Text · page 110 of 280
Read the whole document on one page (all 280 pages, each with its own heading)
CoolToppers® 154397 CoolToppers, Single Post Shade Parts List Installation Instructions Part# Description Qty. 1) Dig footing hole as shown. 152833 Umbrella Ext. Arm Weldt., Specify Color......................4 153560 Clamp, Specify Color.....................................................2 2) Place post in footing hole. With post braced plumb pour concrete 153663 Brace (Installation & Removal), Specify Color.............4 footing. NOTE: Allow concrete footing to cure for a minimum of 72 154136 Post, Specify Color.........................................................1 hours before proceeding. 210962 LSI Shade 12x12 Cooltopper .......................................1 3) Attach clamps to post at height shown using 3/8” x 1 1/8” BHCS w/pin 175824 Single Post Shade Hardware Package ......................1 with 3/8” SAE flat washers and 3/8” standard hex nuts with 3/8” SAE flat 100322 1 /2” Standard Hex Nut, SST...........................................8 washers. Refer to the Upper Arm Attachment Detail. NOTE: Orientate 100323 5 /8” Standard Hex Nut, SST............................................8 clamp flanges in the direction you want extension arms to face. 100327 3 /8” Standard Hex Nut, SST............................................8 100365 3 /8” SAE Flat Washer, SST.............................................16 4) Lift extension arm into position and attach the top bolt only to clamp 100366 5 /8” Flat Washer, SST......................................................8 flange, using 5/8” x 1 1/2” BHCS w/pin with 5/8” flat washer and 5/8” 175652 5 /8” Lock Washer, SST....................................................8 standard hex nut with 5/8” lock washer. Attach remaining extension 127547 3 /8” x 1 1/8” BHCS w/Pin, SST........................................8 arms following the same sequence. Refer to the Upper Arm Attachment 127551 5 /8” x 1 1/2” BHCS w/Pin, SST........................................8 Detail. NOTE: Lightly tighten bolts, so arms move freely up and down. For ease of installation a 12’-16’ ladder or bucket lift is recommended. 5) Lift extension arm up and attach temporary brace to clamp flange and Specifications extension arm using 1/2” standard hex nuts. Attach temporary braces to remaining extension arms following the same sequence. Refer to CoolToppers the Brace Attachment Detail. Shade Top: High-density polyethylene with ultra violet additives. All corners to be strengthened with 16 oz. non-tear 6) Place the shade over the extension arms and attach each corner to vinyl material. Protective webbing is sewn into all extension arm pin. areas where steel cable enters/exits cloth pockets. Live loads 20 psf. Wind design speed withstands 7) Remove temporary braces from extension arms and clamps. NOTE: up to 90 mph. Uplift 19 psf. Snow loads 5 psf. Tear Retain temporary braces for future use. strength warp 221 lb. and weft 463 lb.. Burst strength 38 PSIA. 8) Simultaneously pull the arms down and bolt the remaining hole in the arm to post flange using 5/8” x 1 1/2” BHCS w/pin with 5/8” flat Extension Arms: Weldment comprised of 2.875” O.D. RS-40 (.149” - .182”) galvanized steel tubing, 1/4” steel plate and 1/4” washers and 5/8” standard hex nuts with 5/8” lock washers. Refer to the diameter carbon steel J-hooks. Finish: ProShield®, Lower Arm Attachment Detail. Final tighten hardware. NOTE: When color specified. CoolToppers shade top is properly tensioned, it should be difficult to insert fingers between fabric and top of post. To increase tension to Clamp: Weldment comprised of 1/4” x 3” HRPO flat steel and 1/4” HRPO steel plate. Finish: ProShield, color shade top, loosen clamp fasteners and pull down on extension arms specified. and clamps. Retighten clamp fasteners. CoolToppers Post: Weldment comprised of 5” O.D. x 11 GA (.120”) 9) Thread cable along perimeter of fabric. galvanized steel tubing and 1/4” steel plate. Finish: ProShield, color specified 10) Cable should lay on top of fabric at the corners. Pull cable tight by hand and attach with cable clamp provided. Refer to the Cable Clamp Fasteners: Primary fasteners shall be socketed and pinned tam- Attachment Detail. perproof in design, stainless steel (SST) per ASTM F 879 unless otherwise indicated (see specific product installation/specifications). Installation Time: Approx. 10 Hours Actual Size: 12’ (3,65 m) x 12’ (3,65 m) Concrete: 9.5 cu. ft. Weight: 266 lbs. ECO 0110949 Document 35525200 replaces 30846900. Update instructions steps and time. Page 5 Page 110 of 280