 7
7
Page 8
8
Page 9
9
Page 10
Town Board of the Town of Hamburg
April 13, 2026 Meeting
4.4. Town of Hamburg EBO
WHEREAS, the New York State Department of Transportation (NYSDOT) Equitable Business
Opportunities (EBO) system is a web-based, free of charge civil rights reporting tool for construction
and engineering industries, and
WHEREAS, the EBO system streamlines tracking DBE, M/WBE, and SDVOB participation,
contractor payments, and employee hours on federally funded or state-sponsored projects, and
WHEREAS, as per a request from NYSDOT, the Town of Hamburg must designate a Responsible
Local Official (RLO) and an EBO Administrator.
NOW, THEREFORE, IT IS HEREBY RESOLVED AS FOLLOWS: As Supervisor, Elizabeth Farrell
Lorentz will serve as the Responsible Local Official (RLO) and Director of Finance, Patrick Shea will
serve as the EBO Administrator.
10
Page 11
Town Board of the Town of Hamburg
April 13, 2026 Meeting
4.5. Out of Town Travel Request - Police / Dog Control Officer
WHEREAS, the 2026 Webster Dog Control Educational Seminar is being held at the West Webster Fire
Hall in Webster, NY from Wednesday, May 6, 2026, to Thursday, May 7, 2026, and
NOW, THEREFORE, BE IT RESOLVED, the Town Board authorizes Dog Control Officer Richard
Stoberl to attend the 2026 Webster Dog Control Education Seminar, with the following expenses:
Lodging (2 nights): $300.96
Meals (2 days: Dinner Only $32.50 per day): $ 65.00
Registration: $180.00
TOTAL COST: $545.96
Money is available in A000.3510.0492.0000 (Training and Professional Development).
ATTACHMENTS:
2026 Webster Dog Control Educ Seminar 5-6-2026 to 5-7-2026.pdf
11
Page 12
12
Page 13
Town Board of the Town of Hamburg
April 13, 2026 Meeting
4.6. Police - Out of Town Travel Request
WHEREAS, the FBINAA National Annual Training Conference will take place in Niagara Falls,
Ontario, Canada from Saturday, June 27, 2026 to Tuesday, June 30, 2026, and;
WHEREAS, the FBINAA National Annual Training Conference offers education and networking with law
enforcement veterans, fellow chiefs, and future leaders, and;
NOW, THEREFORE, BE IT RESOLVED, the Town Board authorizes Captain Todd Ehret to attend the
FBINAA National Annual Training Conference, with the following expenses:
Lodging (5 nights @ $289 CAD per night plus fees): $1,414.88
Registration: $ 600.00
Parking ($50.00 CAD daily): $ 185.00
Meals
1 day @ $32.50 (Dinner Included)
2 days @ $48.75 per day (Lunch Included)-$97.50
1 day @ $16.25 (Lunch / Dinner Included) $ 146.25
TOTAL COST: $2,346.13
BE IT FURTHER RESOLVED, the Town Board authorizes the use of an Unmarked Police Vehicle for
transportation.
Money is available in B3120.492 Seminars/Dept Training.
13
Page 14
Town Board of the Town of Hamburg
April 13, 2026 Meeting
4.7. Authorize Out of Town travel for Emergency Manager utilizing Town Vehicle
Whereas the Town of Hamburg is a member agency for the Niagara International Transportation
Technology Coalition (NITTEC), represented by Emergency Management and the Police Department,
Whereas the 2026 New York State TIMposium is scheduled to take place at the New York State
Fairgrounds in Syracuse, NY on May 20, 2026 from 7am until 445pm,
Whereas this full-day event will bring together professionals from various fields to enhance responder
safety and roadway clearance practices; whose attendees participate in five sessions led by national
experts, covering real-world scenarios, planning, and on-scene tactics,
Whereas this TIMPosium event aims to improve both responder and public safety, streamlining traffic
incident management across New York State,
Whereas Emergency Manager Sean Crotty has been asked by the NYS TIMPosium Organizing
Committee to present with NITTEC Operations Manager an Educational Session on Public Safety
Telecommunications Role in Traffic Incident Management,
Therefore, be it resolved the Town Board Authorize Emergency Manager Sean Crotty to attend the
NYS TIMPosium, and present his educational session at the attendance,
There is no cost for Emergency Manager Sean Crotty to attend and has requested the use of a town
vehicle.
ATTACHMENTS:
Session Descriptions & Bios TIMPosium Draft_3-10-26.pdf
14
Page 15
2026 New York State TIMposium
Wednesday, May 20, 2026, 7:00 AM – 4:45 PM
New York State Fairgrounds, Art & Homes Building, Syracuse, New York
Session and Presentation Descriptions
7:00 AM - 7:45 AM
Event Registration Sign-In and Morning Refreshments
7:45 AM - 9:00 AM
Opening Ceremonies
Martha Eddy Room
Opening Ceremonies Emcee: Tom With, Co-Chair NYS TIM Steering Committee
Presentation of Colors
Troop D Honor Guard, New York State Police
Pledge of Allegiance
Welcome & Opening Remarks:
NYSDOT Executive
State Fire Admin
Lieutenant Colonel Christopher T. Zaba currently serves as the Assistant Deputy Superintendent for the
Uniformed Force of the New York State Police. Lt. Colonel Zaba has over 24 years of service with the State
Police and over 30 years in law enforcement having served as a patrolman with Cobleskill Police Department
and as an Environmental Conservation Officer with NYS DEC. Lt. Colonel Zaba has served as an operator
with the Special Operations Response Team (SORT), Uniform Sergeant, Station Commander, BCI Lieutenant,
Uniform Zone Commander, Aviation Detail Commander, Special Operations Detail Commander, and Staff
Inspector.
In his current position, Lt. Colonel Zaba oversees all the uniform operations in the state, the Office of
Emergency Management, Special Operations, Aviation, and Division Traffic. He also oversees numerous
committees within the New York State Police, and is a member of the New York State Association of Chiefs of
Police and the International Association of Chiefs of Police
15
Page 16
9:10 AM - 9:40 AM
Concurrent Session 1
Understanding the Role of Emergency Responders and Roadway Safety
Concurrent Session 1A, Empire Theater
Description: Struck-by incidents continue to be an alarming trend for responders. During this interactive
presentation, Chief Denniston will explain the importance of attitude, training, and proper policies and
procedures in reducing the number of injuries and deaths across the state and country each year. Unified
Command, advanced warning, coordination, and public education are no longer options; they are necessities.
Each organization must complete a community vulnerability and needs assessment in order to mitigate the
chances of YOU becoming the next tragic headline.
Presenter & Biography Info: David Denniston is the Senior Vice President of Risk Management for McNeil
and Company (ESIP) and serves as Executive Director of the National FARMEDIC Training Program. Dave
has been in Emergency Services for 30-plus years with the Cortlandville Fire Department in Upstate NY. He
has served as Chief of the Department, President, and Chairman of the Board of Directors. Dave serves
Cortland County as Deputy Fire Coordinator and also serves the Town of Virgil as Fire Commissioner. He
serves as VP for the New York State Association of Fire Districts, as Secretary of the National Volunteer Fire
Council Foundation Board, and on the Advisory Board for The New York State Fire Chiefs Association.
Chief Denniston has presented emergency vehicle operation, social media, and leadership classes at several
state, regional, and national shows and conventions, including Firehouse Expo in Baltimore, San Diego, and
Orlando, and IAFC conferences in Dallas, Denver, Chicago, and Atlanta. He has been the keynote speaker at
State Conventions in New York, Indiana, Colorado, and Washington. Dave sits on two NFPA tech committees
and has articles printed in several trade magazines.
NYSDOT Work Zone Safety & Practices to use at a Crash
Concurrent Session 1B, Martha Eddy
Description: An overview of the safety components and equipment found in work zones and how they relate to
crash scenes.
Presenter & Biography Info: Craig D’Allaird is a Professional Engineer currently serving as a Safety
Evaluation Engineer with NYSDOT’s Highway Safety Bureau. In this role, he evaluates roadway safety
performance and supports initiatives aimed at improving transportation safety across New York State. Prior to
joining NYSDOT, Craig worked as a civil engineer with NYSDEC and also served as the Commissioner of
Public Works for the Town of Glenville, New York, where he oversaw municipal infrastructure and public
works operations.
Craig has experience in engineering education as well, having served as an Assistant Professor and Department
Chair at Hudson Valley Community College. Earlier in his career, he worked as a Project Engineer at The
Chazen Companies.
Craig holds a Master of Science from Rensselaer Polytechnic Institute and has built a career focused on public
infrastructure, engineering practice, and transportation safety.
9:40 AM - 9:55 AM
Networking Break/ Exhibitor Review/ Photos
16
Page 17
9:55 AM - 10:55 AM
Concurrent Sessions 2 –
Supplemental TIM Training
2-Lane TIM
Concurrent Session 2A, Empire Theater
Description: TIM is not just for highways. This supplemental training focuses on highlighting the specific
concerns and practices for sparsely populated areas, such as towns, villages, and the rolling hillsides of New
York. A hands-on practical exercise will let you analyze and test a scenario showcasing how TIM is utilized on
narrow roads with farms, different cultures, communities, and the ever-changing topography.
Presenter & Biography Info: Rich Flanagan is a public safety leader and educator serving in various
leadership positions in law enforcement, the fire service, and emergency management. He retired from the
Onondaga County Sheriff's Department after 20 years of service, where he held supervisory positions in patrol,
the detective bureau, SWAT, and the police academy. He then served as director of the Central New York
Police Academy and Public Safety Training Center for the next 20 years.
He also has taught various incident command and incident management courses for five different state agencies,
focusing in the last several years on the traffic incident management system, TIMS. He has taught extensively
for the past 15 years at the National Emergency Training Center in Emmittsburg, Maryland.
He is a member of the NYS Incident Management team that responds statewide and nationally to support major
disasters as an operations section Chief and a member of the command and general staff. He is a member of the
statewide TIMS steering committee and a member of the NYSOEM instructor training team.
Public Safety Telecommunicators Role in Traffic Incident Management
Concurrent Session 2B, Martha Eddy
Description: What do 911, NITTEC, TOC, and TMC's have to do with TIM? Take a peek behind the curtains
and see how these centers operate and what resources they have to offer. This presentation will cover the roles
of dispatch centers and traffic operation centers (TOC) with TIM. The presentation will give the audience a
better understanding of how these centers operate and what resources they have to offer. Participants will walk
away with the tools necessary to get more involved with the centers in their region and learn how to use the
resources they provide.
Presenter & Biography Info: Bill Lobuzzetta is the Operations Manager of the Niagara International
Transportation Technology Coalition (NITTEC), providing leadership and management of the 24/7 Traffic
Operations Center (TOC). Bill is responsible for the TOC staff that operates multi-agency Intelligent
Transportation Systems (ITS) within Western New York and Southern Ontario, Canada. Bill’s professional
career includes over 18 years of management experience in TOC’s. Bill has a Bachelor of Science degree in
Business, Management, and Economics from Empire State College. Bill has attended the Operations Academy
Senior Management Program, the Traffic Management Center Operations Academy, and is a National Traffic
Incident Management Responder Program Trainer.
Sean Crotty currently serves as the Emergency Manager for the Town of Hamburg, New York, where he also
oversees the Regional Public Safety Communications Office. He is in his ninth year as Chair of the Erie County
Emergency Managers Association and most recently served as Co-Chair of the NITTEC Western New York
Traffic Incident Management Committee. Crotty brings more than three decades of experience as a public
safety responder across multiple disciplines throughout Western New York. His service as a street and flight
17
Page 18
paramedic, volunteer firefighter, and multidisciplinary instructor and subject matter expert (SME) has provided
him with broad, practical experience addressing a wide range of threats and hazards.
In addition, Crotty is a Nationally Certified Fire Service Instructor II with the Erie County Division of
Homeland Security & Emergency Services (DHSES), Fire Safety Division. He is the Past Chief of the North
Boston Fire Company and has been an active member of the department for 35 years. Crotty has facilitated
training at the New York State Preparedness Training Center in Oriskany, New York, serving as a subject
matter expert for first responders from across New York State, in addition to conducting training locally
throughout Western New York.
11:00 AM– 12:00 PM
Concurrent Sessions 3
NYS Agriculture and Markets Traffic Incident Notifications & CART - Large Animal
Transport Incidents: Spilled Food, Livestock, and Plants Oh My, what to do next? What to do and what
resources are out there?
Session 3A, Martha Eddy
Description: Ag & Markets will go into detail and provide clear direction/context on the Department's
involvement in traffic incidents involving Dairy, Food Commodities, and Animal haulers throughout New York
State. The Onondaga County Animal Response Teams (ONCART) presentation showcases what tools they have
and how they use them. To help all responders plan, prepare, and respond to disasters affecting pets and
livestock, ensuring animal welfare during emergencies. From llamas to cats around the state, they do it all.
https://alert.ny.gov/county-animal-response-teams
Presenter & Biography Info: Paolo Audino is currently the Emergency Management Coordinator, Health and
Safety Director, and Cyber Risk Coordinator for NYS Ag & Markets. Before joining Ag & Markets, Paola was
a member of the DHSES team as a security analyst and a Special Projects coordinator Intern, conducting
research and analysis on terrorist actions towards first responders, supporting and developing outreach programs
such as Safeguard NY, Citizens Preparedness, and emergency services Intel Sharing.
Mark Burger has been a volunteer firefighter for 44 years, starting as a member of the volunteer fire
department’s Explorer Post for four years before becoming a full member. He has served in officer roles for
many years. He is also a founding member of Onondaga County’s Animal Response Team “OnCART”, where
he currently serves as President. His day job is as the Executive Director of the Onondaga County Soil and
Water Conservation District (SWCD), where the staff of 12 work with over 300 farms across Onondaga County
and the Skaneateles Lake Watershed. He received his Bachelor’s and Master of Science from the SUNY
College of Environmental Science and Forestry in Syracuse.
How to stay safe from Electrical Hazards on a scene?
Session 3B, Outdoor Demo Area
Description: Electrical safety demonstration using a mobile trailer that recreates hazards of live power lines,
showing how objects like fences, ladders, and even water can become energized, often with dramatic sparks and
fire, to educate first responders, utility workers, and the public on the dangers of downed lines and how to stay
safe by calling 911 and assuming all wires are live.
Presenter: National Grid - Live Wire
18
Page 19
Bus Rollover Scene Set-Up Competition
Session 3C, Outdoor Demo Area
Description: “Understanding from your initial dispatch to when Everybody Goes Home.”
A Bus Rollover incident will be staged outdoors of the main building, and participants will learn how to safely
set up around an incident, stage equipment, and discuss ways to keep first responders and motorists safe while
keeping traffic moving. At the same time, all participants will sharpen their learned skills and work on their
teamwork with all the other first responding disciplines. Participants will also be given the opportunity to check
out responding vehicles, their purpose of operation, and how they will perform during the incident.
Presenter & Biography Info: Tom With is An Active member / Interior firefighter of the Fuller Road Fire
Department of Colonie (2/88). Currently a Safety Officer, Fire Police Officer, and Past Captain in charge of FD
Training. Operations CAR #8 Fire Police, of the Town of Colonie Emergency Services Committee, 1996 to
present. Conduct a Monthly Meeting and Drill Program for all Town of Colonie Fire Police. TIMS training
updates are always on the Program Agenda. Past President of The Fire Police Association of Albany County,
1995 – 2011, and current Member (since 1989). Past President of the Volunteer Fire Police Association of NYS,
1999 – 2001.Co-Chair of the NYSDOT TIMS Statewide Steering Comm. (2024 to present), Member since
2016, representing Volunteer Fire Police Association of the State of New York (VFPASNY) and the
Firefighters Association of the State of New York (FASNY). Attended the “FHWA National Traffic Incident
Management Responder Leadership, Technology, and Training Symposium”, October 20 – 22, 2023, at the
National Emergency Training Center, National Fire Academy, Emmitsburg, Maryland. Represented the
NYSDOT TIMS Statewide Steering Committee. Alumnus of National Fire Academy 1995, NYS Weekends &
Volunteer Incentive Program Classes.
Alexander Ruckh is a public safety professional with experience spanning military service, law enforcement,
volunteer firefighting, and emergency transportation operations. He currently serves with the NYS DOT,
supporting emergency preparedness, operations, training, and incident coordination. His Background reflects a
long-standing commitment to public safety through all levels of government.
12:00 PM –1:00 PM
Provided Working Lunch/ Networking/ Exhibitors
LODD overview
1:00 PM – 2:00 PM
Plenary Presentation
Data, Dollars, and Deaths: Making TIM an Uncompromising Priority
Keynote, Martha Eddy
Description: Behind every "struck-by" statistic is a family forever changed, a budget stretched thin, and a gap
in our collective safety net. This session moves beyond the "Move Over" stickers to look at the cold, hard
realities of roadway incidents through the lens of the Struck-By Sentinel (SBS). By analyzing the intersection of
economic impact and human loss, we will build a professional case for why Traffic Incident Management
(TIM) must be a non-negotiable priority for all disciplines—from the smallest towing outfit to the largest law
enforcement agency. We will challenge the status quo and provide the data-driven "why" behind making every
responder a TIM hero.
Presenter & Biography Info: Todd Leiss is a career Traffic Incident Management (TIM) specialist with over
30 years of hands-on experience across the emergency response spectrum. His background includes service as a
volunteer firefighter, EMT, HazMat technician, and 911 dispatcher, giving him a unique, 360-degree
19
Page 20
perspective on roadway safety. Todd is the retired TIM Coordinator for the Pennsylvania Turnpike
Commission, where he managed the towing and recovery program and established landmark training
requirements for leadership. Currently, he serves as the volunteer Deputy Director of Training for the
Emergency Responder Safety Institute (ERSI) and is the Founder of TIM Heroes, Inc. As the creator of the
Struck-By Sentinel, Todd focuses on the data-driven economic and human impacts of struck-by incidents. He is
a co-founder of the National Emergency Roadway Responder Safety Coalition (NERRSC) and currently serves
as the 1st Vice President of the CVVFA.
2:05 PM – 3:05 PM
Concurrent Sessions 4
On Scene Media Relations-Awareness: What to do with the Media? Why is it a good idea to have a
plan? How can they help TIM?
Concurrent Session 4A, Martha Eddy
Description: This presentation will focus on the needs of the media at the scene of an incident and what they
are trying to get, as well as the role that responders play in facilitating good media relations and keeping a
secure and safe scene.
Presenter & Biography Info: Steve Hauck has over 17 years of experience as a public information officer and
is currently a PIO for the NYS Incident Management Team. Steve retired after 22 years from the Utica, NY
Police Department, where he retired as a Lieutenant.
Steve has multiple deployments to disasters across the country and serves as a Public Information instructor for
the NYS Office of Emergency Management and FEMA.
Technical Sergeant Jack L. Keller serves as the Assistant Director of Public Information for the New York State
Police, assigned to Division Headquarters in Albany. In this role, he oversees statewide media relations,
strategic communications, and public messaging on behalf of the Superintendent and Executive Staff.
Sgt. Keller has extensive experience coordinating communications during large-scale incidents, critical
investigations, and high-profile events. He works closely with Troop Public Information Officers across New
York to ensure accurate, timely, and coordinated messaging that supports responder safety, operational
integrity, and public awareness. With a background in field operations and incident response, Sgt. Keller brings
practical, on-scene experience to media and scene management. His focus is on integrating public information
strategy into Traffic Incident Management, helping agencies maintain scene control, protect responders, and use
media engagement as a tool to improve roadway safety and public compliance.
How to stay safe from Electrical Hazards on a scene?
Session 4B, Outdoor Demo Area
Description: Electrical safety demonstration using a mobile trailer that recreates hazards of live power lines,
showing how objects like fences, ladders, and even water can become energized, often with dramatic sparks and
fire, to educate first responders, utility workers, and the public on the dangers of downed lines and how to stay
safe by calling 911 and assuming all wires are live.
Presenter: National Grid - Live Wire
20
Page 21
Drones for Reconstruction: What Do They Need & Why:
Session 4C, Outdoor Demo Area
Description: Discuss and provide a live demonstration on the usage and role of the UAS/Drone in the on-scene
investigation of collisions and crime scenes. What helps them & what hurts? What does the reconstruction look
like?
Presenter & Biography Info: Investigator Devin Bacon with the NYS Police Troop E Collision
Reconstruction Unit, joined the New York State Police in 2012 and worked as a Trooper in Troop E. In 2017,
Devin received his Part 107 UAS (Unmanned Aerial System) License from the FAA. The New York State
Police created a UAS unit in 2018, in which Devin was one of thirty operators to first receive training and fly
successful missions across the state. Devin was promoted to Investigator and assigned to the Collision
Reconstruction Unit in Troop E in 2020. The Troop E Collision Reconstruction Unit covers and provides
Collision Reconstruction services to ten counties in the greater Finger Lakes/Rochester Region.
During his last six years, Devin has continued the professional reputation of this specialty unit throughout
Troop E. Annually, over 70 reconstruction and crime scene investigations benefit from his knowledge and
expertise in the operational standards, continuous training, and advanced equipment. Devin has received over
1500 hours of crash reconstruction training and provided expert testimony in numerous criminal and civil
proceedings. Devin holds an ACTAR (Accreditation Commission for Traffic Accident Reconstruction)
accreditation.
3:05 PM – 3:20 PM
Networking Break/ Exhibitor Review/ Photo Booth
3:20 PM – 4:20 PM
Concurrent Sessions 5
Vicarious Trauma and PTSD of the First Responder
Session 5A, Martha Eddy
Description: provide specialized mental health, trauma support, and peer-to-peer counseling for first responders
(police, firefighters, EMS) to combat high rates of stress, burnout, and PTSD. These programs address the
"culture of silence" and stigma in the first responder community by providing confidential resources, including
post-critical incident seminars and specialized training for peer volunteers.
Presenters: NYS Police Investigator Alexander Hyra and Investigator Lisa MacLauchlin. Senior Investigator
Alexander Hyra has been serving in the NY State Police since May 2006. In 2017, Hyra was promoted to
Investigator after working as a road Trooper in Wappinger, Poughkeepsie, and Brunswick. In 2019, Investigator
Hyra attained his permanent rank as a Sergeant and became the Acting Senior Investigator at the Brunswick
Barracks. In 2020, Investigator Hyra interviewed and became a Regional Coordinator within the Employee
Assistance Program and covered Troops K, H, and G. Additionally, Investigator Hyra has assisted numerous
outside agencies with EAP services. In 2025, he was promoted to Senior Investigator in the Employee
Assistance Program and is responsible for and oversees the 11 EAP Investigators throughout the state. Prior to
his career in law enforcement, Senior Investigator Hyra was a career Firefighter/Paramedic with the City of
Watervliet Fire Department from 2003-2006. Senior Investigator Hyra has also been a Volunteer Firefighter
with the Center Brunswick Fire Company since he was 16 and is currently the Fire Chief.
21
Page 22
How to stay safe from Electrical Hazards on a scene?
Session 5B, Outdoor Demo Area
Description: Electrical safety demonstration using a mobile trailer that recreates hazards of live power lines,
showing how objects like fences, ladders, and even water can become energized, often with dramatic sparks and
fire, to educate first responders, utility workers, and the public on the dangers of downed lines and how to stay
safe by calling 911 and assuming all wires are live.
Presenter: National Grid - Live Wire
Inside Look at the Tow World
Session 5C, Outdoor Demo Area
Description: Can you upright a School Bus? Why do they do the things they do? Why is this taking so long?
How do they make it happen? Unseen factors they are looking at.
Presenter & Biography Info: Chris Morin, Towing and Recovery Operations Manager for Big Red Towing.
Chris has been a member of the Big Red family for 16 years. Born into the towing and recovery industry
through his family’s recovery business, Chris developed a deep respect for the profession from an early age. In
2024, he was recognized as a WreckMaster Top 10 Operator by WreckMaster, Inc., an honor presented during
an award ceremony at the American Towman Exposition in Baltimore. Despite his leadership role, Chris
remains active in the field, believing that staying hands-on helps him stay connected to the evolving challenges,
expectations, and responsibilities of the towing and recovery industry.
Chris is also a strong advocate for professional development and safety. He encourages all of his staff to attend
TIM (Traffic Incident Management) training and to build strong working relationships with their responding
partners to ensure safer and more efficient incident response.
4:20 PM – 4:45 PM
Closing Remarks
Martha Eddy Room
Emcee: Tom With
Announce the Winner of the Competitive Exercise
Thank You's
Distribute Learning/ Promo Item
22
Page 23
Town Board of the Town of Hamburg
April 13, 2026 Meeting
4.8. Annual Grass Cutting Bid
WHEREAS, the Town of Hamburg Code Enforcement Department is responsible for the enforcement
of Town of Hamburg Local Law No. 9-1974 (Chapter 75) Brush, Grass and Weeds, Village of
Hamburg Local Law No. 3 – 1998 Section 182-2 and Village of Blasdell Chapter 95 Article 1 and such
services to perform cutting of grass and weeds on private property as required.
BE IT RESOLVED, that the Town Clerk is authorized to advertise for sealed bids entitled “Hamburg
Code Enforcement 2026 Annual Contract for Grass/Weed Cutting Services”
Sealed bids must be received at Hamburg Town Hall, Town Clerk’s Office, 6100 South Park Avenue,
Hamburg, New York 14075, and said bid will be publicly opened and read aloud on
May 12, 2026 at 11:30 a.m. in Conference Room 7A Mailed bids should be sent to:
Town of Hamburg, Attn: Town Clerk 6100 South Park Avenue, Hamburg, New York 14075.
Please mark clearly on the envelope: Bid Enclosed – “Hamburg Code Enforcement 2026 Annual
Contract for Grass/Weed Cutting Services”
Charged to Clean up of properties A3620.469
ATTACHMENTS:
Final Grass cutting bid.docx
23
Page 24
TOWN OF HAMBURG, NEW YORK
REQUEST FOR WEED/GRASS CUTTING SERVICES (2026 SEASON)
FOR THE CODE ENFORCEMENT DEPARTMENT
Your firm is hereby invited to submit a proposal to provide professional weed and/or grass
removal services as authorized by the Town of Hamburg Code Enforcement Department. The
requested services and related proposal requirements are as described below.
General
The Town of Hamburg Code Enforcement Department is responsible for the enforcement
of Town of Hamburg Local Law No. 9-1974 (Chapter 75) Brush, Grass and Weeds, Village of
Hamburg Local Law No. 3 – 1998 Section 182-2 and Village of Blasdell Chapter 95 Article 1.
These local laws provide for the cutting and removal of high grass and weeds verified to be in
excess of ten inches of height by the Town and when determined that the owner of such property
has failed to comply with the Town of Hamburg certified mail notification.
This Department is seeking a reliable contractor to perform the cutting and removal of high
grass and weeds located on those properties found to be in violation within the Town of Hamburg
and the Villages of Hamburg and Blasdell. These services would be executed on an “as directed
basis” under the supervision of the Town of Hamburg Code Enforcement Department. The cost of
these services under such agreement will be funded through Town account A 3620.469 (Clean up
of properties).
This request for proposal neither commits the Town of Hamburg to select the contractor
nor reimburse any costs associated with the preparation or submittal of proposals in this regard.
The Town reserves the right to reject any and all proposals, should it be deemed to be in the best
interest of the Town of Hamburg.
Scope of Work Services
The services to be provided by the contractor are to include, but not to be limited to, the
following:
(A) Initial Cutting
(1) After receiving notification by the Code Enforcement Department as to the location
of violation, perform a site visit to investigate and become familiar with the specific
physical conditions essential to the required scope of work. It is essential that the
contractor notify the Code Enforcement Department of any obstructions present on
the premises such as tree limbs, brush or refuse which would impede their ability to
perform the cutting. Upon approval from the Code Enforcement Officer the
contractor shall remove any of the obstructions from the premises prior to
undertaking the initial cutting.
