Southtowns Record

Town Board Regular Meeting Agenda, Mar 23, 2026 — Agenda

Government
Town of Hamburg
Board
Town Board
Meeting
Mar 23, 2026
Kind
Agenda
Topics
Zoning and land use, Water, sewer and drainage, Parks and recreation, Budget and taxes, Public safety, Roads and traffic

Original document

Same meeting

Text · page 32 of 79

Read the whole document on one page (all 79 pages, each with its own heading)

m. Will the proposed action produce noise that will exceed existing ambient noise levels during construction, 9 Yes 9 No
  operation, or both?
If yes:
i. Provide details including sources, time of day and duration:
  _______________________________________________________________________________________________________
  _______________________________________________________________________________________________________
ii. Will the proposed action remove existing natural barriers that could act as a noise barrier or screen?  9 Yes 9 No
  Describe: _________________________________________________________________________________________________
  _________________________________________________________________________________________________________
n. Will the proposed action have outdoor lighting?  9 Yes 9 No
 If yes:
 i. Describe source(s), location(s), height of fixture(s), direction/aim, and proximity to nearest occupied structures:
  _________________________________________________________________________________________________________
  _________________________________________________________________________________________________________
ii. Will proposed action remove existing natural barriers that could act as a light barrier or screen?  9 Yes 9 No
  Describe: _________________________________________________________________________________________________
  _________________________________________________________________________________________________________
o. Does the proposed action have the potential to produce odors for more than one hour per day?  9 Yes 9 No
  If Yes, describe possible sources, potential frequency and duration of odor emissions, and proximity to nearest
  occupied structures: ______________________________________________________________________________________
  ________________________________________________________________________________________________________
  ________________________________________________________________________________________________________

p. Will the proposed action include any bulk storage of petroleum (combined capacity of over 1,100 gallons)  9 Yes 9 No
  or chemical products 185 gallons in above ground storage or any amount in underground storage?
If Yes:
  i. Product(s) to be stored ______________________________________________________________________________________
 ii. Volume(s) ______ per unit time ___________ (e.g., month, year)
iii. Generally, describe the proposed storage facilities:________________________________________________________________
  ________________________________________________________________________________________________________
q. Will the proposed action (commercial, industrial and recreational projects only) use pesticides (i.e., herbicides,  9 Yes 9 No
  insecticides) during construction or operation?
If Yes:
  i. Describe proposed treatment(s):
  ________________________________________________________________________________________________________
  ________________________________________________________________________________________________________
  ________________________________________________________________________________________________________
  ________________________________________________________________________________________________________
  ii. Will the proposed action use Integrated Pest Management Practices?  9 Yes 9 No
r. Will the proposed action (commercial or industrial projects only) involve or require the management or disposal 9 Yes 9 No
  of solid waste (excluding hazardous materials)?
If Yes:
  i. Describe any solid waste(s) to be generated during construction or operation of the facility:
  • Construction: ____________________ tons per ________________ (unit of time)
  • Operation : ____________________ tons per ________________ (unit of time)
  ii. Describe any proposals for on-site minimization, recycling or reuse of materials to avoid disposal as solid waste:
  • Construction: ________________________________________________________________________________________
  ____________________________________________________________________________________________________
  • Operation: __________________________________________________________________________________________
  ____________________________________________________________________________________________________
iii. Proposed disposal methods/facilities for solid waste generated on-site:
  • Construction: ________________________________________________________________________________________
  ____________________________________________________________________________________________________
  • Operation: __________________________________________________________________________________________
  ____________________________________________________________________________________________________

  Page 8 of 13

  32