  Project : 2026 Amended Hamburg LWRP Rezonings (Camp Road an
  Date : 3/23/26

  Full Environmental Assessment Form
  Part 3 - Evaluation of the Magnitude and Importance of Project Impacts
  and
  Determination of Significance

 Part 3 provides the reasons in support of the determination of significance. The lead agency must complete Part 3 for every question
 in Part 2 where the impact has been identified as potentially moderate to large or where there is a need to explain why a particular
 element of the proposed action will not, or may, result in a significant adverse environmental impact.

 Based on the analysis in Part 3, the lead agency must decide whether to require an environmental impact statement to further assess
 the proposed action or whether available information is sufficient for the lead agency to conclude that the proposed action will not
 have a significant adverse environmental impact. By completing the certification on the next page, the lead agency can complete its
 determination of significance.

 Reasons Supporting This Determination:
 To complete this section:
  • Identify the impact based on the Part 2 responses and describe its magnitude. Magnitude considers factors such as severity,
  size or extent of an impact.
  • Assess the importance of the impact. Importance relates to the geographic scope, duration, probability of the impact
  occurring, number of people affected by the impact and any additional environmental consequences if the impact were to
  occur.
  • The assessment should take into consideration any design element or project changes.
  • Repeat this process for each Part 2 question where the impact has been identified as potentially moderate to large or where
  there is a need to explain why a particular element of the proposed action will not, or may, result in a significant adverse
  environmental impact.
  • Provide the reason(s) why the impact may, or will not, result in a significant adverse environmental impact
  • For Conditional Negative Declarations identify the specific condition(s) imposed that will modify the proposed action so that
  no significant adverse environmental impacts will result.
  • Attach additional sheets, as needed.
Part 2 of the FEAF identified no moderate to large environmental impacts and these rezonings presently include no proposals for any construction. The
rezonings are being done in accordance with Section V of the Town's Draft 2025 Local Waterfront Revitalization Program.

  Determination of Significance - Type 1 and Unlisted Actions
 SEQR Status:  †
  ✔ Type 1  † Unlisted

 Identify portions of EAF completed for this Project: †
  ✔ Part 1  †
  ✔ Part 2  †
  ✔ Part 3  48