24
Page 25
(2) Upon authorization to proceed, mobilize the necessary equipment to the subject
property to promptly perform the cutting of weeds, grass and/or other rank
vegetation as required on the premises. The grass should be cut to be maximum
height of four inches and excess grass/weeds should be removed and properly
disposed of off the premises. It is anticipated that the contractor complete this work
within 48 hours of authorization to proceed by this Department.
(B) Maintenance Cutting
Within two (2) weeks of the initial cutting and at a frequency every two weeks
thereafter the contractor shall maintain cutting said premises in good condition
until the end of the growing season or until directed otherwise by the Code
Enforcement Department.
Form of Proposal
Two (2) copies of your proposal are to be submitted. Proposals are to be concise and
specific. The proposal shall include the following:
(1) A cost for all necessary work as deemed necessary to accomplish the initial cutting
and maintenance cutting described in the scope of work. This cost should include all the necessary
costs (including but not limited to labor, equipment, tools, mobilization to the work site and any
other direct and indirect costs associated with the performance of the specified services). Bidders
must provide an estimate on the attached Estimate Forms showing the cost involved with the
cutting of each of the following lot types located within the Town of Hamburg.
A. Type I lot – A typical residential lot with a typical Square footage up to 15,000 square
feet to cut. Primarily Flat lots, lots with five or less structures, and lots with trees to cut around.
B. Type II lot – A typical commercial lot with a typical square footage up to 15,000
square feet to cut. Primarily flat lots with commercial buildings, paved parking lots, and possible
obstructions to mow around such as guard rails, parking signs, business signs, dumpsters, other
landscaping features, etc.
C. Type III Lot – Unique lots. Lots with extreme hills/slopes, deep ditches, ponds,
area to cut is significantly higher than 15,000 square feet, or an extreme number of obstacles to
mow around etc.
The successful low bid will be awarded based on a weighted average of the cost for
the above categories, (A) Initial Cutting and (B) Maintenance Cutting. The cost for Initial
Cutting will be the average cost of the three described lot types and will be weighted at
10%. The cost of Maintenance Cutting of Type I lots will be weighted at 60%, Type II lots
will be weighted at 20%, and Type III lots will be weighted at 10%. The Total Bid will be
sum of the costs for each category/lot type described above multiplied by the assigned weight
25
Page 26
expressed as a percentage.
(2) Equipment on hand to perform the work.
(3) Insurance (Liability and Workmen’s Compensation & Disability).
Commercial Liability (Town of Hamburg must be named as additional insured)
General Aggregate $1,000,000.00
Products and Comp/Op, Aggregate $2,000,000.00
Personal & Advertising Injury $1,000,000.00
Each Occurrence $1,000,000.00
Fire Damage (any one fire) $ 50,000.00
Med. Expense (any one person) $ 5,000.00
Additional Insured: Coverage in Commercial General Liability, Automobile
Liability, and Excess Liability and/or Umbrella Liability policies or coverage
sections shall be written or endorsed so as to apply to the following as additional
insured on a primary and non-contributory basis:
"Town of Hamburg and its employees, authorized volunteers and board
members.”
The Certificate of Insurance must clearly state how Additional Insured
coverage is achieved in the General Liability, Automobile Liability, and
Umbrella/Excess Liability policies. Certificates of Insurance must show
the form numbers that are used to achieve all of the Additional Insured
coverage. A copy of the actual policy language that effects this coverage
in each policy must be provided to the Town with the Certificate of
Insurance.
Waiver of Subrogation: To the fullest extent permitted by applicable state law, a
Waiver of Subrogation Clause shall be added to the General Liability, Automobile,
Umbrella/Excess Liability, and Workers Compensation policies in favor of the
Town.
Automobile Liability Insurance
Bodily injury and Property Damage, coverage for the Vendors as the owner or the
lessee of automobiles, trucks, trailers, self-propelled Vendor’s equipment and all
other owned, hired and non-owned vehicles registered for use on the public
highway and/or used in operations relating to work under contract. The coverage
limit applicable shall be the greater of the amounts below or the amount(s) carried
by the Vendor.
Combined Single Limit $1,000,000.00
Excess Liability and/or Umbrella Liability:
Applicable to Commercial General and Automobile Liability policies. The
Excess Liability and/or Umbrella Liability coverage limits applicable shall be the
26
Page 27
greater of the amounts indicated below or the amounts carried by the Town.
Each Occurrence $1,000,000.00
Aggregate $1,000,000.00
Workers Compensation and Employer’s Liability Insurance
Coverage as required by New York State statutory limits
New York State Disability (NYDBL)
Coverage as required by New York State statutory limits
Proposal Due Date
Proposals are to be received by the:
Hamburg Town Clerks Office
Hamburg Town Hall
6100 South Park Avenue
Hamburg, New York 14075
Please mark clearly on the envelope:
Bid Enclosed – 2026 Annual Grass/Weed Cutting Services
Bids must be submitted no later than 11:00 am on Tuesday, May 12,
2026.
Late submittals will not be accepted, and will be returned unopened.
27
Page 28
Estimate Form
Lot Type I
Initial cut _____________________________
Maintenance cut _____________________________
Lot Type II
Initial cut _____________________________
Maintenance cut _____________________________
Lot Type III
Initial cut _____________________________
Maintenance cut _____________________________
28
Page 29
Town Board of the Town of Hamburg
April 13, 2026 Meeting
4.9. POLICE –Budget Amendment
WHEREAS, the Town of Hamburg Police Department receives distribution payments from a share of
assets forfeited from defendants from time to time and,
WHEREAS, these items are not included in the 2026 budget,
NOW, THEREFORE BE IT RESOLVED, that the Town Board approves the receipt of the following
monies and approves a budget amendment to the revenue account as follows:
Recoveries and Sales Budget Adjustment
Receipt Revenue Code Expenditure Code
Amount To Increase To Increase Purpose/Source
$8,308.91 B.4358.519 Assets Forfeited
Total:
$8,308.91
29
Page 30
Town Board of the Town of Hamburg
April 13, 2026 Meeting
4.10. B&G PAF
BE IT RESOLVED, that the Town Board approves the termination and hiring of the following
employees in Buildings & Grounds.
ATTACHMENTS:
DOC041026-001.pdf
30
Page 31
31
Page 32
Town Board of the Town of Hamburg
April 13, 2026 Meeting
4.11. Youth, Recreation, & Senior Services P.A.F.
BE IT RESOLVED, that the Town Board approve the termination and hiring of personnel for the
Youth, Recreation & Senior Services Department as follows:
ATTACHMENTS:
scan_2026_04_06_11_27_28_731.pdf
32
Page 33
33
Page 34
Town Board of the Town of Hamburg
April 13, 2026 Meeting
4.12. Town Clerk's Office PAF
BE IT RESOLVED, that the Town Board approves the attached PAF.
ATTACHMENTS:
DOC040626-04062026124137.pdf
34
Page 35
35
Page 36
Town Board of the Town of Hamburg
April 13, 2026 Meeting
4.13. Engineering Department PAF
RESOLVED, that the Town Board approve the attached PAF.
ATTACHMENTS:
Paf.pdf
36
Page 37
37
Page 38
Town Board of the Town of Hamburg
April 13, 2026 Meeting
4.14. Budget Amendment - JCAP Grant
WHEREAS, the Hamburg Town Justice Court has been awarded a grant under the 2025-26 cycle of the
Justice Court Assistance Program (JCAP), funding to be recorded under revenue code
A000.0000.3089.0510; and
WHEREAS, it is necessary to amend the current budget to accurately reflect the receipt and allocation
of these funds; and
WHEREAS, these grant funds will be used to purchase new office furniture for the Judges' Chambers in
support of operational and administrative needs;
NOW, THEREFORE, BE IT RESOLVED, that the Town Board hereby approves a budget amendment
to increase the revenue budget line A000.0000.3089.0510 by the amount of $4,000.00; and
BE IT FURTHER RESOLVED, that the corresponding appropriations be increased in the following
expense codes to support the grant activities;
A000.1110.0203.0510 - Office Equipment - JCAP Grant.
BE IT FURTHER RESOLVED, that this resolution shall take effect immediately upon adoption.
38
Page 39
Town Board of the Town of Hamburg
April 13, 2026 Meeting
4.15. New Audio System at Town of Hamburg Arena Bids
BE IT RESOLVED, that the Town Board approve the rejection of the “New Audio System at Town of
Hamburg Ice Arena” RFP and corresponding bids, authorized on December 9, 2025, with a submission
deadline of December 23, 2025.
39
Page 40
Town Board of the Town of Hamburg
April 13, 2026 Meeting
4.16. Dog Shelter Lease Agreement Addendum
BE IT RESOLVED, that the Town Board authorizes the Town Supervisor to sign the attached contract
amendment pending legal review and approval.
ATTACHMENTS:
Addendum.docx
40
Page 41
Addendum (2) to the 2026 Dog Shelter Lease Agreement
Between the Town of Hamburg and the Eden Veterinary Clinic
As directed by the New York State Agriculture and Markets Law Article 26-C, veterinary
facilities providing sheltering services are now expected to meet expanded requirements relating
to intake assessments, physical examinations, vaccination timing, parasite control, behavioral
documentation, written medical protocols, staff training, and recordkeeping. These requirements
significantly increase the medical oversight, administrative workload, staffing needs, and
operational costs associated with the housing stray or municipal animals.
In order to remain compliant and continue providing these services in a medically appropriate
and sustainable manner, the following contract addendum and fee authorizations will be required
for each dog received, regardless of the duration of stay:
Requirement of Dog Control Officer at Intake
Initial exam/evaluation and note findings as required by the shelter
Required Medical Services at Intake
Physical Examination
$65.00 per healthy animal
$80.00 per sick or medically compromised animal
Deworming/Parasite Prevention-Credelio Quattro
$50.00 per dog (0-100 lbs)
Dogs over 100 lbs will require two doses
Each dose provides approximately 30 days of coverage and must be repeated if the
animal remains in our facility beyond 30 days
Upon Expiration of Stray Hold (5/7/9 days per NYS Agriculture & Markets Law
Section 117
Distemper vaccine & parvo vaccine will be administered withing 24-48 hrs
$50.00 per dog
Bordatella vaccine
$60.00 per dog
Boarding Fee Adjustment
Boarding fees will increase to $40.00 per day per animal, effective April 1, 2026 through
December 31,2026, to account for the additional handling, documentation, monitoring,
sanitation, enrichment, and regulatory compliance requirements no expected.
41
Page 42
Additional Medical Treatments
Any additional diagnostics, treatments, medications, procedures, or emergency care
deemed medically necessary will be charged at our regular fees consistent with those
charged to the general public.
Authorization for the above medical services and associated fees must be included as a formal
addendum to the current municipal contract.
Eden Veterinary Clinic Town of Hamburg
______________________ _____________________
Print name:_____________ Elizabeth Farrell Lorentz
Town Supervisor
Date:__________________ Date:________________
42
Page 43
Town Board of the Town of Hamburg
April 13, 2026 Meeting
4.17. Article LX Smoke Shops and Vape Shops SEQR Resolution
WHEREAS, the Hamburg Town Code contains and specifies the local laws and ordinances of the
Town of Hamburg; and
WHEREAS, the Town has received complaints from residents regarding smoke shops and vape shops;
and
WHEREAS, the Code Review Committee has generated a draft for smoke shops and vape shops
regulations, and has sent these suggested revisions for the Town Board to begin the adoption process;
and
WHEREAS, pursuant to Municipal Home Rule Law, the Town Board is proposing to enact a local law
as follows:
Be it enacted by the Town Board of the Town of Hamburg, New York, that the Hamburg Town Board
proposes to amend the Hamburg Town Code as follows (full copies attached):
Add a new “Article LX Smoke Shops and Vape Shops” to Chapter 280 (Zoning)
WHEREAS, a public hearing was held on February 23rd, 2026, for discussion and public comment
concerning adoption of this proposed local law; and
WHEREAS, these proposed local law amendments were referred to Erie County through the 239-m
referral process and received no objections; and
WHEREAS, pursuant to Part 617 of the implementing regulations pertaining to Article 8 (State
Environmental Quality Review Act - SEQR) of the Environmental Conservation Law, the Hamburg
Town Board established itself as SEQR Lead Agency for this Unlisted action; and
WHEREAS, the Town Board has completed the FEAF (Parts 1, 2, and 3) and solicited input from the
public and from other Involved and Interested agencies, and has taken a hard look at the social,
economic, and environmental impacts of the adoption of the proposed Code changes; and
43
Page 44
WHEREAS, the findings of this review indicate that the proposed Code changes will not adversely
affect the natural resources of the State and/or the health, safety and welfare of the public.
NOW, THEREFORE BE IT RESOLVED, that the Hamburg Town Board, as Lead Agency has
determined that the adoption of the Smoke Shop and Vape Shops Code will not result in any significant
adverse impacts on the environment, and a Negative Declaration is hereby issued, based on the reasons
as set forth in the Full Environmental Assessment Form (Parts 1, 2 and 3); and
BE IT FINALLY RESOLVED, that the Town Board authorizes the Town Supervisor to sign the
Environmental Assessment Form, which will act as the SEQR Negative Declaration, and authorizes that
the appropriate notices and filings be made.
ATTACHMENTS:
FEAF Part 1.pdf
FEAF Part 2.pdf
FEAF Part 3.pdf
44
Page 45
Full Environmental Assessment Form
Part 1 - Project and Setting
Instructions for Completing Part 1
Part 1 is to be completed by the applicant or project sponsor. Responses become part of the application for approval or funding,
are subject to public review, and may be subject to further verification.
Complete Part 1 based on information currently available. If additional research or investigation would be needed to fully respond to
any item, please answer as thoroughly as possible based on current information; indicate whether missing information does not exist,
or is not reasonably available to the sponsor; and, when possible, generally describe work or studies which would be necessary to
update or fully develop that information.
Applicants/sponsors must complete all items in Sections A & B. In Sections C, D & E, most items contain an initial question that
must be answered either “Yes” or “No”. If the answer to the initial question is “Yes”, complete the sub-questions that follow. If the
answer to the initial question is “No”, proceed to the next question. Section F allows the project sponsor to identify and attach any
additional information. Section G requires the name and signature of the applicant or project sponsor to verify that the information
contained in Part 1is accurate and complete.
A. Project and Applicant/Sponsor Information.
Name of Action or Project:
Proposed code changes to Chapter 280 for a new Smoke Shops and Vape Shops Code
Project Location (describe, and attach a general location map):
N/A (Involves local law amendment)
Brief Description of Proposed Action (include purpose or need):
The proposed local law involves the Hamburg Town Board establishing a new Smoke Shops and Vape Shops Code, to create a unified code that sets
special use permit standards and regulations for new and existing smoke shops/vape shops in the Town of Hamburg.
Name of Applicant/Sponsor: Telephone: 716-649-6111
Town of Hamburg E-Mail:
Address: 6100 South Park Avenue
City/PO: Hamburg State: Zip Code:
NY 14075
Project Contact (if not same as sponsor; give name and title/role): Telephone:
E-Mail:
Address:
City/PO: State: Zip Code:
Property Owner (if not same as sponsor): Telephone:
E-Mail:
Address:
City/PO: State: Zip Code:
Page 1 of 13
FEAF 2019
45
Page 46
B. Government Approvals
B. Government Approvals, Funding, or Sponsorship. (“Funding” includes grants, loans, tax relief, and any other forms of financial
assistance.)
Government Entity If Yes: Identify Agency and Approval(s) Application Date
Required (Actual or projected)
a. City Council, Town Board, 9 ✔ Yes 9 No Town Board Approval April 2026
or Village Board of Trustees
b. City, Town or Village 9 Yes ✔
9 No
Planning Board or Commission
c. City, Town or 9 Yes ✔
9 No
Village Zoning Board of Appeals
d. Other local agencies 9 Yes ✔
9 No
e. County agencies 9 Yes 9 No
✔ County 239 referral January 2026
f. Regional agencies 9 Yes ✔
9 No
g. State agencies 9 Yes ✔
9 No
h. Federal agencies 9 Yes ✔
9 No
i. Coastal Resources.
i. Is the project site within a Coastal Area, or the waterfront area of a Designated Inland Waterway? 9 Yes 9 No
✔
ii. Is the project site located in a community with an approved Local Waterfront Revitalization Program? ✔
9 Yes 9 No
iii. Is the project site within a Coastal Erosion Hazard Area? 9 Yes 9 No
✔
C. Planning and Zoning
C.1. Planning and zoning actions.
Will administrative or legislative adoption, or amendment of a plan, local law, ordinance, rule or regulation be the 9 Yes 9 No
✔
only approval(s) which must be granted to enable the proposed action to proceed?
• If Yes, complete sections C, F and G.
• If No, proceed to question C.2 and complete all remaining sections and questions in Part 1
C.2. Adopted land use plans.
a. Do any municipally- adopted (city, town, village or county) comprehensive land use plan(s) include the site ✔
9 Yes 9 No
where the proposed action would be located?
If Yes, does the comprehensive plan include specific recommendations for the site where the proposed action 9 Yes 9 No
✔
would be located?
b. Is the site of the proposed action within any local or regional special planning district (for example: Greenway; 9 Yes 9 No
✔
Brownfield Opportunity Area (BOA); designated State or Federal heritage area; watershed management plan;
or other?)
If Yes, identify the plan(s):
_______________________________________________________________________________________________________
NYS Heritage Area: West Erie Canal Corridor
________________________________________________________________________________________________________
________________________________________________________________________________________________________
9 Yes 9 No
c. Is the proposed action located wholly or partially within an area listed in an adopted municipal open space plan, ✔
or an adopted municipal farmland protection plan?
If Yes, identify the plan(s):
Open ________________________________________________________________________________________________________
Space and Greenspace Plan
________________________________________________________________________________________________________
________________________________________________________________________________________________________
Page 2 of 13
46
Page 47
C.3. Zoning
a. Is the site of the proposed action located in a municipality with an adopted zoning law or ordinance. 9 Yes 9 No
✔
If Yes, what is the zoning classification(s) including any applicable overlay district?
All _________________________________________________________________________________________________________
_________________________________________________________________________________________________________
b. Is the use permitted or allowed by a special or conditional use permit? 9 Yes 9 No
c. Is a zoning change requested as part of the proposed action? 9 Yes ✔
9 No
If Yes,
i. What is the proposed new zoning for the site? ___________________________________________________________________
C.4. Existing community services.
a. In what school district is the project site located? Frontier
________________________________________________________________
CSD and Hamburg CSD
b. What police or other public protection forces serve the project site?
_________________________________________________________________________________________________________
Hamburg Police and Erie County Sheriff's
c. Which fire protection and emergency medical services serve the project site?
All __________________________________________________________________________________________________________
Fire Districts
d. What parks serve the project site?
__________________________________________________________________________________________________________
All parks
__________________________________________________________________________________________________________
D. Project Details
D.1. Proposed and Potential Development
a. What is the general nature of the proposed action (e.g., residential, industrial, commercial, recreational; if mixed, include all
components)?
_________________________________________________________________________________________________________
b. a. Total acreage of the site of the proposed action? _____________ acres
b. Total acreage to be physically disturbed? _____________ acres
c. Total acreage (project site and any contiguous properties) owned
or controlled by the applicant or project sponsor? _____________ acres
c. Is the proposed action an expansion of an existing project or use? 9 Yes 9 No
i. If Yes, what is the approximate percentage of the proposed expansion and identify the units (e.g., acres, miles, housing units,
square feet)? % ____________________ Units: ____________________
d. Is the proposed action a subdivision, or does it include a subdivision? 9 Yes 9 No
If Yes,
i. Purpose or type of subdivision? (e.g., residential, industrial, commercial; if mixed, specify types)
________________________________________________________________________________________________________
ii. Is a cluster/conservation layout proposed? 9 Yes 9 No
iii. Number of lots proposed? ________
iv. Minimum and maximum proposed lot sizes? Minimum __________ Maximum __________
e. Will the proposed action be constructed in multiple phases? 9 Yes 9 No
i. If No, anticipated period of construction: _____ months
ii. If Yes:
• Total number of phases anticipated _____
• Anticipated commencement date of phase 1 (including demolition) _____ month _____ year
• Anticipated completion date of final phase _____ month _____year
• Generally describe connections or relationships among phases, including any contingencies where progress of one phase may
determine timing or duration of future phases: _______________________________________________________________
____________________________________________________________________________________________________
____________________________________________________________________________________________________
Page 3 of 13
47
Page 48
f. Does the project include new residential uses? 9 Yes 9 No
If Yes, show numbers of units proposed.
One Family Two Family Three Family Multiple Family (four or more)
Initial Phase ___________ ___________ ____________ ________________________
At completion
of all phases ___________ ___________ ____________ ________________________
g. Does the proposed action include new non-residential construction (including expansions)? 9 Yes 9 No
If Yes,
i. Total number of structures ___________
ii. Dimensions (in feet) of largest proposed structure: ________height; ________width; and _______ length
iii. Approximate extent of building space to be heated or cooled: ______________________ square feet
h. Does the proposed action include construction or other activities that will result in the impoundment of any 9 Yes 9 No
liquids, such as creation of a water supply, reservoir, pond, lake, waste lagoon or other storage?
If Yes,
i. Purpose of the impoundment: ________________________________________________________________________________
ii. If a water impoundment, the principal source of the water: 9 Ground water 9 Surface water streams 9 Other specify:
_________________________________________________________________________________________________________
iii. If other than water, identify the type of impounded/contained liquids and their source.
_________________________________________________________________________________________________________
iv. Approximate size of the proposed impoundment. Volume: ____________ million gallons; surface area: ____________ acres
v. Dimensions of the proposed dam or impounding structure: ________ height; _______ length
vi. Construction method/materials for the proposed dam or impounding structure (e.g., earth fill, rock, wood, concrete):
________________________________________________________________________________________________________
D.2. Project Operations
a. Does the proposed action include any excavation, mining, or dredging, during construction, operations, or both? 9 Yes 9 No
(Not including general site preparation, grading or installation of utilities or foundations where all excavated
materials will remain onsite)
If Yes:
i .What is the purpose of the excavation or dredging? _______________________________________________________________
ii. How much material (including rock, earth, sediments, etc.) is proposed to be removed from the site?
• Volume (specify tons or cubic yards): ____________________________________________
• Over what duration of time? ____________________________________________________
iii. Describe nature and characteristics of materials to be excavated or dredged, and plans to use, manage or dispose of them.
________________________________________________________________________________________________________
________________________________________________________________________________________________________
iv. Will there be onsite dewatering or processing of excavated materials? 9 Yes 9 No
If yes, describe. ___________________________________________________________________________________________
________________________________________________________________________________________________________
v. What is the total area to be dredged or excavated? _____________________________________acres
vi. What is the maximum area to be worked at any one time? _______________________________ acres
vii. What would be the maximum depth of excavation or dredging? __________________________ feet
viii. Will the excavation require blasting? 9 Yes 9 No
ix. Summarize site reclamation goals and plan: _____________________________________________________________________
________________________________________________________________________________________________________
________________________________________________________________________________________________________
b. Would the proposed action cause or result in alteration of, increase or decrease in size of, or encroachment 9 Yes 9 No
into any existing wetland, waterbody, shoreline, beach or adjacent area?
If Yes:
i. Identify the wetland or waterbody which would be affected (by name, water index number, wetland map number or geographic
description): ______________________________________________________________________________________________
_________________________________________________________________________________________________________
Page 4 of 13
48
Page 49
ii. Describe how the proposed action would affect that waterbody or wetland, e.g. excavation, fill, placement of structures, or
alteration of channels, banks and shorelines. Indicate extent of activities, alterations and additions in square feet or acres:
_________________________________________________________________________________________________________
_________________________________________________________________________________________________________
_________________________________________________________________________________________________________
_________________________________________________________________________________________________________
iii. Will the proposed action cause or result in disturbance to bottom sediments? Yes 9 No
If Yes, describe: __________________________________________________________________________________________
iv. Will the proposed action cause or result in the destruction or removal of aquatic vegetation? 9 Yes 9 No
If Yes:
• acres of aquatic vegetation proposed to be removed: ___________________________________________________________
• expected acreage of aquatic vegetation remaining after project completion:________________________________________
• purpose of proposed removal (e.g. beach clearing, invasive species control, boat access): ____________________________
____________________________________________________________________________________________________
• proposed method of plant removal: ________________________________________________________________________
• if chemical/herbicide treatment will be used, specify product(s): _________________________________________________
v. Describe any proposed reclamation/mitigation following disturbance: _________________________________________________
_________________________________________________________________________________________________________
c. Will the proposed action use, or create a new demand for water? 9 Yes 9 No
If Yes:
i. Total anticipated water usage/demand per day: __________________________ gallons/day
ii. Will the proposed action obtain water from an existing public water supply? 9 Yes 9 No
If Yes:
• Name of district or service area: _________________________________________________________________________
• Does the existing public water supply have capacity to serve the proposal? 9 Yes 9 No
• Is the project site in the existing district? 9 Yes 9 No
• Is expansion of the district needed? 9 Yes 9 No
• Do existing lines serve the project site? 9 Yes 9 No
iii. Will line extension within an existing district be necessary to supply the project? 9 Yes 9 No
If Yes:
• Describe extensions or capacity expansions proposed to serve this project: ________________________________________
____________________________________________________________________________________________________
• Source(s) of supply for the district: ________________________________________________________________________
iv. Is a new water supply district or service area proposed to be formed to serve the project site? 9 Yes 9 No
If, Yes:
• Applicant/sponsor for new district: ________________________________________________________________________
• Date application submitted or anticipated: __________________________________________________________________
• Proposed source(s) of supply for new district: _______________________________________________________________
v. If a public water supply will not be used, describe plans to provide water supply for the project: ___________________________
_________________________________________________________________________________________________________
vi. If water supply will be from wells (public or private), what is the maximum pumping capacity: _______ gallons/minute.
d. Will the proposed action generate liquid wastes? 9 Yes 9 No
If Yes:
i. Total anticipated liquid waste generation per day: _______________ gallons/day
ii. Nature of liquid wastes to be generated (e.g., sanitary wastewater, industrial; if combination, describe all components and
approximate volumes or proportions of each): __________________________________________________________________
_________________________________________________________________________________________________________
_________________________________________________________________________________________________________
iii. Will the proposed action use any existing public wastewater treatment facilities? 9 Yes 9 No
If Yes:
• Name of wastewater treatment plant to be used: _____________________________________________________________
• Name of district: ______________________________________________________________________________________
• Does the existing wastewater treatment plant have capacity to serve the project? 9 Yes 9 No
• Is the project site in the existing district? 9 Yes 9 No
• Is expansion of the district needed? 9 Yes 9 No
Page 5 of 13
49
Page 50
• Do existing sewer lines serve the project site? 9 Yes 9 No
• Will a line extension within an existing district be necessary to serve the project? 9 Yes 9 No
If Yes:
• Describe extensions or capacity expansions proposed to serve this project: ____________________________________
____________________________________________________________________________________________________
____________________________________________________________________________________________________
iv. Will a new wastewater (sewage) treatment district be formed to serve the project site? 9 Yes 9 No
If Yes:
• Applicant/sponsor for new district: ____________________________________________________________________
• Date application submitted or anticipated: _______________________________________________________________
• What is the receiving water for the wastewater discharge? __________________________________________________
v. If public facilities will not be used, describe plans to provide wastewater treatment for the project, including specifying proposed
receiving water (name and classification if surface discharge or describe subsurface disposal plans):
________________________________________________________________________________________________________
________________________________________________________________________________________________________
vi. Describe any plans or designs to capture, recycle or reuse liquid waste: _______________________________________________
________________________________________________________________________________________________________
________________________________________________________________________________________________________
e. Will the proposed action disturb more than one acre and create stormwater runoff, either from new point 9 Yes 9 No
sources (i.e. ditches, pipes, swales, curbs, gutters or other concentrated flows of stormwater) or non-point
source (i.e. sheet flow) during construction or post construction?
If Yes:
i. How much impervious surface will the project create in relation to total size of project parcel?
_____ Square feet or _____ acres (impervious surface)
_____ Square feet or _____ acres (parcel size)
ii. Describe types of new point sources. __________________________________________________________________________
_________________________________________________________________________________________________________
iii. Where will the stormwater runoff be directed (i.e. on-site stormwater management facility/structures, adjacent properties,
groundwater, on-site surface water or off-site surface waters)?
________________________________________________________________________________________________________
________________________________________________________________________________________________________
• If to surface waters, identify receiving water bodies or wetlands: ________________________________________________
____________________________________________________________________________________________________
____________________________________________________________________________________________________
• Will stormwater runoff flow to adjacent properties? 9 Yes 9 No
iv. Does the proposed plan minimize impervious surfaces, use pervious materials or collect and re-use stormwater? 9 Yes 9 No
f. Does the proposed action include, or will it use on-site, one or more sources of air emissions, including fuel 9 Yes 9 No
combustion, waste incineration, or other processes or operations?
If Yes, identify:
i. Mobile sources during project operations (e.g., heavy equipment, fleet or delivery vehicles)
_________________________________________________________________________________________________________
ii. Stationary sources during construction (e.g., power generation, structural heating, batch plant, crushers)
________________________________________________________________________________________________________
iii. Stationary sources during operations (e.g., process emissions, large boilers, electric generation)
________________________________________________________________________________________________________
g. Will any air emission sources named in D.2.f (above), require a NY State Air Registration, Air Facility Permit, 9 Yes 9 No
or Federal Clean Air Act Title IV or Title V Permit?
If Yes:
i. Is the project site located in an Air quality non-attainment area? (Area routinely or periodically fails to meet 9 Yes 9 No
ambient air quality standards for all or some parts of the year)
ii. In addition to emissions as calculated in the application, the project will generate:
• ___________Tons/year (short tons) of Carbon Dioxide (CO2)
• ___________Tons/year (short tons) of Nitrous Oxide (N2O)
• ___________Tons/year (short tons) of Perfluorocarbons (PFCs)
• ___________Tons/year (short tons) of Sulfur Hexafluoride (SF6)
• ___________Tons/year (short tons) of Carbon Dioxide equivalent of Hydroflourocarbons (HFCs)
• ___________Tons/year (short tons) of Hazardous Air Pollutants (HAPs)
Page 6 of 13
50
Page 51
h. Will the proposed action generate or emit methane (including, but not limited to, sewage treatment plants, 9 Yes 9 No
landfills, composting facilities)?
If Yes:
i. Estimate methane generation in tons/year (metric): ________________________________________________________________
ii. Describe any methane capture, control or elimination measures included in project design (e.g., combustion to generate heat or
electricity, flaring): ________________________________________________________________________________________
_________________________________________________________________________________________________________
i. Will the proposed action result in the release of air pollutants from open-air operations or processes, such as 9 Yes 9 No
quarry or landfill operations?
If Yes: Describe operations and nature of emissions (e.g., diesel exhaust, rock particulates/dust):
_________________________________________________________________________________________________________
_________________________________________________________________________________________________________
j. Will the proposed action result in a substantial increase in traffic above present levels or generate substantial 9 Yes 9 No
new demand for transportation facilities or services?
If Yes:
i. When is the peak traffic expected (Check all that apply): Morning Evening Weekend
Randomly between hours of __________ to ________.
ii. For commercial activities only, projected number of truck trips/day and type (e.g., semi trailers and dump trucks): _____________
________________________________________________________________________________________________________
iii. Parking spaces: Existing ___________________ Proposed ___________ Net increase/decrease _____________________
iv. Does the proposed action include any shared use parking? Yes No
v. If the proposed action includes any modification of existing roads, creation of new roads or change in existing access, describe:
________________________________________________________________________________________________________
vi. Are public/private transportation service(s) or facilities available within ½ mile of the proposed site? 9 Yes 9 No
vii Will the proposed action include access to public transportation or accommodations for use of hybrid, electric 9 Yes 9 No
or other alternative fueled vehicles?
viii. Will the proposed action include plans for pedestrian or bicycle accommodations for connections to existing 9 Yes 9 No
pedestrian or bicycle routes?
k. Will the proposed action (for commercial or industrial projects only) generate new or additional demand 9 Yes 9 No
for energy?
If Yes:
i. Estimate annual electricity demand during operation of the proposed action: ____________________________________________
_________________________________________________________________________________________________________
ii. Anticipated sources/suppliers of electricity for the project (e.g., on-site combustion, on-site renewable, via grid/local utility, or
other):
________________________________________________________________________________________________________
iii. Will the proposed action require a new, or an upgrade, to an existing substation? 9 Yes 9 No
l. Hours of operation. Answer all items which apply.
i. During Construction: ii. During Operations:
• Monday - Friday: _________________________ • Monday - Friday: ____________________________
• Saturday: ________________________________ • Saturday: ___________________________________
• Sunday: _________________________________ • Sunday: ____________________________________
• Holidays: ________________________________ • Holidays: ___________________________________
Page 7 of 13
51
Page 52
m. Will the proposed action produce noise that will exceed existing ambient noise levels during construction, 9 Yes 9 No
operation, or both?
If yes:
i. Provide details including sources, time of day and duration:
_______________________________________________________________________________________________________
_______________________________________________________________________________________________________
ii. Will the proposed action remove existing natural barriers that could act as a noise barrier or screen? 9 Yes 9 No
Describe: _________________________________________________________________________________________________
_________________________________________________________________________________________________________
n. Will the proposed action have outdoor lighting? 9 Yes 9 No
If yes:
i. Describe source(s), location(s), height of fixture(s), direction/aim, and proximity to nearest occupied structures:
_________________________________________________________________________________________________________
_________________________________________________________________________________________________________
ii. Will proposed action remove existing natural barriers that could act as a light barrier or screen? 9 Yes 9 No
Describe: _________________________________________________________________________________________________
_________________________________________________________________________________________________________
o. Does the proposed action have the potential to produce odors for more than one hour per day? 9 Yes 9 No
If Yes, describe possible sources, potential frequency and duration of odor emissions, and proximity to nearest
occupied structures: ______________________________________________________________________________________
________________________________________________________________________________________________________
________________________________________________________________________________________________________
p. Will the proposed action include any bulk storage of petroleum (combined capacity of over 1,100 gallons) 9 Yes 9 No
or chemical products 185 gallons in above ground storage or any amount in underground storage?
If Yes:
i. Product(s) to be stored ______________________________________________________________________________________
ii. Volume(s) ______ per unit time ___________ (e.g., month, year)
iii. Generally, describe the proposed storage facilities:________________________________________________________________
________________________________________________________________________________________________________
q. Will the proposed action (commercial, industrial and recreational projects only) use pesticides (i.e., herbicides, 9 Yes 9 No
insecticides) during construction or operation?
If Yes:
i. Describe proposed treatment(s):
________________________________________________________________________________________________________
________________________________________________________________________________________________________
________________________________________________________________________________________________________
________________________________________________________________________________________________________
ii. Will the proposed action use Integrated Pest Management Practices? 9 Yes 9 No
r. Will the proposed action (commercial or industrial projects only) involve or require the management or disposal 9 Yes 9 No
of solid waste (excluding hazardous materials)?
If Yes:
i. Describe any solid waste(s) to be generated during construction or operation of the facility:
• Construction: ____________________ tons per ________________ (unit of time)
• Operation : ____________________ tons per ________________ (unit of time)
ii. Describe any proposals for on-site minimization, recycling or reuse of materials to avoid disposal as solid waste:
• Construction: ________________________________________________________________________________________
____________________________________________________________________________________________________
• Operation: __________________________________________________________________________________________
____________________________________________________________________________________________________
iii. Proposed disposal methods/facilities for solid waste generated on-site:
• Construction: ________________________________________________________________________________________
____________________________________________________________________________________________________
• Operation: __________________________________________________________________________________________
____________________________________________________________________________________________________
Page 8 of 13
52
Page 53
s. Does the proposed action include construction or modification of a solid waste management facility? 9 Yes 9 No
If Yes:
i. Type of management or handling of waste proposed for the site (e.g., recycling or transfer station, composting, landfill, or
other disposal activities): ___________________________________________________________________________________
ii. Anticipated rate of disposal/processing:
• ________ Tons/month, if transfer or other non-combustion/thermal treatment, or
• ________ Tons/hour, if combustion or thermal treatment
iii. If landfill, anticipated site life: ________________________________ years
t. Will the proposed action at the site involve the commercial generation, treatment, storage, or disposal of hazardous 9 Yes 9 No
waste?
If Yes:
i. Name(s) of all hazardous wastes or constituents to be generated, handled or managed at facility: ___________________________
_________________________________________________________________________________________________________
_________________________________________________________________________________________________________
ii. Generally describe processes or activities involving hazardous wastes or constituents: ___________________________________
_________________________________________________________________________________________________________
________________________________________________________________________________________________________
iii. Specify amount to be handled or generated _____ tons/month
iv. Describe any proposals for on-site minimization, recycling or reuse of hazardous constituents: ____________________________
________________________________________________________________________________________________________
________________________________________________________________________________________________________
v. Will any hazardous wastes be disposed at an existing offsite hazardous waste facility? 9 Yes 9 No
If Yes: provide name and location of facility: _______________________________________________________________________
________________________________________________________________________________________________________
If No: describe proposed management of any hazardous wastes which will not be sent to a hazardous waste facility:
________________________________________________________________________________________________________
________________________________________________________________________________________________________
E. Site and Setting of Proposed Action
E.1. Land uses on and surrounding the project site
a. Existing land uses.
i. Check all uses that occur on, adjoining and near the project site.
9 Urban 9 Industrial 9 Commercial 9 Residential (suburban) 9 Rural (non-farm)
9 Forest 9 Agriculture 9 Aquatic 9 Other (specify): ____________________________________
ii. If mix of uses, generally describe:
__________________________________________________________________________________________________________
__________________________________________________________________________________________________________
b. Land uses and covertypes on the project site.
Land use or Current Acreage After Change
Covertype Acreage Project Completion (Acres +/-)
• Roads, buildings, and other paved or impervious
surfaces
• Forested
• Meadows, grasslands or brushlands (non-
agricultural, including abandoned agricultural)
• Agricultural
(includes active orchards, field, greenhouse etc.)
• Surface water features
(lakes, ponds, streams, rivers, etc.)
• Wetlands (freshwater or tidal)
• Non-vegetated (bare rock, earth or fill)
• Other
Describe: _______________________________
________________________________________
Page 9 of 13
53
Page 54
c. Is the project site presently used by members of the community for public recreation? 9 Yes 9 No
i. If Yes: explain: __________________________________________________________________________________________
d. Are there any facilities serving children, the elderly, people with disabilities (e.g., schools, hospitals, licensed 9 Yes 9 No
day care centers, or group homes) within 1500 feet of the project site?
If Yes,
i. Identify Facilities:
________________________________________________________________________________________________________
________________________________________________________________________________________________________
e. Does the project site contain an existing dam? 9 Yes 9 No
If Yes:
i. Dimensions of the dam and impoundment:
• Dam height: _________________________________ feet
• Dam length: _________________________________ feet
• Surface area: _________________________________ acres
• Volume impounded: _______________________________ gallons OR acre-feet
ii. Dam=s existing hazard classification: _________________________________________________________________________
iii. Provide date and summarize results of last inspection:
_______________________________________________________________________________________________________
_______________________________________________________________________________________________________
f. Has the project site ever been used as a municipal, commercial or industrial solid waste management facility, 9 Yes 9 No
or does the project site adjoin property which is now, or was at one time, used as a solid waste management facility?
If Yes:
i. Has the facility been formally closed? 9 Yes 9 No
• If yes, cite sources/documentation: _______________________________________________________________________
ii. Describe the location of the project site relative to the boundaries of the solid waste management facility:
_______________________________________________________________________________________________________
_______________________________________________________________________________________________________
iii. Describe any development constraints due to the prior solid waste activities: __________________________________________
_______________________________________________________________________________________________________
g. Have hazardous wastes been generated, treated and/or disposed of at the site, or does the project site adjoin 9 Yes 9 No
property which is now or was at one time used to commercially treat, store and/or dispose of hazardous waste?
If Yes:
i. Describe waste(s) handled and waste management activities, including approximate time when activities occurred:
_______________________________________________________________________________________________________
_______________________________________________________________________________________________________
h. Potential contamination history. Has there been a reported spill at the proposed project site, or have any 9 Yes 9 No
remedial actions been conducted at or adjacent to the proposed site?
If Yes:
i. Is any portion of the site listed on the NYSDEC Spills Incidents database or Environmental Site 9 Yes 9 No
Remediation database? Check all that apply:
9 Yes – Spills Incidents database Provide DEC ID number(s): ________________________________
9 Yes – Environmental Site Remediation database Provide DEC ID number(s): ________________________________
9 Neither database
ii. If site has been subject of RCRA corrective activities, describe control measures:_______________________________________
________________________________________________________________________________________________________
________________________________________________________________________________________________________
iii. Is the project within 2000 feet of any site in the NYSDEC Environmental Site Remediation database? 9 Yes 9 No
If yes, provide DEC ID number(s): ______________________________________________________________________________
iv. If yes to (i), (ii) or (iii) above, describe current status of site(s):
_______________________________________________________________________________________________________
_______________________________________________________________________________________________________
Page 10 of 13
54
Page 55
v. Is the project site subject to an institutional control limiting property uses? 9 Yes 9 No
• If yes, DEC site ID number: ____________________________________________________________________________
• Describe the type of institutional control (e.g., deed restriction or easement): ____________________________________
• Describe any use limitations: ___________________________________________________________________________
• Describe any engineering controls: _______________________________________________________________________
• Will the project affect the institutional or engineering controls in place? 9 Yes 9 No
• Explain: ____________________________________________________________________________________________
___________________________________________________________________________________________________
___________________________________________________________________________________________________
E.2. Natural Resources On or Near Project Site
a. What is the average depth to bedrock on the project site? ________________ feet
b. Are there bedrock outcroppings on the project site? 9 Yes 9 No
If Yes, what proportion of the site is comprised of bedrock outcroppings? __________________%
c. Predominant soil type(s) present on project site: ___________________________ __________%
___________________________ __________%
____________________________ __________%
d. What is the average depth to the water table on the project site? Average: _________ feet
e. Drainage status of project site soils: 9 Well Drained: _____% of site
9 Moderately Well Drained: _____% of site
9 Poorly Drained _____% of site
f. Approximate proportion of proposed action site with slopes: 9 0-10%: _____% of site
9 10-15%: _____% of site
9 15% or greater: _____% of site
g. Are there any unique geologic features on the project site? 9 Yes 9 No
If Yes, describe: _____________________________________________________________________________________________
________________________________________________________________________________________________________
h. Surface water features.
i. Does any portion of the project site contain wetlands or other waterbodies (including streams, rivers, 9 Yes 9 No
ponds or lakes)?
ii. Do any wetlands or other waterbodies adjoin the project site? 9 Yes 9 No
If Yes to either i or ii, continue. If No, skip to E.2.i.
iii. Are any of the wetlands or waterbodies within or adjoining the project site regulated by any federal, 9 Yes 9 No
state or local agency?
iv. For each identified regulated wetland and waterbody on the project site, provide the following information:
• Streams: Name ____________________________________________ Classification _______________________
• Lakes or Ponds: Name ____________________________________________ Classification _______________________
• Wetlands: Name ____________________________________________ Approximate Size ___________________
• Wetland No. (if regulated by DEC) _____________________________
v. Are any of the above water bodies listed in the most recent compilation of NYS water quality-impaired 9 Yes 9 No
waterbodies?
If yes, name of impaired water body/bodies and basis for listing as impaired: _____________________________________________
___________________________________________________________________________________________________________
i. Is the project site in a designated Floodway? 9 Yes 9 No
j. Is the project site in the 100-year Floodplain? 9 Yes 9 No
k. Is the project site in the 500-year Floodplain? 9 Yes 9 No
l. Is the project site located over, or immediately adjoining, a primary, principal or sole source aquifer? 9 Yes 9 No
If Yes:
i. Name of aquifer: _________________________________________________________________________________________
Page 11 of 13
55
Page 56
m. Identify the predominant wildlife species that occupy or use the project site: ______________________________
______________________________ _______________________________ ______________________________
______________________________ _______________________________ ______________________________
n. Does the project site contain a designated significant natural community? 9 Yes 9 No
If Yes:
i. Describe the habitat/community (composition, function, and basis for designation): _____________________________________
________________________________________________________________________________________________________
ii. Source(s) of description or evaluation: ________________________________________________________________________
iii. Extent of community/habitat:
• Currently: ______________________ acres
• Following completion of project as proposed: _____________________ acres
• Gain or loss (indicate + or -): ______________________ acres
o. Does project site contain any species of plant or animal that is listed by the federal government or NYS as 9 Yes 9 No
endangered or threatened, or does it contain any areas identified as habitat for an endangered or threatened species?
If Yes:
i. Species and listing (endangered or threatened):______________________________________________________________________________
________________________________________________________________________________________________________________________
________________________________________________________________________________________________________________________
p. Does the project site contain any species of plant or animal that is listed by NYS as rare, or as a species of 9 Yes 9 No
special concern?
If Yes:
i. Species and listing:____________________________________________________________________________________________________
_______________________________________________________________________________________________________________________
q. Is the project site or adjoining area currently used for hunting, trapping, fishing or shell fishing? 9 Yes 9 No
If yes, give a brief description of how the proposed action may affect that use: ___________________________________________
________________________________________________________________________________________________________
E.3. Designated Public Resources On or Near Project Site
a. Is the project site, or any portion of it, located in a designated agricultural district certified pursuant to 9 Yes 9 No
Agriculture and Markets Law, Article 25-AA, Section 303 and 304?
If Yes, provide county plus district name/number: _________________________________________________________________
b. Are agricultural lands consisting of highly productive soils present? 9 Yes 9 No
i. If Yes: acreage(s) on project site? ___________________________________________________________________________
ii. Source(s) of soil rating(s): _________________________________________________________________________________
c. Does the project site contain all or part of, or is it substantially contiguous to, a registered National 9 Yes 9 No
Natural Landmark?
If Yes:
i. Nature of the natural landmark: 9 Biological Community 9 Geological Feature
ii. Provide brief description of landmark, including values behind designation and approximate size/extent: ___________________
________________________________________________________________________________________________________
________________________________________________________________________________________________________
d. Is the project site located in or does it adjoin a state listed Critical Environmental Area? 9 Yes 9 No
If Yes:
i. CEA name: _____________________________________________________________________________________________
ii. Basis for designation: _____________________________________________________________________________________
iii. Designating agency and date: ______________________________________________________________________________
Page 12 of 13
56
Page 57
e. Does the project site contain, or is it substantially contiguous to, a building, archaeological site, or district 9 Yes 9 No
which is listed on the National or State Register of Historic Places, or that has been determined by the Commissioner of the NYS
Office of Parks, Recreation and Historic Preservation to be eligible for listing on the State Register of Historic Places?
If Yes:
i. Nature of historic/archaeological resource: 9 Archaeological Site 9 Historic Building or District
ii. Name: _________________________________________________________________________________________________
iii. Brief description of attributes on which listing is based:
_______________________________________________________________________________________________________
f. Is the project site, or any portion of it, located in or adjacent to an area designated as sensitive for 9 Yes 9 No
archaeological sites on the NY State Historic Preservation Office (SHPO) archaeological site inventory?
g. Have additional archaeological or historic site(s) or resources been identified on the project site? 9 Yes 9 No
If Yes:
i. Describe possible resource(s): _______________________________________________________________________________
ii. Basis for identification: ___________________________________________________________________________________
h. Is the project site within fives miles of any officially designated and publicly accessible federal, state, or local 9 Yes 9 No
scenic or aesthetic resource?
If Yes:
i. Identify resource: _________________________________________________________________________________________
ii. Nature of, or basis for, designation (e.g., established highway overlook, state or local park, state historic trail or scenic byway,
etc.): ___________________________________________________________________________________________________
iii. Distance between project and resource: _____________________ miles.
i. Is the project site located within a designated river corridor under the Wild, Scenic and Recreational Rivers 9 Yes 9 No
Program 6 NYCRR 666?
If Yes:
i. Identify the name of the river and its designation: ________________________________________________________________
ii. Is the activity consistent with development restrictions contained in 6NYCRR Part 666? 9 Yes 9 No
F. Additional Information
Attach any additional information which may be needed to clarify your project.
If you have identified any adverse impacts which could be associated with your proposal, please describe those impacts plus any
measures which you propose to avoid or minimize them.
G. Verification
I certify that the information provided is true to the best of my knowledge.
Joshua Rogers
Applicant/Sponsor Name ___________________________________ 1/21/2026
Date_______________________________________
Planner
Signature________________________________________________ Title_______________________________________
PRINT FORM Page 13 of 13
57
Page 58
Agency Use Only [If applicable]
Full Environmental Assessment Form Project : Proposed code changes for a new Smoke Shops a
Part 2 - Identification of Potential Project Impacts Date : 4/13/26
Part 2 is to be completed by the lead agency. Part 2 is designed to help the lead agency inventory all potential resources that could
be affected by a proposed project or action. We recognize that the lead agency=s reviewer(s) will not necessarily be environmental
professionals. So, the questions are designed to walk a reviewer through the assessment process by providing a series of questions that
can be answered using the information found in Part 1. To further assist the lead agency in completing Part 2, the form identifies the
most relevant questions in Part 1 that will provide the information needed to answer the Part 2 question. When Part 2 is completed, the
lead agency will have identified the relevant environmental areas that may be impacted by the proposed activity.
If the lead agency is a state agency and the action is in any Coastal Area, complete the Coastal Assessment Form before proceeding
with this assessment.
Tips for completing Part 2:
• Review all of the information provided in Part 1.
• Review any application, maps, supporting materials and the Full EAF Workbook.
• Answer each of the 18 questions in Part 2.
• If you answer “Yes” to a numbered question, please complete all the questions that follow in that section.
• If you answer “No” to a numbered question, move on to the next numbered question.
• Check appropriate column to indicate the anticipated size of the impact.
• Proposed projects that would exceed a numeric threshold contained in a question should result in the reviewing agency
checking the box “Moderate to large impact may occur.”
• The reviewer is not expected to be an expert in environmental analysis.
• If you are not sure or undecided about the size of an impact, it may help to review the sub-questions for the general
question and consult the workbook.
• When answering a question consider all components of the proposed activity, that is, the Awhole action@.
• Consider the possibility for long-term and cumulative impacts as well as direct impacts.
• Answer the question in a reasonable manner considering the scale and context of the project.
1. Impact on Land
Proposed action may involve construction on, or physical alteration of, ✔
NO YES
the land surface of the proposed site. (See Part 1. D.1)
If “Yes”, answer questions a - j. If “No”, move on to Section 2.
Relevant No, or Moderate
Part I small to large
Question(s) impact impact may
may occur occur
a. The proposed action may involve construction on land where depth to water table is E2d 9 9
less than 3 feet.
b. The proposed action may involve construction on slopes of 15% or greater. E2f 9 9
c. The proposed action may involve construction on land where bedrock is exposed, or E2a 9 9
generally within 5 feet of existing ground surface.
d. The proposed action may involve the excavation and removal of more than 1,000 tons D2a 9 9
of natural material.
e. The proposed action may involve construction that continues for more than one year D1e 9 9
or in multiple phases.
f. The proposed action may result in increased erosion, whether from physical D2e, D2q 9 9
disturbance or vegetation removal (including from treatment by herbicides).
g. The proposed action is, or may be, located within a Coastal Erosion hazard area. B1i 9 9
h. Other impacts: _______________________________________________________ 9 9
___________________________________________________________________
Page 1 of 10
FEAF 2019
58
Page 59
2. Impact on Geological Features
The proposed action may result in the modification or destruction of, or inhibit
access to, any unique or unusual land forms on the site (e.g., cliffs, dunes, NO
✔ YES
minerals, fossils, caves). (See Part 1. E.2.g)
If “Yes”, answer questions a - c. If “No”, move on to Section 3.
Relevant No, or Moderate
Part I small to large
Question(s) impact impact may
may occur occur
a. Identify the specific land form(s) attached: ________________________________ E2g 9 9
___________________________________________________________________
b. The proposed action may affect or is adjacent to a geological feature listed as a E3c 9 9
registered National Natural Landmark.
Specific feature: _____________________________________________________
c. Other impacts: ______________________________________________________ 9 9
___________________________________________________________________
3. Impacts on Surface Water
The proposed action may affect one or more wetlands or other surface water ✔
NO YES
bodies (e.g., streams, rivers, ponds or lakes). (See Part 1. D.2, E.2.h)
If “Yes”, answer questions a - l. If “No”, move on to Section 4.
Relevant No, or Moderate
Part I small to large
Question(s) impact impact may
may occur occur
a. The proposed action may create a new water body. D2b, D1h 9 9
b. The proposed action may result in an increase or decrease of over 10% or more than a D2b 9 9
10 acre increase or decrease in the surface area of any body of water.
c. The proposed action may involve dredging more than 100 cubic yards of material D2a 9 9
from a wetland or water body.
d. The proposed action may involve construction within or adjoining a freshwater or E2h 9 9
tidal wetland, or in the bed or banks of any other water body.
e. The proposed action may create turbidity in a waterbody, either from upland erosion, D2a, D2h 9 9
runoff or by disturbing bottom sediments.
f. The proposed action may include construction of one or more intake(s) for withdrawal D2c 9 9
of water from surface water.
g. The proposed action may include construction of one or more outfall(s) for discharge D2d 9 9
of wastewater to surface water(s).
h. The proposed action may cause soil erosion, or otherwise create a source of D2e 9 9
stormwater discharge that may lead to siltation or other degradation of receiving
water bodies.
i. The proposed action may affect the water quality of any water bodies within or E2h 9 9
downstream of the site of the proposed action.
j. The proposed action may involve the application of pesticides or herbicides in or D2q, E2h 9 9
around any water body.
k. The proposed action may require the construction of new, or expansion of existing, D1a, D2d 9 9
wastewater treatment facilities.
Page 2 of 10
59
Page 60
l. Other impacts: _______________________________________________________ 9 9
___________________________________________________________________
4. Impact on groundwater
The proposed action may result in new or additional use of ground water, or ✔
NO YES
may have the potential to introduce contaminants to ground water or an aquifer.
(See Part 1. D.2.a, D.2.c, D.2.d, D.2.p, D.2.q, D.2.t)
If “Yes”, answer questions a - h. If “No”, move on to Section 5.
Relevant No, or Moderate
Part I small to large
Question(s) impact impact may
may occur occur
a. The proposed action may require new water supply wells, or create additional demand D2c 9 9
on supplies from existing water supply wells.
b. Water supply demand from the proposed action may exceed safe and sustainable D2c 9 9
withdrawal capacity rate of the local supply or aquifer.
Cite Source: ________________________________________________________
c. The proposed action may allow or result in residential uses in areas without water and D1a, D2c 9 9
sewer services.
d. The proposed action may include or require wastewater discharged to groundwater. D2d, E2l 9 9
e. The proposed action may result in the construction of water supply wells in locations D2c, E1f, 9 9
where groundwater is, or is suspected to be, contaminated. E1g, E1h
f. The proposed action may require the bulk storage of petroleum or chemical products D2p, E2l 9 9
over ground water or an aquifer.
g. The proposed action may involve the commercial application of pesticides within 100 E2h, D2q, 9 9
feet of potable drinking water or irrigation sources. E2l, D2c
h. Other impacts: ______________________________________________________ 9 9
__________________________________________________________________
5. Impact on Flooding
The proposed action may result in development on lands subject to flooding. NO
✔ YES
(See Part 1. E.2)
If “Yes”, answer questions a - g. If “No”, move on to Section 6.
Relevant No, or Moderate
Part I small to large
Question(s) impact impact may
may occur occur
a. The proposed action may result in development in a designated floodway. E2i 9 9
b. The proposed action may result in development within a 100 year floodplain. E2j 9 9
c. The proposed action may result in development within a 500 year floodplain. E2k 9 9
d. The proposed action may result in, or require, modification of existing drainage D2b, D2e 9 9
patterns.
e. The proposed action may change flood water flows that contribute to flooding. D2b, E2i, 9 9
E2j, E2k
f. If there is a dam located on the site of the proposed action, is the dam in need of repair, E1e 9 9
or upgrade?
Page 3 of 10
60
Page 61
g. Other impacts: ______________________________________________________
9 9
___________________________________________________________________
6. Impacts on Air
The proposed action may include a state regulated air emission source.
✔ NO YES
(See Part 1. D.2.f., D.2.h, D.2.g)
If “Yes”, answer questions a - f. If “No”, move on to Section 7.
Relevant No, or Moderate
Part I small to large
Question(s) impact impact may
may occur occur
a. If the proposed action requires federal or state air emission permits, the action may
also emit one or more greenhouse gases at or above the following levels:
i. More than 1000 tons/year of carbon dioxide (CO2) D2g 9 9
ii. More than 3.5 tons/year of nitrous oxide (N2O) D2g 9 9
iii. More than 1000 tons/year of carbon equivalent of perfluorocarbons (PFCs) D2g 9 9
iv. More than .045 tons/year of sulfur hexafluoride (SF6) D2g 9 9
D2g 9 9
v. More than 1000 tons/year of carbon dioxide equivalent of
hydrochloroflourocarbons (HFCs) emissions
vi. 43 tons/year or more of methane D2h 9 9
b. The proposed action may generate 10 tons/year or more of any one designated D2g 9 9
hazardous air pollutant, or 25 tons/year or more of any combination of such hazardous
air pollutants.
c. The proposed action may require a state air registration, or may produce an emissions D2f, D2g 9 9
rate of total contaminants that may exceed 5 lbs. per hour, or may include a heat
source capable of producing more than 10 million BTU=s per hour.
d. The proposed action may reach 50% of any of the thresholds in “a” through “c”, D2g 9 9
above.
e. The proposed action may result in the combustion or thermal treatment of more than 1 D2s 9 9
ton of refuse per hour.
f. Other impacts: ______________________________________________________ 9 9
__________________________________________________________________
7. Impact on Plants and Animals
The proposed action may result in a loss of flora or fauna. (See Part 1. E.2. m.-q.) NO
✔ YES
If “Yes”, answer questions a - j. If “No”, move on to Section 8.
Relevant No, or Moderate
Part I small to large
Question(s) impact impact may
may occur occur
a. The proposed action may cause reduction in population or loss of individuals of any E2o 9 9
threatened or endangered species, as listed by New York State or the Federal
government, that use the site, or are found on, over, or near the site.
b. The proposed action may result in a reduction or degradation of any habitat used by E2o 9 9
any rare, threatened or endangered species, as listed by New York State or the federal
government.
c. The proposed action may cause reduction in population, or loss of individuals, of any E2p 9 9
species of special concern or conservation need, as listed by New York State or the
Federal government, that use the site, or are found on, over, or near the site.
d. The proposed action may result in a reduction or degradation of any habitat used by E2p 9 9
any species of special concern and conservation need, as listed by New York State or
the Federal government.
Page 4 of 10
61
Page 62
e. The proposed action may diminish the capacity of a registered National Natural E3c 9 9
Landmark to support the biological community it was established to protect.
f. The proposed action may result in the removal of, or ground disturbance in, any E2n 9 9
portion of a designated significant natural community.
Source: ____________________________________________________________
g. The proposed action may substantially interfere with nesting/breeding, foraging, or
E2m 9 9
over-wintering habitat for the predominant species that occupy or use the project site.
h. The proposed action requires the conversion of more than 10 acres of forest, 9 9
E1b
grassland or any other regionally or locally important habitat.
Habitat type & information source: ______________________________________
__________________________________________________________________
i. Proposed action (commercial, industrial or recreational projects, only) involves use of D2q 9 9
herbicides or pesticides.
j. Other impacts: ______________________________________________________ 9 9
__________________________________________________________________
8. Impact on Agricultural Resources
The proposed action may impact agricultural resources. (See Part 1. E.3.a. and b.) ✔
NO YES
If “Yes”, answer questions a - h. If “No”, move on to Section 9.
Relevant No, or Moderate
Part I small to large
Question(s) impact impact may
may occur occur
a. The proposed action may impact soil classified within soil group 1 through 4 of the E2c, E3b 9 9
NYS Land Classification System.
b. The proposed action may sever, cross or otherwise limit access to agricultural land E1a, Elb 9 9
(includes cropland, hayfields, pasture, vineyard, orchard, etc).
c. The proposed action may result in the excavation or compaction of the soil profile of E3b 9 9
active agricultural land.
d. The proposed action may irreversibly convert agricultural land to non-agricultural E1b, E3a 9 9
uses, either more than 2.5 acres if located in an Agricultural District, or more than 10
acres if not within an Agricultural District.
e. The proposed action may disrupt or prevent installation of an agricultural land El a, E1b 9 9
management system.
f. The proposed action may result, directly or indirectly, in increased development C2c, C3, 9 9
potential or pressure on farmland. D2c, D2d
g. The proposed project is not consistent with the adopted municipal Farmland C2c 9 9
Protection Plan.
h. Other impacts: ________________________________________________________ 9 9
Page 5 of 10
62
Page 63
9. Impact on Aesthetic Resources
The land use of the proposed action are obviously different from, or are in ✔
NO YES
sharp contrast to, current land use patterns between the proposed project and
a scenic or aesthetic resource. (Part 1. E.1.a, E.1.b, E.3.h.)
If “Yes”, answer questions a - g. If “No”, go to Section 10.
Relevant No, or Moderate
Part I small to large
Question(s) impact impact may
may occur occur
a. Proposed action may be visible from any officially designated federal, state, or local E3h 9 9
scenic or aesthetic resource.
b. The proposed action may result in the obstruction, elimination or significant E3h, C2b 9 9
screening of one or more officially designated scenic views.
c. The proposed action may be visible from publicly accessible vantage points: E3h
i. Seasonally (e.g., screened by summer foliage, but visible during other seasons) 9 9
ii. Year round 9 9
d. The situation or activity in which viewers are engaged while viewing the proposed E3h
action is:
E2q,
i. Routine travel by residents, including travel to and from work 9 9
ii. Recreational or tourism based activities E1c 9 9
e. The proposed action may cause a diminishment of the public enjoyment and E3h 9 9
appreciation of the designated aesthetic resource.
f. There are similar projects visible within the following distance of the proposed D1a, E1a, 9 9
project: D1f, D1g
0-1/2 mile
½ -3 mile
3-5 mile
5+ mile
g. Other impacts: ______________________________________________________ 9 9
__________________________________________________________________
10. Impact on Historic and Archeological Resources
The proposed action may occur in or adjacent to a historic or archaeological NO
✔ YES
resource. (Part 1. E.3.e, f. and g.)
If “Yes”, answer questions a - e. If “No”, go to Section 11.
Relevant No, or Moderate
Part I small to large
Question(s) impact impact may
may occur occur
a. The proposed action may occur wholly or partially within, or substantially contiguous
to, any buildings, archaeological site or district which is listed on the National or E3e 9 9
State Register of Historical Places, or that has been determined by the Commissioner
of the NYS Office of Parks, Recreation and Historic Preservation to be eligible for
listing on the State Register of Historic Places.
b. The proposed action may occur wholly or partially within, or substantially contiguous E3f 9 9
to, an area designated as sensitive for archaeological sites on the NY State Historic
Preservation Office (SHPO) archaeological site inventory.
c. The proposed action may occur wholly or partially within, or substantially contiguous E3g 9 9
to, an archaeological site not included on the NY SHPO inventory.
Source: ____________________________________________________________
Page 6 of 10
63
Page 64
d. Other impacts: ______________________________________________________ 9 9
__________________________________________________________________
If any of the above (a-d) are answered “Moderate to large impact may
e. occur”, continue with the following questions to help support conclusions in Part 3:
i. The proposed action may result in the destruction or alteration of all or part E3e, E3g, 9 9
of the site or property. E3f
ii. The proposed action may result in the alteration of the property’s setting or E3e, E3f, 9 9
integrity. E3g, E1a,
E1b
iii. The proposed action may result in the introduction of visual elements which E3e, E3f, 9 9
are out of character with the site or property, or may alter its setting. E3g, E3h,
C2, C3
11. Impact on Open Space and Recreation
The proposed action may result in a loss of recreational opportunities or a NO
✔ YES
reduction of an open space resource as designated in any adopted
municipal open space plan.
(See Part 1. C.2.c, E.1.c., E.2.q.)
If “Yes”, answer questions a - e. If “No”, go to Section 12.
Relevant No, or Moderate
Part I small to large
Question(s) impact impact may
may occur occur
a. The proposed action may result in an impairment of natural functions, or “ecosystem D2e, E1b 9 9
services”, provided by an undeveloped area, including but not limited to stormwater E2h,
storage, nutrient cycling, wildlife habitat. E2m, E2o,
E2n, E2p
b. The proposed action may result in the loss of a current or future recreational resource. C2a, E1c, 9 9
C2c, E2q
c. The proposed action may eliminate open space or recreational resource in an area C2a, C2c 9 9
with few such resources. E1c, E2q
d. The proposed action may result in loss of an area now used informally by the C2c, E1c 9 9
community as an open space resource.
e. Other impacts: _____________________________________________________ 9 9
_________________________________________________________________
12. Impact on Critical Environmental Areas
The proposed action may be located within or adjacent to a critical NO
✔ YES
environmental area (CEA). (See Part 1. E.3.d)
If “Yes”, answer questions a - c. If “No”, go to Section 13.
Relevant No, or Moderate
Part I small to large
Question(s) impact impact may
may occur occur
a. The proposed action may result in a reduction in the quantity of the resource or E3d 9 9
characteristic which was the basis for designation of the CEA.
b. The proposed action may result in a reduction in the quality of the resource or E3d 9 9
characteristic which was the basis for designation of the CEA.
c. Other impacts: ______________________________________________________ 9 9
__________________________________________________________________
Page 7 of 10
64
Page 65
13. Impact on Transportation
The proposed action may result in a change to existing transportation systems. ✔
NO YES
(See Part 1. D.2.j)
If “Yes”, answer questions a - f. If “No”, go to Section 14.
Relevant No, or Moderate
Part I small to large
Question(s) impact impact may
may occur occur
a. Projected traffic increase may exceed capacity of existing road network. D2j 9 9
b. The proposed action may result in the construction of paved parking area for 500 or D2j 9 9
more vehicles.
c. The proposed action will degrade existing transit access. D2j 9 9
d. The proposed action will degrade existing pedestrian or bicycle accommodations. D2j 9 9
e. The proposed action may alter the present pattern of movement of people or goods. D2j 9 9
f. Other impacts: ______________________________________________________ 9 9
__________________________________________________________________
14. Impact on Energy
The proposed action may cause an increase in the use of any form of energy. NO
✔ YES
(See Part 1. D.2.k)
If “Yes”, answer questions a - e. If “No”, go to Section 15.
Relevant No, or Moderate
Part I small to large
Question(s) impact impact may
may occur occur
a. The proposed action will require a new, or an upgrade to an existing, substation. D2k 9 9
b. The proposed action will require the creation or extension of an energy transmission D1f, 9 9
or supply system to serve more than 50 single or two-family residences or to serve a D1q, D2k
commercial or industrial use.
c. The proposed action may utilize more than 2,500 MWhrs per year of electricity. D2k 9 9
d. The proposed action may involve heating and/or cooling of more than 100,000 square D1g 9 9
feet of building area when completed.
e. Other Impacts: ________________________________________________________
____________________________________________________________________
15. Impact on Noise, Odor, and Light
The proposed action may result in an increase in noise, odors, or outdoor lighting. NO
✔ YES
(See Part 1. D.2.m., n., and o.)
If “Yes”, answer questions a - f. If “No”, go to Section 16.
Relevant No, or Moderate
Part I small to large
Question(s) impact impact may
may occur occur
a. The proposed action may produce sound above noise levels established by local D2m 9 9
regulation.
b. The proposed action may result in blasting within 1,500 feet of any residence, D2m, E1d 9 9
hospital, school, licensed day care center, or nursing home.
c. The proposed action may result in routine odors for more than one hour per day. D2o 9 9
Page 8 of 10
65
Page 66
d. The proposed action may result in light shining onto adjoining properties. D2n 9 9
e. The proposed action may result in lighting creating sky-glow brighter than existing D2n, E1a 9 9
area conditions.
f. Other impacts: ______________________________________________________ 9 9
__________________________________________________________________
16. Impact on Human Health
The proposed action may have an impact on human health from exposure ✔
NO YES
to new or existing sources of contaminants. (See Part 1.D.2.q., E.1. d. f. g. and h.)
If “Yes”, answer questions a - m. If “No”, go to Section 17.
Relevant No,or Moderate
Part I small to large
Question(s) impact impact may
may cccur occur
a. The proposed action is located within 1500 feet of a school, hospital, licensed day E1d 9 9
care center, group home, nursing home or retirement community.
b. The site of the proposed action is currently undergoing remediation. E1g, E1h 9 9
c. There is a completed emergency spill remediation, or a completed environmental site E1g, E1h 9 9
remediation on, or adjacent to, the site of the proposed action.
d. The site of the action is subject to an institutional control limiting the use of the E1g, E1h 9 9
property (e.g., easement or deed restriction).
e. The proposed action may affect institutional control measures that were put in place E1g, E1h 9 9
to ensure that the site remains protective of the environment and human health.
f. The proposed action has adequate control measures in place to ensure that future D2t 9 9
generation, treatment and/or disposal of hazardous wastes will be protective of the
environment and human health.
g. The proposed action involves construction or modification of a solid waste D2q, E1f 9 9
management facility.
h. The proposed action may result in the unearthing of solid or hazardous waste. D2q, E1f 9 9
i. The proposed action may result in an increase in the rate of disposal, or processing, of D2r, D2s 9 9
solid waste.
j. The proposed action may result in excavation or other disturbance within 2000 feet of E1f, E1g 9 9
a site used for the disposal of solid or hazardous waste. E1h
k. The proposed action may result in the migration of explosive gases from a landfill E1f, E1g 9 9
site to adjacent off site structures.
l. The proposed action may result in the release of contaminated leachate from the D2s, E1f, 9 9
project site. D2r
m. Other impacts: ______________________________________________________
__________________________________________________________________
Page 9 of 10
66
Page 67
17. Consistency with Community Plans
The proposed action is not consistent with adopted land use plans. NO
✔ YES
(See Part 1. C.1, C.2. and C.3.)
If “Yes”, answer questions a - h. If “No”, go to Section 18.
Relevant No, or Moderate
Part I small to large
Question(s) impact impact may
may occur occur
a. The proposed action’s land use components may be different from, or in sharp C2, C3, D1a 9 9
contrast to, current surrounding land use pattern(s). E1a, E1b
b. The proposed action will cause the permanent population of the city, town or village C2 9 9
in which the project is located to grow by more than 5%.
c. The proposed action is inconsistent with local land use plans or zoning regulations. C2, C2, C3 9 9
d. The proposed action is inconsistent with any County plans, or other regional land use C2, C2 9 9
plans.
e. The proposed action may cause a change in the density of development that is not C3, D1c, 9 9
supported by existing infrastructure or is distant from existing infrastructure. D1d, D1f,
D1d, Elb
f. The proposed action is located in an area characterized by low density development C4, D2c, D2d 9 9
that will require new or expanded public infrastructure. D2j
g. The proposed action may induce secondary development impacts (e.g., residential or C2a 9 9
commercial development not included in the proposed action)
h. Other: _____________________________________________________________ 9 9
__________________________________________________________________
18. Consistency with Community Character
The proposed project is inconsistent with the existing community character. NO
✔ YES
(See Part 1. C.2, C.3, D.2, E.3)
If “Yes”, answer questions a - g. If “No”, proceed to Part 3.
Relevant No, or Moderate
Part I small to large
Question(s) impact impact may
may occur occur
a. The proposed action may replace or eliminate existing facilities, structures, or areas E3e, E3f, E3g 9 9
of historic importance to the community.
b. The proposed action may create a demand for additional community services (e.g. C4 9 9
schools, police and fire)
c. The proposed action may displace affordable or low-income housing in an area where C2, C3, D1f 9 9
there is a shortage of such housing. D1g, E1a
d. The proposed action may interfere with the use or enjoyment of officially recognized C2, E3 9 9
or designated public resources.
e. The proposed action is inconsistent with the predominant architectural scale and C2, C3 9 9
character.
f. Proposed action is inconsistent with the character of the existing natural landscape. C2, C3 9 9
E1a, E1b
E2g, E2h
g. Other impacts: ______________________________________________________ 9 9
__________________________________________________________________
PRINT FULL FORM Page 10 of 10
67
Page 68
Agency Use Only [IfApplicable]
Project : Proposed code changes for a new Smoke Shops and Vape
Date : 4/13/26
Full Environmental Assessment Form
Part 3 - Evaluation of the Magnitude and Importance of Project Impacts
and
Determination of Significance
Part 3 provides the reasons in support of the determination of significance. The lead agency must complete Part 3 for every question
in Part 2 where the impact has been identified as potentially moderate to large or where there is a need to explain why a particular
element of the proposed action will not, or may, result in a significant adverse environmental impact.
Based on the analysis in Part 3, the lead agency must decide whether to require an environmental impact statement to further assess
the proposed action or whether available information is sufficient for the lead agency to conclude that the proposed action will not
have a significant adverse environmental impact. By completing the certification on the next page, the lead agency can complete its
determination of significance.
Reasons Supporting This Determination:
To complete this section:
• Identify the impact based on the Part 2 responses and describe its magnitude. Magnitude considers factors such as severity,
size or extent of an impact.
• Assess the importance of the impact. Importance relates to the geographic scope, duration, probability of the impact
occurring, number of people affected by the impact and any additional environmental consequences if the impact were to
occur.
• The assessment should take into consideration any design element or project changes.
• Repeat this process for each Part 2 question where the impact has been identified as potentially moderate to large or where
there is a need to explain why a particular element of the proposed action will not, or may, result in a significant adverse
environmental impact.
• Provide the reason(s) why the impact may, or will not, result in a significant adverse environmental impact
• For Conditional Negative Declarations identify the specific condition(s) imposed that will modify the proposed action so that
no significant adverse environmental impacts will result.
• Attach additional sheets, as needed.
The adoption of Article LX Smoke Shops and Vape Shops is not anticipated to have any significant environmental impacts, as the action only involves
Code changes to Chapter 280 Zoning to create special use permit provisions for new and existing smoke shops and vape shops, and will not include any
development or construction.
Determination of Significance - Type 1 and Unlisted Actions
SEQR Status: Type 1
✔ Unlisted
Identify portions of EAF completed for this Project:
✔ Part 1
✔ Part 2
✔ Part 3 68
FEAF 2019
Page 69
Upon review of the information recorded on this EAF, as noted, plus this additional support information
and considering both the magnitude and importance of each identified potential impact, it is the conclusion of the
Hamburg Town Board as lead agency that:
✔ A. This project will result in no significant adverse impacts on the environment, and, therefore, an environmental impact
statement need not be prepared. Accordingly, this negative declaration is issued.
B. Although this project could have a significant adverse impact on the environment, that impact will be avoided or
substantially mitigated because of the following conditions which will be required by the lead agency:
There will, therefore, be no significant adverse impacts from the project as conditioned, and, therefore, this conditioned negative
declaration is issued. A conditioned negative declaration may be used only for UNLISTED actions (see 6 NYCRR 617.7(d)).
C. This Project may result in one or more significant adverse impacts on the environment, and an environmental impact
statement must be prepared to further assess the impact(s) and possible mitigation and to explore alternatives to avoid or reduce those
impacts. Accordingly, this positive declaration is issued.
Name of Action: Adoption of Article LX Smoke Shops and Vape Shops
Name of Lead Agency: Hamburg Town Board
Name of Responsible Officer in Lead Agency: Elizabeth Farrell-Lorentz
Title of Responsible Officer: Supervisor
Signature of Responsible Officer in Lead Agency: Date:
Signature of Preparer (if different from Responsible Officer) Date:
For Further Information:
Contact Person: Joshua Rogers
Address: 6100 South Park Avenue
Telephone Number: 716-649-2023
E-mail: [email protected]
For Type 1 Actions and Conditioned Negative Declarations, a copy of this Notice is sent to:
Chief Executive Officer of the political subdivision in which the action will be principally located (e.g., Town / City / Village of)
Other involved agencies (if any)
Applicant (if any)
Environmental Notice Bulletin: http://www.dec.ny.gov/enb/enb.html
PRINT FULL FORM Page 2 of 2
69
Page 70
Town Board of the Town of Hamburg
April 13, 2026 Meeting
4.18. Article LX Smoke Shops and Vape Shops Adoption Resolution
WHEREAS, the Hamburg Town Code contains and specifies the local laws and ordinances of the
Town of Hamburg; and
WHEREAS, the Town has received complaints from residents regarding smoke shops and vape shops;
and
WHEREAS, the Code Review Committee has generated a draft for smoke shops and vape shops
regulations, and has sent these suggested revisions for the Town Board to begin the adoption process;
and
WHEREAS, pursuant to Municipal Home Rule Law, the Town Board is proposing to enact a local law
as follows:
Be it enacted by the Town Board of the Town of Hamburg, New York, that the Hamburg Town Board
proposes to amend the Hamburg Town Code as follows (full copies attached):
Add a new “Article LX Smoke Shops and Vape Shops” to Chapter 280 (Zoning)
WHEREAS, a public hearing was held on February 23rd, 2026, for discussion and public comment
concerning adoption of this proposed local law; and
WHEREAS, this proposed local law amendment was referred to Erie County through the 239-m referral
process and received no objections; and
WHEREAS, pursuant to Part 617 6NYCRR, Article 8 of the Environmental Conservation Law
(SEQRA), the Town of Hamburg Town Board established itself as SEQR Lead Agency and has issued
a SEQR Negative Declaration; and
WHEREAS, the proposed local law amendment is in accordance with the recommendation of the Town
of Hamburg Code Review Committee and the Town of Hamburg Planning Board.
70
Page 71
NOW THEREFORE BE IT RESOLVED, the Hamburg Town Board amends Local Law #10 of the
year 1986 of the Code of the Town of Hamburg Chapter 280 entitled “Zoning” to provide for the
revision of the Town Code as referenced above and attached.
ATTACHMENTS:
Smoke and Vape Shops Draft Code 4-8-26.pdf
71
Page 72
Article LX
Smoke Shops and Vape Shops
§ 280-429. Findings; purpose.
To further the goals of New York State's tobacco use prevention and control program, as identified in New
York State Public Health Law § 1399-ii, the Town of Hamburg finds that:
A. Tobacco is a leading cause of preventable death and disease in New York State;
B. Adolescent brains are uniquely vulnerable to the effects of nicotine and the formation of nicotine
dependence;
C. Tobacco and vapor/e-cigarette retail outlet density is associated with high rates of youth and adult
tobacco use, as well as higher rates of initiation of nicotine use among adolescents and young adults;
D. Tobacco and vapor products usage is linked to an increased incidence in cancers and disease and
therefore is harmful to the public health; and
E. Restricting the sale of tobacco and vapor/e-cigarette products to certain zoning districts and reducing
the concentration of sale locations will reduce the availability of tobacco and nicotine to residents,
including adolescents, improving public health and lessening the incidence of various cancers and
diseases.
§ 280-430. Definitions.
As used in this chapter, the following terms shall have the meanings indicated:
SMOKE SHOP(S) AND/OR VAPE SHOPS— Any shop, store, or business of which the primary activity is
the sale, manufacture, or promotion of tobacco, tobacco products, and accessories, either at wholesale or
retail, dedicated to the sale of tobacco products and/or smoking paraphernalia, as herein defined.
SMOKING PARAPHERNALIA — All equipment, products, and materials, of any kind, which are used,
intended for use, or designed and/or adapted for use in packaging, repackaging, storing, containing,
injecting, ingesting, inhaling and/or otherwise introducing into the human body tobacco products.
TOBACCO PRODUCTS — Tobacco, tobacco products, including but not limited to cigarettes, chewing
tobacco, cigars, electronic cigarettes, vape pens, vapors, e-liquids, e-vaporizers and other like substances,
CBD (cannabidiol), and CBD products, including but not limited to CBD gummies and/or CBD oil.
§ 280-431. General regulations.
A. All smoke shops and vape shops within the Town of Hamburg after the effective date of this chapter must
obtain a special use permit and site plan approval in accordance with Town Code.
B. Smoke shop or vape shop locations may only operate between the hours of 8:00 a.m. and 10:00 p.m. on
weekdays and Saturdays, and 12:00 noon and 9:00 p.m. on Sundays.
C. A special use permit (§ 280-318) is required for each and every smoke shop or vape shop. No smoke
shop or vape shop may open, operate, or exist in the Town without first obtaining a special use permit
from the Planning Board following a public hearing. A property owner and/or landlord shall not permit
a tenant or subtenant to open or operate a smoke shop or vape shop within the Town unless a special
use permit has been obtained for the desired premises. Application procedures for a special use permit
shall follow § 280-319 of the Town Code.
D. A smoke shop/vape shop is only allowable, subject to a special use permit, on a parcel of land in the
72
Page 73
C-2 General Commercial District.
E. A special use permit issued for a smoke shop or vape shop is not transferable to a new owner or
operator. The new owner or operator of the smoke shop or tobacco retailer must file a new application
in accordance with the terms of this chapter if such property is to continue to be used as a smoke shop
or tobacco retail operation.
F. It is unlawful for a smoke shop or vape shop to knowingly allow or permit a minor, not accompanied
by his or her parent or legal guardian, to enter or remain within any smoke shop.
G. Each and every smoke shop or vape shop shall post clear signage stating that minors may not enter
the premises unless accompanied by a parent or legal guardian. One said sign, measuring
approximately 144 square inches, shall be placed in a conspicuous location near each public entrance.
It shall be unlawful for a smoke shop or vape shop to fail to display and maintain, or fail to cause to
be displayed or maintained, said signage.
H. All smoke shops and vape shops must comply with the sign regulations (Article XXXVI Sign
Regulations) contained in the Town Code.
§ 280-432. Location.
A. A smoke shop or vape shop shall be allowable only within the C-2 General Commercial District,
subject to the issuance of a special use permit, and subject to the regulations set forth herein.
B. No smoke shop or vape shop shall be permitted within 500 feet of another smoke shop or vape shop.
C. No smoke shop or vape shop shall be permitted within 500 feet of a school, nursery school, day care,
playground, public library, municipal park, or other similar uses where children regularly gather at
the discretion of the Supervising Code Enforcement Officer.
D. No smoke shop or vape shop shall be permitted within 500 feet of the lot line of any lot zoned for residential
use.
E. No smoke shop or vape shop shall be permitted within 500 feet of a house of worship.
F. Said distances shall be measured from property line to property line.
§ 280-433. Existing smoke shops or vape shops.
The provisions of Article XLI of Chapter 280 of the Town Code concerning nonconforming uses in existence
at the time of the adoption of this chapter shall apply to smoke shops or vape shops. In addition to the provisions
of Article XLI of Chapter 280 of the Town Code, if there is any change in the ownership of an existing smoke
shop or vape shop after the adoption of this chapter, then any further use of such property as a smoke shop or
vape shop shall be required to conform to this chapter and be required to apply for a special use permit, as
applicable. No existing smoke shop or vape shop shall be permitted to expand the square footage of its existing
footprint without conforming to this chapter and obtaining a special use permit, as applicable.
§ 280-434. Enforcement.
Any violation of this article shall be subject to the same enforcement requirements, including the civil and
criminal penalties, provided for in the zoning or land use regulations of the Town. This article shall be
enforced by the Town of Hamburg Code Enforcement Department, the Town of Hamburg Police
Department, and/or the New York State Police.
§ 280-435. Severability.
The invalidity or unenforceability of any section, subsection, paragraph, sentence, clause, provision, or phrase
of the aforementioned sections, as declared by the valid judgement of any court of competent jurisdiction to
73
Page 74
be unconstitutional, shall not affect the validity or enforceability of any other section, subsection, paragraph,
sentence, clause, provision, or phrase, which shall remain in full force and effect.
74
Page 75
Town Board of the Town of Hamburg
April 13, 2026 Meeting
4.19. Nike Concession and Bathroom National Grid Service
WHEREAS, the Town of Hamburg installed a new concession and bathroom building at the soccer
fields on the Nike Recreational Facility; and
WHEREAS, the building requires an electrical service extension across Lakeview Road by National
Grid including installation of one new utility pole; and
WHEREAS, National Grid would like to set the pole on our property and has requested a 20 ft x 20 ft
easement around the pole; and
WHEREAS, National Grid has also prepared the proposal for the work on the public utility associated
with the extension at a cost of $10,541.00.
NOW THEREFORE BE IT RESOLVED, that the Town Board authorizes the supervisor to sign the
attached easement and the attached agreement with National Grid and authorizes the payment upon
receipt of an invoice.
Funds are available in H.21.7141.0303
ATTACHMENTS:
WR# 31203402, Town of Hamburg.pdf
Letter Agreement - Customer Convenience Rule 28.2 06.14.2024.pdf
75
Page 76
GRANT OF EASEMENT
Town of Hamburg, a New York municipal corporation, having an address at 6100 South Park Avenue,
Hamburg, New York 14075 (hereinafter is the owner of that certain parcel of real property
commonly known as 2800 Lakeview Road, located in the Town of Hamburg, County of Erie in the State of New York,
identified on the tax maps of the County of Erie, as Section 194.00/Block 4/Lot 16 (SBL# 194.00-4-16) and pursuant to
that certain deed recorded with the County Clerk of the County of Erie on November 19, 1993 in Liber 10797 at Page
consideration in the amount of One Dollar ($1.00) and other valuable
considerations, the receipt and sufficiency of which are hereby acknowledged, hereby grants to NIAGARA MOHAWK
POWER CORPORATION, a New York corporation, having an address at 300 Erie Boulevard West, Syracuse, New
York 13202 and VERIZON NEW YORK INC., having an address at 140 West Street, New York New York 10007
hereinafter collectively Grantees for Grantees and their lessees, licensees, successors, and assigns a
perpetual and (the
under the following terms and conditions.
Section 1 Description of the Easement. The Easement provides the Grantees with the right, privilege, and
authority to:
a. construct, reconstruct, relocate, extend, repair, maintain, operate, inspect, patrol, and, at their pleasure,
remove any poles or lines of poles, supporting structures, cables, crossarms, overhead and underground wires, guys, guy
stubs, insulators, transformers, braces, fittings, foundations, anchors, lateral service lines, communications facilities, and
Grantees shall require now and from time to
time, for the transmission and distribution of high and low voltage electric current and for the purpose of transmitting
intelligence and communication data, by any means, whether now existing or hereafter devised, for public or private use,
in, through, upon, over, under, and across that certain 2 below (the
and any , and to renew, replace, remove, add
to, and otherwise change the Facilities and each and every part thereof and the location thereof within the Easement Area,
and utilize the Facilities within the Easement Area for the purpose of providing service to the Grantor and others; and
b. from time to time, without further payment therefor, to clear the Easement Area of obstructions or
structures, and clear and keep cleared the Easement Area by physical and/or mechanical means, of any and all brush,
trees, limbs, branches, roots, vegetation, or other obstructions; and
c. from time to time, without further payment therefor, to clear and keep cleared by physical and/or
mechanical beyond the bounds of the Easement Area, of any and all trees, limbs, branches,
roots or vegetation that, in the sole judgment of the Grantees, due to species or structural defects or their tall growing
nature, are likely to fall into or encroach upon the Easement Area or interfere in any way with the safe and reliable
operation of Grantees existing or proposed Facilities; and
d. excavate or change the grade of the as is reasonable, necessary, and proper for any and
all purposes described in this Easement; provided, however, that the Grantees will, upon completion of the work, backfill
and restore any excavated areas to reasonably the same condition as existed prior to such excavation; and
e. pass and repass on foot and with vehicles and equipment, along, over, across and upon the Easement
onstruct, reconstruct, relocate, use, and maintain
roads, paths, causeways, and ways of access to and from the Easement Area as is reasonable and necessary in order to
exercise to the fullest extent the Easement.
Section 2 Location of the Easement Area.
Land twenty (20) feet in width throughout its extent, the centerline of the Easement Area being the centerline of the
Facilities. The general location of the Easement Area is shown on the sketch entitled, -Exhibit A,
WR# 31203402 which sketch is attached hereto as Exhibit A and recorded herewith. The final and definitive
location(s) of the Easement Area shall become established by and upon the final installation and erection of the Facilities
by the Grantees in substantial compliance with Exhibit A hereto.
Section 3 Facilities Ownership. It is agreed that the Facilities shall remain the property of the Grantees, their
successors and assigns.
Section 4 General Provisions. The Grantor, for itself, its heirs, legal representatives, successors, and assigns,
hereby covenants and agrees with the Grantees that no act will be permitted within the Easement Area which is
inconsistent with the Easement hereby granted; no buildings or structures, or replacements thereof or additions thereto,
2b OH Electric & Telephone Dist Easement-corp, llc, estate, trust (September 2022)
WR# 31203402
76
Page 77
swimming pools, or obstructions will be erected or constructed above or below grade within the Easement Area; no trees
shall be grown, cultivated, or harvested, and no excavating, mining, or blasting shall be undertaken within the Easement
Area without the prior written consent of the Grantees; the Easement shall not be modified nor the Easement Area
relocated by the Grantor without the Grantees
Area will not be changed by excavation or filling; the Grantees and the Grantor
.
The Grantees, their successors and assigns, are hereby expressly given and granted the right to assign this
Easement, or any part thereof, or interest therein, and the same shall be divisible between or among two or more owners,
as to any right or rights created hereunder, so that each assignee or owner shall have the full right, privilege, and authority
herein granted, to be owned and enjoyed either in common or severally. This Grant of Easement shall at all times be
the successors, heirs, legal representatives, and assigns of the parties named in this Grant of Easement.
IN WITNESS WHEREOF, the Grantor has duly executed this Grant of Easement under seal this _________ day
of ________________________, 20____.
Town of Hamburg
By: ____________________________________
(signature)
Name: _________________________________
(printed)
Its: ____________________________________
(title)
State of __________________ )
) ss:
County of _________________ )
On the ____ day of ______________ in the year 20___, before me, the undersigned, personally appeared
_____________________________________ , personally known to me or proved to me on the basis of satisfactory
evidence to be the individual(s) whose name(s) is (are) subscribed to the within instrument and acknowledged to me that
he/she/they executed the same in his/her/their capacity(ies), and that by his/her/their signature(s) on the instrument, the
individual(s), or the person upon behalf of which the individual(s) acted, executed the instrument.
_________________________________
Notary Public
RETURN TO:
The NLS Group
Attn: Kathleen Foster
P.O. Box 198
Dansville, NY 14437
2b OH Electric & Telephone Dist Easement-corp, llc, estate, trust (September 2022)
WR# 31203402
77
Page 78
2b OH Electric & Telephone Dist Easement-corp, llc, estate, trust (September 2022)
WR# 31203402
78
Page 79
April 1, 2026
Town of Hamburg
2980 Lakeview Rd
Hamburg, NY 14075
Re: Electric Service Proposal 31203402
2800 Lakeview Rd, Hamburg, NY 14075
Enclosed please find an Electric Service Proposal for installing new pole/transformer,
replacing 2 poles and installing 200’ overhead single-phase primary wire at 2800
Lakeview Rd, Hamburg, NY.
This project falls under PSC No. 220 Tariff Rule 28.2. Rule 28.2 requires that the customer pay
all costs associated with the project. Under this rule, there is an estimated cost to you in the
amount of $10,541.00.
NOTE: If you have an applicable tax exemption certificate, please forward along with
this signed proposal.
If this Proposal is acceptable, please sign and return this letter. Upon receipt of your acceptance,
you will be billed under separate cover in the amount of $10,541.00. This estimate is valid for 90
days from the date of this letter.
This work will be scheduled upon receipt of this signed proposal, payment of invoice,
and completion of all responsibilities as outlined in the attached proposal.
Pursuant to PSC No. 220, you are responsible for the actual costs of this project. Upon project
completion, costs will be reconciled to the installed span footage whenever the installed span
footage varies from the footage provided in the initial design by more than 10 feet and actual
number of pole sets (if applicable). The Company will subsequently bill you if our costs run over
the invoiced amount or refund the difference if costs run below the invoiced amount. You are
responsible for all invoiced amounts.
Additionally, under Rule 28.2, there is an option to pay via a monthly surcharge for a period of 10
years (120 months). If you are interested in that option, please let me know.
Should you have any questions, please contact me at 716-343-5490.
Sincerely,
Howard Winkler
Consumer Representative
Regional Account Service
National Grid
79
Page 80
I ACCEPT AND AGREE TO BE BOUND BY THE TERMS OF THIS PROPOSAL:
Print Name:
Title:
(if applicable)
Signature:
Date:
By signing this agreement, the signatory represents and warrants that he or she is duly authorized and has
legal capacity to execute, deliver, and bind the party to this agreement.
80
Page 81
ELECTRIC SERVICE PROPOSAL WR#31203402
Town of Hamburg
2800 Lakeview Rd
Hamburg, NY 14075
Service Work Request: 31203402
Electrical Contractor: Stenzel Electric
Customer’s Contribution: $10,541.00
Billing Party: Town of Hamburg
Customer’s ➢ Return signed Proposal cover letter, if accepted
Responsibilities: ➢ Provide all necessary right-of-way easements
➢ Notify National Grid if any changes in the Billing Party
occur
➢ Payment in full, upon receipt of invoice
➢ Provide copy of Tax-Exempt Certificate (if applicable)
➢ Adherence to applicable Electric Service bulletin(s)
Electric Specifications (site.com)
National Grid Installing new pole/transformer, replacing 2 poles and
Responsibilities: installing 200’ OH single phase primary wire.
Construction Lead Time: Approximately 4-6 weeks will be necessary for construction.
Upon receipt of payments, permits, right-of-way and the signed
Agreement, this project will be added to National Grid’s
construction schedule.
Note: Payment must be made upon receipt of invoice. The
correct mailing address for payments will be noted on the
invoice you receive.
Customer If a progress report is needed during construction, including the
Communications Update: expected date for the Owners project completion, the expected
completion date for the utility’s work, and confirmation of the
expected date for the service connection of permanent power,
please contact the Company Job Owner at the number listed
below.
Remarks: This Proposal is based upon projected cost and rate schedule
provisions in effect at the date of this proposal and will be
withdrawn if not accepted within 90 days of the date of this
Proposal.
This proposal and all attached documentation are proprietary
property of National Grid and can only be used for its intended
purpose and shall not otherwise be disclosed.
Prepared By: Howard Winkler
81
Page 82
Regional Account Services 716-343-5490
82
Page 83
Town Board of the Town of Hamburg
April 13, 2026 Meeting
4.20. McKinley Sidewalk Extension Engineering Design
WHEREAS, the Clark and McKinley intersection project was completed and funding remains under the
County ARPA allocation; and
WHEREAS, the Town would like to extend the new sidewalk along the west side of McKinley from the
intersection to the Fairgrounds driveway; and
WHEREAS, Watts Engineering, who designed the original project, has provided a proposal for the
extension.
BE IT RESOLVED, that the Town Board authorizes the supervisor to sign the proposal from Watts
Engineering in the amount not-to-exceed $8,600.
Funds are available in H.106.1440.440
ATTACHMENTS:
24-394 Proposal Letter to Town of Hamburg for Additional Services 03 11 2026 rev 03 30 2026.pdf
83
Page 84
Transmitted via Email: [email protected]
March 31, 2026
Town of Hamburg
Camie Jarrell, P.E.
Engineering & Building Department
6100 South Park Avenue
Hamburg, New York 14075
RE: Intersection Improvement Project, Clark Street and McKinley Parkway
Proposal for Engineering and Construction Support Services
Watts Proposal No. 24-394 (Revision 1) – Additional Services
Dear Camie Jarrell:
Watts Architects & Engineers (Watts) is pleased to submit this proposal to provide the above-referenced service. Our proposal is
presented in the following sections: Background, Scope of Services, Compensation, Assumptions, and Schedule.
BACKGROUND
In 2025, the Town of Hamburg and Watts completed the subject project. Based on the final project payments, the Town has
remaining County ARPA funding and is considering using the balance to fund an extension of the sidewalk along McKinley
Parkway, as shown on the attached sketch. If the cost of the project exceeds the amount of the remaining ARPA funds, the
Town and the Agricultural Society will find a solution together for covering the overage. Given Watts’s involvement with the
original project, the Town contacted Watts for engineering services to develop bid-ready contract documents and provide
support during the construction phase.
The Town can award contracts based on quotes (minimum of 3) if the cost is under $35,000 (limit). Therefore, the Town would
like Watts to prepare the necessary drawings for the Town to solicit quotes from contractors. If the quotes come back below the
limit, Watts will not need to prepare a full bid package. In this case, the Town will award the construction contract to the bidder
with the lowest quote. If all quotes exceed the limit, then Watts will proceed with preparing documents for a formal bid process.
SCOPE OF SERVICES
Watts shall provide the following services:
1. Conduct a topographic survey and prepare a base map of the project area
2. Prepare contract drawings, details, and proposal book
3. Prepare a construction cost estimate
4. Provide the Town with a review set of the contract documents and address comments prior to bidding
5. Provide a PDF of the bid-ready contract documents for the Town's use (i.e., the contract deliverable)
6. Assist the Town with contacting prospective bidders
7. Respond to questions from prospective bidders
8. Review the bids received, verify the bid tabulations, and identify any errors
9. Respond to Requests for Information during the construction phase
COMPENSATION
We propose a Lump Sum fee of $8,600.00.
If Watts does not need to prepare a full bid package, the fee for the services is a Lump Sum of $7,500.00
84
Page 85
Intersection Improvement Project, Clark Street and McKinley Parkway
Proposal for Engineering and Construction Support Services
Watts Proposal No. 24-394 (Revision 1) – Additional Services
Compensation for the Scope of Services indicated above shall be in accordance with the fee stated above and Appendix A -
General Conditions for Professional Services. Our invoices shall be submitted monthly with 30 days terms of net. The fees in this
proposal are firm for 30 days from the date shown but thereafter are subject to change without notice.
ASSUMPTIONS
1. The NYSDOT Standard Specifications for Materials and Construction shall be used.
2. The project will be bid as a lump sum – individual pay items will not be used.
3. The design shall conform to NYSDOT design standards and Public Right-of-Way Accessibility Guidelines (PROWAG). The
width of the sidewalk will be 5-feet wherever possible and 4-feet where not.
4. The Town shall advise Watts of any special provisions that need to be included in the bidding documents.
5. The bid documents shall consist of the standard proposal book which shall contain the drawings in 11"x17" format.
6. The Town shall be responsible for printing the bid documents and plan sales.
7. The bid documents shall require New York State prevailing wage rates and the Town’s insurance requirements.
8. The Town shall be responsible for the administration of the entire bid phase except for tasks #7 and #8 of the Scope of
Services. All direct costs incurred during the bidding phase, including the services of a public plan room, shall be the
responsibility of the Town.
9. The Town shall be responsible for construction inspection and administration.
10. The survey and mapping shall be provided by a subconsultant to Watts.
SCHEDULE
Watts is prepared to begin services within two (2) weeks of receiving written notice to proceed. The Town would like to advance
this project in a timely manner so the sidewalk can be completed and ready prior to the opening of the Erie County Fair.
If the above Scope of Services, Compensation, Assumptions, Schedule, and Appendix A - General Conditions for Professional
Services are acceptable to the Town of Hamburg, please indicate your acceptance by returning a purchase order or the proposal
acceptance page, which will constitute our agreement and notice to proceed.
We appreciate the opportunity to present this proposal and look forward to working with you again. Should you have any
questions or need additional information, please contact me at (716) 206-5121.
Sincerely,
WATTS ARCHITECTS & ENGINEERS
Phillip Galbo, PE, F.ASCE
Vice President
Attachments:
1. Sketch showing the proposed project limits and preliminary sidewalk layout
2. Appendix A - General Conditions for Professional Services
\\wattsfp1\projects3\2024\24985 Proposals\394 Clark Street-McKinley Parkway Project\Proposal\24-394 Proposal Letter to Town of Hamburg for Additional Services85
03 11 2026 rev 03 30 2026.docx
Page 86
Intersection Improvement Project, Clark Street and McKinley Parkway
Proposal for Engineering and Construction Support Services
Watts Proposal No. 24-394 (Revision 1) – Additional Services
PROPOSAL ACCEPTANCE
The above Scope of Services, Compensation, Assumptions, Schedule, and Appendix A are acceptable for Watts Proposal 24-
394, Additional Services, for the Town of Hamburg (Client).
Agreed to and accepted this day of , 2026.
Signed:
Name:
(please print)
Title:
Town’s Reference Number
to Appear on our Invoice(s):
\\wattsfp1\projects3\2024\24985 Proposals\394 Clark Street-McKinley Parkway Project\Proposal\24-394 Proposal Letter to Town of Hamburg for Additional Services86
03 11 2026 rev 03 30 2026.docx
Page 87
87
MATCHLINE STA. CS XX+XX SEE DWG. NO. PL-02
CL REE
REMOVE DRIVEWAY
ST
APRON
AR T
N
PED 2
K
10
PROPOSED SIDEWALK
P. GALBO
LIMIT OF CLARK/MCKINLEY
BUILT SIDEWALK
REMOVE DRIVEWAY
PROJECT MANAGER
START CONCRETE CURB
APRON
9
START CONCRETE CURB TRAFFIC SIGNAL HEAD
PED 1
CONFIGURATION
16 HEADS 2, 3, 5, 6, 7 & 8
PED 3
SP1
END CONCRETE CURB
11
MATCHLINE STA. MP XX+XX SEE DWG. NO. PL-03
NOTE:
CLARK/MCKINLEY PROJECT LINEWORK
IS FROM PRELIMINARY DESIGN PHASE.
CHECK P. GALBO
TRAFFIC SIGNAL HEAD
7
CONFIGURATION
4 HEADS 1 & 4
MCKINLEY PARKWAY
2
5
8
1
3
MCKINLEY PARKWAY
DRAFTING V. CONERS
6
TRAFFIC SIGNAL HEAD
15 CONFIGURATION
HEADS 9, 10, 11, 12, 13,
SP2 14, 15 & 16
LEGEND
R:\2024\20240463 Clark Street-McKinle\18. CADD\Trans\20240463_General Plan.dwg
4" CONCRETE
14 SIDEWALK
CHECK P. GALBO
12 6" CONCRETE CURB
PED 5 RAMP WITH DWS
PED 4
CONCRETE REMOVAL &
13
TURF RESTORATION
SIGNAL PULLBOX
CL REE
ST
SIGNAL POLE WITH
AR T
MAST ARM
K
SIGNAL HEAD
DESIGN V. CONERS
MATCHLINE STA. CS XX+XX SEE DWG. NO. PL-04 PEDESTRIAN
SIGNAL POLE
PEDESTRIAN
SIGNAL HEAD
CONTROLLER CABINET
AFFIX SEAL: ALTERED BY:
ON: ON:
CONDUIT & CONDUCTOR
JOB MANAGER K. KOSTOWNIAK
9/17/2024 11:17:07 AM
0 5 10 20
FEET
Victoria Coners
AS-BUILT REVISIONS ALL DIMENSIONS IN ft UNLESS OTHERWISE NOTED TOWN OF HAMBURG
DESCRIPTION OF ALTERATIONS:
INTERSECTION IMPROVEMENT PROJECT
CLARK STREET AND MCKINLEY PARKWAY
DRAWING NO. PL-01
GENERAL PLAN
SHEET NO.
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR,
TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE STAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR
SHALL STAMP THE DOCUMENT AND INCLUDE THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION.
Page 88
88
N
P. GALBO
START OF 4' WIDE LIMIT OF PROPOSED SIDEWALK -
SIDEWALK TO AVOID FENCE SOUTHERNMOST FAIRGROUNDS DRIVEWAY
AND UTILITY POLES
PROJECT MANAGER
PROPOSED SIDEWALK
MATCHLINE STA. MP XX+XX SEE DWG. NO. PL-01
END OF 4' WIDE SIDEWALK
TO AVOID FENCE AND
UTILITY POLES
CHECK P. GALBO
MCKINLEY PARKWAY
DRAFTING V. CONERS
R:\2024\20240463 Clark Street-McKinle\18. CADD\Trans\20240463_General Plan.dwg
LEGEND
CHECK P. GALBO
4" CONCRETE
APPROX. END OF SIDEWALK
CLARK/MCKINLEY SURVEY
6" CONCRETE CURB
RAMP WITH DWS
CONCRETE REMOVAL &
TURF RESTORATION
NOTES:
1. PROPOSED SIDEWALK IS DRAWN AS 5'-0" WIDE EXCEPT WHERE NOTED DUE TO SIGNAL PULLBOX
ANTICIPATED WIDTH CONSTRAINTS.
DESIGN V. CONERS
SIGNAL POLE WITH
2. SURVEY FROM THE CLARK & MCKINLEY PROJECT ENDS APPROXIMATELY WHERE MAST ARM
INDICATED. PROPOSED SIDEWALK LAYOUT BEYOND THAT POINT IS APROXIMATED
USING AERIAL IMAGRY OF EXISTING SITE FEATURES SUCH AS FENCING AND UTILITY SIGNAL HEAD
POLES. FIELD VERIFICATION WOULD BE NEEDED TO CONFIRM CONSTRUCTABILITY,
PEDESTRIAN
PARTICULARLY IN THE AREA OF UTILITY POLE NYSEG 819/41. SIGNAL POLE
AFFIX SEAL: ALTERED BY: 3. LAYOUT ASSUMES GUY WIRE FOR UTILITY POLE NYSEG 819/41 IS EITHER NOT IN
ON: ON: PEDESTRIAN
CONFLICT WITH PROPOSED SIDEWALK OR IS ABLE TO BE RESET/RELOCATED.
SIGNAL HEAD
4. LAYOUT ASSUMES HIGHWAY BOUNDARY LINE CONTINUES ALONG THE SURVEYED
JOB MANAGER K. KOSTOWNIAK
OFFSET PAST THE END OF SURVEY. CONTROLLER CABINET
9/17/2024 11:43:54 AM
5. LAYOUT ASSUMES GRADING PAST THE END OF SURVEY IS FEASIBLE WITHOUT 0 5 10 20
FEET CONDUIT & CONDUCTOR
MAJOR ADJUSTMENTS WITHIN HIGHWAY BOUNDARY.
Victoria Coners
AS-BUILT REVISIONS ALL DIMENSIONS IN ft UNLESS OTHERWISE NOTED TOWN OF HAMBURG
DESCRIPTION OF ALTERATIONS:
INTERSECTION IMPROVEMENT PROJECT
CLARK STREET AND MCKINLEY PARKWAY
DRAWING NO. PL-03
GENERAL PLAN
SHEET NO.
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR,
TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE STAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR
SHALL STAMP THE DOCUMENT AND INCLUDE THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION.
Page 89
Appendix A
GENERAL CONDITIONS FOR PROFESSIONAL SERVICES
Watts Architects & Engineers (WATTS) will perform professional services in a timely manner but it is agreed between the parties to this
Agreement that WATTS cannot be responsible for delays occasioned by factors beyond its control, nor by factors which could not reasonably have
been foreseen at the time this Agreement was prepared and executed.
WATTS will perform its services using that degree of care and skill ordinarily exercised under similar conditions by professional
consultants practicing in the same field at the same time in the same or similar locality. No other warranty, express or implied, is made or intended
related to the services provided. Watts shall only be liable for its own negligent acts or omissions and assumes no liability for the acts or omissions
of any other party.
Drawings, specifications and other documents, prepared by WATTS and their consultants are Instruments of Service for use solely with
respect to this Project. This includes documents in electronic form. WATTS and their consultants shall be deemed the authors and owners of their
respective Instruments of Service and shall retain all common law, statutory and other reserved rights, including copyrights. The Instruments of
Service shall not be used by any other party for future additions or alterations to this Project or for other projects, without the prior written
agreement of WATTS. Any unauthorized use of the Instruments of Service shall be at the other party’s sole risk and without liability to WATTS and
their consultants.
During the performance of services within this Agreement, the scope of WATTS’ services and compensation thereon may be adjusted by
written consent of the client.
If a dispute arises out of or relates to this Agreement or its breach, and if the dispute cannot be settled through direct discussions, the
parties agree that prior to the filing of any legal action, they will first endeavor to settle the dispute in an amicable matter by non-binding
mediation, using a certified mediator or certified mediation service. Failure of the parties to resolve the dispute through mediation shall in no way
remove the right of either party to pursue any legal action or recourse. Unless otherwise specified within the Agreement, this Agreement shall be
governed by the laws of the State of New York.
Neither party shall hold the other responsible for damages or delays in performance caused by acts of God, strikes, lockouts, accidents,
pandemics, epidemics or other events beyond the control of the other or the other’s employees and agents.
Progress payments shall be made in proportion to services performed and shall be due and payable within 30 days of submittal, without
retainage unless other terms are specified in proposal. Overdue invoices shall bear an interest rate of 1-1/2% per month calculated from the 31st
day after submittal.
The total liability, in the aggregate, of WATTS to CLIENT and anyone claiming by, through, or under CLIENT, for any and all claims, losses,
costs or damages whatsoever arising out of, resulting from or in any way related to the Project or the Agreement from any cause or causes,
including but not limited to the negligence, professional errors or omissions, strict liability or breach of contract, or warranty express or implied, of
WATTS, shall not exceed the total insurance proceeds paid on behalf of or to CLIENT by WATTS insurers in settlement or satisfaction of CLIENT’s
claims under the terms and conditions of WATTS insurance polices applicable thereto (excluding fees, costs, and expenses of investigation, claims
adjustment, defense, and appeal).
To the fullest extent permitted by law, WATTS shall indemnify and hold harmless CLIENT’s officers, directors, partners, and employees
from and against any and all damages caused solely by the negligent acts or omissions of WATTS in the performance and furnishing of services
under this Agreement.
To the fullest extent permitted by law, CLIENT shall indemnify and hold harmless WATTS from and against any and all costs, losses and
damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals, and all court or other
dispute resolution costs) caused solely by the negligent acts or omissions of CLIENT with respect to this Agreement or the Project.
To the fullest extent permitted by law, WATTS’ total liability to CLIENT and anyone claiming by, through, or under CLIENT for any cost,
loss or damages caused in part by the negligence of WATTS and in part by the negligence of CLIENT or any other negligent entity or individual
shall not exceed the percentage share that WATTS’ negligence bears to the total negligence of CLIENT, WATTS, and all other negligent entities and
individuals.
To the fullest extent permitted by law, CLIENT shall indemnify and hold harmless WATTS from and against all costs, losses, and damages
(including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals, and all court or arbitration or other
dispute resolution costs) caused by, arising out of or resulting from a Hazardous Environmental Condition, provided that (i) any such cost, loss, or
damage is attributable to bodily injury, sickness, disease, or death, or to injury or destruction of tangible property (other than completed Work),
including the loss of use resulting therefrom, and (ii) nothing shall obligate CLIENT to indemnify any individual or entity from and against the
consequences of that individual’s or entity’s own negligence or willful misconduct.
The Parties agree that this Agreement may be executed in counterparts, each of which shall be enforceable against the other Party
signing it and together shall be deemed to be a single original. The Parties agree that electronic copies and facsimile transmissions of signatures
shall be deemed originals for all purposes.
K:\Office\STANFORM\FORMS\Appendix A.doc 89
Page 90
Town Board of the Town of Hamburg
April 13, 2026 Meeting
4.21. West Arnold Archeological Phase 1B Study
WHEREAS, as the Town pursues funding opportunities for the waterline replacement project on W
Arnold Drive for the Idlewood Subdivision, the Office of Parks, Recreation and Historic Preservation
requires the investigation for any historic or archeological resources in the project area; and
WHEREAS, the Town must conduct a Phase 1B archeological study and has obtained a proposal from
Heritage Chronicle in the amount of $9946.88; and
WHEREAS, the proposal has been reviewed by Town departments working on this project and find it
adequate.
NOW THEREFORE BE IT RESOLVED, that the Town Board authorizes the legal team to enter into a
contract with Heritage Chronicle for the performance of a Phase 1B archeological study.
Funds are available in H120.8397.283
ATTACHMENTS:
Phase IB - Proposed Idlewood Subdivision, Hamburg PA.Final.pdf
90
Page 91
BUFFALO, NEW YORK
T: (716) 821-1650 2390 Clinton Street
[email protected] Buffalo, New York 14227-1735
April 1, 2026
Mr. Ian Shavitz
Lippes Mathias
50 Fountain Plaza, Suite 1700
Buffalo, New York 14202
RE: Phase 1B Archaeological Field Investigation for the Proposed Idlewood Subdivision Water
District Formation, Town of Hamburg, Erie County, New York; 25PR04922
Dear Ian,
The Buffalo Office of Chronicle Heritage (PaleoWest, LLC d/b/a Chronicle Heritage) is pleased to
submit a cost and technical proposal to conduct a Phase 1B Archaeological Field Investigation for
the proposed Idlewood Subdivision Water District Formation, Town of Hamburg, Erie County, New
York. The project involves the abandonment of the existing system and installation of
approximately 1,600 linear feet of 8-inch PVC water main and three fire hydrants along West Arnold
loop road.
At the request of Lippes Mathias Attorneys at Law, Chronicle Heritage completed a Phase 1A
cultural Resources Investigation of the Area of Potential Effect (APE) associated with the
proposed Idlewood Subdivision Water District Formation project.
The results of the investigation indicate that the APE is in an archaeologically sensitive area. A
known Indigenous American archaeological site sites within the APE, while another is less than 100
meters to the North. The proximity to known sites and low levels of soil disturbance indicate the
APE has an elevated potential for containing archaeological deposits. On this basis, Chronicle
Heritage recommended a Phase 1B archaeological investigation be conducted to determine if such
deposits are present in the project area. The New York State Historic Preservation Office
(NYSHPO) has confirmed agreement with Chronicle Heritage’s recommendations.
At the request of Lippes Mathias, we are providing a Scope of Work (SOW) and cost estimate to
complete a Phase 1B Archaeological Field Investigation of the APE.
Please contact me if you have any questions or would like to discuss any of the enclosed
information in more detail.
Sincerely,
CHRONICLE HERITAGE
Erin Linn, M.A. | Office Principal
91
Page 92
Phase 1B – Idlewood Subdivision - Hamburg, PA
SOW – Phase 1B Archaeological Survey
The purpose of a Phase IB archaeological survey is to conduct field testing to determine the
presence or absence of archaeological sites within a project's APE. The following scope of work
outlines the key tasks required to complete the Phase 1B investigations.
Task 1. Pre-field Project Coordination
This task includes the set-up of the project in our systems, monthly invoicing, staff coordination,
communication with NY SHPO as required, and an internal project kick-off call within 5 business
days of Notice to Proceed.
Chronicle Heritage will present a fully justified sampling plan for any recommended field
identification survey (Phase IB survey). This sampling plan will be developed for the project area and
will be based on the results of the Phase 1A investigations and consideration for ground slope and
wetlands. Support for assumptions underlying the model will be presented, and this will be derived
from comparison of results of similar projects in the area and information on previously recorded
sites in the project vicinity.
Task 2. Field Survey
Upon completion of pre-field work, Chronicle will conduct field-based surveys of the specified
areas. Key tasks will include, but not be limited to:
Subsurface testing:
If subsurface investigations are required, field investigation will include an on-site field inspection
of the proposed routes and subsurface shovel testing conducted according to SHPO standards in
all sensitive areas. The data collected will be utilized by the archaeological field crew to identify
any previously disturbed areas, wetlands, etc. that will be visually examined with limited shovel
testing and undisturbed sensitive areas that will be shovel tested at the standard 50-foot interval.
Shovel tests will be 30 to 50 centimeters in diameter and dug to undisturbed or non-artifact
bearing subsoil at a 50-foot (15-meter interval) in relatively undisturbed portions of the
archaeologically sensitive sections of the project area. Tests will be dug at 25-ft (7.5-m)
intervals in front of Map Documented Structures (MDSs). All excavated soils will be screened
through ¼-inch hardware cloth and results recorded on shovel test record forms. Any areas of
severe slope (i.e., over 15%) will only be visually inspected. Several deeper tests will be dug in
alluvial soils to assess the potential of deeply buried cultural deposits.
Shovel test transects and shovel tests will be numbered in a systematic fashion, and tests will
be indicated on project maps. Soils excavated from shovel tests will be carefully screened as
noted above to recover any cultural material. All stratigraphic profiles will be described on
appropriate field forms. Information recorded on the forms will include, but not be confined to,
descriptions of soil type, texture, color, condition, and the presence or absence of cultural
materials or cultural features.
Documentation of fieldwork activities will include the recording of field observations in
notebooks and on appropriate forms. Digital photography will be employed to document field
conditions, observations, and field techniques. Photographs will be keyed to project maps. Any
2
92
Page 93
Phase 1B – Idlewood Subdivision - Hamburg, PA
archaeological sites identified during the field investigation will be documented on OPHRP site
forms.
If required, laboratory analysis of artifacts, including cleaning, identification, and cataloging,
will be conducted at Chronicle’s Buffalo office. Artifacts will be grouped by provenience and
uniquely numbered and identified on artifact identification cards made from acid-free paper.
Catalog numbers will not be written on artifacts. Results will be presented in final report.
Task 2. Laboratory Work
If there are artifacts recovered from features during the Phase IB archaeological investigation,
they will be returned to Chronicle Heritage’s Buffalo, NY Office’s laboratory for cleaning,
cataloguing, and analysis. Laboratory processing will be carried out in accordance with applicable
state and federal curation guidelines. Following processing, an artifact inventory will be prepared.
To the extent possible, the recovered artifacts will be identified as to material, temporal
association, or cultural or chronological association, style, and function. Preliminary analysis will
seek patterns in the relative composition of the recovered artifact assemblage, particularly to the
extent that such patterns may indicate the functional nature of the assemblages, and the site
formation processes associated with their deposition. These attributes are particularly relevant to
the evaluation of potential archaeological significance. Artifacts and associated documentation
will be processed and prepared in accordance with the requirements of the NYSHPO. At the
conclusion of the investigation, the artifacts will be returned to the landowner or transferred to the
NYSHPO for permanent curation along with field records and documentation.
Task 3: Reporting
The report will include a summary of relevant information, with accompanying maps (where
appropriate), concerning the environmental/physical setting addressing geology, soils, hydrology,
physiography/geomorphology, climate, flora, fauna, and any recent human/natural disturbances; a
summary of background historical information and historical maps; a summary of official NYSHPO
records for the Project Area derived from the NYSHPO online Cultural Resources Information
System (CRIS) database research; the results of the walkover reconnaissance of the project area
with digital photography to document field conditions, observations, areas of disturbance, and site
setting; and recommendations for future cultural resources work, if necessary.
The report can be uploaded to NYSHPO at the request of the client. (Please note, however, we
would need to be made a contact for the project in CRIS and have the upload token provided by
NYSHPO to complete that task.)
Assumptions
The below cost estimate assumes:
1. as recommended in the Phase 1A report, STPs will be dug at a ten-meter intervals off of
paved surfaces along the entire length of the project area,
2. property access to conduct the investigation will be granted before initiation of the survey,
3. project boundaries can be clearly delineated for the project area(s),
4. if the proposed project area design changes or is different to the figure provided on
October 7, an additional cost may be required,
3
93
Page 94
Phase 1B – Idlewood Subdivision - Hamburg, PA
5. a client representative will be available to assist with property access and identification of
project boundaries and locations, as necessary,
6. no deep testing (i.e., backhoe) is included in this bid,
7. the level of effort assumes that no areas of elevated cultural or archaeological sensitivity
will be identified in the Phase 1A. If such areas are identified they may require additional
field investigation.
8. no more than 5 archaeological resources will require radial testing,
9. that no more than 300 artifacts will be recovered during the proposed survey; if more than
300 artifacts are recovered, there will be an additional cost,
10. no curation costs are included in this bid,
11. if NYSHPO makes recommendations for additional work (e.g., monitoring during
construction, more shovel testing) beyond the area proposed and time proposed, that work
will be an additional cost,
12. no formal Tribal consultation is included in this bid (however, we can notify the pertinent
Nation about the project and ask whether they have information specific to the project
area, if requested),
13. the Chronicle archaeologists will be made contacts on the CRIS website to facilitate access
for submitting documents and forms, and
14. a formal written notice to proceed and signed contract will be given before project
initiation of the investigation.
Cost Estimate
Chronicle Heritage will complete the proposed work for: $9946.88 exclusive of tax.
Costs are inclusive of all labor and direct expenses (lodging, vehicle rental, gas, materials and
supplies, mileage, and per diem) with the exception of those outlined in the assumptions above.
This commercial offer is valid for 90 days.
Chronicle Heritage emphasizes professionalism, expertise, and timeliness in our services to
provide exceptional value to our clients. We appreciate your consideration of Chronicle Heritage
for this project and look forward to the prospect of being of service.
4
94
Page 95
Town Board of the Town of Hamburg
April 13, 2026 Meeting
4.22. SW Blvd and Big Tree Road Traveler Center Rezoning SEQR Resolution
WHEREAS, the Town of Hamburg received a request from Briad Development, LLC to rezone 4.14
acres of land (SBL # 160.18-1-9.1) located at the intersection of Southwestern Boulevard and Big Tree
Road from C-1 (Local Retail Business District District) to C-2 (General Commercial District) for the
development of a small-scale travel center, to be anchored by an 8,700 sq-ft building with gasoline
service, accompanied by several quick-service restaurant (QSR) establishments, and other site
improvements; and
WHEREAS, pursuant to Part 617 of the implementing regulations pertaining to Article 8 (State
Environmental Quality Review Act - SEQR) of the Environmental Conservation Law, the Hamburg
Town Board has established itself as SEQR Lead Agency and conducted a coordinated environmental
(SEQR) review for this Unlisted action; and
WHEREAS, the Town Board has reviewed the FEAF (Parts 1, 2, and 3) and solicited input from the
public and from other Involved and Interested agencies, and has taken a hard look at the social,
economic, and environmental impacts of the adoption of the proposed zoning map amendment and
subsequent project; and
WHEREAS, the findings of this review indicate that the proposed zoning map amendment and
construction of the small-scale travel center with accompanying gasoline service (with the conditions
proposed by the Planning Board and accepted by the Town) will not adversely affect the natural
resources of the State and/or the health, safety and welfare of the public; and
WHEREAS, the Town of Hamburg Town Board held the required public hearing on March 9 th, 2026.
NOW, THEREFORE BE IT RESOLVED, the Hamburg Town Board, as SEQR Lead Agency for
this action, has determined that the adoption of the Town of Hamburg zoning change and construction
of the small-scale travel center with accompanying gasoline service at this location will not result in
any significant adverse impacts on the environment, and a Negative Declaration is hereby issued, based
on the reasons as set forth in the full Environmental Assessment Form and Part 3 analysis attachment;
and
BE IT FINALLY RESOLVED, the Town Board authorizes the Town Supervisor to sign the
Environmental Assessment Form, which will act as the SEQR Negative Declaration, and authorizes that
the appropriate notices and filings be made.
95
Page 96
ATTACHMENTS:
04_SEQR - Circle K Hamburg.pdf
FEAF Part 2 - SW Blvd and Big Tree Road Traveler Center.pdf
FEAF Part 3.pdf
SW Blvd and Big Tree Road Rezoning Part 3 Analysis.pdf
96
Page 97
97
Page 98
98
Page 99
99
Page 100
100
Page 101
101
Page 102
102
Page 103
103
Page 104
104
Page 105
105
Page 106
106
Page 107
107
Page 108
108
Page 109
109
Page 110
110
Page 111
111
Page 112
Agency Use Only [If applicable]
Full Environmental Assessment Form Project : Briad Development Southwestern and Big Tree Re
Part 2 - Identification of Potential Project Impacts Date : 4/13/2026
Part 2 is to be completed by the lead agency. Part 2 is designed to help the lead agency inventory all potential resources that could
be affected by a proposed project or action. We recognize that the lead agency=s reviewer(s) will not necessarily be environmental
professionals. So, the questions are designed to walk a reviewer through the assessment process by providing a series of questions that
can be answered using the information found in Part 1. To further assist the lead agency in completing Part 2, the form identifies the
most relevant questions in Part 1 that will provide the information needed to answer the Part 2 question. When Part 2 is completed, the
lead agency will have identified the relevant environmental areas that may be impacted by the proposed activity.
If the lead agency is a state agency and the action is in any Coastal Area, complete the Coastal Assessment Form before proceeding
with this assessment.
Tips for completing Part 2:
• Review all of the information provided in Part 1.
• Review any application, maps, supporting materials and the Full EAF Workbook.
• Answer each of the 18 questions in Part 2.
• If you answer “Yes” to a numbered question, please complete all the questions that follow in that section.
• If you answer “No” to a numbered question, move on to the next numbered question.
• Check appropriate column to indicate the anticipated size of the impact.
• Proposed projects that would exceed a numeric threshold contained in a question should result in the reviewing agency
checking the box “Moderate to large impact may occur.”
• The reviewer is not expected to be an expert in environmental analysis.
• If you are not sure or undecided about the size of an impact, it may help to review the sub-questions for the general
question and consult the workbook.
• When answering a question consider all components of the proposed activity, that is, the Awhole action@.
• Consider the possibility for long-term and cumulative impacts as well as direct impacts.
• Answer the question in a reasonable manner considering the scale and context of the project.
1. Impact on Land
Proposed action may involve construction on, or physical alteration of, NO YES
✔
the land surface of the proposed site. (See Part 1. D.1)
If “Yes”, answer questions a - j. If “No”, move on to Section 2.
Relevant No, or Moderate
Part I small to large
Question(s) impact impact may
may occur occur
a. The proposed action may involve construction on land where depth to water table is E2d 9
✔ 9
less than 3 feet.
b. The proposed action may involve construction on slopes of 15% or greater. E2f 9
✔ 9
c. The proposed action may involve construction on land where bedrock is exposed, or E2a 9
✔ 9
generally within 5 feet of existing ground surface.
d. The proposed action may involve the excavation and removal of more than 1,000 tons D2a 9
✔ 9
of natural material.
e. The proposed action may involve construction that continues for more than one year D1e 9
✔ 9
or in multiple phases.
f. The proposed action may result in increased erosion, whether from physical D2e, D2q 9
✔ 9
disturbance or vegetation removal (including from treatment by herbicides).
g. The proposed action is, or may be, located within a Coastal Erosion hazard area. B1i 9
✔ 9
h. Other impacts: _______________________________________________________ 9 9
___________________________________________________________________
Page 1 of 10
FEAF 2019
112
Page 113
2. Impact on Geological Features
The proposed action may result in the modification or destruction of, or inhibit
access to, any unique or unusual land forms on the site (e.g., cliffs, dunes, NO
✔ YES
minerals, fossils, caves). (See Part 1. E.2.g)
If “Yes”, answer questions a - c. If “No”, move on to Section 3.
Relevant No, or Moderate
Part I small to large
Question(s) impact impact may
may occur occur
a. Identify the specific land form(s) attached: ________________________________ E2g 9 9
___________________________________________________________________
b. The proposed action may affect or is adjacent to a geological feature listed as a E3c 9 9
registered National Natural Landmark.
Specific feature: _____________________________________________________
c. Other impacts: ______________________________________________________ 9 9
___________________________________________________________________
3. Impacts on Surface Water
The proposed action may affect one or more wetlands or other surface water ✔
NO YES
bodies (e.g., streams, rivers, ponds or lakes). (See Part 1. D.2, E.2.h)
If “Yes”, answer questions a - l. If “No”, move on to Section 4.
Relevant No, or Moderate
Part I small to large
Question(s) impact impact may
may occur occur
a. The proposed action may create a new water body. D2b, D1h 9 9
b. The proposed action may result in an increase or decrease of over 10% or more than a D2b 9 9
10 acre increase or decrease in the surface area of any body of water.
c. The proposed action may involve dredging more than 100 cubic yards of material D2a 9 9
from a wetland or water body.
d. The proposed action may involve construction within or adjoining a freshwater or E2h 9 9
tidal wetland, or in the bed or banks of any other water body.
e. The proposed action may create turbidity in a waterbody, either from upland erosion, D2a, D2h 9 9
runoff or by disturbing bottom sediments.
f. The proposed action may include construction of one or more intake(s) for withdrawal D2c 9 9
of water from surface water.
g. The proposed action may include construction of one or more outfall(s) for discharge D2d 9 9
of wastewater to surface water(s).
h. The proposed action may cause soil erosion, or otherwise create a source of D2e 9 9
stormwater discharge that may lead to siltation or other degradation of receiving
water bodies.
i. The proposed action may affect the water quality of any water bodies within or E2h 9 9
downstream of the site of the proposed action.
j. The proposed action may involve the application of pesticides or herbicides in or D2q, E2h 9 9
around any water body.
k. The proposed action may require the construction of new, or expansion of existing, D1a, D2d 9 9
wastewater treatment facilities.
Page 2 of 10
113
Page 114
l. Other impacts: _______________________________________________________ 9 9
___________________________________________________________________
4. Impact on groundwater
The proposed action may result in new or additional use of ground water, or ✔
NO YES
may have the potential to introduce contaminants to ground water or an aquifer.
(See Part 1. D.2.a, D.2.c, D.2.d, D.2.p, D.2.q, D.2.t)
If “Yes”, answer questions a - h. If “No”, move on to Section 5.
Relevant No, or Moderate
Part I small to large
Question(s) impact impact may
may occur occur
a. The proposed action may require new water supply wells, or create additional demand D2c 9 9
on supplies from existing water supply wells.
b. Water supply demand from the proposed action may exceed safe and sustainable D2c 9 9
withdrawal capacity rate of the local supply or aquifer.
Cite Source: ________________________________________________________
c. The proposed action may allow or result in residential uses in areas without water and D1a, D2c 9 9
sewer services.
d. The proposed action may include or require wastewater discharged to groundwater. D2d, E2l 9 9
e. The proposed action may result in the construction of water supply wells in locations D2c, E1f, 9 9
where groundwater is, or is suspected to be, contaminated. E1g, E1h
f. The proposed action may require the bulk storage of petroleum or chemical products D2p, E2l 9 9
over ground water or an aquifer.
g. The proposed action may involve the commercial application of pesticides within 100 E2h, D2q, 9 9
feet of potable drinking water or irrigation sources. E2l, D2c
h. Other impacts: ______________________________________________________ 9 9
__________________________________________________________________
5. Impact on Flooding
The proposed action may result in development on lands subject to flooding. NO
✔ YES
(See Part 1. E.2)
If “Yes”, answer questions a - g. If “No”, move on to Section 6.
Relevant No, or Moderate
Part I small to large
Question(s) impact impact may
may occur occur
a. The proposed action may result in development in a designated floodway. E2i 9 9
b. The proposed action may result in development within a 100 year floodplain. E2j 9 9
c. The proposed action may result in development within a 500 year floodplain. E2k 9 9
d. The proposed action may result in, or require, modification of existing drainage D2b, D2e 9 9
patterns.
e. The proposed action may change flood water flows that contribute to flooding. D2b, E2i, 9 9
E2j, E2k
f. If there is a dam located on the site of the proposed action, is the dam in need of repair, E1e 9 9
or upgrade?
Page 3 of 10
114
Page 115
g. Other impacts: ______________________________________________________
9 9
___________________________________________________________________
6. Impacts on Air
The proposed action may include a state regulated air emission source.
✔ NO YES
(See Part 1. D.2.f., D.2.h, D.2.g)
If “Yes”, answer questions a - f. If “No”, move on to Section 7.
Relevant No, or Moderate
Part I small to large
Question(s) impact impact may
may occur occur
a. If the proposed action requires federal or state air emission permits, the action may
also emit one or more greenhouse gases at or above the following levels:
i. More than 1000 tons/year of carbon dioxide (CO2) D2g 9 9
ii. More than 3.5 tons/year of nitrous oxide (N2O) D2g 9 9
iii. More than 1000 tons/year of carbon equivalent of perfluorocarbons (PFCs) D2g 9 9
iv. More than .045 tons/year of sulfur hexafluoride (SF6) D2g 9 9
D2g 9 9
v. More than 1000 tons/year of carbon dioxide equivalent of
hydrochloroflourocarbons (HFCs) emissions
vi. 43 tons/year or more of methane D2h 9 9
b. The proposed action may generate 10 tons/year or more of any one designated D2g 9 9
hazardous air pollutant, or 25 tons/year or more of any combination of such hazardous
air pollutants.
c. The proposed action may require a state air registration, or may produce an emissions D2f, D2g 9 9
rate of total contaminants that may exceed 5 lbs. per hour, or may include a heat
source capable of producing more than 10 million BTU=s per hour.
d. The proposed action may reach 50% of any of the thresholds in “a” through “c”, D2g 9 9
above.
e. The proposed action may result in the combustion or thermal treatment of more than 1 D2s 9 9
ton of refuse per hour.
f. Other impacts: ______________________________________________________ 9 9
__________________________________________________________________
7. Impact on Plants and Animals
The proposed action may result in a loss of flora or fauna. (See Part 1. E.2. m.-q.) NO
✔ YES
If “Yes”, answer questions a - j. If “No”, move on to Section 8.
Relevant No, or Moderate
Part I small to large
Question(s) impact impact may
may occur occur
a. The proposed action may cause reduction in population or loss of individuals of any E2o 9 9
threatened or endangered species, as listed by New York State or the Federal
government, that use the site, or are found on, over, or near the site.
b. The proposed action may result in a reduction or degradation of any habitat used by E2o 9 9
any rare, threatened or endangered species, as listed by New York State or the federal
government.
c. The proposed action may cause reduction in population, or loss of individuals, of any E2p 9 9
species of special concern or conservation need, as listed by New York State or the
Federal government, that use the site, or are found on, over, or near the site.
d. The proposed action may result in a reduction or degradation of any habitat used by E2p 9 9
any species of special concern and conservation need, as listed by New York State or
the Federal government.
Page 4 of 10
115
Page 116
e. The proposed action may diminish the capacity of a registered National Natural E3c 9 9
Landmark to support the biological community it was established to protect.
f. The proposed action may result in the removal of, or ground disturbance in, any E2n 9 9
portion of a designated significant natural community.
Source: ____________________________________________________________
g. The proposed action may substantially interfere with nesting/breeding, foraging, or
E2m 9 9
over-wintering habitat for the predominant species that occupy or use the project site.
h. The proposed action requires the conversion of more than 10 acres of forest, 9 9
E1b
grassland or any other regionally or locally important habitat.
Habitat type & information source: ______________________________________
__________________________________________________________________
i. Proposed action (commercial, industrial or recreational projects, only) involves use of D2q 9 9
herbicides or pesticides.
j. Other impacts: ______________________________________________________ 9 9
__________________________________________________________________
8. Impact on Agricultural Resources
The proposed action may impact agricultural resources. (See Part 1. E.3.a. and b.) ✔
NO YES
If “Yes”, answer questions a - h. If “No”, move on to Section 9.
Relevant No, or Moderate
Part I small to large
Question(s) impact impact may
may occur occur
a. The proposed action may impact soil classified within soil group 1 through 4 of the E2c, E3b 9 9
NYS Land Classification System.
b. The proposed action may sever, cross or otherwise limit access to agricultural land E1a, Elb 9 9
(includes cropland, hayfields, pasture, vineyard, orchard, etc).
c. The proposed action may result in the excavation or compaction of the soil profile of E3b 9 9
active agricultural land.
d. The proposed action may irreversibly convert agricultural land to non-agricultural E1b, E3a 9 9
uses, either more than 2.5 acres if located in an Agricultural District, or more than 10
acres if not within an Agricultural District.
e. The proposed action may disrupt or prevent installation of an agricultural land El a, E1b 9 9
management system.
f. The proposed action may result, directly or indirectly, in increased development C2c, C3, 9 9
potential or pressure on farmland. D2c, D2d
g. The proposed project is not consistent with the adopted municipal Farmland C2c 9 9
Protection Plan.
h. Other impacts: ________________________________________________________ 9 9
Page 5 of 10
116
Page 117
9. Impact on Aesthetic Resources
The land use of the proposed action are obviously different from, or are in ✔
NO YES
sharp contrast to, current land use patterns between the proposed project and
a scenic or aesthetic resource. (Part 1. E.1.a, E.1.b, E.3.h.)
If “Yes”, answer questions a - g. If “No”, go to Section 10.
Relevant No, or Moderate
Part I small to large
Question(s) impact impact may
may occur occur
a. Proposed action may be visible from any officially designated federal, state, or local E3h 9 9
scenic or aesthetic resource.
b. The proposed action may result in the obstruction, elimination or significant E3h, C2b 9 9
screening of one or more officially designated scenic views.
c. The proposed action may be visible from publicly accessible vantage points: E3h
i. Seasonally (e.g., screened by summer foliage, but visible during other seasons) 9 9
ii. Year round 9 9
d. The situation or activity in which viewers are engaged while viewing the proposed E3h
action is:
E2q,
i. Routine travel by residents, including travel to and from work 9 9
ii. Recreational or tourism based activities E1c 9 9
e. The proposed action may cause a diminishment of the public enjoyment and E3h 9 9
appreciation of the designated aesthetic resource.
f. There are similar projects visible within the following distance of the proposed D1a, E1a, 9 9
project: D1f, D1g
0-1/2 mile
½ -3 mile
3-5 mile
5+ mile
g. Other impacts: ______________________________________________________ 9 9
__________________________________________________________________
10. Impact on Historic and Archeological Resources
The proposed action may occur in or adjacent to a historic or archaeological NO
✔ YES
resource. (Part 1. E.3.e, f. and g.)
If “Yes”, answer questions a - e. If “No”, go to Section 11.
Relevant No, or Moderate
Part I small to large
Question(s) impact impact may
may occur occur
a. The proposed action may occur wholly or partially within, or substantially contiguous
to, any buildings, archaeological site or district which is listed on the National or E3e 9 9
State Register of Historical Places, or that has been determined by the Commissioner
of the NYS Office of Parks, Recreation and Historic Preservation to be eligible for
listing on the State Register of Historic Places.
b. The proposed action may occur wholly or partially within, or substantially contiguous E3f 9 9
to, an area designated as sensitive for archaeological sites on the NY State Historic
Preservation Office (SHPO) archaeological site inventory.
c. The proposed action may occur wholly or partially within, or substantially contiguous E3g 9 9
to, an archaeological site not included on the NY SHPO inventory.
Source: ____________________________________________________________
Page 6 of 10
117
Page 118
d. Other impacts: ______________________________________________________ 9 9
__________________________________________________________________
If any of the above (a-d) are answered “Moderate to large impact may
e. occur”, continue with the following questions to help support conclusions in Part 3:
i. The proposed action may result in the destruction or alteration of all or part E3e, E3g, 9 9
of the site or property. E3f
ii. The proposed action may result in the alteration of the property’s setting or E3e, E3f, 9 9
integrity. E3g, E1a,
E1b
iii. The proposed action may result in the introduction of visual elements which E3e, E3f, 9 9
are out of character with the site or property, or may alter its setting. E3g, E3h,
C2, C3
11. Impact on Open Space and Recreation
The proposed action may result in a loss of recreational opportunities or a NO
✔ YES
reduction of an open space resource as designated in any adopted
municipal open space plan.
(See Part 1. C.2.c, E.1.c., E.2.q.)
If “Yes”, answer questions a - e. If “No”, go to Section 12.
Relevant No, or Moderate
Part I small to large
Question(s) impact impact may
may occur occur
a. The proposed action may result in an impairment of natural functions, or “ecosystem D2e, E1b 9 9
services”, provided by an undeveloped area, including but not limited to stormwater E2h,
storage, nutrient cycling, wildlife habitat. E2m, E2o,
E2n, E2p
b. The proposed action may result in the loss of a current or future recreational resource. C2a, E1c, 9 9
C2c, E2q
c. The proposed action may eliminate open space or recreational resource in an area C2a, C2c 9 9
with few such resources. E1c, E2q
d. The proposed action may result in loss of an area now used informally by the C2c, E1c 9 9
community as an open space resource.
e. Other impacts: _____________________________________________________ 9 9
_________________________________________________________________
12. Impact on Critical Environmental Areas
The proposed action may be located within or adjacent to a critical NO
✔ YES
environmental area (CEA). (See Part 1. E.3.d)
If “Yes”, answer questions a - c. If “No”, go to Section 13.
Relevant No, or Moderate
Part I small to large
Question(s) impact impact may
may occur occur
a. The proposed action may result in a reduction in the quantity of the resource or E3d 9 9
characteristic which was the basis for designation of the CEA.
b. The proposed action may result in a reduction in the quality of the resource or E3d 9 9
characteristic which was the basis for designation of the CEA.
c. Other impacts: ______________________________________________________ 9 9
__________________________________________________________________
Page 7 of 10
118
Page 119
13. Impact on Transportation
The proposed action may result in a change to existing transportation systems. NO YES
✔
(See Part 1. D.2.j)
If “Yes”, answer questions a - f. If “No”, go to Section 14.
Relevant No, or Moderate
Part I small to large
Question(s) impact impact may
may occur occur
a. Projected traffic increase may exceed capacity of existing road network. D2j 9 9
✔
b. The proposed action may result in the construction of paved parking area for 500 or D2j 9
✔ 9
more vehicles.
c. The proposed action will degrade existing transit access. D2j 9
✔ 9
d. The proposed action will degrade existing pedestrian or bicycle accommodations. D2j 9
✔ 9
e. The proposed action may alter the present pattern of movement of people or goods. D2j 9 9
✔
f. Other impacts: ______________________________________________________ 9 9
__________________________________________________________________
14. Impact on Energy
The proposed action may cause an increase in the use of any form of energy. NO
✔ YES
(See Part 1. D.2.k)
If “Yes”, answer questions a - e. If “No”, go to Section 15.
Relevant No, or Moderate
Part I small to large
Question(s) impact impact may
may occur occur
a. The proposed action will require a new, or an upgrade to an existing, substation. D2k 9 9
b. The proposed action will require the creation or extension of an energy transmission D1f, 9 9
or supply system to serve more than 50 single or two-family residences or to serve a D1q, D2k
commercial or industrial use.
c. The proposed action may utilize more than 2,500 MWhrs per year of electricity. D2k 9 9
d. The proposed action may involve heating and/or cooling of more than 100,000 square D1g 9 9
feet of building area when completed.
e. Other Impacts: ________________________________________________________
____________________________________________________________________
15. Impact on Noise, Odor, and Light
The proposed action may result in an increase in noise, odors, or outdoor lighting. NO ✔
YES
(See Part 1. D.2.m., n., and o.)
If “Yes”, answer questions a - f. If “No”, go to Section 16.
Relevant No, or Moderate
Part I small to large
Question(s) impact impact may
may occur occur
a. The proposed action may produce sound above noise levels established by local D2m ✔9 9
regulation.
b. The proposed action may result in blasting within 1,500 feet of any residence, D2m, E1d 9
✔ 9
hospital, school, licensed day care center, or nursing home.
c. The proposed action may result in routine odors for more than one hour per day. D2o 9
✔ 9
Page 8 of 10
119
Page 120
d. The proposed action may result in light shining onto adjoining properties. D2n 9 9
✔
e. The proposed action may result in lighting creating sky-glow brighter than existing D2n, E1a 9
✔ 9
area conditions.
f. Other impacts: ______________________________________________________ 9 9
__________________________________________________________________
16. Impact on Human Health
The proposed action may have an impact on human health from exposure NO ✔
YES
to new or existing sources of contaminants. (See Part 1.D.2.q., E.1. d. f. g. and h.)
If “Yes”, answer questions a - m. If “No”, go to Section 17.
Relevant No,or Moderate
Part I small to large
Question(s) impact impact may
may cccur occur
a. The proposed action is located within 1500 feet of a school, hospital, licensed day E1d 9
✔ 9
care center, group home, nursing home or retirement community.
b. The site of the proposed action is currently undergoing remediation. E1g, E1h 9
✔ 9
c. There is a completed emergency spill remediation, or a completed environmental site E1g, E1h 9
✔ 9
remediation on, or adjacent to, the site of the proposed action.
d. The site of the action is subject to an institutional control limiting the use of the E1g, E1h 9
✔ 9
property (e.g., easement or deed restriction).
e. The proposed action may affect institutional control measures that were put in place E1g, E1h 9
✔ 9
to ensure that the site remains protective of the environment and human health.
f. The proposed action has adequate control measures in place to ensure that future D2t 9
✔ 9
generation, treatment and/or disposal of hazardous wastes will be protective of the
environment and human health.
g. The proposed action involves construction or modification of a solid waste D2q, E1f 9
✔ 9
management facility.
h. The proposed action may result in the unearthing of solid or hazardous waste. D2q, E1f ✔
9 9
i. The proposed action may result in an increase in the rate of disposal, or processing, of D2r, D2s 9
✔ 9
solid waste.
j. The proposed action may result in excavation or other disturbance within 2000 feet of E1f, E1g ✔
9 9
a site used for the disposal of solid or hazardous waste. E1h
k. The proposed action may result in the migration of explosive gases from a landfill E1f, E1g 9
✔ 9
site to adjacent off site structures.
l. The proposed action may result in the release of contaminated leachate from the D2s, E1f, 9
✔ 9
project site. D2r
m. Other impacts: ______________________________________________________
__________________________________________________________________
Page 9 of 10
120
Page 121
17. Consistency with Community Plans
The proposed action is not consistent with adopted land use plans. NO YES
✔
(See Part 1. C.1, C.2. and C.3.)
If “Yes”, answer questions a - h. If “No”, go to Section 18.
Relevant No, or Moderate
Part I small to large
Question(s) impact impact may
may occur occur
a. The proposed action’s land use components may be different from, or in sharp C2, C3, D1a 9 9
✔
contrast to, current surrounding land use pattern(s). E1a, E1b
b. The proposed action will cause the permanent population of the city, town or village C2 9
✔ 9
in which the project is located to grow by more than 5%.
c. The proposed action is inconsistent with local land use plans or zoning regulations. C2, C2, C3 9 9
✔
d. The proposed action is inconsistent with any County plans, or other regional land use C2, C2 9
✔ 9
plans.
e. The proposed action may cause a change in the density of development that is not C3, D1c, 9
✔ 9
supported by existing infrastructure or is distant from existing infrastructure. D1d, D1f,
D1d, Elb
f. The proposed action is located in an area characterized by low density development C4, D2c, D2d 9
✔ 9
that will require new or expanded public infrastructure. D2j
g. The proposed action may induce secondary development impacts (e.g., residential or C2a 9
✔ 9
commercial development not included in the proposed action)
h. Other: _____________________________________________________________ 9 9
__________________________________________________________________
18. Consistency with Community Character
The proposed project is inconsistent with the existing community character. NO
✔ YES
(See Part 1. C.2, C.3, D.2, E.3)
If “Yes”, answer questions a - g. If “No”, proceed to Part 3.
Relevant No, or Moderate
Part I small to large
Question(s) impact impact may
may occur occur
a. The proposed action may replace or eliminate existing facilities, structures, or areas E3e, E3f, E3g 9 9
of historic importance to the community.
b. The proposed action may create a demand for additional community services (e.g. C4 9 9
schools, police and fire)
c. The proposed action may displace affordable or low-income housing in an area where C2, C3, D1f 9 9
there is a shortage of such housing. D1g, E1a
d. The proposed action may interfere with the use or enjoyment of officially recognized C2, E3 9 9
or designated public resources.
e. The proposed action is inconsistent with the predominant architectural scale and C2, C3 9 9
character.
f. Proposed action is inconsistent with the character of the existing natural landscape. C2, C3 9 9
E1a, E1b
E2g, E2h
g. Other impacts: ______________________________________________________ 9 9
__________________________________________________________________
PRINT FULL FORM Page 10 of 10
121
Page 122
Agency Use Only [IfApplicable]
Project : Briad Development Southwestern and Big Tree Traveler Ce
Date : 4/13/2026
Full Environmental Assessment Form
Part 3 - Evaluation of the Magnitude and Importance of Project Impacts
and
Determination of Significance
Part 3 provides the reasons in support of the determination of significance. The lead agency must complete Part 3 for every question
in Part 2 where the impact has been identified as potentially moderate to large or where there is a need to explain why a particular
element of the proposed action will not, or may, result in a significant adverse environmental impact.
Based on the analysis in Part 3, the lead agency must decide whether to require an environmental impact statement to further assess
the proposed action or whether available information is sufficient for the lead agency to conclude that the proposed action will not
have a significant adverse environmental impact. By completing the certification on the next page, the lead agency can complete its
determination of significance.
Reasons Supporting This Determination:
To complete this section:
• Identify the impact based on the Part 2 responses and describe its magnitude. Magnitude considers factors such as severity,
size or extent of an impact.
• Assess the importance of the impact. Importance relates to the geographic scope, duration, probability of the impact
occurring, number of people affected by the impact and any additional environmental consequences if the impact were to
occur.
• The assessment should take into consideration any design element or project changes.
• Repeat this process for each Part 2 question where the impact has been identified as potentially moderate to large or where
there is a need to explain why a particular element of the proposed action will not, or may, result in a significant adverse
environmental impact.
• Provide the reason(s) why the impact may, or will not, result in a significant adverse environmental impact
• For Conditional Negative Declarations identify the specific condition(s) imposed that will modify the proposed action so that
no significant adverse environmental impacts will result.
• Attach additional sheets, as needed.
The analysis completed for Part 2 included use of the following studies or analyses provided by the Applicant:
-Planning Board Rezoning Report
-Site Survey
-Proposed Site Plan
-Circulation Plan
-FEMA Flood Map
-Wetland Delineation Plan
-Safety Systems and Regulatory Controls at Modern Fueling Facilities Memo
-Official Agency Comments from Coordinated Review
-SHPO Letter of No Concern
-ITE Trip Generation Analysis
Please find the attached Part 3 analysis as the basis for why this project should be issued a Negative Declaration.
Determination of Significance - Type 1 and Unlisted Actions
SEQR Status: Type 1
✔ Unlisted
Identify portions of EAF completed for this Project:
✔ Part 1
✔ Part 2
✔ Part 3 122
FEAF 2019
Page 123
Upon review of the information recorded on this EAF, as noted, plus this additional support information
and considering both the magnitude and importance of each identified potential impact, it is the conclusion of the
Hamburg Town Board as lead agency that:
✔ A. This project will result in no significant adverse impacts on the environment, and, therefore, an environmental impact
statement need not be prepared. Accordingly, this negative declaration is issued.
B. Although this project could have a significant adverse impact on the environment, that impact will be avoided or
substantially mitigated because of the following conditions which will be required by the lead agency:
There will, therefore, be no significant adverse impacts from the project as conditioned, and, therefore, this conditioned negative
declaration is issued. A conditioned negative declaration may be used only for UNLISTED actions (see 6 NYCRR 617.7(d)).
C. This Project may result in one or more significant adverse impacts on the environment, and an environmental impact
statement must be prepared to further assess the impact(s) and possible mitigation and to explore alternatives to avoid or reduce those
impacts. Accordingly, this positive declaration is issued.
Name of Action: Briad Development Southwestern and Big Tree Traveler Center Rezoning
Name of Lead Agency: Hamburg Town Board
Name of Responsible Officer in Lead Agency: Elizabeth Farrell-Lorentz
Title of Responsible Officer: Supervisor
Signature of Responsible Officer in Lead Agency: Date:
Signature of Preparer (if different from Responsible Officer) Date:
For Further Information:
Contact Person: Joshua Rogers
Address: 6100 South Park Ave
Telephone Number: 716-649-6111 ext. 2384
E-mail: [email protected]
For Type 1 Actions and Conditioned Negative Declarations, a copy of this Notice is sent to:
Chief Executive Officer of the political subdivision in which the action will be principally located (e.g., Town / City / Village of)
Other involved agencies (if any)
Applicant (if any)
Environmental Notice Bulletin: http://www.dec.ny.gov/enb/enb.html
PRINT FULL FORM Page 2 of 2
123
Page 124
Hamburg Town Board
Part 3 Analysis
Briad Development Southwestern and Big Tree Rezoning
0 Big Tree Road and Southwestern Boulevard, Hamburg, NY 14219 (SBL#: 160.18-1-9.1)
4/13/2026
Based on Part 1 and Part 2 of the FEAF, information submitted by the Applicant, correspondence
received, and discussions of the Planning Board and Town Board, the following potentially moderate
to large impacts were identified, and have been analyzed:
Project Description and Action
See FEAF.
1. Impact on Land
The project will disturb approximately 2.2 acres of land out of a 4.08-acre site, with conversion to
a convenience store building, a gas station facility, with drive-thru space, 43 parking spaces, and
other impervious areas. Approximately 1.5 acres of land will consist of impervious surface. Final
engineered plans will be reviewed and approved by the Town Engineer, including a Stormwater
Pollution Prevention Plan (SWPPP). Appropriate erosion and sediment control measures will be
required during construction, with inspections occurring by a qualified person. A condition of the
rezoning approval will be to maintain existing natural features, and vegetative buffers on the site,
especially to keep a 0.66-acre lawned area on the site and to buffer the nearest adjoining
neighbors at Big Tree Road and Burke Parkway, to be addressed during site plan review.
A landscaping plan will need to be prepared that focuses on highlighting the existing natural
areas to be maintained in addition to the substantial tree planting that will take place around the
Project Site and especially in screening areas easily meeting § 280-209’s requirement for a
single tree to be planted every 30 feet. This landscape plan can also be a rezoning condition that
is subject to Planning Board review/approval during the site plan stage.
Information submitted and Analysis: Proposed Site Plan, FEAF Part 1, Planning Board Rezoning
Report.
Conclusion: The project is not anticipated to have a significant impact on land.
13. Impact on Transportation
The site is bounded by Big Tree Road to the north, Interstate 90 to the west, Southwestern
Boulevard to the south, and where the Seven Corners intersection was removed to the east. The
project site is currently vacant land. Land uses within the vicinity of the project site are generally
commercial. The proposed development consists of a multi-tenant commercial site designed to
124
Page 125
function as a small-scale travel center serving both the local community and motorists traveling
along the Interstate I-90 corridor.
The Applicant has submitted a circulation plan, showing a driveway onto Southwestern Boulevard
located as far as possible from the intersection of Southwestern Boulevard and Big Tree Road,
based on input from NYSDOT.
The project and it’s uses generate what is known as pass-by taffic, meaning that vehicles are
already traveling on a road adjacent to a business, and will stop as part of their existing journey,
rather than generating new, separate trips. These customers, commonly seen at gas stations or
convenience stores, do not create new traffic, but simply make a turn-in maneuver. The table
below shows the estimated daily visits for the development, as well as the AM and PM peak trips.
These visits were determined using the 8th Edition ITE Trip Generation Rates.
The Applicant has also been in communication with the NYSDOT regarding driveway access. The
Applicant has proposed driveways from Southwestern Blvd and Big Tree Road into the project
site. Correspondence from the NYSDOT has highlighted that they are open to considering the two
entrances but noted that since the project is a major commercial development, review and
comment from several of their teams will be required.
Information submitted and Analysis
Circulation Plan, Planning Board Rezoning Report, ITE Trip Generation Analysis, FEAF Part 1
Conclusion: Based on the information provided above, the project is not anticipated to have a
significant impact on transportation.
15. Impact on Noise, Odor, and Light
The project will temporarily produce excess sound during construction, primarily between 7 am
and 4 pm on weekdays (the project will need to follow Town noise ordinances). There will be
outdoor lighting on the project site, and conditions of site plan approval will require the lighting to
meet dark sky residential lighting standards as set forth by the Town of Hamburg. Parking lot
lighting will be shielded and regulated by conditions of site plan approval. The fuel canopy
component of the project will not produce adverse odors, and will have double‑wall tanks, leak
detection technology, spill containment systems.
125
Page 126
Information submitted: FEAF Part 1, Safety Systems and Regulatory Controls at Modern Fueling
Facilities Memo
Conclusion: The project is not anticipated to have a significant impact on the noise, odor, or light
on the site.
16. Impact on Human Health
Given that part of the project involves a fuel station component, there have been some questions
in regard to applicable safety standards for fueling facilities. The Applicant presented at the 3/9
Town Board public hearing and produced a memo detailing the applicable EPA and NYSDEC
standards. Fueling facilities in New York State operate under strict environmental regulations
requiring advanced engineering systems and operational safeguards. These protections—
including double‑wall tanks, leak detection technology, spill containment systems, operator
training, and regular inspections—greatly reduce the risk of fuel releases compared to older filling
station designs.
Information submitted: FEAF Part 1, Safety Systems and Regulatory Controls at Modern Fueling
Facilities Memo
Conclusion: The project is not anticipated to have a significant impact on human health.
17. Impact on Community Plans
Due to the project needing a rezoning, the question of whether “the proposed action is
inconsistent with local land use plans or zoning regulations” was checked as a moderate to large
impact.
During Code Review and Planning Board review of the project, it was determined that a rezoning
from C-1 to C-2 would not result in spot zoning, nor would it be inconsistent with zoning in the
area, given that there are C-2 uses across the street, and to the immediate east of the property.
The project is within a commercial corridor of the Town, and the rezoning report that was
produced by the Planning Board highlights that Comprehensive Plan denotes that the north side
of Southwestern Boulevard is a commercial area but suggests that it needs uses and restrictions
that protect the surrounding residential areas.
There also is adequate fire protection and other community services in this area.
Information submitted and Analysis: Hamburg Planning Board Rezoning Report, Southwestern
Blvd Excerpt from Hamburg Comp Plan
Conclusion: The project is not anticipated to have a significant impact on community plans.
Attachments:
• -Planning Board Rezoning Report
• -Site Survey
126
Page 127
• -Proposed Site Plan
• -Circulation Plan
• -FEMA Flood Map
• -Wetland Delineation Plan
• -Safety Systems and Regulatory Controls at Modern Fueling Facilities Memo
• -Official Agency Comments from Coordinated Review
• -SHPO Letter of No Concern
• -ITE Trip Generation Analysis
127
Page 128
Town Board of the Town of Hamburg
April 13, 2026 Meeting
4.23. SW Blvd and Big Tree Road Traveler Center Rezoning Approval Resolution
Whereas, the Town of Hamburg received a request from Briad Development, LLC to rezone 4.14 acres
of land (SBL # 160.18-1-9.1) located at the intersection of Southwestern Boulevard and Big Tree Road
from C-1 (Local Retail Business District District) to C-2 (General Commercial District) for the
development of a small-scale travel center, to be anchored by an 8,700 sq-ft building with gasoline
service, accompanied by several quick-service restaurant (QSR) establishments, and other site
improvements; and
Whereas, the Hamburg Planning Board reviewed the rezoning request and recommended on February
4th, 2026, that this rezoning request be approved with conditions; and
Whereas, a public hearing was held regarding the zoning map revision and subsequent project on March
9th, 2026 and comments were received from the public, and the Town completed the required Erie
County 239 m referral; and
Whereas, the Hamburg Town Board has determined that the proposed rezoning and project will not
result in any significant negative effect on the environment and has issued a Negative Declaration and
determined that the rezoning is in accordance with the Town's Comprehensive Plan.
Now, Therefore, Be It Resolved, that the Town of Hamburg Town Board hereby rezones the property
identified above from C-1 to C-2 with the following conditions:
1. The following uses shall not be permitted:
All uses in the Permitted Uses section of the C-2 General Commercial Zoning District A§ 280-
81(A) except for uses (2) Retail sales, (3) Eating or drinking establishments, and (23-f), but
specifically filling stations, gasoline stations. Automotive repair services (including oil change,
muffler and brake shops, collision shops and tire shops) are prohibited.
2. The fueling facility component of the project will comply with EPA and NYSDEC standards and
shall require advanced engineering systems and operational safeguards. These protections will include
double-wall tanks, leak detection technology, spill containment systems, operator training, alarm
systems and regular inspections.
3. An adequate landscape buffer shall consist of a landscaped area, adjacent to Big Tree Road. The
width and the landscaping to be provided in the landscaped area shall be determined by the Planning
Board during the site plan review process.
4. All dumpsters to be located on the Project Site shall be enclosed by a six-foot-tall fence in
accordance with Town requirements.
5. Fully engineered plans will be prepared and submitted with a SWPPP & Engineer's Report during the
Site Plan Application review process, subject to Town Engineering review.
6. Dark sky compliant lighting will be provided for the entire project site and there will not be any
lighting spillover onto the residential properties to the rear of the project site.
128
Page 129
7. The Project will require a Special Use Permit from the Planning Board and shall meet the
requirements per § 280-330 of the Zoning Code.
8. Site plan approval by the Planning Board is required to ensure that the above requirements are met,
and other site plan issues are addressed (including landscaping, lighting, parking lot design, building
aesthetics, and other site improvements).
Be It Further Resolved, that the Zoning Code of the Town of Hamburg be amended as follows: To
amend Local Law #10 of the year 1986 of the Code of the Town of Hamburg Chapter 280 entitled
"Zoning" to provide for a change in the boundary of the Zoning Map whereby the Zoning is changed
from C-1 to C-2 for the property identified by SBL # 160.18-1-9.1.
ATTACHMENTS:
Site 2025 - 094-C101 SITE DEVELOPMENT PLAN (2).pdf
129
Page 130
130
PLOT TIME: 1/13/2026 12:35:53 PM
GENERAL SURVEY NOTES:
PLANNING DATA
ZONING CLASSIFICATION: LOCAL RETAIL BUSINESS DISTRICT (C-1) 1. EXISTING CONDITIONS ARE BASED ON A FIELD SURVEY PREPARED BY
PARCEL #: 160.18 -1 - 9.1 BOWMAN CONSULTING TITLED ALTA/NSPS LAND TITLE SURVEY FOR BRIAD
SEWER DISTRICT: ERIE COUNTY SEWER DISTRICT NO.3 DEVELOPMENT, LLC, DATED OCTOBER 10, 2025.
WATER DISTRICT: ERIE COUNTY WATER AUTHORITY
2. THE SURVEY IS TIED HORIZONTALLY INTO THE NORTH AMERICAN DATUM OF
Architecture
ITEM REQUIRED / ALLOWED PROPOSED 1983 (NAD 83). Eng ine er ing
MAX BUILDING HEIGHT 35 FT. 25 FT. Land Surveying
3. THE SURVEY IS TIED VERTICALLY INTO THE NORTH AMERICAN VERTICAL
MAX LOT COVERAGE 75% 35.2% DATUM OF 1988 (NAVD 88). WWW.GYMODPC.COM
MAXIMUM PRINCIPAL USE AND
15,000 SF. 8,702 SF.
18969 US Route 11
STRUCTURE SIZE Watertown,NY13601
MINIMUM LOT WIDTH 100 FT. > 100 FT. 315.788.3900
MINIMUM FRONT YARD SETBACK 40 FT. 56 FT.
©
MINIMUM SIDE YARD SETBACK 5 FT. / 25 FT. 107 FT. / 54 FT.
MINIMUM REAR YARD SETBACK 10 FT. 210 FT.
IT IS A VIOLATION OF SECTION
NUMBER OF PARKING SPACES IS 7209, SUBDIVISION 2, OF THE
43 PARKING SPACES NEW YORK STATE EDUCATION
PARKING SPACES DETERMINED BY THE TOWN OF LAW FOR ANY PERSON, UNLESS
14 GAS CANOPY SPACES
HAMBURG NY PLANNING BOARD. ACTING UNDER THE DIRECTION
OF A LICENSED PROFESSIONAL
12" H
ENGINEER OR LAND SURVEYOR
N 33° 53' 38" W 0.8' TO ALTER THIS DOCUMENT IN
21.92'
DPE
ANY WAY. IF ALTERED, SUCH
) 2'
EED
109.7
(21.92' DEED ) LICENSEE SHALL AFFIX HIS OR
.72' D S OF
3
T
EN D " (109 AND
70 EXISTING LEGEND HER SEAL AND THE NOTATION
07" W
701
M N 6' G T HE L "ALTERED BY" FOLLOWED BY
U U T °2 ON
S 41 TERLY A5L, PG. 397
701.8
BC 7
N FO DO .1' '
701.9
EXISTING WETLAND HIS OR HER SIGNATURE, DATE
703.3
699.6
O Y 2 .9 E S 87 AND A SPECIFIC DESCRIPTION
702.5
M THW LIBER 5
TC 7701.57
03.60
"N
BC
0
SOU OF ALTERATION.
3
701.5
701.3
01.89
CONCRETE SIDEWALK
2
3
10' M YARD
69 SEAL:
REA ACK
693.3 693.4
4
SETB
694.4 70 20' PERMANENT EASEMENT
INIM
R
5 INLET
69
(B)
MONUMENT GR. 702.72
UM
20
FOUND INV. 698.72 (A) PROPERTY LINE
'
692.4
"NYDOT" INV. 698.67 (B)
1.2'
(A)
693
MINOR CONTOUR LINE
5
N 39° 18' 50
0.5'
70
(N 39° 26' 33
APPROX. LOC.
695.9
20' WIDE PERMANENT
EASEMENT MAJOR CONTOUR LINE
BC 70
693.4
PER REF. #2
705.32
TC 703.66
BC 703.34
6
703.86
69
(NOT REFERENCED IN TITLE REPORT)
703.5
703.4
5
702.6
701.6
.54
691.4 STORM SEWER LINE
" 293' +/- RE
"W
EXISTING OVERHEAD PROJECT NO: 2025-094
PROPOSED 4" DIP MONUMENT
12" HDPE
WATER SERVICE UTILITY LINE SCALE: 1" = 30'
FOUND
293.76'
6
"NYDOT"
70
692.5 EXISTING ELECTRICAL BOX DRAWN BY: CC
F #3)
693.7 695.4
DESIGNED BY: PS
BC 704.59
1
TC 704.89
69 EXISTING TRANSMISSION
697
E
690.8 POLE
ER ONT
LIN
PS
BC 706.95
10 697.3 CHECKED BY:
706.73
705.58
7' M
704.7
' MINIMU
704.1
703.1
YA FR 69825
TY
R
689.3
E YA R D EXISTING UTILITY POLE DATE ISSUED: N/A
RD OM SID
PR OM F
PR W SETBACK
OP
691 EXISTING ELECTRICAL
LI OP EST
YA 10' FR
NE E S 692.3 694.5 697.4 MANHOLE
RT ID
6
R5
70
705 R15
BC 705.34
TC 705.65
Y E INLET
RD
0'
707.04
2
689.5
GR. 706.50 EXISTING GAS MARKER
89
'
6 INV. 702.15 (A)
30'
1
69
INV. 701.95 (B)
707
INLET EXISTING CATCH BASIN
0'
GR. 708.03
R2
691.7
BC 706.32
TC 706.61
R2 INV. 704.33 (A)
707.95
707.41
692 9 0 ' INV. 702.63 (B) SANITARY MANHOLE
69
(B)
15 " HD P E
692.6
15" HDPE
703.9
705.2
(B)
5' AR
(B)
706.0
706.4
689.4
69
3 (B) NYSDOT MONUMNET
M D
(A)
696.4
Y
IN S
APPROX. LOC.
(A)
PROPOSED ASPHALT 9
IM ET
SAN MH. 699.2
U BA
3 PAVEMENT WETLAND MARKER
M
689.0 PER REF. #2 69 N.Y.D.O.T.
6" HDPE
0
8
SI CK
70
70
BC
MAP NO. 288 PROPOSED
D
694
708.17
E
708.55
70
PARCEL 324VENDOR SIGN TRAFFIC SIGN
8.
R2
R2
695.1
35
12'
706
(REF. #3)
0'
5
7'
707
69
7 7
69
690
696
68 BC 708.32
TC 707.81
BC 707.55
688.7
698
688
APPROX. LOC.
708.92
705.2
704.9
708.52
706.6
707.5
708.98
20' WIDE PERMANENT 4 ' 702.1
694.7 R5
PROPOSED LEGEND
699
702
EASEMENT 69
SOUTHWESTERN BLVD (NYS ROUTE 20) AND BIG TREE ROAD
5 '
20' PER REF. #2 R6912
(NOT REFERENCED IN TITLE REPORT) 2-113 BUILDING
689.2
12" HDPE
691.0
TOWN OF HAMBURG, ERIE COUNTY, STATE OF NEW YORK
687.6
PROPOSED CONCRETE 697.4 2 '
70
703 10 3 7 08.
56
CONCRETE
DUMPSTER PAD R 70 BC
70
' 6 96 MONUMENT
9
79 FOUND ASPHALT PAVEMENT
9
. 693.1 INLET
70
7 6 77 GR. 708.54 "NYDOT"
68 INV. 704.09 (A)
JIMMY JOHN'S/
INLET PAVEMENT PAINT
CONCEPT SITE DEVELOPMENT PLAN
705.2
708.5
INV. 703.99 (B)
PROPOSED
+/- 1,799 SF
PROPOSED
+/- 1,387 SF
"W
696.1 702.4
GR. 709.33
PROPOSED
699.4
+/- 4,625 SF
698
DUNKIN
(A)
+/- 891 SF
BWW2GO
CIRCLE K
4 4 INV. 705.88 (A)
QSR
STORMWATER
706.8
'
708 707.6
1 704.1
(B) 12" HDPE INV. 705.13 (B) MANAGEMENT AREA
°0
688.3
(B)
BC 708.55
(A) TC 708.86
709.84
709.70
(A)
692.9 694.3
11
704
12' 30' SETBACK LINE
PROJECT LOCATION: C:\Users\cchawgo\GYMO DPC\2025-094 Circle K Wendy's Jimmy John's Hamburg NY - Documents\04_Engineering\01_Drawings\Site 2025 - 094.dwg
6" HDPE
S
8 MONUMENT
68 690.3 696.5 701.8
703
FOUND WATER SERVICE LINE
PROPOSED STORMWATER "NYDOT"
CIRCLE K/ JIMMY JOHN'S/DUNKIN/BWW2GO
687.1
9
68 MANAGEMENT AREA 1
70
6' FULL HEIGHT CURB
5
709
689.5
70
701.4
BC 709.63
684.3 686.4 2
70 PROPOSED CONCRETE
BC 709.11
TC 709.40
690
168.38'
710.17
710
709.95
18 PAVEMENT SIGN
709.1
709.4
16
707.7
692.2
14' 12'
18'
BIG TREE
694.5 702
R1 DRIVE THROUGH INTERCOM
0'
(N 33° 43' 35" REF #3)
702.4
690.7 9'
R5
ROAD
(VARIABLE WIDTH)
688.1
5'
684.6 R5
'
N 33° 42' 54" W
63' FROM
R
701.0 BOLLARD
697.1 '
698.3 705.4
685 702.4 EAST SIDE
686.4
PROPERTY LINE
37'
692.2 703.5
9 43 PARKING COUNT
PROPOSED FUEL 70
6
BC 709.36
TC 709.72
CANOPY
700.8
BC 709.90
6
68
710.30
709.5
709.5
708.6
689.6
685.5
6
8 698.3
69
69 706.3
710.36
694.1
703.2
0
35' 35'
70
690
687 691.1
710
1 7
687.2 69 70
697.0 CANOPY DRIP LINE
688.4
7 7 01 702.7
INLET
9
69
69
2
701.0 GR. 709.58
709
69 693.1 703.7 INV. 705.38 (A)
R
8 691.0
703
68
BC 710.08
687.7
INV. 705.28 (B)
702
2'
696.2
3 2-103
-6
69 PROPOSED INLET
"
706.3
GR. 710.05
(B)
698
AIR PORT
708.7
699.4
45'
709.3
4 INV. 705.85 (A)
709.6
69 705.3
MONUMENT INV. 705.65 (B)
689 689.3
9 698.8
709.85 709.8
708.1
687.9 700.1 FOUND (A) 10" HDPE
710.61
710.62
5 701.6 "NYDOT" (B)
709.93
6
MONUMENT
706
N.Y.D.O.T. 69
705
MONUMENT
69
(A
688.2
MAP NO. 288 695.3
INLET FOUND TC 709.84 FOUND
) 1
708.8 BC 709.56 "NYDOT"
PARCEL 324 692.4
GR. 704.25 703.5 0.1'
0"
(REF. #3) INLET 697 MONUMENT 0.5' (N 56° 52' 18" REF #3)
SAN MH. INV. 701.05 (A) )
HD
GR. 598.00 699.0 FOUND (N 53° 15 ' 47" RE
PROPOSED F #3 2-108 708.1 TC 709.36
.70
RIM 700.30 INV. 700.25 (B)
PROPOSED N 56° 52' 59" E 95.20' 709.4
P
8'
709
688.8 690.5 INV. 594.60 (A) 0.3' E 186.9
' 28" TANKS 707.9
709
N 53° 16FUEL
E
688 (N 56° 00' 36" 346' +/- REF #3) (SEALED) VENDOR SIGN
688.0 INV. 594.10 (B) 0.1' 30' 709.0
N 56° 01' 17" E 346.17' 707.6 09
FRONT YARD
FRONT YARD
705.5 706.4 9. BC
40' MINIMUM
688.2 702.2
PROPERTY
704.1 705 708.7 70 71
56' FROM
708
SETBACK
699.1 706.37 707.25 0.7
695.6 697.8 700 701.0 708.68
687.9 692.6 698 699 701 R2 ' 705.03 8.98 70 MONUMENT 4
LINE
686.6 9
689.7
694 696 697 701.70 0' R15
703.40 706.32 707.20 708.04 708.65 70 9.0
8 691.2 692 693 695 698.40 700.08 8
68 68 690 1077
691.00
694.06 696.38 703.38 705.00
707.97 7 08 FOUND
UGEL
701.59 .92
687.42 689.68 691.80
696.29 698.38 700.08
TC 704.89 6" HDPE
TC 706.14 TC 707.17 TC 708.49
"NYDOT"
691.78 693.99
TC 699.95 TC 701.48 TC 703.29
BC 702.96
(A) BC 704.58
BC 705.89 BC 706.89 BC 708.18 (A) 6" HDPE 0.2'
687.32 689.59 BC 701.27
TC 696.21 BC 699.64
(B)
(B) 0.5'
(B)
TC 691.65 12" HDPE TC 693.91 BC 695.93
TC 687.24 TC 689.50 (A) BC 693.61 INLET
(A)6" HDPE
BC 689.24 BC 691.32
BC 686.96
GR. 708.50 LAST REVISED: N/A
(B)
INLET INV. 705.40 (A)
GR. 690.01 INV. 704.50 (B) PROGRESS PRINTS ONLY
E
INV. 685.51 (A)
12" HDPE
JANUARY 13, 2026
DP
INV. 685.41 (B)
12" HDPE
SOUTHWESTERN BOULEVARD
"H
DRAWING NO.
12
(S.H. 9269)
GRAPHIC SCALE
INLET
(WIDTH VARIES)
NORTH
BY DATUM
1 inch = 30 ft.
15 0 7.5 15 30 60
C101
Page 131
Town Board of the Town of Hamburg
April 13, 2026 Meeting
4.24. Budget Amendment
RESOLVED, that the Town Board hereby approves a budget amendment to transfer $25,000 from the
General Fund to the Nike Arena Capital Account as follows:
GENERAL FUND (A):
A000.0000.0599.0000 - Appropriated Fund Balance - $25,000
A000.9950.0975.0003 – Interfund Transfers to Capital Fund - $25,000
CAPITAL FUND (H):
H111.0000.5031.0000 – Interfund Transfers from General Fund - $25,000
H111.7185.0281.0000-Capital Construction - $25,000
BE IT FURTHER RESOLVED, that the Town Supervisor and Finance Office are authorized and
directed to make the necessary accounting and budgetary entries to carry out this amendment.
131
Page 132
Town Board of the Town of Hamburg
April 13, 2026 Meeting
4.25. Ice Arena Pro-Shop and Concession Stand RFP
BE IT RESOLVED: the Town Board authorizes the Youth, Recreation and Senior Services Department
to put out a Request for Proposal (RFP) for the operation of the pro-shop and concession stand at the
Hamburg Town Arena. The new contract would be set up for the 2026-2027,2027-2028 seasons with an
option for the 2028 - 2029 season.
ATTACHMENTS:
Ice Rink RFP Concession and Pro Shop updated 4-7-2026.pdf
132
Page 133
COMPANY ___________________________
ADDRESS ___________________________
TOWN OF HAMBURG, NEW YORK
REQUEST FOR PROPOSALS FOR
TOWN OF HAMBURG ICE ARENA
CONCESSION AND PRO SHOP OPERATION
for 2026-2027, 2027-2028, with the option of (2028-2029) with the
opportunity to renegotiate the payment structure for (2028-2029).
Town of Hamburg
6100 South Park Ave., Hamburg NY 14075
133
Page 134
TOWN OF HAMBURG
REQUEST FOR PROPOSALS
Sealed Proposals are hereby requested on the following:
"Town of Hamburg Ice Arena Concession and Pro Shop Operation,” all in accordance with
specifications on file with the Hamburg Town Clerk, Natalie Nitsche, 6100 South Park Avenue,
Hamburg, New York 14075. These specifications may be obtained in the Hamburg Town
Clerk’s office during regular business hours on weekdays (Monday-Friday) from 9:00 a.m. to
5:00 p.m. (local time).
Sealed proposals on the above must be filed and submitted in writing to the Hamburg Town
Clerk, 6100 South Park Avenue, Hamburg, New York 14075, no later than 11:00 a.m. (local
time) on Wednesday May 13th, 2026.
Proposals must be marked " Town of Hamburg Ice Arena Concession and Pro Shop Operation.”
THE TOWN BOARD RESERVES THE RIGHT TO REJECT ALL PROPOSALS AND TO
WAIVE ANY INFORMALITIES.
Dated: Wednesday April 15th, 2026 Natalie Nitsche
Town Clerk
Town of Hamburg
134
Page 135
Invitation
Your firm is hereby invited to submit a proposal for the operation of the Town of
Hamburg’s Ice Arena Concession Stand/Snack Bar and Pro Shop located at 2982 Lakeview
Road, Hamburg, NY 14075. The concession contract includes both a hockey pro shop and a
snack bar.
Introduction
The Town of Hamburg is seeking proposals (RFP) from experienced concessionaires
familiar with the operation of an Ice Hockey Pro Shop and Snack Bar. The Hamburg Town Ice
Arena is a year-round facility that has previously separated the snack bar and pro shop during the
hockey season of mid-September to early April. The concessionaire would be required to be open
for the duration of the season. The selected proposer will provide pro shop amenities and food,
beverage, and/or recreational concession services to arena patrons in a manner that is safe,
professional, environmentally responsible, and consistent with the character of the arena during
the season (Mid-September through Early April).
The concessionaire will also have the option to operate an exterior concession window
during summer months.
This RFP neither commits the Town of Hamburg to select an operator nor reimburse any
costs associated with the preparation or submittal of proposals in this regard. The Town reserves
the right to reject any and all proposals, should it be deemed to be in the best interest of the Town
of Hamburg. The Vendor must be in good standing with the Town of Hamburg at the time of
proposal submission.
Background
The Town of Hamburg Ice Arena is a year-round facility used in the winter for skating
and hockey and in warmer weather for summer camp and sport rentals. The main programs held
at the Ice Arena include Hamburg Hawks hockey, Hilbert College hockey, high school hockey,
Public Skate, Learn to Skate, Skate and Shoot, SABAH (organization for individuals with
disabilities), Summer Day Camp, organized sports rentals (lacrosse, etc.) and private rentals.
Time Frame
The vendor will operate the Pro Shop and Snack Bar from 4 p.m. to 9 p.m. Monday
through Friday and from 8 a.m. to 8 p.m. Saturday and Sunday for the duration of the Fall/Winter
season. The Pro Shop and Snack Bar hours will be subject to change with the approval of the
Youth, Recreation and Senior Services Department on special events such as tournaments,
college and high school hockey games, open skates, etc. Hours of operation are subject to change
upon successful negotiations with the Youth, Recreation and Senior Services Department.
The vendor has the option to operate an exterior concession window during summer
months for events/programs.
135
Page 136
The Town of Hamburg desires a two-season contract (2026-2027, 2027-2028) with an
option for a third season with the opportunity to renegotiate the payment structure (2028-2029).
Financial
The vendor/operator will provide the Town of Hamburg with a pre-determined agreed
upon rental fee. Minimum bid to start at $9,000.00 per season (September 10th – April 10th).
Scope of Work and Operating Responsibilities
The selected proposer will be responsible for operating arena concession/snack bar and arena
pro shop, which includes
Concession/Snack Bar
• Sale of food and non-alcoholic beverages.
• Creation of menu with market pricing suitable for arena patrons.
• Purchase of food, beverages, condiments, napkins, straws, etc. to be sold and used for
serving.
• Operator must supply own concession equipment, and all equipment must be
approved by Hamburg Town Board prior to installation.
Pro Shop
• Skate sharpening.
• Basic equipment services.
• Retail sales of hockey, skating, and related merchandise (tape, laces, apparel, etc.).
• List of services and merchandise at reasonable competitive prices.
• Maintaining the Town of Hamburg’s skate rental inventory with skate sharpening
service twice during each season within the time frame of the contract.
General
• Daily setup, operation, and breakdown.
• Staffing, training, and supervision of employees.
• Maintaining cleanliness of concession area, pro shop, and immediate surroundings.
• Cash registers.
• Purchase of items to be sold.
• Signage such as menu and pricing.
• Only operating inside Pro Shop and Concession/Snack Bar areas (with optional
exterior window).
• Compliance with all health, safety, licensing, permits and insurance requirements
(insurance requirements attached).
• Security Bond.
• Three (3) References.
• Additional ideas to be considered for operation.
136
Page 137
Town of Hamburg Support
• Keys for entry/lock up of concession area and pro shop area.
• Electric, gas and water utilities.
Form of Proposal
Two (2) copies of your proposal are to be submitted. Proposals are to be concise and
specific, directed toward describing your firm’s:
1. a. Proposed concession/snack bar menu with pricing.
b. Proposed pro shop services and retail items with pricing.
2. Business overview, related experience, qualifications and capabilities in providing a
service of this nature.
3. Qualified available management staff to oversee both operations.
4. Commitment to set up and begin service within the listed time frame (to begin as
soon as winning proposal is approved by the Town Board).
5. Specific plans to address all scope of work and operating responsibilities listed above.
6. Proposed seasonal rental fee for the Pro Shop/Snack Bar operations to be paid to the
Town of Hamburg, 6100 South Park Avenue, Hamburg, New York 14075, (minimum
bid $9,000.00). Total winning proposal will be made in one payment (July 1st of
2026-2027, 2027-2028, option 2028-2029).
7. Proof of insurance & licenses (or ability to obtain).
8. The names, addresses and phone numbers of at least three (3) client references for
similar type of projects performed by the firm, preferably in the Western New York
area, are also to be furnished.
9. Any suggested optional items which the potential operator feels would be beneficial
and appropriate to include in the scope of work, should be presented as part of the
proposal.
137
Page 138
Evaluation Procedure
Submissions will not only be evaluated based on overall proposal, but on best value
procurement approach. Bids will be graded on a ten (10) point scale. See rubric listed below:
• 3 points – Price
• 3 points – Operation of Pro Shop services
• 2 points – Concession/creativity of menu
• 1 point – Off season operation of concessions
• 1 point – Installation and operation of vending machines year-round
Proposals are to be received by the Hamburg Town Clerk no later than 11:00 a.m. (local
time) on Wednesday May 13th, 2026. Late submittals will not be accepted and will be returned
unopened.
Award of Contract
The Town of Hamburg has elected to award this contract on the basis of best value
pursuant to Town Code Chapter 48. The award of this contract will be made only to the
responsible bidder whose proposals shall comply with all the provisions required to render it
responsive and provides the best value to the Town. The Town Board reserves the right to reject
any or all proposals if, in its opinion, the best interests of the Town will, thereby, be promoted.
Insurance, Legal and Agreements
Specifications for license to operate the concession/snack bar and pro shop at the Town of
Hamburg Ice Arena for 2026-2027, 2027-2028, with an option for 2028-2029 seasons.
1. The vendor is to file with the Town Clerk a performance bond issued by an incorporated
surety company in the amount of One Thousand ($2000) Dollars.
2. The vendor shall comply with all applicable Federal, State, County and all local statutes,
laws, regulations, and licensing requirements as well as an up-to-date health permit and
shall maintain the property in accordance with such laws and all the regulations.
3. The vendor agrees to operate the Pro Shop and Snack Bar from 4 p.m. to 9 p.m. Monday
through Friday and from 8 a.m. to 8 p.m. Saturday and Sunday, September 10th – April
10th unless the arena is closed by the Town of Hamburg. The Pro Shop and Snack Bar
hours will be subject to change with the approval of the Youth, Recreation and Senior
Services Department on special events such as tournaments, college and high school
hockey games, open skates, etc. Hours of operation are subject to change upon successful
138
Page 139
negotiations with the Youth, Recreation and Senior Services Department.
4. The vendor shall charge reasonably competitive prices for any concessions, services, and
retail sold. For purposes of this agreement, “reasonably competitive prices” shall be
defined as prices that are competitive or reasonably aligned with the fair market pricing
for the sale of similar products at local establishments in the Hamburg, NY area.
5. The vendor shall be solely responsible and shall keep the concession, pro shop and
surrounding areas clean and free of debris, food debris, paper, bottles, and trash
connected with the concession and pro shop and shall dispose of all garbage daily.
6. The vendor shall secure and maintain in force during the term of the contract Workers’
Compensation and New York State Disability Benefits insurance as required by New
York State Law.
7. The vendor shall also secure and maintain the following insurance: See insurance
document attached. All coverages are to be written by a company licensed in New York
and the company should have a Best’s Key rating Guide rating of at least B+.
8. A certificate of the above required insurance providing a minimum of 30 days written
notice of cancellation or non-renewal of such insurance shall be submitted to the Town
Attorney's office, Town Hall, 6100 South Park Avenue, Hamburg, New York 14075, prior
to execution of the lease (see accompanying Certificate of Insurance sample for
reference).
9. Indemnification: Vendor agrees that it shall, to the fullest extent permitted by law, defend,
hold harmless and indemnify including the payment of attorney’s fees and costs, the
Town of Hamburg and any other facility owner, and their respective agents, officers, and
employees, from and against all claims, suits, damages, defense, and other legal costs and
expenses of any kind, arising out of, resulting from, caused by, or in any way related to
the activities and operations of Vendor and/ or use of Town owned or provided facilities.
10. If the vendor is a corporation or LLC, all corporate officers or managers, respectively,
must execute an individual guarantee for all payments due and owing to the Town of
Hamburg under the agreement.
11. The town's insurance requirements are subject to change at the sole discretion of the
Town and its insurance consultants.
139
Page 140
12. The vendor agrees not to subrogate against the Town for damage to vendor’s property
caused by Town employees or its’ representatives.
13. The vendor shall abide by and enforce the following rules and regulations:
a. All space except concession stand and pro shop are reserved for Town use.
b. No beverages should be sold or delivered into containers that are brought by any
patrons. No refreshments are to be dispensed in glass or metal containers.
c. No additions or alterations may be made to the premises temporarily or otherwise,
by the vendor.
d. Vendor cannot sub-contract the sale or distribution of any food/beverage to any
outside entities on the premises.
e. The vendor shall use reasonable and diligent care in using and maintaining the
property and equipment in a condition as good as at present, ordinary wear and
usage expected, and shall deposit with the Town the sum of One Thousand
($1000) Dollars cash, or certified check, as security for said return. If said
property and equipment is returned in a condition as good as at the present,
ordinary wear and usage accepted, said deposit shall be returned to the bidder. If
any property is damaged, such portion of said deposit necessary to repair and/or
replace the damaged property and equipment shall be forfeited to the Town of
Hamburg, but such forfeiture shall in no way prevent or limit the Town of
Hamburg from pursuing any further claims for damages which exceed the amount
of the deposit forfeited.
f. Vendor shall provide all necessary restaurant equipment, in addition to whatever
equipment may now be on the premises owned by the Town of Hamburg.
14. The Town of Hamburg Ice Arena is deemed total smoke-free areas as governed by the
Erie County Anti-Smoking Law. This decision is based on Section 6, Option to Declare
Establishment “Smoke-Free” of the Local Law.
15. The bid price will be for the 2026-2027, 2027-2028, (2028-2029 option) arena seasons; at
the amount specified.
16. Acceptable bids are at the discretion of the vendor and will be reviewed when opened on
May 13th, 2026, at 11:00 a.m. Full payment must be received in one payment by July 1st
of 2026-2027, 2027-2028, option 2028-2029.
17. The successful applicant shall enter into an agreement by June 1st, 2026, with the Town
covering the foregoing terms herein set forth, prior to occupancy.
140
Page 141
18. THE TOWN RESERVES THE RIGHT TO REJECT ALL PROPOSALS, to consider the
reputation of the applicant in making its selection, and to waive any informalities or
minor deviations from the specifications.
19. The Town reserves the right to include the Town of Hamburg Ice Arena Concession as
part of any “pouring rights” contract negotiated for soft drink sales. Vendor must limit
sales to the designated brand(s) if an agreement is in place. Vendor will be required to
check to see if such an agreement is in place by February 1st of each year of the contract.
20. This sheet must be signed and returned with the proposal.
___________________________________
Signature of Applicant
141
Page 142
Insurance Requirements
Instructions pertaining to the Town of Hamburg regarding:
CONTRACTORS’ OR VENDORS’
INSURANCE COVERAGE AND CERTIFICATES
1. GENERAL PROVISIONS
As to all required insurance:
.1 The Vendor shall provide current Certificates of Insurance and accompanying
documents and agrees to obtain a health permit prior to opening as described
herein for the Town’s approval prior to Town’s signing of contract(s).
.2 “Certificate Holder” shall be Town of Hamburg at the address of
6100 South Park Avenue Hamburg, NY 14075.
.3 Coverage must comply with all specifications set forth herein.
.4 All insurance documents must be executed with authorized signatures.
.5 The Vendor’s required liability policies must be endorsed to provide that any Notice
of Cancellation or Notice of Non-Renewal given to the First Named Insured shall
also be given to the Additional Insureds for this project. A copy of such
endorsement(s) must be furnished to the Certificate Holder.
.6 Failure of the Town to object to the Vendor’s failure to furnish a Certificate or other
evidence of the required insurance coverages, object to any defect in such
Certificate or other evidence of coverage, or demand receipt of such Certificate or
other evidence of coverage shall not be deemed a waiver of Vendor’s obligation to
furnish the required insurance coverages described herein. Nothing contained
herein imposes on the Town a duty or obligation to review any evidence of insurance
coverages or issue any formal approval or acceptance of such evidence.
.7 The Vendor’s liability and indemnification of the Town shall not be relieved or
diminished by the Vendor securing insurance coverage in accordance with the
Town’s requirements. Any approval by the Town of such insurance coverage shall not
142
Page 143
be construed as accepting in any way the deficiencies in the Vendor’s insurance
coverage.
.8 In addition to Certificates of Insurance and other documents, the Vendor shall
provide to the Town and other Certificate Holders, on a timely basis, copies of any
subsequently issued endorsement(s) that amend applicable coverages or limits.
.9 When any required insurance shall expire, due to the attainment of a normal
expiration or renewal date, the Vendor shall supply, no later than ten (10) days prior
to such expiration, the Town with Certificates of Insurance and accompanying
documents evidencing continuation of coverage in the same manner, limits of
protection and scope as provided by the previous policy.
.10 The Vendor will assure that any and all subcontractors retained by the Vendor carry
and maintain insurance with reasonably prudent limits and coverage satisfactory to
the Town in light of the work to be performed, written by companies meeting the
same criteria as required in Section 2. LIABILITY INSURANCE, and that the Town is
named additional insured on the subcontractor’s liability policies according to the
same requirements as described in Section 2.1(b).
.11 The Vendor shall disclose to the Owner any deductible or self-insured retentions
applicable to any of the coverages required herein of the Vendor.
.12 The Town reserves the right to modify the requirements herein, including limits,
based on circumstances involved, including but not limited to the nature of the risk
involved, prior experience, insurer, or coverage
143
Page 144
2. LIABILITY INSURANCE
The Vendor agrees to secure and maintain, at the Vendor’s own expense, all insurance
coverage required herein from one or more insurance companies that are licensed to
write such insurance in New York State or are eligible non-admitted insurers, per the
current Excess Line Association of New York’s (ELANY) official list. Insurers must carry
an A.M. Best “Secure” rating of B+ or better. The vendor will secure health permit
annually. The Vendor’s insurance shall include the following, and shall be written with
limits no less than hereinafter specified:
.1 COMMERCIAL GENERAL LIABILITY
(a) Occurrence based Commercial General Liability coverage to include bodily
injury, personal injury, and property damage applicable to ongoing operations
and contractual liability. The coverage limits applicable shall be the greater of
the amounts indicated below or the amounts carried by the VENDOR:
General Aggregate $2,000,000
Products & Comp/Op. Aggregate $2,000,000
Personal & Advertising Injury $1,000,000
Each Occurrence $1,000,000
Fire Damage (any one fire) $ 50,000
Med. Expense (any one person) $ 5,000
(b) Additional Insured: Coverage in Commercial General Liability and Excess
Liability and/or Umbrella Liability policies or coverage sections shall be written
or endorsed so as to apply to the following as additional insured on a primary
and non-contributory basis:
"Town of Hamburg and its employees, authorized volunteers and board
members.”
144
Page 145
The Certificate of Insurance must clearly state how Additional Insured coverage
is achieved in the General Liability and Umbrella/Excess Liability policies.
Certificates of Insurance must show the form numbers that are used to achieve
all of the Additional Insured coverage. A copy of the actual policy language that
affects this coverage in each policy must be provided to the Town with the
Certificate of Insurance.
(c) Waiver of Subrogation: To the fullest extent permitted by applicable state law, a
Waiver of Subrogation Clause shall be added to the General Liability,
Umbrella/Excess Liability, and Workers Compensation policies in favor of the
Town.
.2 AUTOMOBILE LIABILITY INSURANCE
Bodily Injury and Property Damage, coverage for the Vendor as the owner or the
lessee of automobiles, trucks, trailers, self-propelled Vendor’s equipment and all
other owned, hired and non-owned vehicles registered for use on the public highway
and/or used in operations relating to work under contract. The coverage limit
applicable shall be the greater of the amounts indicated below or the amount(s)
carried by the Vendor:
Combined Single Limit $1,000,000
(b) Additional Insured: Coverage in Auto Liability policy or coverage sections shall
be written or endorsed so as to apply to the following as additional insured:
"Town of Hamburg and its employees, authorized volunteers and board
members.”
145
Page 146
.3 EXCESS LIABILITY AND/OR UMBRELLA LIABILITY applicable to Commercial
General and Automobile Liability policies. The Excess Liability and/or Umbrella
Liability coverage limits applicable shall be the greater of the amounts indicated
below or the amounts carried by the Vendor:
Each Occurrence $1,000,000
Aggregate $1,000,000
See Section 2.1(b) above for additional insured requirements applicable to the
Excess Liability and/or Umbrella Liability insurance.
4. WORKERS COMPENSATION AND EMPLOYER’S LIABILITY INSURANCE
Coverage as required by New York State statutory limits. Coverage shall include a
waiver of subrogation in favor of the Town of Hamburg.
5. NEW YORK DISABILITY (NYDBL)
Coverage as required by New York State statutory limits.
146